1 Efficiency Maine Commercial and Industrial (C&I) Custom Program Distributed Generation Projects 1
2 Agenda C&I Custom Program Distributed Generation Projects Eligibility & Incentives Scoping Audits Technical Assistance Studies Funding 2
3 C&I Custom Program 3
4 Distributed Generation (DG) Projects Reduction of grid-supplied electricity (behind the meter) Minimum incentive: $10,000 EMT will pay for a limited time up to 70% of project cost (vs. 50%) up to $1 million Minimum annual electricity reduction: 36,000 kwh Contract required for all projects Contract will include metering requirements 4
5 Project Requirements Operating efficiency of 60% or greater Must supply 15-minute metering data to EMT with EMT-specified metering Offset existing grid-supplied electricity (i.e. not for export to the grid or other customers) Must pass EMT s benefit cost test 5
6 Other Custom Program Requirements Must be cost effective All projects must have a benefit-to-cost (B:C) ratio of 1.0 or higher B:C ratio = Total Benefit Total Cost Benefit = net present value of the avoided cost of energy saved by the implementing the project Cost = all of the project costs including labor, material, engineering, etc. 6
7 CHP Cost Effectiveness Guidelines 24-hour electric demand that exceeds the nameplate electric output rating of the unit Thermal loads that allow for 100% utilization of the thermal output Installed cost of $4,000 per kw or less 7
8 Incentives Incentive amounts will be the lessor of: $1 million 70% of the project cost (limited-time offer) Amount required to buy down the project to a one year payback with the incentive 8
9 Implementation Timeline for Bonus Complete applications submitted by May 1, 2017 See DG Program Opportunity Notice (PON) Complete TA studies submitted by April 1, 2017 (if applicable) Contract signed by June 15, 2017 Proof of financial commitment by June 30,
10 Project Readiness Participants need to demonstrate that internal company approvals are in place Incentives must help meet capital planning criteria Participants must provide commitment letter(s) for matching funds, including any third parties Awards will be first-in, first-ready 10
11 Qualifying Distributed Generation Examples Including but not limited to: Reciprocating engines Anaerobic digesters Organic Rankine cycle 11
12 Contract Contract with EMT required for all DG Projects Contract will include: Milestone Payment Schedule Measurement & Verification requirements Final incentive may be adjusted based on as-built savings and costs 12
13 Ineligible Projects Measures available through Efficiency Maine s C&I Prescriptive Program Lighting measures that fall into one of the 20 categories listed under the Design Light Consortium (DLC) Technical Requirements Power quality, power factor or power conditioning projects Projects with paybacks less than 1 year with the incentive 13
14 Ineligible Projects Seed money for projects to be completed or funded subsequently Measure required by state or federal law Projects for which the customer has already made binding commitments prior to award Measures that rely on human behavior or facility maintenance Feasibility studies 14
15 Scoping Audits Targeted toward companies who may not have engineering staff on site Online form followed by a phone screening No cost to the participant Potential projects may be referred to A&E firms for further development 15
16 Technical Assistance Technical Assistance must be pre-approved by Efficiency Maine prior to conducting the study Study must be for a Distributed Generation project that will qualify for the program The study must result in an investment-grade report submitted to EMT Must be completed by a professional that has experience with the technology 16
17 Technical Assistance The application should be accompanied by: Description of the measure(s) being studied Methodology for estimating savings Description of the facility where the study will be done Detailed scope of work and budget Qualifications of those performing the study 17
18 Technical Assistance Efficiency Maine will provide 50% of the Technical Assistance Study up to $20,000 Approved TA Study Customer cost $14,000, EMT pays $7,000 Customer cost $40,000, EMT pays $20,000 Customer cost $50,000, EMT pays $20,000 18
19 Funding The program is open and funds are available ($3.3 million) Entities may apply up to 3 years of their annual cap limit to one project provided it meets all other criteria in the DG PON E.g., $3,000,000 incentive Paid out in three $1,000,000 installments over 3 successive fiscal years Extra Large Projects - XL PON 19
