ITEA 2012 Investing in the Future of Test. Mr. Chris Paust Deputy Program Manager Central Test and Evaluation Investment Program

Size: px
Start display at page:

Download "ITEA 2012 Investing in the Future of Test. Mr. Chris Paust Deputy Program Manager Central Test and Evaluation Investment Program"

Transcription

1 ITEA 2012 Investing in the Future of Test Mr. Chris Paust Deputy Program Manager Central Test and Evaluation Investment Program 1

2 DoD Cost of Testing A $10B Enterprise *Then Year Dollars ($K) 2

3 TRMC Investment Programs T&E/S&T CTEIP JMETC Established in FY2002 Matures/develops test technologies for transition to CTEIP and Services 6.3 RDT&E funds ~$100M / year 80 active projects in 8 test technology areas Electronic Warfare Directed Energy Cyberspace Netcentric Systems High Speed Systems Unmanned Systems Advanced Instrumentation Spectrum Efficiencies Established in FY1991 Develops or improves test capabilities that have multi-service utility 6.4 RDT&E funds ~$150M / year 43 current projects 19 projects developing core Joint capabilities 13 projects improving threat representations used in testing 11 projects addressing nearterm OT shortfalls Established in FY2007 Provides corporate infrastructure for distributed Joint testing 6.5 RDT&E funds ~$20M / year 67 current sites Expanding to 77 sites Maintains Network connections Security agreements Integration software Interface definitions Distributed test tools Reuse repository 3 3

4 CTEIP Criteria Support multi-service/agency T&E need Promote interoperability and standardization across DoD Not duplicate existing capability Developmental (not procurement) Technology Readiness Level 6 or better Executable risk (technical, cost, and schedule) Service/Agency life-cycle ownership agreements 4

5 Cost to Achieve T&E/S&T Program CTEIP Transitioning Technology to Capability Technology Readiness Levels TRL 9 TRL 8 TRL 7 TRL 6 TRL 5 TRL 4 TRL 3 TRL 2 TRL 1 Actual system 'flight proven' through successful mission operations Actual system completed and 'flight qualified' through test and demonstration System prototype demonstration in an operational environment System/subsystem model or prototype demonstration in a relevant environment Component and/or breadboard validation in relevant environment Component and/or breadboard validation in laboratory environment Analytical and experimental critical function and/or characteristic proof of concept Technology concept and/or application formulated Basic principles observed and reported 5

6 CTEIP Central T&E Investment Program Mission: Develop or Improve Major Test Capabilities that have Multi-Service Utility Initiated DEPSECDEF 9 November 1988 Established in FY91 by Congress 6.4 RDT&E funds Purpose Have multi-service utility Be developmental Be non-procurement 43 Active Projects T&E Master Plan (TEMP) References MILSATCOM Atmospheric Scintillation Simulator AEHF survivability and effectiveness testing in realistic atmospheric environments Ground Mounted Seeker Simulation Advanced open-air SAM simulator to support IDECM Block IV effectiveness testing Prec Tgt Sig - Performance Mover (PTS-RPM) Radar reflective/mobile tgts to support Gray Eagle UAS testing Threat Systems Project (TSP) 1-2 year requirement horizon EMD of target capabilities Address shortfalls in threat systems representation Coordinated with DOT&E $3-5M/year Joint Improvement & Modernization (JIM) 3-5 year requirement horizon EMD of Major Test Capabilities Must address joint requirements Services & Agencies budget for O&M over Life-Cycle of delivered capabilities $ M/year Resource Enhancement Project (REP) 1-2 year requirement horizon EMD of instrumentation needed to address an emergent requirement Must address OT shortfalls Coordinated with DOT&E $18-20M/year 11 TSP, 19 JIM, 13 REP = 43 Projects 6

7 Funding By Test Resource Area 1 Project 6 Projects 3 Projects 10 Projects 13 Projects 14 Projects 7

8 Where is the current focus? Accurate TSPI (Time Space Positioning Information) Precision tracking capability for high-dynamic aircraft Safe Test of Large Footprint Weapons Miniature, low power, modular flight termination system for small high dynamic weapons Infrared Countermeasure Testing Realistic representations of IR missile threats to test IRCM systems-under-test Spectrum Efficiencies Advancing efficiency of aeronautical telemetry at Open Air Test Ranges 8

9 Accurate Time Space Position Information (TSPI) Drivers Program Example Common Range Integrated Instrumentation System (CRIIS) - First real-time, highprecision (sub-meter) TSPI range system Adds 2 new internal mount configurations for F-22, F-15, F-18, and F-35 New high throughput ground station for Army, Navy & AF ranges Challenge Goal Field airborne capability starting in 2014 Replaces obsolete ARDS (pod only) system fielded for 25 years on 10 MRTFB ranges, training venues, foreign military end-users GPS ARDS Provide precise Ground Truth TSPI for high accuracy future Systems Under Test (SUT) CRIIS Development Status- Successes Successfully completed Preliminary Design Review in FY11 and on-track for Critical Design Review in FY12 Flight testing to start in FY13 9

