1 Improvement and Support Team 18 Weeks Service Redesign and Transformation Programme 2009 report NHS Board template NHS Board: NHS Lanarkshire Completed by Cathy Dunn, Programme Manager Signed off by the Executive Lead On 9 th July 2009 Rosemary Lyness Director of Acute Services IST 18 weeks Publications 2009 report Template for NHS Boards 1
2 NHS Board Key team members Governance structure Programme priorities: Specialties NHS Lanarkshire Executive lead Yes Clinical lead(s) Yes Programme Manager Yes Service Improvement Manager(s) Yes Information Manager(s) Yes Appointed (yes/no) Other(s) (please state role) Administration Not yet appointed (please add anticipated recruitment deadline) (if so why) In place Not yet in place (if so why) Programme Board Yes Active project plan Yes Risk reporting Yes Patient and public involvement Yes Equality and diversity impact assessment Sustainability strategy In progress Communications plan Yes Improvement action plan in place with project lead In progress Draft available however awaiting the National EIDA to cross reference No improvement plan yet in place (if so why) Comments Neurology Yes Dermatology Yes Orthopaedics Yes Audiology Yes Dental specialties/ Orthodontics Yes Plastics No Minors only in Lanarkshire. Consultant service provided by NHSGGC. Lanarkshire participates in the Regional Plastics Group and links to the National Task and Finish Group. Other priority specialties (please Clinical Service Improvement IST 18 weeks Publications 2009 report Template for NHS Boards 2
3 specify) Groups exist for all specialties Work to date involves: DCAQ completion of the capacity plans. Communicating the principles and definitions and relating to specialty pathways Arrange of demand side solution pilots Pathways development for example Hernia, gallstones, Orthotic,etc, Workforce in relation to the specialties e.g. urology Diagnostics Physiological measurement - Cardiac - Respiratory - Neurophysiology Improvement action plan in place with project lead No improvement plan yet in place (if so why) Difficulties with the ability to measure the 13 key tests. Data quality issues around the baseline measurement. Date on which case study is expected to be available Radiology Yes Endoscopy Yes Other diagnostic areas (please specify) Orthopaedic Referral protocol for ESPs to refer directly for MRI as part of the knee pathway Audiology Audit of referral to MRI for sensory hearing loss Rheumatology Service improvement IST 18 weeks Publications 2009 report Template for NHS Boards 3
4 commenced on dexa scanning Whole systems improvement Improvement action plan in place with project lead No improvement plan yet in place (if so why) Date on which case study is expected to be available Improved referral processes Yes RMS is in place. Continuous improvement action plan developed. Analysis of GP demand by specialty has been completed. Process for engagement with practices and locality agreed. evetting introduced in ENT rollout Programme developed Poster presentation included Appendix A Access to pre-assessment services Yes Revised pathway developed Aim is that all patients identified as requiring surgery will be pre-assessed within two weeks of their outpatient appointment. Other service improvements outlined in poster presentations Poster presentations included in Appendix A Increasing same day surgery rates Yes Audit of patients attending for a daycase procedure did not meet the discharge criteria. Poster presentation IST 18 weeks Publications 2009 report Template for NHS Boards 4
5 included in Appendix A Reducing cancellations and DNAs Yes Baseline Data for all specialties has been completed for outpatients Priority areas have been identified and are being managed through the Outpatient Workstream. Reducing length of stay See improved Discharge Pilot for outpatients IV antibiotic tested over the winter period evaluation in progress Improved theatre utilisation Yes LEAN programme in theatre continues. Theatre utilisation embed in weekly Theatre Operational Groups (TOGs) Poster presentation included in appendix A TOG s Terms of Reference included Standard Operating Procedures for Theatres being developed. Improved discharge planning Yes Inpatient capacity management workstream of the emergency access programme Refreshed approach to traffic lights discharge prediction IST 18 weeks Publications 2009 report Template for NHS Boards 5
6 system has improved performance of traffic lights, reduction in boarding and length of stay Better use of in-patient capacity to balance emergency and elective demand Workforce Reducing new: review rates Yes (in progress) National HEAT target ratios have been applied per specialty and are being examined by outpatient s workstream. In place Not yet in place (if so why) Impact of working time directives and new staffing contracts considered within programme plan Yes To date impact of MMC has been factored into the capacity planning. Information and pathway measurement Leave policy covering all staff including medical staff Clinical outcoming recording in all specialties Exploring the possibility of graduate ultrasound training Audiology Workforce skills analysis undertaken and is in the process of implementation In progress Discussions commenced with Programme Clinical Lead In place Not yet in place (please state expected (if so why) implementation date) Yes for all NEW patients First phase of the programme implemented. Reports developed and performance management arrangements are being agreed. IST 18 weeks Publications 2009 report Template for NHS Boards 6
