1 Wales Critical Care & Trauma Network (North) CRITICAL CARE ADMISSION & DISCHARGE GUIDELINES Revised

2 CONTENTS: 1.0 Introduction 1.1 Scope of the Guideline 1.2 Levels of Care 2.0 Admission Guidance 2.1 General Principles 2.2 Planned (Elective) Referrals/Admissions to Critical Care Bed Booking Process Bed Availability Pre-Operative/Admission Visits Cancelled Operations Audit Process 2.3 Unplanned Referrals/Admissions to Critical Care Repatriation from Tertiary and Other Centres Admission for Organ Donation Admission for Neuro-Prognostication Admission when Critical Care is full Transfer for Non-Clinical Reasons i.e. when Critical Care is full Escalation of Critical Care Services Admission of Children (16 years and under) 3.0 Discharge Guidance 3.1 General Principles Complex Critical Care Patients 3.2 Discharge Process 3.3 Post Discharge Page: Acknowledgements 10 References 10 Appendices Appendix 1: WG Levels of Care Appendix 2: Elective Bed Booking Form Appendix 3: Example: Discharge Summary and Rehabilitation Prescription/Plan

3 1.0 INTRODUCTION The following document sets out the admission and discharge guidelines for the Critical Care services in the Wales Critical Care & Trauma Network. This includes adult critical care (Level 3 and Level 2) beds, and flexible, extended provision of critical care where these exist. These guidelines outline best practice. 1.1 Scope of the Guideline The Wales Critical Care & Trauma Network (North) incorporates three Acute Hospitals within North Wales. Each Hospital has a Critical Care Unit with Level 2 and Level 3 beds in various configurations. This guideline relates to Critical Care services in Betsi Cadwaladr University Local Health Board (BCUHB), specifically: Wrexham Maelor Hospital o Intensive Care Unit/High Dependency Unit (Flexible units) Glan Clwyd Hospital o Intensive Care Unit/High Dependency Unit (Flexible units) Bangor Hospital o Intensive Care Unit and Surgical High Dependency Unit (2 separate units) 1.2 Levels of Care The Levels of Care referred to throughout this document align with the Quality Requirements for Adult Critical Care in Wales (2006). For more in-depth explanation regarding Levels of Care in Wales refer to; With the development of more flexible and integrated Critical Care services the distinction between Level 2 and Level 3 care units has become blurred; the term Critical Care Unit is used throughout this document. For clarification Level 2 care was previously referred to as High Dependency Care (HDU) and Level 3 care was previously referred to as Intensive Care (ICU). For a quick guide to Levels of Care refer to Appendix ADMISSION GUIDELINE The objective of the Admission guideline is to ensure appropriate and timely admission of patients to critical care and to facilitate proper utilisation of limited capacity and staffing resource. 2.1 General Principles Critical Care may be defined as a service for patients who can benefit from more detailed observation, monitoring and treatment than is available on a general ward. It is not appropriate for this guideline to be too proscriptive about which patients should or should not be admitted however it is generally accepted that the clinical condition which has resulted in the patient requiring Critical Care should be identifiable, acute and potentially reversible*. Even when there is an acute reversible component, the patient s chronic health status and frailty may significantly affect the patient s ability to survive and benefit from an intensive care episode. This requires careful assessment and explicit assessment, but should not be prejudiced by age or disability alone. The decision to admit a patient to Critical Care should be based on the concept of potential benefit. Patients who are too well to benefit or those who have no hope of recovery to an acceptable quality of life should not be admitted. This is a clinical decision and can only be made for each individual patient at the time of referral. Patient autonomy should be respected. As far as is reasonably ascertainable, the person s past and present wishes, feelings, beliefs, values and other factors, for or against intensive care, stated or written, should be taken into account. The patient must be involved, as much as possible, in the decision to admit (Mental Capacity Act 2005). 3

4 The role of relatives in the case of an incapacitated patient is to represent their understanding of what the patient would wish for. Where a patient lacks capacity the admitting Consultants must discuss with other people (e.g. Carers, close relatives, friends or anyone interested in the person s welfare or anyone named by the person as someone to be consulted) taking into account their views as to what would be in the best interests of the person lacking capacity (Mental Capacity Act 2005). The final decision to admit or refuse admission of patients to the critical care unit is the responsibility of duty Critical Care consultant. Any disputes should initially be discussed between the duty Critical Care consultant and referring consultant. If further resolution is required this should involve the respective lead clinicians or clinical directors. All patients admitted to Critical Care will have their care directed by critical care staff. Whilst the referring team will be encouraged to regularly visit critical care and discuss the case with Critical Care staff the final decisions regarding changes to therapy will rest with the duty Critical Care consultant. There will be assessment of the rehabilitation needs of all patients within 24 hours of admission to Critical Care and NICE 83 eligible patients on discharge from Critical Care must receive a rehabilitation prescription (GPICS 2015). It is not an appropriate use of Critical Care resources to admit to, or delay discharge from the Critical Care Unit patients who can be managed on an appropriate general ward, due to purely organisational factors (e.g. ward staff shortages). Such organisational factors should be brought to the attention of the referring consultant and if required the Chief of Staff of the referring location. *For guidance regarding Admission for Non-Heartbeating Organ Donation (also known as donation after cardiac death) see section Planned (Elective) Referrals/Admissions to Critical Care The referral for planned (elective) admissions should ideally be based on assessment of the patient s requirements rather than the procedure itself. In line with NICE CG50 Acutely ill patients in hospital (2007) if admission to a Critical Care area is clinically indicated, then the decision to admit for elective admissions should normally involve both the referring consultant and the consultant in Critical Care. When no other discharge/death/transfer are expected, the last Critical Care bed would not be offered to an elective patient except in specific circumstances and with the agreement of the Critical Care Consultant Bed Booking Process 1. Once a patient is identified as potentially requiring critical care postoperatively the Critical Care Bed Booking Form (Appendix 2) should be commenced at the earliest opportunity, this includes urgent planned (e.g. cancer) cases. 2. A copy of the form should be sent to the critical care unit to book a bed. 3. Bookings should be for named patients only Bed Availability Surgeons and anaesthetists who have booked elective cases must check on bed availability prior to starting the case. If a case is started in the knowledge that there are no Critical Care beds then the surgeon/anaesthetist must organise alternative suitable post-operative care Pre-Operative/Admission Visits Whenever possible, a member of the Critical Care nursing team will visit the patient pre-operatively. A visit to the Critical Care department will be offered. 4

