Royal United Hospitals Bath NHS Foundation Trust Annual Health and Safety Report 2014/15

Size: px
Start display at page:

Download "Royal United Hospitals Bath NHS Foundation Trust Annual Health and Safety Report 2014/15"

Transcription

1 Royal United Hospitals Bath NHS Foundation Trust Annual Health and Safety Report 2014/15 Introduction and background This Annual Health and Safety Report covers the period from 1 April 2014 to 31 March The purpose of the report is to provide key information regarding the Trust s health and safety arrangements put in place to protect its employees, patients, contractors and members of the public. The Trust s Health and Safety Framework is based on the 1997 Health and Safety Executive s publication entitled: Successful Health and Safety Management (HSG 65). This is the over-arching guide on the essential philosophy of good health and safety: what it means; how to achieve it; and how to maintain it. The well-known POPIMAR model (Policy, Organising, Planning, Implementation, Measuring performance, Audit and Review) was replaced in 2013 with the Plan, Do, Check, Act cycle, which is similar to the Plan, Do, See, Act model introduced for patient safety. This has simplified the process, without losing the general points for good Health and Safety management. The Health and Safety Executive [HSE] set out key health and safety issues relating to healthcare provision. The Trust has measures in place to limit the impact of these on patients, employees and members of the public. Under safety topics are the following:- Slips and trips Falls from windows Moving and handling Safe use of Bed rails Scalding and Burning Workplace violence Under Health topics are the following:- Sharps injuries Legionella Skin care [Dermatitis & latex allergy] The status of these initiatives will be discussed in more detail later in the report. Management Responsibilities Responsibility for Health and Safety at Board level lies with the Director of Estates and Facilities. The Director of Estates and Facilities is supported by a dedicated Head of Security and Safety and a Health and Safety Service Manager, who line manages the members of the Health and Safety team. Managers and staff at all levels are encouraged to act within the Strategic Framework for Risk Management where risks are identified. Agenda Item: 15 Page 1 of 6

2 The Health and Safety Committee is currently chaired by the Director of Estates and Facilities, with representation from both staff side and management across a wide range of departments and meets quarterly. The chairmanship of this committee is being reviewed to ensure sufficient challenge exists in the reporting structure. Risks The Trust undertakes a broad range of activities, and so there are a wide variety of risks to manage. The list below represents only some of the most common of these. The Trust s Strategic Framework for Risk Management is well embedded and includes a risk assessment process for use by managers and staff that is underpinned by a suite of policies and procedures which can be found on the Trust s Intranet. The types of health and safety risks experienced within the trust are varied, but include: Slips, Trips and Falls Lone Working Security Violence and Aggression, including Managing Difficult Behaviour Manual Handling Infection Control, including waste management and needle stick injuries Work related ill health, and injuries, including work related stress Environmental, including structural and equipment Fire safety Performance 2013/14 and 2014/15 The table below shows the number of incidents recorded on the Trust s Incident Reporting System (Datix) for each of the two financial years. The increase in the number of RIDDOR reportable incidents is due in part to a significant number of late reports, which may not have previously been reported. Health and Safety training has been emphasising the need to report incidents, both as a legal duty and shared learning. Over the last year the number of employees has also increased, first with the transfer of maternity services from Great Western Hospitals NHS Foundation Trust in June 2014, then with the acquisition of the Royal National Hospital for Rheumatic Diseases (RNHRD). Category 2013/ /15 Environment Fire Ill Health Personal Accident Security Vehicle Violence, abuse, harassmen RIDDOR New Claims 6 6 Total Agenda Item: 15 Page 2 of 6

3 Health and Safety Training Health and Safety training relates to Health and Safety, Fire, Resuscitation [First Aid], Conflict Resolution Training and Moving and Handling training (levels 1 {loads} & Level 2 {patient handling}), the target figure for H&S training is 90%. The final totals for 2013/14 are shown in brackets. The compliance figures on 31 March 2015 were CRT Fire H&S Moving and Handling (1) Moving and Handling (2) Resuscitation (adults) Resuscitation (paediatric) 67.1% (51.4) 78.8% (69.7) 90.6% (87.4) 87.6% (72.2) 80.5% (62.8) 88.2% (81.8) 84.8% (82.5) Over the last 12 months there has been a steady increase in compliance figures across all Health and Safety training subjects, with the largest rise being Moving and Handling level 2 ( patient handling). The resuscitation training is the only area to have moved into another category, moving up from red to amber. Health and Safety remains the only subject in the green category, due in part to it being embedded into the core skills 2 and 3 programme with no requirement for staff to undertake more frequent refresher /update training. Areas with a high incidence of violence and aggression incidents are targeted to receive Conflict Resolution Training. The Conflict Resolution Training faculty receive a quarterly report relating to all violence and aggression incidents reported on Datix so that action can be taken to ensure areas reporting incidents receive appropriate training. Contractors employed to undertake works on the RUH site have to complete an online induction training programme before they can be issued with an Identity Card and authority to carry out works. This procedure is well established within the Estates Department. Summary of work undertaken 2014/15 Safety risks Slips and trips and falls- During 2014/15 the number of staff related slips, trips and falls have decreased. A template risk assessment has been devised and distributed to wards and departments for completion, the H and Safety Advisor has spent time with wards reviewing this document and updating it during the latter part of The long awaited spill stations were installed in January As a result of the mild winter, there have not been any serious injuries reported as a result of slipping and falling due to ice and snow. Lone Working- Areas where lone working is carried out have submitted risk assessments and procedures. No adverse incidents have been reported. Those lone workers attending Agenda Item: 15 Page 3 of 6

