1 Radiology CPG Annual Report for Quality, Safety and Experience Sub-Committee- April Purpose of report To provide assurance to the QSE sub-committee of the Radiology CPG s commitment to quality, safety and experience 2. Introduction/Context This paper is a summary review of the QSE activity by the Radiology CPG during 2014/15 3. Main body of the report 3.1 CPG Quality Delivery Plans - position against Quality Delivery Plan The Radiology CPG identified its contribution to the BCU Quality objectives in its submitted QDP. Progress is outlined below Domain 1 safety Reduction of mortality rates for stroke, heart attack and fractured neck of femur. Radiology measure - compliance with CT scan within 24 hours, working towards CT scanning for stroke within 12 hours and scans for thrombolysis within 45minutes. To reduce the time to scan during the out of hours period, non-ct radiographers undertaking night and weekend day shifts are currently being trained to perform CT head scans. To date 33 radiographers have been trained across BCU Involvement in mortality reviews Is as required Reduction in % of patients who have hospital acquired thrombosis up to 90 days post discharge. Radiology support the diagnosis and have a reporting system in place Reduction of pressure ulcers Radiology is currently developing a tool for use for interventional procedures of more than 1 hour. Radiology CPG April 2015 Page 1
2 Safety Checklists Cadiovascular and Interventional Radiological Society of Europe (CIRSE) safety checklist introduced for interventional procedures. Auditing of compliance with using the checklist is just being completed. Checklists are also in place for MRI safety and the safe use of contrast media MRSA and C. Diff rates reduction Radiology not able to measure this target but is actively implementing and monitoring the bare below elbows initiative Hand washing audits are regularly between 95% and 100%. Monthly audit data for bare below elbows across the Divisions report scores between 80% and 100% for 2014/15. Staff are reminded regularly about the requirements for hand washing and Bare below elbows. During 2015/16 it is planned to do random checks using visiting staff to remove any local bias and ensure consistency of application across the divisions Peripheral Vascular Care bundle compliance It has been agreed with the Assistant Director of Nursing for Infection Prevention and Control that the bundle is not suitable for use in Radiology. A Radiology compliance list has been added to the request card that is being introduced June Audits of compliance will then be implemented Antibiotic prescribing A review of antibiotic prescribing within the CPG is currently being carried out by the Clinical Director for Central. There is limited prescribing within radiology and it is usually for prophylaxis during interventional procedures NPSA 16 Failure to act As reported last year this needs to be embedded across referring CPGs with Radiology providing support. It has recently been agreed that the Assistant Director of Therapies will lead a series of task and finish workshops to ensure compliance with this alert Escorts with Patients Some vulnerable and unstable patients are brought to the Radiology departments with inappropriate escort support, from HCA or registered nurses. This has been an issue for the departments for a number of years and numerous meetings have taken place with referring departments and with Directors of Nursing. Escort policies have been developed, but these have not been implemented / resourced. Radiology have taken steps to reduce the risk, for example, establishing a system with the YG ED team to hand over patients in the ED, rather than within the Radiology department so risk can be appropriately assessed within ED prior to transfer. Further work must be done and support from the new Hospital Directors will be needed to address these risks Domain 2 Clinical effectiveness Improve Radiology reporting turn round times to meet national standards The CPG monitors against All Wales standards for report turnaround times (time taken from the scan / x-ray being undertaken to a validated report being issued). The standards are: Referrer A&E and inpatients GP Outpatients working days Radiology CPG April 2015 Page 2
3 Audit and effectiveness Radiology has an active audit calendar with regular meetings held in each division and a series of joint audit sessions across the CPG. There is an identified radiographer and radiologist lead for each division. Number of audits registered 2014/15 = 22 Number of audits completed and action plan submitted = 12 Research Radiology has had 5 papers published in journals both within radiology and other specialties. The continued funding by NISCAR of 1.5WTE research radiographers is allowing the CPG to ensure that IR(ME)R compliance is maintained in relation to research and also initiate primary research. Current projects Image quality & dose implication for trolley imaging Patient anxiety and image quality in MRI scanning Projects looking at the weight bearing MRI scanner Reduction in procedures of limited effectiveness The CPG is working with the GP Engagement Group to reduce lumbar spine plain film examinations performed. A pathway is being developed that includes input from CMATs and the pain control team NICE During 2014 links have been developed to ensure Radiology is linked into the NICE process. NICE guidance involving Radiology is being reviewed and updated. The NICE guidance on HCC has not been implemented and a decision of future provision of service is awaited following a review of the public health research and current guidance by Karen Mottart, Associate Medical Director Cancer mortality support delivery of 31 and 62 day targets The CPG is working with members of the Cancer Performance Board to improve performance Compliance with stroke bundles and SNAP audit See section Domain 3 Patient Experience Radiology CPG April 2015 Page 3
4 Concerns Response times for concerns, has deteriorated over 2014/15 due to staffing issues but these are now in the process of being resolved. The main patterns for concerns during 2014/15 have been time waiting for imaging and reporting discrepancies Review of Datix incident reporting common themes and learning Cancellation of beds for interventional procedures SBAR developed and has been submitted to the East Safer Patient group. Lack of gowns Current supplies of gowns do not meet radiology requirements. The theatre style patient gowns do not afford dignity to patients in radiology and are a source of verbal complaints. Meetings have been held with the laundry and a pilot of a different style of gown is nearing completion. Consideration will need to be given to the cost of new gowns and ensuring supply is restricted to radiology MRI Safety multiple near misses due to referrer s not highlighting patients have pacemakers. CT incidents a series of MDT workshops have been held, taking a whole system view of incidents which has lead to improvements in processes and sharing of good practise across the divisions resulting in a lower number of reportable incidents. As a result of the MRI near misses and the radiation incidents and near misses involving addressograph labels a radiology safety newsletter was created and sent to all CPGs, safer patient groups and put on the radiology webpage Effective Communication A Welsh buddy system is in place. The annual review of compliance against the Radiology standard operating procedure was completed in March 2015 and an action plan has been developed Service user experience For Radiology the term service user includes referrers as well as patients attending for imaging or interventional procedures. The public member and identified staff are currently developing a pilot for snap shot audits that will commence in April In addition the All Wales Imaging Patient experience Survey will be used to measure the experience of 10 patients per month. During 2014/15 the Radiology CPG had engagement sessions with secondary care referrers to feedback on the outcome of the secondary care user survey these served as useful discussion forums. A GP engagement group has held its initial meeting and a work plan agreed. A repeat user survey of GP s is planned for 2015/ Dementia risk assessment The Radiology CPG has identified dementia champions who are working on raising awareness across the CPG. 3.2 Evidence against the robustness of your self assessment scores for Healthcare Standards and outlines planned actions to improve the low scores; The completion of the Health Care standards performance for the Radiology CPG is acknowledged to be low. Standards 14 and 17 are not applicable to Radiology. Standards7, 16, 19 and 21have been completed. Whilst completion of the standards has been poor the CPG can confirm it has robust arrangements in place for governance particularly with respect: Radiology CPG April 2015 Page 4
5 Health & Safety Management HSE inspection July 2014 described the CPG as borderline exemplar Radiation Protection HIW inspection January st time that HIW have lead an inspection where there are no actions for improvement. IPC highest up take of flu vaccine across health board. The Radiology CPG has now commenced its work towards gaining the Imaging Services Accreditation Scheme. An initial workshop has been held and a gap analysis is currently being completed to identify areas for improvement. As part of the process of completing the traffic light ready tool the work will be mapped across to the health care standards. 3.3 An indication of key risks and plans in place to reduce these; Significant identified risks for the CPG Failure to recruit consultant Radiologists mitigation ongoing recruitment, working with WOD on creative strategies for recruitment, increasing radiographer skill mix. There is also a national shortage of radiographers which is being mitigated against by an increase in the number training in North Wales. Failure of the Ysbyty Glan Clwyd CT scanner The current scanner has reached end of life and is due replacement. Failure would lead to loss of service on the YGC site there are limited opportunities to mitigate this risk due to their being little capacity on the radiotherapy planning scanner. A second scanner has been purchased but is not likely to be installed until the latter part of the financial year due to the asbestos strip. Lack of escorts as discussed in above 4. Assessment of risk Please see section 3.3 above. 5. Equality Impact Assessment An equality impact assessment register has been set up for the Radiology CPG 6. Conclusions / Next Steps This section should briefly summarise any conclusions being drawn, together with planned next steps and key dates for delivery. 7. Recommendations Note: To receive the information contained in the report Radiology CPG April 2015 Page 5
