1 FLORIDA-ALABAMA TRANSPORTATION PLANNING ORGANIZATION 2017 PEDESTRIAN BICYCLE MASTER PLAN UPDATE Scope of Work Project Name: Purpose: Florida-Alabama TPO 2017 Pedestrian Bicycle Master Plan Update To provide a resource for Escambia County, Santa Rosa County, and Baldwin County citizens, planners, developers, and political leaders to use for the establishment of pedestrian and bicycle friendly communities. Project Manager: Project Team: Internal Consulting Team: Assistance from Others: Mary Beth Washnock, WFRPC Staff Brittany Ellers, WFRPC Staff Jessica Paul, WFRPC Staff Jill Lavender, WFRPC Staff Jenny Cook, WFRPC Staff Gary Kramer, WFRPC Staff Advocacy Working Groups Local Government Planners Local Government Engineers Florida Department of Transportation Alabama Department of Transportation Federal Highway Administration Concerned Citizens Deliverable(s): Florida-Alabama TPO Pedestrian Bicycle Master Plan Update Proposed Schedule: Project to be initiated in February 2017 and completed within 15 months of Notice to Proceed Date 1 P age
2 BACKGROUND SCOPE OF WORK A network of complete streets improves the safety, convenience, efficiency, and accessibility of the transportation system for all users. The TPO has a history of planning for complete streets that dates back well before the creation and popularity of the term. The 2005 Bicycle & Pedestrian Plan was centered on providing transportation choices by integrating bicycle and pedestrian facilities in transportation planning activities. The 2010 Bicycle Pedestrian Plan centered on identifying potential bicycle and pedestrian facility improvements and prioritizing them for future construction. In addition, the Florida Department of Transportation adopted the Complete Streets policy in September 2014, which promotes safety, quality of life, and economic development in Florida. INTENT Given the many bicycle and pedestrian improvements over the past five years as well as the addition of the Complete Streets policy, the TPO will undertake an effort to incorporate the improvements and Complete Streets policy into an updated Pedestrian and Bicycle Master Plan. The ultimate goal of this plan is to develop a non-motorized system that addresses the needs of all users and encourages the use of alternative modes of transportation. By providing alternate modes of transportation, citizens benefit not only with their own physical health but increased prosperity for themselves and the community as a whole. The purpose of the Florida- Alabama TPO Pedestrian Bicycle Master Plan Update is to: Develop a shared vision for all communities through public input. Develop strategies that support integration of safe and well-connected pedestrian and bicycle networks into the overall transportation system. In providing a comprehensive evaluation of the existing network of pedestrian and bicycle connections, the following objectives should be met: Identify existing federal, state, and local legislation policies and plans that affect pedestrians and bicyclists. Formulate a public involvement plan to be used throughout the development of the plan. Take into account the demographic and socioeconomic characteristics of local communities. Develop an inventory of existing and proposed pedestrian and bicycle facilities, including opportunities and constraints in the network. Identify a methodology for prioritizing pedestrian and bicycle projects. Develop an implementation process by which the identified goals and objectives of the plan can be attained. Develop and maintain channels for educating/informing the public on planning efforts. 2 P age
3 Task 1.0 Public Involvement Plan and Plan Marketing A. The WFRPC staff will utilize the Florida-Alabama TPO Public Participation Plan (PPP) throughout the development of the pedestrian bicycle plan. The PPP shall identify the specific public involvement procedures to be used throughout the project, including public outreach procedures, meeting formats, presentations to the TPO and steering committees, and the utilization of feedback and comments throughout the project. Specifically, the WFRPC staff will utilize feedback from the Advocacy Working Group to develop the vision statement, goals, and objectives. B. The PPP shall identify specific outreach efforts to inform and involve the traditionally underserved (such as limited English proficiency, disabled, minority, and low-income populations) in this plan. The plan shall involve the participation of a variety of interested parties including recreational pedestrian and cycling organizations, law enforcement, parents, students, school safety officials, university safety officials, and underserved communities, as well as the general public. C. The WFRPC staff will solicit public input by using social media, outreach materials, and online presence for the planning effort. The WFRPC staff will also continuously monitor and update online media. Ø Facebook page, Ø Webpage will be hosted on the West Florida Regional Planning Council website, Ø And outreach materials including but not limited to, plan logo, handouts, maps, surveys, flyers, and graphics. Task 2.0 Data Inventory A. The WFRPC staff will provide a comprehensive summary of legal documents, plans, and ordinances that may influence any dimension of the pedestrian and bicycle master plan. The following information will be included: Municipal and County comprehensive plans, local government master plans, previous bike/ped plans, current neighborhood plans and studies, the congestion management process plan, current TIP, priority projects report, the TPO Long Range Transportation Plan, and the current Transit Development Plan. Legal ordinances and policies relevant to the completion and implementation of the pedestrian and bicycle master plan. This will include any local, state, and federal legislation which bears an impact on pedestrian and bicycle travel networks. State legislation on greenways and trails including research of the current state greenways and trails program. B. The WFRPC staff will collect and present all appropriate demographic, socioeconomic, land use, transportation, and comprehensive plan data necessary for assessing the TPO area s pedestrian and bicycle transportation needs. The plan network will coincide with, but not be limited to, the TPO s most recent Congestion Management Process (CMP) Plan and consist of arterial and collector roadways. The data to be collected will include, but not be limited to, the following: Demographic and socioeconomic data for the TPO area. This will also include information on automobile ownership and commuting trends describing mode splits for the area. Inventory of existing and planned pedestrian and bicycle networks and facilities as needed. Pedestrian and bicycle crash data. Neighborhood and land use characteristics which will include locations of schools, parks, playgrounds, and other recreational and cultural areas which are destinations for pedestrians and bicyclists. Ø Summary report of existing policies and plans within TPO area, Ø Community profile with demographic and socioeconomic data, 3 P age