4 Health and Safety training are able to outline the procedures they use. From these discussions, it has to be noted that although the systems are in place, they are not robustly adhered to. A lone worker device has been identified and was trialled on and off site during March The outcome of this work has not yet been finalised. Violence and Aggression, including Managing Difficult Behaviour The Security Operations Manager is responsible for overseeing the management of violence and aggression within the Trust. A document issued following the death of a Nursing Home resident, who had been restrained, identified that a clinical condition, such as Dementia or Learning Disability needed to be better understood as a cause of violence and aggression towards staff. This has led to a change in guidance regarding the use of control and restraint (restrictive practices) and has identified that the standard Conflict Resolution Training is not suitable for all staff. Work is ongoing to identify suitable training based on staff role, and how to deliver this training in the future. The current management of violence and aggression is focussing on identifying potential problems before they escalate and having the appropriate people in place. The Women and Children s Division has been leading on this initiative. Falls from windows- Falls from windows was one of the main reasons for prosecution within the Health and Social Care sector in the United Kingdom during 2012/13. The Trust has worked hard to reduce this risk to a level as low as is reasonably practicable Risk assessments have been completed for all areas, with additional risk assessments in place for windows fitted with single glazed units. In some staff only areas, window restriction has been reviewed, and where safe, removed to aid thermal comfort of staff. The main issue now associated with window restriction is the reduced level of ventilation achieved by opening windows. Heat-wave advice was sent to wards and departments regarding not opening windows during the hottest part of the day, but more needs to be done. Estates staff have researched the rental of air conditioning units to manage raised temperatures over the warmer months, but this has to be funded by the ward or department and in order to prevent legionella contamination maintained and serviced by the supplier. New windows are being fitted which are designed to offer better ventilation whilst complying with the need for restriction to 100mm eg. Waterhouse and Cardiac wards. Moving and handling- Training compliance continues to improve, and a number of new trainers were trained during 2014/15. The revised training programme now includes those attending and participating in a patient handling induction session so that teaching style and skills can be assessed. Once this is completed, trainees are deemed competent to train at ward /department level. This has proven to be successful, with trainees actively taking part in the induction session and using it to ensure that they deliver high quality standardised training across the Trust. All incidents relating to Moving and handling are investigated by the Manual Handling Advisor and where changes in practice are required, she works with the department in order to facilitate this change. Safe use of Bed rails All Trust beds are fitted with integral safety sides, except on the low level beds where their use would be contra-indicated. A risk assessment process is in place to ensure their correct deployment. The Trust s Falls Policy, incorporating bed rails use has recently been updated. Agenda Item: 15 Page 4 of 6

5 Scalding and Burning- This is a National Patient Safety Agency (NPSA) never event. Water temperatures have to be maintained above 50 o C for legionella management, therefore thermal mixing valves are fitted to all taps in areas used by patients. A review of the location and use of thermo mixing valves (TMV) is required to ensure their correct use and removal of those where they are not required. This will reduce the impact these devices have on the Trust s maintenance resources. There were no reported incidents of patients being burnt or scalded by the domestic hot water system during 2014/15. Fire Safety - The Fire Safety Advisor delivers a fire awareness session on the Induction Course and also on the two and three year Core Skills Courses. Classroom based fire awareness sessions are also provided, for consultant /medical staff, student nurses and staffing solutions staff. In addition to this, he has provided specific fire awareness training, to staff in their work areas. In January 2015, a Fire Safety craftsperson started working at the Trust to support the Fire Safety Advisor. He has taken on some of the fire awareness training here at the RUH and at the RNHRD plus many other fire safety related duties. The Fire Safety Advisor and Fire Safety craftsperson, continue to identify measures, to reduce the number of unwanted fire alarm activations and to improve the fire alarm system. Health Risks Sharps injuries- all reported incidents are dealt with in line with the Trust s Sharps Policy. During 2014, the number of reported sharps related injuries increased. A review of all incidents took place from June 2014 until December 2014, but no definitive cause for sharp injuries was Identified. Safer sharps devices have now been introduced, starting with insulin pen needles and syringes, and now including venepuncture needles and butterfly and subcutaneous fluid needles. Risk assessments have been completed for paediatrics as it is currently not possible to get safety devices in the small sizes that are used in practice. Work will continue during 2015/16 to ensure safer sharps are available where reasonably practicable Legionella The Trust has completed all the actions set out in the 2011 Health and Safety Executive action plan. The Trust is focusing on the action plan associated with the 2012 Legionella Risk Assessment. The requirement to also to test for, and manage Pseudomonas bacteria and this has led to an increase in the amount of water sampling completed. The Trust currently undertakes approximately. 600 water samples per year. The Water Safety Group manages and monitors all aspects of water safety and has recently agreed to the revision of the Legionella Risk Assessment. The Trust is currently progressing with work to replace the current chemical water disinfectant plant with a Copper /Silver ion system. Before this can be installed a separate water supply is required for Dialysis, as it is felt the Copper/Silver ions may impact on patients treatment. Skin care [Dermatitis & latex allergy] - An additional category was added to the Datix Incident Reporting system to capture incidents relating to skin /hand damage. To date there s Agenda Item: 15 Page 5 of 6

6 been only been one incident reported. Occupational health have amended their preemployment screening for skin damage and staff attending core skills and induction Health and Safety training are reminded of the conditions they need to look out for and the appropriate action to take. Royal National Hospital for Rheumatic Diseases With the acquisition of the RNHRD in February 2014, there has been a requirement to review the health and safety risks at the RNHRD site as outlined above. Prior to the acquisition, the Health and Safety Service Manager provided health and Safety support and advice to the RNHRD under a Service Level Agreement. This role has continued, with the focus being on aligning the health and safety systems and processes at the RNHRD site with those at the Trust. The change in management has resulted in a review of the RNHRD risks which were tolerated by the RNHRD being reassessed, such as the balconies and fire assessment for Bath Heights used for patients attending RNHRD residential programmes. Conclusion The Board of Directors is asked to take note of the contents of this report as a record of Health and Safety performance for 2014/15. Agenda Item: 15 Page 6 of 6