7 Process for linking non-admitted pathways Next phase will include the integration of outpatient procedure coding per specialty. Poster Apeendix A In progress Initial output of clinic outcomes is given high level linkage at specialty and Consultant level. Process for linking admitted pathways In progress Ardentia have completed a scoping exercise for NHSL Patient tracking list In process Element of patient tracking still related to stage of treatment targets. Engagement and review of Admin and Clerical roles Process to support managers to undertake demand, capacity, activity, queue analysis Yes Lanarkshire had a DCAQ training day facilitated by Kurtosis. Capacity plans have been developed based on this methodology for all specialties Access policy Being developed Access policy is in draft Involvement of key staff groups Use of No Delays Scotland patient journey analyser Medical staff Yes Administrative services Yes Allied health professionals Yes Health care science Yes Primary and community services Yes Yes No delay is being introduced to the specialties through the Clinical Service Improvement Groups Strategy for engagement in place No formal approach to engagement yet Details of any projects underway IST 18 weeks Publications 2009 report Template for NHS Boards 7
8 Integration across agendas Projects underway (please provide key details) No projects yet initiated Comments Long term conditions Scoping audit in Dermatology to assess if patients who attended as a return have been educated in self management A strategic matrix has been developed that identifies the interdependencies of the programmes and the lead for delivery Patient Safety Yes As above Releasing time to care Yes As above Patient experience Yes As above Strategic lean Yes LEAN proof of concept complete.programme plan being developed and will include diagnostics Mental health Yes As above Productivity and efficiency Yes As above IST 18 weeks Publications 2009 report Template for NHS Boards 8
9 Appendix A Please find enclosed Poster Presentations that have been prepared these outline the detail required to format the case study proforma TOGs%20poster.pdf Same%20Day%20A dmission.pdf Environmental%20I mprovements.pdf Visual%20Manageme nt.pdf Continuous%20Runn ing.pdf Patient%20Flow.pdf Preadmission%20Ass Rationalisation%20o essment.pdf f%20prosthesis.pdf CTP.QUASER pdf (167 KB) CTP.FMCREA L.pdf (351 KB... TOR TOG (3).doc Details of Improvement What was the problem? How was this identified? What were the implemented improvements (tools/techniques)? What is the situation now? How is the change sustainable? Sustainability can be defined as being achieved when new ways of working and improved outcomes become the norm. Describe how this improvement is sustainable. Measurable outcome E.g. DNA rates, CNA rates, DCAQ, time from referral to report available, waiting times. What are the patient benefits? e.g. qualitative data results of patient surveys, patient stories, quotes from patients. What are the staff benefits? e.g. qualitative data results of staff surveys, staff stories, quotes from staff. What are the organisational benefits? How did staff feel before the improvement/during the improvement and after the improvement? What are the lessons learnt and what would you do differently next time? What plans are there to spread the improvement? Name, title, and phone number for key contacts: Contact Name Telephone number Case study owner Key department contact (e.g. clinical lead/unit manager) IST 18 weeks Publications 2009 report Template for NHS Boards 9
WAITING TIMES 1. PURPOSE
Agenda Item Meeting of Lanarkshire NHS Board 28 April 2010 Lanarkshire NHS board 14 Beckford Street Hamilton ML3 0TA Telephone 01698 281313 Fax 01698 423134 www.nhslanarkshire.org.uk WAITING TIMES 1. PURPOSE
More informationLanarkshire NHS board 14 Beckford Street Hamilton ML3 0TA Telephone Fax
Agenda Item Meeting of Lanarkshire NHS Board 25 February 2009 Lanarkshire NHS board 14 Beckford Street Hamilton ML3 0TA Telephone 01698 281313 Fax 01698 423134 www.nhslanarkshire.co.uk WAITING TIMES 1.
More informationAyrshire and Arran NHS Board
Paper 12 Ayrshire and Arran NHS Board Monday 9 October 2017 Planned Care Performance Report Author: Fraser Doris, Performance Information Analyst Sponsoring Director: Liz Moore, Director for Acute Services
More informationThe PCT Guide to Applying the 10 High Impact Changes
The PCT Guide to Applying the 10 High Impact Changes This Guide has been produced by the NHS Modernisation Agency. For further information on the Agency or the 10 High Impact Changes please visit www.modern.nhs.uk
More informationReducing Elective Waits: Delivering 18 week pathways for patients. Programme Director NHS Elect Caroline Dove.