4 Ø And GIS data/mapping as required through the course of the plan. Task 3.0 Civic Engagement The plan will be conducted in a collaborative atmosphere, with public participation integrated into the process of the technical evaluation and prioritization. The plan will incorporate the following civic engagement efforts: TPO presentations: The WFRPC staff will provide three sets of presentations to the TPO board and committees and report the progress. Advocacy Working Group: An Advocacy Working Group will be formatted to help provide guidance on the plan, and will be responsible for reviewing and providing comments on key deliverables, development of vision statement, goals, and objectives, and providing input on plan recommendations. It is anticipated that the Advocacy Working Group will have a minimum of three (3) meetings. The Committee may include representation of stakeholder groups such as recreational pedestrian and cycling organizations, law enforcement, citizens, school safety officials, university safety officials, transportation planning and design professionals, and other groups as determined. Public meetings: The WFRPC staff will hold three (3) public meetings which may be in the form of open houses and/or charrettes. Targeted outreach: The WFRPC staff will use various methods of targeting stakeholders, such as surveys, focus group meetings, social media outreach, and neighborhood pop up events. Ø Three sets of TPO presentations, Ø Three Advocacy Working Group meetings, Ø Three public meetings, Ø And targeted outreach. Task 4.0 Prioritization Methodology The WFRPC staff will work with the Advocacy Working Group to develop criteria and a methodology for prioritizing pedestrian and bicycle projects. The methodology will include consideration of the following: Level of Service (LOS) standards consistent with the standards established by the Florida Department of Transportation (FDOT). Previously identified needs and improvements from other plans. Feedback from civic engagement efforts that determines specific deficiencies and community perceptions. Potential demand for pedestrian and bicycle facilities. Ø Technical memorandum describing the prioritization methodology, Ø And summary of major pedestrian and bicycle trends, issues, needs constraints, and opportunities within the TPO area. Task 5.0 Identification of Vision, Goals and Objectives The WFRPC staff will identify the vision statement and a series of logical and realistic goals and objectives for the plan based on public input and the analysis of existing conditions. Objectives set specific, measurable milestones to be completed that will enable progress toward reaching the community vision. The objectives will be system and performance oriented and will provide quantitative direction towards the attainment of goals. Ø Vision statement, goals, and objectives. 4 P age
5 Task 6.0 Identification of Funding Sources and Best Practices Review The WFRPC staff will provide a summary of existing funding sources available for the construction and improvement of pedestrian and bicycle transportation facilities. The summary will also include the review of best practices for funding opportunities and improvements. Ø Summarization of existing and potential funding sources and review best practices for funding improvements. Task 7.0 Development of Plan and Selection of Improvements The WFRPC staff will develop a Pedestrian Bicycle Master Plan Update built upon the task descriptions and results. The analysis of possible improvements will be conducted to assess the implications to the study area, the ability to address identified issues, trends, needs, conflicts, and problems and opportunities, as well as potential funding sources and revenue. The plan and all of the information shall be in a concise, organized, and understandable format for public consumption. Based on the results of the previous task, possible improvements will include the following elements: Locations and types of facilities to be built for different communities. Strategies for improving pedestrian and bicycle safety, such as safety education programs and improvement of roadway signage. A system for maintenance and management of current and future pedestrian and bicycle facilities. Design and safety standards for the provision of pedestrian and bicycle facilities. Policies for realization of the plan s specified goals and objectives of the plan. Strategies for monitoring and evaluating the success and implementation of the plan. A post-plan public meeting to introduce the final plan to the public. The format and the content of materials shall be suitable for public consumption. Ø Final plan delivered in ten (10) hard copies and electronic format (MS Word and Searchable PDF format), Ø And one post-plan meeting. 5 P age
6 Summary of Deliverable Deliverable 1: Public involvement plan, Facebook page, Website may be hosted on the West Florida Regional Planning Council website, And outreach materials including but not limited to plan logo, handouts, maps, surveys, flyer, and graphics. Deliverable 2: Summary report of existing policies and plans within TPO area, Community profile with demographic and socioeconomic data, And GIS data/mapping as required through the course of the plan. Deliverable 3: Three sets of TPO presentations, Three Advocacy Working Group meetings, Three public meetings, And targeted outreach. Deliverable 4: Technical memorandum describing the methodology of prioritization, And summarization of major pedestrian and bicycle trends, issues, needs constraints, and opportunities within the TPO area. Deliverable 5: Vision statement, goals, and objectives. Deliverable 6: Summarization of existing and potential funding sources and review best practices for funding improvements Deliverable 7: Final plan delivered in ten (10) hard copies and electronic format (MS Word and Searchable PDF format), And one post-plan meeting. 6 P age
2016 Public Participation Plan. Florida-Alabama Transportation Planning Organization (TPO)
2016 Public Participation Plan Florida-Alabama Transportation Planning Organization (TPO) April 13, 2016 Florida-Alabama Transportation Planning Organization Public Participation Plan April 13, 2016 with
More informationExhibit B. Plumas County Non-Motorized Transportation Plan SCOPE OF WORK
Exhibit B Plumas County Non-Motorized Transportation Plan SCOPE OF WORK PROJECT INTRODUCTION: The proposed project is the development of a legally compliant Plumas County Non- Motorized Transportation
More informationA. CALL TO ORDER /PLEDGE/ INVOCATION Mr. Frohlich called the meeting to order and led the pledge. Mr. Lincoln led the invocation.
