1 210 N. Church Street Suite B. Visalia, California Phone (559) FAX (559) DATE: September 12, 2018 TO: FROM: RE: Interagency Consultation Partners and Public Gabriel Gutierrez, TCAG Staff Availability of Draft Amendment No. 1 to the 2019 FTIP for Interagency Consultation and Public Review The Association of Governments (TCAG) is proposing a formal amendment (Type 3) to its Board approved 2019 Federal Transportation Improvement Program (FTIP). The 2019 FTIP is the programming document that identifies four years (Federal Fiscal Years 2018/19, 19/20, 20/21, and 21/22) of federal and other funding sources for projects in. Amendment No. 1 consists of the following changes: CTIPS ID No : Visalia City Transit Bus Purchases. Changes project description from "Purchase of 17 transit buses for Visalia City Transit" to "Purchase of 7 electric transit buses for Visalia City Transit". CTIPS ID No : Grouped Projects for Bridge Rehabilitation and Reconstruction - HBP Program. Corrects the Local AC to HBP funding conversion in FY 18/19. CTIPS ID No : Grouped Projects for Safety Improvements - HSIP Program. Corrects the amount of HSIP funds programmed in FY 18/19 which was not shown correctly in the Draft FTIP. CTIPS ID No : Grouped Projects for Safety Improvements, Shoulder Improvements, Pavement Resurfacing and /or rehabilitation - Minor Program. Adds new 18/19 Minor projects to the 2019 FTIP per request from Caltrans dated 7/6/2018. CTIPS ID No : Grouped Projects for Operating Assistance to Transit Agencies. Programs updated transit operating assistance amounts per the FFY 18/19 FTA 5311 Program of Projects. CTIPS ID No : Grouped Projects for Safety Improvements - SHOPP Collision Reduction Program. Updates programming amounts in FY 18/19, 19/20, and 20/21 per the latest 2018 SHOPP Collision Reduction Program listing amended by the CTC in May CTIPS ID No : Northwest Downtown Traffic Signal Interconnections. Programs conversion of Local AC to CMAQ in FFY 18/19. CTIPS ID No : City of Tulare Solid Waste Truck Purchases. Programs conversion of Local AC to CMAQ in FFY 18/19. Dinuba Exeter Farmersville Lindsay Porterville Tulare Visalia Woodlake County of Tulare
2 CTIPS ID No : City of Porterville Solid Waste Truck Purchases (2): Programs conversion of Local AC to CMAQ in FFY 18/19. CTIPS ID No : Visalia Road (Ave 280) Improvements. Changes project limits and scope, adds Highway Infrastructure Program (HIP) funds for construction and increases Regional Measure funds for construction. CTIPS ID No : Grouped Projects for Bicycle and Pedestrian Facilities funded with Congestion Mitigaiton and Air Quality (CMAQ) funds (using toll credits). Project from Bike and Ped group listing moved from FFY 20/21 to FFY 19/20. CTIPS ID No : Grouped Projects for Pavement Resurfacing and/or Rehabilitation (STBGP). STBGP programming amounts increased for each of the agencies receiving federalized STBGP funds, per the latest STBGP apportionment estimates dated 12/12/2017. CTIPS ID No : City of Dinuba Alta and Nebraska Roundabout. Decreases CMAQ CON funds in 21/22 by $446k and increases Regional Measure CON funds in 21/22 by $446k. CTIPS ID No : State Route 190 and Westwood Roundabout and Operational Improvements. New Project added to 2019 FTIP. CTIPS ID No : Porterville Transit Charging Station Infrastructure. New project. Carried over from 2017 FTIP. Project List Attachment 1 includes a summary of programming changes that result from Amendment No. 1. These projects and/or project phases are consistent with the 2018 Regional Transportation Plan (RTP), which was adopted by TCAG on August 20, The attachment also includes the CTIPS project listings for the proposed project changes. Updated Financial Plan Attachment 2 consists of the Financial Summary Tables from the 2019 FTIP which have been updated to include the project list as provided in Attachment 1. Attachment 3 consists of the MPO Fund Type Report. Attachment 4 consists of the grouped project lists. Performance Measures The 2012 federal transportation authorization legislation, Moving Ahead for Progress in the 21st Century (MAP-21) established new requirements for performance management and reporting to ensure the most efficient investment of Federal transportation funds. To incorporate the new federal performance requirements into the Federal Transportation Improvement Program (FTIP), the Tulare County Association of Governments is required to show (1) that the FTIP makes progress towards achieving the region s performance targets and (2) that the FTIP includes, to the maximum extent practicable, a description of the anticipated effect of the FTIP towards achieving the performance targets. The projects contained within Amendment No. 1 have been developed in accordance with the applicable provisions and requirements of 23 CFR Part 450 and are expected to support the achievement of these targets. These targets will be achieved through the implementation of investment priorities through the programming of transportation projects in the 2019 FTIP, this FTIP Amendment, and subsequent FTIP Amendments and Administrative Modifications. Dinuba Exeter Farmersville Lindsay Porterville Tulare Visalia Woodlake County of Tulare
3 Conformity Requirements The proposed project changes have been determined to be exempt from the requirement that a conformity determination and/or regional emissions analysis be performed per 40 CFR , , or Because the projects are exempt, no further conformity determination is required. In addition, the project and/or project phases contained in Amendment No. 1 do not interfere with the timely implementation of any approved Transportation Control Measures (TCMs). As per TCAG s adopted 2015 Public Participation Plan, the public review and comment period is open for 14 days commencing on Wednesday, September 12, 2018 to Wednesday, September 26, Amendment No. 1 to the 2019 FTIP is posted on the TCAG website for public review at All comments are due to TCAG by Wednesday, September 26, The 2019 FTIP meets all applicable transportation planning requirements per 23 CFR Part 450, 40 CFR Part 93, and conforms to the applicable SIPs, and does not interfere with the timely implementation of approved TCMs. If you have any questions regarding this amendment or wish to submit comments please contact Gabriel Gutierrez at (559) or ggutierrez@tularecog.org. Attachment 1: Summary of Changes Table and CTIPS project listings Attachment 2: Financial Summary Tables Attachment 3: MPO Fund Type Report Attachment 4: Grouped Project Listings Dinuba Exeter Farmersville Lindsay Porterville Tulare Visalia Woodlake County of Tulare
4 Attachment 1 Summary of Changes Table and CTIPS Project Listings
5 Summary of Changes TCAG 2019 FTIP Amendment No. 1 (Type 3 - Formal Amendment) (Dollars rounded to thousands) Existing / New CTIPS ID Implementing Agency Project Title Phase Prior CTIPS Amt. Current CTIPS Amt. FFY Financial Table Fund Source Category Net Change Prior Total Project Cost Current Total Project Cost Total Project Cost Change % Change Comments Existing City of Visalia Visalia City Transit Bus Purchases No Funding Changes Changes project description from "Purchase of 17 transit buses for Visalia City Transit" to "Purchase of 7 electric transit buses for Visalia City Transit" Existing Grouped Projects for Bridge $0 $1,452,000 18/19 HBP $1,452, Various Rehabilitation and Reconstruction - HBP CON $82,323,000 $82,323,000 Program $0 ($1,452,000) 18/19 Local AC ($1,452,000) $0 0% Corrects the Local AC to HBP funding conversion in FFY 18/19. Existing Various Grouped Projects for Safety Improvements - HSIP Program CON $520,000 $550,000 18/19 HSIP $30,000 $4,323,000 $4,353,000 $30,000 1% Corrects the amount of HSIP funds programmed in FY 18/19 which was not shown correctly in the DFTIP. New Various Grouped Projects for Safety Improvements, Shoulder Improvements, Pavement Resurfacing and /or rehabilitation - Minor Program CON $0 $3,447,000 18/19 SHOPP AC $3,447,000 $0 $3,447,000 $3,447,000 New Project Adds new 18/19 Minor projects to the 2019 FTIP per request from Caltrans dated 7/6/2018. Existing Various Grouped Projects for Operating Assistance to Transit Agencies $730,000 $874,000 18/19 FTA 5311 $144,000 CON $50,876,000 $52,770,000 $1,894,000 4% $6,913,000 $8,663,000 18/19 LTF $1,750,000 Programs updated transit operating assistance amounts per the FFY 18/19 FTA 5311 Program of Projects. Existing Various Grouped Projects for Safety Improvements-SHOPP Collision Reduction Program CON $6,049,000 $6,799,000 18/19 SHOPP AC $750,000 $5,210,000 $5,977,000 19/20 SHOPP AC $767,000 $7,328,000 $9,758,000 20/21 SHOPP AC $2,430,000 $36,406,000 $40,353,000 $3,947,000 11% Updates programming amounts in FY 18/19, 19/20, and 20/21 per the latest 2018 SHOPP Collision Reduction Program listing amended by the CTC in May $0 $331,000 Prior CMAQ $331,000 $0 $76,000 Prior Regional Measure $76,000 $0 $251,000 Prior Local AC $251,000 Existing City of Visalia Northwest Downtown Traffic Signal Interconnections CON $0 $251,000 18/19 CMAQ $251,000 $790,000 $790,000 $0 0% Programs conversion of Local AC to CMAQ in FFY 18/19. $0 -$251,000 18/19 Local AC ($251,000) $582,000 $0 19/20 CMAQ ($582,000) $76,000 $0 19/20 $0 $209,000 Prior Regional Measure Local City Funds ($76,000) $209,000 $0 $1,611,000 Prior Local AC $1,611,000 Existing City of Tulare City of Tulare Solid Waste Truck Purchases $0 $1,611,000 18/19 CMAQ $1,611,000 CON $1,820,000 $1,820,000 $0 -$1,611,000 18/19 Local AC ($1,611,000) $0 0% Programs conversion of Local AC to CMAQ in FFY 18/19 $1,611,000 $0 20/21 CMAQ ($1,611,000) $209,000 $0 20/21 Local City Funds ($209,000)
6 Existing / New CTIPS ID Implementing Agency Project Title Phase Prior CTIPS Amt. Current CTIPS Amt. FFY Financial Table Fund Source Category Net Change Prior Total Project Cost Current Total Project Cost Total Project Cost Change % Change Comments $0 $489,000 Prior Local AC $489,000 $0 $64,000 Prior Regional Measure $64,000 Existing City of Porterville City of Porterville Solid Waste Truck Purchases (2) CON $0 $489,000 18/19 CMAQ $489,000 $0 -$489,000 18/19 Local AC ($489,000) $553,000 $553,000 $0 0% Programs conversion of Local AC to CMAQ in FFY 18/19 $489,000 $0 19/20 CMAQ ($489,000) $64,000 $0 19/20 Regional Measure ($64,000) $0 $700,000 Prior ROW $0 $530,000 Prior Existing City of Exeter Visalia Road (Ave 280) Improvements Regional $3,500,000 $6,020,000 $2,520,000 72% $3,500,000 $3,635,000 18/19 $135,000 Measure CON $0 $1,155,000 18/19 Regional Measure Regional Measure Highway Infrastructure Program (HIP) $700,000 $530,000 $1,155,000 Changes project limits and scope and adds Highway Infrastructure Program (HIP) funds for construction and increases Regional Measure funds for construction. $0 $1,500,000 19/20 CMAQ $1,500,000 Existing Various Grouped Projects for Bicycle and Pedestrian Facilities funded with Congestion Mitigaiton and Air Quality (CMAQ) funds (using toll credits) Regional $0 $195,000 19/20 $195,000 Measure CON $5,360,000 $5,360,000 $0 0% $1,500,000 $0 20/21 CMAQ ($1,500,000) Project from Bike and Ped group listing moved from FFY 20/21 to FFY 19/20 $195,000 $0 20/21 Regional Measure ($195,000) $2,772,000 $2,992,000 18/19 STBGP $220,000 Existing Various Grouped Projects for Pavement Resurfacing and/or Rehabilitation (STBGP) $2,772,000 $2,992,000 19/20 STBGP $220,000 CON $32,888,000 $33,768,000 $880,000 3% $2,772,000 $2,992,000 20/21 STBGP $220,000 STBGP programming amounts increased for each of the agencies receiving federalized STBGP funds. Per the latest STBGP apportionment estimates dated 12/12/2017. $2,772,000 $2,992,000 21/22 STBGP $220,000 Existing City of Dinuba City of Dinuba Alta and Nebraska Roundabout CON $1,461,000 $1,015,000 21/22 CMAQ ($446,000) $189,000 $635,000 21/22 Regional Measure $446,000 $2,077,000 $2,077,000 $0 0% Decreases CMAQ CON funds in 21/22 by $446k and increases Regional Measure CON funds in 21/22 by $446k.
