Higher Education Reforms Project (HERP)

Size: px
Start display at page:

Download "Higher Education Reforms Project (HERP)"

Transcription

1 Higher Education Reforms Project (HERP) Report on Achievement of Disbursement Linked Indicators 1 st Claim for Year 1, (2015/16) (Overall Claim- 2nd) University Grants Commission (UGC), Sanothimi, Bhaktapur Nepal February, 2016

2 Table of Contents Acronyms Executive Summary Introduction Process of DLI Achievement Report Compilation University Grants Commission Process Tribhuvan University Process Student Financial Assistance Fund Development Board Process Progress in the Achievement of DLI Targets Eligible Expenditure Programs (EEPs) Challenges Encountered and Lessons Learned Conclusion... 12

3 Annexes Annex 1: The guidelines for FBF for universities and autonomous campuses, PBF for all HEIs participating in HERP and the PBF criteria for regular funding of community campuses Annex 2: Public Administration Campus Autonomy - TUEC Decision Annex 3: Salary Expenditures of TU Institutions a) FY 2071/072 auditor certified b) FY 2072/073 up to Poush 2072 (January 14, 2016) Annex 4: Attachment 6 - Statement Relating to Roll-Over of Eligible Expenditure Programs and DLI Amounts for Category 1

4 Acronyms DLI EEP FA FBF FY GoN HERP IDA PBF PMT PU QAAA QAAC QAAD RDI SDR SFAFDB TU TU-PIO UGC USD Disbursement Linked Indicators Eligible Expenditure Programs Financing Agreement Formula Based Funding Fiscal Year Government of Nepal Higher Education Reforms Project International Development Association Performance Based Funding Proxy Means Testing Purbanchal University Quality Assurance and Accreditation Agency Quality Assurance and Accreditation Council Quality Assurance and Accreditation Division Research Development and Innovation Special Drawing Rights Student Finance Assistance Fund Development Board Tribhuvan University Tribhuvan University Project Implementation Office University Grants Commission United States Dollar

5 Executive Summary Following the signing of the Financing Agreement (FA) between Government of Nepal (GoN) and International Development Association (IDA) on April 06, 2015, the Higher Education Reforms Project (HERP) has been formally activated from May 22, In the baseline year starting from July 2014 till June 2015 almost all necessary preparatory work were completed and accordingly baseline year DLI reimbursement received. Subsequently, in year one implementation activities have been started targeting DLI achievement for the year. This report covers the project implementation progress up to the month of Poush 2072 (January 14, 2016) of the Nepali fiscal year 2072/73 which is the first year of the project implementation with full annual work plan and budget. The implementing agencies - University Grants Commission (UGC), Tribhuvan University Project Implementation Office (TUPIO) and Student Financial Assistance Fund Development Board (SFAFDB), have taken necessary actions to ensure that the implementation targets relating to all seven disbursements linked indicators are met. The following is a brief summary of the activities and the progress: DLI I: The UGC has amended its Rules in order to setup functionally autonomous QAA system at UGC and published on its website ( It is in the process of getting government endorsement. Nonetheless, UGC has initiated strengthening the QAA Division with provisions of making it independent and self functioning unit of UGC. DLI II: The guidelines for FBF for universities and autonomous campuses, PBF for all HEIs participating in HERP and the PBF criteria for regular funding of community campuses constitute DLI2 target of year 1. The related sub-target has already been achieved. Reimbursement of US $ 1.5 million allocated for the DLI sub target achievement is being claimed now with this reporting. On the basis of the provisions, criteria and processes listed in the Project Implementation Guidelines (PIM) 60 community campuses have been selected (45 on the basis of national competition and 15 on regional competition basis. This constitute partial fulfilment of DLI 2 target for year one. Orientation programs have been launched for undertaking the project activities towards ensuring the fulfilment of the remaining targets. DLI III: Public Administration Campus, Kathmandu has been granted the status of autonomy by TU on December 5, 2015 (Mangsir 19, 2072). TU has also prepared ranking criteria and procedure for granting academic autonomy to constituent and affiliated campuses as per the revised Autonomy Rules. The current DLI achievement regarding institutional autonomy constitutes 50% of the target; this qualifies for claiming US $ million. DLI IV: In order to achieve the DLI sub-targets of fully complying with the published academic calendar within one year TU has prepared internal working manual for implementation of the revised Academic Rules that it has adopted since June 2, 2015 (Jestha 19, 2072). 1

6 Similarly, it has started implementation of the plan for examination reform endorsed on June 4, 2015 (Jestha 21, 2072). DLI V: The provisions of supporting new programs and the criteria and procedures for selection of programs in priority areas and institutions have been discussed in the university coordination committee meetings in September 2016 (Bhadra-Asoj, 2072). The guidelines for HERP support and the frame work for the national priorities have already been approved by UGC on June 1, 2015 (Jestha 18, 2072). DLI VI: Data entry of the PMT form received from students seeking enrolment in the science stream at the higher secondary level has been completed on online based ( PMT scoring. Also 6500 PMT forms have been collected for Bachelor level students, the data will be entered for PMT scoring. Agreement has been made with RBB for fund transfer and partial monitoring of beneficiaries of SFA Program. DLI VII: UGC has made announcement calling for submission of proposals for funding on competitive basis is being scheduled; TU is preparing criteria and guidelines for recruiting faculties in line with the Parallel Recruitment and Promotion rules recently adopted on May 15, 2015 (Jestha 1, 2072). Earlier in the baseline year, almost all of the baseline year activities were accomplished and the baseline DLIs targets were met. The total amount earned against the Year Zero DLIs was SDR million (equivalent US$ million). On the basis of the total EEPs by the baseline year reporting period of June 15, 2015 WB had provided US $ million (1 US $ = NPR 102.5) against the DLI achievement equivalent to US$ million. The roll over amount in the Year 0 report was US$ million which had remained to be claimed with additional EEP reporting. The total EEP as on (July 16, 2015) reported on FMR/Project Account was NPR 5, million which is final and auditor reported. The 20% of the same is NPR 1, million. The difference of 20% of EEP as reported on DLI achievement report of Year 0 and 20% of EEP as reported on July 16 is NPR million which is equivalent to US$ 3.56 million (@ US$ 1=NPR 110). The EEP Year 1 - First Claim Period i.e, of 16 July January 2016 is NPR 1, million. The 20% of the same is NPR million which is equivalent to US$ 2.76 million. The DLI claim for year one by the end of Poush FY 2072/73 (July 16 - January 14, 2016) includes one DLI 2 achievement (Criteria for PBF based regular funding for community campuses adopted by UGC) which is US $ 1.5 million, one DLI 3 Achievement of US $ million. The EEP that can be use to claim (20% of the total EEP) by the end of Poush FY 2072/73 (July 16 - January 14, 2016) is US$ 6.32 million which is the sum of roll over EEP of year 0 reporting period i.e., US$ 3.56 million and the EEP of the current reporting period i.e., US$ 2.76 million. Thus the total DLI claim in this period is US $ 1.5 million + US $ million + US $ million = US $ million. The EEP that can be rolled over to next reporting period is US$ 1.94 million. 2

7 1 Introduction Following the financing agreement (FA) signed between Government of Nepal (GoN) and International Development Association (IDA) regarding Higher Education Reform Project on April 06, 2015, UGC has prepared this DLI achievement report for year one first withdrawal by compiling and consolidating reports from Tribhuvan University Project Implementation Office (TUPIO) and Student Finance Assistance Fund Development Board (SFAFDB), to achievement of UGC s own part. This report covers withdrawal under sub-category (1) disbursements according to the achievements stated in DLI 1 - DLI University Grants Commission Process 2 Process of DLI Achievement Report Compilation UGC has been mobilizing its organizational set up, human resources and office facilities in coordinating implementation of HERP as well as implementing major components of the project. Specifically, UGC Research Division (RD) is given responsibility to implement DLI component 7(a); DLI component 1 to Quality Assurance and Accreditation Division (QAAD). Monitoring and Evaluation Division (MED), Education Management Information System (EMIS) Section, Administration Division and Finance Division are mobilized to ensure effective and efficient implementation of HERP activities. Reform Unit (RU) is given specific responsibility of overall coordination along with specific tasks of achieving the targets of DLI 2, DLI 5, part of DLI 3, and supporting HEIs in achieving accreditation status. The Reform Unit also coordinates and compiles the information for preparing progress reports and the DLI achievement reports. UGC Reform unit also receives the information and data from TU PIO as well as SFAFDB indicating progress in their respective areas of DLI achievement responsibilities. Quality Assurance and Accreditation Division (QAAD) of UGC undertakes the activities relating to quality assessment and accreditation contributing to achieving the targets of DLI 1. In order to ameliorate the QAA system making it more credible with independent assessment and accreditation UGC has strengthened the capacity of the division towards making it function as an autonomous unit. UGC has already revised its regulation towards developing a fully autonomous QAA system and has submitted to the government, it is awaiting endorsement of the regulation by the government. UGC Reform Unit supports HEIs participating in HERP to undertake reform and development activities with performance based funding regarding DLI 1, DLI 2, and DLI 5, as well as part of DLI 3 relating to universities other than TU. Reform Unit also maintains the information relating to NPHERD/HERP participating beneficiary institutions including universities and their constituent as well as community campuses relating to all performance based funding. It also compiles and prepares the comprehensive regular implementation progress reports and maintains the data. Reform Unit also keeps the record of all MOUs and contracts relating to PBF and FBF. 3