6 Radiology CPG Annual Report for Quality, Safety and Experience Sub-Committee- April Purpose of report To provide assurance to the QSE sub-committee of the Radiology CPG s commitment to quality, safety and experience 2. Introduction/Context This paper is a summary review of the QSE activity by the Radiology CPG during 2014/15 3. Main body of the report 3.1 CPG Quality Delivery Plans - position against Quality Delivery Plan The Radiology CPG identified its contribution to the BCU Quality objectives in its submitted QDP. Progress is outlined below Domain 1 safety Reduction of mortality rates for stroke, heart attack and fractured neck of femur. Radiology measure - compliance with CT scan within 24 hours, working towards CT scanning for stroke within 12 hours and scans for thrombolysis within 45minutes. To reduce the time to scan during the out of hours period, non-ct radiographers undertaking night and weekend day shifts are currently being trained to perform CT head scans. To date 33 radiographers have been trained across BCU Involvement in mortality reviews Is as required Reduction in % of patients who have hospital acquired thrombosis up to 90 days post discharge. Radiology support the diagnosis and have a reporting system in place Reduction of pressure ulcers Radiology is currently developing a tool for use for interventional procedures of more than 1 hour. Radiology CPG April 2015 Page 1
7 Safety Checklists Cadiovascular and Interventional Radiological Society of Europe (CIRSE) safety checklist introduced for interventional procedures. Auditing of compliance with using the checklist is just being completed. Checklists are also in place for MRI safety and the safe use of contrast media MRSA and C. Diff rates reduction Radiology not able to measure this target but is actively implementing and monitoring the bare below elbows initiative Hand washing audits are regularly between 95% and 100%. Monthly audit data for bare below elbows across the Divisions report scores between 80% and 100% for 2014/15. Staff are reminded regularly about the requirements for hand washing and Bare below elbows. During 2015/16 it is planned to do random checks using visiting staff to remove any local bias and ensure consistency of application across the divisions Peripheral Vascular Care bundle compliance It has been agreed with the Assistant Director of Nursing for Infection Prevention and Control that the bundle is not suitable for use in Radiology. A Radiology compliance list has been added to the request card that is being introduced June Audits of compliance will then be implemented Antibiotic prescribing A review of antibiotic prescribing within the CPG is currently being carried out by the Clinical Director for Central. There is limited prescribing within radiology and it is usually for prophylaxis during interventional procedures NPSA 16 Failure to act As reported last year this needs to be embedded across referring CPGs with Radiology providing support. It has recently been agreed that the Assistant Director of Therapies will lead a series of task and finish workshops to ensure compliance with this alert Escorts with Patients Some vulnerable and unstable patients are brought to the Radiology departments with inappropriate escort support, from HCA or registered nurses. This has been an issue for the departments for a number of years and numerous meetings have taken place with referring departments and with Directors of Nursing. Escort policies have been developed, but these have not been implemented / resourced. Radiology have taken steps to reduce the risk, for example, establishing a system with the YG ED team to hand over patients in the ED, rather than within the Radiology department so risk can be appropriately assessed within ED prior to transfer. Further work must be done and support from the new Hospital Directors will be needed to address these risks Domain 2 Clinical effectiveness Improve Radiology reporting turn round times to meet national standards The CPG monitors against All Wales standards for report turnaround times (time taken from the scan / x-ray being undertaken to a validated report being issued). The standards are: Referrer A&E and inpatients GP Outpatients working days Radiology CPG April 2015 Page 2
8 Audit and effectiveness Radiology has an active audit calendar with regular meetings held in each division and a series of joint audit sessions across the CPG. There is an identified radiographer and radiologist lead for each division. Number of audits registered 2014/15 = 22 Number of audits completed and action plan submitted = 12 Research Radiology has had 5 papers published in journals both within radiology and other specialties. The continued funding by NISCAR of 1.5WTE research radiographers is allowing the CPG to ensure that IR(ME)R compliance is maintained in relation to research and also initiate primary research. Current projects Image quality & dose implication for trolley imaging Patient anxiety and image quality in MRI scanning Projects looking at the weight bearing MRI scanner Reduction in procedures of limited effectiveness The CPG is working with the GP Engagement Group to reduce lumbar spine plain film examinations performed. A pathway is being developed that includes input from CMATs and the pain control team NICE During 2014 links have been developed to ensure Radiology is linked into the NICE process. NICE guidance involving Radiology is being reviewed and updated. The NICE guidance on HCC has not been implemented and a decision of future provision of service is awaited following a review of the public health research and current guidance by Karen Mottart, Associate Medical Director Cancer mortality support delivery of 31 and 62 day targets The CPG is working with members of the Cancer Performance Board to improve performance Compliance with stroke bundles and SNAP audit See section Domain 3 Patient Experience Radiology CPG April 2015 Page 3
9 Concerns Response times for concerns, has deteriorated over 2014/15 due to staffing issues but these are now in the process of being resolved. The main patterns for concerns during 2014/15 have been time waiting for imaging and reporting discrepancies Review of Datix incident reporting common themes and learning Cancellation of beds for interventional procedures SBAR developed and has been submitted to the East Safer Patient group. Lack of gowns Current supplies of gowns do not meet radiology requirements. The theatre style patient gowns do not afford dignity to patients in radiology and are a source of verbal complaints. Meetings have been held with the laundry and a pilot of a different style of gown is nearing completion. Consideration will need to be given to the cost of new gowns and ensuring supply is restricted to radiology MRI Safety multiple near misses due to referrer s not highlighting patients have pacemakers. CT incidents a series of MDT workshops have been held, taking a whole system view of incidents which has lead to improvements in processes and sharing of good practise across the divisions resulting in a lower number of reportable incidents. As a result of the MRI near misses and the radiation incidents and near misses involving addressograph labels a radiology safety newsletter was created and sent to all CPGs, safer patient groups and put on the radiology webpage Effective Communication A Welsh buddy system is in place. The annual review of compliance against the Radiology standard operating procedure was completed in March 2015 and an action plan has been developed Service user experience For Radiology the term service user includes referrers as well as patients attending for imaging or interventional procedures. The public member and identified staff are currently developing a pilot for snap shot audits that will commence in April In addition the All Wales Imaging Patient experience Survey will be used to measure the experience of 10 patients per month. During 2014/15 the Radiology CPG had engagement sessions with secondary care referrers to feedback on the outcome of the secondary care user survey these served as useful discussion forums. A GP engagement group has held its initial meeting and a work plan agreed. A repeat user survey of GP s is planned for 2015/ Dementia risk assessment The Radiology CPG has identified dementia champions who are working on raising awareness across the CPG. 3.2 Evidence against the robustness of your self assessment scores for Healthcare Standards and outlines planned actions to improve the low scores; The completion of the Health Care standards performance for the Radiology CPG is acknowledged to be low. Standards 14 and 17 are not applicable to Radiology. Standards7, 16, 19 and 21have been completed. Whilst completion of the standards has been poor the CPG can confirm it has robust arrangements in place for governance particularly with respect: Radiology CPG April 2015 Page 4
