dhammakaya international meditation center

Size: px
Start display at page:

Download "dhammakaya international meditation center"

Transcription

1 SCH AUGUST 2015 CITY OF AZUSA dhammakaya international meditation center Final Environmental Impact Report Hogle-Ireland 1500 Iowa Avenue, Suite 110 Riverside, CA

2 - This document is designed tor double-sided printing -

3 Dhammakaya International Meditation Center Specific Plan Final Environmental Impact Report SCH August 2015 City of Azusa

4 This document is designed for double-sided printing to conserve natural resources

5 Table of Contents 1 Introduction Responses to Comments Errata Public Circulation Mitigation Monitoring Reporting Program List of Tables Table 1 DEIR Comments... 3 Environmental Impact Report i

6 Table of Contents This Page Intentionally Left Blank ii City of Azusa

7 1 Introduction This Final Environmental Impact Report (FEIR) has been prepared to comply with Sections and of the State CEQA Guidelines. As noted in Section15089 (b) of the Guidelines, the focus of a FEIR should be on responses to comments on the Draft Environmental Impact Report (DEIR). Accordingly, this document incorporates the Dhammakaya International Meditation Center Specific Plan DEIR, Volumes I and II (State Clearinghouse No ) by reference, in its entirety. The DEIR is available for review at the City of Azusa, Community Development Department, 213 E. Foothill Boulevard, Azusa, California 91702, and on the City s website ( The contents of this FEIR include: Section 1: Introduction Section 2: Responses to Comments The City published a Notice of Availability and circulated a DEIR for public review and comment, for the period of May 1, 2015 through June 15, A total of four different pieces of correspondence were submitted to the City during the review period. This section includes a list of all correspondence submitted to the City of Azusa on the DEIR, each identified by a letter for later reference, together with the authors and the dates the letters were issued. Following this list, all of the letters are presented, with numbered brackets to highlight specific comments that are responded to in the next section. Public comments were received at the City of Azusa Cultural and Historic Preservation Meeting held on May 19, 2015, at the City of Azusa Planning Commission Meeting held on June 10, 2015, and at the City of Azusa Planning Commission Meeting held on June 29, Comments and responses to the comments are listed in this section in the same format. Review of Environmental Documents Section of the California Environmental Quality Act (CEQA) Guidelines provides guidance to the public in reviewing CEQA documents. This section is designed not to limit the scope of comments that can be submitted by the public but to focus comments on issues that are substantive to the environmental analysis. Commenting entities should focus on the adequacy of the document in identifying and analyzing impacts to the environment and identify any areas they believe to be inadequate. The guidance indicates that comments should be submitted in a manner that: Identifies a specific environmental effect Supports the effect and its significance with substantial evidence Comments should include alternatives or mitigation measures to avoid or reduce identified, specific environmental effects. This section reiterates that the lead agency is bound by reasonableness and good faith in its analysis and that the lead agency is not required to respond to comments in the FEIR that do not identify significant environmental issues. Each response provided herein is coded to correspond to the individual comment/author and each of the bracketed comments in that letter. A summary table is included with each response to identify if the response introduces new significant information under any of the four categories identified in Section et seq of the CEQA Guidelines. Evaluation of Comments Section et seq of the State CEQA Guidelines provides guidance on the evaluation and response to comments received during circulation of the DEIR. To summarize: The lead agency must evaluate all comments received during the public review period and prepare a written response to comments on significant environmental issues Environmental Impact Report 1

8 1 Introduction The lead agency must provide the response to the commenting entity at least ten days prior to certification of the EIR The response must: o Identify any significant environmental issues raised in the comment o Explain, if necessary, why any recommendations provided in the comment were not accepted o Be supported by reasoned analysis Responses may be provided as direct revisions to the DEIR or as a separate section of the FEIR with marginal notes in the DEIR text indicated that it was subsequently revised A lead agency is required to recirculate the DEIR if significant new information is introduced during the public comment period. Significant new information includes: 1. New significant impacts 2. Substantial increases in the severity of impacts 3. Feasible alternatives or mitigation that would reduce significant impacts 4. Identification of inadequacies in the analysis Recirculation is not required when new information is not significant, this includes: Revisions that clarify or amplify an adequate analysis Insignificant modifications (such as spelling and grammar corrections) Section 3: Errata This section identifies revisions to the DEIR to incorporate clarifications developed in response to comments on the DEIR. Additions to the text are underlined and deletions have been stricken through. No substantial revisions were made to the DEIR and recirculation of the document is not required pursuant to CEQA. Section 4: Notices and Distribution This consists of notices concerning the release of the Draft EIR for public review and comment, and the list of agencies, groups and individuals who were sent notices and/or a copy of the Draft EIR. 2 City of Azusa

9 The Draft Environmental Impact Report (DEIR) was circulated for a 45-day public review and comment period, beginning May 1, 2015 and ending June 15, Correspondence was received from multiple parties during this time period. The correspondence listed in Table 1 (DEIR Comments) was submitted to the City of Azusa concerning the DEIR. Public comments were also submitted during the City of Azusa Cultural and Historic Preservation Meeting held on May 19, 2015 and at the City of Azusa Planning Commission Meetings held on June 10, 2015 and July 29, Written responses to comments are subsequently provided. The following responses to comments include a summary statement to identify if the response will introduce new significant information under any of the four categories identified in Section et seq of the California Environmental Quality Act (CEQA) Guidelines or if it does not introduce new significant information. The four general categories are: 1. New significant impacts 2. Substantial increases in the severity of impacts 3. Feasible alternatives or mitigation that would reduce significant impacts 4. Identification of inadequacies in the analysis Table 1 DEIR Comments ID Commenting Agencies and Individuals Date A City of Azusa Cultural and Historic Preservation Commission Meeting May 19, 2015 B Los Angeles County Fire Department June 8, 2015 C City of Azusa Planning Commission Meeting June 10, 2015 D California Department of Transportation District 7 June 15, 2015 E State Clearinghouse and Planning Unit June 16, 2015 F Los Angeles County Department of Public Works June 17, 2015 G City of Azusa Planning Commission Meeting July 29, 2015 Environmental Impact Report 3

10 Comment A City of Azusa Cultural and Historic Preservation Commission Meeting On May 19, 2015, the City of Azusa Cultural and Historic Preservation Commission held their monthly meeting at which time they discussed details of the proposed project, specifically, the swimming pool located on the project site. The swimming pool was filled with soil in the late-1990s and has since been utilized as a rose garden. Commissioner Jule Arevalo led the discussion regarding the pool. Her comments are summarized herein. A-1 Commissioner Jule Arevalo commented that the pool was constructed before the MacNeil Mansion. She further commented that the pool and the MacNeil Mansion function as one unit that establish the historic character of the property and as such, both are cultural resources. After deliberation, the Commissioners prepared the following recommendation for submittal to the City of Azusa Planning Commission regarding the pool: The pool and balustrade pool walls shall remain in place. The pool shall be restored using existing coping and tiles, along with new matching materials as required, to allow the use of the pool to be a reflecting pool, with a maximum depth of 18 inches, to meet California Building Code. Comment A-1 suggests that the pool is a significant cultural resource in contradiction with the conclusions made by the architectural historian in the Cultural and Paleontological Resources Assessment in July While the Cultural and Historic Preservation Commission indicated a preference for preservation of the pool, the Commission decided to recommend a condition of approval to convert the pool to a reflecting pool. In its action, the Commission did not present any evidence or new information that would change the conclusions presented in the EIR nor did it present evidence of new information supporting the statement that the pool is a unique historical resource. The discussion in the EIR regarding the history of the construction of the pool and MacNeil Mansion is consistent with the history presented by Commissioner Arevalo; however, in determining significance, the technical report notes that the primary reason the pool has lost its historic integrity is due to changes from its original design and thus no longer qualifies as a significant cultural resource. The conclusion of the technical report remains unchanged by Comment A-1. Therefore, while there are competing opinions on the significance of the pool as a historic resource, the analysis of this issue in the DEIR remains adequate, supported by substantial evidence without new information to the contrary. 4 City of Azusa

11 Comment B Los Angeles County Fire Department B-1 B-2 Environmental Impact Report 5

12 B-3 B-4 B-5 B-6 B-7 6 City of Azusa

13 B-8 B-9 B-10 B-11 B-12 Environmental Impact Report 7

14 B-13 B-14 8 City of Azusa

15 B-15 Environmental Impact Report 9

16 Response B Los Angeles County Fire Department B-1 The commenter indicates that the Planning Division has no comments at this time. No response to this comment is required. B-2 Comments B-2 through B-13 were submitted by the Land Development Unit. The commenter suggests that the proposed project may necessitate multiple ingress/egress access for the circulation of traffic and emergency response issues. As mentioned in the Draft EIR, the project proposed an additional ingress/egress point located on Monrovia Place, an upgraded emergency access road, and improved circulation throughout the project site. The proposed project will comply will all applicable Los Angeles County Fire Department codes and ordinance requirements. This comment does not identify any significant new information and does not comment on the adequacy of the environmental analysis in the DEIR. B-3 The commenter indicates that the proposed project must comply with all applicable code and ordinance requirements for construction, access, water mains, fire flows, and fire hydrants. The proposed project will comply will all applicable Los Angeles County Fire Department codes and ordinance requirements. This comment does not identify any significant new information and does not comment on the adequacy of the environmental analysis in the DEIR. B-4 The commenter notes that the project site is located within the area described by the Fire Department as the Very High Fire Hazard Severity Zone and that a Preliminary Fuel Modification Plan shall be submitted and approved prior to public hearing. The proposed project will comply will all applicable Los Angeles County Fire Department codes and ordinance requirements. In addition, the project site is entirely surrounded by the Rosedale residential community for which fuel modification was installed around its perimeter. The applicant is currently working with the Fire Department on review of the landscape plans and any changes will be incorporated into the final project plans. This comment does not identify any significant new information and does not comment on the adequacy of the environmental analysis in the DEIR. B-5 The commenter indicates that fire sprinkler systems are required in all residential and most commercial occupancies, and that fire sprinklers systems are strongly suggested even in occupancies where they are not required. The commenter further references Sections through of the Los Angeles County Fire Code for the proper placement of sprinkler systems. The proposed project includes fire sprinklers in all of the new buildings and will also comply will all applicable Los Angeles County Fire Department codes and ordinance requirements. This comment does not identify any significant new information and does not comment on the adequacy of the environmental analysis in the DEIR. B-6 The commenter indicates that every building constructed shall be accessible to the Los Angeles County Fire Department s apparatus by way of access roadways with an all-weather surface of not less than the prescribed width. The commenter further states that the roadway shall be extended to within 150 feet of all portions of the exterior walls when measured by an unobstructed route around the exterior of the building. The proposed parking lot and emergency access road provides access to all parts of the Meditation Hall and Organizational Housing structures to within 150 feet, consistent with the Fire Code. The proposed project will comply will all applicable Los Angeles County Fire Department codes and ordinance requirements. This comment does not identify any significant new information and does not comment on the adequacy of the environmental analysis in the DEIR. B-7 This comment is related to access requirements for the proposed Meditation Hall and storage/workshop building. The commenter indicates that the proposed project shall provide a minimum unobstructed with of 28 feet exclusive of shoulders except for approved security gates in accordance with Section 503.6, and an unobstructed vertical clearance clear to sky Fire Departments s vehicular access to within 150 feet of all portions of the exterior walls of the first story of the building as measured by an approved route around the 10 City of Azusa