Internal Audit. Health and Safety Governance. November Report Assessment

Internal Audit. Health and Safety Governance. November Report Assessment November 2015 Report Assessment G G G A G This report has been prepared solely for internal use as part of NHS Lothian s internal audit service. No part of this report should be made available, quoted

More information

Annual Health and Safety Report 01 April March 2012

Annual Health and Safety Report 01 April March 2012 Annual Health and Safety Report 01 April 2011 31 March 2012 Version 1.0 August 2012 Introduction The purpose of this report to provide Trust Board with information relating to performance, key developments

More information

HEALTH AND SAFETY PRIORITY ACTION PLAN 2012/13

HEALTH AND SAFETY PRIORITY ACTION PLAN 2012/13 AGENDA ITEM 4.2 HEALTH AND SAFETY PRIORITY ACTION PLAN /13 Executive Lead: Deputy Chief Executive Author: Head of Health and Safety Contact Details for further information: Charles Dalton 02920 743751

More information

Level 2 Award in Health and Safety in Health and Social Care

Level 2 Award in Health and Safety in Health and Social Care Level 2 Award in Health and Safety in Health and Social Care Accidents and ill-health Accidents in the workplace Typically, the most common causes of injury to employees in health and social care are due

More information

Barnet, Enfield & Haringey Mental Health Trust

Barnet, Enfield & Haringey Mental Health Trust Barnet, Enfield & Haringey Mental Health Trust Health & Safety Annual Report 2014/2015 July 2015 Page 1 Table of Contents Number Section Page 1. Introduction and Background 3 2. Fees For Interventions,

More information

Slips Trips and Falls Policy (Staff and Others)

Slips Trips and Falls Policy (Staff and Others) Title Reference Slips Trips and Falls Policy (Staff and Others) HS/POL/076 Description of document The purpose of this policy is to ensure all Norfolk Community Health & Care NHS Trust staff are aware

More information

BRIEFING REPORT ON VERBAL FEEDBACK FROM HEALTH & SAFETY MANAGEMENT AUDIT 2012/13

BRIEFING REPORT ON VERBAL FEEDBACK FROM HEALTH & SAFETY MANAGEMENT AUDIT 2012/13 AGENDA ITEM 4.1 BRIEFING REPORT ON VERBAL FEEDBACK FROM HEALTH & SAFETY MANAGEMENT AUDIT 2012/13 Executive Lead: Deputy Chief Executive Author: Head of Health and Safety Contact Details for further information:

More information

Occupational Health & Safety Policy

Occupational Health & Safety Policy Occupational Health & Safety Policy N.B. Staff should be discouraged from printing this document. This is to avoid the risk of out of date printed versions of the document. The Intranet should be referred

More information

Policy for the Reporting and Management of Incidents Including Serious Incidents. Version Number: 006

Policy for the Reporting and Management of Incidents Including Serious Incidents. Version Number: 006 CONTROLLED DOCUMENT Policy for the Reporting and Management of Incidents Including Serious Incidents CATEGORY: CLASSIFICATION: PURPOSE Controlled Number: Document Policy Governance To set out the principles

More information

HEALTH AND SAFETY POLICY

HEALTH AND SAFETY POLICY NHS GREATER GLASGOW AND CLYDE HEALTH AND SAFETY POLICY November 2015 Lead Manager: K. Fleming Head of Health and Safety Responsible Director A. MacPherson Director of Human Resources and Organisational

More information

Management Standard: Control of Legionella

Management Standard: Control of Legionella OHSS: H&S Management Standard 103 Control of Legionella Management Standard: Control of Legionella 1. Legal Framework This policy is produced to ensure compliance with; 1.1. the Health and Safety at Work

More information

Discussion Assurance Approval Regulatory requirement Mark relevant box with X

Discussion Assurance Approval Regulatory requirement Mark relevant box with X Report to: Board of Directors Date of Meeting: 26 th July 2017 Report Title: Health and Safety Annual Report Status: For information Discussion Assurance Approval Regulatory requirement Mark relevant box

More information

Corporate. Health and Safety Policy. Document Control Summary. Contents

Corporate. Health and Safety Policy. Document Control Summary. Contents Corporate Health and Safety Policy Document Control Summary Status: Version: Author/Title: Owner/Title: Approved by: Ratified: Related Trust Strategy and/or Strategic Aims Implementation Date: Review Date:

More information

Health and Safety Policy

Health and Safety Policy Health and Safety Policy Policy reviewed by: Philippa Mills : September 2017 Next review date : September 2018 School refers to Cambridge International School; parents refers to parents, guardians and

More information

Health, Safety and Wellbeing Policy

Health, Safety and Wellbeing Policy Health, Safety and Wellbeing Policy Page 1 of 18 Woodlands School - Health, Safety and Wellbeing Policy Section 1. Statement of Intent by Chair of Governors 2. Responsibilities - All Employees 3. Responsibilities

More information

Health and Safety Strategy and Action Plan 2017/18. April 2017

Health and Safety Strategy and Action Plan 2017/18. April 2017 Section 1 Workplace hazards 1.1 Violence & Aggression Reduction NHS GGC will have a strategy and Policy in place to reduce the risks of violence and aggression towards staff. This will be monitored through

More information

CONTROLLED DOCUMENT. All Managers. All Employees. Page 1 of 30. Health and Safety Policy Issued: 26/01/2017

CONTROLLED DOCUMENT. All Managers. All Employees. Page 1 of 30. Health and Safety Policy Issued: 26/01/2017 CONTROLLED DOCUMENT CATEGORY: CLASSIFICATION: PURPOSE Controlled Document Number: Health and Safety Policy Policy Health and Safety Policy covering scope and responsibilities for health and safety in UHB