10 Health & Safety Management HSE inspection July 2014 described the CPG as borderline exemplar Radiation Protection HIW inspection January st time that HIW have lead an inspection where there are no actions for improvement. IPC highest up take of flu vaccine across health board. The Radiology CPG has now commenced its work towards gaining the Imaging Services Accreditation Scheme. An initial workshop has been held and a gap analysis is currently being completed to identify areas for improvement. As part of the process of completing the traffic light ready tool the work will be mapped across to the health care standards. 3.3 An indication of key risks and plans in place to reduce these; Significant identified risks for the CPG Failure to recruit consultant Radiologists mitigation ongoing recruitment, working with WOD on creative strategies for recruitment, increasing radiographer skill mix. There is also a national shortage of radiographers which is being mitigated against by an increase in the number training in North Wales. Failure of the Ysbyty Glan Clwyd CT scanner The current scanner has reached end of life and is due replacement. Failure would lead to loss of service on the YGC site there are limited opportunities to mitigate this risk due to their being little capacity on the radiotherapy planning scanner. A second scanner has been purchased but is not likely to be installed until the latter part of the financial year due to the asbestos strip. Lack of escorts as discussed in above 4. Assessment of risk Please see section 3.3 above. 5. Equality Impact Assessment An equality impact assessment register has been set up for the Radiology CPG 6. Conclusions / Next Steps This section should briefly summarise any conclusions being drawn, together with planned next steps and key dates for delivery. 7. Recommendations Note: To receive the information contained in the report Radiology CPG April 2015 Page 5
11 Radiology CPG Annual Report for Quality, Safety and Experience Sub-Committee- April Purpose of report To provide assurance to the QSE sub-committee of the Radiology CPG s commitment to quality, safety and experience 2. Introduction/Context This paper is a summary review of the QSE activity by the Radiology CPG during 2014/15 3. Main body of the report 3.1 CPG Quality Delivery Plans - position against Quality Delivery Plan The Radiology CPG identified its contribution to the BCU Quality objectives in its submitted QDP. Progress is outlined below Domain 1 safety Reduction of mortality rates for stroke, heart attack and fractured neck of femur. Radiology measure - compliance with CT scan within 24 hours, working towards CT scanning for stroke within 12 hours and scans for thrombolysis within 45minutes. To reduce the time to scan during the out of hours period, non-ct radiographers undertaking night and weekend day shifts are currently being trained to perform CT head scans. To date 33 radiographers have been trained across BCU Involvement in mortality reviews Is as required Reduction in % of patients who have hospital acquired thrombosis up to 90 days post discharge. Radiology support the diagnosis and have a reporting system in place Reduction of pressure ulcers Radiology is currently developing a tool for use for interventional procedures of more than 1 hour. Radiology CPG April 2015 Page 1
12 Safety Checklists Cadiovascular and Interventional Radiological Society of Europe (CIRSE) safety checklist introduced for interventional procedures. Auditing of compliance with using the checklist is just being completed. Checklists are also in place for MRI safety and the safe use of contrast media MRSA and C. Diff rates reduction Radiology not able to measure this target but is actively implementing and monitoring the bare below elbows initiative Hand washing audits are regularly between 95% and 100%. Monthly audit data for bare below elbows across the Divisions report scores between 80% and 100% for 2014/15. Staff are reminded regularly about the requirements for hand washing and Bare below elbows. During 2015/16 it is planned to do random checks using visiting staff to remove any local bias and ensure consistency of application across the divisions Peripheral Vascular Care bundle compliance It has been agreed with the Assistant Director of Nursing for Infection Prevention and Control that the bundle is not suitable for use in Radiology. A Radiology compliance list has been added to the request card that is being introduced June Audits of compliance will then be implemented Antibiotic prescribing A review of antibiotic prescribing within the CPG is currently being carried out by the Clinical Director for Central. There is limited prescribing within radiology and it is usually for prophylaxis during interventional procedures NPSA 16 Failure to act As reported last year this needs to be embedded across referring CPGs with Radiology providing support. It has recently been agreed that the Assistant Director of Therapies will lead a series of task and finish workshops to ensure compliance with this alert Escorts with Patients Some vulnerable and unstable patients are brought to the Radiology departments with inappropriate escort support, from HCA or registered nurses. This has been an issue for the departments for a number of years and numerous meetings have taken place with referring departments and with Directors of Nursing. Escort policies have been developed, but these have not been implemented / resourced. Radiology have taken steps to reduce the risk, for example, establishing a system with the YG ED team to hand over patients in the ED, rather than within the Radiology department so risk can be appropriately assessed within ED prior to transfer. Further work must be done and support from the new Hospital Directors will be needed to address these risks Domain 2 Clinical effectiveness Improve Radiology reporting turn round times to meet national standards The CPG monitors against All Wales standards for report turnaround times (time taken from the scan / x-ray being undertaken to a validated report being issued). The standards are: Referrer A&E and inpatients GP Outpatients working days Radiology CPG April 2015 Page 2
13 Audit and effectiveness Radiology has an active audit calendar with regular meetings held in each division and a series of joint audit sessions across the CPG. There is an identified radiographer and radiologist lead for each division. Number of audits registered 2014/15 = 22 Number of audits completed and action plan submitted = 12 Research Radiology has had 5 papers published in journals both within radiology and other specialties. The continued funding by NISCAR of 1.5WTE research radiographers is allowing the CPG to ensure that IR(ME)R compliance is maintained in relation to research and also initiate primary research. Current projects Image quality & dose implication for trolley imaging Patient anxiety and image quality in MRI scanning Projects looking at the weight bearing MRI scanner Reduction in procedures of limited effectiveness The CPG is working with the GP Engagement Group to reduce lumbar spine plain film examinations performed. A pathway is being developed that includes input from CMATs and the pain control team NICE During 2014 links have been developed to ensure Radiology is linked into the NICE process. NICE guidance involving Radiology is being reviewed and updated. The NICE guidance on HCC has not been implemented and a decision of future provision of service is awaited following a review of the public health research and current guidance by Karen Mottart, Associate Medical Director Cancer mortality support delivery of 31 and 62 day targets The CPG is working with members of the Cancer Performance Board to improve performance Compliance with stroke bundles and SNAP audit See section Domain 3 Patient Experience Radiology CPG April 2015 Page 3
14 Concerns Response times for concerns, has deteriorated over 2014/15 due to staffing issues but these are now in the process of being resolved. The main patterns for concerns during 2014/15 have been time waiting for imaging and reporting discrepancies Review of Datix incident reporting common themes and learning Cancellation of beds for interventional procedures SBAR developed and has been submitted to the East Safer Patient group. Lack of gowns Current supplies of gowns do not meet radiology requirements. The theatre style patient gowns do not afford dignity to patients in radiology and are a source of verbal complaints. Meetings have been held with the laundry and a pilot of a different style of gown is nearing completion. Consideration will need to be given to the cost of new gowns and ensuring supply is restricted to radiology MRI Safety multiple near misses due to referrer s not highlighting patients have pacemakers. CT incidents a series of MDT workshops have been held, taking a whole system view of incidents which has lead to improvements in processes and sharing of good practise across the divisions resulting in a lower number of reportable incidents. As a result of the MRI near misses and the radiation incidents and near misses involving addressograph labels a radiology safety newsletter was created and sent to all CPGs, safer patient groups and put on the radiology webpage Effective Communication A Welsh buddy system is in place. The annual review of compliance against the Radiology standard operating procedure was completed in March 2015 and an action plan has been developed Service user experience For Radiology the term service user includes referrers as well as patients attending for imaging or interventional procedures. The public member and identified staff are currently developing a pilot for snap shot audits that will commence in April In addition the All Wales Imaging Patient experience Survey will be used to measure the experience of 10 patients per month. During 2014/15 the Radiology CPG had engagement sessions with secondary care referrers to feedback on the outcome of the secondary care user survey these served as useful discussion forums. A GP engagement group has held its initial meeting and a work plan agreed. A repeat user survey of GP s is planned for 2015/ Dementia risk assessment The Radiology CPG has identified dementia champions who are working on raising awareness across the CPG. 3.2 Evidence against the robustness of your self assessment scores for Healthcare Standards and outlines planned actions to improve the low scores; The completion of the Health Care standards performance for the Radiology CPG is acknowledged to be low. Standards 14 and 17 are not applicable to Radiology. Standards7, 16, 19 and 21have been completed. Whilst completion of the standards has been poor the CPG can confirm it has robust arrangements in place for governance particularly with respect: Radiology CPG April 2015 Page 4