10 Safe Realistic Testing of Large Footprint Weapons Drivers Program Example Subminiature Flight Safety System (SFSS) Leverages completed CTEIP projects: Joint Advanced Missile Instrumentation (JAMI) provides GPS-based TSPI and real time post flight data processing Enhanced Flight Termination System (EFTS) provides new digital and encrypted flight termination link Challenge Longer range (large footprint) of new missiles necessitates the use of flight termination systems for flight safety Limited unused space inside modern missiles requires flight termination systems to be subminiature in size (~18 inch 3 vs. ~96 inch 3 ) Goals More realistic operational test of long range weapons- eliminate range safety constraints Reconfigurable, modular, low power design suitable for high dynamic environments Demonstrate on multiple ranges in FY15 Development Status- Successes Completed Preliminary Design Review. Identified JASSM as initial customer with integration contract award in late FY12 Detailed design and testing in FY12/13 10

11 Drivers Advanced IR Missiles Advanced IRCM Systems MWS DECLARE Infra-Red Countermeasure (IRCM) Testing HANDOFF SUSTAIN & TRACK Challenge Laser Jammer MISS LASER JAM and/or FLARES Flares Not feasible to fire missiles at manned aircraft to test IRCM system effectiveness Present IRCM system-under-test with a realistic representation of an incoming missile Ground Based (JMITS) Missile Simulators Airborne (TAPS) Program Examples Ground Based Missile Simulators JMITS - Joint Mobile IRCM Test System (Fielded) MSALTS- Multi-Spectral Sea and Land Target Simulator Airborne Threat Missile Simulator TAPS - Towed Airborne Plume Simulator (Fielded) Installed System Environments JDIGS - Joint Distributed IRCM Ground Test System Missile Signal Processors in the Loop (SPIL) Development Status -Successes JMITS upgraded with Quantum Cascade Laser to achieve higher power in red band MSALTS completed Preliminary Design Review with IOC planned for FY14 JDIGS completed Risk Reduction Demonstrations and Preliminary Design Reviews in 2011 Block A planned IOC in FY14 Block B low TRL components in technology maturity phase under T&E/S&T Program IRCM Test Resource Requirements Study Update Identifying urgent Hostile Fire Indicator testing needs 11

12 Spectrum Efficient Technology Test Capability Driver Spectrum and Data Rates Trends Challenge Develop a Range Telemetry capability that: Provides more efficient/effective ways to use available spectrum Reduces test and re-test time by fixing data drop-outs Enables selective data acquisition during tests Program Example Integrated Network Enhanced Telemetry (inet) Block 1 Project Enhances current 1-way Serial Streaming Telemetry (SST) systems with a 2-way network capability Leverages Service and TRMC initiatives to develop C-band spectrum for downlink Leverages T&E/S&T projects addressing: 1) network handoffs, 2) multi-path mitigation, and 3) forward error correction Goal Test inet Block 1 capability at Edwards Air Force Base and Patuxent River Naval Air Station by FY14 Development Status- Successes Using multiple suppliers for components. Ground testing at the Southwest Research Institute (SwRI) System Integration Laboratory Successfully completed Preliminary Design Review 12

13 What does the future have in store? Cyberspace & Network Centric Systems Technologies and capabilities to emulate, visualize, and assess our abilities to defend cyberspace Unmanned Autonomous Systems Technologies and capabilities to test interoperability and effectiveness of unmanned systems Electronic Warfare Testing Capability to simulate Electronic Attack of red systems and evaluate effectiveness of blue Electronic Protection systems Testing in Urban Environments A robust, realistic environment to test mission effectiveness and interoperability of systems under test (to include electromagnetic effects) 13

14 Net-Centric Warfare Testing Drivers Joint service test & training exercises are increasing in frequency and complexity Testing of Net Enabled Weapons Interoperability testing of systems of systems. T&E must exploit networks,e.g., the Global Information Grid Distributed Live, Virtual and Constructive Testing Challenge Program Example Interoperability Test and Evaluation Capability (InterTEC) Provides the products to: Construct, control, instrument, capture joint C4ISR data Stimulate and analyze an operationally relevant distributed test environment Perform post-event analysis Support interoperability certification Goal Field full capability (Spiral 3 Release 3) and transition support to JMETC by end of FY13 Development Status-Successes Spiral 3 (Release 2) System Acceptance Testing (SAT) completed in November 2011 Successfully conducted Cyber T&E event at Eglin AFB in conjunction with SAT. Project completing sustainment planning FY12 Resolve battle space interoperability problems before networked systems are brought to war 14

15 T&E for Unmanned Aerial Systems Drivers Challenge Develop a set of interoperable Army, Navy, and Air Force ground test simulators that support: Program of Record test schedules & requirements: e.g. Gray Eagle, Shadow, BAMS, & Global Hawk Simulated testing in the National Airspace (NAS) OSD Unmanned Systems Integrated Roadmap FY Program Example Joint Unmanned Aerial System Mission Environment Project Airspace Integration test UAS safety cases, collision avoidance and sense and avoid payloads Manned-Unmanned Integration test UAS control and handoff procedures Networking and Interoperability STANAG compliance, data links and beyond line of sight communications Goal Field initial Block 1 capability at Patuxent River in late FY13. Full fielding through Block 3 at Redstone Arsenal and Wright Patterson AFB by FY16. Development Status- Successes Successful completed Acquisition and Affordability Review (MS-I) in Jan 2012 Preliminary Design Reviews to be held Apr 12 15

