1 University of Michigan Health System Program and Operations Analysis CSR Staffing Process Final Report To: Jean Shlafer, Director, Central Staffing Resources, Admissions Bed Coordination Center Amanda Silva, Central Lean Coach Associate, Quality Improvement, Michigan Quality System Sam Clark, Industrial Engineer Lead, Program & Operations Analysis Mary Duck, Professor, IOE 481 From: IOE 481 Project Team 8, Programs and Operations Analysis Jesse Brauner Paolo DiBenedetto Daniel Weinblatt Date: December 13, 2011 i

2 Table of Contents Executive Summary... iv Introduction... iv Background... iv Methods... v Findings... v Conclusions... vi Recommendations... vi Final Report... 1 Introduction... 1 Background... 1 Key Issues... 2 Goals and Objectives... 2 Project Scope... 3 Methods... 3 Data Collection... 3 Data Analysis... 4 Findings... 5 Qualitative Findings from Interviews and Observations... 5 Quantitative Findings from Data Sheets... 6 Conclusions... 8 Late Forms and Changes to Forms... 8 Lean Analysis... 8 Insufficient Nurses... 9 Recommendations Immediate Fixes Long Term Solution Further Analysis Expected Impact Impact of Immediate Fixes Impact of Long Term Solution Appendices... A Appendix A: Sample CSR Request Form... A Appendix B: CSR Management Interview Questions... B Appendix C: Unit Manager Interview Questions... C Appendix D: Charge Nurse Questionnaire... D Appendix E: Sample Data Collection Sheet... E Appendix F: Completed Data Sheets... F ii

3 List of Figures and Tables Figure i: High Level CSR Process Flow Diagram..iv Table i: Process Times in Minutes... vi Table ii: Wait Times in Minutes...vi Figure 1: High Level CSR Process Flow Diagram..2 Figure 2: CSR Process Flow Chart..4 Figure 3: Form Arrival Time... 6 Table 1: Process Times in Minutes. 7 Table 2: Wait Times in Minutes.. 8 Table 3: Nurses Requested vs. Nurses Available 8 Figure 4: Current State Flow Chart.. 9 Figure 5: Number of Nurses Available Lags Number of Nurses Requested... 9 Figure 6: Future State Flow Chart. 12 iii

4 Executive Summary Introduction Although over 3,000 nurses work at the University of Michigan Hospital, units frequently need additional nursing support. One of the most important functions of the Central Staffing Resource (CSR) is to deploy RN resources throughout the hospital to meet patient care needs. The Director of the CSR believes the communications and information flow throughout this process is very inefficient, and takes important time away from patient care. Therefore, the CSR director asked a student team to evaluate the CSR nurse request process, in order to identify opportunities to improve the process. This evaluation consisted of observing the CSR request process and interviewing key personnel including the CSR director, CSR manager, Nurse Managers and Charge Nurses. The team collected data during the observations and interviews, and analyzed this data to help develop recommendations. After all data collection was complete, the team developed several short-term recommendations that are immediately implementable to reduce process lead time by eliminating inefficiencies. The team also developed a long-term plan that can significantly improve the overall nurse request process. Background The CSR nurse request process occurs 4 times per day. The charge nurse from each unit fills out a CSR request form and faxes it to the CSR. An administrative assistant (AA) in the CSR enters the charge nurses inputs into a spreadsheet that assesses the current status of all of the units. The House Manager (HM) then decides how to deploy the CSR nurses, and this decision information is relayed to the units. This process includes a long lead time and a significant amount of rework, confusion, and inefficiency within the CSR. A high level process flow diagram can be found in figure i. Figure i: High Level CSR Process Flow Diagram iv

5 The goal of the project was to examine and evaluate the current process in order to identify inefficiencies and create recommendations to eliminate the problems. Methods The team performed two major types of data collection to evaluate the CSR nurse request process: interviews and observations. Interviews: CSR Director project definition and guidance CSR Manager specific CSR process questions, discuss solution options House Managers group interview with HM s to explain project and ask advice for data collection methods Unit Managers acquire feedback from Unit s perspectives, discuss solution options Charge Nurses gather data regarding process from Unit s perspectives Observations: Observed the nurse request process within the CSR 12 times Collected data by filling out data sheets Informally asked the AA and HW questions regarding their issues and opinions of the process Findings The methods describe above led to both qualitative and quantitative findings for the CSR nurse staffing process. Subjective Findings: CSR Management believes the dynamic nature of the process leads to the confusion and inefficiency within the process CSR office personnel believe the physical layout and hardware within the CSR office can be greatly improved to aid the process flow Unit Managers believe the process should have more automation Charge Nurses believe the CSR form does not relay all relevant information, and that communication with the CSR needs to be standardized Process observations reveal an inefficient and non-standardized process for handling the CSR forms and relaying the information to the units Quantitative Findings: Four late CSR form for every CSR request processes, 2 of which are due to slow faxes Late forms arrived 2 minutes late on average 1.8 changes to request forms per process 0.5 changes to forms per process after HM allocation v

6 Below are tables representing average process and wait times for the CSR process: Table i: Processing Times in Minutes (8 process observations by team members from Oct 17, 2011-Nov 7, 2011) Average Standard Deviation AA Work Time HM Work Time AA Page Time Total Processing Time 23.3 Table ii: Wait Times in Minutes (8 process observations by team members from Oct 17, 2011-Nov 7, 2011) Average Standard Deviation Fax Travel Time AA Wait Time Paging Wait Time Unit Callback Time Total Waiting Time 31.2 Conclusions Late request forms to the CSR are a minor problem within the process. Units changing their request information is also a minor problem; it has little effect on the overall process time Office layout and hardware improvement can improve office inefficiencies Process details: o 54 minutes total time o 23 minute of actual processing o 8 minutes of value added time Recommendations Immediate Fixes Each computer and phone within the CSR office should be dedicated to a specific cluster. s and phone calls from the units should be directed to their specific computer/phone based on the cluster the unit belongs to CSR office should be rearranged so the printer can be reached from the AA s desk Utilize a group paging system to contact the charge nurses as a group Send (automated) reminders via pager to the charge nurses to submit their CSR forms Send the results of the nurse allocation to the units as a page, instead of a page requiring a phone call from the charge nurse. vi

7 Long Term Solution This process can be greatly improved with the use of an automated CSR request form that utilizes a shared folder within the nurses shared drive (S: drive). The nurse would fill out an equivalent CSR form as an excel spreadsheet, and save it in a specific folder within the shared drive. This information would be automatically extracted to the spreadsheet that the AA and HM currently use to determine the unit status and make allocation decisions. This would greatly streamline the information flow, and reduce much of the inefficiency and confusion that currently exist within the process. vii

8 Final Report Introduction The University of Michigan Health System employs over 22,000 people who care for nearly 200,000 people per year. Among the caregivers are over 3,000 nurses, the majority of which work for a specific unit within the hospital; however, units frequently need additional nursing support due to multiple causes including fluctuations in patient census and acuity as well as nurse availability. When a hospital unit needs additional nurses, the Central Staffing Resource (CSR) provides backup nurses via a request process that occurs four times per day, once per shift. The Director of the CSR believed the process took important time away from patient care and results in confusion regarding whether the unit would receive sufficient assistance. She felt that the current nurse request and deployment process was very inefficient. Therefore, the Director of the CSR asked a team of Industrial and Operations Engineering (IOE) students to examine the CSR nurse request process to develop recommendations to improve the process by reducing lead time and avoiding confusion. The nurse request process begins when each unit s charge nurse faxes a request form to the CSR office. After the House Manager (HM) decides how to allocate the CSR nurses, the administrative assistant (AA) communicates the results back to the units. The team has determined methods to streamline the CSR request process and improve throughput while reducing lead time. The project goal was to analyze the current process and identify opportunities to improve the process. This final report presents the findings, conclusions, and recommendations of the team in response to the Director s request. Background Units can request nurses from the CSR four times per day. The charge nurse fills out a CSR request form, found in Appendix A, and faxes it to the CSR. An administrative assistant in the CSR enters the charge nurses inputs into a spreadsheet that details the current status of the unit regarding patient census and acuity along with the number and type of nurses. The House Manager then decides how to deploy the CSR nurses appropriately using the information on the spreadsheet, the individual request forms, and other subjective information that the House Manager knows from personal experience. After the House Manager determines the appropriate assignment of CSR nurses, an Administrative Assistant conveys the information back to the unit, primarily via pager. Figure 1 shows a diagram of the process from a high level. 1