Page 1 BAY COUNTY CITIZENS ADVISORY COMMITTEE (CAC) April 27, 2016 MEETING MINUTES West Florida Regional Planning Council (Designated staff) Bay County Government Center 840 West 11 th Street Panama City,
More informationREQUEST FOR PROPOSALS
Community Development Department Planning & Zoning Division REQUEST FOR PROPOSALS COMBINED ACTIVE TRANSPORTATION/ SAFE ROUTES TO SCHOOL PLAN State Project No. ATPL-5169 (048) RELEASE DATE: SEPTEMBER 23,
More informationREQUEST FOR PROPOSALS
REQUEST FOR PROPOSALS Town of Hope Mills Multi-Modal Congestion Management Plan September 19, 2016 Fayetteville Area Metropolitan Planning Organization Proposal Due Date: 3:00 PM Eastern Time, 28 th October,
More informationTable of Contents Introduction... 1 Summary of Study Outreach Efforts... 3 Figure No. Description Page
Oak Ridge Road Pedestrian/Bicycle Safety Program Public Involvement and Agency Coordination Summary T Table of Contents Introduction... 1 1.1 Overview of the Project... 1 1.2 Purpose of this Report...
More informationTransportation Alternatives Program Application For projects in the Tulsa Urbanized Area
FFY 2015-2016 Transportation Alternatives Program Application For projects in the Tulsa Urbanized Area A Grant Program of Moving Ahead for Progress in the 21st Century (MAP-21) U.S. Department of Transportation
More informationREQUEST FOR PROPOSALS
REQUEST FOR PROPOSALS Consultant Service to Conduct a Visioning Study and Prepare Recommendations for the Culver City Transit Oriented Development (TOD) District September 2016 RFP Released: September
More informationREQUEST FOR PROPOSALS Development of a Master Plan for Shoelace Park on the Bronx River Greenway
REQUEST FOR PROPOSALS Development of a Master Plan for Shoelace Park on the Bronx River Greenway Issue Date: November 21, 2008 Proposal Submission Deadline: December 31, 2008 Description of Work: The Bronx
More informationPublic Participation Plan
Lowcountry Area Transportation Study (LATS) Metropolitan Planning Organization Approved January 24, 2014 Table of Contents Introduction and Background... 1 Purpose... 1 LATS Organization... 4 Public Participation
More informationA FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICTS FOUR AND SIX COMMUTER SERVICES SCOPE OF SERVICES
Exhibit A FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICTS FOUR AND SIX COMMUTER SERVICES SCOPE OF SERVICES 1.0 Purpose The South Florida Commuter services vendor (hereinafter referred to as Vendor ) for
More informationREQUEST FOR PROPOSAL
REQUEST FOR PROPOSAL FOR SERVICES TO CONDUCT THE BEADLE COUNTY MASTER TRANSPORTATION PLAN THE SOUTH DAKOTA DEPARTMENT OF TRANSPORTATION IN CONJUNCTION WITH BEADLE COUNTY, SOUTH DAKOTA AND THE FEDERAL HIGHWAY
More informationAquidneck Island Transportation Study Public Participation Work Plan. July 6, 2009
Aquidneck Island Transportation Study Public Participation Work Plan July 6, 2009 OVERVIEW The Public Participation Work Plan provides a framework for undertaking a comprehensive outreach process for the
More informationINTRODUCTION. RTPO Model Program Guide February 27, 2007 Page 1
TABLE OF CONTENTS INTRODUCTION... 1 HOW TO USE THIS GUIDE... 2 SECTION I: LAND USE AND TRANSPORTATION CONTEXT... 3 SECTION II: MINIMUM CRITERIA FOR GROWTH AND TRANSPORTATION EFFICIENCY CENTERS... 5 SECTION
More informationODOT s Planning Program Public Involvement Process
ODOT s Planning Program Public Involvement Process The Ohio Department of Transportation Table of Contents 1.0 Introduction to ODOT s Planning Program Public Involvement Process 3 1.1 Public Involvement
More informationDirector of Transportation Planning
Director of Transportation Planning The Lehigh Valley Planning Commission (LVPC) is seeking a candidate for Director of Transportation Planning to lead a team developing and managing the implementation
More informationBOWLING GREEN - WARREN COUNTY METROPOLITAN PLANNING ORGANIZATION
BOWLING GREEN - WARREN COUNTY METROPOLITAN PLANNING ORGANIZATION Fiscal Year 2016 Annual Performance and Expenditure Report July 1, 2015 June 30, 2016 September 2016 Prepared and submitted by: Bowling
More informationPUBLIC PARTICIPATION PLAN
Prepared for: Metropolitan Transportation Planning Organization for the Gainesville Urbanized Area 2040 Long Range Transportation Plan PUBLIC PARTICIPATION PLAN Prepared by: Atkins Global & Quest Corporation
More informationRussell County Commission. Russell County, Alabama. Request for Proposal Comprehensive Plan Pages Notice of Intent to Respond
Russell County Commission Russell County, Alabama Request for Proposal Comprehensive Plan Pages 1-15 Notice of Intent to Respond Request for Proposal Due: February 8, 2010 Table of Contents I. Project
More informationP.O. Box Pensacola, FL 4081 E. Olive Road-Suite A P: F:
Mike Nichols Chairman Pamn Henderson Vice Chairman P.O. Box 11399 32524-1399 Pensacola, FL 4081 E. Olive Road-Suite A 32514 P: 850.332.7976 1.800.226.8914 F: 850.637.1923 www.wfrpc.org MEETING OF THE TRANSPORTATION