20 20
21 Contacts Chuck Porter ext. 507 Mike Watson ext
PROGRAM OPPORTUNITY NOTICE EFFICIENCY MAINE TRUST CUSTOM INCENTIVE PROGRAM FOR DISTRIBUTED GENERATION PROJECTS PON EM
PROGRAM OPPORTUNITY NOTICE EFFICIENCY MAINE TRUST CUSTOM INCENTIVE PROGRAM FOR DISTRIBUTED GENERATION PROJECTS PON Opening: July 1, 2017 Closing: June 30, 2018 Updated: July 1, 2017 CONTENTS SECTION 1:
More informationPROGRAM OPPORTUNITY NOTICE EFFICIENCY MAINE TRUST CUSTOM INCENTIVE PROGRAM FOR ELECTRIC EFFICIENCY PROJECTS PON EM
PROGRAM OPPORTUNITY NOTICE EFFICIENCY MAINE TRUST CUSTOM INCENTIVE PROGRAM FOR ELECTRIC EFFICIENCY PROJECTS PON Opening: July 1, 2017 Closing: June 30, 2018 Revised: February 6, 2018 {P1472575.1} CONTENTS
More informationThe Narragansett Electric Company d/b/a National Grid
The Narragansett Electric Company d/b/a National Grid Rhode Island Renewable Energy Growth Program Solicitation and Enrollment Process Rules for Solar (Greater than 25 kw), Wind, Hydro and Anaerobic Digester
More informationCustomer Tailored Energy Efficiency Pilot Program FY18 PROGRAM GUIDE
Customer Tailored Energy Efficiency Pilot Program FY18 PROGRAM GUIDE JULY 1, 2017 JUNE 30, 2018 TABLE OF CONTENTS 1. INTRODUCTION... 1 2. PILOT PROGRAM DESIGN... 2 Eligibility... 2 Incentives... 2 Base
More informationFY2016 RENEWABLE ELECTRIC STORAGE INCENTIVE PROGRAM STRAW PROPOSAL MAY 07, 2015
FY2016 RENEWABLE ELECTRIC STORAGE INCENTIVE PROGRAM STRAW PROPOSAL MAY 07, 2015 Purpose and Intent The New Jersey Board of Public Utilities Staff (Staff) and the Market Manager are issuing this straw proposal
More informationTucson Electric Power. Stakeholder Meeting
Tucson Electric Power 2011 Energy Efficiency Implementation Plan Stakeholder Meeting January 10, 2011 Agenda Introduction Overview Residential Programs Behavioral Programs Commercial Programs EE Financing
More informationGrants and incentives for Agricultural Projects. Nathan Rudgers Director of Business Development
Grants and incentives for Agricultural Projects Nathan Rudgers Director of Business Development nathan.rudgers@farmcrediteast.com 585-993-0395 Why Do Government Agencies and Others Offer Grants? 1. Meets
More informationADVERTISEMENT OF PUBLIC NOTICE
ADVERTISEMENT OF PUBLIC NOTICE Request for Proposals Notice is hereby given that pursuant to the New Jersey Public School Contracts Law competitive contracting process, N.J.S.A. 18A:4.1 through 4.5, sealed
More informationRhode Island Renewable Distributed Generation Standard Contract Enrollment Application and Enrollment Process Rules
Rhode Island Renewable Distributed Generation Standard Contract Enrollment Application and Enrollment Process Rules I. Introduction and Overview 1.1 Purpose of the Enrollment The Narragansett Electric
More informationNew Jersey Energy Resilience Bank
New Jersey Energy Resilience Bank Overview SECTION 1 Introduction to the ERB The State of New Jersey 1 New Jersey Energy Resilience Bank (ERB) Overview The extensive damage and outages caused by Superstorm
More informationCommercial Scale. Direct Ownership-Application. Renewable Energy Projects over 10kW. Commercial Block program details can be found at:
Commercial Scale Direct Ownership-Application Renewable Energy Projects over 10kW Commercial Block program details can be found at: http://commerceri.com/finance-business/renewable-energy-fund/commercial-scale-projects/
More informationINDUSTRIAL ENERGY OPTIMIZATION PROGRAM
INDUSTRIAL ENERGY OPTIMIZATION PROGRAM YOU VE GOT THE POWER TO SAVE Identify energy waste and reduce your production costs. Our efficiency experts will provide customized technical assistance to help you
More informationLeveraging NYSERDA Funds for Energy Efficiency Upgrades
Leveraging NYSERDA Funds for Energy Efficiency Upgrades Sarah Eckstein ERS, Energy & Resource Solutions Representing Willdan Energy Solutions as a NYSERDA Outreach Contractor 1 About ERS Energy Engineering
More informationRESIDENTIAL AND SMALL COMMERCIAL STANDARD OFFER PROGRAM
RESIDENTIAL AND SMALL COMMERCIAL STANDARD OFFER PROGRAM Incorporates changes approved at the PUCT 8/21/03 Open Meeting PROGRAM OVERVIEW Description The Residential and Small Commercial Standard Offer Program
More informationCUSTOM COMMERCIAL & INDUSTRIAL (C&I) Program Application
CUSTOM COMMERCIAL & INDUSTRIAL (C&I) ENERGY IS PRECIOUS. LET S NOT WASTE IT. TABLE OF CONTENTS TERMS AND CONDITIONS... 2 CUSTOM C&I PROJECT SPECIFICATIONS... 3 STEPS FOR SUBMITTING YOUR APPLICATION...
