1 FOR INFORMATION UHB Board Meeting: 17 January 2012 IMPLEMENTATION OF SETTING THE DIRECTION - WHOLE SYSTEMS CHANGE PROGRESS UPDATE Report of Paper prepared by Executive Summary Director of Public Health Divisional Manager Primary, Community & Intermediate Care This report provides an update on the implementation of Setting the Direction - The Primary and Community Services Strategic Programme (WAG, 2010) Setting the Direction in Cardiff and the Vale of Glamorgan. Setting the Direction - The Primary and Community Services Strategic Programme (WAG, 2010) proposes a system of care that will deliver an easily recognisable model of integrated and evidence based health and social care services in the community. This acts as a bridge between primary care and the acute sector bringing together all partners and will focus on the needs of the individual, moving from a reactive to a proactive model of care. The framework is predicated on whole systems working within the NHS and with local authorities and third sector partners. There is an All-Wales framework approach and each Health Board is progressing this agenda. The vision for primary and community services in Cardiff and the Vale of Glamorgan was previously set out locally through the Programme for Health Services Implementing Setting the Direction Page 1 of 18 Board Meeting
2 Improvement (PHSI). This has formed a strong base on which to deliver the challenges laid out in Setting the Direction. The Division of Primary, Community & Intermediate Care (PCIC) has been structured to enable the delivery of Setting the Direction locally. Within Cardiff and Vale of Glamorgan, the management infrastructure for delivery is in place which includes partnership agreement on localities and neighbourhoods. Neighbourhood teams and networks are also in place with appointed clinical leaders. Each neighbourhood is developing its delivery plan and at the same time ensuring demonstrable progress through defined projects. These are described within the paper. The next 6 months will see consolidation of three key recent changes. It will also see further changes in communications; service delivery and partnership working all of which are laid out within the paper. Action/Decision required Link to other Board Committee (s) and subcommittees Link to Standards for Health Services in Wales Link to Public Health Agenda Link to UHB Strategic Direction and Corporate Objectives / Legislative and To note the progress made to date and to support the continuing implementation of the programme. Presentation to the UHB Board on 22 March Updates as part of Capacity Plan Reports to Strategic Planning and Performance Committee, Board of Directors and the Operational Management Group. Standard 8 Care planning and provision Working to maximise individuals health and wellbeing Welsh Assembly Government (2005) Designed for Life Welsh Assembly Government (2010) Setting the Direction Cardiff & Vale UHB (2010) Making a Difference John Bolton (2010) Achieving greater efficiencies in Implementing Setting the Direction Page 2 of 18 Board Meeting
3 Regulatory Framework Link to relevant evidence base services for older people in Wales Cardiff & Vale UHB (2011) UHB Operational Plan Cardiff and Vale UHB (2010) UHB Five Year Framework for improving health in Cardiff and the Vale of Glamorgan Cardiff Health Alliance (2008) Working towards a healthy city Cardiff & Vale UHB (2011) Unscheduled Care Delivery Plan Cardiff & Vale UHB (2011) Capacity Plan Cardiff & Vale Integrated Health & Social Care Board. Older People s Programme Plan Cardiff Integrated Partnership (2011) What Matters? Strategy Vale of Glamorgan Partnership (2011). Community Strategy Setting the Direction Implementing Setting the Direction Page 3 of 18 Board Meeting
4 INTRODUCTION IMPLEMENTATION OF SETTING THE DIRECTION - WHOLE SYSTEMS CHANGE PROGRESS UPDATE Agenda Item 3.3 Setting the Direction - The Primary and Community Services Strategic Programme (WAG, 2010) proposes a system of care that will deliver an easily recognisable model of integrated and evidence based health and social care services in the community. This will act as a bridge between primary care and the acute sector bringing together all partners and will focus on the whole needs of the individual, moving from a reactive to a proactive model of care. The framework is predicated on whole systems working within the NHS and with local authorities and third sector partners. The framework aims to ensure a degree of consistency across Wales to enable key impacts and outcomes to be identified and monitored. However, accountability for delivery is retained locally with recognition of the need for local flexibility. The vision for primary and community services in Cardiff and the Vale of Glamorgan was set out initially in 2006 through the Programme for Health Services Improvement. That vision aligned well with Setting the Direction, and our delivery structures through the Division of Primary, Community & Intermediate Care (PCIC) enable and lead the delivery of Setting the Direction locally. This report describes what Setting the Direction means for people and services in Cardiff and Vale of Glamorgan. Progress on implementation to date is outlined and the next steps are identified. SETTING THE DIRECTION WHAT DOES IT MEAN FOR CARDIFF & VALE OF GLAMORGAN? The key aim is to maximise health, well-being and independence. This requires a change in focus: From To Illness of patient => Health of person Patient => Individual C&V UHB => Working with partner organisations Services delivered => Population needs Implementing Setting the Direction Page 4 of 18 Board Meeting
5 To enable this change, there needs to be a move from an organisational ethos with structures based on the services delivered, to services designed around the needs of the population. The building block for planning and delivery of services in the community is the GP practice; networks of practices will work together at a neighbourhood level. These networks support the delivery of community based services working in partnership to meet local need. The networks reflect natural communities (as far as practicable) with populations of 50 80,000 to enable a critical mass to support services. With UHB partners (local authority, police, fire service and third sector partners) common neighbourhood areas are being established, which will enable truly integrated and collaborative service planning and delivery. Groups of neighbourhoods (Cardiff) and areas (Vale of Glamorgan), aggregate to localities, and further align service provision with the needs of the neighbourhood populations. Setting the Direction describes a system of empowered localities in the form of Locality Networks developed around natural communities as a key platform for local service planning and delivery. These will comprise primary care, community and social care teams, working together across agreed populations to plan and deliver core out-of-hours hospital services. In Cardiff and Vale, there are three Locality Teams with a core management team in each Locality. To support integrated working there is a wider team of people drawn from therapies, public health, secondary care services, social services and the third sector. This integrated approach will reduce duplication and gaps in service, ensuring the needs of the population are met by the most appropriate person/ service/organisation. The delivery of services in the future will be through an organised service provision co-ordinated by a Community Resource Team (CRT) in each Locality. Setting the Direction describes a CRT as one of the key mechanisms for developing advanced skills within the community settings, which is intended to support primary care and hospital clinicians to maintain individuals at home and in the community. In Cardiff and Vale, the CRT will provide a hub of resource (health and social care) that straddles primary and secondary care and complements core community services, to provide enhanced levels of support for individuals who are failing in the community or require support on Implementing Setting the Direction Page 5 of 18 Board Meeting