17 exterior of the building when the height of the building above the lowest level of the Fire Department s vehicular access road is more than 30 feet high or the building is more than three stories. The access roadway shall be located a minimum of 15 feet and a maximum of 30 feet from the building and shall be positioned parallel to one entire side of the building. The commenter further indicates that the side of the building on which the aerial fire apparatus access road is positioned shall be approved by the fire code official. The commenter further states that cross hatches shall indicate the Fire Department s vehicular access on the site plan and clearly depict the required width. The proposed project provides a new emergency access road around the northern perimeter of the property consistent with Fire Code requirements that also provides emergency access to within 150 feet of all structures. The proposed project will comply will all applicable Los Angeles County Fire Department codes and ordinance requirements. This comment does not identify any significant new information and does not comment on the adequacy of the environmental analysis in the DEIR. B-8 This comment is related to access requirements for the proposed two-story organizational housing structures. The commenter indicates that the proposed project shall provide a minimum unobstructed width of 26 feet exclusive of shoulders except for approved security gates in accordance with Section 503.6, and an unobstructed vertical clearance clear to sky Fire Department s vehicular access to within 150 feet of all portions of the exterior walls of the first story of the building as measured by an approved route around the exterior of the building (Fire Code and ). The proposed project will comply will all applicable Los Angeles County Fire Department codes and ordinance requirements. This comment does not identify any significant new information and does not comment on the adequacy of the environmental analysis in the DEIR. B-9 This comment is related to access requirements for the proposed two-story organizational housing structures. The commenter indicates that turning radii shall not be less than 32 feet and that this measurement shall be determined at the centerline of the road. The commenter further indicates that the Fire Department approved turning area shall be provided for all driveways exceeding 150 feet in length and at the end of all cul-de-sacs. The proposed project will comply will all applicable Los Angeles County Fire Department codes and ordinance requirements. This comment does not identify any significant new information and does not comment on the adequacy of the environmental analysis in the DEIR. B-10 This comment is related to access requirements for the proposed two-story organizational housing structures. The commenter states that dead-end fire apparatus access roads in excess of 150 feet in length shall be provided with an approved Fire Department turnaround on the site plan with dimensions of the turnaround included. The commenter further states that the orientation of the turnaround shall be properly placed in the direction of travel of the access roadway. The proposed project will comply will all applicable Los Angeles County Fire Department codes and ordinance requirements. This comment does not identify any significant new information and does not comment on the adequacy of the environmental analysis in the DEIR. B-11 This comment is related to water requirements. The commenter states that fire hydrant spacing shall be 300 feet and shall meet the following requirements: a) No portion of lot frontage shall be more than 200 feet via vehicular access from a public fire hydrant. b) No portion of a building shall exceed 400 feet via vehicular access from a properly spaced public fire hydrant. c) Additional hydrants will be required if hydrant spacing exceeds specified distances. d) When cul-de-sac depth exceeds 200 feet on a commercial street, hydrants shall be required at the corner and midblock. Environmental Impact Report 11

18 e) A cul-de-sac shall not be more than 500 feet in length when serving land zoned for commercial use. The proposed project will comply will all applicable Los Angeles County Fire Department codes and ordinance requirements. This comment does not identify any significant new information and does not comment on the adequacy of the environmental analysis in the DEIR. B-12 This comment is related to water requirements. The development may require fire flows up to 8,000 gpm at 20 pounds per square inch residual pressure for the duration up to four hours as outlined in the 2013 County of Los Angeles Fire Code Appendix B, table B105. Final fire flows will be based on the size of buildings, its relationship to other structures, property lines, and types of construction used. The proposed project will comply will all applicable Los Angeles County Fire Department codes and ordinance requirements. This comment does not identify any significant new information and does not comment on the adequacy of the environmental analysis in the DEIR. B-13 This comment closes out the Land Development Unit s portion of the comment letter and states that the comments are only general requirements and that further requirements will be addressed at the building and fire plan check phase. No response to this comment is required. B-14 Comment B-14 was submitted by the Forestry Division. The commenter states the statutory requirements of the Division and indicates that the Forestry Division has no objection to the proposed project. No response to this comment is required. B-15 Comment B-15 was submitted by the Health and Hazardous Materials Division. The commenter states the the Division previously submitted comments regarding the proposed project in January 2015 and has no additional comments at this time. No response to this comment is required. 12 City of Azusa

19 Comment C City of Azusa Planning Commission Meeting #1 On June 10, 2015, a public hearing was convened with the City s Planning Commission to discuss the proposed project and its DEIR. Comments from the Planning Commissioners regarding the following topics were addressed during the workshop by City of Azusa Planning Staff and by the applicant s representative: Commissioner Donnelson Commissioner Contreras Commissioner S. Avila - Use of reclaimed water for the control of fugitive dust during demolition and grading - Water restrictions and the proposed reflecting pool - Fencing requirements for the proposed reflecting pool - Adequate parking - Permeable pavement code requirements - Future installation of access gates - Meditation Hall use restrictions (weddings) - Use of retaining walls on the project site As mentioned herein, responses to the Commissioner s comments were provided by the City of Azusa Planning Staff and the applicant s representative. These comments do not identify any significant new information and do not comment on the adequacy of the environmental analysis in the DEIR. Three people provided public testimony at the hearing regarding topics such as traffic and cultural resources. Their comments and responses to their comments are provided herein. C-1 Mr. Jorge Rosales addressed the Commission and commented on the importance of re-connecting Citrus Avenue and commented that the traffic analysis should analyze that scenario. The completion of that road is a requirement of the Rosedale development and is in the engineering design stage. This comment does not identify any significant new information and does not comment on the adequacy of the environmental analysis in the DEIR. C-2 Ms. Jule Arevalo addressed the Commission and commented on the historic significance of the pool and advised the Commissioners to consider the Cultural and Historic Preservation Commission s recommendation to preserve the pool. C-3 Mr. Jeffrey Cornejo, City Clerk, addressed the Commission and gave a detailed description of the pool s history and of the architect who designed the pool. Mr. Cornejo provided similar testimony to Commissioner Arevalo that the pool and MacNeil Mansion are historically linked and both are significant cultural resources. Mr. Cornejo expressed the importance of preserving the pool. Comments C-2 and C-3 suggest that the pool is a significant cultural resource in contradiction with the conclusions made by the architectural historian in the Cultural and Paleontological Resources Assessment in July In their comments, the Ms. Arevalo and Mr. Cornejo did not present any evidence or new information that would change the conclusions presented in the EIR nor did their comments present evidence of new information supporting the statement that the pool is a unique historical resource. The discussion in the EIR regarding the history of the construction of the pool and MacNeil Mansion is consistent with the history presented by Ms. Arevalo and Mr. Cornejo; however, in determining significance, the technical report notes that the primary reason the pool has lost its historic integrity is due to changes from its original design and thus no longer qualifies as a significant cultural resource. The conclusion of the technical report remains unchanged by Comments C-2 and C-3. Therefore, while there are competing opinions on the significance of the pool as a historic resource, the analysis of this issue in the DEIR remains adequate, supported by substantial evidence without new information to the contrary. Environmental Impact Report 13

20 Comment D California Department of Transportation, District 7 D-1 D-2 D-3 14 City of Azusa

21 D-4 D-5 Environmental Impact Report 15

22 Response D California Department of Transportation, District 7 D-1 The commenter is requesting additional traffic analysis for the I-210 freeway and Citrus Avenue on-ramp/offramp and other nearby ramps. The Traffic Impact Assessment prepared by Linscott Law & Greenspan identified six key roadway segments within the project vicinity that may be impacted by the proposed improvements to the project site. Utilizing the criteria outlined in the current Congestion Management Plan (CMP) for Los Angeles County, a traffic study is typically required when a proposed development project is forecast to generate 50 or more two-way peak hour trips on a typical weekday. Based on the trip generation forecast the proposed project is not anticipated to generate more than 50 peak hour trips. As such, it was concluded that a traffic study was not required for the proposed project. Nevertheless, to document to potential impacts of the proposed project, an assessment of six roadway segments in the vicinity was conducted. The results of roadway segment capacity analysis indicate that all study locations are expected to operate at acceptable LOS A or B. Hence, based on the City of Azusa s LOS standards, the proposed project will not have a significant traffic impact. Without any significant traffic impacts attributable to the proposed project, project-related mitigation measures are not necessary. According to the Caltrans Guide for the Preparation of Traffic Impact Studies (December 2002), the following criterion is a starting point in determining when a Traffic Impact Study is needed: 1) Generates over 100 peak hour trips assigned to a State highway facility 2) Generates 50 to 100 peak hour trips assigned to a State highway facility and, affected State highway facilities are experiencing noticeable delay; approaching unstable traffic flow conditions (LOS C or D ). 3) Generates 1 to 49 peak hour trips assigned to a State highway facility the following are examples that may require a full TIS or some lesser analysis: a) Affected State highway facilities experiencing significant delay; unstable or forced traffic flow conditions (LOS E or F ). b) The potential risk for a traffic incident is significantly increased (i.e., congestion related collisions, non-standard sight distance considerations, increase in traffic conflict points, etc.). c) Change in local circulation networks that impact a State highway facility (i.e., direct access to State highway facility, a non-standard highway geometric design, etc.). This comment does not identify any significant new information or comment on the adequacy of the environmental analysis in the DEIR. No further response is required. D-2 The commenter is requesting that cumulative traffic impacts to State Facilities (I-210 freeway) generated by the proposed project as well as future projects be considered. As mentioned in the response to Comment B- 1, based on the trip generation forecast the proposed project is not anticipated to generate more than 50 peak hour trips. Since the trip generation for the proposed project is below the established Congestion Management Plan (CMP) for Los Angeles County threshold, the proposed project would not have a cumulatively considerable impact on a State Facility. This comment does not identify any significant new information or comment on the adequacy of the environmental analysis in the DEIR. No further response is required. D-3 The commenter suggests the implementation of smart growth strategies to reduce the demand on single occupancy trips. As mentioned in the Draft EIR, the DIMC will encourage the use of public transportation by providing a shuttle service to and from the Gold Line station located at Citrus Avenue during major ceremonies. This comment does not identify any significant new information or comment on the adequacy of the environmental analysis in the DEIR. No further response is required. 16 City of Azusa