More informationRefer to section 2.C. for more information on the evaluation criteria.
SOLARIZE RALEIGH PILOT PROGRAM DRAFT Request for Proposals from Installers of Residential Solar Photovoltaic Systems Proposed Posting Date: February 4, 2014 I. OPPORTUNITY SUMMARY: The North Carolina Solar
More informationEVALUATION AND STATUS REPORT
NEW YORK S SYSTEM BENEFITS CHARGE PROGRAMS EVALUATION AND STATUS REPORT QUARTERLY REPORT TO THE PUBLIC SERVICE COMMISSION QUARTER ENDING SEPTEMBER 30, 2009 FINAL REPORT NOVEMBER 2009 NEW YORK STATE ENERGY
More informationMay 25, Request for Proposals No Offsite Virtual Net Metering
May 25, 2018 Request for Proposals No. 28017 Offsite Virtual Net Metering I. Introduction The Rhode Island Airport Corporation (RIAC) seeks proposals from qualified enterprises to provide offsite virtual
More informationENGIE FEED IN TARIFF APPLICATION FORM. Version ENGIE FIT Application P a g e 0
ENGIE FEED IN TARIFF APPLICATION FORM Version 21.12.2017 ENGIE FIT Application P a g e 0 Completing the FIT form The FIT form won t take long to complete, but will ask for specific details throughout.
More informationCommunity Solar Garden Program Form
Community Solar Garden Program Form Application Instructions The completed application and associated forms must be sent electronically to LPEA at: CommunitySolarGardenApp@lpea.coop Community Solar Garden
More informationActual Expenditures, Last Three Budgets, include funding sources:
Actual Expenditures, Last Three Budgets, include funding sources: Actual Expenditures: 2011-13: $450,666 2013-15: $685,017 2015-17 (projected): $803,010 Funding Sources: Fees collected from program applicants,
More information2018 RENEWABLE ENERGY GROWTH PROGRAM
National Grid The Narragansett Electric Company 2018 RENEWABLE ENERGY GROWTH PROGRAM Consisting of: Tariffs and Solicitation and Enrollment Process Rules Pre-filed Testimony and Schedules of Ian Springsteel
More informationNew York s system BeNefits Charge Programs evaluation and status report
New York s system BeNefits Charge Programs evaluation and status report QuarterlY report to the PuBliC service CommissioN Quarter ending september 30, 2010 final report NovemBer 2010 New York state energy
More information1 Customer and Contact Information
Appalachian Power C&I Program Rebate Application Before you start Review the eligibility detail requirements and terms and conditions at the end of this application to verify that you are eligible for
More information2017 Residential & Hard-to-Reach Standard Offer Programs Workshop. October 26, 2016
2017 Residential & Hard-to-Reach Standard Offer Programs Workshop October 26, 2016 2 2 AEP Contact Information AEP Texas Central Company (TCC) Residential: Jim Fowler 361-881-5790 jjfowler@aep.com Hard-to-Reach:
More informationMay 6, 2002 Revision 2
Self-Generation Incentive Program Handbook May 6, 2002 Revision 2 Table of Contents 1. Introduction...5 1.1 Program Summary...5 1.2 Program Background...5 2. Program Eligibility Criteria and Requirements...6
More informationThe Narragansett Electric Company d/b/a National Grid
The Narragansett Electric Company d/b/a National Grid Rhode Island Renewable Energy Growth Program Solicitation and Enrollment Process Rules for Small Scale Solar Projects Effective Date: April 1, 2018
More informationPacifiCorp 2017S SOLAR Request for Proposals. Bidder s Conference Portland November 21, 2017
PacifiCorp 2017S SOLAR Request for Proposals Bidder s Conference Portland November 21, 2017 Workshop Date/Time November 21, 2017 Location Portland, Oregon 10:00 AM 12:00 PM Logistics PacifiCorp s Lloyd
More informationFEED-IN TARIFF LICENSEE TRANSFER
ABOUT FEED-IN TARIFFS The Feed-in Tariff (FIT) scheme is an environmental programme introduced by Government to promote widespread uptake of a range of small-scale renewable and low carbon electricity
More informationPHILADELPHIA ENERGY AUTHORITY