More informationTitle VI: Public Participation Plan
Whatcom Council of Governments Public Participation Plan Adopted October 14, 2009 Updated November 12, 2014 Whatcom Council of Governments 314 East Champion Street Bellingham, WA 98225 (360) 676 6974 Whatcom
More informationNORTH CENTRAL TEXAS COUNCIL OF GOVERNMENTS METROPOLITAN PLANNING ORGANIZATION REQUEST FOR PROPOSALS
NORTH CENTRAL TEXAS COUNCIL OF GOVERNMENTS METROPOLITAN PLANNING ORGANIZATION REQUEST FOR PROPOSALS CITY OF CEDAR HILL CITY CENTER TRANSIT-ORIENTED DEVELOPMENT PLAN August 19, 2011 REQUEST FOR PROPOSALS
More informationRequest for Proposals City of Oberlin, Ohio Branding and Cultural Wayfinding Signage Plan
Request for Proposals City of Oberlin, Ohio Branding and Cultural Wayfinding Signage Plan Introduction The City of Oberlin, Ohio, in association with the Firelands Association for the Visual Arts (FAVA),
More informationCitizen Participation in the MPO Transportation Planning Process. Pinellas County Metropolitan Planning Organization Pinellas County, Florida
Citizen Participation in the MPO Transportation Planning Process Pinellas County Metropolitan Planning Organization Pinellas County, Florida PUBLIC PARTICIPATION PLAN PINELLAS COUNTY METROPOLITAN PLANNING
More informationUnified Planning Work Program Fiscal Year 2016 (July 1, 2015 June 30, 2016)
Unified Planning Work Program Fiscal Year (July 1, 2015 June 30, ) APPROVED BY OTO BOARD OF DIRECTORS: April 16, 2015 APPROVED BY USDOT: April 22, 2015 AMENDMENT ONE APPROVED BY OTO BOARD OF DIRECTORS:
More informationRequest for Proposals
Town of Waldoboro 1600 Atlantic Highway, PO Box J Waldoboro, Maine 04572 planning@waldoboromaine.org, (207) 832-5369 PROJECT SUMMARY The Town of Waldoboro, Maine invites qualified consultants (the Consultant
More informationREQUEST FOR PROPOSAL (RFP) Posey County Long Range Transportation Plan
October 23rd, 2015 Attention: Qualified and Interested Consultants REQUEST FOR PROPOSAL (RFP) Posey County Long Range Transportation Plan The Posey County Economic Development Partnership, cooperatively
More informationThe Downtown Revitalization Collaborative
Revitalizing York Village Requires Multiple Complementary Efforts 9 Citizens Community Participation Outreach & Updates Workshops 9 Citizens 9 Citizens 1 5 Design 1 5 Design 1 5 Design & Improvements 1.
More informationComplete Streets Design and Implementation Plan: City of Hoboken
Complete Streets Design and Implementation Plan: City of Hoboken Pre-Proposal Meeting January 3, 2018 Sutapa Bandyopadhyay, Principal Planner Angellita S. Young, Director Finance and Administration NJTPA
More informationThe Public Participation Plan for Transportation Planning
2017 The Public Participation Plan for Transportation Planning Adopted by TCRPC Commission on April 26, 2017 3135 Pine Tree Road, Suite 2C Lansing, Michigan 48911 Toll Free: 1.800.619.6676 Phone: 517.393.0342
More informationCoolidge - Florence Regional Transportation Plan
Coolidge - Florence Regional Transportation Plan A Partnership Among the City of Coolidge, Town of Florence, and ADOT FINAL REPORT Kimley-Horn Kimley Kimley-Horn and and Associates, Associates, Inc. Inc.
More informationPlanning Resources - Tribal. Kenneth Petty
Tribal Transportation Planning Resources - Tribal Planning Modules Transportation Decision-making: Information Tools for Tribal Governments Presenters: Fawn Thompson Kenneth Petty Tribal Planning Modules
More informationREQUEST FOR PROPOSALS
REQUEST FOR PROPOSALS Atlanta s Transportation Demand Management Strategy April 3, 2018 Contact: Audrey F. Leous Central Atlanta Progress, Inc. The Walton Building 84 Walton Street NW, Atlanta, Georgia
More informationRegional Sustainable Infrastructure Planning Grant Program Cycle 1. FINAL Draft
Regional Sustainable Infrastructure Planning Grant Program Cycle 1 FINAL Draft Fresno Council of Governments January 2018 1 Introduction Fresno Council of Governments is simultaneously soliciting Regional
More information2040 Transportation Policy Plan Update. Council Committee of the Whole December 6, 2017
2040 Transportation Policy Plan Update Council Committee of the Whole December 6, 2017 What is the Transportation Policy Plan (TPP)? Long-range transportation plan for the region Required under state and
More informationWilmington Area Planning Council
Wilmington Area Planning Council WILMAPCO Council: John Sisson, Chair Delaware Transit Corporation Chief Executive Officer Robert J. Alt Mayor of Elkton Jennifer Cohan Delaware Dept. of Transportation
More informationPUBLIC PARTICIPATION PLAN
0 PUBLIC PARTICIPATION PLAN GENERAL The City of Tyler currently serves as the fiscal agent for the Tyler Area Metropolitan Planning Organization (MPO), which represents the Tyler Metropolitan Study Area.