9 Figure 1: High Level CSR Process Flow Diagram Charge nurses would like to know the results of the process immediately after submitting the request forms. If the units will not be receiving a CSR nurse they must make other staffing arrangements. The process s long lead time contributes to inappropriate nurse allocation because sometimes units send nurses home that may actually be needed and other times nurses must work overtime to provide sufficient patient care. Additionally, the dynamic nature of the process, particularly charge nurses making changes to their requests, contributes to the confusion and inefficiency in the process. Key Issues The following key issues drove the need for an investigation and analysis of the CSR process: The long lead time of the CSR process from a charge nurse making a request to the CSR providing a response The confusion and inefficiency of the CSR process including frequent changes to the request forms, resulting in significant rework by the AA and HM and contributing to the extensive lead time Inappropriate nurse allocation leading to unbalanced nurse workloads; for example, at some times nurses may get sent home and have to use vacation hours and at other times nurses may have to work overtime Goals and Objectives The goal of the project was to examine the current CSR process and recommend ways to improve the efficiency of the process by reducing lead time and eliminating errors. To achieve this goal, the team had the following intermediate objectives: Understand the current process by interviewing people relevant to the process. Understand the current process through first-hand observations. Observations consisted of time-studies of the process from the CSR office s perspective. Categorize each step in the process as value-added, incidental work, or waste to determine areas for improvement Develop methods and tools to decrease lead time and reduce rework in the process caused by late forms and changes to forms 2

10 Project Scope This project included only the CSR staffing process specifically in the Adult Telemetry (ATC) and Adult General Care (AGC) clusters. The process begins when the unit charge nurse expresses its need of nurses via a form. The process ends when CSR communicates the results of the request back to the unit. This process occurs four times a day. Any task not connected to the CSR staffing process for the Adult Telemetry and Adult General Care clusters were not included in this project. Also, the team did not consider changing the assigned hours per patient day (HPPD) for each unit or nurse scheduling matrix. The scope excluded the actual decision making process by the House Manager and focused on the information and communication flow. Methods The following details the data collection methods and data analysis methods. The collection methods include the type of data, quantity of data, and specific methods. The analysis methods include data organization and statistical analyses. Data Collection Interviews and observations provided information to analyze and understand the current process. The team formally interviewed with people involved in the process, and informally interviewed the House Manager and administrative assistant during the observations to enhance understanding of that specific iteration. Interviews The team formally interviewed the following parties involved with the process: CSR Director three interviews, two to firmly define project and one to ensure project was proceeding correctly CSR Manager two interviews, one to further understand the specifics of the CSR process and one to discuss viability of potential solutions House Managers group interview with 12 House Managers to explain project and acquire broad information on the process from CSR perspective Unit Managers five separate Unit Manager interviews to acquire feedback on process from the Units perspectives and to assess viability of potential solutions Charge Nurses fifteen questionnaires for charge nurses, 6 responses received The interviews clarified the entire process, specifically the human factors. The team assessed the communication flow through the CSR process similarly to a factory manufacturing a product, where the request form is the raw material being processed and the response to the unit is the finished good. However, because of the intangible human aspects to the process the team interviewed the relevant people to understand the personal factors. Appendix B shows the questions used to interview the CSR Director and CSR manager. Appendix C shows the questions used to interview the Unit Managers. Appendix D shows the questionnaire sent to the charge nurses. 3

11 Observations Separately, each member of the team observed the CSR staffing process from the perspective of the Administrative Assistant and House Manager. The team members observed the communication methods and information flow from the hospital units, through the CSR, until a staffing decision is made and reported back to the units. During the observation, the team member filled out a data sheet that has the length of time for each step of the process and a count of factors that impede the process. A sample data sheet can be found in Appendix E. The team observed the process 12 times and collected 8 data sheets, which can be found in Appendix F. Given the minimal variance found in the results the team determined this was sufficient data. During observations, the team informally interviewed the House Manager who is on duty along with the Administrative Assistant that is working on Adult General Care and Adult Telemetry. The questions varied every time but generally covered reasons the AA and HM made certain decisions along with evaluations of the plausibility of specific solutions. Data Analysis After the data collection phase, the data was analyzed to develop conclusions and recommendations. The primary analysis methods were charting the communication flow and performing statistical analyses to define the current process and understand the impact of potential solutions. Flow Charts The team developed flow charts documenting the current communication flow of the CSR nurse request process. The charts include key statistics such as processing time and waiting time. The flow charts demonstrate bottlenecks and backups in the process, identifying specific problem areas. A flow chart can be found in Figure 2. Figure 2: CSR Process Flow Chart: Total Time = 59.4 minutes 4

12 Statistical Analyses The team performed statistical analyses to determine the current status of the CSR request process. The team performed basic statistical analysis to evaluate the length and variability of each step in the process. The team also evaluated the frequency of various root causes of delays in the process. Findings The team obtained qualitative information from the interviews as well as from the team s observations. The team acquired objective, quantitative data via the data sheets. Qualitative Findings from Interviews and Observations Completed interviews indicate that personnel associated with the CSR staffing process believe the process is inefficient. Different roles within the process tend to have different opinions about the most significant problem as well as potential solutions. Additionally, the student team developed thoughts about the process during observations. CSR Management Interviews The CSR Director and CSR Manager both believe that the dynamic nature of the process contributes most significantly to the length and confusion of the request process. If the process is nearly completed and a unit has a nurse call out sick, the House Manager must re-evaluate the nurse allocation, delaying the process. CSR Office Personnel Interviews AAs believe that the fax machine causes problems due to both technical errors and human errors like faxing to the wrong number or sending a fax upside-down. AAs also would like larger computer screens so that they would not have to shift between spreadsheets. Finally, AAs feel they frequently receive the CSR request forms late and charge nurses make many changes to the forms. HMs believe that the process could be more automated to save them time. Unit Manager Interviews Four of the five Unit Managers think that the process should have more automation, although the other Unit Manager desires more human interaction within the process. The Unit Managers explained that the information on the CSR form comes from highly variable, handwritten, daily sheets and therefore must always be manually entered. The comment box on the CSR form is used inconsistently; the charge nurses do not follow any standard procedure regarding what type of information they provide. All Unit Managers interviewed find a page an acceptable method of communicating results, although one worried about delays in the paging system. Charge Nurse Questionnaires The charge nurses provided insight to the CSR process from their perspectives. When asked the length of time spent filling out the request sheet, responses varied from 2 to 10 minutes, but the charge nurses agreed that filling out the form takes about 5 minutes total. All 6 charge nurses felt that the form needs to indicate some measurement of patient acuity. 5

13 Team Observations In addition to information obtained from interviews, team members identified other opportunities to improve the process that cannot be quantified: AAs handle each others CSR request forms and calls, resulting in handoffs AAs must stand up and walk to printer every time a form arrives AAs are not dedicated to only the nurse allocation process; they have other simultaneous duties and tasks. The phone rings often for unrelated reasons. The nurse allocation process is not standardized Some AAs and HMs copy information onto their own personal sheets with which they are more comfortable and familiar AAs page each unit separately, copying and pasting the same message Quantitative Findings from Data Sheets The data from the observations provides quantitative results that describe the current status of the process. These findings include the time for each step in the process and a count of factors that affect the process. Late CSR Forms The team observed the CSR office receive 144 request forms during the course of 8 process observations. Of the 144, 34 forms arrived in the CSR office later than they were due. However, the charge nurses sent 18 of the late forms on time but they arrived late because the fax took time to travel to the CSR office. On an individual process level, which includes 18 total sheets, 14 arrived on time, 2 arrived late but were sent on time, and 2 arrived late and were sent late. Late forms arrived an average of about 2 minutes after they were due. Figure 3 indicates the arrival status of each form observed. Figure 3: Form Arrival Time (144 total forms) 6