PHILADELPHIA ENERGY AUTHORITY REQUEST FOR QUALIFICATIONS for A Heating, Cooling and Power Supplier for the Public Safety Services Campus 2015 Issued by: Philadelphia Energy Authority Philadelphia Energy
More informationFeed in Tariffs (FIT) Generator Application Form
First Utility is part of the Feed in Tariffs scheme and support our own electricity customers. If your current electricity supplier is British Gas, E.ON, EDF Energy, Npower, Scottish Power, SSE, Utility
More informationPART 1 - Rules and Regulations for the Renewable Energy Development Fund Programs
870-RICR-20-00-1 TITLE 870 - COMMERCE CORPORATION CHAPTER 20 - LOANS AND GRANTS SUBCHAPTER 00 N/A PART 1 - Rules and Regulations for the Renewable Energy Development Fund Programs 1.1 AUTHORITY These Rules
More informationEnergy Efficiency Alberta Residential and Commercial Solar Program Terms and Conditions
Energy Efficiency Alberta Residential and Commercial Solar Program Terms and Conditions Thi Updated: ebook provides an overview of the eligibility Page 1 of 11 requirements, available funding, and process
More information2016 Residential & Hard-to-Reach Standard Offer Programs Workshop. October 28, 2015
2016 Residential & Hard-to-Reach Standard Offer Programs Workshop October 28, 2015 1 AEP Contact Information AEP Texas Central Company Residential: Jim Fowler Hard-to-Reach: Vee Strauss 361.881.5790 jjfowler@aep.com
More informationNon-Pipeline Solutions Pre-RFP Webinar. January 24, 2018
Non-Pipeline Solutions Pre-RFP Webinar January 24, 2018 Agenda Con Edison s Need for Non-Pipeline Solutions Con Edison s Smart Solutions for Natural Gas Customers initiative Con Edison s Non-Pipeline Solutions
More informationOregon Community Solar Program + U.S. DOE SunShot In Your Community Challenge
Oregon Community Solar Program + U.S. DOE SunShot In Your Community Challenge 2017 Fall Energy Symposium October 16-17, 2017 Hood River, Oregon SunShot: Solar In Your Community Challenge A U.S. Department
More informationUtility Warehouse. Feed-In Tariff scheme. Application form
Utility Warehouse Feed-In Tariff scheme Application form Applying for a Utility Warehouse Feed-In Tariff Thank you for your interest in the Utility Warehouse Feed-In Tariff scheme The Feed-in Tariff (FIT)
More informationTrade Ally WPS Bonus Bid Program
Trade Ally WPS Bonus Bid Program Table of Contents Introduction... 3 I. Program Goals... 3 II. Anticipated Funding... 3 III. Timeline... 4 IV. Definitions... 5 Program Information... 7 I. Program Introduction...
More informationNew Solar Homes Partnership Program Webinar
New Solar Homes Partnership Program Webinar December 16, 2015 1 Q&A after presentation Housekeeping E-mail questions during presentation to renewable@energy.ca.gov with subject line NSHP Webinar 12-16-15
More informationIllinois Power Agency Long-Term Renewable Resources Procurement Plan. What s Next?
Illinois Power Agency Long-Term Renewable Resources Procurement Plan What s Next? Anthony Star Director Illinois Power Agency Institute for Regulatory Policy Studies Spring 2018 Conference Long-Term Renewable
More informationFeed-In Tariff scheme
Utility Warehouse Feed-In Tariff scheme An Introduction and guide to your application This leaflet introduces you to the Utility Warehouse Feed- In Tariff scheme; what it is, how it works, how to apply
More informationAgenda. CMFNH and California Advanced Homes Program (CAHP) CSI Solar Initiative. CSI Solar Thermal. New Solar Homes Partnership (NSHP)
1 Agenda CMFNH and California Advanced Homes Program (CAHP) Program Requirements, Application Process, Incentives Questions for CMFNH and CAHP CSI Solar Initiative Program Requirements, Application Process,
More informationPay For Performance (P4P) Program Guide for Commercial & Industrial (C&I) New & Existing Buildings. Fiscal Year 2017 (7/1/2016 through 6/30/2017)
Pay For Performance (P4P) Program Guide for Commercial & Industrial (C&I) New & Existing Buildings Fiscal Year 2017 (7/1/2016 through 6/30/2017) Table of Contents 1. Purpose... 4 2. General Program Description...