7 Existing / New CTIPS ID Implementing Agency Project Title Phase Prior CTIPS Amt. Current CTIPS Amt. FFY Financial Table Fund Source Category Net Change Prior Total Project Cost Current Total Project Cost Total Project Cost Change % Change Comments New Caltrans State Route 190 and Westwood Roundabout and Operational Improvements $0 $1,210,000 18/19 ROW $0 $1,500,000 19/20 Regional Measure Regional Measure $1,210,000 $1,500,000 CON $0 $735,000 20/21 CMAQ $735,000 $0 $8,960,000 $8,960,000 New Project New Project added to 2019 FTIP. CON $0 $5,515,000 20/21 Regional Measure $5,515,000 $0 $110,000 Prior LTF $110,000 New City of Porterville Porterville Transit Charging Station Infrastructure CON $0 $2,210,000 20/21 FTA 5307 $2,210,000 CON $0 $950,000 20/21 LTF $950,000 $0 $4,070,000 $4,070,000 New Project New project. Carried over from 2017 FTIP. CON $0 $800,000 20/21 CMAQ $800,000 Note: Prior years amounts shown for informational purposes only. The total net change does not include the prior year amounts shown in the summary table. Total $21,377,000 Summary of Net Increases and Decreases by Federal Fiscal Year Fund Source 18/19 19/20 20/21 21/22 Total CMAQ $2,351,000 $429,000 ($1,576,000) ($446,000) $758,000 FTA 5307 $0 $0 $2,210,000 $0 $2,210,000 FTA 5311 $144,000 $0 $0 $0 $144,000 HBP $1,452,000 $0 $0 $0 $1,452,000 Highway Infrastructure Program (HIP) $1,155,000 $0 $0 $0 $1,155,000 HSIP $30,000 $0 $0 $0 $30,000 Local AC ($3,803,000) $0 $0 $0 ($3,803,000) Local City Funds $0 $0 ($209,000) $0 ($209,000) LTF $1,750,000 $0 $950,000 $0 $2,700,000 Regional Measure $1,345,000 $1,555,000 $5,320,000 $446,000 $8,666,000 SHOPP AC $4,197,000 $767,000 $2,430,000 $0 $7,394,000 STBGP $220,000 $220,000 $220,000 $220,000 $880,000 Total $8,841,000 $2,971,000 $9,345,000 $220,000 $21,377,000
8 DIST: 06 CT PROJECT ID: COUNTY: Association of Governments - Federal Transportation Improvement Program Transit System PPNO: EA: CTIPS ID: ROUTE: MPO ID.: TUL PM: TITLE (DESCRIPTION): Visalia City Transit Bus Purchases (In Visalia: Purchase of 7 electric transit buses for Visalia City Transit. (2018 RTP, Table F-6, page C-14)) MPO Aprv: State Aprv: Federal Aprv: EPA TABLE II or III EXEMPT CATEGORY Purchase new buses and rail cars to replace exist. IMPLEMENTING AGENCY: Visalia, City of PROJECT MANAGER: Carmen Quevedo PHONE: (559) carmen.quevedo@visalia.city PROJECT VERSION HISTORY (Printed Version is Shaded) (Dollars in whole) Version Status Date Updated By Change Reason Amend No. Prog Con Prog 2 Active 09/06/2018 GGUTIERR Amendment - Cost/Scope/Sch. Change 1 10,880,000 1 Official 08/20/2018 GGUTIERR Adoption - Carry Over 0 10,880,000 * CMAQ - * Fund Source 1 of 2 * Fund Type: Congestion Mitigation * Funding Agency: Federal Highway Administration (FHWA) CON 2,254,000 2,254,000 Total: 2,254,000 2,254,000 * Local Funds - * Fund Source 2 of 2 * Fund Type: City Funds * Funding Agency: Visalia, City of CON 8,626,000 8,626,000 Total: 8,626,000 8,626,000 Project Total: CON 10,880,000 10,880,000 Total: 10,880,000 10,880,000 Comments: ******** Version 2-09/06/2018 ********Amendment No. 1. Changes project description from "Purchase of 17 transit buses for Visalia City Transit" to "Purchase of 7 electric transit buses for Visalia City Transit".//gg ******** Version 1-04/03/18 ******** Carryover from 2017 FTIP. Project data transfered from 2016 FTIP. ******** Version 1-07/12/2016 ********New project for 2017 FTIP.//gg Products of CTIPS Page 1 09/06/ :21:03
9 DIST: 06 CT PROJECT ID: COUNTY: Association of Governments - Federal Transportation Improvement Program Transit System PPNO: EA: CTIPS ID: ROUTE: MPO ID.: TUL PM: TITLE (DESCRIPTION): Visalia City Transit Bus Purchases (In Visalia: Purchase of 17 transit buses for Visalia City Transit. (2018 RTP, Table F-6, page C-14)) MPO Aprv: 08/20/2018 State Aprv: Federal Aprv: EPA TABLE II or III EXEMPT CATEGORY Purchase new buses and rail cars to replace exist. IMPLEMENTING AGENCY: Visalia, City of PROJECT MANAGER: Carmen Quevedo PHONE: (559) carmen.quevedo@visalia.city PROJECT VERSION HISTORY (Printed Version is Shaded) (Dollars in whole) Version Status Date Updated By Change Reason Amend No. Prog Con Prog 1 Official 08/20/2018 GGUTIERR Adoption - Carry Over 0 10,880,000 * CMAQ - * Fund Source 1 of 2 * Fund Type: Congestion Mitigation * Funding Agency: Federal Highway Administration (FHWA) CON 2,254,000 2,254,000 Total: 2,254,000 2,254,000 * Local Funds - * Fund Source 2 of 2 * Fund Type: City Funds * Funding Agency: Visalia, City of CON 8,626,000 8,626,000 Total: 8,626,000 8,626,000 Project Total: CON 10,880,000 10,880,000 Total: 10,880,000 10,880,000 Comments: ******** Version 1-04/03/18 ******** Carryover from 2017 FTIP. Project data transfered from 2016 FTIP. ******** Version 1-07/12/2016 ********New project for 2017 FTIP.//gg Products of CTIPS Page 1 09/06/ :08:24
10 DIST: 06 CT PROJECT ID: COUNTY: Association of Governments - Federal Transportation Improvement Program State Highway System PPNO: EA: CTIPS ID: ROUTE: MPO ID.: TUL PM: TITLE (DESCRIPTION): Grouped Projects for Bridge Rehabilitation and Reconstruction-HBP Program (In : Grouped Projects for Bridge Rehabilitation and Reconstruction-HBP Program (Using Toll Credits). (2018 RTP, Table F-15, page C-26)) MPO Aprv: State Aprv: Federal Aprv: EPA TABLE II or III EXEMPT CATEGORY Pavement resurfacing and/or rehabilitation. IMPLEMENTING AGENCY: Various Agencies PROJECT MANAGER: Jason Vivian PHONE: (559) jvivian@co.tulare.ca.us PROJECT VERSION HISTORY (Printed Version is Shaded) (Dollars in whole) Version Status Date Updated By Change Reason Amend No. Prog Con Prog 2 Active 09/12/2018 GGUTIERR Amendment - Cost/Scope/Sch. Change 1 82,323,000 1 Official 08/20/2018 GGUTIERR Adoption - Carry Over 0 82,323,000 * Local HBRR - * Fund Source 1 of 3 * Fund Type: Highway Bridge Program * Funding Agency: Federal Highway Administration (FHWA) CON 14,367,000 1,452,000 4,463, ,000 58,909,000 79,324,000 Total: 14,367,000 1,452,000 4,463, ,000 58,909,000 79,324,000 * Local Funds - * Fund Source 2 of 3 * Fund Type: County Funds * Funding Agency: CON 54, ,000 17,000 2,484,000 2,999,000 Total: 54, ,000 17,000 2,484,000 2,999,000 * Local Funds - * Fund Source 3 of 3 * Fund Type: Local Transportation Funds - Advance Construction * Funding Agency: CON 1,452,000-1,452,000 Total: 1,452,000-1,452,000 Project Total: CON 15,873,000 4,907, ,000 61,393,000 82,323,000 Total: 15,873,000 4,907, ,000 61,393,000 82,323,000 Products of CTIPS Page 1 09/12/ :35:19
11 Association of Governments - Federal Transportation Improvement Program State Highway System Comments: ******** Version 2-09/06/2018 ********Amendment No. 1. Corrects the Local AC to HBP funding conversion in FFY 18/19.//gg ******** DFTIP Version 1-04/10/2018********Carry over from 2017 FTIP ******** Version 19-11/28/2017 ********Amendment No. 11. Changes made in accordance with HBP Lump Sum Project list dated 10/26/2017. Requested by Caltrans via dated 10/31/2017.//gg ******** Version 18-04/28/2017 ********Amendment No. 2 (A-Mod). Changes made in accordance with HBP Lump Sum Project list dated 3/29/2017. Requested by Caltrans via dated 4/5/2017.//gg ******** Version 17-01/25/2017 ********Amendment No. 1. Revisions made in accordance with HBP Individually listed project list. Amendment requested by Caltrans via dated 11/4/2016.//gg ******** Version 1-06/24/16 ********Project data transfered from 2014 FTIP.//gg ******** Version 14-04/28/2016 ********Amendment No. 16. Updates the Highway Bridge Program (HBP) grouped project listing as reflected in the latest HBP backup list dated 3/26/2016 per from Abhijit Bagde dated 4/4/2016.//gg ******** Version 13-11/24/2015 ********Amendment No. 14. Updates the Highway Bridge Program (HBP) grouped project listing as reflected in the latest HBP backup list dated 10/30/2015 per from Abhijit Bagde on 11/4/2015//gg ******** Version 12-04/23/2015 ********Amendment No. 6 (A-MOD). Highway Bridge Program grouped projects listing update per from Abhijit Bagde received on 3/27/15.