More information

Jo Mitchell, Head of Assurance & Compliance (EFM) Policy to be followed by (target staff) Distribution Method

Jo Mitchell, Head of Assurance & Compliance (EFM) Policy to be followed by (target staff) Distribution Method Slips, Trips and Falls policy (Non-patient) Type: Policy Register No: 17020 Status: Public Developed in response to: Trust requirements Best Practice Contributes to CQC Outcome number: 15 Consulted With

More information

The Prevention and Control of Violence & Aggression Policy CONTROLLED DOCUMENT

The Prevention and Control of Violence & Aggression Policy CONTROLLED DOCUMENT CONTROLLED DOCUMENT The Prevention and Control of Violence & Aggression Policy CATEGORY: CLASSIFICATION: PURPOSE Controlled Document Number: Version Number: 3 Controlled Document Sponsor: Controlled Document

More information

THE HEATH ACADEMY TRUST HEALTH & SAFETY POLICY

THE HEATH ACADEMY TRUST HEALTH & SAFETY POLICY THE HEATH ACADEMY TRUST HEALTH & SAFETY POLICY inspire transform together Summary Policy Reference Number: 018 Category: Authorised By: Committee Responsible: Risk Management Board Of Directors HR & Standards

More information

Prison Service Order Health and Safety Policy Statement

Prison Service Order Health and Safety Policy Statement Prison Service Order Health and Safety Policy Statement ORDER NUMBER 3801 Date of Initial Issue 20/04/2007 (replaces the previous version issued 23/03/05) Issue No. 273 PSI Amendments should be read in

More information

Title: Health & Safety Annual Review September 2014 August 2015

Title: Health & Safety Annual Review September 2014 August 2015 Report to: Board of Director (Public) Paper number: 3.3 Report for: Information Report type: Strategy Date: 29 October 2015 Report author: Gilly Ede, Health & Safety Manager Report of: David Wragg, Finance

More information

Annual health and safety report and the health and safety policy

Annual health and safety report and the health and safety policy Agenda item: 7 Report title: Report by: Action: Annual health and safety report and the health and safety policy Warren Dale - Health, Safety & Compliance Officer warren.dale@gmc-uk.org, 0161 240 8338

More information

HEALTH AND SAFETY POLICY

HEALTH AND SAFETY POLICY HEALTH AND SAFETY POLICY Incorporating the Local Health and Safety Arrangements for: o Alston Lane Catholic Primary School o 06/066 o Preston Road, Longridge, Preston, PR3 3BJ This policy is based on the

More information

Health & Safety Policy

Health & Safety Policy Health & Safety Policy DATE ISSUED: 1 April 2014 DATE TO BE REVIEWED: 1 April 2014 Health & Safety Policy Page 1 of 11 CONTENTS POLICY OVERVIEW 1 Introduction 2 Purpose 3 Who This Policy Applies To 4 Key

More information

Safe Bathing Policy V1.3

Safe Bathing Policy V1.3 V1.3 April 2018 Summary Safe hot water temperatures The hot water distribution temperatures, which are required for the control and prevention of Legionella, can lead to discharge temperatures in excess

More information

Table of Contents: Section E1: Useful Contacts See back of this document Section A Introduction:

Table of Contents: Section E1: Useful Contacts See back of this document Section A Introduction: Health and Safety Reviewed: July 2018 By: Personal Development, Behaviour and Welfare team Agreed: Governors meeting July 2018 Next review date: July 2020 Table of Contents: Section A: Introduction: A1:

More information

Eastwood Community School. Health and Safety Policy

Eastwood Community School. Health and Safety Policy Eastwood Community School Health and Safety Policy Policy Statement (Although Bradford Council s Health and Safety Policy (which can be found on the Councils website www.bradford.gov.uk/hands/) is the

More information

Overall rating for this location Requires improvement

Overall rating for this location Requires improvement Riverdale Grange Clinic Quality Report 93 Riverdale Road Ranmoor Sheffield South Yorkshire S10 3FE Tel:0114 230 2140 Website:http://www.riverdalegrange.co.uk Date of inspection visit: 9 August 2017 Date

More information

Agency Board Meeting 24 July 2018

Agency Board Meeting 24 July 2018 Agency Board Meeting 24 July 2018 Board Report Number: SEPA 32/18 Health and Safety Performance Report Quarter 1 2018/19 Summary: Risks: Financial Implications: Staffing Implications: Environmental and

More information

Management of Violence and Aggression Policy

Management of Violence and Aggression Policy Management of Violence and Aggression Policy Approved by: Trust Health and Safety Committee Date First Issued: August 2000 Reviewed July 2006 TABLE OF CONTENTS Section Page No 1 STATEMENT OF POLICY 2 SCOPE

More information

Health & Safety Policy Statement

Health & Safety Policy Statement Health & Safety Policy Statement DOCUMENT CONTROL POLICY NO. H&S 01 Policy Group Health & Safety Author Andy Howat Version no. 6.0 Reviewer Andy Howat Implementation date 1 st April 2011 Status FINAL Next

More information

ST. AUGUSTINE S CATHOLIC PRIMARY SCHOOL

ST. AUGUSTINE S CATHOLIC PRIMARY SCHOOL ST. AUGUSTINE S CATHOLIC PRIMARY SCHOOL HEALTH & SAFETY POLICY SEPTEMBER 2017 THIS HEALTH & SAFETY POLICY WAS APPROVED AND ADOPTED BY THE FULL GOVERNING BODY ON: 1 CONTENTS STATEMENT OF INTENT 3 ORGANISATIONAL

More information

GENERAL HEALTH AND SAFETY POLICY

GENERAL HEALTH AND SAFETY POLICY GENERAL HEALTH AND SAFETY POLICY 2017-18 GENERAL STATEMENT OF INTENT Moreton Hall is committed to ensuring the health and well being of its students, staff and visitors, so far as is reasonably practicable.