8 Research Division (RD) has prepared database relating to research funding activities including research support, fellowships, and institutional support as well as publication of the research projects funded by UGC. UGC research related documents are also part of the system. RD has already published the announcement for submission of proposals by prospective MPhil and PhD students, faulty researchers, as well as institutions for competitive selections for research funding and scholarships. It was published in Kantipur national daily on December 31, 2015 (Poush 16, 2072) and subsequently in Gorkhapatra national daily with last date of submission on February 3, 2016 (Magh 20, 2072). The proposals are now being processed for selection. The Monitoring and Evaluation Division has database of the community campuses focusing on the regular grants provision, development support and progress, and monitoring. 2.2 Tribhuvan University Process TU has set up TUPIO which includes Finance Section, EMIS Section, Administrative Section, Procurement Section and Monitoring Section, to undertake HERP implementation. It also mobilizes Office of the Controller of Examination (OCE), TU Finance Division, Central Departments, Autonomous and Decentralized campuses, as well as affiliated campuses. TUPIO coordinates and compiles the information for preparing the baseline and progress data from all these entities. The report and the data are submitted to UGC to prepare the comprehensive baseline and progress report. TUPIO maintains the information relating to HERP of participating beneficiary institutions including constituent as well as affiliated campuses relating to all performance based funding, institutional autonomy and academic autonomy, examination reform and implementation of academic calendar, revision of academic programs and new programs, implementation of parallel system for appointment and promotion of faculties. It also compiles and prepares comprehensive regular implementation progress reports, eligible expenditure programs and maintains the data. TUPIO also keeps the record of all MOUs and contracts relating to TU components of HERP. TUPIO monitoring section, in coordination with EMIS, finance and other sections maintains records relating to all TU components of HERP including grants provision, progress, and monitoring. 2.3 Student Financial Assistance Fund Development Board Process SFAFDB has Finance Section, Administrative Section, Procurement Section and Monitoring Section to undertake HERP implementation. It has also mobilizes Department of Education (DEO), Rastriya Banijya Bank (RBB), Higher Secondary Education Board (HSEB) and other stakeholders. SFAFDB coordinates and compiles the information for preparing the baseline and 4

9 progress from all these entities. The report and the data are submitted to UGC to prepare the comprehensive DLI achievement report. SFAFDB maintains the information relating to student financial assistance components of HERP. It also compiles and prepares comprehensive regular implementation progress reports and maintains progress data. SFAFDB also keeps the record of all MOUs and contracts relating to SFAFDB components of HERP. To complete the baseline under DLI 6, SFAFDB has developed new student application form based on the PMT targeting model derived from NLSS 2010 data. New scoring system, including web-based students database, has been developed. Copies of supporting documents relating to achievement of each of the baseline DLIs are included in Annexes 1 through 3. These documents are also uploaded in UGC web- sites ( TUPIO and SFAFDB have also uploaded the documents of respective baseline DLIs in their respective web-sites ( 5

10 3 Progress in the Achievement of DLI Targets 3.1 DLI I: The UGC Rules have been amended to setup functionally autonomous QAA system at UGC. The amended regulation was endorsed by UGC on June 12, 2015 (Jestha 29, 2072) and subsequently published on its website ( It is in the process of getting government endorsement. However, UGC has initiated strengthening the QAA Division with provisions of making it independent and self functioning unit of UGC. 3.2 DLI II: On the basis of the provisions, criteria and processes listed in the Project Implementation Guidelines (PIM), application calls were announced in Kantipur on August 4, 2015 (Shrawan 19, 2072) and in Gorkhapatra on August 5, 2015 (Shrawan 20, 2072) (two national daily newspapers) for the Higher Education Institutions in the country including TU constituent campuses and affiliated community campuses for participation in QAA Process and for participation in Performance Based Funding (PBF). Similarly, the universities in the country were notified regarding the provisions of Formula Based Funding (FBF) in the University Coordination Committee held on August 2015 and September 2015 (Bhadra 2072 and Kartik 2072). UGC has already prepared and endorsed the guidelines for PBF for HEIs participating in HERP, PBF of regular grants for community campuses, and FBF for universities and autonomous campuses on June 1, 2015 (Jestha 18, 2072) and subsequently published on its website ( The guidelines of PBF including the criteria for regular funding of community campuses is the DLI target of year 1 and was achieved in the baseline year itself. Reimbursement of US $ 1.5 million allocated for the DLI achievement is being claimed now with this reporting. 3.3 DLI III: Public Administration Campus, Kathmandu has submitted expression of interest along with strategic development plan to get institutional autonomy in line with the revised Autonomy Campus Rules for constituent campuses that TU adopted in June 2, 2015 (Jestha 19, 2072). Subsequently, TU formed a review committee on July 27, 2015 (Shrawan 11, 2072) to assess the feasibility. The campus got autonomy status in December 5, 2015 (Mangsir 19, 2072). TU has already prepared ranking criteria and procedure for granting academic autonomy to constituent and affiliated campuses as per the revised Autonomy Rules. The rules are posted on the UGC website ( and TU website ( The current DLI achievement regarding institutional autonomy qualifies for claiming US $ million. 3.4 DLI IV: TU has initiated implementation of the revised Academic Rules that it has adopted since June 2, 2015 (Jestha 19, 2072) for ensuring completion of the academic calendar within one year by developing an internal working manual. Similarly, it has started implementation of the plan for examination reform (with special focus on centralized examinations). The plan was endorsed on June 4, 2015 (Jestha 21, 2072). The rules and the plan are available on the UGC website ( 6

11 3.5 DLI V: The provisions of supporting new programs and the criteria and procedures for selection of programs in priority areas and institutions have been discussed in the university coordination committee meetings in September 2016 (Bhadra-Asoj, 2072). The guidelines for HERP support and the frame work for the national priorities were approved by UGC as a constituent part of the guidelines for PBF on June 1, 2015 (Jestha 18, 2072). The guidelines are available on UGC website ( 3.6 DLI VI: Data entry of the PMT form received from students seeking enrolment in the science stream at the higher secondary level has been completed on online based ( PMT scoring. Also 6500 PMT forms have been collected for Bachelor level students, the data will be entered for PMT scoring. Agreement has been made with RBB for fund transfer and partial monitoring of beneficiaries of SFA Program. Efforts are being made for coordination with community campuses for monitoring of the progress of the beneficiary students in the campuses. Earlier in the base year, the Proxy Means Testing (PMT) processes for selection of students was revised by SFAFDB ( and the database and process was computerized. 3.7 DLI VII: UGC has (a) revised the existing guidelines for research funding; and (b) identified priority areas for research support and subsequently published on its website ( announcement calling for submission of proposals for funding on competitive basis is being scheduled; TU is preparing criteria and guidelines for recruiting faculties in line with the Parallel Recruitment and Promotion rules recently adopted on May 15, 2015 (Jestha 1, 2072). The rules are posted on TU and UGC website ( The Table below gives the summary of targets and achievements for Year One DLI Description DLI-1: National Accreditation System Established and Functioning Table 3.1 Achievements of targets for DLI 1-7 in FY 2014/15 F.Y. 2015/16 Target 8 HEIs accredited (cumulative 20 including 12 at baseline) F.Y. 2014/15 Achievement Additional 2 campuses accredited; 9 PRT formed- Total accredited 14 % of Target Achieved Progress in number addition of 2 accredited: 25% of target achieved DLI Pricing, SDR ( 000 ) As per FA not yet earned DLI Pricing, USD ( 000 ) Approximate not yet earned 7