16 Electronic Warfare Testing Drivers Program Examples Next Generation EW Environment Generator (NEWEG) project Block A: A multi-axis jammer test capability for Next Generation Jammer (NGJ) Block B: High fidelity EW T&E capabilities at ACETEF at Pax River, MD Synthetic Battlefield Emitter Systems (SBES): Provide realistic open air Red/Blue network communications environment Challenge Provide high fidelity ground testing of new multi-axis jammer (Next Generation Jammer) Provide high fidelity EW simulation (in a ground test facility) closer to flight test reality than current ISTF including: The capability to test increased detection and processing capabilities of U.S. EW systems Better models to address platform motion, direction finding, modulation, environment, and threats Growth potential in testing UAV Sense & Avoid Goal Field NEWEG Block A in FY13 to support NGJ source selection Development Status-Successes Completed Tri-Service Electronic Warfare Test Capabilities Study (TEWTCS) as foundation for NEWEG project Successfully completed Milestone I for NEWEG Block A in February 2012 Started Tri-Service Signals Library Study as foundation to start of SBES project in FY13 16

17 Urban Environment Testing Drivers Program Example Challenge Develop test capabilities that measure both the effects of Urban Environment (UE) on systems under test (SUT) and SUT interactions in UE Technical performance Operational effectiveness Suitability and survivability Joint Urban Test Capability (JUTC) Project FY2010 New Start Addresses Critical Capability Gap in DoD Strategic Plan for T&E Resources Leverage results of Urban Environment Test Capability Study Leverage S&T investments in advanced instrumentation Goal Develop robust, realistic, technically relevant, urban test environment: Accurate physical, electromagnetic and population effects Test-Quality Instrumentation and Data Collection Development Status Completed Test Capability Requirements Document (TCRD) Expected to enter EMD in FY12 17

18 Summary DoD budget realities will likely shrink available T&E funding over the next decade Department is looking at $500B reduction over the next 5 years Testing accounts for 1-2% of system acquisition costs But that s still a $10B enterprise! We must manage it efficiently! Demands from the T&E community have never been greater Data volume----data rates----data fusion----data Analysis With limited/decreasing resources, we must get more efficient Test Technology investment and transition Test Capability investment Shared use of resources A partnership with the Services providing essential T&E capabilities 18

19 Contact Information Mr. Christopher Paust Test Resource Management Center Deputy Program Manager, CTEIP

Gerry Christeson Test Resource Management Center 20 October 2010

Gerry Christeson Test Resource Management Center 20 October 2010 Building Next Generation Range Capabilities Central Test and Evaluation Investment Program (CTEIP) Gerry Christeson Test Resource Management Center 20 October 2010 1 Test Resource Management Center (TRMC)

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2013 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2013 OCO COST ($ in Millions) FY 2011 FY 2012 FY 2013 Base FY 2013 OCO FY 2013 Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total Program Element 157.971 156.297 144.109-144.109 140.097 141.038

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2012 OCO COST ($ in Millions) FY 2010 FY 2011 FY 2012 Base FY 2012 OCO FY 2012 Total FY 2013 FY 2014 FY 2015 FY 2016 Cost To Complete Total Cost Total Program Element 160.351 162.286 140.231-140.231 151.521 147.426

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2011 Total Estimate. FY 2011 OCO Estimate COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 Cost To Complete Program Element 143.612 160.959 162.286 0.000 162.286 165.007 158.842 156.055 157.994 Continuing Continuing

More information

Oversight of DoD Test and Evaluation (T&E) Resources

Oversight of DoD Test and Evaluation (T&E) Resources Oversight of DoD Test and Evaluation (T&E) Resources Topics Test Resource Management Center (TRMC) Major Range and Test Facility Base (MRTFB) Test Range Issues/Concerns Summary 2 Test Resource Management

More information

Common Range Integrated Instrumentation System (CRIIS)

Common Range Integrated Instrumentation System (CRIIS) Common Range Integrated Instrumentation System (CRIIS) National Defense Industrial Association 50 th Annual Targets, UAVs & Range Operations Symposium & Exhibition CRIIS Program Overview October 2012 Ms.

More information

Common Range Integrated Instrumentation System (CRIIS)

Common Range Integrated Instrumentation System (CRIIS) Common Range Integrated Instrumentation System (CRIIS) National Defense Industrial Association 49 th Annual Targets, UAVs & Range Operations Symposium & Exhibition CRIIS Program Overview October 2011 Mr.

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force Date: February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 3: Advanced Development (ATD) COST ($ in Millions) Prior

More information

The DoD T&E/S&T Program

The DoD T&E/S&T Program The DoD T&E/S&T Program George Rumford Program Manager Test Resource Management Center Test & Evaluation / Science & Technology Program (TRMC, T&E/S&T) NDIA 11 TH Annual Science & Engineering Technology

More information

Common Range Integrated Instrumentation System (CRIIS)

Common Range Integrated Instrumentation System (CRIIS) Common Range Integrated Instrumentation System (CRIIS) National Defense Industrial Association 48 th Annual Targets, UAVs & Range Operations Symposium & Exhibition CRIIS Program Overview October 2010 Mr.