5 2.2.4 Cancelled Operations Elective admissions that are cancelled due to lack of Critical Care capacity or staff should be re-booked as soon as possible. The deferment/cancellation and the reason why should be documented on the outcome section of the bed booking form Audit Process Critical Care Units should complete the outcome section of the Bed Booking Form (Appendix 2) to monitor booked planned admissions against actual admissions. It is a requirement of the Delivery Plan for the Critically Ill Adult that these will be audited. 2.3 Unplanned Referrals/Admissions to Critical Care Referral of patients to Critical Care services should be undertaken at consultant level (NICE CG ). All potential patients should be discussed with the duty Critical Care consultant by the admitting consultant. Direct referrals from the Emergency Department should come from either the admitting consultant or the Emergency Medicine consultant. The Clinical Site Manager must also be made aware of these admissions to ensure recording of accurate bed availability. All patients formally referred for Critical Care should be reviewed by the Critical Care Consultant prior to admission (NICE CG ). In certain circumstances this may not be practicable in which case these patients should be reviewed by the Critical Care consultant as soon as possible. It is the responsibility of the Critical Care service to assess patients suitability for Critical Care need. No patient should be admitted without the explicit agreement of the Critical Care Consultant. Overall frailty should be assessed and scored to aid the decision making process. The referring team shall maintain responsibility for the patient up to admission to Critical Care, and shall remain responsible for ongoing management if admission is refused or deferred. In circumstances of urgency, junior medical staff, nursing or allied health professional staff, or members of the Acute Intervention Team may need to alert Critical Care medical staff directly. In these cases the referring consultant must always be alerted and agree to the referral. Priority for admission is: Emergency in house Emergency in BCUHB Repatriation from outside BCUHB Repatriation from within BCUHB Urgent cases in house Elective cases in house This prioritisation list is only for guidance and can be superseded by clinical judgement/risk assessment after discussion with all parties involved. No Unit in the Network shall accept a patient for transfer from another hospital (any departmentwards/theatres/ed) unless he or she has been referred to the Critical Care team of the referring hospital and assessed as suitable for Critical Care Repatriation from Tertiary and Other Centres Patients should be repatriated, preferably to within the patient s locality as soon as a bed becomes available (see section 2.3 for priority of admissions). Refer to existing guidance ill%20adult_approved.pdf 5

6 Designed for Life: Welsh Guidelines for the transfer of the critically ill adult (2016) which essentially states that such repatriations should normally take precedence over elective admissions to the unit: A side room should be considered until infection screening is complete. Where possible, infection prevention to infection prevention team discussion should take place prior to repatriating. If a patient arrives without a named consultant, the on-take team in the relevant specialty at the time of arrival will be responsible for the care of the patient; they will be notified as such Admission for Organ Donation Patients initially assessed in EDs in whom organ donation is a possibility should be admitted wherever possible to an ICU in order that their clinical and broader interests (including the potential for donation) can be fully assessed. It is recognised that this course of action is dependent on the availability of resources. All ICUs should have a bed management protocol to manage situations where there is a potential donor but capacity issues are present (BTS / ICS consensus document from 2011). Please also refer and adhere to Betsi Cadwaladr University Health Board Organ Donation after Circulatory Death policy Admission to Critical Care for neuro-prognostication If an acute, severely brain injured patient has been declined for referral by a neurosurgical unit, it is often difficult to prognosticate in the acute setting. These patients should normally be admitted to the Critical Care Unit for assessment unless other co-morbidities or advanced directives preclude this. (A Welsh Government guideline is in the process of being produced) Admission when Critical Care is full Whenever a resource is limited it is possible that demand may outstrip supply. The clinical team is responsible for allocating available critical care resources in the most effective way. When the Critical Care unit is full and another patient requires admission it will be necessary for the consultant and senior nurse responsible for the unit to consider the relative needs of all the patients. This will include many issues such as the dependencies of all the patients, any speciality requirements and suitability for transfer. The Critical Care team will undertake a balanced clinical risk assessment of the short-term strategies available to deal with further referrals for care, pending a definitive critical care bed: these may vary in each of the three localities but include flexing above capacity either within the unit, or by use of theatres/recovery, and premature discharge of Level 2 patients (Acute Intervention Team support where available). These decisions will be influenced by medical and nursing staff issues, and the availability of physical resources. Patients accepted for critical care will become the clinical responsibility of the Critical Care Intensivist, in collaboration with the referring team. Other resources e.g. additional staffing, equipment and placement will need to be arranged in collaboration with the Clinical Nurse Manager (in hours) and the Clinical Site Manager Transfer for Non-Clinical Reasons i.e. when Critical Care is full The decision of which patient to transfer has significant ethical and medico legal implications. BCUHB has a duty of care to all its patients inside and outside Critical Care, and must triage resources accordingly. Non clinical transfers should not take place where there are delayed transfers of care (DToCs) on the Critical Care Unit. 6

7 Refer to existing guidance Designed for Life: Welsh Guidelines for the transfer of the critically ill adult (2009) which essentially states that an ethical decision needs to be made whether to transfer a stable patient already on the critical care unit, or the new patient requiring critical care. The guidance advocates moving the new patient to a place of safety i.e. transferring, however it also recognises that there will be instances when moving the stable patient is the best option: ill%20adult_approved.pdf Escalation of Critical Care Services There is a Welsh Government expectation that all Critical Care Units in Wales have plans in place to escalate 100% Level 3 capacity should the need arise i.e. mass casualty event, pandemic flu. Health Boards must demonstrate clearly that their arrangements for critical care escalation meet the requirements of the WG (2016) guidance. Each Local Health Board and Critical Care Network needs to assure themselves that they have plans in place to respond swiftly to such demand for services. Principles include (not exclusive): Health boards must plan for a 100% increase in level 3 adult critical care capacity, ensuring plans are realistic and sustainable Equity of access to care Minimise non-clinical transfer of patients All efforts must be made to maximise the efficient use of critical care - minimise DToCs from critical care and avoid unnecessary admissions e.g. maximising vaccinations, providing public health advice. Patients requiring discharge from a critical care facility must take precedence above all other patient flow issues Admission of Children (16 years and under) Depending on local practice and facilities, some adult critical care units may admit children in the shortterm, especially where there are capacity issues at the tertiary centre. Standards of care for children admitted to adult critical care units are set out by the Paediatric Intensive Care Society (2015). Such admissions should ideally be cared for in a side room with continued Paediatric nurse presence. If this is not possible a Paediatric nurse should be available for advice, and the child should be reviewed twice daily by Paediatric senior medical and nursing staff. Clinical management will be the joint responsibility of the Paediatricians (or referring specialist) and the Intensivists, supported by Paediatric Intensivists at the tertiary centre as required. 3.0 DISCHARGE GUIDELINE The objective of the Discharge guideline is to support well organised, safe and timely discharge of patients from Critical Care. 3.1 General Principles Once patient dependency is assessed as having changed to that consistent with ward care the patient should be discharged. Prior to discharge all patients must have a clinical assessment to identify their current rehabilitation needs and agreement of their short and medium term physical and non-physical rehabilitation goals as described in NICE CG83 (2009), this includes a rehabilitation prescription, incorporating physical, emotional, psychological and communication needs (GPICS 2015). Finding the most appropriate ward bed may take a short time but it is important that patient discharge should not be delayed longer than four hours from the time a bed was requested (WAG 2010, GPICS 2015). Discharges after four hours will be classed as a delayed discharge (DoH 2005, GPICS 2015). After the decision to transfer a patient from a critical care area to the general ward has been made, the patient should be transferred as early as possible during the day (GPICS 2015). Transfer from critical care 7

