1 Customer Tailored Energy Efficiency Pilot Program FY18 PROGRAM GUIDE JULY 1, 2017 JUNE 30, 2018
2 TABLE OF CONTENTS 1. INTRODUCTION PILOT PROGRAM DESIGN... 2 Eligibility... 2 Incentives... 2 Base Incentives... 2 Technical Assistance (TA) Incentive... 3 Schedule of Payments TECHNICAL REQUIREMENTS... 5 Baselines... 5 Minimum Performance Standards... 5 Ineligible Measures BUSINESS PROCESS... 6 Outreach and Recruitment into CTEEPP... 6 Enrollment... 6 Benchmarking... 6 Energy Efficiency Plan Development... 6 Incentive Commitment... 7 Construction Kick-off... 7 Substantial Completion... 7 Performance Verification... 8 Pre & Post Inspections and Quality Control Procedures PROGRAM DISPUTE RESOLUTION i TRC Energy Services
3 1. INTRODUCTION New Jersey s Clean Energy Program offers a portfolio of Commercial, Industrial, and Local Government energy efficiency programs for state-wide utility customers. The programs have been designed to address different subsectors of the Commercial and Industrial ( C&I ) sector along with the differing efficiency needs of building types and uses. The programs offer varying financial incentives to help offset the costs of installing or implementing various energy efficiency upgrades and technologies that reduce a building s overall energy consumption footprint. This new Pilot program, the Customer Tailored Energy Efficiency Pilot Program (CTEEPP) supplements the current New Jersey C&I incentive programs (mostly NJ SmartStart Buildings) by offering a streamlined approach to developing and implementing energy efficiency projects for mid-to-large customers. This pilot program is mainly for facilities, buildings, or campuses that consume between 200 to 400 kw annually or have energy costs between $150,000 to $350,000 annually. This size category was targeted because buildings/facilities of this size were often too large to participate in the Direct Install program and too small to participate in the Large Energy Users Program. This pilot program is unique in that: Customers can bundle multiple prescriptive and custom measures into one application with one project delivery approach. Customers can install advanced and emerging technologies which are not currently addressed under SmartStart Buildings. Larger customers with multiple measures can access to incentives for their targeted energy efficiency projects without enrolling in a whole-building program. Performance Verification engages with customers after their project is complete to ensure persistence of savings. Incentive funding for this pilot program is limited and is estimated to serve approximately 40 projects. The Pilot has been approved by the New Jersey Board of Public Utilities (BPU) and was launched December 1, TRC Energy Services
4 2. PILOT PROGRAM DESIGN Participating projects will be subject to the following pilot program requirements. Eligibility Eligible projects must meet the target size criteria 1 : Target Customer Size Existing Buildings New Construction & Substantial Renovation 200 kw 50,000 square feet A single application may cover multiple sites, technologies and/or utility meters. The incentive will be payable to one entity; thus, each application must be covered by a single customer Tax ID number and Tax Clearance certificate. There are no minimum energy savings requirements for CTEEPP. Previously Installed Measures are not eligible. Equipment being replaced must still be present at the time of the Outreach Walkthrough, where pre-existing conditions are documented. Customers may start work at their own risk prior to the Notice to Proceed if the old equipment is installed at the time of the Outreach walkthrough or Scoping Session. Incentives There are two types of incentives available. Base incentives are based on the equipment installed. Technical Assistance incentives help to offset the soft costs associated with developing and planning an energy efficiency project. Base Incentives Prescriptive Measures: Measures meeting the requirements of the current SmartStart Building Program will receive the established incentive under that program. Custom Incentives: $0.16 per kwh $1.60 per therm 50% of project cost Buy-down to 1 year payback 1 The Program Manager may adjust the size criteria on a case-by-case basis. 2 TRC Energy Services