15 Health & Safety Management HSE inspection July 2014 described the CPG as borderline exemplar Radiation Protection HIW inspection January st time that HIW have lead an inspection where there are no actions for improvement. IPC highest up take of flu vaccine across health board. The Radiology CPG has now commenced its work towards gaining the Imaging Services Accreditation Scheme. An initial workshop has been held and a gap analysis is currently being completed to identify areas for improvement. As part of the process of completing the traffic light ready tool the work will be mapped across to the health care standards. 3.3 An indication of key risks and plans in place to reduce these; Significant identified risks for the CPG Failure to recruit consultant Radiologists mitigation ongoing recruitment, working with WOD on creative strategies for recruitment, increasing radiographer skill mix. There is also a national shortage of radiographers which is being mitigated against by an increase in the number training in North Wales. Failure of the Ysbyty Glan Clwyd CT scanner The current scanner has reached end of life and is due replacement. Failure would lead to loss of service on the YGC site there are limited opportunities to mitigate this risk due to their being little capacity on the radiotherapy planning scanner. A second scanner has been purchased but is not likely to be installed until the latter part of the financial year due to the asbestos strip. Lack of escorts as discussed in above 4. Assessment of risk Please see section 3.3 above. 5. Equality Impact Assessment An equality impact assessment register has been set up for the Radiology CPG 6. Conclusions / Next Steps This section should briefly summarise any conclusions being drawn, together with planned next steps and key dates for delivery. 7. Recommendations Note: To receive the information contained in the report Radiology CPG April 2015 Page 5
16 Radiology CPG Annual Report for Quality, Safety and Experience Sub-Committee- April Purpose of report To provide assurance to the QSE sub-committee of the Radiology CPG s commitment to quality, safety and experience 2. Introduction/Context This paper is a summary review of the QSE activity by the Radiology CPG during 2014/15 3. Main body of the report 3.1 CPG Quality Delivery Plans - position against Quality Delivery Plan The Radiology CPG identified its contribution to the BCU Quality objectives in its submitted QDP. Progress is outlined below Domain 1 safety Reduction of mortality rates for stroke, heart attack and fractured neck of femur. Radiology measure - compliance with CT scan within 24 hours, working towards CT scanning for stroke within 12 hours and scans for thrombolysis within 45minutes. To reduce the time to scan during the out of hours period, non-ct radiographers undertaking night and weekend day shifts are currently being trained to perform CT head scans. To date 33 radiographers have been trained across BCU Involvement in mortality reviews Is as required Reduction in % of patients who have hospital acquired thrombosis up to 90 days post discharge. Radiology support the diagnosis and have a reporting system in place Reduction of pressure ulcers Radiology is currently developing a tool for use for interventional procedures of more than 1 hour. Radiology CPG April 2015 Page 1
17 Safety Checklists Cadiovascular and Interventional Radiological Society of Europe (CIRSE) safety checklist introduced for interventional procedures. Auditing of compliance with using the checklist is just being completed. Checklists are also in place for MRI safety and the safe use of contrast media MRSA and C. Diff rates reduction Radiology not able to measure this target but is actively implementing and monitoring the bare below elbows initiative Hand washing audits are regularly between 95% and 100%. Monthly audit data for bare below elbows across the Divisions report scores between 80% and 100% for 2014/15. Staff are reminded regularly about the requirements for hand washing and Bare below elbows. During 2015/16 it is planned to do random checks using visiting staff to remove any local bias and ensure consistency of application across the divisions Peripheral Vascular Care bundle compliance It has been agreed with the Assistant Director of Nursing for Infection Prevention and Control that the bundle is not suitable for use in Radiology. A Radiology compliance list has been added to the request card that is being introduced June Audits of compliance will then be implemented Antibiotic prescribing A review of antibiotic prescribing within the CPG is currently being carried out by the Clinical Director for Central. There is limited prescribing within radiology and it is usually for prophylaxis during interventional procedures NPSA 16 Failure to act As reported last year this needs to be embedded across referring CPGs with Radiology providing support. It has recently been agreed that the Assistant Director of Therapies will lead a series of task and finish workshops to ensure compliance with this alert Escorts with Patients Some vulnerable and unstable patients are brought to the Radiology departments with inappropriate escort support, from HCA or registered nurses. This has been an issue for the departments for a number of years and numerous meetings have taken place with referring departments and with Directors of Nursing. Escort policies have been developed, but these have not been implemented / resourced. Radiology have taken steps to reduce the risk, for example, establishing a system with the YG ED team to hand over patients in the ED, rather than within the Radiology department so risk can be appropriately assessed within ED prior to transfer. Further work must be done and support from the new Hospital Directors will be needed to address these risks Domain 2 Clinical effectiveness Improve Radiology reporting turn round times to meet national standards The CPG monitors against All Wales standards for report turnaround times (time taken from the scan / x-ray being undertaken to a validated report being issued). The standards are: Referrer A&E and inpatients GP Outpatients working days Radiology CPG April 2015 Page 2
18 Audit and effectiveness Radiology has an active audit calendar with regular meetings held in each division and a series of joint audit sessions across the CPG. There is an identified radiographer and radiologist lead for each division. Number of audits registered 2014/15 = 22 Number of audits completed and action plan submitted = 12 Research Radiology has had 5 papers published in journals both within radiology and other specialties. The continued funding by NISCAR of 1.5WTE research radiographers is allowing the CPG to ensure that IR(ME)R compliance is maintained in relation to research and also initiate primary research. Current projects Image quality & dose implication for trolley imaging Patient anxiety and image quality in MRI scanning Projects looking at the weight bearing MRI scanner Reduction in procedures of limited effectiveness The CPG is working with the GP Engagement Group to reduce lumbar spine plain film examinations performed. A pathway is being developed that includes input from CMATs and the pain control team NICE During 2014 links have been developed to ensure Radiology is linked into the NICE process. NICE guidance involving Radiology is being reviewed and updated. The NICE guidance on HCC has not been implemented and a decision of future provision of service is awaited following a review of the public health research and current guidance by Karen Mottart, Associate Medical Director Cancer mortality support delivery of 31 and 62 day targets The CPG is working with members of the Cancer Performance Board to improve performance Compliance with stroke bundles and SNAP audit See section Domain 3 Patient Experience Radiology CPG April 2015 Page 3
19 Concerns Response times for concerns, has deteriorated over 2014/15 due to staffing issues but these are now in the process of being resolved. The main patterns for concerns during 2014/15 have been time waiting for imaging and reporting discrepancies Review of Datix incident reporting common themes and learning Cancellation of beds for interventional procedures SBAR developed and has been submitted to the East Safer Patient group. Lack of gowns Current supplies of gowns do not meet radiology requirements. The theatre style patient gowns do not afford dignity to patients in radiology and are a source of verbal complaints. Meetings have been held with the laundry and a pilot of a different style of gown is nearing completion. Consideration will need to be given to the cost of new gowns and ensuring supply is restricted to radiology MRI Safety multiple near misses due to referrer s not highlighting patients have pacemakers. CT incidents a series of MDT workshops have been held, taking a whole system view of incidents which has lead to improvements in processes and sharing of good practise across the divisions resulting in a lower number of reportable incidents. As a result of the MRI near misses and the radiation incidents and near misses involving addressograph labels a radiology safety newsletter was created and sent to all CPGs, safer patient groups and put on the radiology webpage Effective Communication A Welsh buddy system is in place. The annual review of compliance against the Radiology standard operating procedure was completed in March 2015 and an action plan has been developed Service user experience For Radiology the term service user includes referrers as well as patients attending for imaging or interventional procedures. The public member and identified staff are currently developing a pilot for snap shot audits that will commence in April In addition the All Wales Imaging Patient experience Survey will be used to measure the experience of 10 patients per month. During 2014/15 the Radiology CPG had engagement sessions with secondary care referrers to feedback on the outcome of the secondary care user survey these served as useful discussion forums. A GP engagement group has held its initial meeting and a work plan agreed. A repeat user survey of GP s is planned for 2015/ Dementia risk assessment The Radiology CPG has identified dementia champions who are working on raising awareness across the CPG. 3.2 Evidence against the robustness of your self assessment scores for Healthcare Standards and outlines planned actions to improve the low scores; The completion of the Health Care standards performance for the Radiology CPG is acknowledged to be low. Standards 14 and 17 are not applicable to Radiology. Standards7, 16, 19 and 21have been completed. Whilst completion of the standards has been poor the CPG can confirm it has robust arrangements in place for governance particularly with respect: Radiology CPG April 2015 Page 4