14 Changes to CSR Forms Observations indicated an average of 1.8 total changes to the forms per process. However, only 0.5 changes per shift occurred after the House Manager had allocated the nurses. Process Times The observations provided process times for each step in the process as depicted in the flowchart. The actual portions of the process during which a person was working on the request process to can be broken down in to four main segments: 1. The AA moving the form to the correct folder on the computer, printing the form, and inputting the data on the form to the Excel spreadsheet 2. The HM deciding how to allocate the CSR nurses 3. The AA paging the units informing them that either no nurses are available or they should call to find out the name of the nurse(s) they will be receiving The average process times along with their standard deviations can be seen below: Table 1: Processing Times in Minutes (8 process observations by team members from Oct 17, 2011-Nov 7, 2011) Average Standard Deviation AA Work Time HM Work Time AA Page Time Total Processing Time 23.3 The amount of time the charge nurse takes to fill out the form was not measured by the team but instead estimated by the nurses to be roughly 5 minutes. However, the process usually does not begin until shortly before the forms are due in to the CSR office so that number has not been included in Table 1. The phone call from the charge nurse to the CSR office to obtain the name of the nurse they will be receiving always takes less than 1 minute, and was therefore not included. Wait Times The observations also provided wait times between the processing steps. Waiting generally occurs in the following areas: 1. Waiting for the fax to reach the CSR office 2. Waiting for the HM to begin allocating nurses 3. Waiting to begin paging units 4. Waiting for the units to call the CSR office back 7

15 The average wait times and their standard deviations can be found below: Table 2: Wait Times in Minutes (8 process observations by team members from Oct 17, 2011-Nov 7, 2011) Average Standard Deviation Fax Travel Time AA Wait Time Paging Wait Time Unit Callback Time Total Waiting Time 31.2 Nurse Availability Although outside the scope of the project, data collected shows a discrepancy between the number of CSR nurses available and the number requested: Table 3: Nurses Requested vs. Nurses Available (8 process observations by team members from Oct 17, 2011-Nov 7, 2011) Adult General Care Adult Telemetry Requested Available Requested Available Average Standard Deviation Conclusions The findings from the interviews and observations provide insight to the CSR process including opportunities to improve and areas that require further research and analysis. Late Forms and Changes to Forms The CSR Director and other interviewees felt that a significant inhibitor to the process is units sending their CSR request forms in late or making changes to the forms. However, the findings indicate these problems are fairly minor because forms are late infrequently and generally only a few minutes late. Although about 2 units make changes to their forms every iteration of the process, the majority occur before the HM has made a decision. Late changes create re-work for the AAs, but it does not add to the processing time because the AAs are typically just waiting for the HM when the changes occur. Also, the frequent handoffs of sheets and phone calls add to the confusion of the CSR process. Lean Analysis The team analyzed the process using lean methodologies. The CSR request form is analogous to the raw material and the result (whether a unit will receive a nurse) is analogous to the finished good. Just like in a factory, there is processing time and waiting time that contribute to the total lead time. The only value added step to the process is the House Manager deciding how to allocate the nurses. All other steps are either waste or incidental. Although the process takes 54 minutes on average, only 23 minutes are actual processing time and only 8 minutes are value added. All other steps should be eliminated or minimized. Figure 4 depicts the status of each step in the process as waste, incidental, or value added. 8

16 Figure 4: Current State Flow Chart (red = waste, yellow = incidental, green = value added) Insufficient Nurses Analysis of the number of nurses requested versus the number of nurses available indicates a shortage of nurses. Fifty percent of requests in AGC are filled and 38% of requests in ATC are filled. If more nurses were available, the House Manager would take less time to make a decision because the decision would not negatively impact as many units. Figure 5 shows the discrepancy between the number of nurses available versus the number of nurses requested. Figure 5: Number of Nurses Available Lags Number of Nurses Requested 9

17 Additionally, a better rating of patient acuity would ensure that the nurses are allocated properly. The decision currently is based largely on ratio of nurses to patients with no consideration of the condition of the patients. Recommendations The team has developed three types of recommendations: Immediately implementable fixes to make minor improvements Long term solutions that will be more difficult to execute but more effective Areas for further research and analysis Immediate Fixes Several improvements are immediately implementable and can reduce the process lead time and confusion: Dedicate each computer and phone to either AGC and ATC or the other clusters. That way, whenever a unit calls the CSR office the call will go to the correct AA. Also, having dedicated computer inboxes for each cluster will eliminate handoffs between AAs. Rearrange the CSR office so that the printer can be reached from the AAs desks. That would eliminate the AAs constantly standing up and walking over to the printer to retrieve the form printouts. Send reminders to the units to submit their CSR request forms. If the AAs use the group paging system, they could just send one page at a predetermined time reminding the charge nurses to submit the CSR request forms. The reminder page could also probably be automated so the AA would not have to do anything. Utilize the group paging system. All units that requested nurses receive one of two pages, either telling them that no nurses are available or to call the CSR office. If the AA uses the group paging system, only two messages would have to be sent. Send the results of the nurse allocation as a page. Each unit agreed that calling the CSR office to find out which nurses they received is unnecessary. Sending a page with the nurse name would eliminate the waiting time for the unit to call the CSR office. Add some measurement of acuity to the CSR request forms. Long Term Solution Although more complex, long term solutions can significantly improve the nurse request process. The team recommends a system that eliminates the fax machine and simultaneously saves the AAs the time they currently spend inputting the data to the spreadsheet. The team proposes assigning each unit its own spreadsheet into which the charge nurse will type the same information currently found on the CSR nurse request form. The CSR office will have a master file that automatically extracts the information from each unit s file through the shared nursing 10

18 drive. This live model will also allow charge nurses to make changes to their forms. Immediate solutions above could also be used to further improve the process. Further Analysis The findings demonstrated two specific areas in need of additional analysis, the shortage of CSR nurses and the non-automated nature of the process. As indicated by the shortage of nurses, the number of nurses on each unit as well as the number of CSR nurses should be re-evaluated. Units that constantly need additional CSR nurses probably need more full time nurses. The CSR also may need additional floating nurses. Another potential IOE 481 project would be developing a computer program to automatically allocate the nurses. Because the HMs currently use a combination of objective and subjective information such a program would be complicated; however, simply solving a linear program to minimize the pain factor currently included in the spreadsheet subject to certain constraints would provide a strong basis. Expected Impact Implementing these solutions would both shorten the lead time of the CSR nurse request process and reduce the confusion inherent to the process. Impact of Immediate Fixes The following details the expected impact of the above immediate solutions: Reduce confusion Reduce AA work time Reduce late forms Reduce AA page time Eliminate unit callback time, saving over 3 minutes. Impact of Long Term Solution Implementing the live model would eliminate all steps prior to the HM allocating nurses, saving an average of 34 minutes. It would also reduce confusion because the charge nurses would be inputting their exact requests rather than relying on the AA as an intermediary between the units and the House Manager. Figure 6 depicts the future state of the system if the recommended long term solution is implemented. 11

19 Figure 6: Future State Flow Chart: Total time = (red = waste, yellow = incidental, green = value added) Implementation of the recommended live model as well as suggested minor fixes will reduce the total time from 59.4 minutes to 25.4 minutes. The only non-value added steps are inputting the information and paging the units with results. Automation of these processes would be next steps in fully optimizing the system. 12

20 Appendices Appendix A: Sample CSR Request Form A

21 Appendix B: CSR Management Interview Questions What are your goals for the project? What do you think is the biggest problem? Do you have any ideas for potential fixes? Who are the key people to interview/what are their roles? What is the scope of this project? What units should we study? What is the current process for staffing nurses? Have you had any similar problems before? How were they solved? B

22 Appendix C: Unit Manager Interview Questions Where do you get the information to fill out the CSR form? Is the data available on a computer (even if you do not use it)? If so, which program? When is the earliest (on average) that you could have the CSR form filled out? When is the latest (on average) that you can afford to know the CSR answer? What are some reasons for filling out the form late? Would you be ok receiving a page with results instead of a call? What works well in the staffing process? What doesn't work well in the staffing process? What would you change? How often do you get a nurse when you request one? If you absolutely need a nurse, how do you get one? Do you use the comment box and what for? What do you do if you do not get your requested nurse? C

23 Appendix D: Charge Nurse Questionnaire How long, on average, would you say it takes you to fill out and fax the CSR form? Where do you get the information needed to fill out the CSR form? Does the CSR form require all of the information you believe is necessary for CSR to make a staffing decision for your unit? Do you expect to hear a response from CSR all the time (even if you didn't request any nurses)? Is this usually the case? How does the CSR relay the decision regarding nurses to you? When does this usually happen? How often do you have to call CSR to find out about your decision? What would you like to see improved most? (CSR form, overall process, etc.) D