More information

Occupational Health Surveillance Policy V2.1

Occupational Health Surveillance Policy V2.1 Occupational Health Surveillance Policy V2.1 May 2016 Table of Contents 1. Introduction... 2 2. Purpose of this Policy... 2 3. Scope... 2 4. Definitions/Glossary... 3 5. Ownership and Responsibilities...

More information

RISK ASSESSMENT POLICY This Policy includes the Nursery & Early Years Foundation Stage

RISK ASSESSMENT POLICY This Policy includes the Nursery & Early Years Foundation Stage REVIEWED: MAY 2016 NEXT REVIEW DATE: SUMMER 2017 REVIEWED BY: BURSAR SIGNED BY: HEAD RISK ASSESSMENT POLICY This Policy includes the Nursery & Early Years Foundation Stage Definition: Hazelwood means Hazelwood

More information

Health & Safety Policy

Health & Safety Policy Health & Safety Policy Reviewed by SLT 31/7/17 Ratified by Governors 30 September 2015 Effective from 1 October 2015 Review scheduled for Autumn 2019 Responsible person Responsible Governor Committee Business

More information

HEALTH AND SAFETY POLICY 2010

HEALTH AND SAFETY POLICY 2010 April 2008 CONTENTS Page No ii 1 GENERAL STATEMENT OF POLICY 2 2 DELIVERING HEALTH AND SAFETY 3 2.1 Management 3 2.2 Policy and Procedures 3 2.3 Training 4 2.4 Communication and Involvement 4 2.5 The Working

More information

WILSON S SCHOOL HEALTH AND SAFETY POLICY

WILSON S SCHOOL HEALTH AND SAFETY POLICY WILSON S SCHOOL HEALTH AND SAFETY POLICY Introduction The School wants to provide a safe and healthy learning environment. We will ensure compliance with legislation. We are committed, so far as is reasonably

More information

Health, Safety and Welfare. Study guide

Health, Safety and Welfare. Study guide Health, Safety and Welfare Study guide Health, Safety and Welfare Regulations CQC Outcome 10 Working together to improve health and safety Key health and safety statistics according to the Health and Safety

More information

Risk Assessment Policy

Risk Assessment Policy HORRIS HILL SCHOOL Risk Assessment Policy Policy reviewed: January 2017 Policy approval: Reviewed by Policy & Audit Committee February 2017 Approved by Full Governing Board February 2017 Date of next review:

More information

Controlling Scalding Risks from Bathing and Showering

Controlling Scalding Risks from Bathing and Showering UKHCA Guidance Controlling Scalding Risks from Bathing and Showering August 2016 Prepared for UKHCA member organisations by: Colin Angel, Policy and Campaigns Director United Kingdom Homecare Association

More information

HEALTH AND SAFETY POLICY

HEALTH AND SAFETY POLICY HEALTH AND SAFETY POLICY Version: 4 Ratified by: Trust Board (Required) Date ratified: January 2016 Title of originator/author: Title of responsible committee/group: Head of Corporate Business Date issued:

More information

Health and Safety Policy and Managerial Responsibilities

Health and Safety Policy and Managerial Responsibilities Health and Safety Policy and Managerial Responsibilities 1.0 Purpose This document outlines the policies, procedures and practices governing the manner in which the Royal Conservatoire of Scotland manages

More information

Cleaning of the Environment: Standard Operating Procedure

Cleaning of the Environment: Standard Operating Procedure Facilities and Estates Cleaning of the Environment: Standard Operating Procedure Document Control Summary Status: New Version: v1.0 Date: September 2015 Author/Title: Author/Title: Author/Title: Owner/Title:

More information

Health and Safety Policy

Health and Safety Policy Company Name: Policy Name: BeTo Solutions Ltd. Health and Safety Policy Date Adopted: 01/07/2016 Created By: Julia Lamb Date Last Reviewed: 22/08/2018 Reviewed By: Julia Lamb Health and Safety Policy Status

More information

Violence and Aggression Policy

Violence and Aggression Policy Violence and Aggression Policy Document Status Approved Version: V7.0 DOCUMENT CHANGE HISTORY Initiated by Date Author Danny Daniel September 2008 Danny Daniel, Health, Safety & Security Manager Version

More information

St Anne's Community Services Staff Manual

St Anne's Community Services Staff Manual 4.01 St Anne's Health and Safety Policy Title of Policy: 4.01 St. Anne s Health and Safety Policy Issue date: July 2016 Version number: V5.0 Ratified by: H&S Committee 27 th July 2016 Expiry date: July

More information

Health & Safety Policy. Oasis Community Learning Health & Safety Policy Version

Health & Safety Policy. Oasis Community Learning Health & Safety Policy Version Health & Safety Policy 1 Index Oasis Community Learning Health & Safety Policy (pages 3-15) Template for Department H&S Policy (page 16) Template for Risk Assessment (page 24) Appendices (in alphabetical

More information

POLICY ON LONE WORKING JANUARY 2012

POLICY ON LONE WORKING JANUARY 2012 POLICY ON LONE WORKING JANUARY 2012 Author: Sheena Gordon V&A Co-ordinator Responsible Director: Ian Reid Director of HR Approved by: Health and Safety Forum Date for Review: January 2014 Version: 2.0

More information

Health and Safety Policy

Health and Safety Policy Health and Safety Policy NHS Leeds rth Clinical Commissioning Group NHS Leeds South and East Clinical Commissioning Group NHS Leeds West Clinical Commissioning Group Version: 2.1 Ratified by: NHS Leeds

More information

Health Information and Quality Authority Regulation Directorate

Health Information and Quality Authority Regulation Directorate Health Information and Quality Authority Regulation Directorate Compliance Monitoring Inspection report Designated Centres under Health Act 2007, as amended Centre name: Centre ID: Centre county: Type

More information

The KSF handbook wording for: Core 3 Health, Safety and Security

The KSF handbook wording for: Core 3 Health, Safety and Security Status Levels Core this is a key aspect of all jobs as it is vital that everyone takes responsibility for promoting the health, safety and security of patients and clients, the public, colleagues and themselves.