//gg ******** Version 11-12/22/2014 ********Amendment No. 2 to make changes per Caltrans' updated lump sum HBP backup list dated 10/29/14. //gg ******** DFTIP Version 1-04/01/2014 ******** Carry over from 2013 FTIP//GG ******** Version 8-12/02/2013 ********Requested by CaltransAbhijit Bagde, by dated 11/21/2013 to update the bridge lump sum. GG ******** Version 7-04/03/2013 ********Requested by CaltransAbhijit Bagde, by dated 4/2/2013 to update the bridge lump sum. EW ******** Version 6-01/30/2013 ******** dated 11/6/2012 Dear MPO FTIP Coordinator, The note below provides information on an update to the Local Assistance Highway Bridge Program (HBP). Please program these projects in your 2013 FTIP through the next FTIP administrative modification/amendment. Note that this information replaces the project lists dated 03/22/2012 which were transmitted to you on April 3, The information below along with the detailed (back-up) listings is posted on Caltrans HBP website. The link is included in the note below. Please contact Eric Bost at (916) (by at eric.bost@dot.ca.gov), or Linda Newton at (916) (by at linda.newton@dot.ca.gov) should you have any questions on the information below. Thank you. Abhijit J. Bagde, P.E. Senior Transportation Engineer Division of Transportation Programming Office of Federal Trans. Mgmt. Program (916) , CALNET ******** Version 1-05/09/12 ********Revised 3/23/2012-9:37AM List-Back up list on Caltrans website Project data transfered from 2010 FTIP. 4-3/2012 Dear MPO FTIP Coordinator, The note below provides information on an update to the Local Assistance (HBP). This information is to be used for updating programming from the current 2011 FTIP, and for developing your 2013 FTIP. Please program these projects in your 2011 FTIP through the next FTIP administrative modification/amendment. Note that this information replaces the project lists dated 10/24/2011which were transmitted to you on October 31, The information below along with the detailed (back-up) listings is posted on Caltrans HBP website. The link is included in the note below. Please contact Eric Bost at (916) (by at eric.bost@dot.ca.gov), or Linda Newton at (916) (by at linda.newton@dot.ca.gov) should you have any questions on the information below. Thank you. Abhijit J. Bagde, P.E. Senior Transportation Engineer Division of Transportation Programming Office of Federal Trans. Mgmt. Program (916) , CALNET FAX: (916) ******** Version 4-12/06/2011 ********Requested by Caltrans Thomas Glaski, verified by Caltrans HBR website to update the Lump Sum Highway Bridge program to match the 2010/ /16 Highway Bridge Program List dated 11/10/2011, 9:20 AM. dated 11/16/2011 back up list is provided at EW ******** Version 3-04/04/2011 ********Requested by Caltrans Abhijit J. Bagde to updated Bridge List, by dated 4/4/11. Back up list provided on website at -EW ******** Version 2-03/28/2011 ********Toll Credits Programmed for & Con. as requested by Caltrans Bridge list 11/20/ dated 11/22/10. ******** Version 1-02/03/2011 ********Requested by Caltrans, Thomas Glaski, Muhaned Aljabiry HBR-Bridge Program List. dated 11/22/10 to add Lump Sum Bridges with back up list located on Caltrans Website -EW Products of CTIPS Page 2 09/12/ :35:19
12 DIST: 06 CT PROJECT ID: COUNTY: Association of Governments - Federal Transportation Improvement Program State Highway System PPNO: EA: CTIPS ID: ROUTE: MPO ID.: TUL PM: TITLE (DESCRIPTION): Grouped Projects for Bridge Rehabilitation and Reconstruction-HBP Program (In : Grouped Projects for Bridge Rehabilitation and Reconstruction-HBP Program (Using Toll Credits). (2018 RTP, Table F-15, page C-26)) MPO Aprv: 08/20/2018 State Aprv: Federal Aprv: EPA TABLE II or III EXEMPT CATEGORY Pavement resurfacing and/or rehabilitation. IMPLEMENTING AGENCY: Various Agencies PROJECT MANAGER: Jason Vivian PHONE: (559) jvivian@co.tulare.ca.us PROJECT VERSION HISTORY (Printed Version is Shaded) (Dollars in whole) Version Status Date Updated By Change Reason Amend No. Prog Con Prog 1 Official 08/20/2018 GGUTIERR Adoption - Carry Over 0 82,323,000 * Local HBRR - * Fund Source 1 of 3 * Fund Type: Highway Bridge Program * Funding Agency: Federal Highway Administration (FHWA) CON 14,367,000 4,463, ,000 58,909,000 77,872,000 Total: 14,367,000 4,463, ,000 58,909,000 77,872,000 * Local Funds - * Fund Source 2 of 3 * Fund Type: County Funds * Funding Agency: CON 54, ,000 17,000 2,484,000 2,999,000 Total: 54, ,000 17,000 2,484,000 2,999,000 * Local Funds - * Fund Source 3 of 3 * Fund Type: Local Transportation Funds - Advance Construction * Funding Agency: CON 1,452,000 1,452,000 Total: 1,452,000 1,452,000 Project Total: CON 15,873,000 4,907, ,000 61,393,000 82,323,000 Total: 15,873,000 4,907, ,000 61,393,000 82,323,000 Products of CTIPS Page 1 09/06/ :09:32
13 Association of Governments - Federal Transportation Improvement Program State Highway System Comments: ******** DFTIP Version 1-04/10/2018********Carry over from 2017 FTIP ******** Version 19-11/28/2017 ********Amendment No. 11. Changes made in accordance with HBP Lump Sum Project list dated 10/26/2017. Requested by Caltrans via dated 10/31/2017.//gg ******** Version 18-04/28/2017 ********Amendment No. 2 (A-Mod). Changes made in accordance with HBP Lump Sum Project list dated 3/29/2017. Requested by Caltrans via dated 4/5/2017.//gg ******** Version 17-01/25/2017 ********Amendment No. 1. Revisions made in accordance with HBP Individually listed project list. Amendment requested by Caltrans via dated 11/4/2016.//gg ******** Version 1-06/24/16 ********Project data transfered from 2014 FTIP.//gg ******** Version 14-04/28/2016 ********Amendment No. 16. Updates the Highway Bridge Program (HBP) grouped project listing as reflected in the latest HBP backup list dated 3/26/2016 per from Abhijit Bagde dated 4/4/2016.//gg ******** Version 13-11/24/2015 ********Amendment No. 14. Updates the Highway Bridge Program (HBP) grouped project listing as reflected in the latest HBP backup list dated 10/30/2015 per from Abhijit Bagde on 11/4/2015//gg ******** Version 12-04/23/2015 ********Amendment No. 6 (A-MOD). Highway Bridge Program grouped projects listing update per from Abhijit Bagde received on 3/27/15.//gg ******** Version 11-12/22/2014 ********Amendment No. 2 to make changes per Caltrans' updated lump sum HBP backup list dated 10/29/14. //gg ******** DFTIP Version 1-04/01/2014 ******** Carry over from 2013 FTIP//GG ******** Version 8-12/02/2013 ********Requested by CaltransAbhijit Bagde, by dated 11/21/2013 to update the bridge lump sum. GG ******** Version 7-04/03/2013 ********Requested by CaltransAbhijit Bagde, by dated 4/2/2013 to update the bridge lump sum. EW ******** Version 6-01/30/2013 ******** dated 11/6/2012 Dear MPO FTIP Coordinator, The note below provides information on an update to the Local Assistance Highway Bridge Program (HBP). Please program these projects in your 2013 FTIP through the next FTIP administrative modification/amendment. Note that this information replaces the project lists dated 03/22/2012 which were transmitted to you on April 3, The information below along with the detailed (back-up) listings is posted on Caltrans HBP website. The link is included in the note below. Please contact Eric Bost at (916) (by at eric.bost@dot.ca.gov), or Linda Newton at (916) (by at linda.newton@dot.ca.gov) should you have any questions on the information below. Thank you. Abhijit J. Bagde, P.E. Senior Transportation Engineer Division of Transportation Programming Office of Federal Trans. Mgmt. Program (916) , CALNET ******** Version 1-05/09/12 ********Revised 3/23/2012-9:37AM List-Back up list on Caltrans website Project data transfered from 2010 FTIP. 4-3/2012 Dear MPO FTIP Coordinator, The note below provides information on an update to the Local Assistance (HBP). This information is to be used for updating programming from the current 2011 FTIP, and for developing your 2013 FTIP. Please program these projects in your 2011 FTIP through the next FTIP administrative modification/amendment. Note that this information replaces the project lists dated 10/24/2011which were transmitted to you on October 31, The information below along with the detailed (back-up) listings is posted on Caltrans HBP website. The link is included in the note below. Please contact Eric Bost at (916) (by at eric.bost@dot.ca.gov), or Linda Newton at (916) (by at linda.newton@dot.ca.gov) should you have any questions on the information below. Thank you. Abhijit J. Bagde, P.E. Senior Transportation Engineer Division of Transportation Programming Office of Federal Trans. Mgmt. Program (916) , CALNET FAX: (916) ******** Version 4-12/06/2011 ********Requested by Caltrans Thomas Glaski, verified by Caltrans HBR website to update the Lump Sum Highway Bridge program to match the 2010/ /16 Highway Bridge Program List dated 11/10/2011, 9:20 AM. dated 11/16/2011 back up list is provided at EW ******** Version 3-04/04/2011 ********Requested by Caltrans Abhijit J. Bagde to updated Bridge List, by dated 4/4/11. Back up list provided on website at -EW ******** Version 2-03/28/2011 ********Toll Credits Programmed for & Con. as requested by Caltrans Bridge list 11/20/ dated 11/22/10. ******** Version 1-02/03/2011 ********Requested by Caltrans, Thomas Glaski, Muhaned Aljabiry HBR-Bridge Program List. dated 11/22/10 to add Lump Sum Bridges with back up list located on Caltrans Website -EW Products of CTIPS Page 2 09/06/ :09:32