More informationProduction Device Registration
I-REC Code Subsidiary Document 02 Production Device Registration version 1.4 I-REC Code Subsidiary Document 02 Production Device Registration Version 1.4 Contents 1. Introduction... 4 1.1 The I-REC Service...
More informationBUSINESS. New Construction. Save money on qualified construction projects. Read about rebates for your home and business at mid.
BUSINESS New Construction Save money on qualified construction projects Read about rebates for your home and business at mid.org/rebates REV06.2018 PURPOSE The MPower Business: New Construction Rebate
More informationCommercial & Industrial (C&I) Local Government Energy Audit (LGEA) Program Program Guide. Fiscal Year 2017 (7/1/2016 through 6/30/2017)
Commercial & Industrial (C&I) Local Government Energy Audit (LGEA) Program Program Guide Fiscal Year 2017 (7/1/2016 through 6/30/2017) Table of Contents 1. Overall Program Description... 3 2. Target Market...
More informationUC/CSU/IOU Energy Efficiency Partnership
UC/CSU/IOU Energy Efficiency Partnership 1. Projected Program Budget $ 6,830,972 2. Projected Program Impacts MWh 2,596 MW (Summer Peak) 0.55 3. Program Cost Effectiveness TRC 2.18 PAC 2.22 4. Program
More informationENERGY EFFICIENCY PROGRAM FOR BUSINESS Program Overview & Designated Trade Ally Training
ENERGY EFFICIENCY PROGRAM FOR BUSINESS 2018 Program Overview & Designated Trade Ally Training 1 ENERGY EFFICIENCY PROGRAM FOR BUSINESS Sean Pachuta Outreach 2 ENERGY EFFICIENCY PROGRAM FOR BUSINESS Safety
More informationBEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION
Duquesne Light Statement No. BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION PETITION OF DUQUESNE LIGHT COMPANY FOR APPROVAL OF ITS ENERGY EFFICIENCY AND CONSERVATION PLAN PHASE III Docket Nos. P-0-
More information2017 All Source Request for Proposals for Electric Power Supply and Load Management Resources. Pre-Bid Meeting
2017 All Source Request for Proposals for Electric Power Supply and Load Management Resources Pre-Bid Meeting July 19, 2017 2:00 PM MST 100 N. Stanton Safety and Basics Emergency Escape Routes Facilities
More informationFeed-in Tariff: Draft guidance for renewable installations (Version 5)
Promoting choice and value for all gas and electricity customers Feed-in Tariff: Draft guidance for renewable installations (Version 5) Draft Guidance Reference: 160/12 Contact: Renewables & CHP team Publication
More informationFAQ. Frequently Asked Questions
FAQ Frequently Asked Questions CONTENTS General Efficiency... 3-4 Efficiency Auction.... 5 Pre-Qualification Process... 6 Project Eligibility Program... 7 Program Details... 8 Program Implementation...
More informationSolar Photovoltaic. Standard Offer Program (SVPSOP) 2018 Program Manual. Rev # Final
Solar Photovoltaic Standard Offer Program (SVPSOP) 2018 Program Manual Rev # Final CONTENTS 1 Introduction... 3 2 Program Overview... 3 3 Solar Photovoltaic Standard Offer Program... 3 3.1 Program Options...
More informationRenewable Energy Incentive Program. Guidebook
Renewable Energy Incentive Program Guidebook January 2009 Version 1.0 Table of Contents List of Figures, Tables, and Glossary of Abbreviations... 4 Overview of the Renewable Energy Incentive Program...