12 DLI Description DLI-2: Performance- Based Financing Extended to Higher Education Institution F.Y. 2015/16 Target (a) First group of 45 HEIs selected as per PIM, Memorandum of Understandings (MOUs) signed; and first tranche of performance based grants released F.Y. 2014/15 Achievement Public call made; 101 applied; reform committee formed for selection % of Target Achieved Selection fully achieved; MOU and disbursement on the process DLI Pricing, SDR ( 000 ) As per FA DLI Pricing, USD ( 000 ) Approximate (b) Criteria for PBF based regular funding for community campuses adopted by UGC UGC has adopted the PBF for regular funding for community campuses (endorsed by UGC on 1 June, 2015) 100% achieved DLI-3: Autonomy Extended to Additional Campuses /Schools DLI-4: Examination Reforms Implemented and Academic Calendar Enforced in TU Autonomy granted to two campuses/ schools (cumulative six including four at baseline) Two autonomous /accredited campuses or schools exercise academic autonomy Academic calendar of three program-years of centralized Master s programs adhered to Results for regular centralized Bachelor s programs 1 published within seven months on an average (Humanities & Soc. Sc; Ed; Management) One campus got autonomy (Public administration campus on December 5 Consultations with stakeholders are being held Academic rules of TU revised and approved as envisaged; and implementation initiated 50% achieved A plan for examination reforms approved as envisaged; and implementation initiated Humanities and Social Sciences, Education and Management. 8

13 DLI Description DLI-5: Academic reforms introduced : Revision of existing and introduction of new programs at undergraduate and graduate levels F.Y. 2015/16 Target A total of 20 programs revised or introduced 2 F.Y. 2014/15 Achievement Areas of priority approved; Guidelines for selection of programs and institutions approved; Application Call is scheduled for third week of March % of Target Achieved DLI Pricing, SDR ( 000 ) As per FA DLI Pricing, USD ( 000 ) Approximate DLI-6: Poverty Targeted Financial Support for Under-Privileged Students (i) First cohort (at least 3,000 3 students) selected through PMT; and (ii) funds released to at least 3,000 students Data entry for selection ranking of HSEB students completed; Forms of Bachelors level students collected DLI-7: Institutions Supported for Academic Excellence in Priority Areas through RDI awards (i) First batch of projects ( at least 100) selected; and (ii) funds released as per schedule First batch of faculty (at least ten) recruited and/or promoted based on excellence Announcement made for submission of proposals for funding support made Criteria and process of selection prepared Total Value SDR 1= US$ As shown in the Table above the total amount earned against the Year one DLIs by January 2016 is SDR million which is approximately US$ million. Earlier, all baseline DLIs except one (Quality Assurance and Accreditation Agency with functional autonomy established at UGC) were achieved. Accordingly the DLI based reimbursement claim was US$ million, however the EEP reporting limited the the amount to be received to US $ million. The remaining amount US$ million is being claimed now along with the amount earned on the basis of DLI achievement in year one by January Thus the total 2 50 to 60% of the target is for revision of existing programs, which can be in any area/discipline, and remaining 40 to 50% of the target is for introduction of new programs that have to be in identified priority areas. 3 79% of the target is for students at Bachelors Level (HE) and remaining 21% of the target is for students at Higher Secondary Level altogether. 9

14 amount claimed in year one by January 2016 is US $ 1.5 million + US $ million + US $ million = US $ million. The EEP (based on expenditure of TU on staff salary) in the baseline year, fiscal year 2071/72 was NPR million. However, EEP amount reported and used was NPR million accordingly US$ million DLI reimbursement (20% of the EEP converted to US $) was received. The EEP in year one (also based on expenditure of TU on staff salary) is the remaining EEP amount from year 0 which is NPR million and the EEP reported by January which is NPR million. The table below provides summary on expenditures made under Eligible Expenditure Programs EEPs: Time July 17, 2014 July 16, 2015 FY 2071/72 July 17, 2014 July 16, 2015 July 16, 2015 December 30, 2016 EEPs Salaries of faculty and staff of TU campuses Salaries of faculty and staff of TU campuses Salaries of faculty and staff of TU campuses Table 3.2 Expenditures under EEPs Expenditure in NPR Expenditure in US $ Remarks 3,306,502, ,258, As per EEP reported by the time of first claim-- Institutions that have reported partial EEPs of FY 2014/15= 103; yet to 1 US$= ,092,759, Final Total EEP for the FY 2071/71, Auditor certified 1,519,877, campuses out of 122 are yet to provide update of expenditure upto Kartik; By Ashadh 121 reported EEP; 6 campuses reported upto Marga and one upto Poush DLI achievement, EEP, DLI Claim and rollover DLIs Amount Equivalent to Earned DLIs (Based on DLI Report 1) Amount disbursed by IDA against DLI Report 1 Balance amount to be claimed against DLI Report 1 Criteria for PBF based regular funding for community campuses adopted by UGC Autonomy granted to two campuses/ schools (cumulative six including four Amount (In Millions) Currency US$ Remarks US$ NPR US$ US$ US$ Year one target was achieved in Year zero Target 2 and one campus opted autonomy (50% 10

15 at baseline) achievement) Amount against DLI Progress US$ Eligible expenditure Programs, Year Zero complete, Total 5, NPR Final total of FY 071/72 Auditor certified: NPR 5, % of EEP, Year Zero complete 1, NPR NPR EEP to be carried over from Year 0 to Year EEP to be carried over from Year 0 to Year 1 (in US$, exchange rate NPR 110) Eligible expenditure Programs, by Year 1, 2072 Poush (January 14, 2016) NPR 3.56 US$ 1, NPR NPR NPR % NPR Eligible expenditure Programs, Year 1, 2072 Poush (January 14, 2016) (in US$, exchange rate NPR 110) 2.76 US$ EEP that can be claimed (20% of the US$ 3.56 million + US$ US$ total EEP) by the this reporting time million = US$ 6.32 million Amount that can be claimed in DLI Progress Report US$ EEP that can be carried over to DLI Progress Report US$ Please refer Annex 4: Attachment 6 - Statement Relating to Roll-Over of Eligible Expenditure Programs and DLI Amounts for Category 1. 4 Eligible Expenditure Programs (EEPs) For the year one, the total salary expenditure of TU and its constituent campuses/schools/ departments/ verified and reported for the period June 2015-January 2016 is NPR 1, million (USD million). This includes salary of 75 institutions/cost centers out of which eight institutions included EEPs for Year 1, 2072 Poush (January 14, 2016); six campuses included EEPs for five months; and one for six months (See details in the Annex 3-b). Additional EEPs (salary component) from forty-seven institutions/cost centers are yet to submit the report and all these institutions, remaining EEPs will be submitted along with the next DLI achievement report. The EEP claim based on this year reporting by TU US$ 2.76 million. The carry over EEP from year zero based on auditor certified final total reporting of TU is US $ 3.56 million (20% of auditor certified EEP - Amount received from the IDA). The total EEP by this reporting period is US $ 6.32 million. This includes only salary as no expenditures were made during the period for EEPs related with scholarship and research. Hence, for first term, year 1 FY 2015/16, UGC would like to request the World Bank to disburse US $ million to the GoN treasury against the DLI earned amount as per the Financing Agreement. The remaining EEP amount US $ 1.94 million will be rolled over to the next reporting period. 11