14 DIST: 06 CT PROJECT ID: COUNTY: Association of Governments - Federal Transportation Improvement Program Local Highway System PPNO: EA: CTIPS ID: ROUTE: MPO ID.: TUL PM: TITLE (DESCRIPTION): Grouped Proejcts for Safety Improvements - HSIP Program (Grouped Proejcts for Safety Improvements - HSIP Program. Throughout. (2018 RTP, Table F-14, page C-23)) MPO Aprv: State Aprv: Federal Aprv: EPA TABLE II or III EXEMPT CATEGORY Safety Improvement Program. IMPLEMENTING AGENCY: Various Agencies PROJECT MANAGER: GABRIEL GUTIERREZ PHONE: (559) ggutierrez@tularecog.org PROJECT VERSION HISTORY (Printed Version is Shaded) (Dollars in whole) Version Status Date Updated By Change Reason Amend No. Prog Con Prog 2 Active 09/06/2018 GGUTIERR Amendment - Cost/Scope/Sch. Change 1 4,353,000 1 Official 08/20/2018 GGUTIERR Adoption - Carry Over 0 4,323,000 * Other Fed - * Fund Source 1 of 3 * Fund Type: Highway Safety Improvement Program * Funding Agency: Federal Highway Administration (FHWA) CON 337, , ,000 2,345,000 3,980,000 Total: 337, , ,000 2,345,000 3,980,000 * Local Funds - * Fund Source 2 of 3 * Fund Type: County Funds * Funding Agency: CON 290, ,000 Total: 290, ,000 * Local Funds - * Fund Source 3 of 3 * Fund Type: City Funds * Funding Agency: Various Agencies CON 39,000 44,000 83,000 Total: 39,000 44,000 83,000 Project Total: CON 337, , ,000 2,635,000 4,353,000 Total: 337, , ,000 2,635,000 4,353,000 Comments: ******** Version 2-09/06/2018 ********Amendment No. 1. Corrects the amount of HSIP funds programmed in FY 18/19 which were not shown correctly in the DFTIP.//gg ******** Version 1-04/03/18 ******** Carryover from 2017 FTIP. Project data transfered from 2016 FTIP. ******** Version 14-03/07/2018 ********Amendment No. 15 (A-Mod) adds $606,592 in STBGP funds to HSIP in FFY 17/18.//gg ******** Version 13-01/21/2017 ********Amendment No. 1. Revisions made in accordance with HSIP Grouped Project list. Amendment requested by Caltrans via dated 12/7/2016.//gg ******** DFTIP Version 1-07/19/2016********Carry over from 2015 FTIP.//gg ******** Version 10-07/18/2016 ********Amendment No. 19 (AMOD). Adds additional HSIP funds to group listed HSIP Project No. HSIP , as approved by Caltrans HSIP Program Manager via on June 30, 2016.//gg ******** Version 9-07/07/2016 ********Amendment No. 18 (AMOD). Updates the Highway Safety Improvement Program (HSIP) grouped project listing as requested by Richard Ke, Caltrans Local Assistance via on 6/30/16.//gg ******** Version 8-11/24/2015 ********Amendment No. 14. Updates the Highway Safety Improvement Program (HSIP) grouped project listing as reflected in the latest HSIP backup list dated 11/12/2015 per from Lilibeth Green, Caltrans.//gg ******** Version 7-08/13/2015 ********HSIP Grouped Project listing updated per from Abhijit Bagde received on 7/17/2015.//gg ******** Version 6-04/23/2015 ********Amendment No. 6 (A-MOD). Highway Safety Improvement Program grouped projects listing update per from Abhijit Bagde received on 3/27/15. Includes toll credits effective until 9/30/16 for Cycle 6 Projects (HSIP6). /gg ******** Version 5-01/12/2015 ********Amendment No. 3 (Administrative Modification) to update grouped project listing to match current HSIP Program list released on 11/21/14.//gg ******** DFTIP Version 2-09/15/2014 ********Revise funding for HSIP projects per updated HSIP back-up list from Caltrans dated 6/4/14.//GG ******** DFTIP Version 1-01/28/2014 ********Carry over from 2013 FTIP -GG ******** Version 2-12/02/2013 ********Changes from cycle 6-- from Abhijit Bagde (11/20/13).-GG ******** Version 1-12/19/2012 ********Projects included are in Farmersville, Porterville, Tulare,, Visalia see group listing back up list for project details dated 10/24/2012 as submitted by Caltrans Richard Ke Safety Program Coordinator and Abhijit Bagde, HQ dated 10/29/2012.-EW Products of CTIPS Page 1 09/06/ :28:09
15 DIST: 06 CT PROJECT ID: COUNTY: Association of Governments - Federal Transportation Improvement Program Local Highway System PPNO: EA: CTIPS ID: ROUTE: MPO ID.: TUL PM: TITLE (DESCRIPTION): Grouped Proejcts for Safety Improvements - HSIP Program (Grouped Proejcts for Safety Improvements - HSIP Program. Throughout. (2018 RTP, Table F-14, page C-23)) MPO Aprv: 08/20/2018 State Aprv: Federal Aprv: EPA TABLE II or III EXEMPT CATEGORY Safety Improvement Program. IMPLEMENTING AGENCY: Various Agencies PROJECT MANAGER: GABRIEL GUTIERREZ PHONE: (559) ggutierrez@tularecog.org PROJECT VERSION HISTORY (Printed Version is Shaded) (Dollars in whole) Version Status Date Updated By Change Reason Amend No. Prog Con Prog 1 Official 08/20/2018 GGUTIERR Adoption - Carry Over 0 4,323,000 * Other Fed - * Fund Source 1 of 3 * Fund Type: Highway Safety Improvement Program * Funding Agency: Federal Highway Administration (FHWA) CON 337, , ,000 2,345,000 3,950,000 Total: 337, , ,000 2,345,000 3,950,000 * Local Funds - * Fund Source 2 of 3 * Fund Type: County Funds * Funding Agency: CON 290, ,000 Total: 290, ,000 * Local Funds - * Fund Source 3 of 3 * Fund Type: City Funds * Funding Agency: Various Agencies CON 39,000 44,000 83,000 Total: 39,000 44,000 83,000 Project Total: CON 337, , ,000 2,635,000 4,323,000 Total: 337, , ,000 2,635,000 4,323,000 Comments: ******** Version 1-04/03/18 ******** Carryover from 2017 FTIP. Project data transfered from 2016 FTIP. ******** Version 14-03/07/2018 ********Amendment No. 15 (A-Mod) adds $606,592 in STBGP funds to HSIP in FFY 17/18.//gg ******** Version 13-01/21/2017 ********Amendment No. 1. Revisions made in accordance with HSIP Grouped Project list. Amendment requested by Caltrans via dated 12/7/2016.//gg ******** DFTIP Version 1-07/19/2016********Carry over from 2015 FTIP.//gg ******** Version 10-07/18/2016 ********Amendment No. 19 (AMOD). Adds additional HSIP funds to group listed HSIP Project No. HSIP , as approved by Caltrans HSIP Program Manager via on June 30, 2016.//gg ******** Version 9-07/07/2016 ********Amendment No. 18 (AMOD). Updates the Highway Safety Improvement Program (HSIP) grouped project listing as requested by Richard Ke, Caltrans Local Assistance via on 6/30/16.//gg ******** Version 8-11/24/2015 ********Amendment No. 14. Updates the Highway Safety Improvement Program (HSIP) grouped project listing as reflected in the latest HSIP backup list dated 11/12/2015 per from Lilibeth Green, Caltrans.//gg ******** Version 7-08/13/2015 ********HSIP Grouped Project listing updated per from Abhijit Bagde received on 7/17/2015.//gg ******** Version 6-04/23/2015 ********Amendment No. 6 (A-MOD). Highway Safety Improvement Program grouped projects listing update per from Abhijit Bagde received on 3/27/15. Includes toll credits effective until 9/30/16 for Cycle 6 Projects (HSIP6). /gg ******** Version 5-01/12/2015 ********Amendment No. 3 (Administrative Modification) to update grouped project listing to match current HSIP Program list released on 11/21/14.//gg ******** DFTIP Version 2-09/15/2014 ********Revise funding for HSIP projects per updated HSIP back-up list from Caltrans dated 6/4/14.//GG ******** DFTIP Version 1-01/28/2014 ********Carry over from 2013 FTIP -GG ******** Version 2-12/02/2013 ********Changes from cycle 6-- from Abhijit Bagde (11/20/13).-GG ******** Version 1-12/19/2012 ********Projects included are in Farmersville, Porterville, Tulare,, Visalia see group listing back up list for project details dated 10/24/2012 as submitted by Caltrans Richard Ke Safety Program Coordinator and Abhijit Bagde, HQ dated 10/29/2012.-EW Products of CTIPS Page 1 09/06/ :10:17
16 DIST: 06 CT PROJECT ID: COUNTY: Association of Governments - Federal Transportation Improvement Program State Highway System PPNO: EA: CTIPS ID: ROUTE: MPO ID.: TUL PM: TITLE (DESCRIPTION): Grouped Projects for Safety Improvements, Shoulder Improvements, Pavement Resurfacing and /or rehabilitation - Minor Program (Grouped Projects for Safety Improvements, Shoulder Improvements, Pavement Resurfacing and /or rehabilitation - Minor Program. Throughout. (Using Toll Credits) (2018 RTP, Table F-5, page C-14)) MPO Aprv: State Aprv: Federal Aprv: EPA TABLE II or III EXEMPT CATEGORY Pavement resurfacing and/or rehabilitation. IMPLEMENTING AGENCY: Caltrans PROJECT MANAGER: Stephen Tracey PHONE: (559) stephen.tracey@dot.ca.gov PROJECT VERSION HISTORY (Printed Version is Shaded) (Dollars in whole) Version Status Date Updated By Change Reason Amend No. Prog Con Prog 1 Active 09/06/2018 GGUTIERR Amendment - New Project 1 3,447,000 * CT Minor Pgm. - * Fund Source 1 of 1 * Fund Type: SHOPP Advance Construction (AC) * Funding Agency: Federal Highway Administration (FHWA) CON 3,447,000 3,447,000 Total: 3,447,000 3,447,000 Comments: ******** DFTIP Version 1-09/06/2018********Amendment No. 1. Adds new 18/19 Minor projects to the 2019 FTIP per request from Caltrans dated 7/6/2018.//gg ******** Version 7-07/16/2018 ********Amendment No. 19 (Type 3). Adds new Minor projects to group list as requested by Caltrans.//gg ******** Version 6-07/24/2017 ********Amendment No. 8. Adds one new project to the Minor Program Group List. Project added to existing group list with no projects currently programmed in the 4-year element of the 2017 FTIP.//gg ******** DFTIP Version 1-07/19/2016********Carry over from 2015 FTIP.//gg ******** Version 4-07/30/2015 ********Amendment No. 12. Adds three new projects in FFY 15/16 to the Minor Program. Requested by A. Bagde, Caltrans via received 7/1/2015.//gg ******** DFTIP Version 2-09/15/2014 ********Revised funding for State Minor program per udated Minor Program back-up list form Caltrans dated 7/8/14.//GG ******** DFTIP Version 1-01/23/2014 ********Carry over from 2013 FTIP -GG ******** Version 1-07/23/2013 ******** **Requested by Abhijit Bagde to program the State Highway Maintenance projects for FY 2013/14. dated 6.26/2013.-EW State Minors Program Highway Grouped Projects in. Products of CTIPS Page 1 09/06/ :34:13