More information

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit)

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) PE NUMBER: 0604256F PE TITLE: Threat Simulator Development RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) COST ($ In Thousands) FY 1998 Actual FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005

More information

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 7 R-1 Line #9

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 7 R-1 Line #9 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Army Date: March 2014 2040:, Development, Test & Evaluation, Army / BA 2: Applied COST ($ in Millions) Prior Years FY 2013 FY 2014 FY 2015 Base FY

More information

17 th ITEA Engineering Workshop: System-of-Systems in a 3rd Offset Environment: Way Forward

17 th ITEA Engineering Workshop: System-of-Systems in a 3rd Offset Environment: Way Forward 17 th ITEA Engineering Workshop: System-of-Systems in a 3rd Offset Environment: Way Forward Mr. Paul D. Mann (Acting) Principal Deputy Director Test Resource Management Center January 26, 2017 1 2 TRMC

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Requirements Analysis and Maturation. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Requirements Analysis and Maturation. FY 2011 Total Estimate. FY 2011 OCO Estimate Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Air Force DATE: February 2010 COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 To Complete Program Element 0.000 35.533

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force Date: February 2015 3600: Research,, Test & Evaluation, Air Force / BA 6: RDT&E Management Support COST ($ in Millions) Prior Years FY 2014

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 13 R-1 Line #68

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 13 R-1 Line #68 Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 5: System Development & Demonstration (SDD) COST ($ in Millions)

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 213 Army DATE: February 212 24: Research, Development, Test & Evaluation, Army COST ($ in Millions) FY 211 FY 212 FY 213 Base PE 64256A: THREAT SIMULATOR

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army Date: February 2015 2040: Research, Development, Test & Evaluation, Army / BA 6: RDT&E Management Support COST ($ in Millions) Prior Years FY

More information

UNCLASSIFIED. UNCLASSIFIED R-1 Line Item No. 2 Page 1 of 9

UNCLASSIFIED. UNCLASSIFIED R-1 Line Item No. 2 Page 1 of 9 Exhibit R-2, RDT&E Project Justification February 2006 OPERATIONAL TEST AND EVALUATION, DEFENSE (0460) BUDGET ACTIVITY SIX CENTRAL TEST AND EVALUATION INVESTMENT PROGRAM ELEMENT (PE) 0604940D8Z Cost ($

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Air Force DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total

More information

Naval Unmanned Combat Air Vehicle

Naval Unmanned Combat Air Vehicle Naval Unmanned Combat Air Vehicle Advanced Technology Program TTO Tactical Technology Office Dr. William Scheuren DARPA/TTO wscheuren@darpa.mil (703) 696-2321 UCAV-N Vision ❶ Revolutionary New Ship-based

More information

FIGHTER DATA LINK (FDL)

FIGHTER DATA LINK (FDL) FIGHTER DATA LINK (FDL) Joint ACAT ID Program (Navy Lead) Prime Contractor Total Number of Systems: 685 Boeing Platform Integration Total Program Cost (TY$): $180M Data Link Solutions FDL Terminal Average

More information

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 10 R-1 Line #10

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 10 R-1 Line #10 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Army Date: March 2014 2040: Research, Development, Test & Evaluation, Army / BA 2: Applied Research COST ($ in Millions) Prior Years FY 2013 FY 2014

More information

Prepared for Milestone A Decision

Prepared for Milestone A Decision Test and Evaluation Master Plan For the Self-Propelled Artillery Weapon (SPAW) Prepared for Milestone A Decision Approval Authority: ATEC, TACOM, DASD(DT&E), DOT&E Milestone Decision Authority: US Army

More information

Test and Evaluation/ Science and Technology (T&E/S&T) Program

Test and Evaluation/ Science and Technology (T&E/S&T) Program Test and Evaluation/ Science and Technology (T&E/S&T) Program 8th Annual Science & Engineering Technology Conference/DoD Technology Exposition April 17-19, 19, 2007 Mr. Derrick Hinton T&E/S&T Program Manager

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Major T&E Investment. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Major T&E Investment. FY 2011 Total Estimate. FY 2011 OCO Estimate Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Air Force DATE: February 2010 COST ($ in Millions) FY 2009 Actual FY 2010 Air Force Page 1 of 12 FY 2012 FY 2013 FY 2014 FY 2015 Cost To Complete Program

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #86

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #86 Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 5: System Development & Demonstration (SDD) COST ($ in Millions)

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Air Force DATE: April 2013 COST ($ in Millions) # ## FY 2015 FY 2016 FY 2017 FY 2018 To Program Element - 16.397 1.975 1.971-1.971 1.990 1.989 2.023

More information

UNCLASSIFIED. UNCLASSIFIED R-1 Line Item No. 3 Page 1 of 15

UNCLASSIFIED. UNCLASSIFIED R-1 Line Item No. 3 Page 1 of 15 Exhibit R-2, RDT&E Project Justification May 2009 OPERATIONAL TEST AND EVALUATION, DEFENSE (0460) BUDGET ACTIVITY 6 (RDT&E MANAGEMENT SUPPORT) OPERATIONAL TEST ACTIVITIES AND ANALYSES (OT&A) PROGRAM ELEMENT

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2013 United States Special Operations Command DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 Cost

More information

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED UNCLASSIFIED EXHIBIT R-2, RDT&E Budget Item Justification APPROPRIATION/BUDGET ACTIVITY R-1 ITEM NOMENCLATURE RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-6 0604759N Major T & E Investment Prior Total COST ($

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Army DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total Program