8 areas to the general ward between and 07.00hrs should be avoided whenever possible, and should be documented as an adverse incident if it occurs (NICE CG ) Complex Critical Care Patients Discharge of any patient from Critical Care requires planning however it is especially important to plan the discharge of long term or complex patients. Defining this group may be difficult but should include all patients who have required Critical Care for more than four weeks. Patients, their relatives and ward staff all need time to prepare for the discharge. Specific needs must be identified as soon as practically possible and will require multidisciplinary liaison. Specialist services will need time to coordinate all aspects required for continuing care. This may take several days but the process should start before the predicted discharge date i.e. discharge planning should not be a reason for patients staying beyond their need for Critical Care and involve the admitting physician/surgeon. 3.2 Discharge Process 1. Critical Care team decide that the patient is ready for discharge. 2. The admitting/on-call Physician/surgical team are informed. 3. The Acute Intervention Team are informed 4. Critical Care staff to inform the Clinical Site Manager of the need for a patient discharge as soon as patient is ready. Time of call should be noted. Any additional/special requirements should be stated at this time. 5. This time should be recorded onto the Data Collection Tool (DCT) to ensure the correct time is recorded on to WardWatcher (and thus CCMDS). 6. Clinical Site Manager will facilitate discharge to an appropriate ward in partnership with the ward staff. This may be facilitated by the Acute Intervention Team where available. 7. The Critical Care team will commence the Rehabilitation Prescription/ticket to ward and document accordingly. 8. The Critical Care team and the receiving ward team should jointly ensure that there is continuity of care through a formal structured handover of care from critical care staff to ward staff (including both medical and nursing staff); this should be supported by a written plan, which is NICE CG50 (2007) compliant in a Discharge Summary and Rehabilitation Plan (see Appendix 3). This should include (GPICS2015): A summary of Critical Care stay, including diagnosis, treatment and changes to chronic therapies A monitoring and investigation plan A plan for ongoing treatment Rehabilitation assessment and prescription, incorporating physical, emotional, psychological and communication needs Follow-up arrangements. 3.3 Post Discharge The impact of critical care and poor quality rehabilitation on patients, and the ripple effect on families, should be regarded as a major public health issue (NICE CG ). All patients being discharged from Critical Care should have a Rehabilitation plan/prescription (GPICS 2015). After discharge from critical care patients should be followed up by the Acute Intervention Team and/or physiotherapy team. This should be on a daily basis until it is no longer deemed necessary. All patients, and their families, who had a Critical Care admission of five days or more should be offered an appointment to the Follow-Up Clinic. 8

9 When patients are transferred to the general ward from a critical care area, they should be offered information about their condition and encouraged to actively participate in decisions that relate to their recovery. The information should be tailored to individual circumstances. If they agree, their family and carers should be involved. Staff working with acutely ill patients on general wards should be provided with education and training to recognise and understand the physical, psychological and emotional needs of patients who have been transferred from critical care areas. 9

10 Acknowledgments To the Critical Care Networks in Northern Ireland, West Yorkshire, Mid Trent and South East Wales as well as the former North Wales Critical Care Network Admission and Discharge Guideline Working Group which was chaired by Dr Pierre Peyrasse. References Department of Health (2005) Quality Critical Care: Beyond 'Comprehensive Critical Care'. A report by the Critical Care Stakeholder Forum pdf Designed for Life: Quality Requirements for Adult Critical Care in Wales (2006). Designed for Life: Welsh Guidelines for the transfer of the critically ill adult (2016) ritically%20ill%20adult_approved.pdf Guidelines for the Provision of Intensive Care Services (2015). Mental Capacity Act (2005). London, Stationary Office NICE CG50 (2007) Acutely Ill Patients in Hospital NICE CG83 Rehabilitation after critical illness North Wales (and All Wales) Critical Care Levels of Care Paediatric Intensive Care Society: Quality Standards for the Care of Critically Ill Children 10

11 Appendix 1 Designed for Life; Quality Requirements for Adult Critical Care in Wales Levels of Care (Welsh Assembly Government) Level 0 Level 1 Level 2 Level 3 Level 3T Suitable for patients whose needs can be met through normal ward care in an acute hospital. Suitable for patients at risk of their condition deteriorating, those recently relocated from higher levels of care, and those whose needs can be met on an acute ward with additional advice and support from the critical care team. Suitable for hospitalised patients requiring more detailed observation or intervention, including support for a single failing organ system, postoperative care and those stepping down from higher levels of care. Suitable for hospitalised patients requiring advanced respiratory support in addition to the above, but the duration of multi-organ support or ability to manage multiple patients might be limited by staffing or equipment constraints. Organ support and monitoring for most body systems should be available at Level 3T and these facilities would normally be available to multiple patients simultaneously. This level is suitable for critically ill patients requiring prolonged support for multi-organ failure. Such units would have a significant teaching and training role. 11

12 Appendix 2 Elective Bed Booking Form 12

13 13

14 Appendix 3 An Example of a Discharge Summary and Rehabilitation Prescription/Plan 14

15 15

16 16

17 17

18 18

19 19

20 20

1 Introduction 2 2 Definitions of levels of care 3 3 Common principles 4 4 Admission criteria 5 5 Referral procedure

1 Introduction 2 2 Definitions of levels of care 3 3 Common principles 4 4 Admission criteria 5 5 Referral procedure ADMISSION & DISCHARGE POLICY FOR ADULT CRITICAL CARE SERVICES CONTENTS Page 1 Introduction 2 2 Definitions of levels of care 3 3 Common principles 4 4 Admission criteria 5 5 Referral procedure 5-7 5.1

More information

Together for Health A Delivery Plan for the Critically Ill

Together for Health A Delivery Plan for the Critically Ill Together for Health A Delivery Plan for the Critically Ill 2013-2016 March 2015 Approved at CPG Board 25 th March 2015 1. BACKGROUND AND CONTEXT Together for Health a Delivery Plan for the Critically Ill

More information

Specialised Services Commissioning Policy: CP160 Specialised Paediatric Neurological Rehabilitation

Specialised Services Commissioning Policy: CP160 Specialised Paediatric Neurological Rehabilitation Specialised Services Commissioning Policy: CP160 Specialised Paediatric Neurological Rehabilitation April 2018 Version 4.0 Document information Document purpose Document name Author Policy Specialised

More information

SERVICE SPECIFICATION 2 Vascular Access

SERVICE SPECIFICATION 2 Vascular Access SERVICE SPECIFICATION 2 Vascular Access Table of Contents Page 1 Key Messages 1 2 Introduction & Background 2 3 Relevant Guidelines & Standards 2 4 Scope of Service 3 5 Interdependencies with other specialties

More information

Author: Kelvin Grabham, Associate Director of Performance & Information

Author: Kelvin Grabham, Associate Director of Performance & Information Trust Policy Title: Access Policy Author: Kelvin Grabham, Associate Director of Performance & Information Document Lead: Kelvin Grabham, Associate Director of Performance & Information Accepted by: RTT

More information

Acutely ill patients in hospital

Acutely ill patients in hospital Issue date: July 2007 Acutely ill patients in hospital Recognition of and response to acute illness in adults in hospital Developed by the Centre for Clinical Practice at NICE Contents Key priorities for

More information

Standard of Care for MTC inpatients

Standard of Care for MTC inpatients Standard of Care for MTC inpatients The following document is intended to summarise the model of care for patients admitted under the care of the Leeds Major Trauma System. It will outline expected duties

More information

Phases of staged response to an increased demand for Paediatric Intensive Care in the event of pandemic or other disaster.