17 DIST: 06 CT PROJECT ID: COUNTY: Association of Governments - Federal Transportation Improvement Program Transit System PPNO: EA: CTIPS ID: ROUTE: MPO ID.: TUL PM: TITLE (DESCRIPTION): Grouped Projects for Operating Assistance to Transit Agencies (In : Grouped Projects for Operating Assistance to Transit Agencies. (2018 RTP, Table F-4, page C-11)) MPO Aprv: State Aprv: Federal Aprv: EPA TABLE II or III EXEMPT CATEGORY Transit operating assistance. IMPLEMENTING AGENCY: Various Agencies PROJECT MANAGER: Elizabeth Forte PHONE: (559) eforte@tularecog.org PROJECT VERSION HISTORY (Printed Version is Shaded) (Dollars in whole) Version Status Date Updated By Change Reason Amend No. Prog Con Prog 2 Active 09/06/2018 GGUTIERR Amendment - Cost/Scope/Sch. Change 1 52,770,000 1 Official 08/20/2018 GGUTIERR Adoption - Carry Over 0 50,876,000 * FTA Funds - * Fund Source 1 of 3 * Fund Type: FTA Urbanized Area Formula Program * Funding Agency: Federal Highway Administration (FHWA) CON 5,076,000 5,076,000 5,076,000 5,076,000 20,304,000 Total: 5,076,000 5,076,000 5,076,000 5,076,000 20,304,000 * FTA Funds - * Fund Source 2 of 3 * Fund Type: FTA Non Urbanized * Funding Agency: Federal Highway Administration (FHWA) CON 874, , , ,000 3,064,000 Total: 874, , , ,000 3,064,000 * Local Funds - * Fund Source 3 of 3 * Fund Type: Local Transportation Funds * Funding Agency: Various Agencies CON 8,663,000 6,913,000 6,913,000 6,913,000 29,402,000 Total: 8,663,000 6,913,000 6,913,000 6,913,000 29,402,000 Project Total: CON 14,613,000 12,719,000 12,719,000 12,719,000 52,770,000 Total: 14,613,000 12,719,000 12,719,000 12,719,000 52,770,000 Comments: ******** Version 2-09/06/2018 ********Amendment No. 1. Programs updated transit operating assistance amounts per the FFY 18/19 FTA 5311 Program of Projects.//gg ******** Version 1-04/03/18 ******** Carryover from 2017 FTIP. ******** Version 4-03/01/2018 ******** Amendment No. 14. Increases the FTA 5307 and LTF programming amounts from $1,214,000 to $1,350,000 for FFYs 17/18 to 19/20.//gg ******** Version 3-05/12/2017 ********Amendment No. 4. Programming of FTA 5311 Program of Projects for FFYs 2016/17 and 2017/18. Requested by E. Forte.//gg ******** Version 2-05/10/2017 ********Adds FTA funds from prior FTIP to FFY 16/17 in the current FTIP for Tulare City Transit operations assistance. Fund type is FTA The amounts and corresponding FFY's are as follows: FFY12/13 - $152,058, FFY 13/14 - $467,482, FFY 14/15 - $497,455, and FFY 15/16 - $594,846. Amendment also deletes one FTA 5311f project from group list. Requested by E. Forte on 5/9/17.//gg ******** Version 1-06/24/2016 ********New grouped project listing added to 2017 FTIP.//gg Products of CTIPS Page 1 09/06/ :36:45
18 DIST: 06 CT PROJECT ID: COUNTY: Association of Governments - Federal Transportation Improvement Program Transit System PPNO: EA: CTIPS ID: ROUTE: MPO ID.: TUL PM: TITLE (DESCRIPTION): Grouped Projects for Operating Assistance to Transit Agencies (In : Grouped Projects for Operating Assistance to Transit Agencies. (2018 RTP, Table F-4, page C-11)) MPO Aprv: 08/20/2018 State Aprv: Federal Aprv: EPA TABLE II or III EXEMPT CATEGORY Transit operating assistance. IMPLEMENTING AGENCY: Various Agencies PROJECT MANAGER: Elizabeth Forte PHONE: (559) eforte@tularecog.org PROJECT VERSION HISTORY (Printed Version is Shaded) (Dollars in whole) Version Status Date Updated By Change Reason Amend No. Prog Con Prog 1 Official 08/20/2018 GGUTIERR Adoption - Carry Over 0 50,876,000 * FTA Funds - * Fund Source 1 of 3 * Fund Type: FTA Urbanized Area Formula Program * Funding Agency: Federal Highway Administration (FHWA) CON 5,076,000 5,076,000 5,076,000 5,076,000 20,304,000 Total: 5,076,000 5,076,000 5,076,000 5,076,000 20,304,000 * FTA Funds - * Fund Source 2 of 3 * Fund Type: FTA Non Urbanized * Funding Agency: Federal Highway Administration (FHWA) CON 730, , , ,000 2,920,000 Total: 730, , , ,000 2,920,000 * Local Funds - * Fund Source 3 of 3 * Fund Type: Local Transportation Funds * Funding Agency: Various Agencies CON 6,913,000 6,913,000 6,913,000 6,913,000 27,652,000 Total: 6,913,000 6,913,000 6,913,000 6,913,000 27,652,000 Project Total: CON 12,719,000 12,719,000 12,719,000 12,719,000 50,876,000 Total: 12,719,000 12,719,000 12,719,000 12,719,000 50,876,000 Comments: ******** Version 1-04/03/18 ******** Carryover from 2017 FTIP. ******** Version 4-03/01/2018 ******** Amendment No. 14. Increases the FTA 5307 and LTF programming amounts from $1,214,000 to $1,350,000 for FFYs 17/18 to 19/20.//gg ******** Version 3-05/12/2017 ********Amendment No. 4. Programming of FTA 5311 Program of Projects for FFYs 2016/17 and 2017/18. Requested by E. Forte.//gg ******** Version 2-05/10/2017 ********Adds FTA funds from prior FTIP to FFY 16/17 in the current FTIP for Tulare City Transit operations assistance. Fund type is FTA The amounts and corresponding FFY's are as follows: FFY12/13 - $152,058, FFY 13/14 - $467,482, FFY 14/15 - $497,455, and FFY 15/16 - $594,846. Amendment also deletes one FTA 5311f project from group list. Requested by E. Forte on 5/9/17.//gg ******** Version 1-06/24/2016 ********New grouped project listing added to 2017 FTIP.//gg Products of CTIPS Page 1 09/06/ :12:41
19 DIST: 06 CT PROJECT ID: COUNTY: Association of Governments - Federal Transportation Improvement Program State Highway System PPNO: EA: CTIPS ID: ROUTE: MPO ID.: TUL PM: TITLE (DESCRIPTION): Grouped Projects for Safety Improvements-SHOPP Collision Reduction Program (In : Grouped Projects for Safety Improvements-SHOPP Collision Reduction Program (Using Toll Credits). (2018 RTP, Table F-2, page C-7)) MPO Aprv: State Aprv: Federal Aprv: EPA TABLE II or III EXEMPT CATEGORY Safety Improvement Program. IMPLEMENTING AGENCY: Caltrans PROJECT MANAGER: CALTRANS PHONE: (559) PROJECT VERSION HISTORY (Printed Version is Shaded) (Dollars in whole) Version Status Date Updated By Change Reason Amend No. Prog Con Prog 2 Active 09/06/2018 GGUTIERR Amendment - Cost/Scope/Sch. Change 1 40,353,000 1 Official 08/20/2018 GGUTIERR Adoption - Carry Over 0 36,406,000 * SHOPP - Collision Reduction - * Fund Source 1 of 1 * Fund Type: SHOPP Advance Construction (AC) * Funding Agency: Caltrans CON 1,623,000 6,799,000 5,977,000 9,758,000 16,196,000 40,353,000 Total: 1,623,000 6,799,000 5,977,000 9,758,000 16,196,000 40,353,000 Comments: ******** Version 2-09/06/2018 ********Amendment No. 1. Updates programming amounts in FY 18/19, 19/20, and 20/21 per the latest 2018 SHOPP Collision Reduction Program listing amended by the CTC in May 2018.//gg ******** Version 1-04/03/18 ******** Carryover from 2017 FTIP. Project data transfered from 2016 FTIP. ******** DFTIP Version 1-06/23/2016 ********Carry over from 2015 FTIP.//gg ******** Version 13-04/28/2016 ********Amendment No. 16. Updates the SHOPP Collision Reduction Program listing as reflected in the 2016 SHOPP approved by the CTC in March Also programs funds for the new project in the current 2015 FTIP as requested by Caltrans.//gg ******** Version 12-07/29/2015 ********Update to SHOPP Collision Reduction Program as shown on most recent Lump Sum report dated 7/13/2015.//gg ******** Version 11-02/18/2015 ********Add new project to SHOPP Collision Reduction Program Grouped Project Listing. Project added to SHOPP via Amendment No. 14H-327. Requested by Stephen Tracy, Caltrans via dated 2/10/15.//gg ******** Version 10-01/12/2015 ********Amendment No. 3 (Administrative Modification) updates the grouped project listing to match current SHOPP Collision Reduction list released on 12/16/14.//gg ******** DFTIP Version 1-04/01/2014 ******** Carry over from 2013 FTIP//GG ******** Version 7-04/03/2013 ********Requested by Caltrans Stephen Tracy dated 4/2/2013. To update the Shopp Colllision Reduction program-adding project to the Lump Sum listing. Memorandum from Rachel Falsetti Shopp amendment 12H-201 to 12H-210 dated March 25, EW ******** Version 1-05/09/12 ******** Project data transfered from 2010 FTIP. ******** Version 5-03/29/2010 ********Carryover into the 2011 FTIP.-EW ******** Version 4-03/16/2010 ********Amended to match Caltrans Back up list sent by Caltrans Stephen Tracy adding funds to FY 11/12 $2,396,000 Pe, $615,000 to and $1487 to Construction. EW ******** Version 3-12/06/2009 ********Requested by Caltrans Stephen Tracy. dated 9/17/09 and 11/30/09 and phone call. Needs amendment to beging design work on Oakdale signal in Tulare.-EW ******** Version 2-05/14/2008 ********Carry over to the 2008/09 FTIP. -EW ******** Version 1-06/11/2007 *********Converting project to Lump Sum SHOPP-Collision Reduction. Requested by Penny Gray CT HQ. 4/27/07. Phone call 6/11/07.-EW Products of CTIPS Page 1 09/06/ :41:20