More information

Office of the Under Secretary of Defense for Acquisition, Technology, and Logistics

Office of the Under Secretary of Defense for Acquisition, Technology, and Logistics REPORT ON THE DETERMINATION OF UNACCEPTABLE RISK TO NATIONAL SECURITY FROM A PROPOSED COMMERCIAL WIND TURBINE PROJECT IN THE VICINITY OF NAVAL AIR STATION PATUXENT RIVER AND THE ATLANTIC TEST RANGE Pursuant

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Office of the Secretary Of Defense Date: February 2015 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 6: RDT&E Management Support

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army Date: February 2015 2040: Research, Development, Test & Evaluation, Army / BA 3: Advanced Development (ATD) COST ($ in Millions) Prior Years FY

More information

UNCLASSIFIED UNCLASSIFIED. EXHIBIT R-2, RDT&E Budget Item Justification February 2007 RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-4

UNCLASSIFIED UNCLASSIFIED. EXHIBIT R-2, RDT&E Budget Item Justification February 2007 RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-4 EXHIBIT R-2, RDT&E Budget Item Justification APPROPRIATION/BUDGET ACTIVITY R-1 ITEM NOMENCLATURE RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-4 0604272N, TADIRCM COST ($ in Millions) FY 2006 FY 2007

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Navy DATE: April 2013 COST ($ in Millions) All Prior FY 2014 Years FY 2012 FY 2013 # Base FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 213 Navy DATE: February 212 COST ($ in Millions) FY 211 FY 212 FY 214 FY 215 FY 216 FY 217 To Complete Program Element 25.229.872.863 7.6 8.463.874.876.891.96

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #98

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #98 COST ($ in Millions) Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 FY 2015 OCO # Total FY 2016 FY 2017 FY 2018 FY 2019 Air Force Page 1 of 8 R-1 Line #98 Cost To Complete Total Program Element - 33.968

More information

PROGRAM ELEMENT TITLE: Airborne Reconnaissance Advanced Development (ARAD)

PROGRAM ELEMENT TITLE: Airborne Reconnaissance Advanced Development (ARAD) EXHIBIT R-2, FY 2001 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET BUDGET ACTIVITY: 7 PROGRAM ELEMENT: 0305206N PROGRAM ELEMENT TITLE: Airborne Reconnaissance Advanced Development (ARAD) (U) COST: (Dollars in

More information

Detect, Deny, Disrupt, Degrade and Evade Lethal Threats. Advanced Survivability Suite Solutions for Mission Success

Detect, Deny, Disrupt, Degrade and Evade Lethal Threats. Advanced Survivability Suite Solutions for Mission Success Detect, Deny, Disrupt, Degrade and Evade Lethal Threats Advanced Survivability Suite Solutions for Mission Success Countering Smart and Adaptive Threats Military pilots and aircrews must be prepared to

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Initial Operational Test & Evaluation FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Initial Operational Test & Evaluation FY 2012 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Air Force DATE: February 2011 COST ($ in Millions) FY 2013 FY 2014 FY 2015 FY 2016 Cost To Complete Cost Program Element 25.368 20.665 17.767-17.767

More information

Rapid Innovation Fund (RIF) Program

Rapid Innovation Fund (RIF) Program Rapid Innovation Fund (RIF) Program Cyber Security Workshop January 2015 Dan Cundiff Deputy Director, Comparative Technology Office OASD (R&E) Emerging Capabilities & Prototyping E-mail: thomas.d.cundiff.civ@mail.mil

More information

Subj: ELECTRONIC WARFARE DATA AND REPROGRAMMABLE LIBRARY SUPPORT PROGRAM

Subj: ELECTRONIC WARFARE DATA AND REPROGRAMMABLE LIBRARY SUPPORT PROGRAM DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON, DC 20350-2000 OPNAVINST 3430.23C N2/N6 OPNAV INSTRUCTION 3430.23C From: Chief of Naval Operations Subj: ELECTRONIC

More information

Headquarters U.S. Air Force

Headquarters U.S. Air Force Headquarters U.S. Air Force Presented to the National Defense Industrial Association (DoD Technology Exposition) Mr. Jim Engle Deputy Assistant Secretary (Science, Technology & Engineering) 6 March 2003

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army Date: February 2015 2040: Research, Development, Test & Evaluation, Army / BA 4: Advanced Component Development & Prototypes (ACD&P) COST ($ in

More information

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Distributed Common Ground/Surface Systems. Prior Years FY 2013 FY 2014 FY 2015

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Distributed Common Ground/Surface Systems. Prior Years FY 2013 FY 2014 FY 2015 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force Date: March 2014 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) Prior

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Missile Defense Agency Date: February 2015 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 3: Advanced Development (ATD) COST ($

More information

Trusted Partner in guided weapons

Trusted Partner in guided weapons Trusted Partner in guided weapons Raytheon Missile Systems Naval and Area Mission Defense (NAMD) product line offers a complete suite of mission solutions for customers around the world. With proven products,

More information

United States Army Special Operations Aviation Command (USASOAC)

United States Army Special Operations Aviation Command (USASOAC) United States Army Special Operations Aviation Command (USASOAC) AAAA Aircraft Survivability Equipment Symposium BG John R. Evans, Jr. USASOAC Commanding General 14 November 2017 Overall Classification:

More information

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Common Data Link Executive Agent (CDL EA) FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Common Data Link Executive Agent (CDL EA) FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 COST ($ in Millions) Years FY 2017 FY 2018 FY 2019 FY 2020 To Program Element - 33.896 32.015 43.986-43.986 42.760 41.790

More information

UNCLASSIFIED FY This program develops and demonstrates advanced technologies, including Electromagnetic (EM) Rail Gun for naval weapon systems.