16 5 Challenges Encountered and Lessons Learned The devastating earthquakes of April 25, and May 12, 2015 adversely affected the financial environment of the country, more so in the higher education institutions in the country. Further Immense challenges are added by the political tumult following the endorsement of the constitution of Nepal by the National Assembly this year. There is immense pressure on HERP to address the situation. Stakeholders of HERP at the early preparation phase assumed World Bank grants funding support to the project which later changed to soft loan on the basis of apparent country capacity of loan payback. The condition is however far removed from the apparent loan payback financial capacity of the country; there has been demand from stakeholders in the country for review of the financial provisions and modalities by stakeholders. Nonetheless the challenges provided opportunity to develop stringent measures of fund utilization. The effect of prevailing political milieu in the country continued to influence regarding higher education reform initiatives. It has created challenges in the decision making. The tenure of the UGC Member Secretary had expired on May 15 and the post remained vacant until now. Also from October this year, the tenure periods of the four nominated UGC members completed. New members are yet to be nominated by the government (Cabinet of ministers). Earlier, the UGC Board fell short of two members after the completion of the terms of two Vice Chancellors (TU and PU) in August, government nominates two members from among the Vice Chancellors of the Universities in Nepal. This is a serious issue as the UGC Board now fall short of the minimum quorum of 50% of the members for a formal meeting, 6 members out of 11 are yet to be nominated. In order to mitigate this challenge the responsibilities have to be shared by UGC Chairman and the other UGC staff, but without capacity of major decisions. The issue is likely to remain challenging for some time. Overall, there is a need to review HERP provisions and modalities to also address the changed contexts in terms of the need to respond emergency conditions, rehabilitation and reconstructions priorities as well as new socio-psychological conditions of the stakeholders. 6 Conclusion The DLI claim for year one by the end of January 2016 (July-January 2016 period) includes one DLI 2 achievement (Criteria for PBF based regular funding for community campuses adopted by UGC) which is US $ 1.5 million, one DLI 3 Achievement of US $ million as well as the remaining portion (US$ million) of the DLI achieved in the baseline year which had remained to be claimed with additional EEP reporting. Thus the total DLI claim in this period is US $ 1.5 million + US $ million + US $ million = US $ million. The total EEP including the rollover amount from the base year and the TU reporting for year one amounts to US US $ 6.32 million. Hence, for this FY 2015/16 first claim year, UGC requests the World Bank 12

17 to disburse US$ million to the GoN treasury against the DLI earned amount as per the Financing Agreement. Earlier in the baseline year DLIs except one (Quality Assurance and Accreditation Agency with functional autonomy established at UGC) have been achieved. The total amount earned against the Year Zero DLIs is SDR million (equivalent US$ million). Total EEPs by the reporting period of June 15, 2015 was US $ million (1 US $ = NPR 102.5). The World Bank has already reimbursed the amount to the GoN treasury. There is need for facilitating meaningful participation of the HEIs in HERP provisions, modality and process. Institutional capacity development will remain crucial for successful implementation of the project. The documents will be revised regularly based on implementation experiences and feedback. There are great expectations from HERP. The expectations will be heightened by the recent disaster brought by the epic earthquake in the country and the political turmoil following the endorsement of the constitution of Nepal by the National Assembly. Challenges will remain in terms of political milieu. All these need to be addressed with empathy, sensitivity and most importantly with critical reflection. 13

18 7. Annexes: See attached files 14

Afghanistan Reconstruction Trust Fund Grant Agreement

Afghanistan Reconstruction Trust Fund Grant Agreement Public Disclosure Authorized OFFICIAL DOCUMENTS ARTF GRANT NUMBER TFOAO730 Public Disclosure Authorized Public Disclosure Authorized Afghanistan Reconstruction Trust Fund Grant Agreement (Higher Education

More information

United Nations Peace Building Fund Grant Agreement

United Nations Peace Building Fund Grant Agreement Public Disclosure Authorized OFFICIAL DOCUMENTS Public Disclosure Authorized GRANT NUMBER TF018255 United Nations Peace Building Fund Grant Agreement (Additional Financing for the Productive Social Safety

More information

World Bank Iraq Trust Fund Grant Agreement

World Bank Iraq Trust Fund Grant Agreement Public Disclosure Authorized Conformed Copy GRANT NUMBER TF054052 Public Disclosure Authorized World Bank Iraq Trust Fund Grant Agreement Public Disclosure Authorized (Emergency Disabilities Project) between

More information

Rural Community Finance Project. Negotiated financing agreement

Rural Community Finance Project. Negotiated financing agreement Document: EB 2015/LOT/P.37/Sup.1 Date: 17 December 2015 Distribution: Public Original: English E Republic of Liberia Rural Community Finance Project Negotiated financing agreement For: Information Negotiated

More information

OFFICIAL DOCUMENTS. Grant Agreement. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized LEBANESE REPUBLIC

OFFICIAL DOCUMENTS. Grant Agreement. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized LEBANESE REPUBLIC Public Disclosure Authorized OFFICIAL DOCUMENTS LSCTF GRANT NUMBER TF0A4753 Public Disclosure Authorized Grant Agreement (SUPPORT TO REACHING ALL CHILDREN WITH EDUCATION (RACE 2) PROGRAM) Public Disclosure

More information

Global Financing Facility Grant Agreement

Global Financing Facility Grant Agreement Public Disclosure Authorized OFFICIAL DOCUMENTS GFF GRANT NUMBER TF0A2561 Public Disclosure Authorized Global Financing Facility Grant Agreement (Transforming Health Systems for Universal Care Project)

More information

Trust Fund Grant Agreement

Trust Fund Grant Agreement Public Disclosure Authorized CONFORMED COPY GRANT NUMBER TF094521 GZ Public Disclosure Authorized Trust Fund Grant Agreement (Additional Financing for the Palestinian NGO-III Project) Public Disclosure

More information

Financing Agreement. (Zanzibar Basic Education Improvement Project) between THE UNITED REPUBLIC OF TANZANIA. and

Financing Agreement. (Zanzibar Basic Education Improvement Project) between THE UNITED REPUBLIC OF TANZANIA. and Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 4293-TA Public Disclosure Authorized Financing Agreement (Zanzibar Basic Education Improvement Project) between Public Disclosure Authorized THE

More information

Global Environment Facility Trust Fund Grant Agreement

Global Environment Facility Trust Fund Grant Agreement CONFORMED COPY GEF TRUST FUND GRANT NUMBER TF099857 Global Environment Facility Trust Fund Grant Agreement (Nyika Transfrontier Conservation Area Project) between REPUBLIC OF MALAWI and INTERNATIONAL BANK

More information

THE GLOBAL FUND to Fight AIDS, Tuberculosis and Malaria

THE GLOBAL FUND to Fight AIDS, Tuberculosis and Malaria THE GLOBAL FUND to Fight AIDS, Tuberculosis and Malaria Guidelines for Performance-Based Funding Table of Contents 1. Introduction 2. Overview 3. The Grant Agreement: Intended Program Results and Budget

More information

Terms of Reference AUDIT OF SOLAR HOME SYSTEMS PROJECT. The assignment is to engage an auditor for the following.

Terms of Reference AUDIT OF SOLAR HOME SYSTEMS PROJECT. The assignment is to engage an auditor for the following. Note: Bank solar home systems projects receiving grant funds from the Global Environment Facility (GEF) are normally required to have their records and accounts audited by an independent entity each fiscal

More information

Financing Agreement CONFORMED COPY CREDIT NUMBER 4201-ET. (Rural Capacity Building Project) between FEDERAL DEMOCRATIC REPUBLIC OF ETHIOPIA.

Financing Agreement CONFORMED COPY CREDIT NUMBER 4201-ET. (Rural Capacity Building Project) between FEDERAL DEMOCRATIC REPUBLIC OF ETHIOPIA. Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 4201-ET Public Disclosure Authorized Financing Agreement (Rural Capacity Building Project) Public Disclosure Authorized between FEDERAL DEMOCRATIC

More information

THE WORLD BANK BANKGROUP. DOCUMENTS 15 ap

THE WORLD BANK BANKGROUP. DOCUMENTS 15 ap Public Disclosure Authorized THE WORLD BANK BANKGROUP DOCUMENTS 15 ap Public Disclosure Authorized Hon. Patrick Anthony Chinamasa Minister of Finance and Economic Development Ministry of Finance and Economic

More information

TF ID (PEACH Grant for Sub-National Public Financial Management Capacity Building Project)

TF ID (PEACH Grant for Sub-National Public Financial Management Capacity Building Project) Public Disclosure Authorized CONFORMED COPY Letter No. CD-490/UGM/XI/2010 November 15, 2010 Public Disclosure Authorized Prof. Ir. Sudjarwadi M.Eng, Phd Rector Universitas Gadjah Mada Bulaksumur Yogyakarta

More information

DOCUMENTS GPOBA GRANT NUMBER TF Global Partnership on Output-based Aid. Grant Agreement

DOCUMENTS GPOBA GRANT NUMBER TF Global Partnership on Output-based Aid. Grant Agreement GPOBA GRANT NUMBER TF092629 DOCUMENTS Global Partnership on Output-based Aid Grant Agreement (Extending Telecommunications in Rural Indonesia Project) between REPUBLIC OF INDONESIA and INTERNATIONAL BANK

