1 : February 216 Exhibit R2, RDT&E Budget Item Justification: PB : Research, Development, Test & Evaluation, / BA 7: Operational Development COST ($ in Millions) R1 Program Element (Number/Name) PE 3526A / Airborne Reconnaissance FY 218 FY 219 FY 22 To FY 221 Program Element Continuing Continuing EH2: EMARSS ADV DEV (MIP) Continuing Continuing EH3: EMARSS Payloads ADV DEV (MIP) Continuing Continuing EH4: ARL ADV DEV (MIP) 5.1 Continuing Continuing EH5: ARL Payloads ADV DEV (MIP) Continuing Continuing Note This program is not a New Start and funding transferred from Program Element (PE) A. Mission Description and Budget Item Justification Airborne Reconnaissance Low Enhanced (ARLE) is a worldwide selfdeployable airborne Intelligence Surveillance Reconnaissance (ISR) system designed for timely, accurate, assured support to tactical forces over the full spectrum of operations. This system is a De Havilland DHC8 aircraft replacing the DHC7 in accordance with the Aerial ISR (AISR) 22 Strategy. ARLE will enhance the ARLM sensor capability sets through the procurement of new and refurbished sensors to meet the ARLE Capabilities Production Document (CPD) requirements. It provides a persistent capability to include: BroadArea Surveillance and/or Focused Stare on Areas of Interest (Point or Objective s), ElectroOptical/Infrared (EO/IR)/FullMotion Video (FMV), MultiMode Radar, Robust Communications Intelligence (COMINT), onboard Collection, Analysis, Sensor Cross Cue and dissemination through Distributed Common Ground System (DCGSA) Enabled workstations. ARLE will be assigned to the U.S. Intelligence and Security Command's Aerial ISR Brigade providing AISR support to combatant commanders. For the overall system, the Acquisition Objective and the Procurement Objective, is nine. The Mission Equipment Package (MEP) objective is eight. The Enhanced Medium Altitude Reconnaissance and Surveillance System (EMARSS) is the 's next generation C12 based, direct support, manned airborne intelligence collection, processing, and targeting support system. It provides a persistent capability to detect, locate, classify/identify, and track surface targets with a high degree of timeliness and accuracy. EMARSS will be assigned to the U.S. Intelligence and Security Command's Aerial Exploitation Battalions, providing Aerial Intelligence, Surveillance and Reconnaissance support to combatant commanders. The Acquisition Objective for EMARSS is 36 systems, with an Procurement Objective of 24, to include the following variants: eight EMARSSG (GeoINT); four EMARSSV (Vehicle and Dismount Exploitation Radar, VaDER); eight EMARSSM (MultiINT); and four EMARSSS (SIGINT). PE 3526A: Airborne Reconnaissance Page 1 of 26 R1 Line #22 473

2 : February 216 Exhibit R2, RDT&E Budget Item Justification: PB : Research, Development, Test & Evaluation, / BA 7: Operational Development B. Program Change Summary ($ in Millions) Previous President's Budget Current President's Budget Adjustments Congressional General Reductions Congressional Directed Reductions Congressional Rescissions Congressional Adds Congressional Directed Transfers Reprogrammings SBIR/STTR Transfer Adjustments to Budget R1 Program Element (Number/Name) PE 3526A / Airborne Reconnaissance Change Summary Explanation Fiscal Year (FY) 217 funds increase is a result of a funds realignment to support the Long Range Radar development. PE 3526A: Airborne Reconnaissance Page 2 of 26 R1 Line #22 474

3 : February 216 Exhibit R2A, RDT&E Project Justification: PB / 7 COST ($ in Millions) R1 Program Element (Number/Name) PE 3526A / Airborne Reconnaissance EH2: EMARSS ADV DEV (MIP) Quantity of RDT&E Articles 1.74 FY 218 EH2 / EMARSS ADV DEV (MIP) FY 219 FY To FY 221 Continuing Continuing A. Mission Description and Budget Item Justification The Enhanced Medium Altitude Reconnaissance and Surveillance System (EMARSS) is the 's next generation C12 based, direct support, manned airborne intelligence collection, processing, and targeting support system. It provides a persistent capability to detect, locate, classify/identify, and track surface targets with a high degree of timeliness and accuracy. EMARSS will be assigned to the U.S. Intelligence and Security Command's Aerial Exploitation Battalions, providing Aerial Intelligence, Surveillance and Reconnaissance support to combatant commanders. The Acquisition Objective for EMARSS is 36 systems, with an Procurement Objective of 24, to include the following variants: eight EMARSSG (GeoINT); four EMARSSV (Vehicle and Dismount Exploitation Radar, VaDER); eight EMARSSM (MultiINT); and four EMARSSS (SIGINT). This funding line supports nonrecurring engineering (NRE), development of supplemental type certificates (STC), testing, integration and PrePlanned Product Improvement (P3I) of Aerial, Intelligence, Surveillance and Reconnaissance (AISR) systems. Funding provides for Department of Defense (DoD) mandated safety equipment to meet current and evolving International Standards. It also enhances aircraft communications, navigations and surveillance (CNS); aircraft survivability equipment (ASE) and the integration of the AISR mission equipment package (MEP) as well as obsolescence issues involved with the conversion of Liberty Project Aircraft (LPA) to the EMARSS Program of Record (POR), in regards to the Navy AAR47 converting to AAR57, Blue Force Tracker (BFT) to Blue Force Tracker2 (BFT2) and Common Missile Warning (CMWS) upgrades. B. Accomplishments/Planned Programs ($ in Millions) Title: NonRecurring Engineering Description: This funding line supports NRE, development of STC, testing and integration of AISR systems. Funding provides for DoD mandated safety equipment to meet current and evolving International Standards. It also enhances aircraft CNS, ASE and the integration of the AISR MEP as well as obsolescence issues involved with the LPA in regards to the Navy AAR47 changing to AAR57, BFT to BFT2. Plans: Will provide for all associated NRE for conversion of initial Quick Reaction Capability (QRC) systems into the EMARSS POR. Upgraded communication and MEP will ensure continued worldwide deployability and over match dominance for AISR. Accomplishments/Planned Programs Subtotals PE 3526A: Airborne Reconnaissance Page 3 of 26 R1 Line #22 475