5 Incentive cap: $250,000 per project 50% of project cost Buy-down to 1 year payback This does not include the Technical Assistance incentive detailed below. The incentive cap may be adjusted up to 20% on a case-by-case basis at the Program Manager s discretion based on available incentive budget, participation level and project merit. Any additional incentive cap increase will be subject to NJBPU staff approval. Technical Assistance (TA) Incentive Technical Assistance incentives are offered to help minimize the soft costs associated with developing an energy efficiency project. The Technical Assistance incentive allows customers to be reimbursed for 50% of soft costs up to $10,000 per application. Soft costs may include: Energy auditing & analysis Technical Assistance on individual building systems and opportunities Third party energy use monitoring service Performance Verification Services Customers may use their own technical assistance provider. Those needing Technical Assistance to assess their buildings will be referred to a qualified Partners. A qualified Partners is one that has satisfactorily completed at least one Pay for Performance Existing Buildings project. Technical Assistance incentives require pre-approval based on demonstration of need in the Energy Efficiency Plan. Schedule of Payments Incentive payments are made along the life of a project, and differ between Technical Assistance Incentives and Base Incentives. The Technical Assistance incentive, intended to help with project development, is paid at Construction Kick-off (50%) and Substantial Completion (50%). Base Incentives may be either prescriptive or custom. Prescriptive incentives are paid at substantial completion. CTEEPP pays 90% of custom incentives at substantial completion and the remaining 10% at Performance Verification. Project material/labor invoices will signify projection completion followed by a post-inspection as deemed appropriate. Applications with multiple sites and/or buildings may use project phasing to allow multiple incentive payments based upon the completion of installation completion at individual buildings. Phasing is defined in the Energy Efficiency Plan via the Construction Schedule. Phased projects with staggered incentives may require multiple post-construction inspections. The table below displays the Payment Milestones and payout schedule. 3 TRC Energy Services
6 Type of Incentive Technical Assistance Incentive Base Incentives Prescriptive Milestone 1 Construction Kick-Off Schedule of Payments Milestone 2 Substantial Completion 50% 50% 100% Milestone 3 Performance Verification Base Incentives Custom 90% 10% Milestone 1: Milestone 2: Milestone 3: The Energy Efficiency Plan is approved and construction contracts are in place All work is installed and new equipment and systems are generating energy savings. Multiple payments may be provided. Performance Verification is complete. Multiple payments may be provided. This milestone may occur between 3-6 months after substantial completion. 4 TRC Energy Services
7 3. TECHNICAL REQUIREMENTS Baselines Baselines establish the pre-construction energy use of a building, system, or group of systems and are used when calculating energy savings from proposed measures. Baselines are not needed for Prescriptive measures, only those using custom calculations in the Energy Efficiency Plan. The baseline for existing buildings is the existing condition prior to renovation. For new construction or gut rehabilitation projects, the baseline is ASHRAE and/or applicable current industry standard. Minimum Performance Standards CTEEPP uses Minimum Performance Standards to assure that the equipment installed performs in a way that generates energy savings. Prescriptive measures must meet the minimum requirements of the SmartStart Buildings program. Custom measures must meet or exceed current SmartStart Custom requirements or the Minimum Performance Standards for the Large Energy Users Program. Advanced Lighting Control Systems must be listed on the Design Lights Consortium s Qualified Products List. Emerging Technologies must meet current building codes or industry standards, as applicable. Ineligible Measures Measures not eligible for incentives include: Renewable and power storage technologies including, but not limited to, photovoltaics, fuel cells, battery storage, and microturbines Combined heat and power systems are incentivized under New Jersey s Combined Heat and Power program and are not eligible for CTEEPP incentives. Previously Installed Measures are not eligible, with the exception of certain mechanical Prescriptive measures. Equipment being replaced must still be present at time of the Outreach Walkthrough, where pre-existing conditions are documented. Customers may start work at their own risk prior to the Notice to Proceed if the old equipment is installed at the time of the Scoping Session. Measures that do not save energy (kwh or therms) are ineligible. Customers are welcome to install measures which exclusively reduce operating costs and/or energy/demand costs, but they may not be included in the CTEEPP Energy Efficiency Plan. Operations & Maintenance or behavioral measures are ineligible. Behavioral measures include those where existing equipment is adjusted to improve performance or change energy use. Behavioral measures may include boiler clean & tunes, commissioning of existing equipment, thermostat adjustment, or seasonal equipment removal. 5 TRC Energy Services