More information

GREAT OAKS SMALL SCHOOL FIRST AID, MEDICAL ARRANGEMENTS AND ACCIDENT REPORTING PROCEDURES HEAD TEACHER: JULIE KELLY SENCO: KERRI BAKER

GREAT OAKS SMALL SCHOOL FIRST AID, MEDICAL ARRANGEMENTS AND ACCIDENT REPORTING PROCEDURES HEAD TEACHER: JULIE KELLY SENCO: KERRI BAKER GREAT OAKS SMALL SCHOOL FIRST AID, MEDICAL ARRANGEMENTS AND ACCIDENT REPORTING PROCEDURES HEAD TEACHER: JULIE KELLY SENCO: KERRI BAKER DATE AGREED: JUNE 2016 DATE OF NEXT REVIEW: JUNE 2017 ALL STAFF HAVE

More information

Manual Handling Policy

Manual Handling Policy Manual Handling Policy Document Information This is a controlled document. It should not be altered in any way without the express permission of the author or their representative. On receipt of a new

More information

Adverse Incident Management. Mid Highland Community Health Partnership. Report for Governance Committee

Adverse Incident Management. Mid Highland Community Health Partnership. Report for Governance Committee Adverse Incident Management Mid Highland Community Health Partnership Report for Governance Committee Introduction There are two ways risk in its broadest sense can be managed. Firstly, the proactive approach.

More information

Health and Safety Policy

Health and Safety Policy Health and Safety Policy February 2016 The Health and Safety Policy is based on best practice advice and guidance from Lancashire County Council. Policy Approved: 1 st February 2016 The implementation

More information

HEALTH AND SAFETY POLICY

HEALTH AND SAFETY POLICY HEALTH AND SAFETY POLICY Incorporating the Local Health and Safety Arrangements for: o WENNINGTON HALL SCHOOL o MAINTANED SPECIAL SCHOOL o 00131 o LODGE LANE, WENNINGTON, LANCASTER, LA2 8NS This policy

More information

The Newcastle upon Tyne Hospitals NHS Foundation Trust. Ventilation Policy

The Newcastle upon Tyne Hospitals NHS Foundation Trust. Ventilation Policy The Newcastle upon Tyne Hospitals NHS Foundation Trust Ventilation Policy Version.: 1.0 Effective From: 15 January 2016 Expiry Date: 15 January 2019 Date Ratified: 22 December 2015 Ratified By: Estates

More information

HEALTH AND SAFETY POLICY

HEALTH AND SAFETY POLICY The aim of this policy is to (a) comply with the requirements of the Health & Safety at Work etc. Act 1974 and other relevant statutory provisions; (b) to act as a pivotal document in implementing s safety

More information

First Aid at Work HEALTH AND SAFETY POLICY AND PROCEDURE: 16.02

First Aid at Work HEALTH AND SAFETY POLICY AND PROCEDURE: 16.02 SECTION: 16.0 HEALTH AND SAFETY POLICY AND PROCEDURE: 16.02 NATURE AND SCOPE: SUBJECT: POLICY TRUSTWIDE FIRST AID AT WORK This policy has been produced in line with the requirements of First Aid at Work

More information

Statement of Principles

Statement of Principles Health and Safety Policy V2.1 Date Name Notes Drafted 22 nd Sep 2009 D.Robinson Drafted new version based on DCC model policy. Adopted 23 rd Nov 2009 PPC Reviewed 18 th Jun 2013 PPC Drafted new version

More information

JOB DESCRIPTION FOR THE POST OF HOTEL SERVICES ASSISTANT IN HOTEL SERVICES

JOB DESCRIPTION FOR THE POST OF HOTEL SERVICES ASSISTANT IN HOTEL SERVICES JOB DESCRIPTION FOR THE POST OF HOTEL SERVICES ASSISTANT IN HOTEL SERVICES TITLE: AGENDA FOR CHANGE PAY BAND: DIRECTORATE ACCOUNTABLE TO: REPORTS TO: RESPONSIBLE FOR: Hotel Services Assistant (Generic

More information

CPD Accredited H&S elearning Course List

CPD Accredited H&S elearning Course List CPD Accredited H&S elearning Course List New CPD Accredited H&S elearning Courses Judicium Education are releasing a new library of CPD accredited elearning courses. The courses currently available are

More information

Management of Violence and Aggression

Management of Violence and Aggression Health, Safety and Wellbeing Management Arrangements Core I Consider I Complex Management of Violence and Aggression Health, Safety and Wellbeing Service 1. Success Indicators The following indicators

More information

Health and Safety Policy

Health and Safety Policy Health and Safety Policy Purpose The purpose of the policy is to ensure that Churchill Free Special School carries out its statutory duties to safeguard the health, safety and welfare of staff, pupils

More information

First Aid Policy. Date of Policy November 2016 Date agreed by Governing Body November 2016 Date of next review November 2019

First Aid Policy. Date of Policy November 2016 Date agreed by Governing Body November 2016 Date of next review November 2019 First Aid Policy Believing in Excellence means that the school has key values that all members of our school community live by. These are: Respect; Ambition; Confidence; Integrity; Resilience. These values