6 discharge from hospital. It will also work with partner organisations such as the third sector. Figure 1 describes the key co-ordinating role that the CRT will have in each Locality. Primary Care Community Services Voluntary Sector COMMUNITY RESOURCE TEAM Secondary Care Social Services A Communications Hub will support the co-ordination of services across the system. Setting the Direction described this as a model predicated on future systems of communication that are designed to provide a single point of access for the co-ordination, scheduling and tracking of individualised care across the interface between the hospital and community setting. For Cardiff and Vale, the Communication Hub is already working with health, social services and voluntary sector services. The hub is being delivered through the Integrated Health and Social Care Line (IHSCL). It will provide a one-stop-shop for the public, patients, carers, voluntary sector, health and social care professionals. It integrates IT systems and telephony so that there is a single point of contact into services; Implementing Setting the Direction Page 6 of 18 Board Meeting
7 GP out of hours Dental out of hours Locality model (via Community Resource Teams) Referral centre Care co-ordination centre Clinic booking centre Social care services Chronic disease telemedicine monitoring IMPLEMENTATION PROGRESS TO DATE Primary Care The foundation for Setting the Direction is a high quality primary care service; the quality and standard of primary care in Cardiff and Vale is considered good. Three areas were identified for improvement: Open but Full lists historically a significant number of practices in Cardiff operated open but full practice lists. All GP practices across Cardiff are now open and accepting new patient registrations. Student Registrations - The target set in partnership with Cardiff University was to achieve 75% student registrations in 2010/11. This target has been met and exceeded with 83% of students currently registered with a GP. Dental Services access to dental services was sub-optimal and so over the past year the number of urgent access slots available across Cardiff and Vale has been doubled. A 24hour dental helpline has been established, the first of its kind in Wales, to improve access to treatment for patients, making it easier to find a dentist, get advice or access emergency treatment. Communications Hub The Communications Hub has been co-located with the Vale of Glamorgan Council s call centre; this has supported the integration of health and social care from the outset. The establishment of the Communications Hub has been pivotal to supporting the in-house delivery of the out of hours GP services for the Implementing Setting the Direction Page 7 of 18 Board Meeting
8 Vale of Glamorgan (previously provided by Primecare) from 1 April 2011 and Cardiff (previously provided by Cwm Taf) from 1 October The transfer has been completed and the focus is now on consolidating services and improving performance for the remainder of the financial year. The Hub now also integrates and handles calls for: District Nurse Service 24/7 The District Nurse call handling service was previously provided by Cwm Taf LHB. This service was brought in-house on 30 September 2011, and again the focus is now on consolidating the service and moving on to a modernisation phase. In November 2011 (earlier than planned), a trial of electronic district nurse referrals from surgeries using the Welsh Common Clinical Gateway began. This will be rolled out during Electronic referrals will improve the overall efficiency of the service and will result in financial savings towards the middle of /7 Dental Helpline (November 2011) Prior to November 2011, access to Community / Emergency Dental Services throughout Cardiff and Vale was confusing, with patients being provided with a variety of telephone numbers for various services. The formation of the 24/7 Dental Helpline is a one stop shop for all community and emergency dental activity within Cardiff and Vale that also links in with out of hours provision. Locality Working To reflect natural communities with populations of 50-80,000, the UHB has worked with partners (local authority, police, fire service and third sector partners) to establish common neighbourhoods and areas. Six neighbourhoods have been identified in Cardiff and three areas in the Vale of Glamorgan. The three localities are based upon networks of three neighbourhoods or areas in each locality: Vale of Glamorgan Locality Cardiff North and West Locality Cardiff South and East Locality Implementing Setting the Direction Page 8 of 18 Board Meeting
9 Figure 2 illustrates the Locality model with a focus on the patient s usual place of residence and the role of the GP. Primary, Community & Intermediate Care Division Vale of Glamorgan Locality Cardiff North & West Locality Cardiff South & East Locality Neighbourhoods Western Vale Central Vale Eastern Vale Neighbourhoods Cardiff West Cardiff North Cardiff South West GP Practice Neighbourhoods City & South Cardiff South East Cardiff East Patient s Home With the establishment of these three Localities, historical boundaries are being removed to enable strong integration. For example: joint management of health and adult social services in the Vale of Glamorgan alignment of Older People and Intermediate Care (OPAIC) community services with the three Localities via the senior nurse structure. Each Locality with its networks and community resource team is managed by a senior team. The management team includes: - Locality manager - Locality lead nurse. - Neighbourhood community directors (GP leads) - Locality leads for pharmacy, primary care, public health, child health and therapies - Senior social services representative (Cardiff). Implementing Setting the Direction Page 9 of 18 Board Meeting
10 In the Vale of Glamorgan the Locality Manager is a joint appointment with the Vale of Glamorgan Local Authority. Clinical leadership and engagement has been essential in embedding this model. GPs have been appointed as Community Directors to one of two roles. Neighbourhood lead clinical leadership at neighbourhood level, developing the network. Integration team clinical lead this team focuses on improving patient pathways focusing on the integration between primary and secondary care. The locality/neighbourhood management teams have been fully in place for four months. They are developing their partnerships, their strategic direction and at the same time taking forward specific projects to ensure some early tangible progress (making a difference to communities). Figure 3. Achievement by Neighbourhood Neighbourhood Action Outcome Western Vale Following a 12 week engagement period a number of community based services transferred from ABMU to Cardiff and Vale UHB. This included the Western Vale health visiting team and district nursing team as well as community podiatry and community physiotherapy. Central Vale Recently concluded a formal period of stakeholder engagement regarding the patient experience at Barry Hospital, working closely with the CHC and Third Sector colleagues. The stakeholder engagement survey received 98 responses over an eight week period and will help inform and shape priorities for the future of Barry Hospital. The transfer ensured a number of clinical governance issues around continuity of care were addressed, with better access to services for patients. Stakeholders informing the development of Barry Hospital as a community resource. Implementing Setting the Direction Page 10 of 18 Board Meeting