Reducing Elective Waits: Delivering 18 week pathways for patients Programme Director NHS Elect Caroline Dove What I will cover 1. Why 18 Weeks is different 2. Where are we now 3. New models of delivery
More informationInformation for patients
Information for patients 18-Weeks Maximum Waiting Time from Referral to Treatment (RTT): What does this mean for you? Your rights under the NHS Constitution You have the right to access NHS services within
More informationAgenda Item No: 6.2 Enclosure: 4 17/1/02012 Intended Outcome:
TRUST BOARD Date of Meeting: Agenda Item No: 6.2 Enclosure: 4 17/1/02012 Intended Outcome: For noting For information For decision Title of Report: Update on Clinical Strategy Aims: To brief Trust Board
More informationNHS Board Workforce Projections 2017 NHS LANARKSHIRE. Table of Contents
NHS Board Workforce Projections 2017 NHS LANARKSHIRE Table of Contents 1. Overall 1.1 Comments / Data Quality Issues / Direction of Travel 1.2 Brief Information on Workforce Cost Savings (non-staff) i.e.
More informationCCG authorisation Case Study Template. NHS Croydon Clinical Commissioning Group. Patient Navigation (PatNav) 3 of 3
CCG name: Case study title: CCG authorisation Case Study Template NHS Croydon Clinical Commissioning Group Patient Navigation (PatNav) CCG case study number: Does the case study provide core evidence?
More informationThe PCT Guide to Applying the 10 High Impact Changes. A guide from NatPaCT
The PCT Guide to Applying the 10 High Impact Changes A guide from NatPaCT DH INFORMATION READER BOX Policy HR/Workforce Management Planning Clinical Estates Performance IM&T Finance Partnership Working
More informationACUTE WAITING TIMES REPORT
NHS Lanarkshire Headquarters, Kirklands Fallside Road, Bothwell G71 8BB www.nhslanarkshire.org.uk ACUTE WAITING TIMES REPORT 1. PURPOSE The purpose of the paper is to update the NHS Lanarkshire Board on:
More informationWAITING TIMES AND ACCESS TARGETS
NHS Board Meeting Tuesday 17 December 2013 Lead Director (Acute Services Division) Board Paper No 13/60 Recommendation: WAITING TIMES AND ACCESS TARGETS The NHS Board is asked to note progress against
More informationReport by Margaret Brown, Head of Service Planning & Donna Smith, Divisional General Manager, Patient Services, Raigmore
Highland NHS Board 4 June 2013 Item 5.4 NHS HIGHLAND REVISED LOCAL ACCESS POLICY Report by Margaret Brown, Head of Service Planning & Donna Smith, Divisional General Manager, Patient Services, Raigmore
More informationNHS GRAMPIAN. Local Delivery Plan - Section 2 Elective Care
NHS GRAMPIAN Local Delivery Plan - Section 2 Elective Care Board Meeting 01/12/2016 Open Session Item 7 1. Actions Recommended The NHS Board is asked to: Consider the context in which planning for future
More informationPATIENT RIGHTS ACT (SCOTLAND) 2011 ACCESS POLICY FOR TREATMENT TIME GUARANTEE
NHS Board Meeting Tuesday 16 October 2012 Chief Operating Officer (Acute Services Division) Board Paper No. 12/45 PATIENT RIGHTS ACT (SCOTLAND) 2011 ACCESS POLICY FOR TREATMENT TIME GUARANTEE Recommendation:
More informationRTT Recovery Planning and Trajectory Development: A Cambridge Tale
RTT Recovery Planning and Trajectory Development: A Cambridge Tale Linda Clarke Head of Operational Performance Addenbrooke s Hospital I Rosie Hospital Apr 2014 May 2014 Jun 2014 Jul 2014 Aug 2014 Sep
More informationNHS Electronic Referrals Service. Paper Switch Off an update Digital Health Webinar 4 May 2018
NHS Electronic Referrals Service Paper Switch Off an update Digital Health Webinar 4 May 2018 Aims of Session Introductions and refresh of Paper Switch Off Sharon Wilson Implementation manager NHS Digital
More informationBoard of Directors Meeting
Board of Directors Meeting Date: 30 July 2008 Agenda item: 10.2, Part 1 Title: Prepared by: Presented by: Action required: Elaine Hobson, Director of Operations Elaine Hobson, Director of Operations The
More informationRTT Assurance Paper. 1. Introduction. 2. Background. 3. Waiting List Management for Elective Care. a. Planning
RTT Assurance Paper 1. Introduction The purpose of this paper is to provide assurance to Trust Board in relation to the robust management of waiting lists and timely delivery of elective patient care within
More informationMSK AHP REFERRAL HUB (ADMIN)
This SOP supersedes all previous versions. Review Interval: Quarterly until further notice Prepared by: Name Ruth Currie Senga Cree Job Title Acting Physiotherapy MSK Manager Head and Professional Lead
More informationSTATEMENT OF PURPOSE August Provided to the Care Quality Commission to comply with The Health & Social Care Act (2008)
1. Trust Profile STATEMENT OF PURPOSE August 2015 Provided to the Care Quality Commission to comply with The Health & Social Care Act (2008) 1.1 Worcestershire Acute Hospitals NHS Trust was formed on 1