23 D-4 This comment is a reminder that heavy construction equipment and/or materials that require the use of oversized transport vehicles on State highways will require a permit from Caltrans. The commenter also requests that the use of large size trucks be limited to off-peak commute periods. The proposed project will comply will all applicable California Department of Transportation requirements. This comment does not identify any significant new information and does not comment on the adequacy of the environmental analysis in the DEIR. D-5 This comment is a reminder that stormwater runoff is a sensitive issue for Los Angeles County and that the discharge of runoff onto State highway facilities is not permitted. As mentioned in the Draft EIR, the project proposes a detention basin that is sufficiently sized to reduce peak storm flows to below existing conditions. The proposed project will comply will all applicable California Department of Transportation requirements. This comment does not identify any significant new information and does not comment on the adequacy of the environmental analysis in the DEIR. Environmental Impact Report 17

24 Comment E State Clearinghouse and Planning Unit 18 City of Azusa

25 Environmental Impact Report 19

26 20 City of Azusa

27 Response E State Clearinghouse and Planning Unit This letter is not a comment on the DSEIR. This letter indicates that the Notice of Availability (NOA) was received by the State Clearinghouse and circulated to State agencies for review. One state agency (California Department of Transportation, District 7) submitted comments to the State Clearinghouse by June 15, Environmental Impact Report 21

28 Comment F Los Angeles County Department of Public Works 22 City of Azusa

29 F-1 F-2 F-3 F-4 Environmental Impact Report 23

30 24 City of Azusa

31 Response F Los Angeles County Department of Public Works F-1 The commenter has indicated that a connection/construction permit is required from the Los Angeles County Flood Control District (LACFCD) prior to construction of any new connection to LACFCD drains or facilities. In addition, the commenter has indicated that a Hydrology Study and Storm Drain Improvement Plans must be submitted to the Los Angeles County Department of Public Works (LACDPW) for review and approval prior to the start of construction. The proposed project will comply with LACFCD and LACDPW permits and requirements. This comment does not identify any significant new information or comment on the adequacy of the environmental analysis in the DEIR. No further response is required. F-2 The commenter is requesting a minor revision to the Existing Conditions portion of Section 4.7 of the DEIR, Hydrology and Water Quality. The minor revision was made and is included in the Errata Section of this Final EIR. This comment does not identify any significant new information or comment on the adequacy of the environmental analysis in the DEIR. No further response is required. F-3 The commenter is requesting a minor revision to the Existing Conditions portion of Section 4.7 of the DEIR, Hydrology and Water Quality. The minor revision was made and is included in the Errata Section of this Final EIR. This comment does not identify any significant new information or comment on the adequacy of the environmental analysis in the DEIR. No further response is required. F-4 The commenter suggests that the DEIR should reflect the most updated information regarding stormwater requirements such as Low Impact Development (LID) requirements. LID requirements are discussed within the Regulatory Setting Section of 4.7 Hydrology and Water Quality (page 4.7-8). This comment does not identify any significant new information or comment on the adequacy of the environmental analysis in the DEIR. No further response is required. Environmental Impact Report 25

32 Comment G City of Azusa Planning Commission Meeting #2 On June 29, 2015, a public hearing was convened with the City s Planning Commission to discuss the proposed project and its DEIR. Two people provided public testimony at the hearing regarding topics such as aesthetics, parking, public noticing, traffic, lighting, and drainage. Their comments and responses to their comments are provided herein. C-1 Mr. Fred Madjar addressed the Commission and commented on aesthetics, parking, and public noticing requirements. He stated that views of the proposed project would be visible from surrounding roadways and that the views would not be consistent with the area. In regards to parking, he stated that the City of Azusa does not have a mechanism to ensure that the DIMC will provide a shuttle from the Gold Line Station to the DIMC during events. He also stated that there might be insufficient parking available for Gold Line riders if DIMC guest utilize the new Gold Line parking garage during events. Lastly, he requested clarification on the public noticing for the planning commission meetings. C-2 Ms. Vanessa Alikhan, President of the Rosedale Promenade Community Association (RPCA), addressed the Commission on behalf of her organization and commented on drainage, lighting, traffic, and public noticing. She stated that the regional detention basin located east of the proposed project site (Los Angeles County Basin 4D) has not been properly maintained. In regards to lighting, she stated that light from the proposed Buddha statue will be visible from the properties to the south during nighttime hours. She also stated that the proposed project will increase traffic impacts in the area. Lastly, she requested clarification on the public noticing for the planning commission meetings. Response to Comment C-1 Aesthetics The commenter stated that views of the proposed project would be visible from surrounding roadways and that the views would not be consistent with the area. Development of the proposed project could result in a significant impact if it resulted in substantial degradation of the existing visual character or quality of the site and its surroundings. Degradation of visual character or quality is defined by substantial changes to the existing site appearance through construction of structures such that they are poorly designed or conflict with the site s existing surroundings. The Specific Plan prepared for the project site includes Design Guidelines pertaining to the proposed structures, landscaping and signage. In addition, renderings are included within the Specific Plan that depict views of the proposed Meditation Hall looking west from East Manresa Drive, the proposed Organizational Housing looking east from Azusa Veterans Drive, the proposed Organizational Housing looking east from Rosedale Avenue, and the proposed Meditation Hall front entrance off of Monrovia Place. In addition, the proposed Landscape Plan (included within the Specific Plan) indicates that many of the existing trees will remain in place and additional trees will be planted along the north, south, east, west, and interior portions of the project site. After analysis of the landscape plan and renderings, the Initial Study prepared for the proposed project found that impacts related to visual character and the quality of the site and its surroundings will be less than significant. This topic was screened out of the EIR. This comment does not identify any significant new information and does not comment on the adequacy of the environmental analysis in the DEIR. Parking In regards to parking, the commenter stated that the City of Azusa does not have a mechanism to ensure that the DIMC will provide a shuttle from the Gold Line Station to the DIMC during events. Parking was analyzed in the Traffic Impact Assessment (TIA) prepared for the proposed project by Linscott, Law & Greenspan Engineers dated May 20, According to the Specific Plan and Section 4.10 Transportation and Traffic of the DEIR, the DIMC will encourage the use of public transportation by providing a shuttle service to and from the Gold Line station located at 26 City of Azusa

33 Citrus Avenue during major ceremonies. This comment does not identify any significant new information and does not comment on the adequacy of the environmental analysis in the DEIR. Public Noticing The commenter requested clarification regarding the public noticing procedure for public hearings. According to Azusa Municipal Code ( ), after the completion of any environmental documents required by the California Environmental Quality Act (CEQA), the matter shall be scheduled for public hearing on a Commission, or Council agenda (as applicable). According to Azusa Municipal Code ( ) when a planning permit or other matter requires a public hearing, the public shall be provided notice of the hearing in compliance with state law (Government Code Sections 65090, 65091, 65094, and , and Public Resources Code et seq.), as applicable. All public noticing for the proposed project has complied with State law. This comment does not identify any significant new information and does not comment on the adequacy of the environmental analysis in the DEIR. Response to Comment C-2 Drainage Regarding drainage, the commenter stated that the regional detention basin located east of the proposed project site (Los Angeles County Basin 4D) has not been properly maintained. A Drainage Study was prepared by Walden & Associates for the proposed project dated May 15, 2014 and is included as Appendix F of the DEIR. Due to the increase in impervious surfaces, runoff is anticipated to increase with implementation of the proposed improvements to the project site. As stated within the Drainage Study and in Section 4.7, Hydrology and Water Quality of the DEIR, the existing 50-year peak discharge was estimated to be 29.5 cubic feet per second (cfs) and the 50-year peak discharge in the proposed condition is estimated to be 34.8 cfs. In order to match the existing peak discharge, the proposed on-site detention basins will be sized to capture 382 cf based on the 50-year hydrograph (Exhibit in the DEIR). To treat the additional runoff generated due to the increase in impervious surfaces, the MS4 Permit requires an additional treatment volume of 16,357 cubic feet (cf). The water quality detention basins will be designed to have a total capacity of 42,100 cf and therefore are of sufficient size to adequately treat runoff from the project site. Maintenance of the on-site detention basins will be provided by the DIMC. Maintenance of the eastern adjacent Los Angeles County Basin 4D is the responsibility of the Rosedale Land Partners (RLP); responsibility is anticipated to be conveyed to the North Rosedale Homeowners Association at sometime in the future. This comment does not identify any significant new information and does not comment on the adequacy of the environmental analysis in the DEIR. Lighting In regards to lighting, the commenter stated that light from the proposed Buddha statue will be visible from the properties to the south during nighttime hours. Section 4.1 of the DEIR examines impacts due to light and glare. As stated in Section 4.1, the Buddha statue will be surrounded on three sides by a solid shell structure with the opening towards the meditation area. Thus, the Buddha statue will not be visible to residents to the north of the project site. The Buddha statue will be screened by vegetation within the roof deck planters and the screening surrounding the roof deck and thus will not be visible from the residential uses to the south of the project site. Minimal outdoor lighting on the roof level will be provided for safety purposes and to accent the ceremonies. Illumination of the Buddha statue will only take place during ceremonies and will be shielded by the solid shell structure. This comment does not identify any significant new information and does not comment on the adequacy of the environmental analysis in the DEIR. Traffic The commenter stated that the proposed project will increase traffic impacts in the area. A Traffic Impact Assessment (TIA) was prepared for the proposed project by Linscott, Law & Greenspan Engineers dated May 20, 2014 and is attached as Appendix H of the DEIR. All six roadway segments analyzed in the TIA currently operate and are forecast to operate at acceptable levels of service for both existing and existing plus project traffic conditions. It should be noted that the purpose of the proposed improvements to the project site is to provide enhanced facilities Environmental Impact Report 27