UNCLASSIFIED FY This program develops and demonstrates advanced technologies, including Electromagnetic (EM) Rail Gun for naval weapon systems. Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Navy Date: March 2014 1319: Research, Development, Test & Evaluation, Navy / BA 3: Advanced Development (ATD) COST ($ in Millions) Prior Years FY 2013

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Navy Date: February 2016 1319: Research, Development, Test & Evaluation, Navy / BA 3: Advanced Technology Development (ATD) COST ($ in Millions) Prior

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Navy DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total Program

More information

MILITARY STRATEGIC AND TACTICAL RELAY (MILSTAR) SATELLITE SYSTEM

MILITARY STRATEGIC AND TACTICAL RELAY (MILSTAR) SATELLITE SYSTEM MILITARY STRATEGIC AND TACTICAL RELAY (MILSTAR) SATELLITE SYSTEM Air Force ACAT ID Program Prime Contractor Total Number of Systems: 6 satellites Lockheed Martin Total Program Cost (TY$): N/A Average Unit

More information

SPS-TA THALES AIRBORNE SYSTEMS INTEGRATED SELF-PROTECTION SYSTEM FOR TRANSPORT AND WIDE-BODY AIRCRAFT.

SPS-TA THALES AIRBORNE SYSTEMS INTEGRATED SELF-PROTECTION SYSTEM FOR TRANSPORT AND WIDE-BODY AIRCRAFT. THALES AIRBORNE SYSTEMS ELECTRONIC WARFARE SYSTEMS SPS-TA INTEGRATED SELF-PROTECTION SYSTEM FOR TRANSPORT AND WIDE-BODY AIRCRAFT www.thales-airbornesystems.com THALES AIRBORNE SYSTEMS ELECTRONIC WARFARE

More information

UNCLASSIFIED UNCLASSIFIED. EXHIBIT R-2, RDT&E Budget Item Justification February 2008 RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-4

UNCLASSIFIED UNCLASSIFIED. EXHIBIT R-2, RDT&E Budget Item Justification February 2008 RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-4 EXHIBIT R-2, RDT&E Budget Item Justification APPROPRIATION/BUDGET ACTIVITY R-1 ITEM NOMENCLATURE RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-4 0604272N, TADIRCM Total PE 92.490 32.552 63.244 64.668

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force Date: February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 6: RDT&E Management Support COST ($ in Millions) Prior

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Office of the Secretary Of Defense Date: February 2016 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 2: Applied Research COST ($

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: MQ-9 Development and Fielding. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: MQ-9 Development and Fielding. FY 2011 Total Estimate. FY 2011 OCO Estimate Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Air Force DATE: February 2010 COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 To Complete Program Element 57.205 93.145

More information

UNCLASSIFIED. Cost To Complete Total Program Element Continuing Continuing : Physical Security Equipment

UNCLASSIFIED. Cost To Complete Total Program Element Continuing Continuing : Physical Security Equipment COST ($ in Millions) Prior Years FY 2013 FY 2014 Base OCO # Total FY 2016 FY 2017 FY 2018 FY 2019 Cost To Complete Total Program Element - 3.350 3.874 - - - 1.977 - - - Continuing Continuing 645121: Physical

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) BUDGET ACTIVITY ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) PE NUMBER AND TITLE 2 - Applied Research 0602308A - Advanced Concepts and Simulation COST (In Thousands) FY 2002 FY 2003 FY 2004 FY 2005

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 COST ($ in Millions) Years FY 2017 FY 2018 FY 2019 FY 2020 To Program Element - 6.021 8.312 7.963-7.963 8.046 8.146 8.194

More information

Tactical Technology Office

Tactical Technology Office Tactical Technology Office Dr. Bradford Tousley, Director DARPA Tactical Technology Office Briefing prepared for NDIA s 2017 Ground Robotics Capabilities Conference & Exhibition March 22, 2017 1 Breakthrough

More information

UNCLASSIFIED FY 2009 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 2008 Exhibit R-2

UNCLASSIFIED FY 2009 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 2008 Exhibit R-2 Exhibit R-2 PROGRAM ELEMENT: 0605155N PROGRAM ELEMENT TITLE: FLEET TACTICAL DEVELOPMENT AND EVALUATION COST: (Dollars in Thousands) Project Number & Title FY 2007 Actual FY 2008 FY 2009 FY 2010 FY 2011

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 15 R-1 Line #32

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 15 R-1 Line #32 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force Date: March 2014 3600: Research, Development, Test & Evaluation, Air Force / BA 4: Advanced Component Development & Prototypes (ACD&P) COST

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Air Force DATE: February 2012 COST ($ in Millions) Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total Program Element 35.208 38.447

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R2, RDT&E Budget Item Justification: PB 2016 Navy : February 2015 1319: Research, Development, Test & Evaluation, Navy / BA 4: Advanced Component Development & Prototypes (ACD&P) COST ($ in Millions)