Phases of staged response to an increased demand for Paediatric Intensive Care in the event of pandemic or other disaster. Phases of staged response to an increased demand for Paediatric Intensive Care in the event of pandemic or other disaster. Working document The Critical Care Contingency Plan in the event of an emergency

More information

Key Objectives To communicate business continuity planning over this period that is in line with Board continuity plans and enables the Board:

Key Objectives To communicate business continuity planning over this period that is in line with Board continuity plans and enables the Board: Golden Jubilee Foundation Winter Plan 2016/2017 Introduction This plan outlines the proposed action that would be taken to deliver our key business objectives supported by contingency planning. This plan

More information

Clinical guideline Published: 25 July 2007 nice.org.uk/guidance/cg50

Clinical guideline Published: 25 July 2007 nice.org.uk/guidance/cg50 Acutely ill adults in hospital: recognising and responding to deterioration Clinical guideline Published: 25 July 2007 nice.org.uk/guidance/cg50 NICE 2018. All rights reserved. Subject to Notice of rights

More information

Framework for Continuing NHS Healthcare. Self-Assessment Tool

Framework for Continuing NHS Healthcare. Self-Assessment Tool Framework for Continuing NHS Healthcare Self-Assessment Tool Contents Part 1: Introduction and explanation of how to use this self-assessment tool 3 Part 2: Self-assessment tool 5 Page 2 of 16 - Framework

More information

Management of surge and escalation in critical care services: standard operating procedure for adult respiratory extra corporeal membrane oxygenation

Management of surge and escalation in critical care services: standard operating procedure for adult respiratory extra corporeal membrane oxygenation Management of surge and escalation in critical care services: standard operating procedure for adult respiratory extra corporeal membrane oxygenation 1 NHS England INFORMATION READER BOX Directorate Medical

More information

LLANDUDNO HOSPITAL PROJECT CYCLE TWO REPORT FOR UNSCHEDULED CARE PROJECT TEAM: IDENTIFICATION OF PREFERRED SERVICE SOLUTIONS MAY 2010

LLANDUDNO HOSPITAL PROJECT CYCLE TWO REPORT FOR UNSCHEDULED CARE PROJECT TEAM: IDENTIFICATION OF PREFERRED SERVICE SOLUTIONS MAY 2010 SITUATION LLANDUDNO HOSPITAL PROJECT CYCLE TWO REPORT FOR UNSCHEDULED CARE PROJECT TEAM: IDENTIFICATION OF PREFERRED SERVICE SOLUTIONS MAY 2010 The Cycle One SBAR report detailed the solutions which had

More information

GUIDELINE FOR STEP-DOWN TRANSFER OF PATIENTS FROM CRITICAL CARE AREAS

GUIDELINE FOR STEP-DOWN TRANSFER OF PATIENTS FROM CRITICAL CARE AREAS GUIDELINE FOR STEP-DOWN TRANSFER OF PATIENTS FROM CRITICAL CARE AREAS This guidance does not override the individual responsibility of health professionals to make appropriate decision according to the

More information

PARTICULARS, SCHEDULE 2 THE SERVICES, A Service Specification. 12 months

PARTICULARS, SCHEDULE 2 THE SERVICES, A Service Specification. 12 months E09/S(HSS)/b 2013/14 NHS STANDARD CONTRACT FOR VEIN OF GALEN MALFORMATION SERVICE (ALL AGES) PARTICULARS, SCHEDULE 2 THE SERVICES, A Service Specification Service Specification No. Service Commissioner

More information

CYMRU INTER HOSPITAL ACUTE NEONATAL TRANSFER SERVICE - NORTH WALES

CYMRU INTER HOSPITAL ACUTE NEONATAL TRANSFER SERVICE - NORTH WALES CYMRU INTER HOSPITAL ACUTE NEONATAL TRANSFER SERVICE - NORTH WALES STANDARD OPERATING PROCEDURES Ysbyty Glan Clwyd Telephone No: 01745 534686 Fax No: 01745 534681 Date: June 2015 Authors: Neonatal Transport

More information

Completion of Do Not Attempt Resuscitation (DNAR) Forms

Completion of Do Not Attempt Resuscitation (DNAR) Forms Completion of Do Not Attempt Resuscitation (DNAR) Forms The Trust DNAR Policy includes the DNAR form. Please take time to read the Policy. It is essential that when a DNAR decision has been made, the DNAR

More information

anaesthetic services Chapter 15 Services for neuroanaesthesia and neurocritical care 2014 GUIDELINES FOR THE PROVISION OF ACSA REFERENCES

anaesthetic services Chapter 15 Services for neuroanaesthesia and neurocritical care 2014 GUIDELINES FOR THE PROVISION OF ACSA REFERENCES Chapter 15 GUIDELINES FOR THE PROVISION OF anaesthetic services ACSA REFERENCES 15.1.1 15.1.2 15.1.3 15.1.4 15.1.5 15.1.8 15.1.9 15.1.11 15.2.1 15.2.9 15.2.13 15.2.17 15.2.18 15.2.19 15.3.2 15.4.2 15.5.1

More information

Policy for Admission to Adult Critical Care Services

Policy for Admission to Adult Critical Care Services Policy Number: CCaNNI 008 Title: Policy for Admission to Adult Critical Care Services Operational Date: Review Date: December 2009 December 2012 Type of Document: EQIA Screening Date: Corporate x Clinical

More information

North Gwent Crisis Resolution & Home Treatment Team Operational Policy

North Gwent Crisis Resolution & Home Treatment Team Operational Policy North Gwent Crisis Resolution & Home Treatment Team Operational Policy Mission Statement The purpose of the Crisis Resolution & Home Treatment Team (CRHTT) is to provide emergency assessment and intervention

More information

Seven Day Services Clinical Standards September 2017

Seven Day Services Clinical Standards September 2017 Seven Day Services Clinical Standards September 2017 11 September 2017 Gateway reference: 06408 Patient Experience 1. Patients, and where appropriate families and carers, must be actively involved in shared

More information

The Mental Health (Wales) Measure Part 1 Scheme. Local Primary Mental Health Support Services. for

The Mental Health (Wales) Measure Part 1 Scheme. Local Primary Mental Health Support Services. for The Mental Health (Wales) Measure 2010 Part 1 Scheme Local Primary Mental Health Support Services for BETSI CADWALADR UNIVERSITY HEALTH BOARD ANGLESEY COUNTY COUNCIL GWYNEDD COUNCIL CONWY COUNTY BOROUGH

More information

The Welsh NHS Confederation s response to the inquiry into cross-border health arrangements between England and Wales.

The Welsh NHS Confederation s response to the inquiry into cross-border health arrangements between England and Wales. Welsh Affairs Committee. Purpose: The Welsh NHS Confederation s response to the inquiry into cross-border health arrangements between England and Wales. Contact: Nesta Lloyd Jones, Policy and Public Affairs

More information

Mental Health Short Stay

Mental Health Short Stay Mental Health Directorate Central Adelaide Local Health Network Mental Health Short Stay Model of Care January 2016 Extracted from Improving Unplanned Emergency Access pathways (IUEAP) Model of Care: Mental

More information

62 days from referral with urgent suspected cancer to initiation of treatment

62 days from referral with urgent suspected cancer to initiation of treatment Appendix-2012-87 Borders NHS Board PATIENT ACCESS POLICY Aim In preparation for the introduction of the Patients Rights (Scotland) Act 2011, NHS Borders has produced a Patient Access Policy governing the

More information

SBAR Report phase 1 Maternity, Gynaecology & Neonatal services

SBAR Report phase 1 Maternity, Gynaecology & Neonatal services North Wales Maternity, Gynaecology, Neonatal and Paediatric service review SBAR Report phase 1 Maternity, Gynaecology & Neonatal services Situation The Minister for Health and Social Services has established

More information

DRAFT - NHS CHC and Complex Care Commissioning Policy.