11 Eastern Vale Cardiff North Cardiff West Cardiff South West Cardiff East The Penarth integrated care team (PICT) working with nursing homes. A chronic obstructive pulmonary disease (COPD) project is being implemented. The project sees a Consultant Respiratory Physician attending a GP surgery in the area each month, to hold joint consultations with a GP and a practice nurse seeing known complex COPD patients. A different practice is visited each month. Successful bid via the Neighbourhood management team for a healthy eating/exercise scheme (January - March 2012). This project is a collaboration between Leisure Services, Dietetics and the Community Director (GP). Establishment of St Davids Hospital User Group looking at the patient experience and profile of the Community Hospital. Working with Cardiff Council, undertook citizen engagement with those individuals living in the Trowbridge area of the city. Although this was based around the regeneration of the area the team were able to discuss the new Rumney Primary Care Centre plans and invite individuals to become involved in a Health Impact Assessment. Agenda Item 3.3 Significant reduction in emergency admissions. The aim of project is to assess whether the approach improves patient care, minimising exacerbations and reduced referrals to acute services. Integrated working with partner organisations to improve the health and well-being of the neighbourhood. Agreement to establish St David s Hospital as the base for the new CRT. Integrated working with partner organisations to enable citizens to influence the planning of services. Implementing Setting the Direction Page 11 of 18 Board Meeting
12 Cardiff City and South Cardiff South East Working with Cardiff Council regarding the requirements of the new health suite in the new Homeless Single Assessment Centre. The Community Director has been working with a Consultant radiologist to develop a pathway for MRI scans with the aim of improving referral quality. This has being implemented across Cardiff and Vale via Community Directors. Agenda Item 3.3 Integrated working has identified gaps in service and potential areas for focus. Has resulted in a significant decrease in MRI referrals. Community Nursing Services Community and primary care nurses are pivotal to meeting the range of population health needs from promoting health and preventing ill health to dealing with increasingly more complex needs through to end of life care. To support community nurses to use the full range of their skills in improving health and well being, the role of community nursing needed to be re-defined. This process began with District nursing services through the development and approval of a service specification. The service is organised at a neighbourhood level with strengthened links to General Practice to ensure that the service targets the needs of those particular neighbourhoods. This supports the implementation of the Welsh Government recommendations within the Community Nursing Strategy for Wales. Community Resource Teams (CRT) A three phase approach to the development of CRTs across the three localities has been taken; this is an important component of the capacity plan for the UHB. The CRTs represent the first investment into new models of care within the community setting beginning to extend the community infrastructure. Phase 1 (December 2011): Realignment and expansion of current reablement services (UHB and Local Authority) based. The remodelling of these services will provide a CRT nucleus, whose primary purpose will be the pull of patients from hospital services into the community. Implementing Setting the Direction Page 12 of 18 Board Meeting
13 Phase 2 (April 2012): Further expansion and alignment to allow a focus on prevention and proactive support to high risk patients in the community/care home setting, reducing reliance upon hospital attendance and admission. Phase 3 (2012/13): Further service integration where it is identified that it will add value and demonstrate improved outcomes for patients and service efficiency. The existing CRT infrastructure for each Locality varies, with the Vale being the most advanced and Cardiff North and West needing to set up a complete new service. The Vale service has been in place from 1 November with the health and social care team co-located and delivering the CRT pull service. For Cardiff South and East, the former CELT service has been used as the basis for the new CRT extending its coverage to the whole locality population. Cardiff North and West is completing recruitment to posts. Operating a CRT requires co-location of its core health and social care staff. The team will be located at St David s requiring support from the PFI partner. Interface with Hospital Services Integrated service delivery can only be achieved by a much stronger primary/secondary care interface; this is a key role for the GP Community Directors (CDs). The CDs forum provides a vehicle for formal discussion and development of the interface. The CDs are using pathway design, problem solving and delivery as the practical method to build integration. Four CD fora have been held, with strong involvement from secondary care to discuss, develop and deliver a total of 12 pathways across 7 specialties. As an example, for unscheduled care, a revised falls pathway (elder fallers) and end of life pathway have been implemented. Collaborative work with primary, community, secondary care and WAST has resulted in the elder fallers pathway. The purpose of the pathway is to reduce inappropriate conveyance or admission to hospital by timely notification of fallers to the GP practice. Measurable impact will be available from the end of March. Implementing Setting the Direction Page 13 of 18 Board Meeting
14 Within the Emergency Unit (EU), joint work has been undertaken by the PCIC Division and the Medicine Division to explore options for redirecting patients. In October 2011, the GP screening service pilot was launched. A GP is based within the EU to screen patients and redirect patients when appropriate. In the first six weeks (running five days a week) 288 patients were redirected 190 sent back to own GP surgery 48 booked into GP out of hours 44 sent home with advice 6 other (e.g. dentist) Where redirection to a GP or the GP out of hours service was identified the Communications Hub was used to arrange appointments. Vulnerable Groups Excellent partnership working has enabled the development of the Homeless People and Vulnerable Groups Health Action Plans (HaVGHAPs). Results Based Accountability approach has been undertaken to develop the organisational HaVGHAPs that are a requirement of Welsh Government. Multi agency workshops have been held to develop key indicators surrounding the health needs of the homeless population, Gypsies and Travellers and Asylum Seekers. These will be developed into a multi-agency action plan. NEXT STEPS Consolidation Securing health improvement along with ensuring quality, safety and sustainability of services must be achieved. For the new developments, the next 6 months will focus on consolidation of: GP OOH CRTs Phase 1 Call-handling capability of the Communications Hub Further progress Communications Hub Implementing Setting the Direction Page 14 of 18 Board Meeting
15 - The Communications Hub will provide a transport co-ordination service take a leading role in the UHB adverse weather policy implementation; - The hub is linking closely with the voluntary sector as the UHB works closely with the Health and Social Care facilitators. The hub will provide access to Care and Repair and Befriending services by the end of January 2012; - The management of the clinical referral centre will transfer to the IHSCL improving the CRC functionality and offer significant linkage with the pathways being developed by CRC in the community. A business case will be produced in February 2012; - Discussions are underway on transferring the management of the outpatient booking function to the IHSCL. It is expected that delivery of such a service in the IHSCL will realise significant financial and operational benefits. Business case to be produced in March 2012; - It is proposed that by the end of June 2012, the IHSCL call handling will be integrated with Vale Local Authority. This will mean that any call coming into the IHSCL will be answered by the next available agent, regardless of whether it is a Local Authority or NHS Call Enhanced services The current support arrangements for nursing homes, including GP Enhanced Services provision, is under review. The outcome will be consulted upon in March CRT Phase 2 expansion of the three Locality teams (additional resource funded as part of the capacity plan) and alignment with other Locality services. This will allow a focus on prevention and proactive support to high risk patients in the community/care home setting thus reducing, reliance upon hospital attendance and admission. Currently planned for April 2012, albeit this must be informed by lessons learned from Phase 1. Implementing Setting the Direction Page 15 of 18 Board Meeting