20 Health & Safety Management HSE inspection July 2014 described the CPG as borderline exemplar Radiation Protection HIW inspection January st time that HIW have lead an inspection where there are no actions for improvement. IPC highest up take of flu vaccine across health board. The Radiology CPG has now commenced its work towards gaining the Imaging Services Accreditation Scheme. An initial workshop has been held and a gap analysis is currently being completed to identify areas for improvement. As part of the process of completing the traffic light ready tool the work will be mapped across to the health care standards. 3.3 An indication of key risks and plans in place to reduce these; Significant identified risks for the CPG Failure to recruit consultant Radiologists mitigation ongoing recruitment, working with WOD on creative strategies for recruitment, increasing radiographer skill mix. There is also a national shortage of radiographers which is being mitigated against by an increase in the number training in North Wales. Failure of the Ysbyty Glan Clwyd CT scanner The current scanner has reached end of life and is due replacement. Failure would lead to loss of service on the YGC site there are limited opportunities to mitigate this risk due to their being little capacity on the radiotherapy planning scanner. A second scanner has been purchased but is not likely to be installed until the latter part of the financial year due to the asbestos strip. Lack of escorts as discussed in above 4. Assessment of risk Please see section 3.3 above. 5. Equality Impact Assessment An equality impact assessment register has been set up for the Radiology CPG 6. Conclusions / Next Steps This section should briefly summarise any conclusions being drawn, together with planned next steps and key dates for delivery. 7. Recommendations Note: To receive the information contained in the report Radiology CPG April 2015 Page 5
21 Radiology CPG Annual Report for Quality, Safety and Experience Sub-Committee- April Purpose of report To provide assurance to the QSE sub-committee of the Radiology CPG s commitment to quality, safety and experience 2. Introduction/Context This paper is a summary review of the QSE activity by the Radiology CPG during 2014/15 3. Main body of the report 3.1 CPG Quality Delivery Plans - position against Quality Delivery Plan The Radiology CPG identified its contribution to the BCU Quality objectives in its submitted QDP. Progress is outlined below Domain 1 safety Reduction of mortality rates for stroke, heart attack and fractured neck of femur. Radiology measure - compliance with CT scan within 24 hours, working towards CT scanning for stroke within 12 hours and scans for thrombolysis within 45minutes. To reduce the time to scan during the out of hours period, non-ct radiographers undertaking night and weekend day shifts are currently being trained to perform CT head scans. To date 33 radiographers have been trained across BCU Involvement in mortality reviews Is as required Reduction in % of patients who have hospital acquired thrombosis up to 90 days post discharge. Radiology support the diagnosis and have a reporting system in place Reduction of pressure ulcers Radiology is currently developing a tool for use for interventional procedures of more than 1 hour. Radiology CPG April 2015 Page 1
22 Safety Checklists Cadiovascular and Interventional Radiological Society of Europe (CIRSE) safety checklist introduced for interventional procedures. Auditing of compliance with using the checklist is just being completed. Checklists are also in place for MRI safety and the safe use of contrast media MRSA and C. Diff rates reduction Radiology not able to measure this target but is actively implementing and monitoring the bare below elbows initiative Hand washing audits are regularly between 95% and 100%. Monthly audit data for bare below elbows across the Divisions report scores between 80% and 100% for 2014/15. Staff are reminded regularly about the requirements for hand washing and Bare below elbows. During 2015/16 it is planned to do random checks using visiting staff to remove any local bias and ensure consistency of application across the divisions Peripheral Vascular Care bundle compliance It has been agreed with the Assistant Director of Nursing for Infection Prevention and Control that the bundle is not suitable for use in Radiology. A Radiology compliance list has been added to the request card that is being introduced June Audits of compliance will then be implemented Antibiotic prescribing A review of antibiotic prescribing within the CPG is currently being carried out by the Clinical Director for Central. There is limited prescribing within radiology and it is usually for prophylaxis during interventional procedures NPSA 16 Failure to act As reported last year this needs to be embedded across referring CPGs with Radiology providing support. It has recently been agreed that the Assistant Director of Therapies will lead a series of task and finish workshops to ensure compliance with this alert Escorts with Patients Some vulnerable and unstable patients are brought to the Radiology departments with inappropriate escort support, from HCA or registered nurses. This has been an issue for the departments for a number of years and numerous meetings have taken place with referring departments and with Directors of Nursing. Escort policies have been developed, but these have not been implemented / resourced. Radiology have taken steps to reduce the risk, for example, establishing a system with the YG ED team to hand over patients in the ED, rather than within the Radiology department so risk can be appropriately assessed within ED prior to transfer. Further work must be done and support from the new Hospital Directors will be needed to address these risks Domain 2 Clinical effectiveness Improve Radiology reporting turn round times to meet national standards The CPG monitors against All Wales standards for report turnaround times (time taken from the scan / x-ray being undertaken to a validated report being issued). The standards are: Referrer A&E and inpatients GP Outpatients working days Radiology CPG April 2015 Page 2
23 Audit and effectiveness Radiology has an active audit calendar with regular meetings held in each division and a series of joint audit sessions across the CPG. There is an identified radiographer and radiologist lead for each division. Number of audits registered 2014/15 = 22 Number of audits completed and action plan submitted = 12 Research Radiology has had 5 papers published in journals both within radiology and other specialties. The continued funding by NISCAR of 1.5WTE research radiographers is allowing the CPG to ensure that IR(ME)R compliance is maintained in relation to research and also initiate primary research. Current projects Image quality & dose implication for trolley imaging Patient anxiety and image quality in MRI scanning Projects looking at the weight bearing MRI scanner Reduction in procedures of limited effectiveness The CPG is working with the GP Engagement Group to reduce lumbar spine plain film examinations performed. A pathway is being developed that includes input from CMATs and the pain control team NICE During 2014 links have been developed to ensure Radiology is linked into the NICE process. NICE guidance involving Radiology is being reviewed and updated. The NICE guidance on HCC has not been implemented and a decision of future provision of service is awaited following a review of the public health research and current guidance by Karen Mottart, Associate Medical Director Cancer mortality support delivery of 31 and 62 day targets The CPG is working with members of the Cancer Performance Board to improve performance Compliance with stroke bundles and SNAP audit See section Domain 3 Patient Experience Radiology CPG April 2015 Page 3
Betsi Cadwaladr University Health Board. Quality and Safety Committee Item QS12/60.4. Subject:
Betsi Cadwaladr University Health Board Quality and Safety Committee14.6.12 Item QS12/60.4 Subject: Summary or Issues of Significance Wales Ombudsman s Report Section 16 aggregated review: Serious Concerns
More informationIR(ME)R Inspection (Announced) Abertawe Bro Morgannwg University Health Board Princess of Wales Hospital Radiology Department
DRIVING IMPROVEMENT THROUGH INDEPENDENT AND OBJECTIVE REVIEW IR(ME)R Inspection (Announced) Abertawe Bro Morgannwg University Health Board Princess of Wales Hospital Radiology Department 18 and 19 August
More informationCT Scanner Replacement Nevill Hall Hospital Abergavenny. Business Justification
CT Scanner Replacement Nevill Hall Hospital Abergavenny Business Justification Version No: 3 Issue Date: 9 July 2012 VERSION HISTORY Version Date Brief Summary of Change Owner s Name Issued Draft 21/06/12
More informationDELIVERING THE LONDON QUALITY STANDARDS AND 7 DAY SERVICES
Enclosure I DELIVERING THE LONDON QUALITY STANDARDS AND 7 DAY SERVICES Trust Board Meeting Item: 13 Date: 25 th May 2016 Purpose of the Report: Enclosure: I To update the Board on the Trust s current performance
More informationNHS Lanarkshire. Radiology Review. August 2011
NHS Lanarkshire Radiology Review August 2011 Review of Radiology Services 1. Background NHS Lanarkshire has been undertaking a review of acute and community radiology services over the past 18 months.
More informationQuality Improvement Scorecard March 2018
Mortality: HSMR Nat NB: Each month is a 12 month rolling value. I.e. Mar-16 reports the monthly average of Apr-15 to Mar-16. Performance further improved in October. November data not yet available. Mortality:
More informationREVIEW AND UPDATE OF THE COMMITTEE WORK PROGRAMME
AGENDA ITEM 3.1 14 June 2013 REVIEW AND UPDATE OF THE COMMITTEE WORK PROGRAMME Executive Lead: Committee Chair Author: Assistant Director of Patient Safety & Quality Contact Details for further information:
More informationQuality Improvement Scorecard June 2017
Mortality: HSMR Nat NB: Each month is a 12 month rolling value. I.e. Mar-16 reports the monthly average of Apr-15 to Mar-16. Performance remained below target in February. Mortality: HSMR (weekday) vs.