More informationSetting the Context of 18 Weeks RTT
Contact Details: Laura Jones National Programme Manager laura.jones@scotland.gsi.gov.uk Tracey Williams National Programme Manager tracey.williams@scotland.gsi.gov.uk Helen Maitland National Programme
More informationThe National Musculoskeletal (MSK) NHS Lanarkshire Pilot. Dr Sarah L Mitchell National Programme Manager Rehabilitation Framework
The National Musculoskeletal (MSK) NHS Lanarkshire Pilot Dr Sarah L Mitchell National Programme Manager Rehabilitation Framework Policy Background The National Delivery Plan for the Allied Health Professions
More informationWAITING TIMES AND ACCESS TARGETS
NHS Board Meeting Tuesday 21 April 2015 Chief Officer (Acute Services) Board Paper No.15/17 WAITING TIMES AND ACCESS TARGETS Recommendation: The NHS Board is asked to note progress against the national
More informationDiagnostics FAQs. Frequently Asked Questions on completing the Diagnostic Waiting Times & Activity monthly data collection
Diagnostics FAQs Frequently Asked Questions on completing the Diagnostic Waiting Times & Activity monthly data collection First published: October 2006 Updated: 02 February 2015 Prepared by Analytical
More informationClinical Sub Category Review date February 2016 Distribution Who the policy will be Distributed to senior staff as defined by directors
Document Details Title Patient Access Policy Incorporating the management of appointments and Did Not Attend (DNA) Trust Ref No 1613-24356 Local Ref (optional) Main points the document To ensure the effective
More informationConsultation Paper. Distributed Medical Imaging in the new Royal Adelaide Hospital Central Adelaide Local Health Network
Consultation Paper Distributed Medical Imaging in the new Royal Adelaide Hospital Central Adelaide Local Health Network Issued: April 2016 TABLE OF CONTENTS TABLE OF CONTENTS 2 1. INTRODUCTION 3 2. PURPOSE
More informationWAITING TIMES AND ACCESS TARGETS
NHS Board Meeting Tuesday 17 February 2015 Chief Officer (Acute Services) Board Paper No.15/08 WAITING TIMES AND ACCESS TARGETS Recommendation: The NHS Board is asked to note progress against the national
More informationThe 18-week wait programme
Large scale workforce change briefing The 18-week wait programme Findings, successes and learning from NHS Employers large scale workforce change 18-week programme This Briefing summarises some of the
More informationPatient Access Policy
Working together to make best use of specialist hospital services Patient Access Policy (Draft 8 May 2006) A policy for NHS Highland staff and patients May 2006 2 CONTENTS Page 1. INTRODUCTION AND AIM
More informationNational Waiting List Management Protocol
National Waiting List Management Protocol A standardised approach to managing scheduled care treatment for in-patient, day case and planned procedures January 2014 an ciste náisiúnta um cheannach cóireála
More informationGoverning Body. TITLE OF REPORT: Performance Report for period ending 31st December 2012
- Governing Body DATE OF MEETING: TITLE OF REPORT: Performance Report for period ending 31st December 2012 KEY MESSAGES: We are responsible for securing improvements in the quality of care and health outcomes.
More informationReview of Follow-up Outpatient Appointments Hywel Dda University Health Board. Audit year: Issued: October 2015 Document reference: 491A2015
Review of Follow-up Outpatient Appointments Hywel Dda University Health Board Audit year: 2014-15 Issued: October 2015 Document reference: 491A2015 Status of report This document has been prepared as part
More informationHospital Generated Inter-Speciality Referral Policy Supporting people in Dorset to lead healthier lives
NHS Dorset Clinical Commissioning Group Hospital Generated Inter-Speciality Referral Policy Supporting people in Dorset to lead healthier lives PREFACE This Document outlines the CCG s policy in respect
More informationWhitby and the surrounding area
Frequently Asked Questions Whitby and the surrounding area 1. What is the Fit 4 the Future programme for Whitby? There are two aspects to the Whitby Fit 4 the Future programme: 1. Transformation of Community
More informationNHS FORTH VALLEY. Access Policy Version 2.9
NHS FORTH VALLEY Access Policy Version 2.9 Date of First Issue 01/06/2012 Approved 01/09/2012 Current Issue Date 01/04/2017 Review Date 01/04/2019 Version 2.9 EQIA Yes 16/01/2013 Author / Contact Roslyn
More informationWAITING TIMES REPORT
Meeting of Lanarkshire Lanarkshire NHS Board NHS Board: Kirklands 25 March 2015 Fallside Road Bothwell G71 8BB Telephone: 01698 855500 www.nhslanarkshire.org.uk 1. PURPOSE This paper is coming to the Board:
More informationThis paper aims to provide the Board with a clear picture of how Waiting Lists are managed within NHS Borders.