4 : February 216 Exhibit R2A, RDT&E Project Justification: PB / 7 R1 Program Element (Number/Name) PE 3526A / Airborne Reconnaissance EH2 / EMARSS ADV DEV (MIP) C. Other Program Funding Summary ($ in Millions) To Line Item FY 218 FY 219 FY 22 FY 221 Aerial Common Sensors (ACS): A25 EMARSS SEMA Continuing Continuing Mods (MIP): A2112 EMARSS Payloads (MIP): AZ Continuing Continuing EMARSS Payloads Adv Continuing Continuing Dev (MIP): 37526EH3 Remarks The EMARSS RDTE efforts are found in the following two project lines; 3526AEH2 EMARSS ADV DEV (MIP) (Fixed Wing Project Office) and 3526AEH3 EMARSS Payloads ADV DEV (Project Manager Sensors Aerial Intelligence). The supporting procurement lines are A2112 and AZ254. Separate funding lines support the Acquisition Executive's directive, codified in the October 28, 211 memorandum, to assign overall acquisition lead for manned airborne intelligence systems to Program Executive Officer for Aviation; and overall sensor, processing, exploitation, and dissemination responsibilities to Program Executive Officer for Intelligence, Electronic Warfare, and Sensors. D. Acquisition Strategy The acquisition strategy, supported by the EMARSS CPD, is to design and test 24 systems as well as provide enhancements to the following sensor capabilities in order to maintain relevancy to the Warfighter: Electrooptical/Infrared (EO/IR)/Full Motion Video (FMV); Communications Intelligence (COMINT); Wide Area Aerial Surveillance (WAAS); Light Imaging Detection and Ranging (LiDAR) and improved Synthetic Aperture Radar / Moving Indicator (SAR/MTI) radar; lineofsite (LOS) and beyond lineofsite (BLOS) communications; and Processing Exploitation and Dissemination (PED) supporting two Distributed Common Ground System (DCGSA) enabled operator workstations. The EMARSS fleet of 24 systems will consist of the following variants: eight (8) EMARSSG (GeoINT); four (4) EMARSSV (Vehicle and Dismount Exploitation Radar, VaDER); eight (8) EMARSSM (MultiINT); and four (4) EMARSSS (SIGINT). E. Performance Metrics N/A PE 3526A: Airborne Reconnaissance Page 4 of 26 R1 Line #22 476

5 : February 216 Exhibit R3, RDT&E Project Analysis: PB / 7 R1 Program Element (Number/Name) PE 3526A / Airborne Reconnaissance Management Services ($ in Millions) Category Item PMO Method & Type RO Performing Activity & Location FW PO/ PM SAI : Huntsville, AL/ Aberdeen, MD Subtotal Category Item NonRecurring Engineering TBD TBD : TBD Subtotal To To Project s Performing Activity & Location Product Development ($ in Millions) Method & Type EH2 / EMARSS ADV DEV (MIP) 1.74 To 1.74 Remarks PE 3526A: Airborne Reconnaissance Page 5 of 26 R1 Line #22 477

6 : February 216 Exhibit R4, RDT&E Schedule Profile: PB / 7 PE 3526A: Airborne Reconnaissance R1 Program Element (Number/Name) PE 3526A / Airborne Reconnaissance Page 6 of 26 EH2 / EMARSS ADV DEV (MIP) R1 Line #22 478

7 : February 216 Exhibit R4A, RDT&E Schedule Details: PB / 7 R1 Program Element (Number/Name) PE 3526A / Airborne Reconnaissance EH2 / EMARSS ADV DEV (MIP) Schedule Details Start NonRecurring Engineering Events Pre Planned Product Improvements PE 3526A: Airborne Reconnaissance Page 7 of 26 End Quarter 1 Year 216 Quarter 4 Year R1 Line #22 479

8 : February 216 Exhibit R2A, RDT&E Project Justification: PB / 7 COST ($ in Millions) R1 Program Element (Number/Name) PE 3526A / Airborne Reconnaissance EH3: EMARSS Payloads ADV DEV (MIP) Quantity of RDT&E Articles FY EH3 / EMARSS Payloads ADV DEV (MIP) FY 219 FY To FY Continuing Continuing Note The EMARSS RDTE efforts are found in the following two (2) project lines; 3526AEH2 EMARSS ADV DEV (MIP) (Fixed Wing Project Office) and 3526AEH3 EMARSS Payloads ADV DEV (Project Manager Sensors Aerial Intelligence). The supporting procurement lines are A2112 and AZ254. Separate funding lines support the Acquisition Executive's directive, codified in the October 28, 211 memorandum, to assign overall acquisition lead for manned airborne intelligence systems to Program Executive Officer for Aviation; and overall sensor, processing, exploitation, and dissemination responsibilities to Program Executive Officer for Intelligence, Electronic Warfare, and Sensors. A. Mission Description and Budget Item Justification The Enhanced Medium Altitude Reconnaissance and Surveillance System (EMARSS) is the 's next generation C12 based, direct support, manned airborne intelligence collection, processing, and targeting support system. It provides a persistent capability to detect, locate, classify/identify, and track surface targets with a high degree of timeliness and accuracy. EMARSS will be assigned to the U.S. Intelligence and Security Command's Aerial Exploitation Battalions, providing Aerial Intelligence, Surveillance and Reconnaissance support to combatant commanders. The Acquisition Objective for EMARSS is 36 systems, with an Procurement Objective of 24, to include the following variants: eight EMARSSG (GeoINT); four EMARSSV (Vehicle and Dismount Exploitation Radar, VaDER); eight EMARSSM (MultiINT); and four EMARSSS (SIGINT). This funding line supports enhancements to the following sensor capabilities in order to maintain relevancy to the Warfighter: ElectroOptical/Infrared (EO/IR)/Full Motion Video (FMV); Communications Intelligence (COMINT); Wide Area Aerial Surveillance (WAAS); Light Imaging Detection and Ranging (LiDAR) and improved Synthetic Aperture Radar / Moving Indicator (SAR/MTI) radar; lineofsite (LOS) and beyond lineofsite (BLOS) communications; and Processing Exploitation and Dissemination (PED) supporting two Distributed Common Ground System (DCGSA) enabled operator workstations. Fiscal Year (FY) 217 funding in the amount of $13, provides Mission Equipment Packages (MEP) and PED Sensor Engineering Support. B. Accomplishments/Planned Programs ($ in Millions) Title: EMARSS Product Enhancement Description: Research, Development, Test, and Evaluation (RDTE) funds Sensor Engineering Change Proposals (ECPs) and contractor system support. Plans: PE 3526A: Airborne Reconnaissance Page 8 of 26 R1 Line #22 48