More information

AFGHANISTAN Afghanistan Reconstruction Trust Fund (Ref: TF050576)

AFGHANISTAN Afghanistan Reconstruction Trust Fund (Ref: TF050576) Public Disclosure Authorized CONFORMED COPY June 27, 2002 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Mr. Jukka Valtasaari Ambassador Embassy of Finland 3301

More information

Public Disclosure Copy. Implementation Status & Results Report Global Partnership for Education Grant for Basic Education Project (P117662)

Public Disclosure Copy. Implementation Status & Results Report Global Partnership for Education Grant for Basic Education Project (P117662) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized AFRICA Liberia Education Global Practice Recipient Executed Activities Specific Investment

More information

Trust Fund Grant Agreement

Trust Fund Grant Agreement Public Disclosure Authorized CONFORMED COPY GRANT NUMBER TF057872-GZ Public Disclosure Authorized Trust Fund Grant Agreement (Palestinian NGO-III Project) Public Disclosure Authorized between INTERNATIONAL

More information

OFFICIAL DOCUMENTS. Global Partnership for Education Fund Grant Agreement

OFFICIAL DOCUMENTS. Global Partnership for Education Fund Grant Agreement Public Disclosure Authorized OFFICIAL DOCUMENTS GRANT NUMBER TF0A4619 Public Disclosure Authorized Public Disclosure Authorized Global Partnership for Education Fund Grant Agreement (Additional Financing

More information

January 21, Hon. Patrick itch, MP Minister fo reasury Dep t of Treasury. -tc Haus 40' Floor P. aigani, 131 NCD apua New Guinea

January 21, Hon. Patrick itch, MP Minister fo reasury Dep t of Treasury. -tc Haus 40' Floor P. aigani, 131 NCD apua New Guinea Public Disclosure Authorized The World Bank 1818 H Street N.W. (202) 477-1234 INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Washington, D.C. 20433 Cable Address: INTBAFRAD INTERNATIONAL DEVELOPMENT

More information

Terms of Reference. Consultancy to support the Institutional Strengthening of the Frontier Counties Development Council (FCDC)

Terms of Reference. Consultancy to support the Institutional Strengthening of the Frontier Counties Development Council (FCDC) Terms of Reference Consultancy to support the Institutional Strengthening of the Frontier Counties Development Council (FCDC) 1. Introduction August 2016 to August 2018 1. Supporting Kenya s devolution

More information

The World Bank Skills Strengthening for Industrial Value Enhancement Operation (P156867)

The World Bank Skills Strengthening for Industrial Value Enhancement Operation (P156867) Public Disclosure Authorized SOUTH ASIA India Education Global Practice IBRD/IDA Program-for-Results FY 2017 Seq No: 1 ARCHIVED on 27-Jun-2017 ISR28685 Implementing Agencies: Ministry of Skill Development

More information

Global Partnership on Output-based Aid. Grant Agreement. GPOBA GRANT NUMBER TF I1rD

Global Partnership on Output-based Aid. Grant Agreement. GPOBA GRANT NUMBER TF I1rD GPOBA GRANT NUMBER TF091511-I1rD Global Partnership on Output-based Aid Grant Agreement (Expanding Piped Water Supply to Surabaya's Urban Poor Project) between REPUBLIC OF INDONESIA and INTERNATIONAL BANK

More information

Program Management Plan

Program Management Plan Program Management Plan Section 5310 ENHANCED MOBILITY OF SENIORS AND INDIVIDUALS WITH DISABILITIES PROGRAM Table of Contents GOALS AND OBJECTIVES... 3 ROLES AND RESPONSIBILITIES OF VIA... 3 ALAMO AREA

More information

PROJECT AND PROGRAM CYCLE POLICY. Policy: OP/PL/01 Issued on November 3, 2016

PROJECT AND PROGRAM CYCLE POLICY. Policy: OP/PL/01 Issued on November 3, 2016 PROJECT AND PROGRAM CYCLE POLICY Policy: OP/PL/01 Issued on November 3, 2016 Summary This Policy sets out the rules governing the cycles for GEF-financed Projects and Programs. Approved by GEF Council

More information

Ministry of Health (MOH) Christian Health Association of Ghana (CHAG) Memorandum of Understanding and Administrative Instructions

Ministry of Health (MOH) Christian Health Association of Ghana (CHAG) Memorandum of Understanding and Administrative Instructions Ministry of Health (MOH) Christian Health Association of Ghana (CHAG) Memorandum of Understanding and Administrative Instructions REPUBLIC OF GHANA CHAG July 2006. Table of Contents SECTION 1 INTRODUCTION...

More information

Regulation on the implementation of the European Economic Area (EEA) Financial Mechanism

Regulation on the implementation of the European Economic Area (EEA) Financial Mechanism the European Economic Area (EEA) Financial Mechanism 2009-2014 adopted by the EEA Financial Mechanism Committee pursuant to Article 8.8 of Protocol 38b to the EEA Agreement on 13 January 2011 and confirmed

More information

UNIVERSITY OF NAIROBI OFFICE OF THE DEPUTY VICE-CHANCELLOR (RESEARCH, PRODUCTION AND EXTENSION)

UNIVERSITY OF NAIROBI OFFICE OF THE DEPUTY VICE-CHANCELLOR (RESEARCH, PRODUCTION AND EXTENSION) UNIVERSITY OF NAIROBI OFFICE OF THE DEPUTY VICE-CHANCELLOR (RESEARCH, PRODUCTION AND EXTENSION) DEANS RESEARCH GRANT ALLOCATION AND ADMINISTRATION GUIDELINES 2013-2014 TABLE OF CONTENTS 1.0 BACKGROUND...

More information

Global Partnership on Output-based Aid Grant Agreement

Global Partnership on Output-based Aid Grant Agreement Public Disclosure Authorized GPOBA GRANT NUMBER TF010757 Public Disclosure Authorized Public Disclosure Authorized Global Partnership on Output-based Aid Grant Agreement (Philippines Public Health Project)

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES22380 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

FAQs REGARDING HOPWA ADMINSTRATIVE COSTS AND RELATED ISSUES 07/20/2011

FAQs REGARDING HOPWA ADMINSTRATIVE COSTS AND RELATED ISSUES 07/20/2011 FAQs REGARDING HOPWA ADMINSTRATIVE COSTS AND RELATED ISSUES 07/20/2011 I. BACKGROUND The AIDS Housing Opportunity Act, 42 U.S.C.12901 12912, authorizes the Housing Opportunities for Persons With AIDS (HOPWA)

More information

04f'33- OFFICIAL DOCUMENTS

04f'33- OFFICIAL DOCUMENTS Public Disclosure Authorized OFFICIAL DOCUMENTS 04f'33- The World Bank 1818 H Street N.W. (202) 477-1234 INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Washington, D.C. 20433 Cable Address: INTBAFRAD

More information

GRANT PROPOSAL GUIDELINES The Andrew W. Mellon Foundation. Scholarly Communications

GRANT PROPOSAL GUIDELINES The Andrew W. Mellon Foundation. Scholarly Communications As of February 5, 2018 GRANT PROPOSAL GUIDELINES The Andrew W. Mellon Foundation Scholarly Communications Applicants should consider the information below as a guide to submitting an invited proposal and

More information

Cities Alliance: Standard Operating Procedures

Cities Alliance: Standard Operating Procedures Document Version Final Date Last updated Prepared by Approved by Cities Alliance Secretariat Cities Alliance Management Board and Assembly Table of Contents Abbreviations and Acronyms...4 Glossary of Terms...5

More information

Training Facilitation and Management Guideline, 2073

Training Facilitation and Management Guideline, 2073 Facilitation and Management Guideline, 2073 Contents 1. Short title and Commencement:... 3 2. Definition:...3 3. Operation...3 4. Curriculum Arrangement:...4 5. Types of :... 5 6. Trainee Selection Method:...5

More information

EU Grant Agreement DOC8UMEW. Public Disclosure Authorized GRANT NUMBER TF0A2379. Public Disclosure Authorized. (Access to Sustainable Energy Project)

EU Grant Agreement DOC8UMEW. Public Disclosure Authorized GRANT NUMBER TF0A2379. Public Disclosure Authorized. (Access to Sustainable Energy Project) Public Disclosure Authorized DOC8UMEW GRANT NUMBER TF0A2379 Public Disclosure Authorized Public Disclosure Authorized EU Grant Agreement (Access to Sustainable Energy Project) between INTERNATIONAL BANK