Appendix-2012-45 Borders NHS Board MANAGEMENT OF WAITING TIMES Aim This paper aims to provide the Board with a clear picture of how Waiting Lists are managed within NHS Borders. Background NHS Borders
More informationBOARD OFFICIAL NHS GREATER GLASGOW AND CLYDE S INTEGRATED PERFORMANCE REPORT
NHS Greater Glasgow & Clyde BOARD OFFICIAL NHS Board Meeting Head of Performance 19 December 2017 Paper No: 17/64 NHS GREATER GLASGOW AND CLYDE S INTEGRATED PERFORMANCE REPORT Recommendation Board members
More informationBriefing on the first stage of the Acute Services Review the clinical recommendations
Briefing on the first stage of the Acute Services Review the clinical recommendations Introduction Over 100 clinicians from our four main hospitals, GPs, NHS managers and patient representatives have been
More informationThe UCLH Productive Outpatients Programme
The UCLH Productive Outpatients Programme A structured approach to engage, train and empower frontline staff to redesign and improve outpatient services Provided in partnership with NHS Elect Dr Gill Gaskin,
More informationBristol CCG North Somerset CGG South Gloucestershire CCG. Draft Commissioning Intentions for 2017/2018 and 2018/2019
Bristol CCG North Somerset CGG South Gloucestershire CCG Draft Commissioning Intentions for 2017/2018 and 2018/2019 Programme Area Key intention Primary and community care Sustainable primary care Implement
More informationNOTES OF THE MEETING HELD ON TUESDAY 23 rd MARCH 2010 AT 10AM IN THE BOARD ROOM, BECKFORD STREET, HAMILTON
DRAFT NHS LANARKSHIRE EQUALITY, DIVERSITY AND SPIRITUALITY GOVERNANCE COMMITTEE NOTES OF THE MEETING HELD ON TUESDAY 23 rd MARCH 2010 AT 10AM IN THE BOARD ROOM, BECKFORD STREET, HAMILTON Present: In Attendance:
More informationQuestion 1 a) What is the Annual net expenditure on the NHS from 1997/98 to 2007/08 in Scotland? b) Per head of population
NHS SPENDING - SCOTLAND Question 1 a) What is the Annual net expenditure on the NHS from 1997/98 to 2007/08 in Scotland? b) Per head of population Question 2 a) Annual real (GDP deflated) increase in net
More informationBurton Hospitals NHS Foundation Trust
Statement of purpose Health and Social Care Act 2008 Statement of Purpose Health and Social Care Act 2008 Version : 10 Date : July 2017 Date of Next Review : 12 months Service Provider Full name: Address:
More informationAchieving the 18 Weeks Referral to Treatment Standard in Orthopaedic Services. Task & Finish Group Interim Output Report.
Achieving the 18 Weeks Referral to Treatment Standard in Orthopaedic Services Task & Finish Group Interim Output Report October 2010 F3130196 Page 1 of 63 October 2010 Contents Page No. Foreword 3 Chair
More informationAmbulatory Care Model
Ambulatory Care Model Hong Kong May 2013 Andrew Stripp Deputy Chief Executive & Chief Operating Officer Outline What is the Alfred Centre? How does it fit into Alfred Health service model Key aspects of
More informationCLINICAL STRATEGY IMPLEMENTATION - HEALTH IN YOUR HANDS
CLINICAL STRATEGY IMPLEMENTATION - HEALTH IN YOUR HANDS Background People across the UK are living longer and life expectancy in the Borders is the longest in Scotland. The fact of having an increasing
More informationKey Objectives To communicate business continuity planning over this period that is in line with Board continuity plans and enables the Board:
Golden Jubilee Foundation Winter Plan 2016/2017 Introduction This plan outlines the proposed action that would be taken to deliver our key business objectives supported by contingency planning. This plan
More informationStatement of Purpose. June Northampton General Hospital NHS Trust
Statement of Purpose June 2016 Northampton General Hospital NHS Trust The statement of purpose is made in compliance with Care Quality Commission (Registration) Regulations 2009: Regulation 12 and Schedule
More informationNHS GRAMPIAN. Grampian Clinical Strategy - Planned Care
NHS GRAMPIAN Grampian Clinical Strategy - Planned Care Board Meeting 03/08/17 Open Session Item 8 1. Actions Recommended In October 2016 the Grampian NHS Board approved the Grampian Clinical Strategy which