9 : February 216 Exhibit R2A, RDT&E Project Justification: PB / 7 R1 Program Element (Number/Name) PE 3526A / Airborne Reconnaissance B. Accomplishments/Planned Programs ($ in Millions) EH3 / EMARSS Payloads ADV DEV (MIP) Sensor ECPs and contractor system support. Title: EMARSS Sensor Engineering Support Description: Matrix Government and Matrix or engineering support for sensor enhancements. Plans: Funds Matrix Government and Matrix or engineering support for sensor enhancements. Plans: Funds Matrix Government and Matrix or engineering support for sensor enhancements. Title: Program Management Support Description: Program Management Office (PMO) support and travel, as well as Engineering and Technical Assistance (SETA) support. Plans: PMO support and travel, as well as SETA support. Title: EMARSS Test and Evaluation Description: Sensor Specific Testing Plans: Sensor specific testing resulting from engineering design and development. Accomplishments/Planned Programs Subtotals C. Other Program Funding Summary ($ in Millions) Line Item Aerial Common Sensor: A25 EMARSS SEMA: A2112 EMARSS MEP/PED Procurement: AZ254 EMAARSS SEMA: EH PE 3526A: Airborne Reconnaissance Page 9 of 26 FY FY FY R1 Line # To FY Continuing Continuing Continuing Continuing Continuing Continuing 481

10 : February 216 Exhibit R2A, RDT&E Project Justification: PB / 7 R1 Program Element (Number/Name) PE 3526A / Airborne Reconnaissance C. Other Program Funding Summary ($ in Millions) Line Item FY 218 FY 219 EH3 / EMARSS Payloads ADV DEV (MIP) FY 22 To FY 221 Remarks The EMARSS RDTE efforts are found in the following two (2) project lines; 3526AEH2 EMARSS ADV DEV (MIP) (Fixed Wing Project Office) and 3526AEH3 EMARSS Payloads ADV DEV (Project Manager Sensors Aerial Intelligence). The supporting procurement lines are A2112 and AZ254. Separate funding lines support the Acquisition Executive's directive, codified in the October 28, 211 memorandum, to assign overall acquisition lead for manned airborne intelligence systems to Program Executive Officer for Aviation; and overall sensor, processing, exploitation, and dissemination responsibilities to Program Executive Officer for Intelligence, Electronic Warfare, and Sensors. D. Acquisition Strategy The acquisition strategy, supported by the EMARSS CPD, is to design and test 24 systems as well as provide enhancements to the following sensor capabilities in order to maintain relevancy to the Warfighter: EO/IR FMV; COMINT; WAAS; LiDAR and improved SAR/MTI radar; LOS and BLOS communications; and PED supporting two DCGSA enabled operator workstations. The EMARSS fleet of 24 systems will consist of the following variants: eight EMARSSG (GeoINT); four EMARSSV (Vehicle and Dismount Exploitation Radar, VaDER); eight EMARSSM (MultiINT); and four EMARSSS (SIGINT). E. Performance Metrics N/A PE 3526A: Airborne Reconnaissance Page 1 of 26 R1 Line #22 482

11 : February 216 Exhibit R3, RDT&E Project Analysis: PB / 7 R1 Program Element (Number/Name) PE 3526A / Airborne Reconnaissance Management Services ($ in Millions) Category Item Method & Type Performing Activity & Location PMO RO PEO IEW&S, PM SAI : APG, MD SETA C/CPFF BAH : APG, MD Subtotal Category Item LiDAR sensor enhancement C/CPIF Performing Activity & Location BAE : Nashua, CT Subtotal Category Item Matrix or Engineering Support Performing Activity & Location Category Item To Nov C/CPFF BAH : APG, MD.1.2 PE 3526A: Airborne Reconnaissance.1 MIPR USA ATEC : APG, MD Test and Evaluation ($ in Millions) Engineering Development Testing Performing Activity & Location To MIPR Method & Type USACERDEC, I2WD : APG, MD Subtotal.95 Method & Type Support ($ in Millions) Matrix Government Engineering Support JHU APL : Laurel, SS/CPFF MD AWAPSS Sensor enhancement Product Development ($ in Millions) Method & Type EH3 / EMARSS Payloads ADV DEV (MIP).558 Page 11 of To Jan 217 R1 Line # To

12 : February 216 Exhibit R3, RDT&E Project Analysis: PB / 7 R1 Program Element (Number/Name) PE 3526A / Airborne Reconnaissance Test and Evaluation ($ in Millions) Category Item Method & Type Performing Activity & Location Subtotal Project s EH3 / EMARSS Payloads ADV DEV (MIP) To To Remarks PE 3526A: Airborne Reconnaissance Page 12 of 26 R1 Line #22 484

13 : February 216 Exhibit R4, RDT&E Schedule Profile: PB / 7 PE 3526A: Airborne Reconnaissance R1 Program Element (Number/Name) PE 3526A / Airborne Reconnaissance Page 13 of 26 EH3 / EMARSS Payloads ADV DEV (MIP) R1 Line #22 485

14 : February 216 Exhibit R4A, RDT&E Schedule Details: PB / 7 R1 Program Element (Number/Name) PE 3526A / Airborne Reconnaissance EH3 / EMARSS Payloads ADV DEV (MIP) Schedule Details Start Quarter 3 Year 216 Quarter 2 Year 217 QRC to POR Modification and Conversion Fielding Sensor Upgrades/Enhancements EMARSS P3I/Test Events End PE 3526A: Airborne Reconnaissance Page 14 of 26 R1 Line #22 486

15 : February 216 Exhibit R2A, RDT&E Project Justification: PB / 7 COST ($ in Millions) R1 Program Element (Number/Name) PE 3526A / Airborne Reconnaissance EH4: ARL ADV DEV (MIP) Quantity of RDT&E Articles 5.1 FY 218 EH4 / ARL ADV DEV (MIP) FY 219 FY 22 To FY 221 Continuing Continuing A. Mission Description and Budget Item Justification Airborne Reconnaissance Low Enhanced (ARLE) is a worldwide selfdeployable airborne Intelligence Surveillance Reconnaissance (ISR) system designed for timely, accurate, assured support to tactical forces over the full spectrum of operations. This system is a De Havilland DHC8 aircraft replacing the DHC7 IAW the Aerial ISR (AISR) 22 Strategy. ARLE will enhance the ARLM sensor capability sets through the procurement of new and refurbished sensors to meet the ARLE Capabilities Production Document (CPD) requirements. It provides a persistent capability to include: BroadArea Surveillance and/or Focused Stare on Areas of Interest (Point or Objective s), ElectroOptical/Infrared (EO/IR)/FullMotion Video (FMV), MultiMode Radar, Robust Communications Intelligence (COMINT), onboard Collection, Analysis, Sensor Cross Cue and dissemination through Distributed Common Ground System (DCGSA) Enabled workstations. ARLE will be assigned to the U.S. Intelligence and Security Command's Aerial ISR Brigade providing AISR support to combatant commanders. For the overall system, the Acquisition Objective and the Procurement Objective, is nine. The Mission Equipment Package (MEP) objective is eight. This funding line supports nonrecurring engineering (NRE), development of supplemental type certificates (STC), testing, and integration. Funding provides for Department of Defense (DoD) mandated safety equipment to meet current and evolving International Standards. It also enhances aircraft communications, navigations and surveillance (CNS); aircraft survivability equipment (ASE) and the integration of the AISR mission equipment package (MEP) as well as obsolescence issues involved with the conversion of Quick Reaction Capability (QRC) to the ARLE Program of Record (POR). B. Accomplishments/Planned Programs ($ in Millions) Title: NonRecurring Engineering Description: Funding will provide for NRE and the technical drawing package associated with the Department of mandated installation of ASE on a DeHavilland dash 8 and the associated validation testing required for the installed ASE. This funding will also be utilized for the associated system level testing after the final sensor installation on the ARLE DeHavilland dash 8 replacement platforms. Plans: Will provide Department of mandated ASE compliance and total system level testing for the ARLE DeHavilland dash 8 replacement Program of Record aircraft. These aircraft will provide the Department of with a state of the art AISR platform ready for worldwide deployment in support of national interest. Accomplishments/Planned Programs Subtotals PE 3526A: Airborne Reconnaissance Page 15 of 26 R1 Line #22 487