34 and is not expected to increase the number of participants attending. However, to be conservative the total daily volumes estimated for Vesak Day were completely additive to the counted daily volumes. As such, based on the TIA, the proposed improvements to the project site will not have a significant traffic impact on the roadway network in the immediate vicinity of the project. This comment does not identify any significant new information and does not comment on the adequacy of the environmental analysis in the DEIR. Public Noticing The commenter requested clarification regarding the public noticing procedure for public hearings. According to Azusa Municipal Code ( ), after the completion of any environmental documents required by the California Environmental Quality Act (CEQA), the matter shall be scheduled for public hearing on a Commission, or Council agenda (as applicable). According to Azusa Municipal Code ( ) when a planning permit or other matter requires a public hearing, the public shall be provided notice of the hearing in compliance with state law (Government Code Sections 65090, 65091, 65094, and , and Public Resources Code et seq.), as applicable. All public noticing for the proposed project has complied with State law. The commenter s name and address (the commenter s preferred method of communication) were provided to City staff. The commenter received an ed public notice for the June 29, 2015 Planning Commission Public Hearing and received an ed public notice for the September 8, 2015 City Council Public Hearing. This comment does not identify any significant new information and does not comment on the adequacy of the environmental analysis in the DEIR. 28 City of Azusa

35 3 Errata This section identifies revisions to the Environmental Impact Report (EIR) to incorporate clarifications developed in response to comments on the EIR or minor errors corrected through subsequent review. It also identifies any insignificant corrections to the EIR. Additions to the text are underlined and deletions have been stricken through. The minor modifications and corrections below are provided to ensure that all information presented is correct. In addition, corrections to mitigation are intended to clarify the extent of mitigation required to ensure feasibility and continued mitigation of identified impacts. The corrections do not result in any new or more severe environmental impacts or required mitigation measures and are within the scope of impact analysis studied in the Draft EIR. Explanation of Corrections The Los Angeles County Department of Public Works comments F-2 and F-3 required minor revisions to the EIR. Both comments are regarding information within the Existing Conditions portion of Section 4.7 of the DEIR, Hydrology and Water Quality. The changes are included in the Errata on the following pages. No substantial revisions were made to the DEIR and recirculation of the document is not required pursuant to CEQA. Environmental Impact Report 29

36 3 Errata 30 City of Azusa

37 3 Errata This Page Intentionally Left Blank Environmental Impact Report 31

38 4 Public Circulation Notice of Availability Environmental Impact Report 32

39 4 Public Circulation Distribution The Notice of Availability (NOA) was distributed to all agencies and persons on the Planning Department s standard notification list via Certified Mail. The NOA and Notice of Completion (NOC) were sent to the State Clearinghouse for distribution to state agencies. Environmental Impact Report 33

40 4 Public Circulation Notice of Completion 34 City of Azusa

41 4 Public Circulation Environmental Impact Report 35

42 5 Mitigation Monitoring Reporting Program Air Quality Mitigation Measures 4.2.B-1 Mitigation Measures Prior to issuance of building permits, construction drawings shall indicate the types of architectural coatings proposed to be used in interior and exterior applications on the proposed buildings and verification that daily application will conform to the performance standard that emissions of volatile organic compounds from application of interior or exterior coatings will not exceed the daily emissions thresholds established by the South Coast Air Quality Management District. The performance standard may be met through use of low-volatile organic compound coatings, scheduling, or other means that may be identified on the construction drawings. Construction drawing shall specify use of High-Volume, Low Pressure (HVLP) spray guns for application of coatings. This mitigation measure shall be incorporated to the satisfaction of and with oversight by the Building Division. DHAMMAKAYA INTERNATIONAL MEDITATION CENTER SPECIFIC PLAN Environmental Impact Report: Mitigation Monitoring Reporting Program Monitoring Timing/ Frequency Prior to issuance of building permits Action Indicating Compliance Ensure construction drawings and procedures reflect mitigation measure Monitoring Agency Building Division Verification of Compliance Initials Date Remarks Environmental Impact Report 36

43 Mitigation Monitoring Reporting Program 5 Cultural Resources Mitigation Measures 4.3.B-1 Mitigation Measures In the northwest portion of the property an archaeological monitor shall be present to observe ground disturbing activities in the top seven feet in depth from the current surface. The monitor shall work under the direct supervision of a qualified archaeologist (Secretary of Interior Professional Qualification Standards-M.A./M.S. in anthropology, or related discipline with an emphasis in archaeology and demonstrated experience and competence in archaeological research, fieldwork, reporting, and curation). 1. The qualified archaeologist shall be on-site at the pre-construction meeting to discuss monitoring protocols. 2. The archaeological monitor shall be present full-time during excavation within the top approximately seven feet from the current surface. If, after excavation begins, the qualified archaeologist determines that the sediments are not likely to produce historical archaeological resources, monitoring efforts shall be reduced. 3. The monitor shall be empowered to temporarily halt or redirect grading efforts if archaeological resources are discovered. 4. In the event of an archaeological discovery the monitor shall flag the area and notify the construction crew immediately. No further disturbance in the flagged area shall occur until the qualified archaeologist has cleared the area. 5. In consultation with the qualified archaeologist, the monitor shall quickly assess the nature and significance of the find. If the discovery is not significant it shall be quickly mapped, documented, removed and the area cleared. 6. If the discovery is significant, the qualified archaeologist shall notify the applicant and the City immediately. 7. In consultation with the applicant and the City, the qualified archaeologist shall develop a plan of mitigation which will likely include salvage excavation, laboratory analysis and processing, research, curation of the find in a local museum or repository, and preparation of a report summarizing the find. DHAMMAKAYA INTERNATIONAL MEDITATION CENTER SPECIFIC PLAN Environmental Impact Report: Mitigation Monitoring Reporting Program Monitoring Timing/ Frequency Pre-construction, Action Indicating Compliance Documentation from qualified archaeologist Monitoring Agency Planning Department Verification of Compliance Initials Date Remarks Environmental Impact Report 37

44 5 Mitigation Monitoring Reporting Program Cultural Resources Mitigation Measures 4.3.C-1 Mitigation Measures A paleontological monitor shall be present to observe ground disturbing activities below five feet in depth from the current surface in the southern portion of the property and below two feet in depth from the current surface in the northern portion of the property. The monitor shall work under the direct supervision of a qualified paleontologist (B.S./B.A. in geology, or related discipline with an emphasis in paleontology and demonstrated experience and competence in paleontological research, fieldwork, reporting, and curation). 1. The qualified paleontologist shall be on-site at the preconstruction meeting to discuss monitoring protocols. 2. Paleontological monitoring shall start at half-time. If after two weeks of monitoring no paleontological resources are discovered, monitoring shall be reduced to spot-checking on a weekly basis. If significant paleontological resources are identified then monitoring shall be increased to fulltime when working in paleontological bearing sediments, as determined by the paleontologist. 3. The monitor shall be empowered to temporarily halt or redirect grading efforts if paleontological resources are discovered. 4. In the event of a paleontological discovery the monitor shall flag the area and notify the construction crew immediately. No further disturbance in the flagged area shall occur until the qualified paleontologist has cleared the area. 5. In consultation with the qualified paleontologist the monitor shall quickly assess the nature and significance of the find. If the specimen is not significant it shall be quickly removed and the area cleared. 6. If the discovery is significant the qualified paleontologist shall notify the applicant and the City immediately. 7. In consultation with the applicant and the City the qualified paleontologist shall develop a plan of mitigation which will likely include salvage excavation and removal of the find, removal of sediment from around the specimen (in the laboratory), research to identify and categorize the find, curation of the find in a local qualified repository, and preparation of a report summarizing the find. DHAMMAKAYA INTERNATIONAL MEDITATION CENTER SPECIFIC PLAN Environmental Impact Report: Mitigation Monitoring Reporting Program Monitoring Timing/ Frequency Pre-construction Action Indicating Compliance Documentation from qualified paleontologist Monitoring Agency Planning Department Verification of Compliance Initials Date Remarks 38 City of Azusa

Kaiser Riverside-Cirby Medical Office Building Project

Kaiser Riverside-Cirby Medical Office Building Project Final Environmental Impact Report for the Kaiser Riverside-Cirby Medical Office Building Project SCH 2016062020 P R E PA R E D B Y: 1102 R Street Sacramento, California 95811 Date Completed: May 2017 P

More information

City of San Juan Capistrano Agenda Report. Honorable Mayor and Members of the City Council

City of San Juan Capistrano Agenda Report. Honorable Mayor and Members of the City Council 10/6/2015 City of San Juan Capistrano Agenda Report F10 TO: FROM: DATE: SUBJECT: Honorable Mayor and Members of the City Council Sergio Klotz, AICP, Acting Development s~z?s Directo~ Prepared by: Nick

More information

Addendum. Final Environmental Impact Report for North Campus Project. California State University Los Angeles SCH# March 2018.