DRAFT - NHS CHC and Complex Care Commissioning Policy. DRAFT - NHS CHC and Complex Care Commissioning Policy. 1. Introduction 1.1 This policy describes the way the following Clinical Commissioning Groups (CCGs) NHS Wirral Clinical Commissioning Group, NHS

More information

Accreditation Manager

Accreditation Manager Guideline Name: Clinical Learning for Junior Doctors Consultation and Date Approved: Accreditation Committee approval: 18 September 2017 Review: 2020 Responsible Officer: Purpose and Scope Accreditation

More information

Taking Organ Transplantation to 2020 Abertawe Bro Morgannwg University Local Health Board Action Plan

Taking Organ Transplantation to 2020 Abertawe Bro Morgannwg University Local Health Board Action Plan Taking Organ Transplantation to 2020 Abertawe Bro Morgannwg University Local Health Board Action Plan Foreword In 2008 the Department of Health (DH), with the support from the Welsh Assembly Government,

More information

EQuIPNational Survey Planning Tool NSQHSS and EQuIP Actions 4.

EQuIPNational Survey Planning Tool NSQHSS and EQuIP Actions 4. Standard 1: Governance for safety and Quality and Standard 2: Partnering with Consumers Section 1 Governance, Policies, Business decision making, Organisational / Strategic planning, Consumer involvement

More information

INVESTIGATION UNDER SECTION 17 OF THE WELSH LANGUAGE ACT Betsi Cadwaladr University Local Health Board

INVESTIGATION UNDER SECTION 17 OF THE WELSH LANGUAGE ACT Betsi Cadwaladr University Local Health Board INVESTIGATION UNDER SECTION 17 OF THE WELSH LANGUAGE ACT 1993 Betsi Cadwaladr University Local Health Board Background The main aim of the Welsh Language Commissioner, an independent role created in accordance

More information

Guideline scope Intermediate care - including reablement

Guideline scope Intermediate care - including reablement NATIONAL INSTITUTE FOR HEALTH AND CARE EXCELLENCE Guideline scope Intermediate care - including reablement Topic The Department of Health in England has asked NICE to produce a guideline on intermediate

More information

PATIENT RIGHTS ACT (SCOTLAND) 2011 ACCESS POLICY FOR TREATMENT TIME GUARANTEE

PATIENT RIGHTS ACT (SCOTLAND) 2011 ACCESS POLICY FOR TREATMENT TIME GUARANTEE NHS Board Meeting Tuesday 16 October 2012 Chief Operating Officer (Acute Services Division) Board Paper No. 12/45 PATIENT RIGHTS ACT (SCOTLAND) 2011 ACCESS POLICY FOR TREATMENT TIME GUARANTEE Recommendation:

More information

Adult Discharge Policy

Adult Discharge Policy Adult Discharge Policy This document is uncontrolled once printed. Please check on the Trust s Intranet site for the most up to date version. Version: 2 Ratified by: Trust Patient Safety and Quality Committee

More information

Commissioning Policy

Commissioning Policy Commissioning Policy Consultant to Consultant Referrals Version 6.0 December 2017 Name of Responsible Board / Committee for Ratification: North Staffordshire CCG Stoke on Trent CCG Date Issued: November

More information

POSITION STATEMENT ON THE FUTURE MODEL OF NEUROSCIENCES IN MID AND SOUTH WALES. Chief Executive

POSITION STATEMENT ON THE FUTURE MODEL OF NEUROSCIENCES IN MID AND SOUTH WALES. Chief Executive AGENDA ITEM 5.2 23 October 2009 POSITION STATEMENT ON THE FUTURE MODEL OF NEUROSCIENCES IN MID AND SOUTH WALES Report of Chief Executive Paper prepared by Purpose of Paper Action/Decision required Link

More information

CLINICAL PROTOCOL National Early Warning Score (NEWS) Observation Chart

CLINICAL PROTOCOL National Early Warning Score (NEWS) Observation Chart CLINICAL PROTOCOL National Early Warning Score (NEWS) Observation Chart November 2014 1 Document Profile Type i.e. Strategy, Policy, Procedure, Guideline, Protocol Title Category i.e. organisational, clinical,

More information

DISCHARGE AND TRANSFER OF CARE POLICY

DISCHARGE AND TRANSFER OF CARE POLICY Directorate of Operations DISCHARGE AND TRANSFER OF CARE POLICY Reference: OPP005 Version: 1.1 This version issued: 09/12/11 Result of last review: Minor changes Date approved by owner (if applicable):

More information

Borders NHS Board. Appendix NHS BORDERS 2012/13 WINTER PERIOD REPORT. Aim

Borders NHS Board. Appendix NHS BORDERS 2012/13 WINTER PERIOD REPORT. Aim Borders NHS Board NHS BORDERS 2012/13 WINTER PERIOD REPORT Aim To update the Board on key activity relating to the 2012/13 winter period, specifically focussing on the festive period from 17 December to

More information

NICE guideline Published: 22 September 2017 nice.org.uk/guidance/ng74

NICE guideline Published: 22 September 2017 nice.org.uk/guidance/ng74 Intermediate care including reablement NICE guideline Published: 22 September 2017 nice.org.uk/guidance/ng74 NICE 2017. All rights reserved. Subject to Notice of rights (https://www.nice.org.uk/terms-and-conditions#notice-ofrights).

More information

Evidence on the quality of medical note keeping: Guidance for use at appraisal and revalidation

Evidence on the quality of medical note keeping: Guidance for use at appraisal and revalidation Health Informatics Unit Evidence on the quality of medical note keeping: Guidance for use at appraisal and revalidation April 2011 Funded by: Acknowledgements This project was funded by the Academy of

More information

Hospital Discharge and Transfer Guidance. Choice, Responsiveness, Integration & Shared Care

Hospital Discharge and Transfer Guidance. Choice, Responsiveness, Integration & Shared Care Hospital Discharge and Transfer Guidance Choice, Responsiveness, Integration & Shared Care Worcestershire Mental Health Partnership NHS Trust Information Reader Box Document Type: Document Purpose: Unique

More information

NOTTINGHAM UNIVERSITY HOSPITAL NHS TRUST. PATIENT ACCESS MANAGEMENT POLICY (Previously known as Waiting List Management Policy) Documentation Control

NOTTINGHAM UNIVERSITY HOSPITAL NHS TRUST. PATIENT ACCESS MANAGEMENT POLICY (Previously known as Waiting List Management Policy) Documentation Control NOTTINGHAM UNIVERSITY HOSPITAL NHS TRUST PATIENT ACCESS MANAGEMENT POLICY (Previously known as Waiting List Management Policy) Documentation Control Reference CL/CGP/026 Approving Body Senior Management