More information

Global Partnership on Output-based Aid Grant Agreement

Global Partnership on Output-based Aid Grant Agreement Global Partnership on Output-based Aid GRANT NUMBERS TF057614 AND TF057615 Global Partnership on Output-based Aid Grant Agreement (Kenya - Microfinance for Community-Managed Water Projects) between K-REP

More information

Trust Fund Grant Agreement

Trust Fund Grant Agreement Public Disclosure Authorized Public Disclosure Authorized GRANT NUMBER TF016392 Trust Fund Grant Agreement (Co-financing of the Women Entrepreneurship Development Project) Public Disclosure Authorized

More information

GRANT PROPOSAL GUIDELINES The Andrew W. Mellon Foundation. Scholarly Communications

GRANT PROPOSAL GUIDELINES The Andrew W. Mellon Foundation. Scholarly Communications As of April 9, 2018 GRANT PROPOSAL GUIDELINES The Andrew W. Mellon Foundation Scholarly Communications Applicants should consider the information below as a guide to submitting an invited proposal and

More information

OCONEE COUNTY ATAX GRANT APPLICATION GUIDE (Application deadlines are February 15 and August 15)

OCONEE COUNTY ATAX GRANT APPLICATION GUIDE (Application deadlines are February 15 and August 15) OCONEE COUNTY ATAX GRANT APPLICATION GUIDE (Application deadlines are February 15 and August 15) The South Carolina Code of Laws, Title 6 - Chapter 4 provides for Accommodations Tax Provisions with oversight

More information

OFFICIAL DOCUMENTS I

OFFICIAL DOCUMENTS I Public Disclosure Authorized OFFICIAL DOCUMENTS I GPEF GRANT NUMBER TF016558 Public Disclosure Authorized Global Partnership for Education Grant Agreement (Second Education Sector Support Project) Public

More information

GRANT PROPOSAL GUIDELINES The Andrew W. Mellon Foundation. for use with proposals for the following program areas:

GRANT PROPOSAL GUIDELINES The Andrew W. Mellon Foundation. for use with proposals for the following program areas: As of February 5, 2018 GRANT PROPOSAL GUIDELINES The Andrew W. Mellon Foundation for use with proposals for the following program areas: Higher Education and Scholarship in the Humanities Diversity Public

More information

INDEPENDENT AUDITORS' REPORTS ON INTERNAL CONTROL AND ON COMPLIANCE

INDEPENDENT AUDITORS' REPORTS ON INTERNAL CONTROL AND ON COMPLIANCE (A GOVERNMENTAL FUND OF THE REPUBLIC OF THE MARSHALL ISLANDS) INDEPENDENT AUDITORS' REPORTS ON INTERNAL CONTROL AND ON COMPLIANCE YEAR ENDED SEPTEMBER 30, 2012 Deloitte & Touche LLP 361 South Marine Corps

More information

Financing Agreement. (Emergency Demobilization and Transitional Reintegration Project) between REPUBLIC OF BURUNDI. and

Financing Agreement. (Emergency Demobilization and Transitional Reintegration Project) between REPUBLIC OF BURUNDI. and Public Disclosure Authorized CONFORMED COPY GRANT NUMBER H497-BI Public Disclosure Authorized Financing Agreement (Emergency Demobilization and Transitional Reintegration Project) Public Disclosure Authorized

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE MULTI DONOR TRUST FUND FO THE INSTITUTIONAL REFORM AND CAPACITY BUILDING PROJECT TO THE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE MULTI DONOR TRUST FUND FO THE INSTITUTIONAL REFORM AND CAPACITY BUILDING PROJECT TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

OFFICIALf DOCUMENTS. Re: REPUBLIC OF DJIBOUTI JSDF Grant for Enhancing Income Opportunities Project Grant No. TFOAO350

OFFICIALf DOCUMENTS. Re: REPUBLIC OF DJIBOUTI JSDF Grant for Enhancing Income Opportunities Project Grant No. TFOAO350 Public Disclosure Authorized OFFICIALf DOCUMENTS The World Bank 1818 H Street N.W. (202) 477-1234 INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Washington, D.C. 20433 Cable Address: INTBAFRAD INTERNATIONAL

More information

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE National Consultant - Architect (Building Permit Studio)

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE National Consultant - Architect (Building Permit Studio) INDIVIDUAL CONSULTANT PROCUREMENT NOTICE National Consultant - Architect (Building Permit Studio) Date: 09 February 2018 Reference No.: UNDP/PN/06/2018 Country: Nepal Description of the assignment: As

More information

Global Environment Facility Grant Agreement

Global Environment Facility Grant Agreement Public Disclosure Authorized CONFORMED COPY GEF TF GRANT NUMBER TF097126 Public Disclosure Authorized Global Environment Facility Grant Agreement (Financing Energy Efficiency at MSMEs Project) Public Disclosure

More information

CSU COLLEGE REVIEWS. The California State University Office of Audit and Advisory Services. California State University, Sacramento

CSU COLLEGE REVIEWS. The California State University Office of Audit and Advisory Services. California State University, Sacramento CSU The California State University Office of Audit and Advisory Services COLLEGE REVIEWS California State University, Sacramento College of Arts and Letters Audit Report 15-31 May 22, 2015 EXECUTIVE SUMMARY

More information

.s US1 I OFFICIAL. DOCUMENTS T Fo/ 6 5 FROM THE AMERICAN PEOPLE

.s US1 I OFFICIAL. DOCUMENTS T Fo/ 6 5 FROM THE AMERICAN PEOPLE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized.s US1 I FROM THE AMERICAN PEOPLE Jose Luis Irigoyen Public-Private Infrastructure Advisory Facility (PPIAF) 1818 H

More information

USAID Trust Fund Grant Agreement

USAID Trust Fund Grant Agreement Public Disclosure Authorized Public Disclosure Authorized USAID GRANT NUMBER TF0A1567 USAID Trust Fund Grant Agreement (Strengthening Primary Health Care for Results Program) Public Disclosure Authorized

More information

Grant Agreement for Republic of Sudan's Readiness Preparation Proposal Readiness Fund of the FCPF Grant No. TF

Grant Agreement for Republic of Sudan's Readiness Preparation Proposal Readiness Fund of the FCPF Grant No. TF The World Bank INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT INTERNATIONAL DEVELOPMENT ASSOCIATION 1818 H Street NW. Washington, D.C. 20433 U.S.A. (202) 473-1000 Cable Address: INTBAFRAD Cable

More information

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE. Reference No.: UNDP/PN/35/2016 Date: 10 August 2015

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE. Reference No.: UNDP/PN/35/2016 Date: 10 August 2015 INDIVIDUAL CONSULTANT PROCUREMENT NOTICE National Consultant - Establishment and operation of SAIDES in Nepal Reference No.: UNDP/PN/35/2016 Date: 10 August 2015 Country: Nepal Description of the assignment:

More information

OFFICIAL DOCUMENTS, Democratic Republic of Congo: IDF Grant for the Private Sector Development and Competitiveness Project IDF Grant No.

OFFICIAL DOCUMENTS, Democratic Republic of Congo: IDF Grant for the Private Sector Development and Competitiveness Project IDF Grant No. Public Disclosure Authorized OFFICIAL DOCUMENTS, Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank 1818 H Street N.W. (202) 477-1234 INTERNATIONAL BANK

More information

MINISTRY OF SCIENCE, TECHNOLOGY AND INNOVATION, MALAYSIA PRE COMMERCIALISATION FUND (TECHNOFUND) GUIDELINES FOR APPLICANTS (10 March 2011)

MINISTRY OF SCIENCE, TECHNOLOGY AND INNOVATION, MALAYSIA PRE COMMERCIALISATION FUND (TECHNOFUND) GUIDELINES FOR APPLICANTS (10 March 2011) MINISTRY OF SCIENCE, TECHNOLOGY AND INNOVATION, MALAYSIA PRE COMMERCIALISATION FUND (TECHNOFUND) GUIDELINES FOR APPLICANTS (10 March 2011) Pre Commercialisation Fund (TechnoFund) Secretariat, Fund Section,

More information

GRANT PROPOSAL GUIDELINES The Andrew W. Mellon Foundation. International Higher Education and Strategic Projects