8 4. BUSINESS PROCESS The CTEEPP application process can be categorized into eight distinct phases which is detailed further below. Outreach and Recruitment into CTEEPP Applicants that have sites or buildings that meet the eligible criteria as defined in Section 2 may contact a CTEEPP outreach support specialist to gain more information about the program and schedule a Walkthrough of the property to identify whether the project is appropriate for participation in CTEEPP. After the Outreach support specialist deems the project is suitable for participation in the program, they will document facility information, general existing conditions and technologies, areas of customer interest and identify efficiency opportunities as part of the walk-through. The Support Specialist will then forward all this information to a TRC Case Manager who will be the main point of contact for the CTEEPP Applicant and project. Enrollment The Case Manager will perform a Scoping Session with the Applicant to establish customer interest, identify likely energy efficiency measures, document existing conditions, review program requirements and responsibilities, and identify sources of possible funding. During the Scoping Session, the Case Manager performs a needs assessment to determine whether the customer needs additional assistance such as referral to technical expertise, financial assistance, internal sales, or benchmarking. Benchmarking Benchmarking is an optional component of CTEEP and will be offered to projects with a complete application to help identify which opportunities and facilities may benefit most from energy improvements. Benchmarking will be performed by TRC benchmarking staff. Energy Efficiency Plan Development Once the application is received, deemed complete, and accepted by the Case Manager, the customer works with their technical experts to develop an Energy Efficiency Plan which is a spreadsheet workbook ( Energy Efficiency Plan Tool or Tool ). Associated documentation provides additional detailed information about the project. The Workbook incorporates areas for documenting existing conditions, scope of work, and quality control comments. Additionally, the Tool calculates incentives for all measures, both prescriptive and custom. A primary benefit of the Tool is to standardize the data collection on a building-level and measure level basis. During the Scoping Meeting, the Case Manager will work with the customer and energy professionals to detail the information needed for the Plan development and Tool. Energy Efficiency Plan submittals include: 1. Energy Efficiency Plan Tool: This spreadsheet workbook (provided by CTEEPP) includes a measure-bymeasure scope of work with financial and energy savings metrics. The Tool provides calculations for prescriptive measures as well as space for custom measure calculations (#2, below). 2. Engineering Calculations: Custom measures require individualized measure-by-measure energy and cost savings calculations. Calculations are typically performed by the customer s technical assistance provider. 3. Specification Sheets: Manufacturer s cut sheets or specification sheets are provided for all proposed equipment. 4. Utility Bills. Customer will provide at least one month of recent utility data for prescriptive measures and twelve (12) for custom measure evaluation. 6 TRC Energy Services
9 5. Financing Plan: A sources and uses table to determine whether the project has identified funding to allow the project to proceed. 6. Construction Schedule: The construction schedule shows the proposed timeline for installing all the proposed measures. 7. Performance Verification Checklist: Custom measures delineate the proposed operating conditions, setpoints, and controls parameters for ongoing operation. The Performance Verification Checklist is used 3-6 months 1 after construction to determine whether the measures installed are operating as intended. 8. Additional information as specified by program Terms and Conditions. Upon receipt of the Energy Efficiency Plan, the Case Manager reviews the submittal with support from technical staff as needed. Should the Energy Efficiency Plan require revision, the Case Manager will provide comment to the customer in writing per established procedures. The submittal of a revised Energy Efficiency Plan is due 30 days from the provision of comments to the customer. Incentive Commitment Upon acceptance of a complete Energy Efficiency Plan, TRC will commit incentives as defined by the Energy Efficiency Plan and program requirements. The Case Manager issues a Notice to Proceed to the customer which notifies them that their incentives are committed and establishes upcoming milestones and due dates. In keeping with SmartStart Buildings program requirements, most projects are anticipated to have one year from Notice to Proceed to install the work approved in the Energy Efficiency Plan. Construction