Annual Listing of Projects with Federal Funding for Federal Fiscal Year 2014/15
Annual Listing of Projects with Federal Funding for Federal Fiscal Year 2014/15 210 N. Church Street, Suite B Visalia, CA 93291 Phone: (559) 623-0450 Fax: (559) 733-6720 Website: www.tularecog.org Purpose
More informationRegional Planning Partnership
Regional Planning Partnership Item #3 Action February 21, 2018 Amendment #20 to the 2017-20 Metropolitan Transportation Improvement Program Issue: Should the Regional Planning Partnership Committee recommend
More informationMEMORANDUM. February 12, Interagency Transit Committee Members and Interested Parties. Anthony Zepeda, Associate Regional Planner
MEMORANDUM February 12, 2014 To: Fr: Re: Interagency Transit Committee Members and Interested Parties Anthony Zepeda, Associate Regional Planner Cancellation of February 19, 2014 ITC Meeting The Interagency
More informationAppendix E: Grant Funding Sources
Appendix E: Grant Funding Sources Federal Programs The majority of public funds for bicycle, pedestrian, and trails projects are derived through a core group of federal and state programs. Federal funding
More informationOverview of Local Highway Safety Improvement Program (HSIP)
Overview of Local Highway Safety Improvement Program (HSIP) For Public Works Officers Institute & Expo March 22, 2017 Richard Ke, P.E. HSIP Manager Division of Local Assistance California Department of
More informationStaff Recommendation:
ITEM 14 Action March 29, 2017 Approval to Amend the FY 2017-2022 Transportation Improvement Program (TIP) for the Washington Metropolitan Area Transit Authority (WMATA) Staff Recommendation: Issues: Background:
More informationUnderstanding the. Program
Understanding the Transportation Improvement Program Aka: TIP 101 Transportation Improvement Program (TIP) Federally Mandated for all MPO s by USDOT Short Range (no more than four years) All federally
More informationKYOVA Interstate Planning Commission
KYOVA Interstate Planning Commission Sub-allocated Funding Process and Application Package This packet includes information and guidance about the process used by KYOVA Interstate Planning Commission to
More informationAPPENDIX 5. Funding Plan
STUDY: FINAL REPORT APPENDIX 5 Funding Plan May 2015 V:\2073\active\2073009060\report\DRAFT Final Report\rpt_MalPCH_DRAFTFinalReport-20150515.docx Pacific Coast Highway Safety Study: Funding Plan City
More informationFFY Transportation Improvement Program
Lawton Metropolitan Planning Organization DRAFT FFY 2018-2021 Transportation Improvement Program Approved, 2017 The Federal Fiscal Years (FFY) 2018-2021 Transportation Improvement Program (TIP) is updated
More informationFormal STIP Amendment
FHWA/FTA AND MNDOT GUIDANCE FOR FORMAL STIP AMENDMENTS AND ADMINISTRATIVE STIP MODIFICATIONS Effective: April 15, 2015 The STIP may be updated periodically throughout the course of the year for project
More informationRegional Transportation Plan/Sustainable Communities Strategy Roundtable (RTP Roundtable) MEETING AGENDA
210 N. Church Street, Suite B. Visalia, California 93291 (559) 623-0450 FAX (559) 733-6720 www.tularecog.org Regional Transportation Plan/Sustainable Communities Strategy Roundtable (RTP Roundtable) MEETING
More informationAgenda. Tulare County Association of Governments Railroad Advisory Committee
210 N. Church St. Suite B Visalia, California 93292 (559)623-0450 FAX (559)733-6720 www.tularecog.org Agenda Tulare County Association of Governments Railroad Advisory Committee Tuesday, July 28, 2015
More information2018 POLICY FRAMEWORK FOR PSRC S FEDERAL FUNDS
2018 POLICY FRAMEWORK FOR PSRC S FEDERAL FUNDS TABLE OF CONTENTS Section 1: Background... 3 A. Policy Framework... 3 B. Development of the 2019-2022 Regional Transportation Improvement Program (TIP)..
More information2007 Annual List of Obligated Projects
This document is available in accessible formats when requested five days in advance. This document was prepared and published by the Memphis Metropolitan Planning Organization and is prepared in cooperation
More informationNATIONAL CAPITAL REGION TRANSPORTATION PLANNING BOARD 777 North Capitol Street, N.E. Washington, D.C
NATIONAL CAPITAL REGION TRANSPORTATION PLANNING BOARD 777 North Capitol Street, N.E. Washington, D.C. 20002 TPB SR22-2017 May 5, 2017 RESOLUTION ON AN AMENDMENT TO THE FY 2017-2022 TRANSPORTATION IMPROVEMENT
More informationOverview of the Regional Transportation Improvement Program
Overview of the 2017-2020 Regional Transportation Improvement Program Table of Contents What is the Puget Sound Regional Council (PSRC)?... 1 What is the Transportation Improvement Program (TIP)?... 1
More informationMANAGEMENT AND FINANCE COMMITTEE STANCOG BOARD ROOM 1111 I STREET, SUITE 308 MODESTO, CA WEDNESDAY, JANUARY 4, :00 PM
City of Ceres City of Hughson City of Modesto City of Newman City of Oakdale City of Patterson City of Riverbank City of Turlock City of Waterford County of Stanislaus MANAGEMENT AND FINANCE COMMITTEE
More informationSAN JOAQUIN COUNCIL OF GOVERNMENTS
SAN JOAQUIN COUNCIL OF GOVERNMENTS TECHNICAL ADVISORY COMMITTEE SJCOG Conference Room 555 E. Weber Avenue, Stockton, CA 95202 Thursday, October 8, 2015 10:00 A.M. Teleconference Number:(650) 479-3208 Participant
More informationTransportation Improvement Program
Transportation Improvement Program Transportation Conformity Check List The Transportation Improvement Program (TIP) and all amendments must include a conformity report. The conformity report must address
More informationTransportation Improvement Program for Lake, Porter, and LaPorte Counties, Indiana for
Transportation Improvement Program for Lake, Porter, and LaPorte Counties, Indiana for 2012-2015 Part II: TIP Development and Project Selection Processes MPO Planning Process The NIRPC Board of Commissioners
More informationOhio Statewide Urban Congestion Mitigation/Air Quality (CMAQ) Program 2013
Ohio Statewide Urban Congestion Mitigation/Air Quality (CMAQ) Program 2013 Contents Page Preface 2 Background and Purpose 2 General Guidelines 3 Eligibility 4 Policies 5 Administration 6 Solicitation and
More informationStaff Report. Allocation of Congestion Management and Air Quality Improvement Program Funding
ITEM 7B Staff Report Subject: Contact: Allocation of Congestion Management and Air Quality Improvement Program Funding Eric Cowle, Transportation Program Manager (ecowle@cvag.org) Recommendation: Consider
More informationLAP Manual 7-1 February 2014 Compliance Assessment Program Requirements
LAP Manual 7-1 February 2014 Compliance Assessment Program Requirements CHAPTER 8 PROJECT INITIATION AND AUTHORIZATION SUMMARY Ensuring that a project is funded appropriately and included in all required
More informationTransportation Funding Terms and Acronyms Unraveling the Jargon
Funding Terms and Acronyms Unraveling the Jargon Every profession has its own acronyms and jargon. The shorthand wording makes it easier and quicker for professionals in any given field to communicate
More informationMINUTES WINSTON-SALEM URBAN AREA TRANSPORTATION ADVISORY COMMITTEE (TAC) NOVEMBER 18, :15 P.M. FIFTH FLOOR, PUBLIC MEETING ROOM, BRYCE A
MINUTES WINSTON-SALEM URBAN AREA TRANSPORTATION ADVISORY COMMITTEE (TAC) NOVEMBER 18, 2010 4:15 P.M. FIFTH FLOOR, PUBLIC MEETING ROOM, BRYCE A. STUART MUNICIPAL BUILDING MEMBERS PRESENT: Margaret Bessette,
More informationPRESENTER: Chris Blunk, Deputy Public Works Director/City Engineer
G-7 STAFF REPORT MEETING DATE: September 26, 2017 TO: City Council FROM: Chris Blunk, Deputy Public Works Director/City Engineer PRESENTER: Chris Blunk, Deputy Public Works Director/City Engineer 922 Machin
More informationDCHC MPO Funding Source Overview & Guidance draft January 2015
DCHC MPO ing Overview & Guidance draft January 2015 General Ratio APD Bond R CMAQ DP SHRP Appalachian Development Highway Revenue Bond Congestion Mitigation and Air Quality Demonstration, Priority, and
More informationFixing America s Surface Transportation Act: FAST Act Implications for the Region
Fixing America s Surface Transportation Act: FAST Act Implications for the Region Connie Kozlak Metropolitan Transportation Services Mark Fuhrmann Metro Transit Ed Petrie Metro Transit Metropolitan Council
More informationThe next steps outlined at the end of this section are the key requirements as we can best envision them at this stage.
5 Implementation 5.1 Anticipated Caltrans Review Process... 2 5.1.1 Project Initiation Document and Project Report... 2 5.1.2 Environmental Review Process... 4 5.1.3 Right of Way Acquisition Process...