16 It is proposed that by April 2012, Cardiff Local Authority Adult Intake & Assessment Team will be based in the Hub with the Vale team. Over the course of the year, it is intended to move to an integrated assessment team which will improve access and functionality of the service. Setting the Direction Board At present Setting the Direction is seen as the business of the Primary Care and Community division with its partners. However it requires involvement and indeed redesign of the whole system in order to realise its potential. It needs involvement of not only its partners but all of the UHB divisions. To enable such whole systems engagement a Board is to be established. This will oversee and drive implementation with a particular focus on pace. CONCLUSION The vision for primary and community services in Cardiff and the Vale is consistent with Setting the Direction. There has been good progress made to date that provides a solid foundation for the next phases of development. The challenge is to drive the pace of change, ensure whole systems engagement and demonstrate measurable outcomes. RECOMMENDATION The Board is asked to: To NOTE the progress made to date To SUPPORT the ongoing implementation as described within the next steps section. Implementing Setting the Direction Page 16 of 18 Board Meeting
17 IMPACT ASSESSMENT Health Improvement Workforce Education and Training Financial Legal Equality Environmental The focus of this is to maximise the health, wellbeing and independence of individuals. Supports workforce modernisation and the development of partnership working. Able to identify gaps across the whole (health and wellbeing) system. Financial impact identified as part of the Capacity Plan. Of note is different organisations legal framework. Of note is different framework of employment policies between organisations. Not applicable. RISK ASSESSMENT Clinical/Service Financial Reputational The full impact of the service developments will be realised during and after the winter period. Implementation is dependent upon the release3/ shift of resources to community. CRT s Phase 2 is included in the capacity plan. Pace of implementation within Cardiff and Vale, particularly for the CRT s is key. Implementing Setting the Direction Page 17 of 18 Board Meeting
18 Acronyms and abbreviations CD Community Director CHC Community Health Council COPD - Chronic Obstructive Pulmonary Disease CRC Clinical Referral Centre CRT Community Resource Team EU Emergency Unit GP General Practitioner HaVGHAPs - Homeless People and Vulnerable Groups Health Action Plans IHSCL Integrated Health & Social Care Line OMG Operational Management Group OOH Out of Hours UHB University Health Board WCCG Welsh Clinical Communications Gateway Implementing Setting the Direction Page 18 of 18 Board Meeting
In this edition we will showcase the work of the development of a model for GP- Paediatric Hubs
Focusing on the principle of home first and designing the Perfect Locality from the lens of the community Issue 7 June 2017 Welcome to the seventh issue of Our Future Wellbeing, a regular update on the
More informationAneurin Bevan Health Board. Neighbourhood Care Network. Strategic Plan
Agenda Item: 3.8 Appendix Two Aneurin Bevan Health Board Neighbourhood Care Network Strategic Plan 2013-2018 1 CONTENTS 1 Purpose & Scope 3 2 National and Local Context 6 3 The Vision 10 4 Strategic Themes
More informationNational Primary Care Cluster Event ABMU Health Board 13 th October 2016
National Primary Care Cluster Event ABMU Health Board 13 th October 2016 1 National Primary Care Cluster Event - ABMU Health Board Introduction The development of primary and community services is a fundamental
More informationCARDIFF AND THE VALE UNIVERSITY HEALTH BOARD. Stakeholder Reference Group Meeting
CARDIFF AND THE VALE UNIVERSITY HEALTH BOARD Stakeholder Reference Group Meeting 9.00 11.30 Tuesday 24th September 2013 Meeting Room 1, Planning, Estates and Operational Services Department, 2nd Floor,
More informationHealth Board Report SOCIAL SERVICES AND WELL-BEING ACT (WALES) 2014: REVISED REGIONAL IMPLEMENTATION PLAN
Agenda Item 3.3 27 JANUARY 2016 Health Board Report SOCIAL SERVICES AND WELL-BEING ACT (WALES) 2014: REVISED REGIONAL IMPLEMENTATION PLAN Executive Lead: Director of Planning & Performance Author: Assistant
More informationNORTH WALES CLINICAL STRATEGY. PRIMARY CARE & COMMUNITY SERVICES SBAR REPORT February 2010
NORTH WALES CLINICAL STRATEGY PRIMARY CARE & COMMUNITY SERVICES SBAR REPORT February 2010 Situation The Primary Care & Community Services workstream had been tasked with answering the following question:
More informationREPORT 1 FRAIL OLDER PEOPLE
REPORT 1 FRAIL OLDER PEOPLE Contents Vision f-3 Principles / Parameters f-4 Objectives f-6 Current Frail Older People Model f-8 ABMU Model for Frail and Older People f-11 Universal / Enabling f-12 Specialist
More informationSAFEGUARDING ADULTS STEERING GROUP ANNUAL REPORT
SAFEGUARDING ADULTS STEERING GROUP ANNUAL REPORT 2012 2013 Report of Paper prepared by Purpose of Paper Action/Decision required Link to Health Care Standards: Link to Health Board s Strategic Direction
More informationSCOTTISH BORDERS HEALTH & SOCIAL CARE INTEGRATED JOINT BOARD UPDATE ON THE DRAFT COMMISSIONING & IMPLEMENTATION PLAN
Appendix-2016-59 Borders NHS Board SCOTTISH BORDERS HEALTH & SOCIAL CARE INTEGRATED JOINT BOARD UPDATE ON THE DRAFT COMMISSIONING & IMPLEMENTATION PLAN Aim To bring to the Board s attention the Scottish
More informationWelsh Government Response to the Report of the National Assembly for Wales Public Accounts Committee Report on Unscheduled Care: Committee Report
Welsh Government Response to the Report of the National Assembly for Wales Public Accounts Committee Report on Unscheduled Care: Committee Report We welcome the findings of the report and offer the following
More informationTitle of the Health Board Report
AGENDA ITEM 3.2 Title of the Health Board Report IMPLEMENTING THE OUTCOME OF THE SOUTH WALES PROGRAMME THROUGH ACUTE CARE ALLIANCES AND DEVELOPMENT OF THE SOUTH WALES HEALTH COLLABORATIVE Executive Lead:
More informationDelivering Local Health Care
Delivering Local Health Care Accelerating the pace of change Contents Joint foreword by the Minister for Health and Social Services and the Deputy Minister for Children and Social Services Foreword by
More informationDelivering Integrated Health and Social Care for Older People with Complex Needs across Western Bay. Statement of Intent
Delivering Integrated Health and Social Care for Older People with Complex Needs across Western Bay Statement of Intent March 2014 1 1. Introduction This document sets out our commitment to deliver integrated
More informationSETTING THE DIRECTION PROGRAME BOARD PROGRESS REPORT
AGENDA ITEM 2.7 11 December 2012 SETTING THE DIRECTION PROGRAME BOARD PROGRESS REPORT Executive Lead: Executive Director Public Health Author: Head of PCSDU Contact Details for further information: Rhian
More informationPATIENT ACCESS POLICY (ELECTIVE CARE) UHB 033 Version No: 1 Previous Trust / LHB Ref No: Senior Manager, Performance and Compliance.