24 Appendix E: Sample Data Collection Sheet Date: Time: HM: AA: Number Time Time Time Time Time Time Time Number Time Any Nurses Sheet Sheet Sheet Data AA Unit First Changes Change Other Requested Sent Arrived Printed Inputted Paged Called Page To Sheet Call Comments AGC 4A 5A 5B 5C 6A 6B 6C 8A 8B 8C PACU OBS ==================================================================================================================== ATC 4B 4C 7A 7B 7C AMOU CVC 7C AMOU CVC Time HM Starts: Time HM Ends: Time Arrived: # CSR Nurses: HM Time Spent: Total Time: E

25 Appendix F: Completed Data Sheets 17-Oct HM: Char 4:00 PM AA: Jenn Number Time Time Time Time Time Time Time Number Time Nurses Sheet Sheet Sheet Data AA Unit First Changes Change Requested Sent Arrived Printed Inputted Paged Called Page To Sheet Call AGC A A B C A B C A B C PACU OBS ================================================================================================= ATC B C A B C AMOU CVC Time HM Starts: 37 HM Time Spent: 14 Time HM Ends: 51 Total Time: 60 Time Arrived: -15 AGC Nurses: 3 AGC Sat. 33% ATC Nurses: 3 ATC Sat. 43% F

26 18-Oct HM: Orchid 11:00 AM AA: Katie Number Time Time Time Time Time Time Time Number Time Nurses Sheet Sheet Sheet Data AA Unit First Changes Change Requested Sent Arrived Printed Inputted Paged Called Page To Sheet Call AGC A A B C A B C A B C 0-14 PACU OBS ================================================================================================= ATC B C A B C 0-39 AMOU CVC 0-83 Time HM Starts: 34 HM Time Spent: 11 Time HM Ends: 45 Total Time: 58 Time Arrived: -9 AGC Nurses: 4 AGC Sat. 67% ATC Nurses: 2 ATC Sat. 20% G

27 31-Oct HM: Deanna 4:00 PM AA: Mary Number Time Time Time Time Time Time Time Number Time Nurses Sheet Sheet Sheet Data AA Unit First Changes Change Requested Sent Arrived Printed Inputted Paged Called Page To Sheet Call AGC A A B C A B C A B C 0-35 PACU OBS ================================================================================================= ATC B C A B C AMOU CVC 0-19 Time HM Starts: 37 HM Time Spent: 11 Time HM Ends: 48 Total Time: 75 Time Arrived: -8 AGC Nurses: 4 AGC Sat. 57% ATC Nurses: 3 ATC Sat. 43% H

28 31-Oct HM: Deanna 11:00 AM AA: Dawn Number Time Time Time Time Time Time Time Number Time Nurses Sheet Sheet Sheet Data AA Unit First Changes Change Requested Sent Arrived Printed Inputted Paged Called Page To Sheet Call AGC A A B C A B C A B C PACU OBS ================================================================================================= ATC B C A B C AMOU CVC Time HM Starts: 34 HM Time Spent: 7 Time HM Ends: 41 Total Time: 58 Time Arrived: -15 AGC Nurses: 3 AGC Sat. 18% ATC Nurses: 3 ATC Sat. 38% I

29 31-Oct HM: Deanna 4:00 PM AA: Mary Number Time Time Time Time Time Time Time Number Time Nurses Sheet Sheet Sheet Data AA Unit First Changes Change Requested Sent Arrived Printed Inputted Paged Called Page To Sheet Call AGC A A B C ,14 6A B C A B C PACU OBS '================================================================================================= ATC B C A B C AMOU CVC Time HM Starts: 26 HM Time Spent: 4 Time HM Ends: 30 Total Time: 44 Time Arrived: -16 AGC Nurses: 5 AGC Sat. 50% ATC Nurses: 2 ATC Sat. 33% J

30 2-Nov HM: Ericka 11:00 AM AA: Katie Number Time Time Time Time Time Time Time Number Time Nurses Sheet Sheet Sheet Data AA Unit First Changes Change Requested Sent Arrived Printed Inputted Paged Called Page To Sheet Call AGC A A B C A B C A B C PACU OBS '================================================================================================= ATC B C A B C 2-78 AMOU CVC 0-53 Time HM Starts: 11 HM Time Spent: 4 Time HM Ends: 15 Total Time: 43 Time Arrived: -11 AGC Nurses: 6 AGC Sat. 67% ATC Nurses: 4 ATC Sat. 44% K

31 2-Nov HM: Ericka 4:00 PM AA: Faye Number Time Time Time Time Time Time Time Number Time Nurses Sheet Sheet Sheet Data AA Unit First Changes Change Requested Sent Arrived Printed Inputted Paged Called Page To Sheet Call AGC A A B C A B C A B C PACU OBS '================================================================================================= ATC B C A B C AMOU 2-47 CVC Time HM Starts: 21 HM Time Spent: 4 Time HM Ends: 25 Total Time: 45 Time Arrived: -11 AGC Nurses: 7 AGC Sat. 78% ATC Nurses: 3 ATC Sat. 38% L

32 7-Nov HM: Erica 4:00 PM AA: Jenn Number Time Time Time Time Time Time Time Number Time Nurses Sheet Sheet Sheet Data AA Unit First Changes Change Requested Sent Arrived Printed Inputted Paged Called Page To Sheet Call AGC A A B C A B C A B C PACU OBS '================================================================================================= ATC B C A B C AMOU CVC Time HM Starts: 19 HM Time Spent: 6 Time HM Ends: 25 Total Time: 57 Time Arrived: -16 AGC Nurses: 6 AGC Sat. 67% ATC Nurses: 2 ATC Sat. 67% M

University of Michigan Health System. Current State Analysis of the Main Adult Emergency Department

University of Michigan Health System. Current State Analysis of the Main Adult Emergency Department University of Michigan Health System Program and Operations Analysis Current State Analysis of the Main Adult Emergency Department Final Report To: Jeff Desmond MD, Clinical Operations Manager Emergency

More information

University of Michigan Health System. Final Report

University of Michigan Health System. Final Report University of Michigan Health System Program and Operations Analysis Analysis of Medication Turnaround in the 6 th Floor University Hospital Pharmacy Satellite Final Report To: Dr. Phil Brummond, Pharm.D,

More information

The University of Michigan Health System. Geriatrics Clinic Flow Analysis Final Report

The University of Michigan Health System. Geriatrics Clinic Flow Analysis Final Report The University of Michigan Health System Geriatrics Clinic Flow Analysis Final Report To: CC: Renea Price, Clinic Manager, East Ann Arbor Geriatrics Center Jocelyn Wiggins, MD, Medical Director, East Ann

More information

Analysis of Nursing Workload in Primary Care

Analysis of Nursing Workload in Primary Care Analysis of Nursing Workload in Primary Care University of Michigan Health System Final Report Client: Candia B. Laughlin, MS, RN Director of Nursing Ambulatory Care Coordinator: Laura Mittendorf Management

More information

University of Michigan Comprehensive Stroke Center

University of Michigan Comprehensive Stroke Center University of Michigan Comprehensive Stroke Center Improving the Discharge and Post-Discharge Process Flow Final Report Date: April 18, 2017 To: Jenevra Foley, Operating Director of Stroke Center, jenevra@med.umich.edu

More information

Improving Mott Hospital Post-Operative Processes

Improving Mott Hospital Post-Operative Processes Improving Mott Hospital Post-Operative Processes Program and Operation Analysis Submitted To: Sheila Trouten, Client Nurse Manager, PACU, Mott OR Jesse Wilson, Coordinator Administrative Manager of Surgical

More information

University of Michigan Health System. Analysis of the Patient Admission Process in The University of Michigan Hospital Final Report

University of Michigan Health System. Analysis of the Patient Admission Process in The University of Michigan Hospital Final Report University of Michigan Health System Analysis of the Patient Admission Process in The University of Michigan Hospital Final Report Submitted to: Lori Lathers Training Specialist Senior UMHS, Central Staffing

More information

University of Michigan Emergency Department

University of Michigan Emergency Department University of Michigan Emergency Department Efficient Patient Placement in the Emergency Department Final Report To: Jon Fairchild, M.S., R.N. C.E.N, Nurse Manager, fairchil@med.umich.edu Samuel Clark,

More information

University of Michigan Health System Program and Operations Analysis. Analysis of Problem Summary List and Medication Reconciliation Final Report

University of Michigan Health System Program and Operations Analysis. Analysis of Problem Summary List and Medication Reconciliation Final Report University of Michigan Health System Program and Operations Analysis Analysis of Problem Summary List and Medication Reconciliation Final Report To: John Clark, PharmD, MS, University of Michigan Health