More information

HEALTH & SAFETY REPORT 1 st and 2 nd Quarters; April - September 2016

HEALTH & SAFETY REPORT 1 st and 2 nd Quarters; April - September 2016 HEALTH & SAFETY REPORT 1 st and 2 nd Quarters; April - September 2016 Customer and Support Group Health and Safety Service CONTENTS 1.0 Introduction 2.0 Executive Summary 3.0 Interventions 4.0 Corporate

More information

Maiden Erlegh Trust Health and Safety policy

Maiden Erlegh Trust Health and Safety policy This is the statement of general policy and arrangements for: Overall and final responsibility for health and safety is that of: Maiden Erlegh School (Earley) The Maiden Erlegh Trust. A trustee is appointed

More information

Version: 5 Date Issued: 24 October 2017 Review Date: 24 October 2020 Document Type: Policy. Sharps Safety Policy Quick Reference Guide

Version: 5 Date Issued: 24 October 2017 Review Date: 24 October 2020 Document Type: Policy. Sharps Safety Policy Quick Reference Guide Sharps Safety Policy Version: 5 Date Issued: 24 October 2017 Review Date: 24 October 2020 Document Type: Policy Contents Page Paragraph Executive Summary 2 1 Introduction 3 2 Scope 3 3 Purpose 3-4 4 Definitions

More information

Policy for Research Health and Safety

Policy for Research Health and Safety Policy for Research Health and Safety 1. Introduction 1.1. As with teaching, research activities are recognized as a vital element of the University s pursuits. Therefore, the research projects and infrastructure

More information

Health and Safety Strategy

Health and Safety Strategy NHS Newcastle Gateshead Clinical Commissioning Group Health and Safety Strategy Document Status Equality Impact Assessment Document Ratified/Approved By Final No impact Quality, Safety and Risk Committee

More information

POLICY DOCUMENT CONTROL PAGE

POLICY DOCUMENT CONTROL PAGE POLICY DOCUMENT CONTROL PAGE TITLE Title: MOVING AND HANDLING POLICY Version: 2. Reference Number: HSP 6 SUPERSEDES Supersedes: VERSION 1 of October 2006 Description of Amendment(s): Nil ORIGINATOR Originated

More information

HEALTH AND SAFETY POLICY

HEALTH AND SAFETY POLICY HEALTH AND SAFETY POLICY 1. GENERAL The Governors of St George s College and St George s Junior School recognise that under the Health and Safety at Work etc. Act 1974 they have a legal duty to ensure,

More information

HEALTH AND SAFETY MANAGEMENT AT UWE

HEALTH AND SAFETY MANAGEMENT AT UWE HEALTH AND SAFETY MANAGEMENT AT UWE Introduction This document sets out the University s strategic approach to health and safety management. It contains the Statement of Intent that outlines the University

More information

Chartered Institute of Environmental Health (CIEH) Training Course Outlines

Chartered Institute of Environmental Health (CIEH) Training Course Outlines Chartered Institute of Environmental Health (CIEH) Training Course Outlines 1 One day course Staff are required to attend every three years. This course is aimed at any employee who carries out manual

More information

HEALTHCARE INSPECTORATE WALES SAFEGUARDING AND PROTECTING CHILDREN IN WALES:

HEALTHCARE INSPECTORATE WALES SAFEGUARDING AND PROTECTING CHILDREN IN WALES: HEALTHCARE INSPECTORATE WALES SAFEGUARDING AND PROTECTING CHILDREN IN WALES: A Review of the arrangements in place across the Welsh National Health Service ACTION PLAN - UPDATED August 2010 RECOMMENDATION

More information

Agenda item 3.3 Appendix 4 MANDATORY TRAINING POLICY

Agenda item 3.3 Appendix 4 MANDATORY TRAINING POLICY Agenda item 3.3 Appendix 4 MANDATORY TRAINING POLICY Reference No: Issued by Policy Manager Version No: 1 Previous Trust / LHB Ref No: n/a Documents to read alongside this Policy Study Leave Guidelines

More information

The Diocese of Chelmsford Vine Schools Trust Health and Safety Policy

The Diocese of Chelmsford Vine Schools Trust Health and Safety Policy The Diocese of Chelmsford Vine Schools Trust Health and Safety Policy 1 Page CONTENTS PAGE NO: 1. Statement of Intent... 5 2. Responsibilities Vine Trust Board and Local Board/Local Governing Body... 6

More information

First Aid Policy v3.0

First Aid Policy v3.0 First Aid Policy v3.0 Document reference: POL 039 Document Type: Policy Version: 3.0 Purpose: The purpose of this policy is to set out the measures required by the Trust to ensure compliance with the Health

More information

Lone Working Policy. Health & Safety Policy HS6. Version 1 Date Issued April 2012 Review Date March 2014

Lone Working Policy. Health & Safety Policy HS6. Version 1 Date Issued April 2012 Review Date March 2014 Lone Working Policy Health & Safety Policy HS6 Version 1 Date Issued April 2012 Review Date March 2014 Policy Author Local Security Management Specialist Approved by Quality & Governance Committee Date

More information

The Safe Use of Sharps in Healthcare Guidance for managers and staff

The Safe Use of Sharps in Healthcare Guidance for managers and staff The Safe Use of Sharps in Healthcare Guidance for managers and staff This guide has been written to highlight the main requirements of the Health and Safety (Sharps Instruments in Healthcare) Regulations

More information

Lone Working Policy. Director of Finance. Estates and Facilities Manager responsible for Health & Safety Date first approved by BoM 18 December 2014

Lone Working Policy. Director of Finance. Estates and Facilities Manager responsible for Health & Safety Date first approved by BoM 18 December 2014 Lone Working Policy ELT manager Director of Finance Responsible officer Estates and Facilities Manager responsible for Health & Safety Date first approved by BoM 18 December 2014 Date review approved by