Reference No: PATIENT ACCESS POLICY (ELECTIVE CARE) UHB 033 Version No: 1 Previous Trust / LHB Ref No: Trust 364 Documents to read alongside this Policy. Ministerial Letter EH/ML/004/09 WAG Rules for Managing
More informationDraft Commissioning Intentions
The future for Luton s primary care services Draft Commissioning Intentions 2013-14 The NHS will have less money to spend over the next three years. Overall, it has to make 20 billion of efficiency savings
More informationYour Care, Your Future
Your Care, Your Future Update report for partner Boards April 2016 Introduction The following paper has been prepared for the Board members of all Your Care, Your Future partner organisations: NHS Herts
More information15. UNPLANNED CARE PLANNING FRAMEWORK Analysis of Local Position
15. UNPLANNED CARE PLANNING FRAMEWORK 15.1 Analysis of Local Position 15.1.1 Within Renfrewshire unplanned care spans the organisational boundaries of acute and primary care services and social work services
More informationCambridgeshire and Peterborough Sustainability and Transformation Plan / Fit for the Future Programme. Frequently Asked Questions Second Edition
Cambridgeshire and Peterborough Sustainability and Transformation Plan / Fit for the Future Programme Frequently Asked Questions Second Edition Contents Introduction to the Sustainability and Transformation
More informationREPORT 1 PLANNED CARE
REPORT 1 PLANNED CARE Contents Planned care vision c-3 Definition - Planned Care c-3 Current planned care services c-4 What patients say about current planned care services c-7 Vision c-8 Principles c-9
More informationAnnual Review and Evaluation of Performance 2012/2013. Torfaen County Borough Council
Annual Review and Evaluation of Performance 2012/2013 Local Authority Name: Torfaen County Borough Council This report sets out the key areas of progress in Torfaen Social Services Department for the year
More information04c. Clinical Standards included in the Strategic Outline Care part 1, published in December 216
0c Clinical s included in the Strategic Outline Care part, published in December 6 Clinical standards The following clinical standards were included in the Strategic Outline Case part (SOC), published
More informationCommunity Health Partnerships (CHPs) Scheme of Establishment for Glasgow City Community Health and Social Care Partnerships
EMBARGOED UNTIL MEETING Greater Glasgow NHS Board Board Meeting Tuesday 19 th April 2005 Board Paper No. 2005/33 Director of Planning and Community Care Community Health Partnerships (CHPs) Scheme of Establishment
More informationPerformance Evaluation Report Pembrokeshire County Council Social Services
Performance Evaluation Report 2013 14 Pembrokeshire County Council Social Services October 2014 This report sets out the key areas of progress and areas for improvement in Pembrokeshire County Council
More informationCollaborative Commissioning in NHS Tayside
Collaborative Commissioning in NHS Tayside 1 CONTEXT 1.1 National Context Delivering for Health was the Minister for Health and Community Care s response to A National Framework for Service Change in the
More informationAPPROVAL OF MENTAL HEALTH CLINICAL RISK ASSESSMENT & MANAGEMENT POLICY
FOR DECISION AGENDA ITEM 7.2 June 19 th 2012 APPROVAL OF MENTAL HEALTH CLINICAL RISK ASSESSMENT & MANAGEMENT POLICY Report of Paper prepared by Executive Nurse Director Divisional Nurse Mental Heath Executive
More informationTransforming Cancer Services In South East Wales
Transforming Cancer Services In South East Wales Clinical Service Model January 2016 Cancer survival rates are increasing. But the number of people getting cancer is increasing too. At Velindre NHS Trust
More informationImproving General Practice for the People of West Cheshire
Improving General Practice for the People of West Cheshire Huw Charles-Jones (GP Chair, West Cheshire Clinical Commissioning Group) INTRODUCTION There is a growing consensus that the current model of general
More informationOur plan for a primary care service for Wales up to March 2018 Annual Report Appendices
Our plan for a primary care service for Wales up to March 2018 Annual Report 2015 2016 Appendices Planning care locally Strong leadership Improving access and quality A skilled workforce Equitable access
More informationSouth Powys Cluster Plan
South Powys Cluster Plan 2016-17 The Cluster Network Development Domain with the Quality & Outcomes Framework supports medical practices to work collaboratively to: Understand local health needs and priorities
More informationHealthy London Partnership. Transforming London s health and care together
Healthy London Partnership Transforming London s health and care together London-wide transformation In 2014, two publications set out London s transformation priorities NHS Five Year Forward View Better
More informationOur five year plan to improve health and wellbeing in Portsmouth
Our five year plan to improve health and wellbeing in Portsmouth Contents Page 3 Page 4 Page 5 A Message from Dr Jim Hogan Who we are What we do Page 6 Page 7 Page 10 Who we work with Why do we need a
More informationIntegrated Health and Care in Ipswich and East Suffolk and West Suffolk. Service Model Version 1.0
Integrated Health and Care in Ipswich and East Suffolk and West Suffolk Service Model Version 1.0 This document describes an integrated health and care service model and system for Ipswich and East and
More informationPlans for urgent care in west Kent:
Plans for urgent care in west Kent: Introduction and background A summary of our draft strategy NHS West Kent Clinical Commissioning Group (CCG) is working to improve urgent care services and we would
More informationWelcome. PPG Conference North and South Norfolk CCGs June 14 th 2018
Welcome PPG Conference North and South Norfolk CCGs June 14 th 2018 Housekeeping Packed Agenda! Quick feedback on the national patient participation conference Primary care general update and importance
More informationPUBLIC SERVICES OMBUDSMAN WALES PROGRESS WITH CORRECTIVE ACTION PLANS. Assistant Director of Patient Safety & Quality
PUBLIC SERVICES OMBUDSMAN WALES PROGRESS WITH CORRECTIVE ACTION PLANS AGENDA ITEM 2.2 21 June 2011 Report of Paper prepared by Nurse Director Assistant Director of Patient Safety & Quality Executive Summary
More informationGwent Healthcare NHS Trust Discharge Policy
Gwent Healthcare NHS Trust Expiry date: October 2010 Number: GHT/4444 (previously 0085) Contents: 1 Executive Summary... 3 1.1 Scope of Policy... 3 1.2 Essential Implementation Criteria... 3 2 Policy Statement...