More informationThe impact of a flu or norovirus outbreak could have a significant impact on health and social services and could involve:
NHS National Waiting Times Centre Winter Plan 2010/11 Introduction This plan outlines the proposed action that would be taken to deliver our key business objectives supported by contingency planning. This
More informationStandardising Acute and Specialised Care Theme 3 Governance and Approach to Hospital Based Services Strategy Overview 28 th July 2017
Standardising Acute and Specialised Care Theme 3 Governance and Approach to Hospital Based Services Strategy Overview 28 th July 2017 Background Theme 3 builds upon previous key strategic commissioning
More informationF - Demand and Capacity Planning. Laurence Keenan, Service Improvement Manager, Whole System Patient Flow Improvement Programme
F - Demand and Capacity Planning Laurence Keenan, Service Improvement Manager, Whole System Patient Flow Improvement Programme 1 Session Agenda Welcome Dr Tom Jarosz-Cromie, Capacity Planning Programme
More informationNHS Dumfries and Galloway Patient Access Policy
NHS Dumfries and Galloway Patient Access Policy Printed copies must not be considered the definitive version DOCUMENT CONTROL POLICY NO. Policy Group Author Version no. 1.3 Reviewer Waiting Times Group
More informationSupporting Referrals to Diagnostic Services
Supporting Referrals to Diagnostic Services Published February 2017 NHS Digital is the trading name of the Health and Social Care Information Centre. Contents Supported Referrals 3 Setting up a diagnostic
More informationVanguard Programme: Acute Care Collaboration Value Proposition
Vanguard Programme: Acute Care Collaboration Value Proposition 2015-16 November 2015 Version: 1 30 November 2015 ACC Vanguard: Moorfields Eye Hospital Value Proposition 1 Contents Section Page Section
More informationMain body of report Integrating health and care services in Norfolk and Waveney
Item 18.73a ii Norfolk and Waveney Sustainability and Transformation Plan Update for governing bodies and trust boards September 2018 Purpose of report The purpose of this paper is to update members of
More informationA Jardine, R Moorthy, G Watters Date of review: June 2022
ENT UK OUTPATIENTS REVIEW AND RECOMMENDATIONS A Jardine, R Moorthy, G Watters Date of review: June 2022 BACKGROUND ENT UK have published guidelines with indicative numbers of s to be seen in Out Clinics
More informationNHS. Top tips to overcome the challenge of commissioning diagnostic services. NHS Improvement - Diagnostics. NHS Improvement Diagnostics CANCER
CANCER NHS NHS Improvement Diagnostics DIAGNOSTICS HEART LUNG STROKE NHS Improvement - Diagnostics Top tips to overcome the challenge of commissioning diagnostic services Top tips to overcome the challenge
More informationPrime Contractor Model King s Fund Nick Boyle Consultant Surgeon 27 March 2014
Prime Contractor Model King s Fund Nick Boyle Consultant Surgeon 27 March 2014 Current Referral Route options - Information 1. Horizon Health Choices Horizon Musculoskeletal Triage & Treatment Chronic
More informationModernising the perioperative workforce
Multi-disciplinary Modernising the perioperative workforce Report of a review of the perioperative workforce in NHSScotland March 2010 Foreword 1 Contents Foreword 3 Executive summary 4 1. Modernising
More informationElective Access Policy
Seamless Delivery and Excellence in Health Care and Outcomes Elective Access Policy April 2016 CG585 April 2016 Produced by RBFT Head of Access and Performance Target Audience Referrers, Patients, Commissioners
More informationREPORT 1 PLANNED CARE
REPORT 1 PLANNED CARE Contents Planned care vision c-3 Definition - Planned Care c-3 Current planned care services c-4 What patients say about current planned care services c-7 Vision c-8 Principles c-9
More information5. Does this paper provide evidence of assurance against the Governing Body Assurance Framework?