GRANT PROPOSAL GUIDELINES The Andrew W. Mellon Foundation. International Higher Education and Strategic Projects As of February 5, 2018 GRANT PROPOSAL GUIDELINES The Andrew W. Mellon Foundation International Higher Education and Strategic Projects Applicants should consider the information below as a guide to submitting

More information

Implementation Status & Results West Bank and Gaza Gaza II Emergency Water Project (P065920)

Implementation Status & Results West Bank and Gaza Gaza II Emergency Water Project (P065920) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results West Bank and Gaza Gaza II Emergency Water Project (P065920) Operation Name: Gaza II Emergency Water

More information

AFRICAN DEVELOPMEMENT BANK EGYPT

AFRICAN DEVELOPMEMENT BANK EGYPT AFRICAN DEVELOPMEMENT BANK Public Disclosure Authorized Public Disclosure Authorized EGYPT EMERGENCY HUMANITARIAN RELIEF ASSISTANCE TO THE VICTIMS OF THE FLOODS EGFO/GECL November 2015 Table of contents

More information

HTAi Educational Scholarship Program Guideline

HTAi Educational Scholarship Program Guideline HTAi Educational Scholarship Program Guideline I. Program Description Overview The Health Technology Assessment International (HTAi) Scholarship Program provides funding support for individuals studying

More information

Memorandum of Understanding Between The Association of University of New Brunswick Teachers (AUNBT) and The University of New Brunswick

Memorandum of Understanding Between The Association of University of New Brunswick Teachers (AUNBT) and The University of New Brunswick This MOU replaces that signed 22 January, 2007 Memorandum of Understanding Between The Association of University of New Brunswick Teachers (AUNBT) and The University of New Brunswick Subject: Mandate Clinical

More information

(Energy Development and Access Project) between INTERNATIONAL DEVELOPMENT ASSOCIATION. and ARB APEX BANK LIMITED

(Energy Development and Access Project) between INTERNATIONAL DEVELOPMENT ASSOCIATION. and ARB APEX BANK LIMITED Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 4356-GH Public Disclosure Authorized Project Agreement (Energy Development and Access Project) between Public Disclosure Authorized INTERNATIONAL

More information

between ARAB REPUBLIC OF EGYPT and

between ARAB REPUBLIC OF EGYPT and Public Disclosure Authorized GRANT NUMBER TF0A1553 Public Disclosure Authorized MIDDLE EAST AND NORTH AFRICA TRANSITION FUND Grant Agreement Public Disclosure Authorized Public Disclosure Authorized EQUAL

More information

WORKERS' COMPENSATION PROGRAM NORTH CAROLINA INDUSTRIAL COMMISSION Recommendation Follow-Up

WORKERS' COMPENSATION PROGRAM NORTH CAROLINA INDUSTRIAL COMMISSION Recommendation Follow-Up WORKERS' COMPENSATION PROGRAM NORTH CAROLINA INDUSTRIAL COMMISSION Recommendation Follow-Up RECOMMENDATION The agency should develop a comprehensive internal policies and procedures manual as well as step-by-step

More information

Sample Survey FY2009 Higher Education Survey Section 1. Pledges & Testamentary Commitments (Optional)

Sample Survey FY2009 Higher Education Survey Section 1. Pledges & Testamentary Commitments (Optional) Section 1. Pledges & Testamentary Commitments (Optional) A. Outstanding Pledges Report the number and dollar amount of new contributions pledged (unconditionally) during the fiscal year but still outstanding

More information

Solano Community Foundation Policy and Procedures for Awarding Scholarships, Fellowships and Other Grants to Individuals

Solano Community Foundation Policy and Procedures for Awarding Scholarships, Fellowships and Other Grants to Individuals Solano Community Foundation Policy and Procedures for Awarding Scholarships, Fellowships and Other Grants to Individuals Introduction: Scope and Intent of the Policy The Solano Community Foundation ("SCF")

More information

Global Partnership on Output-based Aid Grant Agreement

Global Partnership on Output-based Aid Grant Agreement Public Disclosure Authorized CONFORMED COPY GPOBA GRANT NUMBER TF096551-BD Public Disclosure Authorized Global Partnership on Output-based Aid Grant Agreement (Rural Electrification and Renewable Energy

More information

Letter No: JA-204/JSDF/IV/2010 April 29, 2010

Letter No: JA-204/JSDF/IV/2010 April 29, 2010 Public Disclosure Authorized The World Bank 1818 H Street N.W. (202) 477-1234 INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Washington, D.C. 20433 Cable Address: INTBAFRAD CONFORMED COPY Letter

More information

Procurement of Consulting Services' Direct Purchase

Procurement of Consulting Services' Direct Purchase STANDARD PROCUREMENT DOCUMENT Procurement of Consulting Services' Direct Purchase [For Assignments of value up to 0.15 Million] Issued by: Government of Nepal Ministry of Cooperatives and Poverty Alleviation

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

PROJECT PREPARATION AND DEVELOPMENT FACILITY (PPDF) Southern Africa Development Community Project Preparation and Development Facility

PROJECT PREPARATION AND DEVELOPMENT FACILITY (PPDF) Southern Africa Development Community Project Preparation and Development Facility Southern Africa Development Community Project Preparation and Development Facility OPERATIONAL GUIDELINES 13 OCTOBER 2017 With funding by the European Union & the German Government CONTENTS 1. INTRODUCTION

More information

CHARTER SCHOOL CLOSURE POLICY

CHARTER SCHOOL CLOSURE POLICY OSSE POLICY Date Issued: 03/13/13 CHARTER SCHOOL CLOSURE POLICY Introduction The Office of the State Superintendent of Education (OSSE) is responsible for all state-level educational functions as the State

More information

GRANT AGREEMENT (Special Operations) (Strengthening Public Management Program) between NEPAL. and ASIAN DEVELOPMENT BANK DATED 27 DECEMBER 2012

GRANT AGREEMENT (Special Operations) (Strengthening Public Management Program) between NEPAL. and ASIAN DEVELOPMENT BANK DATED 27 DECEMBER 2012 GRANT NUMBER 0305-NEP(SF) GRANT AGREEMENT (Special Operations) (Strengthening Public Management Program) between NEPAL and ASIAN DEVELOPMENT BANK DATED 27 DECEMBER 2012 NEP 36172 GRANT AGREEMENT (Special

More information

Rwanda Dairy Development Project. Negotiated financing agreement

Rwanda Dairy Development Project. Negotiated financing agreement Document: EB 2016/118/R.19/Sup.1 Agenda: 11(b)(ii) Date: 31 August 2016 Distribution: Public Original: English E Republic of Rwanda Rwanda Dairy Development Project Negotiated financing agreement Executive

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized AFRICA Ethiopia Finance & Markets Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 4 ARCHIVED on 06-Dec-2017 ISR30229 Implementing Agencies: National Bank

More information

(132nd General Assembly) (Amended Senate Bill Number 37) AN ACT

(132nd General Assembly) (Amended Senate Bill Number 37) AN ACT (132nd General Assembly) (Amended Senate Bill Number 37) AN ACT To enact section 109.804 of the Revised Code and to amend Section 243.20 of Am. Sub. H.B. 49 of the 132nd General Assembly to require the

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES22379 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

The Asia-Pacific Quality Register (APQR)

The Asia-Pacific Quality Register (APQR) The Asia-Pacific Quality Register (APQR) (Based on the version at Macao during 22-23 January 2015, this third version was reversed based on the suggestions from the APQR Council on October 1, 2016) ASIA

More information

GEF-7 Policy Agenda. First Meeting for the 7 th Replenishment Paris, France March 30, 2017

GEF-7 Policy Agenda. First Meeting for the 7 th Replenishment Paris, France March 30, 2017 GEF-7 Policy Agenda First Meeting for the 7 th Replenishment Paris, France March 30, 2017 Outline of policy chapter Adapting the GEF s delivery model Allocation Partnership Results Enhancing efficiency

More information

Guidelines for the scheme on Upgradation of Existing Government Industrial Training Institutes into Model ITIs - CENTRALLY SPONSORED SCHEME

Guidelines for the scheme on Upgradation of Existing Government Industrial Training Institutes into Model ITIs - CENTRALLY SPONSORED SCHEME Guidelines for the scheme on Upgradation of Existing Government Industrial Training Institutes into Model ITIs - CENTRALLY SPONSORED SCHEME 0 Project Period and cost: Remaining period of 12 th Five year