Addendum. Final Environmental Impact Report for North Campus Project. California State University Los Angeles SCH# March 2018. Addendum Final Environmental Impact Report for North Campus Project to SCH#2016111038 California State University Los Angeles March 2018 Lead Agency The Board of Trustees of the California State University

More information

COASTAL CONSERVANCY. Staff Recommendation June 16, 2005 MALIBU ACCESS: DAN BLOCKER BEACH. File No Project Manager: Marc Beyeler

COASTAL CONSERVANCY. Staff Recommendation June 16, 2005 MALIBU ACCESS: DAN BLOCKER BEACH. File No Project Manager: Marc Beyeler COASTAL CONSERVANCY Staff Recommendation June 16, 2005 MALIBU ACCESS: DAN BLOCKER BEACH File No. 03-163 Project Manager: Marc Beyeler RECOMMENDED ACTION: Authorization to augment the Conservancy s January

More information

Nob Hill Pipeline Improvements Project

Nob Hill Pipeline Improvements Project Nob Hill Pipeline Improvements Project Final Environmental Impact Report Volume I of III State Clearinghouse No. 2013041037 June 2014 San Diego County Water Authority 4677 Overland Avenue San Diego, California

More information

ADMINISTRATIVE CODE BOARD OF COUNTY COMMISSIONERS

ADMINISTRATIVE CODE BOARD OF COUNTY COMMISSIONERS ADMINISTRATIVE CODE BOARD OF COUNTY COMMISSIONERS CATEGORY: DEVELOPMENT/PLANNING/ZONING TITLE: TRANSPORTATION PROPORTIONATE SHARE CALCULATIONS FOR NEW DEVELOPMENT PROJECTS CODE NUMBER: AC-13-16 ADOPTED:

More information

IRVINE UNIFIED SCHOOL DISTRICT RESPONSE TO COMMENTS FOR THE PLANNING AREA 6 NORTH ELEMENTARY SCHOOL

IRVINE UNIFIED SCHOOL DISTRICT RESPONSE TO COMMENTS FOR THE PLANNING AREA 6 NORTH ELEMENTARY SCHOOL IRVINE UNIFIED SCHOOL DISTRICT RESPONSE TO COMMENTS FOR THE PLANNING AREA 6 NORTH ELEMENTARY SCHOOL Prepared for: IRVINE UNIFIED SCHOOL DISTRICT Facilities Planning & Construction Services Departments

More information

CITY OF ORANGE LOCAL CEQA GUIDELINES

CITY OF ORANGE LOCAL CEQA GUIDELINES CITY OF ORANGE LOCAL CEQA GUIDELINES Prepared by: City of Orange Community Development Department, Advance Planning Division 300 East Chapman Avenue, Orange, CA 92866 April 11, 2006 Page 2 TABLE OF CONTENTS

More information

Public Scoping Meeting for the Environmental Impact Report

Public Scoping Meeting for the Environmental Impact Report Public Scoping Meeting for the Environmental Impact Report Solana Highlands Revitalization Project November 20, 2014 @ 5:30pm 1 Scoping Meeting Agenda Welcome and Introductions Purpose of the Notice of

More information

City of Lynwood MODIFIED REQUEST FOR PROPOSALS FOR

City of Lynwood MODIFIED REQUEST FOR PROPOSALS FOR City of Lynwood MODIFIED REQUEST FOR PROPOSALS FOR AN URBAN PLANNING FIRM TO PREPARE A SPECIFIC PLAN AMENDMENT TO THE LYNWOOD TRANSIT AREA SPECIFIC PLAN AND REQUIRED CEQA SUPPORTING DOCUMENTS (SUPPLEMENTAL

More information

COUNTY OF VENTURA ADMINISTRATIVE SUPPLEMENT TO THE STATE CEQA GUIDELINES

COUNTY OF VENTURA ADMINISTRATIVE SUPPLEMENT TO THE STATE CEQA GUIDELINES COUNTY OF VENTURA ADMINISTRATIVE SUPPLEMENT TO THE STATE CEQA GUIDELINES Amended by the Board of Supervisors on July 13, 2010 This page intentionally left blank. Table of Contents 1. Introduction... 1

More information

CITY OF DANA POINT AGENDA REPORT KYLE BUTTERWICK, DIRECTOR OF COMMUNITY DEVELOPMENT BRAD FOWLER, DIRECTOR OF PUBLIC WORKS DEPARTMENT

CITY OF DANA POINT AGENDA REPORT KYLE BUTTERWICK, DIRECTOR OF COMMUNITY DEVELOPMENT BRAD FOWLER, DIRECTOR OF PUBLIC WORKS DEPARTMENT 01/17/12 Page 1 Item #14 CITY OF DANA POINT AGENDA REPORT Reviewed By: DH _X CM _X CA X DATE: JANUARY 17, 2012 TO: FROM: THE HONORABLE CITY COUNCIL KYLE BUTTERWICK, DIRECTOR OF COMMUNITY DEVELOPMENT BRAD

More information

ENVIRONMENTAL IMPACT REPORT

ENVIRONMENTAL IMPACT REPORT City of Redlands General Plan Update and Climate Action Plan ENVIRONMENTAL IMPACT REPORT Final July 21, 2017 SCH: #2016081041 City of Redlands General Plan Update and Climate Action Plan ENVIRONMENTAL

More information

Traffic Impact Analysis (TIA) POLICY

Traffic Impact Analysis (TIA) POLICY Ascension Parish Planning Commission Traffic Impact Analysis (TIA) POLICY This policy establishes requirements for studies that provide information on traffic projected to be generated by all proposed

More information

REQUEST FOR REQUEST FOR PROPOSAL (RFP) GIBSON ROAD PROJECT TOWN OF EASTON 1060 EASTON VALLEY ROAD EASTON, NH DATE FEBRUARY 1, 2016

REQUEST FOR REQUEST FOR PROPOSAL (RFP) GIBSON ROAD PROJECT TOWN OF EASTON 1060 EASTON VALLEY ROAD EASTON, NH DATE FEBRUARY 1, 2016 REQUEST FOR REQUEST FOR PROPOSAL (RFP) GIBSON ROAD PROJECT TOWN OF EASTON 1060 EASTON VALLEY ROAD EASTON, NH 03580 DATE FEBRUARY 1, 2016 TABLE OF CONTENTS 1. SUMMARY AND BACKGROUND... 2 2. PROPOSAL GUIDELINES...

More information

SOUTHWEST LRT (METRO GREEN LINE EXTENSION)

SOUTHWEST LRT (METRO GREEN LINE EXTENSION) 10 Joint Development This chapter describes potential long-term direct and indirect and short-term (construction) direct and indirect effects that would result from the Southwest Light Rail Transit (LRT)

More information

AZUSA PACIFIC UNIVERSITY SPECIFIC PLAN MARCH 2006

AZUSA PACIFIC UNIVERSITY SPECIFIC PLAN MARCH 2006 AZUSA PACIFIC UNIVERSITY SPECIFIC PLAN MARCH 2006 Prepared for: CITY OF AZUSA, CALIFORNIA Applicant: AZUSA PACIFIC UNIVERSITY Prepared by: AC MARTIN PARTNERS, INC. Richard Thompson, AIA, AICP Susan Painter,

More information

CEDARS-SINAI MEDICAL CENTER WEST TOWER PROJECT

CEDARS-SINAI MEDICAL CENTER WEST TOWER PROJECT A. PROPOSED PROJECT A. PROPOSED PROJECT The Cedars-Sinai Medical Center (CSMC or the Applicant ) proposes to develop a new inpatient/medical support facility on the approximately 24.1-acre CSMC Campus

More information

APPENDIX 1 BROWARD COUNTY PLANNING COUNCIL PLAN AMENDMENT REQUIREMENTS AND PROCEDURES

APPENDIX 1 BROWARD COUNTY PLANNING COUNCIL PLAN AMENDMENT REQUIREMENTS AND PROCEDURES APPENDIX 1 BROWARD COUNTY PLANNING COUNCIL PLAN AMENDMENT REQUIREMENTS AND PROCEDURES Broward County Land Use Plan Amendment Requirements Amendments which are not within the rules of flexibility or more

More information

City of Sacramento City Council 915 I Street, Sacramento, CA,

City of Sacramento City Council 915 I Street, Sacramento, CA, City of Sacramento City Council 915 I Street, Sacramento, CA, 95814 www.cityofsacramento.org Meeting Date: 2/22/2011 Report Type: Public Hearing Title: Pell Circle Billboard Relocation (P10-065) Report

More information

coordination and collaboration between St. Mary s College and the Town of Moraga

coordination and collaboration between St. Mary s College and the Town of Moraga Chapter Five Implementation The Campus Master Plan will be implemented in stages over the next 15 years (2015 2030). During this time coordination and collaboration between St. Mary s College and the Town

More information

STANDARD DRAWINGS INDEX

STANDARD DRAWINGS INDEX STANDARD DRAWINGS INDEX DESCRIPTION GENERAL DRAWING NO. Typical Layout for Improvement Plans... 1 City of Stockton Standard Border and Title Block for 8.5 x 11 Sheet.. 1A City of Stockton Standard Map

More information

REPORT. To the Honorable Mayor and City Council From the City Manager. May 9, 2016

REPORT. To the Honorable Mayor and City Council From the City Manager. May 9, 2016 REPORT To the Honorable Mayor and City Council From the City Manager May 9, 2016 SUBJECT Study Session for Consideration of the Draft Inner Harbor Specific Plan, Draft Inner Harbor Specific Plan Environmental

More information

Town of Scarborough, Maine

Town of Scarborough, Maine Planning Board June 27, 2016 1. Call to Order (7:00 P. M.) 2. Roll Call 3. Approval of Minutes (June 6, 2016) AGENDA 4. The Planning Board will conduct a public hearing to receive comment on amendments

More information

1 Introduction. 1.1 Specific Plan Background

1 Introduction. 1.1 Specific Plan Background Introduction 1 Introduction This document is an Environmental Impact Report (EIR) that evaluates the potential environmental effects associated with implementation of the Bay Fair Transit Oriented Development

More information

Guidelines for the Implementation of the California Environmental Quality Act of 1970 As Amended

Guidelines for the Implementation of the California Environmental Quality Act of 1970 As Amended Guidelines for the Implementation of the California Environmental Quality Act of 1970 As Amended Adopted by the Santa Barbara County Board of Supervisors September 12, 1988 Revised November 12, 1991 Revised

More information

UNIVERSITY OF CALIFORNIA, SANTA CRUZ

UNIVERSITY OF CALIFORNIA, SANTA CRUZ UNIVERSITY OF CALIFORNIA, SANTA CRUZ BERKELEY DAVIS IRVINE LOS ANGELES MERCED RIVERSIDE SAN DIEGO SAN FRANCISCO SANTA BARBARA SANTA CRUZ PHYSICAL PLANNING, DEVELOPMENT & OPERATIONS UC SANTA CRUZ, CALIFORNIA

More information

RESOLUTION NO. -- The applicant, PPF OFF 100 West Walnut, LP ("Applicant"),

RESOLUTION NO. -- The applicant, PPF OFF 100 West Walnut, LP (Applicant), RESOLUTION NO. -- A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PASADENA CERTIFYING THE FINAL ENVIRONMENTAL IMPACT REPORT, ADOPTING FINDINGS PURSUANT TO THE CALIFORNIA ENVIRONMENTAL QUALITY ACT, AND

More information

Vanderburgh County s Qualifications to Manage a Construction Site Run-off Control Program with the County Engineer as MS4 Operator.