More information

RESUSCITATION/DO NOT ATTEMPT RESUSCITATION (DNAR) POLICY

RESUSCITATION/DO NOT ATTEMPT RESUSCITATION (DNAR) POLICY Appendix 9 RESUSCITATION/DO NOT ATTEMPT RESUSCITATION (DNAR) POLICY Approval Committee Version Issue Date Review Date Document Author GaRMC TMB Final January 2011 January 2012 Resuscitation Committee Author:

More information

Birmingham Children s Hospital NHS Foundation Trust. Progress against the recommendations of the Healthcare Commission s intervention report

Birmingham Children s Hospital NHS Foundation Trust. Progress against the recommendations of the Healthcare Commission s intervention report Birmingham Children s Hospital NHS Foundation Trust Progress against the recommendations of the Healthcare Commission s intervention report June 2010 About the Care Quality Commission The Care Quality

More information

Regional Guideline on the Use of Observation and Therapeutic Engagement in Adult Psychiatric Inpatient Facilities in Northern Ireland

Regional Guideline on the Use of Observation and Therapeutic Engagement in Adult Psychiatric Inpatient Facilities in Northern Ireland Regional Guideline on the Use of Observation and Therapeutic Engagement in Adult Psychiatric Inpatient Facilities in Northern Ireland November 2011 1 Contents 1. Introduction 3 2. Aims of Guideline 4 3.

More information

Australasian Health Facility Guidelines. Part B - Health Facility Briefing and Planning Medical Assessment Unit - Addendum to 0340 IPU

Australasian Health Facility Guidelines. Part B - Health Facility Briefing and Planning Medical Assessment Unit - Addendum to 0340 IPU Australasian Health Facility Guidelines Part B - Health Facility Briefing and Planning 0330 - Medical Assessment Unit - Addendum to 0340 IPU Revision 2.0 01 March 2016 COPYRIGHT AND DISCLAIMER Copyright

More information

SERVICE SPECIFICATION

SERVICE SPECIFICATION SERVICE SPECIFICATION Service Rotherham Hospice Lead Gail Palmer Provider Lead Paula Hill / Mike Wilkerson Period 21 st July 2010 20 th July 2013 1. Purpose This specification describes the services which

More information

Choice on Discharge Policy

Choice on Discharge Policy Choice on Discharge Policy Reference No: P_CIG_19 Version 1 Ratified by: LCHS Trust Board Date ratified: 13 th September 2016 Name of originator / author: Sarah McKown Name of responsible committee / Individual

More information

Welsh Government Response to the Report of the National Assembly for Wales Public Accounts Committee Report on Unscheduled Care: Committee Report

Welsh Government Response to the Report of the National Assembly for Wales Public Accounts Committee Report on Unscheduled Care: Committee Report Welsh Government Response to the Report of the National Assembly for Wales Public Accounts Committee Report on Unscheduled Care: Committee Report We welcome the findings of the report and offer the following

More information

EMERGENCY PRESSURES ESCALATION PROCEDURES

EMERGENCY PRESSURES ESCALATION PROCEDURES OP48 EMERGENCY PRESSURES ESCALATION PROCEDURES INITIATED BY: Director of Therapies & Health Sciences / Chief Operating Officer APPROVED BY: Executive Board DATE APPROVED: 21 September 2016 VERSION: 3 OPERATIONAL

More information

Indicators for the Delivery of Safe, Effective and Compassionate Person Centred Service

Indicators for the Delivery of Safe, Effective and Compassionate Person Centred Service Inspections of Mental Health Hospitals and Mental Health Hospitals for People with a Learning Disability Indicators for the Delivery of Safe, Effective and Compassionate Person Centred Service 1 Our Vision,

More information

My Discharge a proactive case management for discharging patients with dementia

My Discharge a proactive case management for discharging patients with dementia Shine 2013 final report Project title My Discharge a proactive case management for discharging patients with dementia Organisation name Royal Free London NHS foundation rust Project completion: March 2014

More information

Using mortality data to improve the quality and safety of patient care December 2015

Using mortality data to improve the quality and safety of patient care December 2015 Using mortality data to improve the quality and safety of patient care December 2015 Version Date Published Notes 12.0 18/12/2015 12 th publication 11.0 18/09/2015 11 th publication 10.0 19/06//2015 10

More information

Final Version Simple Guide to the Care Act and Delayed Transfers of Care (DTOC) SIMPLE GUIDE TO THE CARE ACT AND DELAYED TRANSFERS OF CARE (DTOC)

Final Version Simple Guide to the Care Act and Delayed Transfers of Care (DTOC) SIMPLE GUIDE TO THE CARE ACT AND DELAYED TRANSFERS OF CARE (DTOC) SIMPLE GUIDE TO THE CARE ACT AND DELAYED TRANSFERS OF CARE (DTOC) 1. UNDERPINNING PRINCIPLES Across the whole system, our common aims are to: Improve services for patients by avoiding situations where,

More information

THE ROLE OF COMMUNITY MENTAL HEALTH TEAMS IN DELIVERING COMMUNITY MENTAL HEALTH SERVICES

THE ROLE OF COMMUNITY MENTAL HEALTH TEAMS IN DELIVERING COMMUNITY MENTAL HEALTH SERVICES THE ROLE OF COMMUNITY MENTAL HEALTH TEAMS IN DELIVERING COMMUNITY MENTAL HEALTH SERVICES Interim Policy Implementation Guidance and Standards [July 2010] - 1 - CONTENTS 1. Introduction... 3 2. The guiding

More information

Care of Critically Ill & Critically Injured Children in the West Midlands

Care of Critically Ill & Critically Injured Children in the West Midlands Care of Critically Ill & Critically Injured Children in the West Midlands University Hospitals Coventry & Warwickshire NHS Trust Visit Date: 4 th December 2013 Report Date: April 2014 Images courtesy of

More information

Policy for Patient Access

Policy for Patient Access Policy for Patient Access DOCUMENT CONTROL Revision Date Old Version 10/12/2014 1.0 01/07/2016 1.1 30/04/17 1.2 Amendment General Management Review General Management Review General Management Review Authored

More information

Adult Therapy Services. Community Services. Roundshaw Health Centre. Team Lead / Service Manager. Service Manager / Clinical Director

Adult Therapy Services. Community Services. Roundshaw Health Centre. Team Lead / Service Manager. Service Manager / Clinical Director THE ROYAL MARSDEN NHS FOUNDATION TRUST Job Description Job Title Specialist Neuro Physiotherapist - Community Neuro Therapy Service Area of Specialty Adult Therapy Services Directorate Community Services

More information

Maternity & Child Health Review

Maternity & Child Health Review Maternity & Child Health Review PAEDIATRIC AND CHILD HEALTH WORKSTREAM NB This is a draft document for discussion and still very much in development. Any detail should not be considered a final proposal.