Kick-off Construction kick-off is the point at which the project has completed design and development, and construction contracts are in place. Projects taking advantage of the Technical Assistance incentive will be eligible to receive 50% of that incentive. Submittals for the Construction Kick-off include: 1. Request for Incentive Form 2. Copies of contracts, purchase orders, and/or schedules of values for approved measures 3. Tax Clearance Certificate Upon receipt of the Construction Kick-off Package, the Case Manager reviews the submittal. Should the Construction Kick-off Package require revision, the Case Manager will provide comment to the customer in writing per established procedures. The submittal of a revised Construction Kick-off Package will be due 30 days from the provision of comments to the customer. Substantial Completion Substantial completion is the point at which all the energy efficiency measures have been installed and are generating energy savings. All the energy improvements are installed and functional (or capable of functioning) to the intent of the Energy Efficiency Plan. 1 This pilot allows the opportunity to test different scenarios for performance verification, including the optimum time period for customer follow-up. The Program Manager may assign a performance verification date based on measure type and complexity. 7 TRC Energy Services
10 The Case Manager must receive the Substantial Completion Submittal Package after all the energy improvements have been installed. An improvement is considered installed when it adheres to the American Institute of Architects definition of Substantial Completion defined as the stage in the progress of the Work when the Work or designated portion thereof is sufficiently complete in accordance with Contract Documents so that the Owner can occupy or utilize the Work for its intended use. For energy savings measures, the intended use is to generate the proposed level of energy savings. All measures must be installed per the Minimum Performance Standards. The Substantial Completion Package should include the following items: 1. Final invoices/receipts for all measures. Cost documentation must list material and labor separately. 2. Request for Incentive Form 3. If the project has changed since the initial Energy Efficiency Plan was received and approved, an updated Energy Efficiency Plan Tool reflecting the as-built conditions. 4. Tax Clearance Certificate (if applicable per entity type) When the Substantial Completion Package is received, the Case Manager will schedule a post-construction site visit to verify project completion and accuracy of the Substantial Completion Package. The site visit will also allow a review of any revisions to the Substantial Completion Package. Should the Substantial Completion Package require revision, the Case Manager will provide comment in writing per established procedures. The submittal of a revised Substantial Completion Package will be due 30 days from the provision of comments to the customer. When the Substantial Completion Package is approved, the customer is eligible to receive incentive payments of the remaining 50% of the Technical Assistance incentive, 100% of prescriptive Base Incentives, and 90% of the custom Base Incentive. Performance Verification Performance Verification is intended to provide customers with assurance that their energy efficiency project will continue to provide energy savings once their construction contract has been completed. Performance Verification only applies to Custom measures; it does not apply to Prescriptive measures. The Energy Efficiency Plan includes a Performance Verification Checklist for all custom measures. This checklist is used 3 to 6 months after substantial completion to document whether the installed custom measures are operating as intended. Performance Verification is intended to help with persistence of savings once the contractor has left the site; to make building owners more aware of the effects of operations on energy usage, and to provide on-going customer engagement. Additionally, for emerging technologies and ALCS, Performance Verification provides data about installations under a range of conditions to inform future program design. Performance Verification must be submitted between 3 to 6 months of the Substantial Completion Package submittal. The Performance Verification package consists of the following: 1. Performance Verification Checklist When the Performance Verification Checklist is received, the Case Manager will perform a desk review of the submittal to verify completeness. If the Performance Verification package requires revision, the Case Manager will provide comment in writing per established procedures. The submittal of a revised Performance Verification package is due 30 days from the provision of comments to the customer. 8 TRC Energy Services