More informationRadiology Service Hywel Dda University Health Board
Radiology Service Hywel Dda University Health Board Audit year: 2016 Date issued: April 2017 Document reference: 175A2017 This document has been prepared as part of work performed in accordance with statutory
More informationNHS Wales Delivery Framework 2011/12 1
1. Introduction NHS Wales Delivery Framework for 2011/12 NHS Wales has made significant improvements in targeted performance areas over recent years. This must continue and be associated with a greater
More informationQuality Improvement Scorecard February 2017
Mortality: HSMR Nat Performance continued to improve into Q3 2016/17. NB: Each month is a 12 month rolling value. I.e. Mar-16 reports the monthly average of Apr-15 to Mar-16. Mortality: HSMR (weekday)
More informationTogether for Health A Delivery Plan for the Critically Ill
Together for Health A Delivery Plan for the Critically Ill 2013-2016 March 2015 Approved at CPG Board 25 th March 2015 1. BACKGROUND AND CONTEXT Together for Health a Delivery Plan for the Critically Ill
More informationAdult Practice Review Report
Adult Practice Review Report North Wales Safeguarding Adults Board (NWSAB) Concise Adult Practice Review Re: APR2/2016/Conwy 1. Brief outline of circumstances resulting in the Review 1.1 Patient A died
More informationTrust Key Performance Indicators
Monthly - February 2007 Patient Experience Length of Stay - Overall A Mortality Rate G Cancelled Operations R Elective A Peri-operative Mortality Rate Cancelled Operations (28 day reschedule) A Non-elective
More informationRBCH Actions to meet CQC Essential Standards
RBCH Actions to meet CQC Essential Standards REGULATION 17 How the regulation was not being met Patients, their relatives, and staff told us about incidents where people had not been treated with dignity
More informationQuality Improvement Strategy
/ Colchester Hospital University NHS Foundation Trust Quality Improvement Strategy 2015-2018 Including our four Quality goals Strategy Author Angela Tillett, Medical Director Version 1 Date of Issue -
More informationDelivering Improvement in Practice
v Delivering Improvement in Practice NHS Providers Governance Conference 7 July 2016 Sir Mike Aaronson Chairman, Frimley Health NHS Foundation Trust 2006-2016 Frimley Health FT Comprises: Frimley Park
More informationTheatre Safety and Efficiencies in Wales. Lesley Law Planned Care Policy Lead Welsh Government
Theatre Safety and Efficiencies in Wales Lesley Law Planned Care Policy Lead Welsh Government Welcome Who am I? I am Lesley Law - Policy Lead for planned care in Welsh Government Why am I here? March 2016
More informationNHS GRAMPIAN. Local Delivery Plan - Section 2 Elective Care
NHS GRAMPIAN Local Delivery Plan - Section 2 Elective Care Board Meeting 01/12/2016 Open Session Item 7 1. Actions Recommended The NHS Board is asked to: Consider the context in which planning for future
More informationSeven Day Services Clinical Standards September 2017
Seven Day Services Clinical Standards September 2017 11 September 2017 Gateway reference: 06408 Patient Experience 1. Patients, and where appropriate families and carers, must be actively involved in shared
More informationQuality Improvement Scorecard December 2017
Mortality: HSMR Performance improved in August Nat NB: Each month is a 12 month rolling value. I.e. Mar-16 reports the monthly average of Apr-15 to Mar-16. Mortality: HSMR (weekday) vs. HSMR (weekend)
More informationIntegrated Performance Report August 2017
Integrated Performance Report Contents Section Page High Level Dashboard Balanced scorecard 3 Domain Scorecards and Director Commentaries Operational Performance 4 Quality and Patient Safety 9 Workforce
More informationOpen and Honest Care in your Local Hospital
Open and Honest Care in your Local Hospital The Open and Honest Care: Driving Improvement programme aims to support organisations to become more transparent and consistent in publishing safety, experience
More informationQuality Improvement Scorecard November 2017
Mortality: HSMR Performance remained below target in July Nat NB: Each month is a 12 month rolling value. I.e. Mar-16 reports the monthly average of Apr-15 to Mar-16. Mortality: HSMR (weekday) vs. HSMR
More informationUrological Cancer Peer Review Betsi Cadwaladr University Health Board Ysbyty Glan Clwyd, Ysbyty Wrexham Maelor and Ysbyty Gwynedd
Urological Cancer Peer Review Betsi Cadwaladr University Health Board Ysbyty Glan Clwyd, Ysbyty Wrexham Maelor and Ysbyty Gwynedd MEETING ATTENDANCE Peer Review Team Name Job Title Organisation Dr Tom
More informationSummarise the Impact of the Health Board Report Equality and diversity
AGENDA ITEM 4.1 Health Board Report INTEGRATED PERFORMANCE DASHBOARD Executive Lead: Director of Planning and Performance Author: Assistant Director of Performance and Information Contact Details for further
More informationQuality Accounts: Corroborative Statements from Commissioning Groups. Nottingham NHS Treatment Centre - Corroborative Statement
Quality Accounts: Corroborative Statements from Commissioning Groups Quality Accounts are annual reports to the public from providers of NHS healthcare about the quality of services they deliver. The primary
More informationQuality and Safety Committee
Betsi Cadwaladr University Health Board Committee Paper 13.6.13 Item QS13/112.1 Name of Committee: Subject: Summary or Issues of Significance Quality and Safety Committee Endoscopy action plan Situation:.This
More informationPaper for the Health Board Quality and Safety Committee. Out of Hours Upper GI Haemorrhage
Paper for the Health Board Quality and Safety Committee Out of Hours Upper GI Haemorrhage This short paper describes the current pathways within the Health Board for the management of out of hours emergency
More informationAppendix A: University Hospitals Birmingham NHS Foundation Trust Draft Action Plan in Response to CQC Recommendations
No. Domain CQC Recommendation Lead Operational Lead Current Status 1 Appendix A: University Hospitals Birmingham NHS Foundation Trust Draft Action Plan in Response to CQC Recommendations Wording in long
More informationSue Brown Clinical Audit and Effectiveness Manager. Safety and Quality Committee
Report to Trust Board of Directors Date of Meeting: 24 June 2014 Enclosure Number: 11 Title of Report: Clinical Audit Plan for 2014/15 Author: Executive Lead: Responsible Sub- Committee (if appropriate):
More informationIntegrated Performance Report
Integrated Performance Report M12 March 2015 Presented by: Paul Bostock (Chief Operating Officer) Des Holden (Medical Director) Fiona Alsop (Chief Nurse) Paul Simpson (Chief Financial Officer) An Associated
More informationWorcestershire Acute Hospitals NHS Trust
Worcestershire Acute Hospitals NHS Trust Worcestershire Royal Hospital Quality Report Charles Hastings Way Worcester WR5 1DD Tel: 01905 763333 Website: www.worcsacute.nhs.uk Date of inspection visit: 12,
More informationpatients by referral to x-ray by cardiac nurses, within clearly defined parameters. Contributes to CQC Core Outcome: Outcome 4
Referral of Patients for Chest X-Rays Post Pacemaker Insertion by Cardiac Nurses/ Cardiac Radiographers Type: Register No: 06026 Status: Public Clinical Guidelines Developed in response to: To reduce treatment
More informationAMP Health and Social Care Professional Implementation Group Update
AMP Health and Social Care Professional Implementation Group Update November 2016 Welcome to another update from the National Acute Medicine Programme s Health and Social Care Professionals Implementation
More information21 March NHS Providers ON THE DAY BRIEFING Page 1
21 March 2018 NHS Providers ON THE DAY BRIEFING Page 1 2016-17 (Revised) 2017-18 (Revised) 2018-19 2019-20 (Indicative budget) 2020-21 (Indicative budget) Total revenue budget ( m) 106,528 110,002 114,269
More informationReview of Stroke (Acute Phase) and TIA Services
Review of Stroke (Acute Phase) and TIA Services Mid Staffordshire Health Economy Visit Date: 6 th December, 2011 Report Date: February 2012 WMQRS Mid Staffs Stroke Final Report V1 20120214.Doc 1 IDEX Introduction...
More informationMDT Peer Review Report Proforma
Network Trust NICaN Western Health and Social Care Trust Lung MDT Visit Date 13 September 2017 Structure and function of the service The Western Health and Social Care Trust (WHSCT) was established on
More informationQuality Assurance Framework. Powys thb provided and commissioned services Quality and Safety Committee November 2013
Quality Assurance Framework Powys thb provided and commissioned services Quality and Safety Committee November 2013 1 Background Together for Health vision for NHS Wales 6 domains of quality Effectiveness
More informationConsultation Paper. Distributed Medical Imaging in the new Royal Adelaide Hospital Central Adelaide Local Health Network
Consultation Paper Distributed Medical Imaging in the new Royal Adelaide Hospital Central Adelaide Local Health Network Issued: April 2016 TABLE OF CONTENTS TABLE OF CONTENTS 2 1. INTRODUCTION 3 2. PURPOSE
More informationCompliance with IR(ME)R in radiotherapy departments across England
C Compliance with IR(ME)R in radiotherapy departments across England A summary of our programme of inspections during 2007 to 2009 January 2011 Introduction During 2007 to 2009, we carried out a programme
More informationANEURIN BEVAN HEALTH BOARD Stroke Delivery Plan Template for 2009/2010
ANEURIN BEVAN HEALTH BOARD Stroke Delivery Plan Template for 2009/2010 Objective Action Desired Output / Monitor and manage all those at risk of stroke and, refer as appropriate to smoking cessation services,
More informationLLANDUDNO HOSPITAL PROJECT CYCLE TWO REPORT FOR UNSCHEDULED CARE PROJECT TEAM: IDENTIFICATION OF PREFERRED SERVICE SOLUTIONS MAY 2010
SITUATION LLANDUDNO HOSPITAL PROJECT CYCLE TWO REPORT FOR UNSCHEDULED CARE PROJECT TEAM: IDENTIFICATION OF PREFERRED SERVICE SOLUTIONS MAY 2010 The Cycle One SBAR report detailed the solutions which had
More informationThis SLA covers an enhanced service for care homes for older people and not any other care category of home.