16 : February 216 Exhibit R2A, RDT&E Project Justification: PB / 7 R1 Program Element (Number/Name) PE 3526A / Airborne Reconnaissance EH4 / ARL ADV DEV (MIP) C. Other Program Funding Summary ($ in Millions) To Line Item FY 218 FY 219 FY 22 FY 221 ARL SEMA (MIP): A Continuing Continuing ARL SEMA Mods (MIP): A Continuing Continuing ARL Payloads (MIP): AZ Continuing Continuing ARL Payloads ADV Continuing Continuing DEV (MIP): 37526EH5 Remarks Note: The Airborne Reconnaissance Low Enhanced (ARLE) RDTE efforts are found in the following two (2) project lines; 3526AEH4 ARL ADV DEV (MIP) (Fixed Wing Project Office) and 3526AEH5 ARL Payloads ADV DEV (Project Manager Sensors Aerial Intelligence). The supporting procurement lines are A211 and AZ25. Separate funding lines support the Acquisition Executive's directive, codified in the October 28, 211 memorandum, to assign overall acquisition lead for manned airborne Intelligence systems to Program Executive Officer for Aviation; and overall sensor, processing, exploitation, and dissemination responsibilities to Program Executive Officer for Intelligence, Electronic Warfare, and Sensors. D. Acquisition Strategy ARLE will enhance the ARLM sensor capability sets through the procurement of new and refurbished sensors to meet the ARLE CPD requirements. It provides a persistent capability to include: BroadArea Surveillance and/or Focused Stare on Areas of Interest (Point or Objective s), EO/IR FMV, COMINT, onboard Collection, Analysis, Sensor Cross Cue and dissemination through DCGSA Enabled workstations. The development and testing of Long Range radar (LRR) is required to replace the current ARL Phoenix Eye Radar to increase performance and meet the improved requirements of the Appendix J Payload for the approved ARLE CPD. The remainder will fund software development to enhance COMINT collection capabilities. The software will be added to the existing COMINT systems to effectively prosecute high priority and emerging modern signal emitters. E. Performance Metrics N/A PE 3526A: Airborne Reconnaissance Page 16 of 26 R1 Line #22 488

17 : February 216 Exhibit R3, RDT&E Project Analysis: PB / 7 R1 Program Element (Number/Name) PE 3526A / Airborne Reconnaissance Management Services ($ in Millions) Category Item Method & Type Program Management Support RO Performing Activity & Location FW PO/PM SAI : Huntsville, AL/ Aberdeen, MD Subtotal Category Item Various Performing Activity & Location TBD : TBD Subtotal To To Project s Method & Type Support ($ in Millions) Fixed Wing NonRecurring Engineering EH4 / ARL ADV DEV (MIP) 5.1 To 5.1 Remarks PE 3526A: Airborne Reconnaissance Page 17 of 26 R1 Line #22 489

18 : February 216 Exhibit R4, RDT&E Schedule Profile: PB / 7 PE 3526A: Airborne Reconnaissance R1 Program Element (Number/Name) PE 3526A / Airborne Reconnaissance Page 18 of 26 EH4 / ARL ADV DEV (MIP) R1 Line #22 49

19 : February 216 Exhibit R4A, RDT&E Schedule Details: PB / 7 R1 Program Element (Number/Name) PE 3526A / Airborne Reconnaissance EH4 / ARL ADV DEV (MIP) Schedule Details Start Events NonRecurring Engineering associated with MEP/Sensor Integration Quarter 3 End Year 216 Quarter 3 Year 217 Note This budget line provides for NonRecurring Engineering (NRE) and the technical drawing package associated with the Department of mandated installation of Aviation Survival Equipment (ASE) on a DeHavilland dash 8 and the associated validation testing required for the installed ASE. This funding will also be utilized for the associated system level testing after the final MEP/sensor installation on the Aerial Reconnaissance Low Enhanced (ARLE) DeHavilland dash 8 replacement platforms. PE 3526A: Airborne Reconnaissance Page 19 of 26 R1 Line #22 491

20 : February 216 Exhibit R2A, RDT&E Project Justification: PB / 7 COST ($ in Millions) R1 Program Element (Number/Name) PE 3526A / Airborne Reconnaissance EH5: ARL Payloads ADV DEV (MIP) Quantity of RDT&E Articles FY EH5 / ARL Payloads ADV DEV (MIP) FY 219 FY To FY Continuing Continuing A. Mission Description and Budget Item Justification Airborne Reconnaissance Low Enhanced (ARLE) is a worldwide selfdeployable airborne Intelligence Surveillance Reconnaissance (ISR) system designed for timely, accurate, assured support to tactical forces over the full spectrum of operations. This system is a De Havilland DHC8 aircraft replacing the DHC7 IAW the Aerial ISR (AISR) 22 Strategy. ARLE will enhance the ARLM sensor capability sets through the procurement of new and refurbished sensors to meet the ARLE Capabilities Production Document (CPD) requirements. It provides a persistent capability to include: BroadArea Surveillance and/or Focused Stare on Areas of Interest (Point or Objective s), ElectroOptical/Infrared (EO/IR)/FullMotion Video (FMV), MultiMode Radar, Robust Communications Intelligence (COMINT), onboard Collection, Analysis, Sensor Cross Cue and dissemination through Distributed Common Ground System (DCGSA) Enabled workstations. ARLE will be assigned to the U.S. Intelligence and Security Command's Aerial ISR Brigade providing AISR support to combatant commanders. For the overall system, the Acquisition Objective and the Procurement Objective, is nine. The Mission Equipment Package (MEP) objective is eight. Fiscal Year (FY) 217 funding of $ million completes the Long Range Radar (LRR) effort, and initiates new signal enhancement efforts. This funding line supports development and testing of the LRR to replace the current ARL Phoenix Eye Radar to meet the increased performance requirements of the Appendix J Payload for ARLE approved CPD. LRR effort will add required SAR modes, address obsolescence, Information Assurance (IA) issues, and improved probability at greater required ranges. Effort will produce a prototype and conduct flight testing to characterize the prototype performance. Funding is planned for test and evaluation of LRR capability integrated in ARLE system. Also, it supports the software development to enhance COMINT collection capabilities to effectively prosecute high priority and emerging modern signal emitters. B. Accomplishments/Planned Programs ($ in Millions) Title: Long Range Radar Development Description: LRR Research and Development (R&D) Support Plans: Completion of LRR prototype effort Title: Test Support to LRR and New Signals (COMINT/Software Upgrades) Description: the LRR test and New Signal Upgrades Plans: PE 3526A: Airborne Reconnaissance Page 2 of 26 R1 Line #22 492