More informationEnergy Efficiency Program for Business
2014 Energy Efficiency Program for Business 1 2014 Energy Efficiency Program for Business Program Overview 2 Program Overview Program purpose To help commercial and industrial contractors and customers*:
More informationFeed-in Tariff: Guidance for renewable installations (Version 5)
Promoting choice and value for all gas and electricity customers Feed-in Tariff: Guidance for renewable installations (Version 5) Guidance Reference: 57/13 Contact: Renewables & CHP team Publication date:
More informationPilot Program Framework Proposal
Pilot Program Framework Proposal Brian Yung Market Design Specialist Market Issues Working Group June 21, 2017, 10 Krey Blvd, Rensselaer, NY 12144 Background Date Working Group Discussion points and links
More information2012 Request for Proposals Solar On-site Renewable Energy Credits (REC)
U Issued Date: September 10, 2012 Proposal Submission Date: October 15, 2012 2012 Request for Proposals Solar On-site Renewable Energy Credits (REC) Xcel Energy Inc. is a major U.S. investor-owned electric
More informationAMSP Guidebook. February 2017
AMSP Guidebook This Guidebook provides an overview of the eligibility requirements, available funding, and process for municipalities to participate in the Alberta Municipal Solar Program. February 2017
More informationMCE Feed-In Tariff for Distributed Renewable Generation
I. Applicability MCE Feed-In Tariff for Distributed Renewable Generation Revised and Effective as of March 2018 This Feed-in Tariff ( FIT ) Schedule ( Schedule FIT ) is available to qualifying Applicants
More informationCUSTOM INCENTIVE GUIDE
2017 CUSTOM INCENTIVE GUIDE NEED HELP? CALL 800.762.7077 HOW TO APPLY Custom incentives provide opportunities to upgrade equipment and receive incentives for technologies not available prescriptively.
More informationQalovis Energy Introduction and FleXgen Overview
Qalovis Energy Introduction and FleXgen Overview 20.05.2010 Jason Shrieves Qalovis Stirling Systems Coordinator Qalovis Farmer Automatic Energy www.qalovis.com Seite 1 Topics Who is Qalovis? Qalovis product
More informationFinancing Energy Efficiency Projects in Michigan
Wastewater Administrators Conference January 25, 2018 Financing Energy Efficiency Projects in Michigan Andrew Dow, Donohue & Associates 1 Funding Mechanism Overview Qualified Energy Conservation Bonds
More informationSustainable Jersey Smal Grants Program for Energy Initiatives Funded by The Gardinier Environmental Fund Announcement Date: Application Due Date:
Sustainable Jersey Small Grants Program for Energy Initiatives Funded by The Gardinier Environmental Fund 2017 Municipality and School District Grant Application Package Announcement Date: Monday, August
More informationCity of Loveland Incentive Policy. Adopted October 2017
City of Loveland Incentive Policy Adopted October 2017 1 Introduction 2 Vision Loveland is a community with a growing and diverse economic base that offers ample employment and business opportunities to
More informationRequest for Proposals and Specifications for a Distributed Generation Solar Project entitled The Freeman Coliseum Solar Project
Request for Proposals and Specifications for a Distributed Generation Solar Project entitled The The Freeman Coliseum 3201 E. Houston St. San Antonio, TX 78219 September 25, 2016 Table of Contents 1. Introduction...
More informationCalifornia Self-Generation Incentive Program Evaluation
California Self-Generation Incentive Program Evaluation Brenda Gettig, Itron, Inc. Patrick Lilly, Itron, Inc. Alan Fields, Itron, Inc. Kurt Scheuermann, Itron, Inc. Lori Kudo, Itron, Inc. Pierre Landry,
More informationFeed in Tariff Application Form
Feed in Tariff Application Form If you are producing your own renewable electricity you need to appoint an electricity supplier in order to get your Feed-in Tariff (FIT) payments. LoCO2 Energy has teamed
More informationFeed-In Tariff (FIT) Statement of Terms
Feed-In Tariff (FIT) Statement of Terms 1 This FIT Statement of Terms for the provision of Generation and Export (where applicable) Feed-in-Tariffs by SSE Electricity Limited (trading as Southern Electric,
More informationFeed-in Tariff Scheme: Guidance for Licensed Electricity Suppliers
Feed-in Tariff Scheme: Guidance for Licensed Electricity Suppliers Document type: Guidance Document Ref: 61/10 Date of publication: 14 May 2010 Target audience: All GB licensed electricity suppliers and
More informationProject Application Webinar
Green Infrastructure Phase II Emerging Renewable Power Program Project Application Webinar March 9, 2018 2 Contents Background Applicant Guide Overview: Eligibility and funding Application process Project
More informationNY-Sun Operating Plan. New York State Energy Research and Development Authority Albany, NY
NY-Sun 2016-2023 Operating Plan Prepared by: New York State Energy Research and Development Authority Albany, NY 8/1/2016 Contents SECTION 1: INTRODUCTION... 3 1.1. Background... 3 Section 2: PROGRAM DESCRIPTIONS...