More informationPublic Information Plan
Metcalf Shawnee Mission Parkway Bus Corridors Transit Improvements Public Information Plan Prepared by 1 Plan Purpose The public information plan for the Metcalf Avenue/Shawnee Mission Parkway Bus Corridor
More informationPUBLIC PARTICIPATION PLAN
PUBLIC PARTICIPATION PLAN 10263 The Kankakee County Planning Department, acting as the Metropolitan Planning Organization (MPO) for the Kankakee, Illinois Urbanized Area and through the Policy Committee
More informationFlorida s Safe Routes to School Infrastructure Application
Florida s Safe Routes to School Infrastructure Application Call for Applications Note: fields will expand as needed FDOT FORM # 500-000-30 Section 1 School, Applicant & Maintaining Agency Information Notes:
More informationREQUEST FOR PROPOSALS. 1 P a g e. Town of Bayfield, Colorado Parks, Open Space, Trails & Recreation Plan
REQUEST FOR PROPOSALS 1 P a g e Town of Bayfield, Colorado Parks, Open Space, Trails & Recreation Plan INTRODUCTION: The Town of Bayfield, Colorado desires to obtain a qualified consultant, or team of
More informationTable of Contents. 1. Introduction Public Involvement Requirements... 3
Table of Contents 1. Introduction... 1 2. Public Involvement Requirements... 3 3. Public Outreach Techniques... 6 Branding/Messaging... 6 Public Outreach and Partnering... 7 MPO Newsletter... 8 Media...
More informationREQUEST FOR PROPOSALS. Uptown Main Street/US 25 Traffic Calming Analysis. Date Issued: June 5, 2018
i REQUEST FOR PROPOSALS Uptown Main Street/US 25 Traffic Calming Analysis Date Issued: June 5, 2018 REQUEST FOR PROPOSALS (RFP) INSTRUCTIONS 1.1 Project Introduction The City of Greenwood (City) desires
More informationHIGH COUNTRY RURAL PLANNING ORGANIZATION (RPO) 2015 STIP PROJECT SOLICITATION AND RANKING PROCESS
HIGH COUNTRY RURAL PLANNING ORGANIZATION (RPO) 2015 STIP PROJECT SOLICITATION AND RANKING PROCESS Introduction The North Carolina Department of Transportation (NCDOT) and North Carolina General Assembly
More informationTransportation Improvement Program FY
Transportation Improvement Program FY 2016-2021 (Page intentionally left blank) OMAHA-COUNCIL BLUFFS METROPOLITAN AREA PLANNING AGENCY RESOLUTION NUMBER 2015-16 WHEREAS, the members of the Omaha-Council
More informationTable of Contents. Page 2
Sixth Avenue Transportation Demand Management Construction Mitigation Plan August 2014 Table of Contents Table of Contents... 2 1.0 Introduction... 3 Development of Recommendations... 6 2.0 Recommendations...
More informationADMINISTRATIVE CODE BOARD OF COUNTY COMMISSIONERS
ADMINISTRATIVE CODE BOARD OF COUNTY COMMISSIONERS CATEGORY: DEVELOPMENT/PLANNING/ZONING TITLE: TRANSPORTATION PROPORTIONATE SHARE CALCULATIONS FOR NEW DEVELOPMENT PROJECTS CODE NUMBER: AC-13-16 ADOPTED:
More informationREQUEST FOR PROPOSAL
REQUEST FOR PROPOSAL JOHNSON COUNTY ECONOMIC DEVELOPMENT CORPORATION (JCEDC) 300 N. Holden, Suite 301, Warrensburg Missouri 64093 PROPOSAL CLOSING: 4:00 p.m. on Wednesday, April 24, 2013 DATE OF PROPOSAL:
More informationRequest for Proposal #15-07 Professional Engineering Services for Milwaukee Avenue Streetscape Improvements - Monroe Street to Greenwood Avenue
VILLAGE OF NILES REQUEST FOR PROPOSAL Request for Proposal #15-07 Professional Engineering Services for Milwaukee Avenue Streetscape Improvements - Monroe Street to Greenwood Avenue RFQ Number: RFP# 15-07
More informationBOWLING GREEN - WARREN COUNTY METROPOLITAN PLANNING ORGANIZATION
BOWLING GREEN - WARREN COUNTY METROPOLITAN PLANNING ORGANIZATION Fiscal Year 2016 Unified Planning Work Program Approved by Policy Committee - April 13, 2015 Prepared by Bowling Green-Warren County Metropolitan
More informationPUBLIC PARTICIPATION PLAN PINELLAS COUNTY METROPOLITAN PLANNING ORGANIZATION. Jim Kennedy Chairman. John Morroni Vice Chairman
Public Participation Plan Citizen Participation in the MPO Planning Process Metropolitan Planning Organization Pinellas County, Florida PUBLIC PARTICIPATION PLAN PINELLAS COUNTY METROPOLITAN PLANNING ORGANIZATION
More informationAppendix E: Grant Funding Sources
Appendix E: Grant Funding Sources Federal Programs The majority of public funds for bicycle, pedestrian, and trails projects are derived through a core group of federal and state programs. Federal funding
More informationComprehensive Plan 2009
Comprehensive Plan 2009 2.14 PUBLIC SCHOOLS FACILITIES Goal: Coordinate and maintain a high quality education system. Collaborate and coordinate with the Okaloosa County School Board (School Board) to
More informationREQUEST FOR QUALIFICATIONS DOWNTOWN WAYFINDING CONSULTING AND DESIGN
Downtown Partners Sioux City Page 1 of 7 REQUEST FOR QUALIFICATIONS DOWNTOWN WAYFINDING CONSULTING AND DESIGN I. PURPOSE Downtown Partners Sioux City is hereby soliciting consultant qualifications for