21 : February 216 Exhibit R2A, RDT&E Project Justification: PB / 7 R1 Program Element (Number/Name) PE 3526A / Airborne Reconnaissance B. Accomplishments/Planned Programs ($ in Millions) the LRR test and New Signal Upgrades Title: New Signals (COMINT/Software Upgrades) EH5 / ARL Payloads ADV DEV (MIP) Description: Add new COMINT Software Upgrades Plans: Start development of COMINT Software Upgrades Accomplishments/Planned Programs Subtotals C. Other Program Funding Summary ($ in Millions) To Line Item FY 218 FY 219 FY 22 FY 221 AZ25 ARL MODS (MIP): AZ25 Theater NetCentric Geol: 65766ADX9 A219 ARL SEMA: A A211 ARL SEMA Continuing Continuing MODS (MIP): A211 ARL ADV DEV 5.1 Continuing Continuing (MIP): 3526AEH4 Remarks The Airborne Reconnaissance Low Enhanced (ARLE) RDTE efforts are found in the following two (2) project lines; 3526AEH4 ARL ADV DEV (MIP) (Fixed Wing Project Office) and 3526AEH5 ARL Payloads ADV DEV (Project Manager Sensors Aerial Intelligence). The supporting procurement lines are A211 and AZ25. Separate funding lines support the Acquisition Executive's directive, codified in the October 28, 211 memorandum, to assign overall acquisition lead for manned airborne Intelligence systems to Program Executive Officer for Aviation; and overall sensor, processing, exploitation, and dissemination responsibilities to Program Executive Officer for Intelligence, Electronic Warfare, and Sensors. D. Acquisition Strategy ARLE will enhance the ARLM sensor capability sets through the procurement of new and refurbished sensors to meet the ARLE CPD requirements. It provides a persistent capability to include: BroadArea Surveillance and/or Focused Stare on Areas of Interest (Point or Objective s), EO/IR FMV, COMINT, onboard Collection, Analysis, Sensor Cross Cue and dissemination through DCGSA Enabled workstations. PE 3526A: Airborne Reconnaissance Page 21 of 26 R1 Line #22 493

22 : February 216 Exhibit R2A, RDT&E Project Justification: PB / 7 R1 Program Element (Number/Name) PE 3526A / Airborne Reconnaissance EH5 / ARL Payloads ADV DEV (MIP) The development and testing of LRR is required to replace the current ARL Phoenix Eye Radar to increase performance and meet the improved requirements of the Appendix J Payload for the approved ARLE CPD. The remainder will fund software development to enhance COMINT collection capabilities. The software will be added to the existing COMINT systems to effectively prosecute high priority and emerging modern signal emitters. E. Performance Metrics N/A PE 3526A: Airborne Reconnaissance Page 22 of 26 R1 Line #22 494

23 : February 216 Exhibit R3, RDT&E Project Analysis: PB / 7 R1 Program Element (Number/Name) PE 3526A / Airborne Reconnaissance Product Development ($ in Millions) Category Item Method & Type Performing Activity & Location Long Range Radar Development C/CPFF Northrop Grumman : Linthicum Heights, MD New Signals (COMINT/ Software Upgrades) C/CPFF Leidos : Aberdeen Proving Ground Subtotal Mar EH5 / ARL Payloads ADV DEV (MIP) To Nov Remarks Long Range Radar : W15P7T1DD48/KZ1. FY17 will complete the development and integration and of Long Range Radar (LRR). The development and integration of the LRR is required to replace the current ARL Phoenix Eye Radar to increase performance meet the improved requirement documents of the Appendix J Payload for Airborne Reconnaissance Low Enhanced (ARLE) approved Capability Production Document (CPD). New Signals : W56KGY16D1. The remaining FY17 funding will fund software development to enhance the COMINT collection capabilities. The software will be added to existing COMINT subsystems to effectively prosecute high priority and emerging modern signal emitters. Test and Evaluation ($ in Millions) Category Item Test Support to LRR and New Signals (COMINT/ Software Upgrades) Method & Type C/CPFF Performing Activity & Location Leidos : Aberdeen Proving Ground, MD Subtotal To Nov Remarks Long Range Radar : W15P7T1DD48/KZ1. FY17 will complete the testing of Long Range Radar (LRR). The testing of the LRR is required to determine if the LRR meets the requirements in Appendix J Payload for Airborne Reconnaissance Low Enhanced (ARLE) approved Capability Production Document (CPD). New Signals : W56KGY16D1. The remaining FY17 funding will support the testing of the software to see if it meets the requirements in the ARLE CPD. Project s PE 3526A: Airborne Reconnaissance Page 23 of 26 R1 Line #22 To

24 : February 216 Exhibit R3, RDT&E Project Analysis: PB / 7 R1 Program Element (Number/Name) PE 3526A / Airborne Reconnaissance EH5 / ARL Payloads ADV DEV (MIP) To Remarks PE 3526A: Airborne Reconnaissance Page 24 of 26 R1 Line #22 496

25 : February 216 Exhibit R4, RDT&E Schedule Profile: PB / 7 PE 3526A: Airborne Reconnaissance R1 Program Element (Number/Name) PE 3526A / Airborne Reconnaissance Page 25 of 26 EH5 / ARL Payloads ADV DEV (MIP) R1 Line #22 497

26 : February 216 Exhibit R4A, RDT&E Schedule Details: PB / 7 R1 Program Element (Number/Name) PE 3526A / Airborne Reconnaissance EH5 / ARL Payloads ADV DEV (MIP) Schedule Details Start Events ARLE Radar Development End Quarter 3 Year 215 Quarter 3 Year 215 ARLE Radar Development ARLE MEP ARLE MEP Integration ARLE System LUT ARLE New Signals Development and Test ARLE System LRR FOT&E PE 3526A: Airborne Reconnaissance Page 26 of 26 R1 Line #22 498