More information

Re: Philippines: Cities Alliance Multi-Donor Trust Fund: Development of the National Slum Upgrading Strategy Grant No. TF099881

Re: Philippines: Cities Alliance Multi-Donor Trust Fund: Development of the National Slum Upgrading Strategy Grant No. TF099881 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized )rid Bank 1818 H Street N.W. (202) 477-1234 ZONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

More information

STATEMENT OF POLICY PURPOSE

STATEMENT OF POLICY PURPOSE STATEMENT OF POLICY PURPOSE INDIRECT COST POLICY Winston-Salem State University receives reimbursement of Facilities and Administrative (F&A) costs related to grants and contracts and will allocate these

More information

Primary education (46%); Secondary education (26%); Public administration- Education (16%); Tertiary education (12%) Project ID

Primary education (46%); Secondary education (26%); Public administration- Education (16%); Tertiary education (12%) Project ID Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB5401 General

More information

GRANT AGREEMENT (ADB Strategic Climate Fund) (Greater Mekong Subregion Biodiversity Conservation Corridors Project Additional Financing)

GRANT AGREEMENT (ADB Strategic Climate Fund) (Greater Mekong Subregion Biodiversity Conservation Corridors Project Additional Financing) GRANT NUMBER 0426-CAM (SCF) GRANT AGREEMENT (ADB Strategic Climate Fund) (Greater Mekong Subregion Biodiversity Conservation Corridors Project Additional Financing) (Cambodia Component) between KINGDOM

More information

APRIL 2009 COMMUNITY DEVELOPMENT BLOCK GRANTS/STATE S PROGRAM NORTH CAROLINA SMALL CITIES CDBG AND NEIGHBORHOOD STABILIZATION PROGRAM

APRIL 2009 COMMUNITY DEVELOPMENT BLOCK GRANTS/STATE S PROGRAM NORTH CAROLINA SMALL CITIES CDBG AND NEIGHBORHOOD STABILIZATION PROGRAM APRIL 2009 14.228 State Project/Program: Federal Authorization: State Authorization: COMMUNITY DEVELOPMENT BLOCK GRANTS/STATE S PROGRAM NORTH CAROLINA SMALL CITIES CDBG AND NEIGHBORHOOD STABILIZATION PROGRAM

More information

Incentive Guidelines Start-Up Finance

Incentive Guidelines Start-Up Finance Incentive Guidelines Start-Up Finance 2017-2020 Issue Date: 31 st May 2017 Version: 1 http://support.maltaenterprise.com Malta Enterprise provides support to interested applicants to understand the objectives

More information

Fiduciary Arrangements for Grant Recipients

Fiduciary Arrangements for Grant Recipients Table of Contents 1. Introduction 2. Overview 3. Roles and Responsibilities 4. Selection of Principal Recipients and Minimum Requirements 5. Assessment of Principal Recipients 6. The Grant Agreement: Intended

More information

March 9, Honourable Winston Dookeran Minister of Finance Eric Williams Finance Building Independence Square Port of Spain Trinidad and Tobago

March 9, Honourable Winston Dookeran Minister of Finance Eric Williams Finance Building Independence Square Port of Spain Trinidad and Tobago Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized OFM'CIAL (116 3Y) The World Bank e NW. (202) 473-1000 INTERNATIONAL BANK FOR RECONSTRUCTION

More information

OFFICIAL DOCUMENTS. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

OFFICIAL DOCUMENTS. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized OFFICIAL DOCUMENTS SCF-SREP GRANT NUMBER TF0A1235 SIDS DOCK GRANT NUMBER TF0A1342 GFDRR

More information

GRANT APPLICATION FORM for investment grants (INV GAF)

GRANT APPLICATION FORM for investment grants (INV GAF) IDENTITY OF THE PROJECT 1 Blending Facility WBIF 2 Grant Number/code 3 Date of Steering Committee 4 Sector(s) 5 CRS-code 6 Beneficiary country 7 Name of project 8 Lead International Financial Institution

More information

Memorandum of Understanding between Pueblo Community College and the Pueblo Community College Foundation

Memorandum of Understanding between Pueblo Community College and the Pueblo Community College Foundation Page 1 of 7 Operating Protocol-Procedure #: 106 Category: Governance and Organization Office of Primary Responsibility: President s Office Issue Date: 10/8/12 Approval Date: 10/8/12 Effective Date: 10/8/12

More information

The Green Initiative Fund

The Green Initiative Fund The Green Initiative Fund MISSION STATEMENT The Green Initiative Fund (TGIF) shall aim to empower students with active roles in reducing the environmental footprint of the University of California, Irvine

More information

Grant Agreement for Islamic Republic of Pakistan's Readiness Preparation Proposal Readiness Fund of the FCPF Grant No. TF018696

Grant Agreement for Islamic Republic of Pakistan's Readiness Preparation Proposal Readiness Fund of the FCPF Grant No. TF018696 The World Bank INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT INTERNATIONAL DEVELOPMENT ASSOCIATION 1818 H Street N.W. Washington, D.C. 20433 U.S.A. (202) 473-1000 Cable Address: INTBAFRAD Cable

More information

Delayed Federal Grant Closeout: Issues and Impact

Delayed Federal Grant Closeout: Issues and Impact Delayed Federal Grant Closeout: Issues and Impact Natalie Keegan Analyst in American Federalism and Emergency Management Policy September 12, 2014 Congressional Research Service 7-5700 www.crs.gov R43726

More information

HUMBOLDT STATE UNIVERSITY SPONSORED PROGRAMS FOUNDATION

HUMBOLDT STATE UNIVERSITY SPONSORED PROGRAMS FOUNDATION HUMBOLDT STATE UNIVERSITY SPONSORED PROGRAMS FOUNDATION BASIC FINANCIAL STATEMENTS, SUPPLEMENTARY INFORMATION, AND SINGLE AUDIT REPORTS Including Schedules Prepared for Inclusion in the Financial Statements

More information

Food Price Crisis Response Trust Fund Project Agreement

Food Price Crisis Response Trust Fund Project Agreement Public Disclosure Authorized CONFORMED COPY FPCR TF GRANT NUMBER TF092343 YEM Public Disclosure Authorized Public Disclosure Authorized Food Price Crisis Response Trust Fund Project Agreement (Additional

More information

Department of Human Services Division of Medical Assistance and Health Services Transportation Broker Services Contract Capitation Rates

Department of Human Services Division of Medical Assistance and Health Services Transportation Broker Services Contract Capitation Rates New Jersey State Legislature Office of Legislative Services Office of the State Auditor Department of Human Services Division of Medical Assistance and Health Services Transportation Broker Services Contract

More information

The City of Sandusky. Community Development Block Grant Program (CDBG) Non-Profit Provider Application 501(c) 3 for Program Year 2015

The City of Sandusky. Community Development Block Grant Program (CDBG) Non-Profit Provider Application 501(c) 3 for Program Year 2015 The City of Sandusky Community Development Block Grant Program (CDBG) Non-Profit Provider Application 501(c) 3 for Program Year 2015 Non-Public Service Requests and For-Profit Applicants to use the same

More information

City of Fernley GRANTS MANAGEMENT POLICIES AND PROCEDURES

City of Fernley GRANTS MANAGEMENT POLICIES AND PROCEDURES 1 of 12 I. PURPOSE The purpose of this policy is to set forth an overall framework for guiding the City s use and management of grant resources. II ` GENERAL POLICY Grant revenues are an important part

More information

FRAMEWORK FINANCING AGREEMENT. (National Highway Development Sector Investment Program Project 1) between ISLAMIC REPUBLIC OF PAKISTAN.

FRAMEWORK FINANCING AGREEMENT. (National Highway Development Sector Investment Program Project 1) between ISLAMIC REPUBLIC OF PAKISTAN. FRAMEWORK FINANCING AGREEMENT (National Highway Development Sector Investment Program Project 1) between ISLAMIC REPUBLIC OF PAKISTAN and ASIAN DEVELOPMENT BANK DATED 29 October 2005 FRAMEWORK FINANCING

More information

AFRICAN DEVELOPMENT BANK

AFRICAN DEVELOPMENT BANK Public Disclosure Authorized Public Disclosure Authorized AFRICAN DEVELOPMENT BANK TANZANIA PROPOSAL FOR A GRANT OF US$ 1 MILLION FOR HUMANITARIAN EMERGENCY ASSISTANCE TO MITIGATE THE EFFECTS OF EARTHQUAKE

More information