More informationNY-Sun CHG&E SOLAR SUMMIT VI 6th Annual Conference for Solar Energy Professionals
NY-Sun CHG&E SOLAR SUMMIT VI 6th Annual Conference for Solar Energy Professionals Lillie Ghobrial & Alison Neligan March 2, 2016 2 Agenda NY-Sun Background & Objectives NY-Sun Components: Incentive Program
More informationGoSolarSF Program handbook
GoSolarSF Program handbook Table of Contents GoSolarSF Program Handbook Fiscal Year 2017-2018 1. INTRODUCTION: GOSOLARSF PROGRAM... 2 1.1. PROGRAM OVERVIEW... 2 1.2. GOSOLARSF APPLICATION PROCESS... 2
More informationIntroduction and Instructions
Alaska Village Energy Efficiency Program (VEEP) Funding Announcement & Instructions - RFA AEA-14-008 Announcement Date: July 1, 2013 Application Due Date: August 12, 2013 Introduction and Instructions
More informationFOCUS ON ENERGY BID FOR EFFICIENCY OFFERING. Frequently Asked Questions (FAQs)
FOCUS ON ENERGY BID FOR EFFICIENCY OFFERING Frequently Asked Questions (FAQs) CONTENTS GENERAL INFORMATION... 3 PROJECT ELIGIBILITY... 3 PRE-QUALIFICATION PROCESS... 5 EFFICIENCY AUCTION... 6 OFFERING
More informationFederal stimulus funds allotted to City, County and surrounding municipalities
Energy Edge A NEWSLETTER FOR MEMPHIS LIGHT, GAS AND WATER DIVISION GENERAL POWER CUSTOMERS MAY 2009 Federal stimulus funds allotted to City, County and surrounding municipalities MLGW and other City Divisions
More informationEnergy Efficiency Alberta Residential and Commercial Solar Program Guidebook
Energy Efficiency Alberta Residential and Commercial Solar Program Guidebook This Guidebook provides an overview of the eligibility requirements, available funding, and process for municipalities to participate
More informationMultifamily Affordable Solar Housing. Semi Annual Progress Report. July 30, 2012
Multifamily Affordable Solar Housing Semi Annual Progress Report July 30, 2012 Table of Contents 1. Executive Summary... 2 2. Background... 3 2.1. Incentive Types: Track 1 (A and B) and Track 2... 4 Table
More informationJuly 1, 2006 Revision 2
Self-Generation Incentive Program Modification Guideline (PMG) July 1, 2006 Revision 2 TABLE OF CONTENTS TABLE OF CONTENTS...i 1. GUIDELINE BACKGROUND & PURPOSE...1 1.1. Background...1 1.2. Purpose...1
More information2016 Call. Operational Programme I European Structural and Investment Funds
Grant Scheme for PV systems 2016 Call Operational Programme I European Structural and Investment Funds 2014 2020 Fostering a competitive and sustainable economy to meet our challenges Project part Financed
More informationRequest for Proposals ( RFP ) Under the SREC-Based Financing ( SREC-II ) Program
Request for Proposals ( RFP ) Under the SREC-Based Financing ( SREC-II ) Program ROUND 8 OF 9 For New Eligible Residential/Small-Commercial Solar Photovoltaic Projects (up to 50 kw); Commercial Solar Photovoltaic
More informationThe Evolution of a Successful Efficiency Program: Energy Savings Bid
The Evolution of a Successful Efficiency Program: Energy Savings Bid Carrie Webber, KEMA, Inc. ABSTRACT San Diego Gas and Electric s Energy Savings Bid Program is a highly successful commercial energy-efficiency
More informationRequest for Proposals and Specifications for a Community Solar Project
Request for Proposals and Specifications for a Community Solar Project CPS Energy P.O. Box 1771 San Antonio, TX 78296-1771 October 9, 2014 PR # 10452716 INVITATION TO SUBMIT PROPOSALS 1. Introduction CPS
More informationHigher Education Energy Efficiency Partnerships
Higher Education Energy Efficiency Partnerships Lisa Hannaman Account Manager, Southern California Edison Higher Education Energy Efficiency Partnerships These collaborative Partnerships are designed to:
More informationF I L E D :51 AM CALIFORNIA SOLAR INITIATIVE FINAL HANDBOOK APRIL Arnold Schwarzenegger, Governor
CALIFORNIA SOLAR INITIATIVE F I L E D 04-12-07 11:51 AM FINAL HANDBOOK APRIL 2007 Arnold Schwarzenegger, Governor The California Public Utilities Commission (CPUC) prohibits discrimination in employment,
More informationRequest for Proposals Scaling Up for Success Grant Cycle: July 2016 June 2019 Maximum Annual Grant Amount: $100,000. Introduction