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED UNCLASSIFIED : February 216 Exhibit R2, RDT&E Budget Item Justification: PB 217 24: Research, Development, Test & Evaluation, / BA 5: tem Development & Demonstration (SDD) COST ($ in Millions) FY 215 FY 216 R1 Program

More information

UNCLASSIFIED. UNCLASSIFIED United States Special Operations Command Page 1 of 6 R-1 Line #208

UNCLASSIFIED. UNCLASSIFIED United States Special Operations Command Page 1 of 6 R-1 Line #208 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 United States Special Operations Command Date: March 2014 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 7: Operational Systems

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base Exhibit P-40, Budget Line Item Justification: PB 2017 Army Date: February 2016 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft ID Code (A=Service

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) FY

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2017 United States Special Operations Command : February 2016 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 7: Operational Systems Development

More information

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Distributed Common Ground/Surface Systems. Prior Years FY 2013 FY 2014 FY 2015

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Distributed Common Ground/Surface Systems. Prior Years FY 2013 FY 2014 FY 2015 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force Date: March 2014 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) Prior

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Army DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 FY 2014 FY 2015 FY 2016 FY 2017 To Program Element 19.610 5.856 8.660-8.660 14.704 14.212

More information

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / Tactical Electronic Surveillance System - Adv Dev. Prior Years FY 2013 FY 2014 FY 2015

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / Tactical Electronic Surveillance System - Adv Dev. Prior Years FY 2013 FY 2014 FY 2015 Exhibit R2, RDT&E Budget Item Justification: PB 2015 Army : March 2014 2040: Research, Development, Test & Evaluation, Army / BA 4: Advanced Component Development & Prototypes (ACD&P) COST ($ in Millions)

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) FY

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R2, RDT&E Budget Item Justification: PB 2016 Navy Date: February 2015 1319: Research, Development, Test & Evaluation, Navy / BA 6: RDT&E Management Support COST ($ in Millions) Prior Years R1 Program

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 6 R-1 Line #162

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 6 R-1 Line #162 Exhibit R2, RDT&E Budget Item Justification: PB 2015 Navy Date: March 2014 1319: Research, Development, Test & Evaluation, Navy / BA 6: RDT&E Management Support COST ($ in Millions) Prior Years FY 2013

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army : February 2015 2040: Research, Development, Test & Evaluation, Army / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) Years

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 213 Navy DATE: February 212 COST ($ in Millions) FY 211 FY 212 FY 214 FY 215 FY 216 FY 217 To Complete Program Element 25.229.872.863 7.6 8.463.874.876.891.96

More information

UNCLASSIFIED. Cost To Complete Total Program Element : DIGITAL BATTLEFLD COMM.

UNCLASSIFIED. Cost To Complete Total Program Element : DIGITAL BATTLEFLD COMM. Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army Date: February 2015 2040: Research, Development, Test & Evaluation, Army / BA 3: Advanced Technology Development (ATD) FY 2017 FY 2018 FY 2019

More information

UNCLASSIFIED. Cost To Complete Total Program Element Continuing Continuing EF4: Integrated Broadcast System

UNCLASSIFIED. Cost To Complete Total Program Element Continuing Continuing EF4: Integrated Broadcast System Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army : February 2015 2040: Research, Development, Test & Evaluation, Army / BA 7: Operational Systems Development COST ($ in Millions) Years FY 2014

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Air Force DATE: February 2012 COST ($ in Millions) FY 2011 FY 2014 FY 2015 FY 2016 FY 2017 To Program Element 65.844 127.925 21.000-21.000 8.000 -

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army : February 2015 2040: Research, Development, Test & Evaluation, Army / BA 4: Advanced Component Development & Prototypes (ACD&P) COST ($ in Millions)

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 213 Army DATE: February 212 COST ($ in Millions) FY 211 FY 212 FY 214 FY 215 FY 216 FY 217 To Program Element 1.547 1.935 4.39-4.39 2.917 2.977 3.25 3.77

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2014 United States Special Operations Command DATE: April 2013 COST ($ in Millions) Years FY 2012 FY 2013 # Base OCO ## FY 2015 FY 2016 FY 2017 FY 2018

More information

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Common Data Link Executive Agent (CDL EA) FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Common Data Link Executive Agent (CDL EA) FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 COST ($ in Millions) Years FY 2017 FY 2018 FY 2019 FY 2020 To Program Element - 33.896 32.015 43.986-43.986 42.760 41.790

More information

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED UNCLASSIFIED : February 26 Exhibit R2, RDT&E Budget Item Justification: PB 27 24: Research, Development, Test & Evaluation, / BA 7: Operational Systems Development COST ($ in Millions) R Element (Number/Name) PE 6735A

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) COST (In Thousands) FY1999 Actual FY 2002 FY 2003 FY2004 FY2005 to Army Joint STARS (TIARA) 5316 25676 17898 17713 12833 14372 11527 Continuing Continuing A. Mission Description and Justification: The

More information

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Advanced Medium Range Air-to-Air Missile (AMRAAM) Prior Years FY 2013 FY 2014 FY 2015

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Advanced Medium Range Air-to-Air Missile (AMRAAM) Prior Years FY 2013 FY 2014 FY 2015 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force : March 2014 COST ($ in Millions) Years FY 2013 FY 2014 # FY 2016 FY 2017 FY 2018 FY 2019 To Program Element 242.669 68.656 70.614 82.195-82.195

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 8 R-1 Line #77

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 8 R-1 Line #77 Exhibit R2, RDT&E Budget Item Justification: PB 2015 Navy Date: March 2014 1319: Research, Development, Test & Evaluation, Navy / BA 4: Advanced Component Development & Prototypes (ACD&P) COST ($ in Millions)

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army : February 2015 2040: Research, Development, Test & Evaluation, Army / BA 7: Operational Systems Development COST ($ in Millions) FY 2017 FY 2018

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) 7 - Operational system development 0305206A - Airborne Reconnaissance Adv Development K98 COST (In Thousands) FY 2002 FY 2003 FY 2004 FY 2005 FY 2006

More information

UNCLASSIFIED. Cost To Complete Total Program Element : R/SAOC MODERNIZATION. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. Cost To Complete Total Program Element : R/SAOC MODERNIZATION. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) FY

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2013 United States Special Operations Command DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Preparation (MTPS) Total FY 2014 FY 2015 FY 2016

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Air Force DATE: April 2013 COST ($ in Millions) # ## FY 2015 FY 2016 FY 2017 FY 2018 To Program Element - 0.000 24.500 23.016-23.016 25.350 26.026

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE F: WEATHER SERVICE. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE F: WEATHER SERVICE. FY 2011 Total Estimate. FY 2011 OCO Estimate Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Air Force DATE: February 2010 COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 To Program Element 45.918 33.291 32.373 0.000