More informationGeneral Practice 5 Year Forward View Operational Plan Leicester, Leicestershire and Rutland (LLR) STP
Leicester City Clinical Commissioning Group West Leicestershire Clinical Commissioning Group East Leicestershire and Rutland Clinical Commissioning Group General Practice 5 Year Forward View Operational
More informationTransforming Clinical Services. Our developing clinical strategy
Transforming Clinical Services Our developing clinical strategy Transforming clinical services A developing clinical strategy for the new Foundation Trust Since 1 April 2011, County Durham and Darlington
More informationExecutive Summary / Recommendations
Learning Disability Change Programme A Strategy for the Future Proposed Service Specification for Adult Learning Disability Services in Greater Glasgow & Clyde Executive Summary / Recommendations 1 1.
More informationINVERCLYDE COMMUNITY HEALTH AND CARE PARTNERSHIP - DRAFT SCHEME OF ESTABLISHMENT
EMBARGOED UNTIL DATE OF MEETING Greater Glasgow and Clyde NHS Board Board Meeting Tuesday 17 th August 2010 Board Paper No. 2010/34 Director of Corporate Planning and Policy/Lead NHS Director Glasgow City
More informationThree Year Cluster Network Action Plan North Cardiff Cluster
Three Year Cluster Network ction Plan 2017-2020 North Cardiff Cluster 1 CDIFF NOTH CLUSTE NETWOK CTION PLN This plan has been developed by the following 11 practices which operate in the North Cluster
More informationCynon Cluster GP Network Action Plan P a g e
Cynon Cluster GP Network Action Plan 2017-20 1 P a g e CYNON NETWORK CLUSTER ACTION PLAN 2017-20 This plan has been developed by the following 11 practices which operate in the Cynon Cluster Area, through
More informationControl: Lost in Translation Workshop Report Nov 07 Final
Workshop Report Reviewing the Role of the Discharge Liaison Nurse in Wales Document Information Cover Reference: Lost in Translation was the title of the workshop at which the review was undertaken and
More informationStrategic Plan for Fife ( )
www.fifehealthandsocialcare.org Strategic Plan for Fife (2016-2019) Summary Document Supporting the people of Fife together Foreword NHS Fife and Fife Council are working together in a new Integrated Health
More informationVanguard Programme: Acute Care Collaboration Value Proposition
Vanguard Programme: Acute Care Collaboration Value Proposition 2015-16 November 2015 Version: 1 30 November 2015 ACC Vanguard: Moorfields Eye Hospital Value Proposition 1 Contents Section Page Section
More informationWestminster Partnership Board for Health and Care. 17 January pm pm Room 5.3 at 15 Marylebone Road
Westminster Partnership Board for Health and Care 17 January 2018 4.30pm - 6.00pm Room 5.3 at 15 Marylebone Road Agenda Item # Item and discussion points Lead Papers Timing 1 Preliminary business Welcome
More informationNHS BORDERS CLINICAL STRATEGY. 'A plan for person-centred, innovative healthcare to help the Borders flourish'
NHS BORDERS CLINICAL STRATEGY 'A plan for person-centred, innovative healthcare to help the Borders flourish' CONTENTS NHS BORDERS CLINICAL STRATEGY FOREWORD 3 EXECUTIVE SUMMARY 4 THE CASE FOR CHANGE 5
More informationIMPLEMENTING THE OUTCOME OF THE SOUTH WALES PROGRAMME THROUGH ACUTE CARE ALLIANCES AND DEVELOPMENT OF THE SOUTH WALES HEALTH COLLABORATIVE
AGENDA ITEM 3.3 9 September 2014 IMPLEMENTING THE OUTCOME OF THE SOUTH WALES PROGRAMME THROUGH ACUTE CARE ALLIANCES AND DEVELOPMENT OF THE SOUTH WALES HEALTH COLLABORATIVE Executive Lead: Chief Executive
More informationSWLCC Update. Update December 2015
SWLCC Update Update December 2015 Croydon, Kingston, Merton, Richmond, Sutton and Wandsworth NHS Clinical Commissioning Groups and NHS England Working together to improve the quality of care in South West
More informationA Therapy Strategy for Wales
A Therapy Strategy for Wales The Contribution of Therapy Services to Transforming the Delivery of Health and Social Care in Wales Therapies for Modernisation November 2006 Therapy wales cover eng.indd
More informationMilton Keynes CCG Strategic Plan
Milton Keynes CCG Strategic Plan 2012-2015 Introduction Milton Keynes CCG is responsible for planning the delivery of health care for its population and this document sets out our goals over the next three
More informationIMPROVING UNSCHEDULED CARE IN WALES - UPDATE
AGENDA ITEM No. 10 MEETING : TRUST BOARD DATE : 22 APRIL 2009 REPORT OF : CLINICAL DIRECTORATE Contact : Grayham McLean, Unscheduled Care Lead Officer Tel: 01792 562900 Email: grayham.mclean@ambulance.wales.nhs.uk
More informationMarginal Rate Emergency Threshold. Executive Summary
Part 1 meeting of the Castle Point and Rochford CCG Governing Body held on 29 th September 2016 Agenda item 16 Marginal Rate Emergency Threshold Submitted by: Prepared by: Status: Robert Shaw, Joint Director
More informationGuidelines for the appointment of. General Practitioners with Special Interests in the Delivery of Clinical Services. Respiratory Medicine
Guidelines for the appointment of General Practitioners with Special Interests in the Delivery of Clinical Services Respiratory Medicine April 2003 Respiratory Medicine This General Practitioner with a
More informationLondon Councils: Diabetes Integrated Care Research
London Councils: Diabetes Integrated Care Research SUMMARY REPORT Date: 13 th September 2011 In partnership with Contents 1 Introduction... 4 2 Opportunities within the context of health & social care
More informationGOVERNING BODY REPORT
GOVERNING BODY REPORT 1. Date of Governing Body Meeting: 2. Title of Report: Chief Executive Officer s Business Report 3. Key Messages: This report provides an overview of important clinical commissioning
More informationDRAFT. Rehabilitation and Enablement Services Redesign
DRAFT Rehabilitation and Enablement Services Redesign Services Vision Statement Inverclyde CHP is committed to deliver Adult rehabilitation services that are easily accessible, individually tailored to
More informationREVIEW AND UPDATE OF THE COMMITTEE WORK PROGRAMME
AGENDA ITEM 3.1 14 June 2013 REVIEW AND UPDATE OF THE COMMITTEE WORK PROGRAMME Executive Lead: Committee Chair Author: Assistant Director of Patient Safety & Quality Contact Details for further information:
More informationWELSH AUDIT OFFICE REPORT ON PRIMARY CARE PRESCRIBING
AGENDA ITEM 2.5 28 January 2014 WELSH AUDIT OFFICE REPORT ON PRIMARY CARE PRESCRIBING Lead Responsibility: Medical Director Author: Clinical Board Pharmacist, Primary Community Intermediate Care Clinical
More informationSolent. NHS Trust. Allied Health Professionals (AHPs) Strategic Framework
Solent NHS Trust Allied Health Professionals (AHPs) Strategic Framework 2016-2019 Introduction from Chief Nurse, Mandy Rayani As the executive responsible for providing professional leadership for the
More informationCore Community Rookwood Lodge. YES - we provide a domiciliary physiotherapy service for these groups of patients.