More information

Legionella Management and Control in Leisure, Display, Therapy and other Non-Industrial Water Systems Qualification Specification

Legionella Management and Control in Leisure, Display, Therapy and other Non-Industrial Water Systems Qualification Specification P904 Proficiency Qualification Legionella Management and Control in Leisure, Display, Therapy and other Non-Industrial Water Systems Issue 1 January 2016 Issue 1 April 2017 Contents Page Section 1 About

More information

THE CARE CERTIFICATE WORKBOOK

THE CARE CERTIFICATE WORKBOOK THE CARE CERTIFICATE WORKBOOK Contents What s included in the workbook? Introduction STANDARD 1 Understand your role STANDARD 2 Your personal development STANDARD 3 Duty of care STANDARD 4 Equality and

More information

Health and Safety Policy

Health and Safety Policy Health and Safety Policy 2015 Statement of Health and Safety Policy The University recognises its obligations to properly control the risks to the health of its staff, students and visitors. Strong strategic

More information

Lone Working Guidance

Lone Working Guidance Lone Working Guidance Document History: Version Date Approved by Revision 1.0 July 2009 Health & Safety Committee 1.1 February 2013 Health & Safety Committee First version First review Contents Page Contents

More information

Taranaki District Health Board

Taranaki District Health Board Taranaki District Health Board Current Status: 15 October 2013 The following summary has been accepted by the Ministry of Health as being an accurate reflection of the Certification Audit conducted against

More information

HANDLING OF LAUNDRY POLICY

HANDLING OF LAUNDRY POLICY HANDLING OF LAUNDRY POLICY Version: 6 Ratified by: Date ratified: November 2015 Title of originator/author: Title of responsible committee/group: Senior Managers Operational Group Facilities Manager Estates

More information

Safeguarding Vulnerable People Annual Report

Safeguarding Vulnerable People Annual Report Safeguarding Vulnerable People Annual Report 2014-2015 1. Purpose of report The purpose of this report is to provide assurance that the Trust is fulfilling its responsibilities to promote the safety and

More information

HEALTH AND SAFETY POLICY STUDLEY HIGH SCHOOL

HEALTH AND SAFETY POLICY STUDLEY HIGH SCHOOL HEALTH AND SAFETY POLICY STUDLEY HIGH SCHOOL Review Period: Annually Autumn Term Review By: Leadership Group & P&R SP14 Health and Safety Policy Draft Oct 18 1 Reviewed & Approved by Governors, Date: Oct

More information

Unit title: Safe Working Practice for Care (SCQF level 7)

Unit title: Safe Working Practice for Care (SCQF level 7) Higher National Unit specification General information Unit code: HF25 34 Superclass: PL Publication date: June 2016 Source: Scottish Qualifications Authority Version: 01 Unit purpose This Unit has been

More information

Lanarkshire NHS Board, Kirklands, Fallside Road, Bothwell, Glasgow, G71 8BB Telephone

Lanarkshire NHS Board, Kirklands, Fallside Road, Bothwell, Glasgow, G71 8BB Telephone Paper submitted by Professor Ewan B Macdonald to Lanarkshire Health Board Meeting 28 th September 2011 Lanarkshire NHS Board, Kirklands, Fallside Road, Bothwell, Glasgow, G71 8BB Telephone 01698 858300

More information

Writtle College Health and Safety Policy

Writtle College Health and Safety Policy Writtle College Health and Safety Policy 2015-2016 Document Ownership: Role Title: Chair of the Board Department Approved by Senior Management Team 11 August 2015 Approved by Personnel & Remuneration Committee

More information

Health and Safety Policy

Health and Safety Policy Health and Safety Policy Aim of the Academy To provide unique and enriching opportunities for all. This policy should be read in conjunction with: Langley Academy Health and Safety of Students on Educational

More information

First Aid Policy September 2017

First Aid Policy September 2017 First Aid Policy September 2017 Responsibility for updating this policy: Health and Safety Officer Introduction This policy outlines the responsibility of the School to provide adequate and appropriate

More information

The Newcastle upon Tyne Hospitals NHS Foundation Trust. Safe and Effective Use of Bedrails

The Newcastle upon Tyne Hospitals NHS Foundation Trust. Safe and Effective Use of Bedrails The Newcastle upon Tyne Hospitals NHS Foundation Trust Safe and Effective Use of Bedrails Version No.: 2.0 Effective From: 31 October 2017 Expiry Date: 31 October 2020 Date Ratified: 24 July 2017 Ratified

More information

Unit title: Health Sector: Working Safely (National 4)

Unit title: Health Sector: Working Safely (National 4) Unit code: F599 74 Superclass: PL Publication date: August 2013 Source: Scottish Qualifications Authority Version: 03 (February 2017) Unit purpose This unit has been designed as a mandatory unit of the

More information

Thorpe Primary School. Health and Safety Policy. Date: 24 March 2017

Thorpe Primary School. Health and Safety Policy. Date: 24 March 2017 Thorpe Primary School Health and Safety Policy Date: 24 March 2017 Review Date: March 2018 1 Policy Statement (Although Bradford Council s Health and Safety Policy (which can be found on the Councils website

More information

Orchids Care. Sarah Lyndsey Robson. Overall rating for this service. Inspection report. Ratings. Good

Orchids Care. Sarah Lyndsey Robson. Overall rating for this service. Inspection report. Ratings. Good Sarah Lyndsey Robson Orchids Care Inspection report 69 Tenter Lane Warmsworth Doncaster South Yorkshire DN4 9PE Date of inspection visit: 31 January 2017 Date of publication: 24 March 2017 Tel: 01302570729

More information