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE F: SPECIAL TACTICS/COMBAT CONTROL

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE F: SPECIAL TACTICS/COMBAT CONTROL Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Air Force DATE: February 2011 COST ($ in Millions) FY 2013 FY 2014 FY 2015 FY 2016 To Complete Program Element 9.693 17.670 7.118-7.118 7.538 7.651

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) COST (In Thousands) ARMY COMMON GROUND STATION (CGS) (TIARA) FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 Cost to Total Cost Actual Estimate Estimate Estimate Estimate Estimate Estimate

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 213 Navy DATE: February 212 COST ($ in Millions) FY 211 FY 212 Total FY 214 FY 215 FY 216 FY 217 To Complete Total Total Program Element - 75.7 122.481-122.481

More information

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 20 R-1 Line #121

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 20 R-1 Line #121 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Army : March 2014 2040: Research,, Test & Evaluation, Army / BA 5: System & Demonstration (SDD) COST ($ in Millions) # FY 2016 FY 2017 FY 2018 FY 2019

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE BB: Special Operations Aviation Systems Advanced Development

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE BB: Special Operations Aviation Systems Advanced Development Exhibit R-2, RDT&E Budget Item Justification: PB 2013 United States Special Operations Command DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Total FY 2014 FY 2015 FY 2016 FY 2017 To Complete

More information

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / ADVANCED TANK ARMAMENT SYSTEM (ATAS)

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / ADVANCED TANK ARMAMENT SYSTEM (ATAS) Exhibit R2, RDT&E Budget Item Justification: PB 2015 Army : March 2014 2040: Research, Development, Test & Evaluation, Army / BA 4: Advanced Component Development & Prototypes (ACD&P) COST ($ in Millions)

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 5: System Development & Demonstration (SDD) COST ($ in Millions)

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit) Budget Item Justif ication Exhibit R-2 0604633A ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit) COST (In Thousands) Actual Estimate Estimate to AIR TRAFFIC CONTROL 11676 14167 7578 Continuing Continuing

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Office of the Secretary Of Defense : February 2015 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 4: Advanced Component Development

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE COST ($ in Millions) FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total Program Element 11.589 20.727 63.853-63.853 60.995 19.248 19.291 15.230 Continuing

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Navy DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 FY 2014 FY 2015 FY 2016 FY 2017 Navy Page 1 of 8 R-1 Line #82 To Program Element - -

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 213 Army DATE: February 212 COST ($ in Millions) FY 211 FY 212 FY 214 FY 215 FY 216 FY 217 To Complete Program Element 125.44 31.649 4.876-4.876 25.655

More information

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED UNCLASSIFIED : February 26 Exhibit R2, RDT&E Budget Item Justification: PB 27 2: Research, Development, Test & Evaluation, / BA 7: Operational Systems Development COST ($ in Millions) FY 25 FY 26 R Program Element

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 23 R-1 Line #212

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 23 R-1 Line #212 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force Date: March 2014 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Development COST ($ in Millions) Prior Years

More information

UNCLASSIFIED. Cost To Complete Total Program Element Continuing Continuing : Counter Narcotics Technology Program Office

UNCLASSIFIED. Cost To Complete Total Program Element Continuing Continuing : Counter Narcotics Technology Program Office Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 4: Advanced Component Development & Prototypes (ACD&P) COST

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army : February 2015 2040: Research, Development, Test & Evaluation, Army / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) Years

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) PE

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Air Force DATE: April 2013 COST ($ in Millions) # ## FY 2015 FY 2016 FY 2017 FY 2018 Air Force Page 1 of 6 R-1 Line #142 To Program Element - 2.292

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #211

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #211 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force Date: March 2014 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) Prior

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) Years

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Office of the Secretary Of Defense Date: February 2015 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 3: Advanced Technology Development

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 15 R-1 Line #222

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 15 R-1 Line #222 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force : March 2014 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) (+) #

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Requirements Analysis and Maturation. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Requirements Analysis and Maturation. FY 2011 Total Estimate. FY 2011 OCO Estimate Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Air Force DATE: February 2010 COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 To Complete Program Element 0.000 35.533

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) FY

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R2, RDT&E Budget Item Justification: PB 2016 Navy : February 2015 1319: Research, Development, Test & Evaluation, Navy / BA 7: Operational Systems Development COST ($ in Millions) Years R1 Program

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Defense Information Systems Agency : February 2015 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 7: Operational Systems Development

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 10 R-1 Line #201

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 10 R-1 Line #201 Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) Years

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE A: FIREFINDER FY 2012 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE A: FIREFINDER FY 2012 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 212 Army DATE: February 211 COST ($ in Millions) FY 21 FY 211 FY 213 FY 214 FY 215 FY 216 To Program Element 19.534 24.736 1.358-1.358 3.977 41.223 37.431

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: ASW Systems Development

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: ASW Systems Development Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Navy DATE: February 2011 COST ($ in Millions) FY 2010 FY 2013 FY 2014 FY 2015 FY 2016 Navy Page 1 of 17 R-1 Line Item #30 To Program Element 25.144

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Navy DATE: April 2013 COST ($ in Millions) Years FY 2012 FY 2013 # ## FY 2015 FY 2016 FY 2017 FY 2018 To Program Element 174.037 11.276 8.610 1.971-1.971

More information

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 7 R-1 Line #9

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 7 R-1 Line #9 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Army Date: March 2014 2040:, Development, Test & Evaluation, Army / BA 2: Applied COST ($ in Millions) Prior Years FY 2013 FY 2014 FY 2015 Base FY

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Exhibit R-2, RDT&E Budget Item Justification: PB 214 Army DATE: April 213 COST ($ in Millions) Years FY 212 FY 213 # ## FY 215 FY 216 FY 217 FY 218 To Program Element - 35.46 253.959 177.532-177.532 219.937

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Air Force DATE: April 2013 COST ($ in Millions) # ## FY 2015 FY 2016 FY 2017 FY 2018 To Program Element - 108.021 21.000 3.000-3.000 3.000 2.000 0.000

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Multi-Platform Electronics

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Multi-Platform Electronics Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Air Force DATE: February 2011 COST ($ in Millions) FY 2010 FY 2013 FY 2014 FY 2015 FY 2016 To Program Element 14.370 15.574 - - - - - - - Continuing

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Biometrics Enabled Intelligence FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Biometrics Enabled Intelligence FY 2012 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Army DATE: February 2011 COST ($ in Millions) FY 2010 FY 2011 FY 2013 FY 2014 FY 2015 FY 2016 To Program Element - 14.114 15.018-15.018 15.357 15.125

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) FY

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) (+)