More informationContents. FY 2014 YEAR END REPORT Kalamazoo Area Transportation Study
KATS 5220 Lovers Lane, Suite 110 Portage, MI 49002 PHONE: (269) 343-0766 EMAIL: info@katsmpo.org WEB: www.katsmpo.org FY 2014 YEAR END REPORT FOR THE KALAMAZOO AREA TRANSPORTATION STUDY December 2014 Contents
More informationWELCOME TO THE KALAMAZOO AREA TRANSPORTATION STUDY
WELCOME TO THE KALAMAZOO AREA TRANSPORTATION STUDY (269) 343-0766 www.katsmpo.org Kalamazoo Area Transportation Study @KATSMPO Purpose of Training 1. Discuss the Purpose, Products, and Structure of a Metropolitan
More informationCALVERT - ST. MARY S METROPOLITAN PLANNING ORGANIZATION
CALVERT - ST. MARY S METROPOLITAN PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM FISCAL YEARS 2015-2018 Calvert County Planning Commission St. Mary s County Department of County Services Plaza
More informationMAP-21: Overview of Project Delivery Provisions
MAP-21: Overview of Project Delivery Provisions This paper provides an overview of the project delivery provisions in the Moving Ahead for Progress in the 21st Century Act (MAP-21). It also briefly summarizes
More informationMOVE LV. Show Us the $ + Transportation Funding May 25, 2016, 12 PM MOVE LEHIGH VALLEY
MOVE LV Show Us the $ + Transportation Funding May 25, 2016, 12 PM MOVE LEHIGH VALLEY Services PLANNING DATA + ANALYSIS EDUCATION PROJECTS + LAWS FUNDING Federal Government State Government Regional
More informationOhio Department of Transportation. Transportation Funding for LPAs
Ohio Department of Transportation Transportation Funding for LPAs Christopher L. Brown, P.E., District Three LPA Errol R. Scholtz, E.I., District Three LPA John R. Kasich, Governor Jerry Wray, Director
More informationSAFETEA-LU. Overview. Background
SAFETEA-LU This document provides information related to the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) that was previously posted on the Center for
More informationRe: Public Comment Period DRAFT Fiscal Years Transportation Improvement Program Amendment
Public Works Department Working Together for a Better Tomorrow, Today April 12, 2017 Re: Public Comment Period DRAFT Fiscal Years 2018-2022 Transportation Improvement Program Amendment The Grand Island
More informationIntentional blank page. Los Angeles County Metropolitan Transportation Authority
Intentional blank page Los Angeles County Metropolitan Transportation Authority TABLE OF CONTENTS INTRODUCTION... 1 OVERVIEW... 2 SECTION I: FUND LISTING AND ELIGIBILITY CHART... 5 SECTION II: FUNDING
More informationFY May Quarterly Revision AUSTIN DISTRICT
FY 2013-2016 STIP STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM May Quarterly Revision AUSTIN DISTRICT HIGHWAY May 2013 Approved 4/08/2013 FYs 2013-2016 TIP Amendment Project Description 1 2 3 4 5 6
More informationMissoula Urban Transportation Planning Process Public Participation Plan Prepared by
Missoula Urban Transportation Planning Process Public Participation Plan Prepared by Development Services Transportation Division Adopted: Revisions Approved by: In cooperation with City Of Missoula County
More informationNational Capital Region Transportation Planning Board
National Capital Region Transportation Planning Board 777 North Capitol Street, N.E., Suite 300, Washington, D.C. 20002-4290 (202) 962-3310 Fax: (202) 962-3202 Item #5 MEMORANDUM January 8, 2010 To: From:
More informationTransportation Alternatives Program (TAP) Recreational Trails Program (RTP)
Transportation Alternatives Program (TAP) Recreational Trails Program (RTP) www.fhwa.dot.gov/environment/transportation_alternatives/overview/presentation/ 1 Transportation Alternatives Program Authorized
More informationPlease complete your phone connection now:
Today s seminar will begin shortly. Please complete your phone connection now: 1. Dial the toll free number: 1-866-275-3495. 2. Enter the meeting number *4671867* on your phone keypad. Enter the star (*)
More informationTRANSPORTATION IMPROVEMENT PROGRAM REVISION 23 A M E N D M E N T F E D E R A L F I S C A L Y E A R S
TRANSPORTATION IMPROVEMENT PROGRAM F E D E R A L F I S C A L Y E A R S 2 1 5 2 1 8 REVISION 23 A M E N D M E N T TRANSPORTATION IMPROVEMENT PROGRAM FEDERAL FISCAL YEARS 215-218 FINAL DRAFT Revision 23
More informationLPA Programs How They Work
LPA Programs How They Work Ann Wills, P.E. Transportation Engineering Conference 2018 www.dotd.la.gov Requirements For ALL LPA Projects 1. Risk Assessment 2. Entity-State Agreement 3. Responsible Charge
More informationTHE 411 ON FEDERAL & STATE TRANSPORTATION FUNDING - FHWA
THE 411 ON FEDERAL & STATE TRANSPORTATION FUNDING - FHWA Catherine McCreight, MBA Senior Transportation Planner Texas Department of Transportation - Houston District Houston-Galveston Area Council Bringing
More informationNORTH DAKOTA SIDE TRANSPORTATION IMPROVEMENT PROGRAM
NORTH DAKOTA SIDE TRANSPORTATION IMPROVEMENT PROGRAM 2018-2021 December, 2017 The preparation of this report was partially financed by FHWA/FTA Planning funds through the North Dakota Department of Transportation
More informationMegan P. Hall, P.E. Local Programs Engineer. Federal Highway Administration Washington Division. March 14, 2017
Megan P. Hall, P.E. Local Programs Engineer Federal Highway Administration Washington Division March 14, 2017 1 Transportation Alternatives (TA) Recreational Trails Program (RTP) www.fhwa.dot.gov/environment/transportation_alternatives/overview/presentation/
More informationFISCAL YEAR OVERALL WORK PROGRAM
FISCAL YEAR 2017-2018 OVERALL WORK PROGRAM 369 West 18 th Street Merced, CA 95340 Phone: (209) 723-3153 Fax: (209) 723-0322 www.mcagov.org Partnering For Regional Solutions TABLE OF CONTENTS INTRODUCTION........
More informationMAP-21 and Its Effects on Transportation Enhancements
Date: July 13, 2012 Subject: MAP-21 and Its Effects on Transportation Enhancements The recently enacted Moving Ahead for Progress in the 21 st Century (MAP-21) includes a number of substantial changes
More informationPurpose. Funding. Eligible Projects
SMART SCALE is a statewide program that distributes funding based on a transparent and objective evaluation of projects that will determine how effectively they help the state achieve its transportation
More informationMississippi Gulf Coast Metropolitan Planning Organization. Transportation Improvement Program FY
Mississippi Gulf Coast Metropolitan Planning Organization Transportation Improvement Program FY 2015-2019 November 2015 The Metropolitan Planning Organization (MPO) is a federally mandated planning body
More informationAssociation of Metropolitan Planning Organizations Fixing America s Surface Transportation (FAST) Act
Association of Metropolitan Planning Organizations Fixing America s Surface Transportation (FAST) Act General Overview Total authorizations (Highway Trust Fund, HTF, Contract Authority plus General Funds
More informationSummary of. Overview. existing law. to coal ash. billion in FY. funding in FY 2013 FY 2014
H.R. 4348, THE MOVING AHEAD FOR PROGRESS IN THE 21ST CENTURY ACT CONFERENCE REPORT Summary of Key Highway and Research Provisions The following summary is intended to highlight thee highway and research
More informationNavigating MAP 21. Securing Federal Funding for Community Walking & Biking Projects
Navigating MAP 21 Securing Federal Funding for Community Walking & Biking Projects Presenters Dave Tyahla NRPA Christopher Douwes Federal Highway Administration Margo Pedroso Safe Routes to School National
More information2018 Call for Projects Guidebook
2018 Call for Projects Guidebook Project Selection for the NFRMPO CMAQ, STBG, and TA Programs in FY2022 and FY2023 October 8, 2018 Table of Contents Introduction... 2 Section 1 - Call Overview... 2 1.1
More informationAppendix 5 Freight Funding Programs
5. Chapter Heading Appendix 5 Freight Programs Table of Contents 4.1 Surface Transportation Block Grant (STBG);... 5-1 4.2 Transportation Investment Generating Economic Recovery Discretionary Grant Program
More informationREPORT TO MAYOR AND COUNCIL
AGENDA ITEM NO..d REPORT TO MAYOR AND COUNCIL TO THE HONORABLE MAYOR AND COUNCIL: DATE: July, SUBJECT: ADOPT RESOLUTION NOS. -, -, -, - AND -0 OF LOCAL SUPPORT AUTHORIZING THE FILING OF APPLICATIONS FOR
More informationAppendix E Federal and State Funding Categories
Appendix E Federal and State Funding Categories This page left blank intentionally. Federal and State Funding Categories Appendix E E 3 Appendix E Federal and State Funding Categories Highway Programs
More informationNORTH DAKOTA SIDE TRANSPORTATION IMPROVEMENT PROGRAM
NORTH DAKOTA SIDE TRANSPORTATION IMPROVEMENT PROGRAM 2018-2021 December, 2017 The preparation of this report was partially financed by FHWA/FTA Planning funds through the North Dakota Department of Transportation
More informationMiTIP APPLICATION PACKET
SFY 2022-2023 Illustrative Projects 2018-2021 INDIANAPOLIS REGIONAL TRANSPORTATION IMPROVEMENT PROGRAM (IRTIP) MiTIP APPLICATION PACKET Indianapolis Metropolitan Planning Organization October 2017 This
More informationRESOLUTION FOR APPROVAL OF AMENDMENTS TO THE TRANSPORTATION IMPROVEMENT PROGRAM (TIP) AND 2040 REGIONAL TRANSPORTATION PLAN (RTP)
TPC Agenda Item 6A Mailout 10/20/16 RESOLUTION FOR APPROVAL OF AMENDMENTS TO THE 2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM (TIP) AND 2040 REGIONAL TRANSPORTATION PLAN (RTP) Amendment Summary Amendment
More informationStaff Approve Resolution R to amend the FY TIP.
ITEM 11 Action April 19, 2017 Approval to Amend the FY 2017-2022 (TIP) to add nine New Projects to the FY 2017-2022 TIP, As Requested By the Virginia Department of Transportation (VDOT) Staff Recommendation:
More informationRESOLUTION OF THE BOARD OF DIRECTORS OF THE OHIO KENTUCKY INDIANA REGIONAL COUNCIL OF GOVERNMENTS
OKI 2015 RESOLUTION OF THE BOARD OF DIRECTORS OF THE OHIO KENTUCKY INDIANA REGIONAL COUNCIL OF GOVERNMENTS CONCERNING AMENDMENT #1 OF THE FISCAL YEARS 2016 2019 TRANSPORTATION IMPROVEMENT PROGRAM WHEREAS,
More informationNon-Motorized Transportation Funding Options
Non-Motorized Transportation Funding Options Bicycle and pedestrian projects are broadly eligible for funding from nearly all major federal highway, transit, safety, and other programs. To be eligible
More informationCIRTPA Small Community Fund Application
CIRTPA Small Community Fund Application November 2017 2 P a g e Schedule and Decision Making Process November 16, 2017 January 18, 2018 Application process approved by CIRTPA Policy Committee and posted
More informationTRANSPORTATION IMPROVEMENT PROGRAM FY 2013
Kankakee Metropolitan Planning Organization Policy Committee Paul Schore, Chairman Mayor Village of Bourbonnais Nina Epstein, Vice-Chairman Mayor City of Kankakee Bruce Adams, Mayor Village of Bradley
More informationCounty Executive Office/Legislative Affairs. County of Orange Report on Grant Applications/Awards
AttachmentA County Executive Office/Legislative Affairs DRAFT September 27, 2016 Item No. 41 Vol. XXXlX, No. 17 County of Orange Report on Grant Applications/Awards The Grants Report is a condensed list
More information9. REVENUE SOURCES FEDERAL FUNDS
9. REVENUE SOURCES This Chapter summarizes multimodal revenue sources and estimates that are applicable to the City of Coolidge and the Town of Florence, together with financial constraints and opportunities
More informationCass County Rural Task Force Call for Projects Deadline: December 12, 2018
Cass County Rural Task Force 2020-2023 Call for Projects Deadline: December 12, 2018 The Southwest Michigan Planning Commission (SWMPC) is pleased to announce the Call for Projects for the Cass County
More informationSMALL CITY PROGRAM. ocuments/forms/allitems.