More information

Cost-Benefit Analysis of Medication Reconciliation Pharmacy Technician Pilot Final Report

Cost-Benefit Analysis of Medication Reconciliation Pharmacy Technician Pilot Final Report Team 10 Med-List University of Michigan Health System Program and Operations Analysis Cost-Benefit Analysis of Medication Reconciliation Pharmacy Technician Pilot Final Report To: John Clark, PharmD, MS,

More information

University of Michigan Health System Program and Operations Analysis. Analysis of Pre-Operation Process for UMHS Surgical Oncology Patients

University of Michigan Health System Program and Operations Analysis. Analysis of Pre-Operation Process for UMHS Surgical Oncology Patients University of Michigan Health System Program and Operations Analysis Analysis of Pre-Operation Process for UMHS Surgical Oncology Patients Final Report Draft To: Roxanne Cross, Nurse Practitioner, UMHS

More information

Neurosurgery Clinic Analysis: Increasing Patient Throughput and Enhancing Patient Experience

Neurosurgery Clinic Analysis: Increasing Patient Throughput and Enhancing Patient Experience University of Michigan Health System Program and Operations Analysis Neurosurgery Clinic Analysis: Increasing Patient Throughput and Enhancing Patient Experience Final Report To: Stephen Napolitan, Assistant

More information

Eliminating Common PACU Delays

Eliminating Common PACU Delays Eliminating Common PACU Delays Jamie Jenkins, MBA A B S T R A C T This article discusses how one hospital identified patient flow delays in its PACU. By using lean methods focused on eliminating waste,

More information

University of Michigan Health System

University of Michigan Health System University of Michigan Health System Programs and Operations Analysis Analysis of the Discharge Process at Internal Medicine Unit B Department of Internal Medicine Final Report To: Dr. Christopher Kim,

More information

Michigan Medicine--Frankel Cardiovascular Center. Determining Direct Patient Utilization Costs in the Cardiovascular Clinic.

Michigan Medicine--Frankel Cardiovascular Center. Determining Direct Patient Utilization Costs in the Cardiovascular Clinic. Michigan Medicine--Frankel Cardiovascular Center Clinical Design and Innovation Determining Direct Patient Utilization Costs in the Cardiovascular Clinic Final Report Client: Mrs. Cathy Twu-Wong Project

More information

University of Michigan Health System Programs and Operations Analysis. Order Entry Clerical Process Analysis Final Report

University of Michigan Health System Programs and Operations Analysis. Order Entry Clerical Process Analysis Final Report University of Michigan Health System Programs and Operations Analysis Order Entry Clerical Process Analysis Final Report To: Richard J. Coffey: Director, Programs and Operations Analysis Bruce Chaffee:

More information

Driving Business Value for Healthcare Through Unified Communications

Driving Business Value for Healthcare Through Unified Communications Driving Business Value for Healthcare Through Unified Communications Even the healthcare sector is turning to technology to take a 'connected' approach, as organizations align technology and operational

More information

University of Michigan Health System Analysis of Wait Times Through the Patient Preoperative Process. Final Report

University of Michigan Health System Analysis of Wait Times Through the Patient Preoperative Process. Final Report University of Michigan Health System Analysis of Wait Times Through the Patient Preoperative Process Final Report Submitted to: Ms. Angela Haley Ambulatory Care Manager, Department of Surgery 1540 E Medical

More information

Validating Pilot Program to Improve Discharge Medication in 12 West at C.S. Mott Children s Hospital. Final Report. Submitted To:

Validating Pilot Program to Improve Discharge Medication in 12 West at C.S. Mott Children s Hospital. Final Report. Submitted To: Validating Pilot Program to Improve Discharge Medication in 12 West at C.S. Mott Children s Hospital Final Report Submitted To: Cathy Lewis, MSN, RN Clinical Nurse Specialist and Adjunct Clinical Instructor

More information

University of Michigan Health System. Inpatient Tracking Analysis and Process Standardization at. Mott Children s and Women s Hospital.

University of Michigan Health System. Inpatient Tracking Analysis and Process Standardization at. Mott Children s and Women s Hospital. University of Michigan Health System Program and Operations Analysis Inpatient Tracking Analysis and Process Standardization at Mott Children s and Women s Hospital Final Report Team 6 To: Perry Spencer,

More information

Directing and Controlling

Directing and Controlling NUR 462 Principles of Nursing Administration Directing and Controlling (Leibler: Chapter 7) Dr. Ibtihal Almakhzoomy March 2007 Dr. Ibtihal Almakhzoomy Directing and Controlling Define the management function

More information

Emergency Services. Time Study

Emergency Services. Time Study Prepared for: Peter Forster Management Systems University of Michigan Hospitals December 18,1991 by: Associate Hospital Administrator Emergency Services Ann Arbor, MI Don Suffivan Jeremy Roberts Lisa Clayton

More information

Improving Patient Throughput in the Emergency Department

Improving Patient Throughput in the Emergency Department University of Michigan Health System Program and Operations Analysis Improving Patient Throughput in the Emergency Department To: Jennifer Holmes, Director of Operations, Emergency Department Sam Clark,

More information

Final Report. Karen Keast Director of Clinical Operations. Jacquelynn Lapinski Senior Management Engineer

Final Report. Karen Keast Director of Clinical Operations. Jacquelynn Lapinski Senior Management Engineer Assessment of Room Utilization of the Interventional Radiology Division at the University of Michigan Hospital Final Report University of Michigan Health Systems Karen Keast Director of Clinical Operations

More information

Part 4. Change Concepts for Improving Adult Cardiac Surgery. In this section, you will learn a group. of change concepts that can be applied in

Part 4. Change Concepts for Improving Adult Cardiac Surgery. In this section, you will learn a group. of change concepts that can be applied in Change Concepts for Improving Adult Cardiac Surgery Part 4 In this section, you will learn a group of change concepts that can be applied in different ways throughout the system of adult cardiac surgery.

More information

University of Michigan Health System. Inpatient Cardiology Unit Analysis: Collect, Categorize and Quantify Delays for Procedures Final Report

University of Michigan Health System. Inpatient Cardiology Unit Analysis: Collect, Categorize and Quantify Delays for Procedures Final Report Project University of Michigan Health System Program and Operations Analysis Inpatient Cardiology Unit Analysis: Collect, Categorize and Quantify Delays for Procedures Final Report To: Dr. Robert Cody,

More information

University of Michigan Health System Program and Operations Analysis. Anesthesia Technical Support Work Distribution Analysis.

University of Michigan Health System Program and Operations Analysis. Anesthesia Technical Support Work Distribution Analysis. University of Michigan Health System Program and Operations Analysis Anesthesia Technical Support Work Distribution Analysis Final Report To: Paul Salow, Clinical Department Administrator, Anesthesiology

More information

Operational Assessments: Utilizing Productivity Standards

Operational Assessments: Utilizing Productivity Standards Operational Assessments: Utilizing Productivity Standards Mary Klimp CEO Queen of Peace Hospital 952.758.8101 mklimp@qofp.org Ross Manson Principal Eide Bailly 701.239.8634 rmanson@eidebailly.com Agenda

More information

Pilot Study: Optimum Refresh Cycle and Method for Desktop Outsourcing

Pilot Study: Optimum Refresh Cycle and Method for Desktop Outsourcing Intel Business Center Case Study Business Intelligence Pilot Study: Optimum Refresh Cycle and Method for Desktop Outsourcing SOLUTION SUMMARY The Challenge IT organizations working with reduced budgets

More information

University of Michigan Health System

University of Michigan Health System University of Michigan Health System Program and Operations Analysis Analysis of the Orthopedic Surgery Taubman Clinic Final Report To: Andrew Urquhart, MD: Orthopedic Surgeon Patrice Seymour, Administrative

More information

Analyzing Physician Task Allocation and Patient Flow at the Radiation Oncology Clinic. Final Report

Analyzing Physician Task Allocation and Patient Flow at the Radiation Oncology Clinic. Final Report Analyzing Physician Task Allocation and Patient Flow at the Radiation Oncology Clinic Final Report Prepared for: Kathy Lash, Director of Operations University of Michigan Health System Radiation Oncology

More information

Improving Clinical Flow ECHO Collaborative Change Package

Improving Clinical Flow ECHO Collaborative Change Package Primary Drivers (driver diagram) Change Concepts Change Ideas Examples, Tips, and Resources Engaged Leadership Develop culture for transformation Use walk-arounds and attendance at team meetings to talk