Care Homes for Older People Service Level Agreement 2016-2019 All practices are expected to provide essential and those additional services they are contracted to provide to all their patients. This service
More informationNHS LANARKSHIRE QUALITY DASHBOARD Board Report June 2011 (Data available as at end April 2011)
NHS LANARKSHIRE QUALITY DASHBOARD Board Report June 2011 (Data available as at end April 2011) INTRODUCTION This paper provides a monthly quality dashboard for NHS Lanarkshire. This is in line with the
More informationReport of the Care Quality Commission. May 2017
Report of the Care Quality Commission May 2017 1. Purpose 1.1 The purpose of this report is to formally confirm the findings of the Care Quality Commission (CQC) following its inspection in October 2016;
More informationPEER REVIEW VISIT REPORT (MULTI-DISCIPLINARY TEAM)
PEER REVIEW VISIT REPORT (MULTI-DISCIPLINARY TEAM) Regional Trauma Network Trauma Centre Trauma Service SVTN North Bristol NHS Trust North Bristol NHS Trust Reception and Resuscitation Measures (T14-2B-1)
More informationSERVICE SPECIFICATION 2 Vascular Access
SERVICE SPECIFICATION 2 Vascular Access Table of Contents Page 1 Key Messages 1 2 Introduction & Background 2 3 Relevant Guidelines & Standards 2 4 Scope of Service 3 5 Interdependencies with other specialties
More informationSHEFFIELD TEACHING HOSPITALS NHS FOUNDATION TRUST EXECUTIVE SUMMARY REPORT TO THE TRUST BOARD HELD ON 18 NOVEMBER 2015
SHEFFIELD TEACHING HOSPITALS NHS FOUNDATION TRUST EXECUTIVE SUMMARY REPORT TO THE TRUST BOARD HELD ON 18 NOVEMBER 2015 Subject: Supporting TEG Member: Authors: Status 1 Data Quality Baseline Assessment
More informationPercutaneous Transhepatic Cholangiogram (PTC) and Biliary Stent
Patient information leaflet Royal Surrey County Hospital NHS Foundation Trust Percutaneous Transhepatic Cholangiogram (PTC) and Biliary Stent Radiology This leaflet informs you about the procedure known
More informationWe are the regulator: Our job is to check whether hospitals, care homes and care services are meeting essential standards.
Inspection Report We are the regulator: Our job is to check whether hospitals, care homes and care services are meeting essential standards. Inhealth Diagnostic Centre 688 South Fifth Street, Milton Keynes,
More informationStatus: Information Discussion Assurance Approval. Claire Gorzanski, Head of Clinical Effectiveness
Report to: Trust Board Agenda item: Date of Meeting: 2 October 2017 SFT3934 Report Title: Annual quality governance report 2016-2017 Status: Information Discussion Assurance Approval X Prepared by: Executive
More informationQUALITY REPORT. Part A Patient Experience
QUALITY REPORT Part A Patient Experience 1 Number of complaints Complaints and Patient Advice and Liaison Report 40 Total number of complaints received 30 20 10 Number of complaints received Trendline
More informationAnnual General Meeting 17 September 2014
Annual General Meeting 17 September 2014 Quality Accounts Mike Wright Executive Director of Nursing & Patient Experience Director of Infection Prevention and Control Quality Account 2013/14 2013/14 in
More informationSpecialised Services Commissioning Policy: CP160 Specialised Paediatric Neurological Rehabilitation
Specialised Services Commissioning Policy: CP160 Specialised Paediatric Neurological Rehabilitation April 2018 Version 4.0 Document information Document purpose Document name Author Policy Specialised
More informationMaternity & Child Health Review
Maternity & Child Health Review PAEDIATRIC AND CHILD HEALTH WORKSTREAM NB This is a draft document for discussion and still very much in development. Any detail should not be considered a final proposal.
More informationClinical Strategy
Clinical Strategy 2012-2017 www.hacw.nhs.uk CLINICAL STRATEGY 2012-2017 Our Clinical Strategy describes how we are going to deliver high quality care in response to patient and carer feedback and commissioner
More informationIntegrated Performance Report Executive Summary (for NHS Fife Board Meeting) Produced in February 2018
6b Integrated Performance Report Executive Summary (for NHS Fife Board Meeting) Produced in February 2018 2 Contents Integrated Performance Report: Executive Summary 5 Clinical Governance: Chair and Committee
More informationQuality Improvement Scorecard December 2016
Mortality: HSMR Nat The improvement in performance has been maintained in year. NB: Each month is a 12 month rolling value. I.e. Mar-16 reports the average of Apr-15 to Mar-16. Mortality: HSMR (weekday)
More informationAnnex 3 Cluster Network Action Plan South Ceredigion and Teifi Valley Cluster Plan
Annex 3 Network Action Plan 06-7 South Ceredigion and Teifi Valley Plan The Network Development Domain supports GP Practices to work to collaborate to: Understand local needs and priorities. Develop an
More informationEMERGENCY PRESSURES ESCALATION PROCEDURES
OP48 EMERGENCY PRESSURES ESCALATION PROCEDURES INITIATED BY: Director of Therapies & Health Sciences / Chief Operating Officer APPROVED BY: Executive Board DATE APPROVED: 21 September 2016 VERSION: 3 OPERATIONAL
More informationCancer services improvement plan to achieve cancer standard August 2015
Cancer services improvement plan to achieve cancer standard August 2015 Action Timeline to recovery Lead Officer Current Position Current RAG rating against timeline Key next steps General January 2016
More informationLanarkshire NHS board 14 Beckford Street Hamilton ML3 0TA Telephone Fax
Agenda Item Meeting of Lanarkshire NHS Board 25 February 2009 Lanarkshire NHS board 14 Beckford Street Hamilton ML3 0TA Telephone 01698 281313 Fax 01698 423134 www.nhslanarkshire.co.uk WAITING TIMES 1.
More informationPEER REVIEW VISIT REPORT (MULTI-DISCIPLINARY TEAM)
PEER REVIEW VISIT REPORT (MULTI-DISCIPLINARY TEAM) Network Organisation (Trust) Team MVCN LUTON AND DUNSTABLE Luton & Dunstable Colorectal MDT (11-2D-1) - 2011/12 Peer Review Visit Date 11th November 2011
More informationStandard of Care for MTC inpatients
Standard of Care for MTC inpatients The following document is intended to summarise the model of care for patients admitted under the care of the Leeds Major Trauma System. It will outline expected duties
More informationNHS England London Southside 4th Floor 105 Victoria Street London SW1E 6QT. 24 th July Dear Daniel, Fiona and Louise. Re: CCG Annual Assurance
NHS England London Southside 4th Floor 105 Victoria Street London SW1E 6QT 24 th July 2014 Dear Daniel, Fiona and Louise Re: CCG Annual Assurance Many thanks for meeting with us on 6 th June 2014 to discuss
More informationBSUH INTEGRATED PERFORMANCE REPORT. 1) Responsive Domain 2) Safe Domain 3) Effective Domain 4) Caring Domain 5) Well Led Domain
BSUH INTEGRATED PERFORMANCE REPORT 1) Responsive Domain 2) Safe Domain 3) Effective Domain 4) Caring Domain 5) Well ed Domain RESPONSIVE DOMAIN RESPONSIVE DOMAIN Metric Defined by Standard Apr-16 May-16
More informationReducing Mortality and Harm in ABMU Local Health Board
10 th June 2011 Reducing Mortality and Harm in ABMU Local Health Board Insert name of presentation on Master Slide Programme Driver Diagram Aims/Outcome Measure Reduce Mortality Reduce RAMI to
More informationDoncaster and Bassetlaw Hospitals NHS Foundation Trust
Doncaster and Bassetlaw Hospitals NHS Foundation Trust Doncaster Royal Infirmary Quality Report Armthorpe Road Doncaster DN2 5LT Tel: 01302 366666 Website: www.dbh.nhs.uk Date of inspection visit: 14 17
More informationMediastinal Venogram and Stent Insertion
Patient information leaflet Royal Surrey County Hospital NHS Foundation Trust Mediastinal Venogram and Stent Insertion Radiology This leaflet tells you about the procedure known as a mediastinal venogram.
More informationSUMMARY OF INDICATOR CHANGES FOR VERSION 3 INTELLIGENT MONITORING REPORTS Acute and Specialist NHS Trusts 23 June Final Draft, Subject to Change
Never Event incidence Yes: 01 May 2013-30 Apr 2014 Incidence of Clostridium difficile (C.difficile) Incidence of Meticillin-resistant Staphylococcus aureus (MRSA) Dr Foster Intelligence: Mortality rates
More informationQuality, Safety & Experience (QSE) Committee. Minutes of the Meeting Held on Wednesday 29 th March 2017 in the Boardroom, Carlton Court, St Asaph
1 Minutes QSE Public 29.3.17 V1.0 Present: Quality, Safety & Experience (QSE) Committee Minutes of the Meeting Held on Wednesday 29 th March 2017 in the Boardroom, Carlton Court, St Asaph Mrs Margaret
More informationOverall rating for this location Outstanding
The London Bridge Hospital Quality Report 27 Tooley Street London Bridge SE1 2PR Tel: 02074 073100 Website: www.londonbridgehospital.com Date of inspection visit: 21 and 22 September 2016 Date of publication:
More informationWe are the regulator: Our job is to check whether hospitals, care homes and care services are meeting essential standards.