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Navy DATE: April 2013 COST ($ in Millions) Years FY 2012 FY 2013 # ## FY 2015 FY 2016 FY 2017 FY 2018 To Program Element 92.713 23.188 31.064 46.007-46.007

More information

Exhibit R-2, RDT&E Budget Item Justification

Exhibit R-2, RDT&E Budget Item Justification PE NUMBER: 0603500F PE TITLE: MULTI-DISCIPLINARY ADV Exhibit R-2, RDT&E Budget Item Justification BUDGET ACTIVITY PE NUMBER AND TITLE Cost ($ in Millions) FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011

More information

ARMY MULTIFUNCTIONAL INFORMATION DISTRIBUTION SYSTEM-LOW VOLUME TERMINAL 2 (MIDS-LVT 2)

ARMY MULTIFUNCTIONAL INFORMATION DISTRIBUTION SYSTEM-LOW VOLUME TERMINAL 2 (MIDS-LVT 2) ARMY MULTIFUNCTIONAL INFORMATION DISTRIBUTION SYSTEM-LOW VOLUME TERMINAL 2 (MIDS-LVT 2) Joint ACAT ID Program (Navy Lead) Total Number of Systems: Total Program Cost (TY$): Average Unit Cost (TY$): Low-Rate

More information

Technical Supplement For Joint Standard Instrumentation Suite Missile Attitude Subsystem (JMAS) Version 1.0

Technical Supplement For Joint Standard Instrumentation Suite Missile Attitude Subsystem (JMAS) Version 1.0 Technical Supplement For Joint Standard Instrumentation Suite Missile Attitude Subsystem (JMAS) 1. INTRODUCTION Version 1.0 1.1 Scope This Technical Supplement describes the Government s need for a capability

More information

UNCLASSIFIED. R-1 Program Element (Number/Name) PE D8Z / Prompt Global Strike Capability Development. Prior Years FY 2013 FY 2014 FY 2015

UNCLASSIFIED. R-1 Program Element (Number/Name) PE D8Z / Prompt Global Strike Capability Development. Prior Years FY 2013 FY 2014 FY 2015 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Office of Secretary Of Defense Date: March 2014 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 5: System Development & Demonstration

More information

NAWCWD Long Range Acquisition Forecast (LRAF) Requirements FY15 FY17

NAWCWD Long Range Acquisition Forecast (LRAF) Requirements FY15 FY17 NAWCWD Long Range Acquisition Forecast (LRAF) Requirements FY15 FY17 Distribution Statement A Approved for public release, distribution is unlimited. File: NAVAIR Brief 1 Weapons Systems Integration and

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Army DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total Program

More information

GOOD MORNING I D LIKE TO UNDERSCORE THREE OF ITS KEY POINTS:

GOOD MORNING I D LIKE TO UNDERSCORE THREE OF ITS KEY POINTS: Keynote by Dr. Thomas A. Kennedy Chairman and CEO of Raytheon Association of Old Crows Symposium Marriott Marquis Hotel Washington, D.C. 12.2.15 AS DELIVERED GOOD MORNING THANK YOU, GENERAL ISRAEL FOR

More information

STATEMENT OF. MICHAEL J. McCABE, REAR ADMIRAL, U.S. NAVY DIRECTOR, AIR WARFARE DIVISION BEFORE THE SEAPOWER SUBCOMMITTEE OF THE

STATEMENT OF. MICHAEL J. McCABE, REAR ADMIRAL, U.S. NAVY DIRECTOR, AIR WARFARE DIVISION BEFORE THE SEAPOWER SUBCOMMITTEE OF THE NOT FOR PUBLICATION UNTIL RELEASED BY THE SENATE ARMED SERVICES COMMITTEE STATEMENT OF MICHAEL J. McCABE, REAR ADMIRAL, U.S. NAVY DIRECTOR, AIR WARFARE DIVISION BEFORE THE SEAPOWER SUBCOMMITTEE OF THE

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Office of the Secretary Of Defense Date: February 2015 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 3: Advanced Technology Development

More information

Aerial Targets & Unmanned Aviation

Aerial Targets & Unmanned Aviation Aerial Targets & Unmanned Aviation Critical Threats Driving Future Requirements RADM Timothy L. Heely, USN Program Executive Officer Strike Weapons and Unmanned Aviation 31 October 2006 Naval UAS Family

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Air Force DATE: February 2012 COST ($ in Millions) Total FY 2014 FY 2015 FY 2016 FY 2017 Air Force Page 1 of 14 R-1 Line #147 Cost To Complete Total

More information

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 16 R-1 Line #45

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 16 R-1 Line #45 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Army Date: March 2014 2040: Research, Development, Test & Evaluation, Army / BA 3: Advanced Technology Development (ATD) COST ($ in Millions) Prior

More information

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED UNCLASSIFIED EXHIBIT R-2, RDT&E Budget Item Justification APPROPRIATION/BUDGET ACTIVITY R-1 ITEM NOMENCLATURE RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-7 0305206N Airborne Reconnaissance Advanced Development

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Office of Secretary Of Defense DATE: April 2013 COST ($ in Millions) Years FY 2012 FY 2013 # ## FY 2015 FY 2016 FY 2017 FY 2018 To Program Element

More information

The Armed Forces Communications and Electronics Association (AFCEA)