More information

SCHEDULE 2 THE SERVICES

SCHEDULE 2 THE SERVICES SCHEDULE 2 THE SERVICES A. Service Specifications Service Specification No. Service E08/S/b Neonatal Intensive Care Transport Commissioner Lead Provider Lead Period Date of Review 12 Months 1. Population

More information

Policy on Admission of Children To The Acute Children s Wards Within the WHSCT August 2012

Policy on Admission of Children To The Acute Children s Wards Within the WHSCT August 2012 Policy on Admission of Children To The Acute Children s Wards Within the WHSCT August 2012 Page 1 of 9 Title Acute Children s Wards Within the WHSCT Reference Number WC12/007 Implementation Date August

More information

Management of surge and escalation in critical care services: standard operating procedure for Adult and Paediatric Burn Care Services in England and

Management of surge and escalation in critical care services: standard operating procedure for Adult and Paediatric Burn Care Services in England and Management of surge and escalation in critical care services: standard operating procedure for Adult and Paediatric Burn Care Services in England and Wales NHS England INFORMATION READER BOX Directorate

More information

HOSPITAL IN THE HOME (HITH) INFORMATION SHEET

HOSPITAL IN THE HOME (HITH) INFORMATION SHEET What is HITH? HOSPITAL IN THE HOME (HITH) INFORMATION SHEET In 1994 the Hospital in the Home (HITH) Program was commenced as a pilot. Hospitals were invited to apply to become HITH providers and 43 were

More information

This SLA covers an enhanced service for care homes for older people and not any other care category of home.

This SLA covers an enhanced service for care homes for older people and not any other care category of home. Care Homes for Older People Service Level Agreement 2016-2019 All practices are expected to provide essential and those additional services they are contracted to provide to all their patients. This service

More information

2017/18 and 2018/19 National Tariff Payment System Annex E: Guidance on currencies without national prices. NHS England and NHS Improvement

2017/18 and 2018/19 National Tariff Payment System Annex E: Guidance on currencies without national prices. NHS England and NHS Improvement 2017/18 and 2018/19 National Tariff Payment System Annex E: Guidance on currencies without national prices NHS England and NHS Improvement December 2016 Contents 1. Introduction... 3 2. Critical care adult

More information

Hospital Generated Inter-Speciality Referral Policy Supporting people in Dorset to lead healthier lives

Hospital Generated Inter-Speciality Referral Policy Supporting people in Dorset to lead healthier lives NHS Dorset Clinical Commissioning Group Hospital Generated Inter-Speciality Referral Policy Supporting people in Dorset to lead healthier lives PREFACE This Document outlines the CCG s policy in respect

More information

Do Not Attempt Cardiopulmonary Resuscitation (DNACPR) Policy

Do Not Attempt Cardiopulmonary Resuscitation (DNACPR) Policy Do Not Attempt Cardiopulmonary Resuscitation (DNACPR) Policy 1 Policy Title: Executive Summary: Do Not Attempt Cardiopulmonary Resuscitation (DNACPR) Policy Cardiopulmonary resuscitation (CPR) can be attempted

More information

The impact of a flu or norovirus outbreak could have a significant impact on health and social services and could involve:

The impact of a flu or norovirus outbreak could have a significant impact on health and social services and could involve: NHS National Waiting Times Centre Winter Plan 2010/11 Introduction This plan outlines the proposed action that would be taken to deliver our key business objectives supported by contingency planning. This

More information

Delivering surgical services: options for maximising resources

Delivering surgical services: options for maximising resources Delivering surgical services: options for maximising resources THE ROYAL COLLEGE OF SURGEONS OF ENGLAND March 2007 2 OPTIONS FOR MAXIMISING RESOURCES The Royal College of Surgeons of England Introduction

More information

Organisational Audit Questions - Links to recommendations, standards and evidence

Organisational Audit Questions - Links to recommendations, standards and evidence Question Quoted recommendation/ standard / evidence Source Notes Section 1 - Hospital characteristics 1. a) How many adult in-patient or overnight beds (including 23- hours stay) are currently available

More information

Southern Adelaide Local Health Network CLINICAL RECONFIGURATION. February 2016

Southern Adelaide Local Health Network CLINICAL RECONFIGURATION. February 2016 CLINICAL RECONFIGURATION February 2016 Acknowledgement of Country > We would like to acknowledge that this land we meet on today is the traditional land of the Kaurna people, and that we respect their

More information

Mental Health (Wales) Measure Implementing the Mental Health (Wales) Measure Guidance for Local Health Boards and Local Authorities

Mental Health (Wales) Measure Implementing the Mental Health (Wales) Measure Guidance for Local Health Boards and Local Authorities Mental Health (Wales) Measure 2010 Implementing the Mental Health (Wales) Measure 2010 Guidance for Local Health Boards and Local Authorities Januar y 2011 Crown copyright 2011 WAG 10-11316 F6651011 Implementing

More information

abcdefgh THE SCOTTISH OFFICE Department of Health NHS MEL(1996)22 6 March 1996

abcdefgh THE SCOTTISH OFFICE Department of Health NHS MEL(1996)22 6 March 1996 abcdefgh THE SCOTTISH OFFICE Department of Health ** please note that this circular has been superseded by CEL 6 (2008), dated 7 February 2008 Dear Colleague NHS RESPONSIBILITY FOR CONTINUING HEALTH CARE

More information

General Practice/Hospitals Transfer of Care Arrangements 2013

General Practice/Hospitals Transfer of Care Arrangements 2013 General Practice/Hospitals Transfer of Care Arrangements 2013 1. Introduction As the population ages and the incidence of chronic disease increases more patients are suffering from multiple chronic conditions

More information

Integrated Health and Care in Ipswich and East Suffolk and West Suffolk. Service Model Version 1.0

Integrated Health and Care in Ipswich and East Suffolk and West Suffolk. Service Model Version 1.0 Integrated Health and Care in Ipswich and East Suffolk and West Suffolk Service Model Version 1.0 This document describes an integrated health and care service model and system for Ipswich and East and

More information

Separating emergency and elective surgical care: Recommendations for practice

Separating emergency and elective surgical care: Recommendations for practice Separating emergency and elective surgical care: Recommendations for practice THE ROYAL COLLEGE OF SURGEONS OF ENGLAND September 2007 2 SEPARATING EMERGENCY AND ELECTIVE SURGICAL CARE The Royal College

More information

Policy Document Control Page

Policy Document Control Page Policy Document Control Page Title: Section 17 (Leave of Absence) Policy Version: 9 Reference Number: CL7 Supersedes Supersedes: Section 17 (Leave of Absence) Policy V8 Description of Amendment(s): Updated

More information

Sample Template Operational Policy

Sample Template Operational Policy Operational Delivery s Sample Template Operational Policy October 2014 Document MTN-OP-03-10-14 Classification: General Organisation Document Purpose Title Author Operational Delivery s Guidance Sample

More information

All clinical areas of the Trust All clinical Trust staff All adults with limited prognosis Palliative care team Approved. Purpose of this document

All clinical areas of the Trust All clinical Trust staff All adults with limited prognosis Palliative care team Approved. Purpose of this document Trust Policy and Procedure Document Ref. No: PP(15)310 End of Life Care For use in: For use by: For use for: Document owner: Status: All clinical areas of the Trust All clinical Trust staff All adults

More information

South East London Interface Prescribing Policy including the NHS and Private Interface Prescribing Guide

South East London Interface Prescribing Policy including the NHS and Private Interface Prescribing Guide South East London Interface Prescribing Policy including the NHS and Private Interface Prescribing Guide 1. Introduction 1.1 This policy has been developed by the South East London Clinical Commissioning