More information

Establishing a Monitoring Process For Inpatient Room Cleaning at Discharge. Final Report

Establishing a Monitoring Process For Inpatient Room Cleaning at Discharge. Final Report Environmental Services and Infection Control & Epidemiology, University of Michigan Hospital Establishing a Monitoring Process For Inpatient Room Cleaning at Discharge Final Report December 13, 2010 To:

More information

University of Michigan Health System MiChart Department Improving Operating Room Case Time Accuracy Final Report

University of Michigan Health System MiChart Department Improving Operating Room Case Time Accuracy Final Report University of Michigan Health System MiChart Department Improving Operating Room Case Time Accuracy Final Report Submitted To: Clients Jeffrey Terrell, MD: Associate Chief Medical Information Officer Deborah

More information

Transformational Patient Care Redesign Project

Transformational Patient Care Redesign Project Transformational Patient Care Redesign Project Kaveh Houshmand Azad 1 Summary In 2008 2009, Providence Holy Cross Medical Center, a 340- bed hospital located in Mission Hills, California embarked upon

More information

Scenario Planning: Optimizing your inpatient capacity glide path in an age of uncertainty

Scenario Planning: Optimizing your inpatient capacity glide path in an age of uncertainty Scenario Planning: Optimizing your inpatient capacity glide path in an age of uncertainty Scenario Planning: Optimizing your inpatient capacity glide path in an age of uncertainty Examining a range of

More information

The Safe Staffing for Quality Care Act will have a profound impact on the Advanced

The Safe Staffing for Quality Care Act will have a profound impact on the Advanced Anne Marie Holler NUR 503 Group Project- Safe Staffing for Quality Care Act 11/21/11 Impact of Safe Staffing for Quality Care Act The Safe Staffing for Quality Care Act will have a profound impact on the

More information

Analysis of Cardiovascular Patient Data during Preoperative, Operative, and Postoperative Phases

Analysis of Cardiovascular Patient Data during Preoperative, Operative, and Postoperative Phases University of Michigan College of Engineering Practicum in Hospital Systems Program and Operations Analysis Analysis of Cardiovascular Patient Data during Preoperative, Operative, and Postoperative Phases

More information

University of Michigan Health System

University of Michigan Health System University of Michigan Health System Program and Operations Analysis Utilization Study of Linear Accelerators in the Radiation Oncology Department Project Report To: Kathy Lash: Director of Operations

More information

uncovering key data points to improve OR profitability

uncovering key data points to improve OR profitability REPRINT March 2014 Robert A. Stiefel Howard Greenfield healthcare financial management association hfma.org uncovering key data points to improve OR profitability Hospital finance leaders can increase

More information

EXECUTIVE SUMMARY. Introduction. Methods

EXECUTIVE SUMMARY. Introduction. Methods EXECUTIVE SUMMARY Introduction University of Michigan (UM) General Pediatrics offers health services to patients through nine outpatient clinics located throughout South Eastern Michigan. These clinics

More information

STATE OF KANSAS DEPARTMENT FOR AGING AND DISABILITY SERVICES OSAWATOMIE STATE HOSPITAL OPERATIONS ASSESSMENT EXECUTIVE SUMMARY

STATE OF KANSAS DEPARTMENT FOR AGING AND DISABILITY SERVICES OSAWATOMIE STATE HOSPITAL OPERATIONS ASSESSMENT EXECUTIVE SUMMARY STATE OF KANSAS DEPARTMENT FOR AGING AND DISABILITY SERVICES OSAWATOMIE STATE HOSPITAL OPERATIONS ASSESSMENT Prepared by: THE BUCKLEY GROUP, L.L.C. OVERVIEW The Osawatomie State Hospital (OSH) in Osawatomie

More information

Quick Guide to A3 Problem Solving

Quick Guide to A3 Problem Solving Quick Guide to A3 Problem Solving What is it? Toyota Motor Corporation is famed for its ability to relentlessly improve operational performance. Central to this ability is the training of engineers, supervisors

More information

Nearly two-thirds of RNs working in Michigan hospitals believe staffing levels are based more on financial factors than on patient acuity.

Nearly two-thirds of RNs working in Michigan hospitals believe staffing levels are based more on financial factors than on patient acuity. Memorandum To: From: Michigan Nurses Association Chris Anderson, Lauren Coates Date: March 21, 2016 RE: Survey of Michigan Registered Nurses This memorandum summarizes the key findings from a statewide

More information

RUNNING HEAD: HANDOVER 1

RUNNING HEAD: HANDOVER 1 RUNNING HEAD: HANDOVER 1 Evidence-Based Practice Project: Implementing Bedside Nursing Handover Jane Jones, BSN RN Austin State Univeristy August 18, 2017 RUNNING HEAD: HANDOVER 2 I. Introduction The purpose

More information

A Publication for Hospital and Health System Professionals

A Publication for Hospital and Health System Professionals A Publication for Hospital and Health System Professionals S U M M E R 2 0 0 8 V O L U M E 6, I S S U E 2 Data for Healthcare Improvement Developing and Applying Avoidable Delay Tracking Working with Difficult

More information

Staffing and Scheduling

Staffing and Scheduling Staffing and Scheduling 1 One of the most critical issues confronting nurse executives today is nurse staffing. The major goal of staffing and scheduling systems is to identify the need for and provide

More information

Full-time Equivalents and Financial Costs Associated with Absenteeism, Overtime, and Involuntary Part-time Employment in the Nursing Profession

Full-time Equivalents and Financial Costs Associated with Absenteeism, Overtime, and Involuntary Part-time Employment in the Nursing Profession Full-time Equivalents and Financial Costs Associated with Absenteeism, Overtime, and Involuntary Part-time Employment in the Nursing Profession A Report prepared for the Canadian Nursing Advisory Committee

More information

Simulering av industriella processer och logistiksystem MION40, HT Simulation Project. Improving Operations at County Hospital

Simulering av industriella processer och logistiksystem MION40, HT Simulation Project. Improving Operations at County Hospital Simulering av industriella processer och logistiksystem MION40, HT 2012 Simulation Project Improving Operations at County Hospital County Hospital wishes to improve the service level of its regular X-ray

More information

Missed Nursing Care: Errors of Omission

Missed Nursing Care: Errors of Omission Missed Nursing Care: Errors of Omission Beatrice Kalisch, PhD, RN, FAAN Titus Professor of Nursing and Chair University of Michigan Nursing Business and Health Systems Presented at the NDNQI annual meeting

More information

SIMULATION FOR OPTIMAL UTILIZATION OF HUMAN RESOURCES IN SURGICAL INSTRUMENTS DISTRIBUTION IN HOSPITALS

SIMULATION FOR OPTIMAL UTILIZATION OF HUMAN RESOURCES IN SURGICAL INSTRUMENTS DISTRIBUTION IN HOSPITALS SIMULATION FOR OPTIMAL UTILIZATION OF HUMAN RESOURCES IN SURGICAL INSTRUMENTS DISTRIBUTION IN HOSPITALS Arun Kumar School of Mechanical & Production Engineering, Nanyang Technological University, Singapore

More information

BAPTIST HEALTH SCHOOLS LITTLE ROCK-SCHOOL OF NURSING NSG 4027: PROFESSIONAL ROLES IN NURSING PRACTICE

BAPTIST HEALTH SCHOOLS LITTLE ROCK-SCHOOL OF NURSING NSG 4027: PROFESSIONAL ROLES IN NURSING PRACTICE BAPTIST HEALTH SCHOOLS LITTLE ROCK-SCHOOL OF NURSING NSG 4027: PROFESSIONAL ROLES IN NURSING PRACTICE M1 ORGANIZATION PROCESSES AND DIVERSIFIED HEALTHCARE DELIVERY 2007 LECTURE OBJECTIVES: 1. Analyze economic,

More information

VA Compensation and Pension Capstone

VA Compensation and Pension Capstone VA Compensation and Pension Capstone Design Team Carrie Abbamonto, Chelsey Bowman, Jeffrey Condon, Kevin Urso Design Advisor Prof. James Benneyan Abstract The United States government has made a promise

More information

CHAPTER 5: SUBMISSION AND CORRECTION OF THE MDS ASSESSMENTS

CHAPTER 5: SUBMISSION AND CORRECTION OF THE MDS ASSESSMENTS CHAPTER 5: SUBMISSION AND CORRECTION OF THE MDS ASSESSMENTS Nursing homes are required to submit Omnibus Budget Reconciliation Act required (OBRA) MDS records for all residents in Medicare- or Medicaid-certified