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Integrated Broadcast Service (DEM/VAL) FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Integrated Broadcast Service (DEM/VAL) FY 2012 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Air Force DATE: February 2011 COST ($ in Millions) FY 2010 FY 2011 FY 2013 FY 2014 FY 2015 FY 2016 To Program Element 24.438 20.580 20.046-20.046 19.901

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 COST ($ in Millions) Years FY 2018 FY 2019 FY 2020 FY 2021 To Program Element - 4.208 2.245 5.830 0.000 5.830 17.932 35.734

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 R-1 Line #213

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 R-1 Line #213 COST ($ in Millions) Prior Years FY 2013 FY 2014 Base OCO # Total FY 2016 FY 2017 FY 2018 FY 2019 Cost To Complete Total Program Element - 12.205 13.491 13.516-13.516 13.767 14.037 14.311 14.584 Continuing

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Unmanned Combat Air Veh(UCAV) Adv Cp/Proto Dev. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Unmanned Combat Air Veh(UCAV) Adv Cp/Proto Dev. FY 2011 Total Estimate. FY 2011 OCO Estimate Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Navy DATE: February 2010 COST ($ in Millions) FY 2009 Actual Navy Page 1 of 19 FY 2012 FY 2013 FY 2014 FY 2015 To Program Element 266.469 304.907 266.368

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army : February 2015 2040: Research, Development, Test & Evaluation, Army / BA 7: Operational Systems Development COST ($ in Millions) Years FY 2014

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Air Force DATE: April 2013 COST ($ in Millions) # ## FY 2015 FY 2016 FY 2017 FY 2018 To Program Element - 16.397 1.975 1.971-1.971 1.990 1.989 2.023

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) FY

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 R-1 Line #123

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 R-1 Line #123 COST ($ in Millions) Prior Years FY 2013 FY 2014 OCO # Total FY 2016 FY 2017 FY 2018 FY 2019 Complete Total Program Element - 0.322 0.450 0.450-0.450 0.454 0.462 0.471 0.481 Continuing Continuing 674797:

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #156

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #156 Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) Years

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 7 R-1 Line #120

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 7 R-1 Line #120 Exhibit R2, RDT&E Budget Item Justification: PB 2015 Navy Date: March 2014 1319: Research, Development, Test & Evaluation, Navy / BA 5: Development & Demonstration (SDD) COST ($ in Millions) Prior Years

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE A: RADAR DEVELOPMENT

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE A: RADAR DEVELOPMENT Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Army DATE: February 2011 COST ($ in Millions) FY 2010 FY 2011 Total FY 2013 FY 2014 FY 2015 FY 2016 Army Page 1 of 10 R-1 Line Item #116 To Complete

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 214 Army DATE: April 213 COST ($ in Millions) Years FY 212 FY 213 # ## FY 215 FY 216 FY 217 FY 218 To Program Element - 62.343 14.347 49.989-49.989 58.6

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Air Force DATE: February 2012 COST ($ in Millions) Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total Program Element 243.161

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 5: System Development & Demonstration (SDD) COST ($ in Millions)

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Air Force DATE: February 2012 COST ($ in Millions) Total Program Element 0.912 2.292 2.095-2.095 3.633 4.555 - - Continuing Continuing 671325: HH-60G

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Air Force DATE: February 2012 COST ($ in Millions) Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total Program Element 35.208 38.447

More information

UNCLASSIFIED FY Quantity of RDT&E Articles

UNCLASSIFIED FY Quantity of RDT&E Articles COST ($ in Millions) Prior Years FY 2013 FY 2014 Base OCO # Total FY 2016 FY 2017 FY 2018 FY 2019 Air Force Page 1 of 5 R-1 Line #159 Cost To Complete Total Program Element - 1.447 1.406 1.782-1.782 1.770

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Navy DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Total FY 2014 FY 2015 FY 2016 FY 2017 To Complete Total Total Program Element - 15.000

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE COST ($ in Millions) FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total Program Element 22.756 - - - - - - - - Continuing Continuing 675043: Fighter Tactical

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 4: Advanced Component Development & Prototypes (ACD&P) COST

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 COST ($ in Millions) Years FY 2017 FY 2018 FY 2019 FY 2020 To Program Element - 6.021 8.312 7.963-7.963 8.046 8.146 8.194

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R2, RDT&E Budget Item Justification: PB 2016 Navy : February 2015 1319: Research, Development, Test & Evaluation, Navy / BA 4: Advanced Component Development & Prototypes (ACD&P) COST ($ in Millions)

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Army DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Total FY 2014 FY 2015 FY 2016 FY 2017 To Complete Total Total Program Element - 2.885

More information

UNCLASSIFIED. Cost To Complete Total Program Element S750: Mission Training and Preparation Systems FY 2015

UNCLASSIFIED. Cost To Complete Total Program Element S750: Mission Training and Preparation Systems FY 2015 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 United States Special Operations Command Date: March 2014 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 7: Operational Development

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: MQ-9 Development and Fielding. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: MQ-9 Development and Fielding. FY 2011 Total Estimate. FY 2011 OCO Estimate Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Air Force DATE: February 2010 COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 To Complete Program Element 57.205 93.145

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 13 R-1 Line #68

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 13 R-1 Line #68 Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 5: System Development & Demonstration (SDD) COST ($ in Millions)

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Air Force DATE: February 2012 COST ($ in Millions) FY 2011 FY 2014 FY 2015 FY 2016 FY 2017 To Program Element 42.067 6.509 5.000-5.000 41.500 30.000

More information

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / Indirect Fire Protection Capability Increment 2-Intercept (IFPC2)

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / Indirect Fire Protection Capability Increment 2-Intercept (IFPC2) Exhibit R2, RDT&E Budget Item Justification: PB 2015 Army : March 2014 2040: Research, Development, Test & Evaluation, Army / BA 4: Advanced Component Development & Prototypes (ACD&P) COST ($ in Millions)

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Navy Date: February 2016 1319: Research, Development, Test & Evaluation, Navy / BA 3: Advanced Technology Development (ATD) COST ($ in Millions) Prior

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 9 R-1 Line #44

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 9 R-1 Line #44 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force Date: March 2014 3600: Research, Development, Test & Evaluation, Air Force / BA 4: Advanced Component Development & Prototypes (ACD&P) COST

More information

UNCLASSIFIED. Cost To Complete Total Program Element ED8: Paladin Integrated Management (PIM)

UNCLASSIFIED. Cost To Complete Total Program Element ED8: Paladin Integrated Management (PIM) Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army : February 2015 2040: Research, Development, Test & Evaluation, Army / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) Years

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational s Development COST ($ in Millions) FY 2017

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 213 Army DATE: February 212 COST ($ in Millions) FY 211 FY 212 FY 214 FY 215 FY 216 FY 217 Army Page 1 of 19 R-1 Line #165 To Program Element 187.27 36.15

More information