The Armed Forces Communications and Electronics Association (AFCEA) U.S. ARMY TEST AND EVALUATION COMMAND The Armed Forces Communications and Electronics Association (AFCEA) MG John W. Charlton 8 November 2017 Mission What does ATEC do for the Army? ATEC plans, integrates,

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R2, RDT&E Budget Item Justification: PB 2016 Navy : February 2015 1319: Research, Development, Test & Evaluation, Navy / BA 7: Operational Systems Development COST ($ in Millions) Years R1 Program

More information

The National Defense Industrial Association Systems Engineering Conference 2009

The National Defense Industrial Association Systems Engineering Conference 2009 Joint Mission Environment Test Capability () Test Resource Management Center Briefing for: The National Defense Industrial Association Systems Engineering Conference 2009 Lowering Technical Risk by Improving

More information

C4I System Solutions.

C4I System Solutions. www.aselsan.com.tr C4I SYSTEM SOLUTIONS Information dominance is the key enabler for the commanders for making accurate and faster decisions. C4I systems support the commander in situational awareness,

More information

RQ-4A GLOBAL HAWK UNMANNED AERIAL VEHICLE (UAV) SYSTEMS

RQ-4A GLOBAL HAWK UNMANNED AERIAL VEHICLE (UAV) SYSTEMS RQ-4A GLOBAL HAWK UNMANNED AERIAL VEHICLE (UAV) SYSTEMS Air Force Program Total Number of Systems Global Hawk Air Vehicles: Common Ground Segments: Total Program Cost (TY$): Average Unit Production Cost

More information

UNCLASSIFIED. R-1 Program Element (Number/Name) PE J / Joint Integrated Air & Missile Defense Organization (JIAMDO) Prior Years FY 2013 FY 2014

UNCLASSIFIED. R-1 Program Element (Number/Name) PE J / Joint Integrated Air & Missile Defense Organization (JIAMDO) Prior Years FY 2013 FY 2014 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 The Joint Staff Date: March 2014 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 6: RDT&E Management Support COST ($ in Millions)

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R2, RDT&E Budget Item Justification: PB 2016 Navy Date: February 2015 1319: Research,, Test & Evaluation, Navy / BA 6: RDT&E Management Support COST ($ in Millions) Prior Years R1 Program Element

More information

UNCLASSIFIED FY 2008/2009 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 2007 Exhibit R-2

UNCLASSIFIED FY 2008/2009 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 2007 Exhibit R-2 Exhibit R-2 PROGRAM ELEMENT: 0605155N PROGRAM ELEMENT TITLE: FLEET TACTICAL DEVELOPMENT AND EVALUATION COST: (Dollars in Thousands) Project Number & Title FY 2006 Actual FY 2007 FY 2008 FY 2009 FY 2010

More information

UNCLASSIFIED. R-1 Program Element (Number/Name) PE BB / SOF Visual Augmentation, Lasers and Sensor Systems. Prior Years FY 2013 FY 2014 FY 2015

UNCLASSIFIED. R-1 Program Element (Number/Name) PE BB / SOF Visual Augmentation, Lasers and Sensor Systems. Prior Years FY 2013 FY 2014 FY 2015 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 United States Special Operations Command Date: March 2014 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 7: Operational Systems

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Army DATE: April 2013 COST ($ in Millions) # ## FY 2015 FY 2016 FY 2017 FY 2018 Army Page 1 of 14 R-1 Line #167 To Program Element - 52.811 20.733

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Unmanned Combat Air Veh(UCAV) Adv Cp/Proto Dev. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Unmanned Combat Air Veh(UCAV) Adv Cp/Proto Dev. FY 2011 Total Estimate. FY 2011 OCO Estimate Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Navy DATE: February 2010 COST ($ in Millions) FY 2009 Actual Navy Page 1 of 19 FY 2012 FY 2013 FY 2014 FY 2015 To Program Element 266.469 304.907 266.368

More information

Task Force Innovation Working Groups

Task Force Innovation Working Groups Task Force Innovation Working Groups Emerging Operational Capabilities Adaptive Workforce Information EMERGING OPERATIONAL CAPABILITIES (EOC) WORKING GROUP VISION Accelerate Delivery of Emerging Operational

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE BB: Special Operations Aviation Systems Advanced Development

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE BB: Special Operations Aviation Systems Advanced Development Exhibit R-2, RDT&E Budget Item Justification: PB 2013 United States Special Operations Command DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Total FY 2014 FY 2015 FY 2016 FY 2017 To Complete

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army Date: February 2015 2040: Research, Development, Test & Evaluation, Army / BA 3: Advanced Technology Development (ATD) COST ($ in Millions) Prior

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Air Force DATE: April 2013 COST ($ in Millions) # ## FY 2015 FY 2016 FY 2017 FY 2018 To Program Element - 22.113 15.501 10.448-10.448 19.601 18.851

More information

The DoD Strategic Plan for Test and Evaluation Resources

The DoD Strategic Plan for Test and Evaluation Resources The DoD Strategic Plan for Test and Evaluation Resources Mr. Jason Coker Mr. Christopher Paust March 4, 2009 Test Resource Management Center 1225 South Clark Street, Arlington VA 22202 Outline TRMC Background

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Office of the Secretary Of Defense Date: February 2016 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 3: Advanced Technology Development

More information