More information

Matching Capacity and Demand:

Matching Capacity and Demand: We have nothing to disclose Matching Capacity and Demand: Using Advanced Analytics for Improvement and ecasting Denise L. White, PhD MBA Assistant Professor Director Quality & Transformation Analytics

More information

Gantt Chart. Critical Path Method 9/23/2013. Some of the common tools that managers use to create operational plan

Gantt Chart. Critical Path Method 9/23/2013. Some of the common tools that managers use to create operational plan Some of the common tools that managers use to create operational plan Gantt Chart The Gantt chart is useful for planning and scheduling projects. It allows the manager to assess how long a project should

More information

THE USE OF SIMULATION TO DETERMINE MAXIMUM CAPACITY IN THE SURGICAL SUITE OPERATING ROOM. Sarah M. Ballard Michael E. Kuhl

THE USE OF SIMULATION TO DETERMINE MAXIMUM CAPACITY IN THE SURGICAL SUITE OPERATING ROOM. Sarah M. Ballard Michael E. Kuhl Proceedings of the 2006 Winter Simulation Conference L. F. Perrone, F. P. Wieland, J. Liu, B. G. Lawson, D. M. Nicol, and R. M. Fujimoto, eds. THE USE OF SIMULATION TO DETERMINE MAXIMUM CAPACITY IN THE

More information

Patient Payment Check-Up

Patient Payment Check-Up Patient Payment Check-Up SURVEY REPORT 2017 Attitudes and behavior among those billing for healthcare and those paying for it CONDUCTED BY 2017 Patient Payment Check-Up Report 1 Patient demand is ahead

More information

Streamlining the discharge process to increase bed availability is an outcome measure

Streamlining the discharge process to increase bed availability is an outcome measure TRENDS Portion Control Opportunities: Real Time Gains for Hospital Patient Throughput Alan J. Goldberg, FACHE, Partner and President, Applied Management Systems, Inc., Burlington, Massachusetts, Shari

More information

Patient Blood Management Certification Program. Review Process Guide. For Organizations

Patient Blood Management Certification Program. Review Process Guide. For Organizations Patient Blood Management Certification Program Review Process Guide For Organizations 2018 What's New in 2018 Updates effective in 2018 are identified by underlined text in the activities noted below.

More information

Lean Six Sigma DMAIC Project (Example)

Lean Six Sigma DMAIC Project (Example) Lean Six Sigma DMAIC Project (Example) Green Belt Project Objective: To Reduce Clinic Cycle Time (Intake & Service Delivery) Last Updated: 1 15 14 Team: The Speeders Tom Jones (Team Leader) Steve Martin

More information

LEAN Transformation Storyboard 2015 to present

LEAN Transformation Storyboard 2015 to present LEAN Transformation Storyboard 2015 to present Rapid Improvement Event Med-Surg January 2015 Access to Supply Rooms Problem: Many staff do not have access to supply areas needed to complete their work,

More information

Outpatient Infusion Access Analysis

Outpatient Infusion Access Analysis Outpatient Infusion Access Analysis Evaluating the current processes for providing infusion services Final Report December 1, 2003 University of Michigan Health System Program and Operations Analysis Client:

More information

HOW TO USE THE WARMBATHS NURSING OPTIMIZATION MODEL

HOW TO USE THE WARMBATHS NURSING OPTIMIZATION MODEL HOW TO USE THE WARMBATHS NURSING OPTIMIZATION MODEL Model created by Kelsey McCarty Massachussetts Insitute of Technology MIT Sloan School of Management January 2010 Organization of the Excel document

More information

Quality Management Building Blocks

Quality Management Building Blocks Quality Management Building Blocks Quality Management A way of doing business that ensures continuous improvement of products and services to achieve better performance. (General Definition) Quality Management

More information

HEALTH WORKFORCE SUPPLY AND REQUIREMENTS PROJECTION MODELS. World Health Organization Div. of Health Systems 1211 Geneva 27, Switzerland

HEALTH WORKFORCE SUPPLY AND REQUIREMENTS PROJECTION MODELS. World Health Organization Div. of Health Systems 1211 Geneva 27, Switzerland HEALTH WORKFORCE SUPPLY AND REQUIREMENTS PROJECTION MODELS World Health Organization Div. of Health Systems 1211 Geneva 27, Switzerland The World Health Organization has long given priority to the careful

More information

Improving Student Critical Thinking Skills through a Root Cause Analysis (RCA) Pilot Project

Improving Student Critical Thinking Skills through a Root Cause Analysis (RCA) Pilot Project Improving Student Critical Thinking Skills through a Root Cause Analysis (RCA) Pilot Project Dana Tschannen, PhD, RN Michelle Aebersold, PhD, RN University of Michigan, School of Nursing June 3, 2010 Presentation

More information

James Fenush Jr. MS, RN Director of Nursing, Clinical Support Services Rita Barry BSN, RN Nurse Manager of Scheduling and Staff Deployment

James Fenush Jr. MS, RN Director of Nursing, Clinical Support Services Rita Barry BSN, RN Nurse Manager of Scheduling and Staff Deployment James Fenush Jr. MS, RN Director of Nursing, Clinical Support Services Rita Barry BSN, RN Nurse Manager of Scheduling and Staff Deployment 551-bed Academic/Quaternary Care Medical Center in central Pennsylvania

More information

Using Lean, Six Sigma to Improve Surgical Services James Pearson J.O.P. Consulting

Using Lean, Six Sigma to Improve Surgical Services James Pearson J.O.P. Consulting Using Lean, Six Sigma to Improve Surgical Services James Pearson J.O.P. Consulting How many times have we heard that it s easy to apply Lean and Six Sigma techniques to hospital processes, and specifically

More information

ResearcH JournaL 2012 / VOL

ResearcH JournaL 2012 / VOL ResearcH JournaL 2012 / VOL 04.02 www.perkinswill.com The Impact of an Operational Process on Space 05. THE IMPACT OF AN OPERATIONAL PROCESS ON SPACE: Improving the Efficiency of Patient Wait Times Amanda

More information

Application of Value Engineering to Improve Discharging Procedure in Healthcare Centers (Case Study: Amini Hospital, Langroud, Iran)

Application of Value Engineering to Improve Discharging Procedure in Healthcare Centers (Case Study: Amini Hospital, Langroud, Iran) International Journal of Engineering Management 2017; 1(1): 1-10 http://www.sciencepublishinggroup.com/j/ijem doi: 10.11648/j.ijem.20170101.11 Application of Value Engineering to Improve Discharging Procedure

More information

Begin Implementation. Train Your Team and Take Action

Begin Implementation. Train Your Team and Take Action Begin Implementation Train Your Team and Take Action These materials were developed by the Malnutrition Quality Improvement Initiative (MQii), a project of the Academy of Nutrition and Dietetics, Avalere

More information

The Determinants of Patient Satisfaction in the United States

The Determinants of Patient Satisfaction in the United States The Determinants of Patient Satisfaction in the United States Nikhil Porecha The College of New Jersey 5 April 2016 Dr. Donka Mirtcheva Abstract Hospitals and other healthcare facilities face a problem

More information

GAO. DEPOT MAINTENANCE The Navy s Decision to Stop F/A-18 Repairs at Ogden Air Logistics Center

GAO. DEPOT MAINTENANCE The Navy s Decision to Stop F/A-18 Repairs at Ogden Air Logistics Center GAO United States General Accounting Office Report to the Honorable James V. Hansen, House of Representatives December 1995 DEPOT MAINTENANCE The Navy s Decision to Stop F/A-18 Repairs at Ogden Air Logistics

More information

Building a Smarter Healthcare System The IE s Role. Kristin H. Goin Service Consultant Children s Healthcare of Atlanta

Building a Smarter Healthcare System The IE s Role. Kristin H. Goin Service Consultant Children s Healthcare of Atlanta Building a Smarter Healthcare System The IE s Role Kristin H. Goin Service Consultant Children s Healthcare of Atlanta 2 1 Background 3 Industrial Engineering The objective of Industrial Engineering is

More information

180 Feedback Results for Sample Nurse Leader

180 Feedback Results for Sample Nurse Leader 180 Feedback Results for Sample Nurse Leader March 24, 2018 2018 by American Organization of Nurse Executives 1 About This Report Sample Nurse Leader This report contains a summary of your 180-Degree Feedback

More information

THERE MUST BE A BETTER WAY.