SMALL CITY PROGRAM The Small City Program provides Federal funds to small cities with populations from 5,000 to 24,999 that are NOT located within Metropolitan Planning Organizations' boundaries. Currently
More informationStatewide Performance Program (SPP) Interstate and National Highway System (NHS) Pavement
Transportation Improvement Program (STIP) Guidance Updated December, 0 wide Performance Program (SPP) Interstate and National Highway System (NHS) Pavement The wide Performance Program (SPP) Pavement is
More informationDraft MAPA FY2019-FY2024 Transportation Improvement Program
Draft MAPA FY2019-FY2024 Transportation Improvement Program Introduction 1.1 Metropolitan Area Planning Agency Overview The Omaha-Council Bluffs Metropolitan Area Planning Agency (MAPA) is a voluntary
More informationTable to accompany Insight on the Issues 39: Policy Options to Improve Specialized Transportation
Table to accompany Insight on the Issues 39: Policy Options to Improve Specialized Transportation Key Characteristics of the Section 5310, JARC, and New Freedom Programs Formal name Elderly Individuals
More informationINTRODUCTION... 1 OVERVIEW... 2 SECTION I: FUND LISTING AND ELIGIBILITY CHART... 5 SECTION II: FUNDING SOURCE DESCRIPTIONS... 8
TABLE OF CONTENTS INTRODUCTION... 1 OVERVIEW... 2 SECTION I: FUND LISTING AND ELIGIBILITY CHART... 5 SECTION II: FUNDING SOURCE DESCRIPTIONS... 8 LOCAL FUNDING SOURCES... 8 PROPOSITION A... 8 PROPOSITION
More informationCFLHD Organizational and Program Overview FEDERAL LAND ACCESS PROGRAM (FLAP) 55 th ACE Annual Conference
CFLHD Organizational and Program Overview FEDERAL LAND ACCESS PROGRAM (FLAP) 55 th ACE Annual Conference - 2016 Topics to Share Federal Lands Access Program History Funding Type of Projects PDC FLMA Coordination
More informationAnnual Listing of Federal Obligation Projects FFY
Annual Listing of Federal Obligation Projects FFY 2014-15 1111 "I" Street, Suite 308 Modesto, CA 95354 www.stancog.org TABLE OF CONTENTS Purpose of the Report... 2 About the Stanislaus Council of Governments...
More informationThe Atlanta Region s Plan RTP/ FY TIP Amendment #4. Transportation Coordinating Committee January 5, 2018
The Atlanta Region s Plan RTP/ FY 2018-2023 TIP Amendment #4 Transportation Coordinating Committee January 5, 2018 What s in Amendment #4? 2017 TIP Project Solicitation Funding Commitments Exempt projects
More information2018 Regional Transportation Improvement Program
2018 Regional Transportation Improvement Program Fiscal Years 2018/19 through 2022/2023 Adopted November 15, 2017 Stanislaus Council of Governments 1111 I Street Suite 308 Modesto, CA 95354 www.stancog.org
More informationCentre County Metropolitan Planning Organization (CCMPO) Coordinating Committee Meeting Tuesday, March 22, :00 p.m.
Centre County Metropolitan Planning Organization (CCMPO) Coordinating Committee Meeting Tuesday, March 22, 2011 6:00 p.m. Please Note the Location: Ferguson Township Municipal Building 1. Call to Order
More informationMoving Ahead for Progress in the 21 st Century (MAP-21)
Moving Ahead for Progress in the 21 st Century (MAP-21) Transportation Alternatives Program (TAP) ATP 6 Discussion June 28, 2013 Minnesota Overview: MAP-21 vs. SAFETEA-LU Overall apportionment consistent
More informationSCOTT COUNTY COMMUNITY SERVICES DIVISION
SCOTT COUNTY COMMUNITY SERVICES DIVISION PHYSICAL DEVELOPMENT 600 COUNTRY TRAIL EAST JORDAN, MN 55352-9339 (952) 496-8346 Fax: (952) 496-8365 www.co.scott.mn.us MITCHELL J. RASMUSSEN, P.E. COUNTY ENGINEER
More informationSafety Projects and the Local Agency Program (LAP)
Safety Projects and the Local Agency Program (LAP) Wednesday, January 8, 2014 Lawrence Taylor Consultant D7 Safety/LAP Project Manager Workshop Series Wed. Oct. 30 Wed. Nov. 6 Wed. Nov. 13 Wed. Nov. 20
More information$5.2 Billion Transportation Funding Deal Announced, includes $1.5 Billion for Local Streets and Roads
1400 K Street, Suite 400 Sacramento, California 95814 Phone: (916) 658-8200 Fax: (916) 658-8240 www.cacities.org $5.2 Billion Transportation Funding Deal Announced, includes $1.5 Billion for Local Streets
More informationTAC Agenda Item 5A Mailout - 04/13/16
TAC Agenda Item 5A Mailout - 04/13/16 RECOMMENDATION FOR TRANSPORTATION POLICY COUNCIL (TPC) APPROVAL OF AMENDMENTS TO THE 2015-2018 TRANSPORTATION IMPROVEMENT PROGRAM (TIP) AND 2040 REGIONAL TRANSPORTATION
More informationRegional Transportation Plan: APPENDIX B
Regional Transportation Plan: 2007-2030 Appendix B APPENDIX B POTENTIAL FUNDING SOURCES Funding sources for transportation improvement projects are needed if the recommended projects of the Transportation
More informationExpected Roadway Project Crash Reductions for SMART SCALE Safety Factor Evaluation. September 2016
Expected Roadway Project Crash Reductions for SMART SCALE Safety Factor Evaluation September 2016 SMART SCALE Safety Factors Evaluation 1. Using Crash Modification Factors for SMART SCALE Safety Evaluation
More informationLake Norman Regional Transportation Commission AGENDA March 8, 2017
Lake Norman Regional Transportation Commission AGENDA March 8, 2017 I Call to Order Review of the Agenda Adoption of the February 8, 2017 Meeting Summary. II Roadway Projects Update Bill Thunberg (30 minutes)
More informationMemorandum. Date: RE: Plans and Programs Committee
Memorandum Date: 02.05.09 RE: Plans and Programs Committee February 10, 2009 To: From: Through: Subject: Summary Plans and Programs Committee: Commissioners Chu (Chair), Campos (Vice Chair), Chiu, Elsbernd,
More informationGuidance for Locally Administered Projects. Funded Through the NJDOT/MPO Program Funds Exchange. August 27, Revised September 15, 2014
1 Guidance for Locally Administered Projects Funded Through the NJDOT/MPO Program Funds Exchange August 27, 2013 Revised September 15, 2014 This document establishes guidelines for administering the program
More information.?-& Approved as to Fonn. R. ZIEGLER, County Counsel THE BOARD OF SUPERVISORS OF THE COUNTY OF ALAMD~, STATE OF CALIFORNIA RESOLUTION NUMBER:
\ \ Approved as to Fonn DONNA -r R. ZIEGLER, County Counsel.?-& By: Deputy THE BOARD OF SUPERVISORS OF THE COUNTY OF ALAMD~, STATE OF CALIFORNIA RESOLUTION NUMBER: R- 201 6'-25 AUTHORIZE THE FILING OF
More informationATTACHMENT G-1 LOS ANGELES COUNTY REGIONAL ITS ARCHITECTURE CONSISTENCY SELF-CERTIFICATION FORM
ATTACHMENT G-1 LOS ANGELES COUNTY REGIONAL ITS ARCHITECTURE CONSISTENCY SELF-CERTIFICATION FORM This form should be completed and executed for all ITS Projects or Projects with ITS elements. The form should
More information2018 Project Selection Process. Transportation Policy Board January 11, 2018
2018 Project Selection Process Transportation Policy Board January 11, 2018 Presentation Overview Overview of the Project Selection Task Force Background on PSRC Funds and Project Selection Task Force
More information2018 and 2020 Regional Congestion Mitigation Air Quality Improvement Program (CMAQ) Grant Application
2018 and 2020 Regional Congestion Mitigation Air Quality Improvement Program (CMAQ) Grant Application PROJECT TITLE: INTERCITY TRANSIT BUS STOP ENHANCEMENTS TRPC use only GENERAL PROJECT INFORMATION Agency
More informationFY Transportation Improvement Program
(CHATS) Metropolitan Planning Organization 2010-2015 June 8, 2009 1 Amendment Adopted: _September 24, 2009_ Amendment Adopted: _February 5, 2010 Amendment Adopted: May 17, 2010 Amendment Adopted: June
More informationOregon Statewide Transportation Improvement Program. STIP Users Guide
Oregon Statewide Transportation Improvement Program STIP Users Guide Table of Contents 1.0 How to Use This Guide -------------------------------------------------------------------------1-1 1.1 Document
More informationA Field Guide. Local Program Opportunities
A Field Guide Local Opportunities Local Opportunities Fact Sheets: 1 Surface Transportation (STP) 2 Highway Safety Improvement (HSIP) 3 High Risk Rural Roads (HRRR) 4 Railway-Highway Grade Crossing 5 Congestion
More informationSMART SCALE Policy Guide
What is SMART SCALE? Virginia s SMART SCALE ( 33.2 21.4) is about picking the right transportation projects for funding and ensuring the best use of limited tax dollars. It is the method of scoring planned
More informationNILES-BUCHANAN-CASS AREA TRANSPORTATION STUDY
NILES-BUCHANAN-CASS AREA TRANSPORTATION STUDY TECHNICAL ADVISORY COMMITTEE MEETING FOR FURTHER INFORMATION CONTACT: Gautam Mani, Transportation Planner Kim Gallagher, Transportation Planner (269)-925-1137
More information