More informationHIGH COUNTRY RURAL PLANNING ORGANIZATION (RPO) 2014 STIP PROJECT SOLICITATION AND RANKING PROCESS
HIGH COUNTRY RURAL PLANNING ORGANIZATION (RPO) 2014 STIP PROJECT SOLICITATION AND RANKING PROCESS Introduction The rth Carolina Department of Transportation (NCDOT) and rth Carolina General Assembly have
More informationBy Rmhermen at en.wikipedia (photo by rmhermen) [GFDL (http://www.gnu.org/copyleft/fdl.html) or CC-BY-SA-3.0
Public Participation Plan By Rmhermen at en.wikipedia (photo by rmhermen) [GFDL (http://www.gnu.org/copyleft/fdl.html) or CC-BY-SA-3.0 (http://creativecommons.org/licenses/by-sa/3.0/)], from Wikimedia
More informationPurpose. Funding. Eligible Projects
SMART SCALE is a statewide program that distributes funding based on a transparent and objective evaluation of projects that will determine how effectively they help the state achieve its transportation
More informationMARTIN METROPOLITAN PLANNING ORGANIZATION CONTINUITY OF OPERATIONS PLAN (COOP)
MARTIN METROPOLITAN PLANNING ORGANIZATION CONTINUITY OF OPERATIONS PLAN (COOP) MARTIN METROPOLITAN PLANNING ORGANIZATION CONTINUITY OF OPERATIONS PLAN Prepared for Prepared by Martin Metropolitan Planning
More information2018 Regional Solicitation for Transportation Projects
2018 Regional Solicitation for Transportation Projects Regional Solicitation Workshop April 17 2018 Regional Solicitation Purpose To distribute federal Surface Transportation Block Grant Program (STBGP)
More informationMOVE LV. Show Us the $ + Transportation Funding May 25, 2016, 12 PM MOVE LEHIGH VALLEY
MOVE LV Show Us the $ + Transportation Funding May 25, 2016, 12 PM MOVE LEHIGH VALLEY Services PLANNING DATA + ANALYSIS EDUCATION PROJECTS + LAWS FUNDING Federal Government State Government Regional
More informationRequest for Proposals (RFP) for Professional Planning Services Burlington VT, Downtown/Waterfront Plan Transportation Study
Department of Planning and Zoning 149 Church Street Burlington, VT 05401 Telephone: (802) 865-7188 (802) 865-7195 (FAX) (802) 865-7142 (TTY) www.ci.burlington.vt.us David E. White, AICP, Director Ken Lerner,
More informationTyler Area Metropolitan Planning Organization
Tyler Area Metropolitan Planning Organization REQUEST FOR QUALIFICATIONS (RFQ) CONSULTANT FOR MPO POLICY COMMITTEE Nathaniel Moran, County Judge Glenn Green, District Engineer Jeff Warr, County Commissioner
More informationREQUEST FOR PROPOSAL (RFP) PLANNING CONSULTING SERVICES FOR THE TOWN OF TOPSHAM S COMPREHENSIVE PLAN UPDATE
REQUEST FOR PROPOSAL (RFP) PLANNING CONSULTING SERVICES FOR THE TOWN OF TOPSHAM S COMPREHENSIVE 1. Purpose PLAN UPDATE The Town of Topsham, seeks proposals from professional planning consultants to prepare
More informationUnified Planning Work Program
Heartland Regional Transportation Planning Organization Unified Planning Work Program Fiscal Years 2018/19-2019/20 July 1, 2018 through June 30, 2020 HRTPO Chair www.heartlandregionaltpo.org 555 East Church
More informationAPPENDIX METROFUTURE OVERVIEW OVERVIEW
APPENDIX B METROFUTURE OVERVIEW OVERVIEW Land use decisions and many economic development decisions in Massachusetts are controlled directly by local municipalities through zoning. This planning is guided
More informationSTAKEHOLDER VISIONING MEETING. November 12, 2015
STAKEHOLDER VISIONING MEETING November 12, 2015 Transportation Responsibilities Maintain approximately 2,450 centerline miles of roadway Maintain more than 180 bridges and bridge culverts Maintain more
More informationLAKE~SUMTER MPO 2035 TRANSPORTATION PLAN & LAND USE WORKSHOP
LAKE~SUMTER MPO 2035 TRANSPORTATION PLAN & LAND USE WORKSHOP Wednesday, January 14, 2009 9:00 a.m. to Noon Lake County Agricultural Center 1951 Woodlea Road Tavares, Florida 32778 PROMOTING REGIONAL TRANSPORTATION
More informationCITY OF LA CENTER PUBLIC WORKS
CITY OF LA CENTER PUBLIC WORKS TRAFFIC CALMING PROGRAM APPROVED PER RESOLUTION 08-304 ON DECEMBER 10, 2008 TABLE OF CONTENTS PAGE Summary... 1 Procedures... 2 Project Eligibility... 2 Project Funding &
More information2040 Southeast Florida Regional Transportation Plan. Regional Public Involvement Plan
2040 Southeast Florida Regional Transportation Plan Regional Public Involvement Plan Date: www.seftc.org Southeast Florida Regional Transportation Plan 2040 Public Involvement Plan Prepared for: Prepared
More informationRequest for Proposals. Downtown South Transit Station Area Enhancements Plan
Request for Proposals Downtown South Transit Station Area Enhancements Plan Contact: Wesley Brown Central Atlanta Progress, Inc. 50 Hurt Plaza SE, Suite 110, Atlanta, Georgia 30303 Telephone: 404-658-5983
More information2012 PUBLIC PARTICIPATION PLAN