THERE MUST BE A BETTER WAY. THERE MUST BE A BETTER WAY. Eliminating the Patient Transfer: No Lift/No Transfer Solutions at Focus Hand and Arm Surgery Center By Patricia Haraldson R.N., C.A.S.C. From my earliest experiences as a nurse,

More information

CHAPTER 5: SUBMISSION AND CORRECTION OF THE MDS ASSESSMENTS

CHAPTER 5: SUBMISSION AND CORRECTION OF THE MDS ASSESSMENTS CHAPTER 5: SUBMISSION AND CORRECTION OF THE MDS ASSESSMENTS Nursing homes are required to submit MDS records for all residents in Medicare- or Medicaidcertified beds regardless of the pay source. Skilled

More information

QAPI Making An Improvement

QAPI Making An Improvement Preparing for the Future QAPI Making An Improvement Charlene Ross, MSN, MBA, RN Objectives Describe how to use lessons learned from implementing the comfortable dying measure to improve your care Use the

More information

The Path to Sustainable Improvements

The Path to Sustainable Improvements What Do You Do When Your Improvement Project FAILS? The Path to Sustainable Improvements Thursday, March 3, 2016 10:00 AM Reza Ziaee, MA, MSE, MBB, PhD, FHIMSS - Antelope Valley Hospital James Bologna

More information

Pediatric Hematology / Oncology Clinic

Pediatric Hematology / Oncology Clinic Pediatric Hematology / Oncology Clinic Final Report for Analysis of Operations April 13, 1995 Program and Operations Analysis Project Team Cristina Bermudez Katherine Horvath Julie Pinsky Seth Roseman

More information

(Muda) Objectives. Determine what is Value added vs. Non-Value added. Identify the eight types of waste. Understand the Barriers to.

(Muda) Objectives. Determine what is Value added vs. Non-Value added. Identify the eight types of waste. Understand the Barriers to. Identifying Waste (Muda) Erika Sundrud, MA AVP Quality, Safety & Performance Improvement 1 Objectives Determine what is Value added vs. Non-Value added Identify the eight types of waste Understand the

More information

Improving Pain Center Processes utilizing a Lean Team Approach

Improving Pain Center Processes utilizing a Lean Team Approach Improving Pain Center Processes utilizing a Lean Team Approach Organization Name: St. Joseph Medical Center Type: Acute Care Hospital Contact Person: Sue Mitchell Title: Nurse Mgr Pain Mgmt Center E-Mail:

More information

1 Title Improving Wellness and Care Management with an Electronic Health Record System

1 Title Improving Wellness and Care Management with an Electronic Health Record System HIMSS Stories of Success! Graybill Medical Group 1 Title Improving Wellness and Care Management with an Electronic Health Record System 2 Background Knowledge It is widely understood that providers wellness

More information

Are You Undermining Your Patient Experience Strategy?

Are You Undermining Your Patient Experience Strategy? An account based on survey findings and interviews with hospital workforce decision-makers Are You Undermining Your Patient Experience Strategy? Aligning Organizational Goals with Workforce Management

More information

GENERAL DENTIST. Dental Receptionist Manual

GENERAL DENTIST. Dental Receptionist Manual GENERAL DENTIST Dental Receptionist Manual Note: The following policies and procedures comprise general information and guidelines only. The purpose of these policies is to assist you in performing your

More information

PEDIATRIC DENTIST. Dental Receptionist Manual

PEDIATRIC DENTIST. Dental Receptionist Manual PEDIATRIC DENTIST Dental Receptionist Manual Note: The following policies and procedures comprise general information and guidelines only. The purpose of these policies is to assist you in performing your

More information

Riverside s Vigilance Care Delivery Systems include several concepts, which are applicable to staffing and resource acquisition functions.

Riverside s Vigilance Care Delivery Systems include several concepts, which are applicable to staffing and resource acquisition functions. 1 EP8: Describe and demonstrate how nurses used trended data to formulate the staffing plan and acquire necessary resources to assure consistent application of the Care Delivery System(s). Riverside Medical

More information

Putting Perfection Into Practice to PreventHospital Acquired Pressure

Putting Perfection Into Practice to PreventHospital Acquired Pressure Organization: Solution Title: Ulcers Atlantic General Hospital Putting Perfection Into Practice to PreventHospital Acquired Pressure Program/Project Description: What was the problem to be solved? How

More information

How Allina Saved $13 Million By Optimizing Length of Stay

How Allina Saved $13 Million By Optimizing Length of Stay Success Story How Allina Saved $13 Million By Optimizing Length of Stay EXECUTIVE SUMMARY Like most large healthcare systems throughout the country, Allina Health s financial health improves dramatically

More information

Aged residential care (ARC) Medication Chart implementation and training guide (version 1.1)

Aged residential care (ARC) Medication Chart implementation and training guide (version 1.1) Aged residential care (ARC) Medication Chart implementation and training guide (version 1.1) May 2018 Prepared by and the Health Quality & Safety Commission Version 1, March 2018; version 1.1, May 2018

More information

Root Cause Analysis (Part I) event/rca_assisttool.doc

Root Cause Analysis (Part I)  event/rca_assisttool.doc (Part I) http://www.jcaho.org/accredited+organizations/sentinel+ event/rca_assisttool.doc Edited by Dr. E. Terry DIO Dr. S.K. Oliver OME Examines the reasons an error occurred Suggests changes to the system

More information

Public Health Needs: Quality of Care and Sustainability an International Overview. Dr. David Jaimovich President

Public Health Needs: Quality of Care and Sustainability an International Overview. Dr. David Jaimovich President Public Health Needs: Quality of Care and Sustainability an International Overview Dr. David Jaimovich President Presentation Outline Present sustainable targeted projects that led to improvement in hospitals

More information

Employee Telecommuting Study

Employee Telecommuting Study Employee Telecommuting Study June Prepared For: Valley Metro Valley Metro Employee Telecommuting Study Page i Table of Contents Section: Page #: Executive Summary and Conclusions... iii I. Introduction...

More information

APPLICATION OF SIMULATION MODELING FOR STREAMLINING OPERATIONS IN HOSPITAL EMERGENCY DEPARTMENTS

APPLICATION OF SIMULATION MODELING FOR STREAMLINING OPERATIONS IN HOSPITAL EMERGENCY DEPARTMENTS APPLICATION OF SIMULATION MODELING FOR STREAMLINING OPERATIONS IN HOSPITAL EMERGENCY DEPARTMENTS Igor Georgievskiy Alcorn State University Department of Advanced Technologies phone: 601-877-6482, fax:

More information

Common Errors on the T3010 related to fundraising costs. Know how to avoid them

Common Errors on the T3010 related to fundraising costs. Know how to avoid them Common Errors on the T3010 related to fundraising costs Know how to avoid them 1 Focus of presentation Many errors that charities make in the reporting of their fundraising expenses on the T3010 occur

More information

Mary Baum President & CEO BA&T September 18, 2015

Mary Baum President & CEO BA&T September 18, 2015 Mary Baum President & CEO BA&T September 18, 2015 Objective Why patient safety is so difficult to solve? The problem remains Advances in clinical workflow A collaborative approach Metrics matter Just start.

More information

ABSTRACT. dose", all steps in the setup of the secondary infusion must be conducted correctly.

ABSTRACT. dose, all steps in the setup of the secondary infusion must be conducted correctly. MITIGATING RISKS ASSOCIATED WITH SECONDARY INTRAVENOUS (IV) INFUSIONS: AN EMPIRICAL EVALUATION OF A TECHNOLOGY-BASED, A PRACTICE-BASED, AND A TRAINING-BASED INTERVENTION Katherine Y Chan 1,2, Sonia Pinkney

More information

Work Effort Analysis

Work Effort Analysis Coordinator: Dolorese Umar The University of Michigan, Ann Arbor Special Projects in Hospital Systems Client: Karolyn Brewer Industrial and Operations Engineering 481 Vivek Gupta Sonia Raheja Julie Simmons

More information

National Patient Experience Survey UL Hospitals, Nenagh.

National Patient Experience Survey UL Hospitals, Nenagh. National Patient Experience Survey 2017 UL Hospitals, Nenagh /NPESurvey @NPESurvey Thank you! Thank you to the people who participated in the National Patient Experience Survey 2017, and to their families

More information