11 The customer is eligible to receive incentive payments of 10% of the Base incentive for custom measures when Performance Verification is approved. Performance Verification is intended as a documentary and educational milestone; there is no calculation of delivered energy savings, metering, or measurement. If project documentation indicates that a building is not performing as planned, the applicant it may keep the full incentive. The final determination of the Performance Verification is that a project is meeting or not meeting expectations. For projects that are not meeting expectations, the customer will be alerted that their equipment is not operating as expected. The Case Manager will provide possible explanations and suggestions about how to get back on track. Pre & Post Inspections and Quality Control Procedures All approved projects will be subject to a Pre-Installation inspection and Post-installation site inspection. The purpose of the Pre-Inspection is to document site conditions and that no efficiency measures/technologies have been installed that are not yet approved and to verify that any pre-existing measures/technologies are excluded from CTEEPP incentives, except where allowed via Prescriptive protocols. The Post-Inspection documents that measures/custom measures/and technologies listed in the EEP Tool are the ones installed at the facility along with the proper quantities. 9 TRC Energy Services
12 5. PROGRAM DISPUTE RESOLUTION Disputes, concerns, or complaints that arise will be addressed initially by the Case Manager or TRC Program Staff at the point of contact. If resolution for whatever reason is not possible, there is a dispute resolution process backed by the NJ Board of Public Utilities. For contractual disputes between an applicant and installer or contractor, the NJ Division of Consumer Affairs (DCA) is the point of contact and the agency has an online complaint form. The program is designed to allow for participation by any third-party contractor that meets the program requirements. One of the primary responsibilities of the program is to oversee the level of performance of the contractors that participate in the program. There are BPU approved contractor remediation procedures that will be followed if a contractor is found to violate program procedures and rules or consistently violates program requirements which may include being barred from participating in the program. 10 TRC Energy Services
Commercial & Industrial (C&I) Local Government Energy Audit (LGEA) Program Program Guide. Fiscal Year 2017 (7/1/2016 through 6/30/2017)
Commercial & Industrial (C&I) Local Government Energy Audit (LGEA) Program Program Guide Fiscal Year 2017 (7/1/2016 through 6/30/2017) Table of Contents 1. Overall Program Description... 3 2. Target Market...
More informationPay For Performance (P4P) Program Guide for Commercial & Industrial (C&I) New & Existing Buildings. Fiscal Year 2017 (7/1/2016 through 6/30/2017)
Pay For Performance (P4P) Program Guide for Commercial & Industrial (C&I) New & Existing Buildings Fiscal Year 2017 (7/1/2016 through 6/30/2017) Table of Contents 1. Purpose... 4 2. General Program Description...
More informationPROGRAM OPPORTUNITY NOTICE EFFICIENCY MAINE TRUST CUSTOM INCENTIVE PROGRAM FOR ELECTRIC EFFICIENCY PROJECTS PON EM
PROGRAM OPPORTUNITY NOTICE EFFICIENCY MAINE TRUST CUSTOM INCENTIVE PROGRAM FOR ELECTRIC EFFICIENCY PROJECTS PON Opening: July 1, 2017 Closing: June 30, 2018 Revised: February 6, 2018 {P1472575.1} CONTENTS
More informationLocal Government Energy Audit (LGEA) Program Program Guide. Fiscal Year 2018 (7/1/2017 through 6/30/2018)
Local Government Energy Audit (LGEA) Program Program Guide Fiscal Year 2018 (7/1/2017 through 6/30/2018) Table of Contents 1. Overall Program Description... 3 2. Target Market... 3 3. Links to Website...
More informationPROGRAM OPPORTUNITY NOTICE EFFICIENCY MAINE TRUST CUSTOM INCENTIVE PROGRAM FOR DISTRIBUTED GENERATION PROJECTS PON EM
PROGRAM OPPORTUNITY NOTICE EFFICIENCY MAINE TRUST CUSTOM INCENTIVE PROGRAM FOR DISTRIBUTED GENERATION PROJECTS PON Opening: July 1, 2017 Closing: June 30, 2018 Updated: July 1, 2017 CONTENTS SECTION 1:
More informationSmartStart Buildings Program Performance Lighting Application FY18 July 1, 2017 June 30, 2018
SmartStart Buildings Program Performance Lighting Application FY18 July 1, 2017 June 30, 2018 MEASURE DESCRIPTION Performance Lighting incentives are available for installation of new lighting in groundup
More informationGround Source Heat Pump - July 1, 2016 through June 30, 2017
Ground Source Heat Pump - July 1, 2016 through June 30, 2017 Customer Information Company Name (as listed on utility bill) Doing Business as (if applicable) Installation Start Date: Installation Completion
More informationBUSINESS. New Construction. Save money on qualified construction projects. Read about rebates for your home and business at mid.