Item Number: 6.3 Governing Body Meeting: 4 February 2016 Report Sponsor Anthony Fitzgerald Director of Strategy and Delivery Report Author Anthony Fitzgerald Director of Strategy and Delivery 1. Title
More informationManaging Elective Waiting Times A checklist for NHS health boards
12 March 2015 Archwilydd Cyffredinol Cymru Auditor General for Wales Managing Elective Waiting Times A checklist for NHS health boards Introduction 1 The Auditor General published his report on NHS Waiting
More informationOP Action Plan Acute Hospital Outpatient Services. Outpatient Services Performance Improvement Programme
OP Action Plan 2017 Acute Hospital Outpatient Services Outpatient Services Performance Improvement Programme 5 th May 2017 1. Introduction This action plan sets out the approach to outpatient waiting list
More informationSpecialised Services Service Specification. Adult Congenital Heart Disease
Specialised Services Service Specification Adult Congenital Heart Disease Document Author: Executive Lead: Approved by: Issue Date: Review Date: Document No: Specialised Planner Director of Planning Insert
More informationPaper 14. Trust Board DECISION NOTE. Recommendation
Paper 14 Recommendation DECISION NOTE Reporting to: Trust Board is asked to note the: Trust Board Positive engagement of our senior staff in ALT training The step change in the activity of the KPO kaizen
More informationNHS. Challenges and improvements in diagnostic services across seven days. Improving Quality
NHS Improving Quality NHS Improving Quality working in partnership with NHS England Challenges and improvements in diagnostic services across seven days 2 Foreword Across the country, hospitals and primary
More informationEvidence on the quality of medical note keeping: Guidance for use at appraisal and revalidation
Health Informatics Unit Evidence on the quality of medical note keeping: Guidance for use at appraisal and revalidation April 2011 Funded by: Acknowledgements This project was funded by the Academy of
More informationDELIVERING THE LONDON QUALITY STANDARDS AND 7 DAY SERVICES
Enclosure I DELIVERING THE LONDON QUALITY STANDARDS AND 7 DAY SERVICES Trust Board Meeting Item: 13 Date: 25 th May 2016 Purpose of the Report: Enclosure: I To update the Board on the Trust s current performance
More informationWhole System Patient Flow Improvement Programme
incomplete Whole System Patient Flow Improvement Programme sub- QuEST Quality, Efficiency, Value Whole System Patient Flow Improvement Programme 2020 Vision and the Quality Strategy The Scottish Government
More informationReferral to Treatment (RTT) Validation and Assurance Standard Operating Procedure (SOP) Contents
Referral to Treatment (RTT) Validation and Assurance Standard Operating Procedure (SOP) Classification: Standard Operating Procedure Lead Author: Toni Coyle, Senior Manager, Access, Booking & Choice Additional
More informationTrust Board Meeting: Wednesday 13 May 2015 TB
Trust Board Meeting: Wednesday 13 May 2015 Title Update on Quality Governance Framework Status History For information, discussion and decision This paper has been presented to Quality Committee in April
More informationService Level Agreements for
99/06 Service Level Agreements for 2006 07 1. This paper summarises the outcome of discussions with commissioning PCTs for the year 2006 07. Whilst there are some areas of detail yet to be agreed with
More informationOutpatient Services Improvement September 2010
Service Improvement Team Outpatient Services Improvement September 2010 SUMMARY The purpose of this report is to give an update on the service improvement project within the outpatient department. BACKGROUND
More informationNHS Diagnostic Waiting Times and Activity Data
NHS Diagnostic Waiting Times and Activity Data 1 NHS Diagnostic Waiting Times and Activity Data February 2018 Monthly Report Version number: 1 First published: 12 th April 2018 Prepared by: Operational
More informationNHS Diagnostic Waiting Times and Activity Data
NHS Diagnostic Waiting Times and Activity Data 1 NHS Diagnostic Waiting Times and Activity Data March 2018 Monthly Report Version number: 1 First published: 10 th May 2018 Prepared by: Operational Information
More informationNOTTINGHAM UNIVERSITY HOSPITAL NHS TRUST. PATIENT ACCESS MANAGEMENT POLICY (Previously known as Waiting List Management Policy) Documentation Control
NOTTINGHAM UNIVERSITY HOSPITAL NHS TRUST PATIENT ACCESS MANAGEMENT POLICY (Previously known as Waiting List Management Policy) Documentation Control Reference CL/CGP/026 Approving Body Senior Management
More informationGuidance notes on the role and function of Organic Old Age Psychiatry wards (NHS Lanarkshire)
Guidance notes on the role and function of Organic Old Age Psychiatry wards (NHS Lanarkshire) Author: Dr Adam Daly, Consultant in Old Age Psychiatry, Clinical Director Old Age Psychiatry November 2014
More informationDiagnostic Waiting Times
Publication Report Diagnostic Waiting Times Quarter ending 30 June 2011 Publication date 30 August 2011 A National Statistics Publication for Scotland Contents Contents... 1 About ISD... 2 Official Statistics...