Vanderburgh County s Qualifications to Manage a Construction Site Run-off Control Program with the County Engineer as MS4 Operator. Vanderburgh County Surveyor s Rule 13 Workbook Chapter 15.13.15 Vanderburgh County s Qualifications to Manage a Construction Site Run-off Control Program with the County Engineer as MS4 Operator. Introduction

More information

CITY OF SACRAMENTO COMMUNITY DEVELOPMENT CALIFORNIA 300 Richards Blvd. DEPARTMENT

CITY OF SACRAMENTO COMMUNITY DEVELOPMENT CALIFORNIA 300 Richards Blvd. DEPARTMENT CITY OF SACRAMENTO COMMUNITY DEVELOPMENT CALIFORNIA 300 Richards Blvd. DEPARTMENT 3 rd Floor Sacramento, CA 95811 DATE: April 12, 2013 TO: FROM: RE: Interested Persons Tom Buford, Senior Planner Community

More information

TOWN OF NEW TECUMSETH PROTOCOL FOR ESTABLISHING TELECOMMUNICATION FACILITIES

TOWN OF NEW TECUMSETH PROTOCOL FOR ESTABLISHING TELECOMMUNICATION FACILITIES TOWN OF NEW TECUMSETH PROTOCOL FOR ESTABLISHING TELECOMMUNICATION FACILITIES February 2009 Table of Contents Section Page Number 1.0 Introduction... 1 2.0 Objectives... 1 3.0 Jurisdiction... 1 4.0 Full

More information

Order of Business. D. Approval of the Statement of Proceedings/Minutes for the meeting of January 24, 2018.

Order of Business. D. Approval of the Statement of Proceedings/Minutes for the meeting of January 24, 2018. COUNTY OF SAN DIEGO BOARD OF SUPERVISORS REGULAR MEETING MEETING AGENDA WEDNESDAY, FEBRUARY 14, 2018, 9:00 AM BOARD OF SUPERVISORS NORTH CHAMBER 1600 PACIFIC HIGHWAY, SAN DIEGO, CALIFORNIA Order of Business

More information

Section F: Committee of Adjustment: Minor Variance and Consent Applications

Section F: Committee of Adjustment: Minor Variance and Consent Applications Executive Summary Introduction The Development Review Process STAR Process Pre-application Consultation Submission of "Complete" Applications STAR Application Streams Section A: Official Plan and Zoning

More information

Casino Reinvestment Development Authority c/o: Lance Landgraf, PP, AICP CRDA Director of Planning 15 South Pennsylvania Avenue Asbury Park, NJ 08401

Casino Reinvestment Development Authority c/o: Lance Landgraf, PP, AICP CRDA Director of Planning 15 South Pennsylvania Avenue Asbury Park, NJ 08401 Casino Reinvestment Development Authority c/o: Lance Landgraf, PP, AICP CRDA Director of Planning 15 South Pennsylvania Avenue Asbury Park, NJ 08401 Via Email: llandgraf@njcrda.com April 14, 2017 Subject:

More information

REQUEST FOR CITY COUNCIL ACTION

REQUEST FOR CITY COUNCIL ACTION REQUEST FOR CITY COUNCIL ACTION MEETING DATE: MARCH 14, 2017 TITLE: SCOPING SESSION FOR A GENERAL PLAN AMENDMENT REQUEST REPRESENTING AN EXCHANGE OF NON RESIDENTIAL BUILDING SQUARE FOOTAGE FOR NEW RESIDENTIAL

More information

Mission Bay Master Plan File No M September 27, 1990

Mission Bay Master Plan File No M September 27, 1990 SAN FRANCISCO CITY PLANNING COMMISSION RESOLUTION NO. 12040 WHEREAS, Mission Bay is generally bounded by Third Street, Berry Street, Fourth Street, the China Basin Channel, China Basin Street, Mariposa

More information

TO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS ACTION ITEM

TO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS ACTION ITEM GB3 Office of the President TO MEMBERS OF THE COMMITTEE ON For Meeting of ACTION ITEM APPROVAL OF DESIGN PURSUANT TO CALIFORNIA ENVIRONMENTAL QUALITY ACT FOR THE STILES STUDENT RESIDENCE HALL PROJECT,

More information

Board of Supervisors' Agenda Items

Board of Supervisors' Agenda Items A. Roll Call COUNTY OF SAN DIEGO BOARD OF SUPERVISORS REGULAR MEETING MEETING AGENDA WEDNESDAY, APRIL 13, 2016, 9:00 A.M. BOARD OF SUPERVISORS NORTH CHAMBER 1600 PACIFIC HIGHWAY, ROOM 310, SAN DIEGO, CALIFORNIA

More information

A NEW APPENDIX VII IS ADDED AS FOLLOWS: APPENDIX VII EMERGENCY ACCESS GATES AND BARRIERS

A NEW APPENDIX VII IS ADDED AS FOLLOWS: APPENDIX VII EMERGENCY ACCESS GATES AND BARRIERS SECTION 1 - SCOPE Where a new gate or barrier is installed on a fire access roadway, it shall be authorized by the Chief and meet the minimum requirements of Appendix VII. Private driveways on lightly

More information

An Bord Pleanála STRATEGIC INFRASTRUCTURE DEVELOPMENT PLANNING AND DEVELOPMENT ACTS 2000 TO An Bord Pleanála Reference Number: 29S.

An Bord Pleanála STRATEGIC INFRASTRUCTURE DEVELOPMENT PLANNING AND DEVELOPMENT ACTS 2000 TO An Bord Pleanála Reference Number: 29S. An Bord Pleanála STRATEGIC INFRASTRUCTURE DEVELOPMENT PLANNING AND DEVELOPMENT ACTS 2000 TO 2015 An Bord Pleanála Reference Number: 29S.PA0043 (Planning Authorities: Dublin City Council, Fingal County

More information

TO MEMBERS OF THE FINANCE AND CAPITAL STRATEGIES COMMITTEE: ACTION ITEM 1

TO MEMBERS OF THE FINANCE AND CAPITAL STRATEGIES COMMITTEE: ACTION ITEM 1 F12(X) Office of the President TO MEMBERS OF THE FINANCE AND CAPITAL : For Meeting of ACTION ITEM 1 AUTHORITY TO ENTER INTO A GROUND LEASE AND LEASE DISPOSITION AND DEVELOPMENT AGREEMENT FOLLOWING ACTION

More information

ADMINISTRATIVE VARIANCE APPLICATION PACKET

ADMINISTRATIVE VARIANCE APPLICATION PACKET ADMINISTRATIVE VARIANCE APPLICATION PACKET Relief from strict compliance with the following regulations of the UDO may be reviewed and approved by the Development Director: (1) Front yard or street side

More information

APPENDIX A PROGRAMMATIC AGREEMENT FOR MINOR TRANSPORTATION PROJECTS

APPENDIX A PROGRAMMATIC AGREEMENT FOR MINOR TRANSPORTATION PROJECTS APPENDIX A PROGRAMMATIC AGREEMENT FOR MINOR TRANSPORTATION PROJECTS PROGRAMMATIC AGREEMENT AMONG THE FEDERAL HIGHWAY ADMINISTRATION THE PENNSYLVANIA DEPARTMENT OF TRANSPORTATION, THE PENNSYLVANIA STATE

More information

NOTICE OF AVAILABILITY TIERED DRAFT ENVIRONMENTAL IMPACT REPORT FOR THE SAN FRANCISCO STATE UNIVERSITY CREATIVE ARTS & HOLLOWAY MIXED-USE PROJECT

NOTICE OF AVAILABILITY TIERED DRAFT ENVIRONMENTAL IMPACT REPORT FOR THE SAN FRANCISCO STATE UNIVERSITY CREATIVE ARTS & HOLLOWAY MIXED-USE PROJECT PHYSICAL PLANNING & DEVELOPMENT 1600 Holloway Avenue, CY 201 San Francisco, CA 94132 Tel: 415/405-3836 Fax: 415/405-3846 NOTICE OF AVAILABILITY TIERED DRAFT ENVIRONMENTAL IMPACT REPORT FOR THE SAN FRANCISCO

More information

Request for Statement of Qualifications for Professional Architectural, Engineering, Staff Augmentation, And Landscape Architecture Services

Request for Statement of Qualifications for Professional Architectural, Engineering, Staff Augmentation, And Landscape Architecture Services Request for Statement of Qualifications for Professional Architectural, Engineering, Staff Augmentation, And Landscape Architecture Services The City of Commerce Public Works and Development Services Department

More information

4.b. 6/22/2017. Local Agency Formation Commission. George J. Spiliotis, Executive Officer

4.b. 6/22/2017. Local Agency Formation Commission. George J. Spiliotis, Executive Officer 4.b. 6/22/2017 TO: FROM: SUBJECT: Local Agency Formation Commission George J. Spiliotis, Executive Officer LAFCO 2014-09-5 SPHERE OF INFLUENCE AMENDMENT TO THE CITY OF BEAUMONT (ADDITION) AND AMENDMENT

More information

General Plan Land Use Amendment

General Plan Land Use Amendment PLANNING SERVICES DEPARTMENT 411 Main Street (530) 879-6800 P.O. Box 3420 Chico, CA 95927 Application No. APPLICATION FOR General Plan Land Use Amendment Applicant Information Applicant Daytime Phone Street

More information

A Guide to. Starting a Business. Auburn, GA

A Guide to. Starting a Business. Auburn, GA A Guide to Starting a Business in Auburn, GA Welcome to Auburn! We are glad you are considering the City of Auburn as the location for your business. We strive to make the experience of starting your business

More information

Joint Application Form for Activities Affecting Water Resources in Minnesota

Joint Application Form for Activities Affecting Water Resources in Minnesota Joint Application Form for Activities Affecting Water Resources in Minnesota This joint application form is the accepted means for initiating review of proposals that may affect a water resource (wetland,

More information

CITY OF VACAVILLE PLANNING COMMISSION Agenda Item No. G.2 STAFF REPORT May 17, Staff Contact: Ward Stewart (707)

CITY OF VACAVILLE PLANNING COMMISSION Agenda Item No. G.2 STAFF REPORT May 17, Staff Contact: Ward Stewart (707) CITY OF VACAVILLE PLANNING COMMISSION Agenda Item No. G.2 STAFF REPORT May 17, 2011 Staff Contact: Ward Stewart (707) 449-5140 TITLE: REQUEST: I-80/ALAMO POLICY PLAN AMENDMENT (FORMER PALM ISLAND FREEWAY

More information

ORDINANCE NO. 640 NOW, THEREFORE, BE IT ORDAINED BY THE MAYOR AND CITY COUNCIL OF THE CITY OF FRUITLAND, IDAHO:

ORDINANCE NO. 640 NOW, THEREFORE, BE IT ORDAINED BY THE MAYOR AND CITY COUNCIL OF THE CITY OF FRUITLAND, IDAHO: ORDINANCE NO. 640 AN ORDINANCE OF THE CITY OF FRUITLAND, IDAHO, AMENDING TITLE 9, CHAPTER 3, SECTION 2, DRAINAGE STANDARDS; AMENDING TITLE 10, CHAPTER 7A, SECTION 19, STORM DRAINAGE; AMENDING TITLE 10,

More information

REQUEST FOR PROPOSALS Town of Brattleboro, VT

REQUEST FOR PROPOSALS Town of Brattleboro, VT REQUEST FOR PROPOSALS Town of Brattleboro, VT June 22, 2010 BACKGROUND: The Town of Brattleboro has conducted an extensive planning process for the reconstruction of the Putney Road (US Route 5) corridor

More information

TRANSPORTATION ALTERNATIVES (TA) SET ASIDE PROGRAM July 2016

TRANSPORTATION ALTERNATIVES (TA) SET ASIDE PROGRAM July 2016 Regional Transportation Commission TRANSPORTATION ALTERNATIVES (TA) SET ASIDE PROGRAM July 2016 Contents 1.0 Purpose and Eligibility... 2 2.0 Process... 5 3.0 Implementation of Funded Projects... 5 Attachment

More information

Stationing and Training of Increased Aviation Assets within U.S. Army Alaska Environmental Impact Statement

Stationing and Training of Increased Aviation Assets within U.S. Army Alaska Environmental Impact Statement Final Stationing and Training of Increased Aviation Assets within U.S. Army Alaska Environmental Impact Statement Prepared for U.S. Army Alaska August 2009 How to Read This Environmental Impact Statement

More information

Port of Long Beach Community Grants Program. Community Infrastructure

Port of Long Beach Community Grants Program. Community Infrastructure Port of Long Beach Community Grants Program Community Infrastructure Guidelines for Implementation of the COMMUNITY INFRASTRUCTURE PROGRAM Port of Long Beach Community Grants Program March 2017 CONTENTS

More information

Welcome. Environmental Impact Statement for Multiple Projects in Support of Marine Barracks Washington, D.C.

Welcome. Environmental Impact Statement for Multiple Projects in Support of Marine Barracks Washington, D.C. Environmental Impact Statement for Multiple Projects in Support of Marine Barracks Washington, D.C. Welcome Public Meeting Your involvement assists the Marine Corps in making an informed decision. Marine

More information

South Dakota Transportation Alternatives

South Dakota Transportation Alternatives South Dakota Transportation Alternatives Program Summary and Application Guide Updated March 2018 Connecting South Dakota and the Nation 1 Transportation Alternatives (TA) Summary 1. Overview Transportation

More information

FREMONT POOL PUBLIC ART PROJECT

FREMONT POOL PUBLIC ART PROJECT Public Art Program, City of Oakland Cultural Arts & Marketing Division 1 Frank Ogawa Plaza, 9 th Floor, Oakland CA 94612 www.oaklandculturalarts.org FREMONT POOL PUBLIC ART PROJECT REQUEST FOR QUALIFICATIONS

More information

Public Notice U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT AND TEXAS COMMISSION ON ENVIRONMENTAL QUALITY

Public Notice U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT AND TEXAS COMMISSION ON ENVIRONMENTAL QUALITY Public Notice U.S. Army Corps Permit Application No: SWG-2012-00381 Of Engineers Date Issued: April 27, 2016 Galveston District Comments Due: May 30, 2017 U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT

More information

Board of Supervisors' Agenda Items

Board of Supervisors' Agenda Items A. Roll Call COUNTY OF SAN DIEGO BOARD OF SUPERVISORS REGULAR MEETING MEETING AGENDA WEDNESDAY, MARCH 16, 2016, 9:00 A.M. BOARD OF SUPERVISORS NORTH CHAMBER 1600 PACIFIC HIGHWAY, ROOM 310, SAN DIEGO, CALIFORNIA

More information

The Historic Preservation Plan

The Historic Preservation Plan The Historic Preservation Plan INTENT AND PURPOSE The purpose of the Historical Preservation Chapter is to provide the comprehensive plan foundation for the protection and enhancement of the City of Sarasota

More information

Value Engineering Program Administration Manual (05/16/2018)

Value Engineering Program Administration Manual (05/16/2018) 1. Value Engineering Value Engineering Program Administration Manual (05/16/2018) Value Engineering (VE) is defined by the Society of American Value Engineers International as "the systematic application

More information

Request for Proposals. On-Call General Engineering Services. Public Works Department City of San Mateo 330 West 20th Avenue San Mateo, CA 94403

Request for Proposals. On-Call General Engineering Services. Public Works Department City of San Mateo 330 West 20th Avenue San Mateo, CA 94403 Request for Proposals On-Call General Engineering Services Public Works Department City of San Mateo 330 West 20th Avenue San Mateo, CA 94403 May 24, 2015 The City of San Mateo is accepting proposals to

More information

DECISION OF THE CAPE COD COMMISSION

DECISION OF THE CAPE COD COMMISSION Date: To: From: Re: Applicant: Michael D. Ford, Esq. P.O. Box 665 Harwich, MA 02671 Cape Cod Commission Development of Regional Impact Hardship Exemption Cape Cod Commission Act, Section 23 Couto Management

More information

Ager1da PROPOSAL FOR LOWER ARROYO ARCHERY RANGE AND DEAL POINTS FOR NEW AGREEMENT WITH PASADENA ROVING ARCHERS

Ager1da PROPOSAL FOR LOWER ARROYO ARCHERY RANGE AND DEAL POINTS FOR NEW AGREEMENT WITH PASADENA ROVING ARCHERS Ager1da eport I 1 TO: Honorable Mayor and City Council FROM: SUBJECT: Department of Public Works PROPOSAL FOR LOWER ARROYO ARCHERY RANGE AND DEAL POINTS FOR NEW AGREEMENT WITH PASADENA ROVING ARCHERS RECOMMENDATION:

More information

Agenda Item No. October 14, Honorable Mayor and City Council Attention: David J. Van Kirk, City Manager

Agenda Item No. October 14, Honorable Mayor and City Council Attention: David J. Van Kirk, City Manager Agenda Item No. October 14, 2008 TO: FROM: SUBJECT: Honorable Mayor and City Council Attention: David J. Van Kirk, City Manager Scott D. Sexton, Community Development Director RESOLUTION OF THE CITY COUNCIL

More information

2. Transportation Alternatives Program Activities Regulations and Guidelines... 4, 5 & Eligible and Ineligible Items...

2. Transportation Alternatives Program Activities Regulations and Guidelines... 4, 5 & Eligible and Ineligible Items... FY 2018 TRANSPORTATION ALTERNATIVES PROGRAM INSTRUCTIONS, GUIDELINES AND APPLICATION TABLE OF CONTENTS Page(s) 1. Instructions for Submitting a Transportation Alternatives Program Application.. 1 2. Transportation

More information

Cal Poly EXECUTIVE SUMMARY. Cal Poly Master Plan. In Fall 1999, the average GPA and SAT scores for incoming freshmen were 3.64 and 1162.

Cal Poly EXECUTIVE SUMMARY. Cal Poly Master Plan. In Fall 1999, the average GPA and SAT scores for incoming freshmen were 3.64 and 1162. EXECUTIVE SUMMARY Cal Poly California Polytechnic State University, founded in 1901, is a predominately undergraduate, teaching university specializing in applied technical and professional fields. With

More information

City of Titusville Community Redevelopment Agency

City of Titusville Community Redevelopment Agency City of Titusville Community Redevelopment Agency Downtown Commercial beautification S Program Policies and Procedures 2018 1 USection 1 Program Purpose and Benefits The City of Titusville s Community

More information

City of Signal Hill Wireless Communications Facility Application

City of Signal Hill Wireless Communications Facility Application Wireless Telecom Application 2017 rev02.docx City of Signal Hill Wireless Communications Facility Application INTRODUCTION a. All applicants seeking to install a wireless communication facility ( WCF )

More information

APPLICATION FOR PARCEL MAP

APPLICATION FOR PARCEL MAP Public Works Number: - / 3- APPLICATION FOR PARCEL MAP Department of Public Works Development Services 200 East Santa Clara Street San Jose, California 95113 (408) 535-7802 Applicant Phone Number Fax Number

More information

Armstrong County Dirt, Gravel & Low Volume Roads Program Quality Assurance Board - Policies and Procedures

Armstrong County Dirt, Gravel & Low Volume Roads Program Quality Assurance Board - Policies and Procedures Armstrong County Dirt, Gravel & Low Volume Roads Program Quality Assurance Board - Policies and Procedures The purpose of the Quality Assurance Board (QAB) in Armstrong County is to recommend to the Armstrong

More information

TOWNSHIP OF MAHWAH BOARD OF ADJUSTMENT MINUTES OCTOBER 21, 2015

TOWNSHIP OF MAHWAH BOARD OF ADJUSTMENT MINUTES OCTOBER 21, 2015 TOWNSHIP OF MAHWAH BOARD OF ADJUSTMENT MINUTES OCTOBER 21, 2015 The combined public/work session meeting of the Board of Adjustment held at the Municipal Building, 475 Corporate Drive, Mahwah, NJ, beginning

More information

Subject: Request for Proposal Route 99 Interchanges at Hammett Road and Kiernan Avenue

Subject: Request for Proposal Route 99 Interchanges at Hammett Road and Kiernan Avenue DEPARTMENT OF PUBLIC WORKS Matt Machado Director 1010 10 th Street, Suite 3500, Modesto, CA 95354-0847 Phone: 209.525.6550 Date «FirstName» «LastName» «Company» «Address1» «City», «State» «PostalCode»

More information

Urban Greening for Sustainable Communities Grant Program

Urban Greening for Sustainable Communities Grant Program Urban Greening for Sustainable Communities Grant Program Review Team Urban Greening for Sustainable Communities Grant Program Technical Glenn Flamik, Rick Kreutzer, John Melvin, Kate Foley, Earle Cummings,

More information

Midpeninsula Regional Open Space District 330 Distel Circle, Los Altos, CA Issued: Friday, January 27, 2017

Midpeninsula Regional Open Space District 330 Distel Circle, Los Altos, CA Issued: Friday, January 27, 2017 Request for Qualifications and Proposals (RFQP) for Design Consulting Services for the Webb Creek Bridge Replacement Project, Bear Creek Redwood Open Space Preserve Midpeninsula Regional Open Space District

More information

PUBLIC WORKS DEPARTMENT 22 E. Weber Avenue, Room 301 Stockton, CA (209) REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR THE