More information

HOME TREATMENT SERVICE OPERATIONAL PROTOCOL

HOME TREATMENT SERVICE OPERATIONAL PROTOCOL HOME TREATMENT SERVICE OPERATIONAL PROTOCOL Document Type Unique Identifier To be set by Web and Systems Development Team Document Purpose This protocol sets out how Home Treatment is provided by Worcestershire

More information

Rehab V Vita Square Operational Guideline

Rehab V Vita Square Operational Guideline Southern Adelaide Local Health Network Rehab V Vita Square Operational Guideline Consultation Paper Version 2.2 January 2018 Purpose The purpose of this document is to provide an overview of operational

More information

Designated Title: Clinical Nurse Specialist. Position Title: Clinical Nurse Specialist Reconstructive Breast Surgery

Designated Title: Clinical Nurse Specialist. Position Title: Clinical Nurse Specialist Reconstructive Breast Surgery Designated Title: Clinical Nurse Specialist Position Title: Clinical Nurse Specialist Reconstructive Breast Surgery This role is considered a non-core children s worker and will be subject to safety checking

More information

Did Not Attend (DNA) and Cancellation Policy and Operational Guidelines

Did Not Attend (DNA) and Cancellation Policy and Operational Guidelines Did Not Attend (DNA) and Cancellation Policy and Operational Guidelines Document Number Version Ratified By & Date Name of Approving Body(s) & Date(s) FPE-004 V1 Safety and Effectiveness Sub-Committee

More information

Dignity and Essential Care Follow-Up Inspection (Announced) Cardiff and Vale University Health Board: Ward B6 Trauma and Orthopaedic, University

Dignity and Essential Care Follow-Up Inspection (Announced) Cardiff and Vale University Health Board: Ward B6 Trauma and Orthopaedic, University Dignity and Essential Care Follow-Up Inspection (Announced) Cardiff and Vale University Health Board: Ward B6 Trauma and Orthopaedic, University Hospital of Wales, Cardiff 20 and 21 January 2015 This publication

More information

Paper for the Health Board Quality and Safety Committee. Out of Hours Upper GI Haemorrhage

Paper for the Health Board Quality and Safety Committee. Out of Hours Upper GI Haemorrhage Paper for the Health Board Quality and Safety Committee Out of Hours Upper GI Haemorrhage This short paper describes the current pathways within the Health Board for the management of out of hours emergency

More information

Intensive Psychiatric Care Units

Intensive Psychiatric Care Units NHS Lothian St John s Hospital, Livingston Intensive Psychiatric Care Units Service Profile Exercise ~ November 2009 NHS Quality Improvement Scotland (NHS QIS) is committed to equality and diversity. We

More information

Discharge Planning Powys Teaching Health Board

Discharge Planning Powys Teaching Health Board Discharge Planning Powys Teaching Health Board Date issued: November 2017 Document reference: 147A2017-18 This document has been prepared as part of work performed in accordance with statutory functions.

More information

PATIENT ACCESS POLICY (ELECTIVE CARE) UHB 033 Version No: 1 Previous Trust / LHB Ref No: Senior Manager, Performance and Compliance.

PATIENT ACCESS POLICY (ELECTIVE CARE) UHB 033 Version No: 1 Previous Trust / LHB Ref No: Senior Manager, Performance and Compliance. Reference No: PATIENT ACCESS POLICY (ELECTIVE CARE) UHB 033 Version No: 1 Previous Trust / LHB Ref No: Trust 364 Documents to read alongside this Policy. Ministerial Letter EH/ML/004/09 WAG Rules for Managing

More information

Note: 44 NSMHS criteria unmatched

Note: 44 NSMHS criteria unmatched Commonwealth National Standards for Mental Health Services linkage with the: National Safety and Quality Health Service Standards + EQuIP- content of the EQuIPNational* Standards 1 to 15 * Using the information

More information

CARE DELIVERY TEAM NURSING GUIDELINES

CARE DELIVERY TEAM NURSING GUIDELINES STANDARDS TO BE MET Team nursing is a model of care which utilises the resources within a nursing team on a shift by shift basis to deliver safe patient care within the clinical unit. The Bay of Plenty

More information

NHS. The guideline development process: an overview for stakeholders, the public and the NHS. National Institute for Health and Clinical Excellence

NHS. The guideline development process: an overview for stakeholders, the public and the NHS. National Institute for Health and Clinical Excellence NHS National Institute for Health and Clinical Excellence Issue date: April 2007 The guideline development process: an overview for stakeholders, the public and the NHS Third edition The guideline development

More information

Disagreement between agencies about threshold judgements. Disagreement within agencies about the appropriate course of safeguarding action

Disagreement between agencies about threshold judgements. Disagreement within agencies about the appropriate course of safeguarding action Escalation Process WSCB Escalation Processes Relating To: Disagreement between agencies about threshold judgements Disagreement within agencies about the appropriate course of safeguarding action Situations

More information

Shetland NHS Board. Board Paper 2017/28

Shetland NHS Board. Board Paper 2017/28 Board Paper 2017/28 Shetland NHS Board Meeting: Paper Title: Shetland NHS Board Capacity and resilience planning - managing safe and effective care across hospital and community services Date: 11 th June

More information

Policy for the use of Leave under Section 17 of the Mental Health Act 1983 (as amended) Version: 9

Policy for the use of Leave under Section 17 of the Mental Health Act 1983 (as amended) Version: 9 SH CP 52 Policy for the use of Leave under Section 17 of the Mental Health Act 1983 (as amended) Version: 9 Summary: Keywords (minimum of 5): (To assist policy search engine) Target Audience: Policy for

More information

Purpose of the Report: Update to the Trust Board on the clinically-led Trauma and Orthopaedic GIRFT review. Information Assurance X

Purpose of the Report: Update to the Trust Board on the clinically-led Trauma and Orthopaedic GIRFT review. Information Assurance X Item 9.4 To: Trust Board From: Mark Brassington Date: 18 th May 2018 Healthcare Standard Title: Trauma and Orthopaedic GIRFT Author: Richard James, General Manager Responsible Director/s: Mark Brassington

More information

Northern Ireland Peer Review of Cancer MDTs. EVIDENCE GUIDE FOR LUNG MDTs

Northern Ireland Peer Review of Cancer MDTs. EVIDENCE GUIDE FOR LUNG MDTs Northern Ireland Peer Review of Cancer MDTs EVIDENCE GUIDE FOR LUNG MDTs CONTENTS PAGE A. Introduction... 3 B. Key questions for an MDT... 6 C. The Review of Clinical Aspects of the Service... 8 D. The

More information

Emergency Care Network Capacity Management and Escalation Plan Action Cards December 2009 December 2010

Emergency Care Network Capacity Management and Escalation Plan Action Cards December 2009 December 2010 Coventry and Warwickshire Emergency Care Network Emergency Care Network Capacity Management and Escalation Plan Action Cards December 2009 December 2010 This aim of this plan is to provide a high level

More information

Submission to the South Australian Child and Adolescent Mental Health Service Re: CAMHS Review. August 2014

Submission to the South Australian Child and Adolescent Mental Health Service Re: CAMHS Review. August 2014 Submission to the South Australian Child and Adolescent Mental Health Service Re: CAMHS Review August 2014 Australian Association of Social Workers National Office Canberra Level 4, 33-35 Ainslie Place

More information