Request for Proposals Grant Cycle: July 2016 June 2019 Maximum Annual Grant Amount: $100,000 Introduction For 89 years, United Way of Rhode Island (UWRI) has been helping Rhode Islanders help themselves
More informationAPPLICATION FOR TECHNICAL ASSISTANCE PROGRAM CONTACT INFORMATION. Progress Energy Carolinas INCENTIVE PROGRAM
APPLICATION FOR TECHNICAL ASSISTANCE PROGRAM CONTACT INFORMATION Progress Energy Carolinas INCENTIVE PROGRAM Visit our website http://progress energy.com/carolinasbusiness or Call our program hotline 866.326.6059
More informationCommercial-Scale Solar Hot Water Program Manual
Commercial-Scale Solar Hot Water Program Manual Posting Date: May 1, 2018 The Massachusetts Clean Energy Technology Center ( MassCEC ) has authorized ten million dollars ($10,000,000) in funding for the
More informationPartner(s): City of Asheville, Duke Energy Progress, Green Built Alliance, Community Action Opportunities, NC Sustainable Energy Association (NCSEA)
Project Title: Blue Horizons - Efficiency Network Summary Statement: Buncombe County, the City of Asheville, Duke Energy Progress, and other partners propose a pilot program to centralize, enhance, and
More informationPOLICY FOR DEVELOPMENT OF SOLAR PARKS IN THE STATE OF MADHYA PRADESH
Preamble: POLICY FOR DEVELOPMENT OF SOLAR PARKS IN THE STATE OF MADHYA PRADESH State Government (GoMP) has notified its policy for implementation of solar power based projects 2012. In clause number 4
More informationDER Pilot Program. Brian Yung Market Design Specialist Business Issues Committee. August 9, 2017, 10 Krey Blvd, Rensselaer, NY 12144
DER Pilot Program Brian Yung Market Design Specialist Business Issues Committee August 9, 2017, 10 Krey Blvd, Rensselaer, NY 12144 Previous Materials Date Working Group Discussion points and links to materials
More informationMemo of Understanding - Evergreen Options Grant Award
Memo of Understanding - Evergreen Options Grant Award Issue Date: Grant Recipient s Legal Name: Taxpayer ID No. Mailing Address: Facility Address: Contact Name: Renewable Energy Project ( Project ): This
More information1. Research Customer Research the various types of renewable energy systems available and decide which system best fits your consumption needs.
1 2 3 4 1. Research Customer Research the various types of renewable energy systems available and decide which system best fits your consumption needs. Research contractors and third party system owners
More informationEl Paso Electric Company New Mexico Energy Efficiency and Load Management Programs
Company 2019 2021 New Mexico Energy Efficiency and Load Management Programs Request for Proposals RFP# EPE-50062135-MM Released on: October 9, 2017 Melissa Muñoz Contract Negotiator 100 N. Stanton, Loc.
More informationNew Renewable Energy System Incentive Program
2017 Washington State Solar Summit New Renewable Energy System Incentive Program Jake Fey, Director WSU Energy Program History: The Renewable Energy Cost Recovery Program In 2005, a production incentive
More informationThe State of Interconnection in NYS:
The State of Interconnection in NYS: Understanding the Current Situation, Navigating the New Interconnection Requirements in NY, and What s Next Melissa Kemp, NYSEIA Policy Co-Chair About NYSEIA NYSEIA
More informationSouthern California Edison Original Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Cal. PUC Sheet No.
Southern California Edison Original Cal. PUC Sheet No. 52964-E Schedule Re-MAT Sheet 1 A. APPLICABILITY The Renewable Market Adjusting Tariff schedule (Re-MAT or this Schedule) implements the renewable
More informationDOE Request for Information (RFI) DE-FOA Weatherization Assistance Program Sustainable Energy Resources for Consumers Grants
Date: March 8, 2010 DOE Request for Information (RFI) DE-FOA-0000283 Weatherization Assistance Program Sustainable Energy Resources for Consumers Grants Subject: Request for Information (RFI) Description:
More information2017 Solar*Rewards Large Request for Proposals Solar On-site Renewable Energy Credits (REC)
U 2017 Solar*Rewards Large Request for Proposals Solar On-site Renewable Energy Credits (REC) Issued Date: July 06, 2017 Proposal Submission Date: August 18, 2017 Xcel Energy Inc. is a major U.S. investor-owned
More information