2012 PUBLIC PARTICIPATION PLAN Planning for Greater Akron September 2012 AMATS [am - ats] - noun 1. acronym for Akron Metropolitan Area Transportation Study. 2. serves Summit County, Portage County, and
More informationPlanning Sustainable Places Program
Planning Sustainable Places Program ADVANCING A SUSTAINABLE REGION PLACE BY PLACE Pre-application Workshop May 17, 2016 Planning Sustainable Places Background Program to build on previous regional planning
More informationTransportation Improvement Program. Mid-America Regional Council Transportation Department
Transportation Improvement Program 2018 2022 Mid-America Regional Council Transportation Department 2 Transportation Improvement Program 2018 2022 Mid-America Regional Council 3 4 Transportation Improvement
More informationTA: TRANSIT-ORIENTED DEVELOPMENT AND IMPROVED TRAFFIC MANAGEMENT IN GCC
Greater Dhaka Sustainable Urban Transport Project (RRP BAN 42169) TA: TRANSIT-ORIENTED DEVELOPMENT AND IMPROVED TRAFFIC MANAGEMENT IN GCC A. TA Description 1. The Government of Bangladesh has requested
More informationTown of Williamston Request for Proposals Mustang Alley Feasibility Study
Town of Williamston Request for Proposals Mustang Alley Feasibility Study Project Name and Location Town of Williamston - Mustang Alley Feasibility Study Williamston, South Carolina Background Information
More informationNOTICE REQUEST FOR STATEMENTS OF QUALIFICATIONS PROFESSIONAL SERVICES SOLICITATION
NOTICE REQUEST FOR STATEMENTS OF QUALIFICATIONS PROFESSIONAL SERVICES SOLICITATION The City of Colville is inviting statements of qualifications and performance information from a qualified person or firm
More informationDraft MAPA FY2019-FY2024 Transportation Improvement Program
Draft MAPA FY2019-FY2024 Transportation Improvement Program Introduction 1.1 Metropolitan Area Planning Agency Overview The Omaha-Council Bluffs Metropolitan Area Planning Agency (MAPA) is a voluntary
More informationREQUEST FOR QUALIFICATIONS/PROPOSALS SCCOG REGIONAL BICYCLE AND PEDESTRIAN PLAN
SOUTHEASTERN CONNECTICUT COUNCIL OF GOVERNMENTS 5 Connecticut Avenue, Norwich, Connecticut 06360 (860) 889-2324/Fax: (860) 889-1222/Email: office@seccog.org REQUEST FOR QUALIFICATIONS/PROPOSALS SCCOG REGIONAL
More informationAPPENDIX 5. Funding Plan
STUDY: FINAL REPORT APPENDIX 5 Funding Plan May 2015 V:\2073\active\2073009060\report\DRAFT Final Report\rpt_MalPCH_DRAFTFinalReport-20150515.docx Pacific Coast Highway Safety Study: Funding Plan City
More informationImplementation. Implementation through Programs and Services. Capital Improvements within Cambria County
The transportation system serves Cambria County communities because people make decisions and take action toward the stated goals of the long-range transportation plan. Locally, these people include officials
More informationOahuMPO Transportation Alternatives Program
OahuMPO Transportation Alternatives Program Guide for Sponsors and Applicants Approved by the OahuMPO Policy Committee May 19, 2015 This guide focuses upon the Transportation Alternatives Program (TAP)
More informationKYOVA Interstate Planning Commission
KYOVA Interstate Planning Commission Sub-allocated Funding Process and Application Package This packet includes information and guidance about the process used by KYOVA Interstate Planning Commission to
More informationSouth Dakota Transportation Alternatives
South Dakota Transportation Alternatives Program Summary and Application Guide Updated March 2018 Connecting South Dakota and the Nation 1 Transportation Alternatives (TA) Summary 1. Overview Transportation
More informationCommunity Engagement Plan
Preliminary Draft Community Engagement Plan for the Kings/Tulare Cross Valley Passenger Rail Plan August 1, 2016 Draft Prepared for: Tulare County Association of Governments Benjamin Kimball, Deputy Executive
More information11:30. n Planning Agency. kimley-horn.com
CRTPA Board Retreat Summary for the Connections 2040 Regional Mobility Plan CRTPA Board Retreat Monday, April 14, 2014 11:30 a.m. to 1:00 p.m. Prepared by: Kimley-Horn 2615 Centennial Boulevard, Suite
More information2016 REGIONAL TRANSPORTATION PLAN. Technical Appendix L: Title VI/ Nondiscrimination Program
2016 REGIONAL TRANSPORTATION PLAN Technical Appendix L: Title VI/ Nondiscrimination Program Draft June 15, 2015 INTENTIONAL BLANK PAGE Table of Contents Title VI... 1 Environmental Justice... 2 Public
More informationDraft CRA Plan Amendment. Community Redevelopment Agency Advisory Board September 23, CRA Plan Amendment
Draft Community Redevelopment Agency Advisory Board September 23, 2013 1 Project Scope Feasibility Study Public Workshops/Stakeholder Interviews Market Study 2 Schedule to Date Feasibility Study Community
More informationRequest for Proposal Date: November 10 th, 2015 Traffic Calming Guide Deadline: Monday, December 7 th, 2015 at 13:00 E.T.