More informationStatement of Purpose Kerry General Hospital 2013
Statement of Purpose Kerry General Hospital 2013 Table of Contents Introduction...3 Description of Services Provided...3 Kerry General Hospital Services...4 Models of service delivery and aligned resources
More informationProvider Profile GENERAL DETAILS STATE/ PROVINCE: OTHERS (PLEASE SPECIFY): CONTACT DETAILS DESIGNATION NAME PHONE MOBILE
Provider Profile Dear Valued Provider, Kindly fill up this form with the information requested below. Availability of accurate and detailed information about your facility will definitely help QLM staff
More informationStatement of Purpose
Statement of Purpose Contents as set out in Schedule 3, The Care Quality Commission (Registration) Regulations 2009. Guy's and St Thomas' NHS Foundation Trust provides integrated hospital and community
More informationNHS Diagnostic Waiting Times and Activity Data
NHS Diagnostic Waiting Times and Activity Data 1 NHS Diagnostic Waiting Times and Activity Data March 2017 Monthly Report Version number: 1 First published: 11 th May 2017 Prepared by: Operational Information
More informationNHS Diagnostic Waiting Times and Activity Data
NHS Diagnostic Waiting Times and Activity Data 1 NHS Diagnostic Waiting Times and Activity Data November 2017 Monthly Report Version number: 1 First published: 11 th January 2018 Prepared by: Operational
More informationROLE DESCRIPTION NATIONAL CLINICAL LEAD INTEGRATED CARE PROGRAMME FOR PATIENT FLOW
ROLE DESCRIPTION NATIONAL CLINICAL LEAD INTEGRATED CARE PROGRAMME FOR PATIENT FLOW CLINICAL STRATEGY AND PROGRAMMMES DIVISION The HSE's Clinical Strategy and Programmes Division (CSPD) is leading a large-scale
More information10.1 NHS DORSET CLINICAL COMMISSIONING GROUP GOVERNING BODY MEETING A&E DELIVERY BOARD UPDATE. Date of the meeting 19/07/2017 Author
NHS DORSET CLINICAL COMMISSIONING GROUP GOVERNING BODY MEETING A&E DELIVERY BOARD UPDATE Date of the meeting 19/07/2017 Author Sponsoring Board member Purpose of Report M Wood, Director of Service Delivery
More informationSUBJECT: CLINICAL GOVERNANCE
Meeting of Lanarkshire NHS Board Lanarkshire NHS Board Kirklands 25 September 2013 Fallside Road Bothwell G71 8BB Telephone: 01698 855500 www.nhslanarkshire.org.uk 1. PURPOSE SUBJECT: CLINICAL GOVERNANCE
More informationNHS Diagnostic Waiting Times and Activity Data
NHS Diagnostic Waiting Times and Activity Data 1 NHS Diagnostic Waiting Times and Activity Data February 2016 Monthly Report Version number: 1 First published: 14 th April 2016 Prepared by: Operational
More informationPhysiotherapy outpatient services survey 2012
14 Bedford Row, London WC1R 4ED Tel +44 (0)20 7306 6666 Web www.csp.org.uk Physiotherapy outpatient services survey 2012 reference PD103 issuing function Practice and Development date of issue March 2013
More informationTrauma & Orthopaedics Service Redesign July 2016
Trauma & Orthopaedics Service Redesign July 2016 1 List of Contents 1 Introduction 2 Background 3 Case for Change 4 Stakeholder Engagement 5 Implementation 6 Capacity 7 Finance 8 Programme Risk 9 Conclusion
More informationREVIEW OF PAEDIATRIC INPATIENT SERVICES AT ROYAL ALEXANDRA HOSPITAL
REVIEW OF PAEDIATRIC INPATIENT SERVICES AT ROYAL ALEXANDRA HOSPITAL 1. Introduction In 2012 there was a proposal by the Women and Children s Services Directorate to move the Paediatric Inpatient Services
More informationNew Directions. The Teams. Chart showing New Directions Project Structure. What s next for New Directions?
May 2016 Volume 1, Issue 1 New Directions A blueprint for future health and social care delivery in Belfast Trust The purpose of New Directions is to determine, with Trust Teams, the future shape of services
More informationNHS Diagnostic Waiting Times and Activity Data
NHS Diagnostic Waiting Times and Activity Data 1 NHS Diagnostic Waiting Times and Activity Data May 2015 Monthly Report Version number: 1 First published: 8 th July 2015 Prepared by: NHS England Analytical
More informationJames Blythe, Director of Commissioning and Strategy. Agenda item: 09 Attachment: 04
Title of paper: Author: Exec Lead: Community Hospital Services Review Tom Elrick, Urgent Care Programme Lead James Blythe, Director of Commissioning and Strategy Date: 23 rd February 2015 Meeting: Executive
More informationNorthumberland, Tyne and Wear NHS Foundation Trust. Board of Directors Meeting
Agenda item 7 iv) Northumberland, Tyne and Wear NHS Foundation Trust Meeting Date: 22 February 2017 Board of Directors Meeting Title and Author of Paper: Safer Staffing Quarter 3 Report (October December,
More informationCommittee is requested to action as follows: Richard Walker. Dylan Williams
BetsiCadwaladrUniversityHealthBoard Committee Paper 17.11.14 Item IG14_60 NameofCommittee: Subject: Summary or IssuesofSignificance StrategicTheme/Priority / Valuesaddressedbythispaper Information Governance
More informationNHS LANARKSHIRE PATIENT ACCESS POLICY
NHS LANARKSHIRE PATIENT ACCESS POLICY 1. BACKGROUND NHS Lanarkshire is required by Scottish Government to deliver a consistent, safe, equitable and patient centred service to Lanarkshire patients within