HBPR* CBPR** Community COPD team (CRRU) 1) Please whether there is a community rehabilitation service in your area for treating the following conditions: - Hip fracture - Stroke - COPD ES ES ES Core Community
More informationQuality care for you, with you Southern Health & Social Care Trust Three Year Strategic Plan Improving Through Change
Quality care for you, with you Southern Health & Social Care Trust Three Year Strategic Plan 2015-2018 Improving Through Change Trust Board 22 nd October 2015 1 Contents Section 1: Why have we produced
More informationBedfordshire, Luton and Milton Keynes. Sustainability and Transformation Plan. Central Brief: February 2018
Bedfordshire, Luton and Milton Keynes Sustainability and Transformation Plan Central Brief: February 2018 Issue date: February 2018 News Transforming care closer to home Our ambition is to build high quality,
More informationDriving and Supporting Improvement in Primary Care
Driving and Supporting Improvement in Primary Care 2016 2020 www.healthcareimprovementscotland.org Healthcare Improvement Scotland 2016 First published December 2016 The publication is copyright to Healthcare
More informationThe Symphony Programme an example from the UK of integrated working between primary and secondary care. Jeremy Martin, Symphony Programme Director
The Symphony Programme an example from the UK of integrated working between primary and secondary care Jeremy Martin, Symphony Programme Director About South Somerset 135,000 population, older age profile
More informationNHS Wales Betsi Cadwaladr University Health Board JOB DESCRIPTION
NHS Wales Betsi Cadwaladr University Health Board JOB DESCRIPTION Post Title: Accountable to: Secondary Care Medical Director Professionally accountable through Executive Medical Director to LHB Chief
More informationANEURIN BEVAN HEALTH BOARD CLINICAL FUTURES STRATEGY AND SPECIALIST CRITICAL CARE CENTRE: BRIEFING
ANEURIN BEVAN HEALTH BOARD Aneurin Bevan Health Board CLINICAL FUTURES STRATEGY AND SPECIALIST CRITICAL CARE CENTRE: BRIEFING 1 PURPOSE The purpose of this paper to is to brief Board members on the proposed
More information5. Does this paper provide evidence of assurance against the Governing Body Assurance Framework?
Item Number: 6.3 Governing Body Meeting: 4 February 2016 Report Sponsor Anthony Fitzgerald Director of Strategy and Delivery Report Author Anthony Fitzgerald Director of Strategy and Delivery 1. Title
More informationHealthy Wirral Vanguard New Care Model Value Proposition th February 2016
Healthy Wirral Vanguard New Care Model Value Proposition 2016-17 8 th February 2016 1 Contents Section Page(s) Introduction and Strategic context Page 3 High level Programme Overview Page 4 Enablers: Cross
More informationGuideline scope Intermediate care - including reablement
NATIONAL INSTITUTE FOR HEALTH AND CARE EXCELLENCE Guideline scope Intermediate care - including reablement Topic The Department of Health in England has asked NICE to produce a guideline on intermediate
More informationThis will activate and empower people to become more confident to manage their own health.
Mid Nottinghamshire Self Care Strategy 2014-2019 Forward The Mid Nottinghamshire Self Care Strategy will be the vehicle which underpins our vision to deliver an increased understanding of and knowledge
More informationNHS GRAMPIAN. Grampian Clinical Strategy - Planned Care
NHS GRAMPIAN Grampian Clinical Strategy - Planned Care Board Meeting 03/08/17 Open Session Item 8 1. Actions Recommended In October 2016 the Grampian NHS Board approved the Grampian Clinical Strategy which
More informationAgenda Item 5.1 Appendix 11 CWM TAF UNIVERSITY LOCAL HEALTH BOARD
CWM TAF UNIVERSITY LOCAL HEALTH BOARD MINUTES OF THE MEETING OF THE PRIMARY CARE COMMITTEE HELD ON 26 AUGUST 2015 AT YNYSMEURIG HOUSE, ABERCYNON PRESENT: Professor D Mead Mr J Palmer Mr G Bell Cllr C Jones
More informationEXECUTIVE SUMMARY... 1 HEALTH AND WELLBEING STRATEGY VISION... 2 ULTIMATE AIM... 3 DELIVERING THE VISION AND THE PRIORITIES... 4 FOCUS...
CONTENTS EXECUTIVE SUMMARY... 1 HEALTH AND WELLBEING STRATEGY VISION... 2 ULTIMATE AIM... 3 DELIVERING THE VISION AND THE PRIORITIES... 4 FOCUS... 6 WHAT WE WILL CONTINUE TO ACHIEVE THROUGH THE HEALTH
More informationCranbrook a healthy new town: health and wellbeing strategy
Cranbrook a healthy new town: health and wellbeing strategy 2016 2028 Executive Summary 1 1. Introduction: why this strategy is needed, its vision and audience Neighbourhoods and communities are the building
More informationYou said We did. Care Closer to home Acute and Community Care services. Commissioning Intentions Engagement for 2017/18
Commissioning Intentions Engagement for 2017/18 You said We did Care Closer to home Acute and Community Care services Top three priorities were: Shifting hospital services into the community Community
More informationNewport East Neighbourhood Care Network Action Plan Progress against the plan
Newport East Neighbourhood Care Network ction Plan 2017-2020 2018-19 Progress against the plan 1 Strategic im 1: To understand and highlight actions to meet the needs of the population served by the Cluster
More informationReview of Management Arrangements within the Microbiology Division Public Health Wales NHS Trust. Issued: December 2013 Document reference: 653A2013
Review of Management Arrangements within the Microbiology Division Public Health Issued: December 2013 Document reference: 653A2013 Status of report This document has been prepared for the internal use
More informationChanging for the Better 5 Year Strategic Plan
Quality Care - for you, with you 5 Year Strategic Plan Contents: Section 1: Vision and Priorities for Change 3 Section 2: About the Trust 5 Section 3: Promoting Health & Wellbeing and Primary Care 6 Section
More informationOur Health & Care Strategy
MO Our Health & Care Strategy 2015-2020 Norfolk Community Health and Care NHS Trust Final September 2015 Version control Date Changes 1 19 th July 2015 Initial document 2 29 th July 2015 Following feedback
More informationWolverhampton CCG Commissioning Intentions
Wolverhampton CCG Commissioning Intentions 2015-16 * Areas of particular focus and priority CI Ref Contract Provider Brief CI001 CI002 CI003 Child Protection Information Sharing Implement the new Child
More informationHealthier Wigan Partnership Board. Richard Mundon Director of Strategy and Planning. Approve x Adopt Receive for information. On the BAF.