Inspection Report We are the regulator: Our job is to check whether hospitals, care homes and care services are meeting essential standards. Lady McAdden Breast Screening Unit Lady McAdden Breast Screening
More informationMortality and harm reduction in Welsh Ambulance Services NHS Trust
25 th November 2010 Mortality and harm reduction in Welsh Ambulance Services NHS Trust Insert name of presentation on Master Slide Introduction First ambulance service in the world to take part in 1000
More informationInfluence of Patient Flow on Quality Care
Influence of Patient Flow on Quality Care Patients Waiting on Trolleys for an Inpatient Bed Patients who are Medically Fit to be discharged and cared for at Home with Support or in a Nursing Home or District
More informationWhittington Health Quality Strategy
Whittington Health Quality Strategy 2012-2017 Safe care Effective care Excellent patient experience...caring for you Quality Strategy for Whittington Health Introduction The purpose of this quality strategy
More informationUsing mortality data to improve the quality and safety of patient care December 2015
Using mortality data to improve the quality and safety of patient care December 2015 Version Date Published Notes 12.0 18/12/2015 12 th publication 11.0 18/09/2015 11 th publication 10.0 19/06//2015 10
More informationTHE FUTURE OF YOUR HOSPITALS: Planned Care site
THE FUTURE OF YOUR HOSPITALS: Planned Care site We have a real opportunity to shape healthcare in Shropshire for future generations. Care Centres. Doctors, nurses and other healthcare professionals are
More informationVANGUARD: Better Care Together
VANGUARD: Better Care Together Case study: Patient Initiated Follow-Ups (PIFU) Purpose: Patient initiated follow ups put the patient in control of any further outpatient appointments with consultants or
More informationINTERNAL VALIDATION REPORT (MULTI-DISCIPLINARY TEAM)
INTERNAL VALIDATION REPORT (MULTI-DISCIPLINARY TEAM) Network Trust MDT GMCCN SALFORD ROYAL Salford Pituitary MDT Neuroscience MDT (11-2K-4) - 2011/12 Date Self Assessment Completed 15th December 2011 Date
More informationNHS. Challenges and improvements in diagnostic services across seven days. Improving Quality
NHS Improving Quality NHS Improving Quality working in partnership with NHS England Challenges and improvements in diagnostic services across seven days 2 Foreword Across the country, hospitals and primary
More informationImaging Department Board Presentation 8 th January 2018 Presented by Dr Hefin Jones, Deonne Lee and Jonathan Barnett
Imaging Department Board Presentation 8 th January 2018 Presented by Dr Hefin Jones, Deonne Lee and Jonathan Barnett Background and Context Imaging lies at the heart of the NHS s work. NHS Imaging services
More informationCLOSTRIDIUM DIFFICILE ACTION PLAN
CLOSTRIDIUM DIFFICILE ACTION PLAN Action plan to address the rise in cases of Clostridium difficile (C.diff) at Sheffield Teaching Hospitals NHS Foundation Trust ACTION KEY MILESTONES PERSON RESPONSIBLE
More informationMedicare Reading Limited
Medicare Reading Limited Medicare Inspection report 603 Oxford Road Reading Berkshire RG30 1HL Tel: 0118 9561766 Website: www.polscy-lekarze.co.uk Date of inspection visit: 7 August 2015 Date of publication:
More informationBOARD OF DIRECTORS PAPER COVER SHEET. Meeting Date: 24 February Title: ANNUAL RADIATION PROTECTION REPORT 2009
BOARD OF DIRECTORS PAPER COVER SHEET Meeting Date: 24 February 2010 Agenda Item: 7 Paper No: D Title: ANNUAL RADIATION PROTECTION REPORT 2009 Purpose: To provide assurance to the Board of Directors with
More informationBetsi Cadwaladr Health Board s Ophthalmic Health Plan Version 1.3 produced 5/6/2014
Betsi Cadwaladr Health Board s Ophthalmic Health Plan 2014-2018 Version 1.3 produced 5/6/2014 Page 1 Overview The National Eye Health Care Delivery Plan was issued in September 2013 setting out the strategic
More informationWe are the regulator: Our job is to check whether hospitals, care homes and care services are meeting essential standards.
Inspection Report We are the regulator: Our job is to check whether hospitals, care homes and care services are meeting essential standards. Liverpool Heart & Chest Hospital NHS Foundation Trust Thomas
More informationIncidents reported to MERU, HSE in Diagnostic Radiology (including Nuclear Medicine) and in Radiotherapy The MERU, HSE (2013)
Incidents reported to MERU, HSE in Diagnostic Radiology (including Nuclear Medicine) and in Radiotherapy 2010-2012 The MERU, HSE (2013) CONTENT Executive summary.. 2 Introduction 3 Incidents reported in
More informationCOVENTRY AND RUGBY CLINICAL COMMISSIONING GROUP
COVENTRY AND RUGBY CLINICAL COMMISSIONING GROUP Report To: Governing Body 11 September 2013 Report From: Title of Report: Purpose of the Report: Jacqueline Barnes, Executive Nurse The Nursing and Quality
More informationThe Royal Wolverhampton NHS Trust
The Royal Wolverhampton NHS Trust Meeting Date: 3 th June 214 Trust Board Report Title: Executive Summary: Action Requested: Report of: Author: Contact Details: Resource Implications: Public or Private:
More informationNorthern Lincolnshire and Goole NHS Foundation Trust
Northern Lincolnshire and Goole NHS Foundation Trust Diana Princess of Wales Hospital Quality Report Scartho Road Grimsby Lincolnshire DN33 2BA Tel: 01472 874111 Website: www.nlg.nhs.uk Date of inspection
More informationDalton Review RCR Clinical Radiology Proposal Radiology in the UK the case for a new service model July 2014
Dalton Review RCR Clinical Radiology Proposal Radiology in the UK the case for a new service model July 2014 Radiology services in the UK are in crisis. The ever-increasing role of imaging in modern clinical
More informationMoving to 7 Day Services. Kerry Gant, Head of Finance Change Team/Debbie Freake, Executive Director of Strategy
Report to Trust Board of Directors Date of Meeting: 24 March 2015 Enclosure Number: 12 Title of Report: Author: Executive Lead: Responsible Sub- Committee (if appropriate): Executive Summary: Moving to
More informationINVESTMENT PROPOSAL FOR A COMPUTED TOMOGRAPHY SCANNING SERVICE IN THE NORTH HIGHLANDS
INVESTMENT PROPOSAL FOR A COMPUTED TOMOGRAPHY SCANNING SERVICE IN THE NORTH HIGHLANDS Last Revised: 19 September 2006 1 CONTENTS Page 1 BACKGROUND 1 2 NATIONAL POSITION 2 3 HIGHLAND POSITION 3/4/5 4 REFERENCES
More informationSERIOUS PATIENT SAFETY INCIDENT REPORTING
SERIOUS PATIENT SAFETY INCIDENT REPORTING Executive Lead : Director of Nursing Author Patient Safety Manager, 029 2074 6387 Caring for People, Keeping People Well : This report underpins the Health Board
More informationCare Quality Commission (CQC) Inspection Briefing
Care Quality Commission (CQC) Inspection Briefing The CQC exists to make sure hospitals, care homes, dental and GP surgeries, and all other care services in England provide people with safe, effective,
More informationAintree University Hospital NHS Foundation Trust Corporate Strategy
Aintree University Hospital NHS Foundation Trust Corporate Strategy 2015 2020 Aintree University Hospital NHS Foundation Trust 1 SECTION ONE: BACKGROUND AND CONTEXT 1 Introduction Aintree University Hospital
More informationReport to the Board of Directors 2015/16
Attachment 9 Report to the Board of Directors 2015/16 Date of meeting 18 Subject Report of Prepared by Seven Day Services Medical Director Ashling Rivá, Project Manager Previously considered by Transformation
More informationPercutaneous Transhepatic Cholangiogram (PTC) and Biliary Stent
Percutaneous Transhepatic Cholangiogram (PTC) and Biliary Stent Radiology Department Patient information leaflet This leaflet informs you about the procedure known as a Percutaneous Transhepatic Cholangiogram
More information