A SCOPE The Traffic Operations and Management Standing Committee (TOMSC) of TAC and the Canadian Institute of Transportation Engineers (CITE) is undertaking a joint project about traffic calming measures.
More informationMULTI-MODAL TRANSPORTATION PLAN CITY OF CHAMBLEE REQUEST FOR PROPOSALS RFP-18-02
MULTI-MODAL TRANSPORTATION PLAN CITY OF CHAMBLEE REQUEST FOR PROPOSALS RFP-18-02 RFP 18-02 Page 2 of 18 MULTI-MODAL TRANSPORTATION PLAN GENERAL CONDITIONS Sealed Proposals for Purchasing RFP 18-02 Multi-Modal
More information8.1 New York State Office Of Parks Recreation & Historic Preservation
8. This chapter provides detailed information on the funding sources available to municipalities looking to develop or enhance their park and recreation systems. 8.1 New York State Office Of Parks Recreation
More informationNOW THEREFORE, the parties enter into the following Agreement:
Interlocal Agreement Between the Board of County Commissioners of St. Johns County, Florida, City of St. Augustine, City of St. Augustine Beach, Town of Hastings and the School Board of St. Johns County,
More informationSUBJECT: LOS LAGOS GOLF COURSE DATE: May 16, 2016 LAND USE PUBLIC OUTREACH
COUNCIL AGENDA: 6/7/16 ITEM NO: 0... CITY OF SAN JOSE CAPITAL OF SILICON VALLEY Memorandum TO: HONORABLE MAYOR AND CITY COUNCIL FROM: Angel Rios, Jr. SUBJECT: LOS LAGOS GOLF COURSE DATE: LAND USE PUBLIC
More informationPUBLIC INVOLVEMENT GUIDELINES FOR TRANSPORTATION PLANNING, PROGRAMS AND PROJECTS Draft for Public Comment. January 15, 2014
PUBLIC INVOLVEMENT GUIDELINES FOR TRANSPORTATION PLANNING, PROGRAMS AND PROJECTS Draft for Public Comment January 15, 2014 Washington County s Department of Land Use & Transportation respects civil rights
More informationRFP for Bicycle/Pedestrian Scoping Study Page 1
Town of Burke 212 School Street West Burke, VT 05871 (802) 467-3717 Request for Proposal Bicycle and Pedestrian Scoping Study Contact: Al Duey, Burke Planning Commission Date of Issue: June 9, 2014 Deadline:
More informationUPWP. Unified Planning Work Program. Bay County Transportation Planning Organization
(July 1, 2018 June 30, 2020) UPWP Unified Planning Work Program Bay County Transportation Planning Organization Staffed by: West Florida Regional Planning Council 4081 East Olive Road Ste. A Pensacola,
More informationTHE 411 ON FEDERAL & STATE TRANSPORTATION FUNDING - FHWA
THE 411 ON FEDERAL & STATE TRANSPORTATION FUNDING - FHWA Catherine McCreight, MBA Senior Transportation Planner Texas Department of Transportation - Houston District Houston-Galveston Area Council Bringing
More informationStrategic Plan
2018-2021 Strategic Plan TOWN OF STONY PLAIN Strategic Plan 2018-2021 As your Town Council, we work with you, for you and in the spirit of our community. We consider our work as true servant leadership.
More informationBLUE HILLS MASTER PLAN RFP OUTLINE
BLUE HILLS MASTER PLAN RFP OUTLINE Introduction The City of Hartford is soliciting responses from qualified individuals/firms to provide professional services for creation of a Master Plan for the Blue
More informationCities of Rockland, South Portland and Biddeford, and Town of Falmouth, Maine
Cities of Rockland, South Portland and Biddeford, and Town of Falmouth, Maine Request for Qualifications - Conversion of community street light system to LED fixtures and from utility owned to municipally
More informationPlanning Sustainable Places Program
Planning Sustainable Places Program ADVANCING A SUSTAINABLE REGION PLACE BY PLACE 2019 Pre-Bid Workshop October 8, 2019 PSP Schedule Reminder Meeting Agenda Welcome RFP General Overview RFP Specifics Overview
More information