Trust Board Agenda Item 6. Date: 31.05.17 Title of Report Purpose of the report and the key issues for consideration/decision Prepared by: me & Title Presented by: Action Required (please X) Strategic/Corporate
More informationNorth School of Pharmacy and Medicines Optimisation Strategic Plan
North School of Pharmacy and Medicines Optimisation Strategic Plan 2018-2021 Published 9 February 2018 Professor Christopher Cutts Pharmacy Dean christopher.cutts@hee.nhs.uk HEE North School of Pharmacy
More informationNorthumberland, Tyne and Wear NHS Foundation Trust. Board of Directors Meeting. Meeting Date: 25 October Executive Lead: Rajesh Nadkarni
Agenda item 9 ii) Northumberland, Tyne and Wear NHS Foundation Trust Board of Directors Meeting Meeting Date: 25 October 2017 Title and Author of Paper: Clinical Effectiveness (CE) Strategy update Simon
More informationDelivering excellent care and support to patients at home, in the community and in hospital - first time, every time.
The Integrated County Durham & Darlington NHS Foundation Trust: Delivering excellent care and support to patients at home, in the community and in hospital - first time, every time. 1.0 Introduction The
More informationPOSITION STATEMENT ON THE FUTURE MODEL OF NEUROSCIENCES IN MID AND SOUTH WALES. Chief Executive
AGENDA ITEM 5.2 23 October 2009 POSITION STATEMENT ON THE FUTURE MODEL OF NEUROSCIENCES IN MID AND SOUTH WALES Report of Chief Executive Paper prepared by Purpose of Paper Action/Decision required Link
More informationPROGRESSING OUR FUTURE. Summary Plan Cardiff and Vale University Health Board
PROGRESSING OUR FUTURE Summary Plan 2017-2018 Cardiff and Vale University Health Board Chair and Chief Executive Introduction The UHB, along with many other health and social care service providers in
More informationPrescription for Rural Health 2011
Foreword Prescription for Rural Health is the Welsh NHS Confederation s contribution to the debate on health in rural Wales. This document has been published alongside Prescription for Health 2011, which
More informationWELSH RENAL CLINICAL NETWORK TERMS OF REFERENCE
INTRODUCTION WELSH RENAL CLINICAL NETWORK TERMS OF REFERENCE In accordance with WHSSC Standing Order 3, the Joint Committee may and, where directed by the LHBs jointly or the Welsh Government must, appoint
More informationAppendix 1: South Lanarkshire H&SCP Improvement Plan 2017/18.
Appendix 1: South Lanarkshire H&SCP Improvement Plan 2017/18. South Lanarkshire - Whole System Pathway Indicators identified capture key data across the whole H&SC system, primarily based around supporting
More informationTOGETHER FOR HEALTH DELIVERING END OF LIFE CARE PLAN A Delivery Plan up to 2016 for NHS Wales and its Partners
AGENDA ITEM 3.1 5 th November 2013 TOGETHER FOR HEALTH DELIVERING END OF LIFE CARE PLAN A Delivery Plan up to 2016 for NHS Wales and its Partners Executive Lead: Director of Therapies and Health Science
More informationStaff Health, Safety and Wellbeing Strategy
Staff Health, Safety and Wellbeing Strategy 2013-16 Prepared by: Effective From: Review Date: Lead Reviewer: Hugh Currie Head of Occupational Health and Safety 31 st January 2013 01 st April 2014 Patricia
More informationNHS GRAMPIAN. Local Delivery Plan (LDP) 2016/17 Progress Report on Primary Care Chapter
NHS GRAMPIAN Board Meeting 06.04.17 Open Session Item 8 Local Delivery Plan (LDP) 2016/17 Progress Report on Primary Care Chapter 1. Actions Recommended The Board is asked to: Note and endorse the progress
More informationApprove Ratify For Discussion For Information
NHS North Cumbria CCG Governing Body Agenda Item 4 October 2017 11 Implementation of Digital road Map Update Purpose of the Report To update the Governing Body as to progress in meeting national targets
More informationCHILD AND ADOLESCENT MENTAL HEALTH SERVICES
AGENDA ITEM 7.5 CHILD AND ADOLESCENT MENTAL HEALTH SERVICES Executive Lead: Director of Public Health Author: Rose Whittle CAMHS Commissioning Lead Contact Details for further information: Rose Whittle
More informationWestminster Partnership Board for Health and Care. 21 February pm pm Room 5.3 at 15 Marylebone Road
Westminster Partnership Board for Health and Care 21 February 2018 4.30pm - 6.00pm Room 5.3 at 15 Marylebone Road Agenda Item # Item and discussion points Lead Papers Timing 1 Preliminary business Welcome
More informationDesigned to Add Value - a third dimension for One Wales
Designed to Add Value - a third dimension for One Wales A Strategic Direction for the Third Sector in Supporting Health & Social Care November 2008 Ministerial Foreword Designed to Add Value - a third
More informationUsing results-based accountability (RBA) to drive improvements in the management of long-term conditions
Using results-based accountability (RBA) to drive improvements in the management of long-term conditions Ruth Jordan Senior Service Improvement Manager Cardiff and Vale University Health Board Chronic
More informationOFFICIAL. Commissioning a Functionally Integrated Urgent Care Access, Treatment and Clinical Advice Service
Our Ref: BH/2015/253 Publications Gateway Ref. No. 03568 NHS England Quarry House Quarry Hill Leeds LS2 7UE Email : england.nhs111@nhs.net To: CCG Accountable Officers CCG Clinical Leaders Cc: Regional
More information