PUBLIC WORKS DEPARTMENT 22 E. Weber Avenue, Room 301 Stockton, CA (209) REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR THE PUBLIC WORKS DEPARTMENT 22 E. Weber Avenue, Room 301 Stockton, CA 95202-3717 (209) 937-8411 REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR THE TRAFFIC SIGNAL, ROUNDABOUT, AND PROTECTED LEFT-TURN PHASING

More information

POSITION DESCRIPTION

POSITION DESCRIPTION POSITION DESCRIPTION TITLE: ENGINEERING TECHNICIAN Scope Of Responsibility: This is the advanced journey level class in the Engineering Technician classification within the Public Works department. Individuals

More information

MICHAEL N. FEUER CITY ATTORNEY REPORT RE:

MICHAEL N. FEUER CITY ATTORNEY REPORT RE: MICHAEL N. FEUER CITY ATTORNEY REPORT RE: R13-0351 REPORTNO.~~ ~ DEC 0 9 2013 DRAFT ORDINANCE FOR THE HAIWEE POWER PLANT PENSTOCK REPLACEMENT PROJECT REQUESTING THE LOS ANGELES CITY COUNCIL TO ESTABLISH

More information

CITY COUNCIL AGENDA REPORT. DEPARTMENT: Public Services MEETING DATE: November 21, PREPARED BY: Alex Tachiki, Management Analyst

CITY COUNCIL AGENDA REPORT. DEPARTMENT: Public Services MEETING DATE: November 21, PREPARED BY: Alex Tachiki, Management Analyst CITY COUNCIL AGENDA REPORT DEPARTMENT: Public Services MEETING DATE: November 21, 2017 PREPARED BY: Alex Tachiki, Management Analyst AGENDA LOCATION: CC-8 TITLE: Recordation of Memorandum of Unrecorded

More information

CITY OF MONTEBELLO AND MONTEBELLO SUCCESSOR AGENCY REQUEST FOR QUALIFICATIONS (RFQ)

CITY OF MONTEBELLO AND MONTEBELLO SUCCESSOR AGENCY REQUEST FOR QUALIFICATIONS (RFQ) CITY OF MONTEBELLO AND MONTEBELLO SUCCESSOR AGENCY REQUEST FOR QUALIFICATIONS (RFQ) POTENTIAL MEDIUM TO HIGH DENSITY URBAN MIXED USE DEVELOPMENT PROJECT 700 BLOCK OF WEST WHITTIER BOULEVARD RFQ RESPONSE

More information

APPLICATION PROCEDURE TO OPERATE A COMMERCIAL CANNABIS BUSINESS IN CULVER CITY

APPLICATION PROCEDURE TO OPERATE A COMMERCIAL CANNABIS BUSINESS IN CULVER CITY APPLICATION PROCEDURE TO OPERATE A COMMERCIAL CANNABIS BUSINESS IN CULVER CITY The application process to operate a Commercial Cannabis Business ( CCB ) in Culver City will open on Monday, October 2, 2017.

More information

Planning Commission Motion No HEARING DATE: FEBRUARY 20, 2014

Planning Commission Motion No HEARING DATE: FEBRUARY 20, 2014 Subject to: (Select only if applicable) Affordable Housing (Sec. 415) Jobs Housing Linkage Program (Sec. 413) Downtown Park Fee (Sec. 412) First Source Hiring (Admin. Code) Child Care Requirement (Sec.

More information

WHEREAS, Mn/DOT has been asked to participate in consultation for and to be an invited signatory to this Programmatic Agreement (PA); and

WHEREAS, Mn/DOT has been asked to participate in consultation for and to be an invited signatory to this Programmatic Agreement (PA); and PROGRAMMATIC AGREEMENT AMONG THE FEDERAL HIGHWAY ADMINISTRATION THE MINNESOTA STATE HISTORIC PRESERVATION OFFICE THE ADVISORY COUNCIL ON HISTORIC PRESERVATION THE DEPARTMENT OF THE ARMY, CORPS OF ENGINEERS,

More information

The next steps outlined at the end of this section are the key requirements as we can best envision them at this stage.

The next steps outlined at the end of this section are the key requirements as we can best envision them at this stage. 5 Implementation 5.1 Anticipated Caltrans Review Process... 2 5.1.1 Project Initiation Document and Project Report... 2 5.1.2 Environmental Review Process... 4 5.1.3 Right of Way Acquisition Process...

More information

Guidance and Instructions for the Implementation of Land Disturbing Activities on Fort Jackson

Guidance and Instructions for the Implementation of Land Disturbing Activities on Fort Jackson Guidance and Instructions for the Implementation of Land Disturbing Activities on Fort Jackson 1. Purpose: This document is to provide a summary of regulations that Fort Jackson and associated consultants,

More information

REQUEST FOR QUALIFICATIONS AND PROPOSALS (RFQ/P) RFQ # ARCHITECTURAL SERVICES Bond Measure G

REQUEST FOR QUALIFICATIONS AND PROPOSALS (RFQ/P) RFQ # ARCHITECTURAL SERVICES Bond Measure G REQUEST FOR QUALIFICATIONS AND PROPOSALS (RFQ/P) RFQ #14-002 ARCHITECTURAL SERVICES Bond Measure G The Solano Community College District ( District ) is requesting qualified persons, firms, partnerships,

More information

REQUEST FOR PROPOSALS PROFESSIONAL DESIGN SERVICES

REQUEST FOR PROPOSALS PROFESSIONAL DESIGN SERVICES PUBLIC WORKS DEPARTMENT 22 E. Weber Avenue, Room 301 Stockton, CA 95202-3717 REQUEST FOR PROPOSALS PROFESSIONAL DESIGN SERVICES FOR THE CONVERT SIGNALS FROM PEDESTAL-MOUNTED TO MAST ARMS (AT THE INTERSECTIONS

More information

2.0 COMMENTS AND RESPONSES TO COMMENTS

2.0 COMMENTS AND RESPONSES TO COMMENTS 2.0 COMMENTS AND RESPONSES TO COMMENTS A list of those agencies, organizations, and interested parties, which have commented on the Draft EIR, is provided below. A copy of each comment letter or a summary

More information

General Plan Referral

General Plan Referral APPLICATION PACKET FOR General Plan Referral Planning Department 1650 Mission Street Suite 400 San Francisco, CA 94103-9425 T: 415.558.6378 F: 415.558.6409 San Francisco Charter Section 4.105 and Sections

More information

Long Range Transportation Plan

Long Range Transportation Plan Summary of Policy Governor in 2000. The baseline can The purpose of the Long Range also be considered as the scenario in Transportation Plan (LRTP) is to which no new transportation projects provide decision

More information

NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT AND SCOPING MEETING FOR THE DOWNTOWN SPECIFIC PLAN COMMENT PERIOD

NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT AND SCOPING MEETING FOR THE DOWNTOWN SPECIFIC PLAN COMMENT PERIOD DATE: February 15, 2017 TO: FROM: RE: Interested Persons Tom Buford, Senior Planner Community Development Department NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT AND SCOPING MEETING FOR THE

More information

PUBLIC FACILITIES FINANCING

PUBLIC FACILITIES FINANCING 9. Public Facilities Financing Brisbane Baylands Specific Plan 257 9 PUBLIC FACILITIES FINANCING 9.1 PURPOSE The Baylands is planned to accommodate a variety of uses including retail at a range of types

More information

REQUEST FOR PROPOSALS PROFESSIONAL ARCHITECTURAL FIRM FOR DESIGN & CONSTRUCTION MANAGEMENT SERVICES

REQUEST FOR PROPOSALS PROFESSIONAL ARCHITECTURAL FIRM FOR DESIGN & CONSTRUCTION MANAGEMENT SERVICES REQUEST FOR PROPOSALS PROFESSIONAL ARCHITECTURAL FIRM FOR DESIGN & CONSTRUCTION MANAGEMENT SERVICES Prepared By: Ellis County Administration 718 Main Street P.O. Box 720 Hays, KS 67601 Contact: Phillip

More information

OGDEN AVENUE SITE IMPROVEMENT GRANT An Ogden Avenue Corridor Enhancement Initiative

OGDEN AVENUE SITE IMPROVEMENT GRANT An Ogden Avenue Corridor Enhancement Initiative OGDEN AVENUE SITE IMPROVEMENT GRANT An Ogden Avenue Corridor Enhancement Initiative An incentive program for site, landscaping, signage, and façade improvements along Ogden Avenue between Rickert Drive

More information

POSITION DESCRIPTION

POSITION DESCRIPTION POSITION DESCRIPTION TITLE: ENGINEERING TECHNICIAN ASSISTANT Scope Of Responsibility: This is the journey level class in the Engineering Technician classification within the Public Works Department. Individuals

More information

PUBLIC SCHOOL FACILITIES ELEMENT:

PUBLIC SCHOOL FACILITIES ELEMENT: PUBLIC SCHOOL FACILITIES ELEMENT: Goals, Objectives and Policies Goal 1: Public School Concurrency. It is a GOAL of the Town of Jupiter to provide for future availability of public school facilities consistent

More information

PUBLIC WORKS DEPARTMENT 22 E. Weber Avenue, Room 301 Stockton, CA (209) REQUEST FOR PROPOSALS PROFESSIONAL DESIGN SERVICES FOR THE

PUBLIC WORKS DEPARTMENT 22 E. Weber Avenue, Room 301 Stockton, CA (209) REQUEST FOR PROPOSALS PROFESSIONAL DESIGN SERVICES FOR THE PUBLIC WORKS DEPARTMENT 22 E. Weber Avenue, Room 301 Stockton, CA 95202-3717 (209) 937-8411 REQUEST FOR PROPOSALS PROFESSIONAL DESIGN SERVICES FOR THE TRAFFIC SIGNAL AND SAFETY LIGHTING MODIFICATIONS AT

More information

State Project No. XXXXXX City Project No. c401807

State Project No. XXXXXX City Project No. c401807 June 29, 2017 Request for Qualifications Design and Environmental Services for the SLR Parkway Phase III Project also known as a portion of the MBSST (Rail Trail) Segment 8 (San Lorenzo River Railroad

More information

Appendix B Review Matrix Text & Table Footnotes

Appendix B Review Matrix Text & Table Footnotes Review Submissions The PDP includes a series of review submissions designed to ensure that all projects are developed in accordance with ODOT policies. The PDP Products Review Matrix found in this Appendix

More information