BUSINESS New Construction Save money on qualified construction projects Read about rebates for your home and business at mid.org/rebates REV06.2018 PURPOSE The MPower Business: New Construction Rebate
More information1 Customer and Contact Information
Appalachian Power C&I Program Rebate Application Before you start Review the eligibility detail requirements and terms and conditions at the end of this application to verify that you are eligible for
More informationCUSTOM COMMERCIAL & INDUSTRIAL (C&I) Program Application
CUSTOM COMMERCIAL & INDUSTRIAL (C&I) ENERGY IS PRECIOUS. LET S NOT WASTE IT. TABLE OF CONTENTS TERMS AND CONDITIONS... 2 CUSTOM C&I PROJECT SPECIFICATIONS... 3 STEPS FOR SUBMITTING YOUR APPLICATION...
More informationWarmWise Business Custom Rebates Program Manual
WarmWise Business Custom Rebates Program Manual January, 2015 Contents CONTENTS... 1 SECTION 1 INTRODUCTION... 2 1.1 PROGRAM OVERVIEW... 2 SECTION 2 ELIGIBILITY REQUIREMENTS... 3 2.1 QUALIFYING CUSTOMERS...
More informationEnergy Efficiency Alberta Residential and Commercial Solar Program Guidebook
Energy Efficiency Alberta Residential and Commercial Solar Program Guidebook This Guidebook provides an overview of the eligibility requirements, available funding, and process for municipalities to participate
More informationCon Edison Commercial and Industrial Energy Efficiency Program
Con Edison Commercial and Industrial Energy Efficiency Program 1 Discussion Overview Benefits, Eligibility & Team Members Program Components Project Incentives & Energy Studies Additional Program Attributes,
More informationMULTIFAMILY UPGRADE CUSTOMER HANDBOOK
MULTIFAMILY UPGRADE CUSTOMER HANDBOOK PACIFIC GAS AND ELECTRIC COMPANY PACIFIC GAS AND ELECTRIC P.O. Box 997300, Sacramento, CA 95899-7300 This page is intentionally left blank. 23 i Table of Contents
More informationPPL s Business Energy Efficiency Program Direct Discount for Small Commercial & Industrial
PPL s Business Energy Efficiency Program Direct Discount for Small Commercial & Industrial 2018 Program Manual PPL Electric Utilities Business Energy Efficiency Program 3 Park Plaza, Suite 101, Wyomissing,
More informationLarge Energy User Program Pre-Qualification Application July 1, June 30, 2017 Customer Information
Large Energy User Program Pre-Qualification Application July 1, 2016 - June 30, 2017 Customer Information Company/Entity Name Number of Buildings Tax Identification # Mailing Address City State ZIP Primary
More informationEfficiency Maine Commercial and Industrial (C&I) Custom Program. Distributed Generation Projects
Efficiency Maine Commercial and Industrial (C&I) Custom Program Distributed Generation Projects 1 Agenda C&I Custom Program Distributed Generation Projects Eligibility & Incentives Scoping Audits Technical
More informationSolar Photovoltaic. Standard Offer Program (SVPSOP) 2018 Program Manual. Rev # Final
Solar Photovoltaic Standard Offer Program (SVPSOP) 2018 Program Manual Rev # Final CONTENTS 1 Introduction... 3 2 Program Overview... 3 3 Solar Photovoltaic Standard Offer Program... 3 3.1 Program Options...
More informationEnergy Efficiency Alberta Residential and Commercial Solar Program Terms and Conditions
Energy Efficiency Alberta Residential and Commercial Solar Program Terms and Conditions Thi Updated: ebook provides an overview of the eligibility Page 1 of 11 requirements, available funding, and process
More information2015 C&I PROCESS VFD APPLICATION FOR PRESCRIPTIVE REBATES
2015 C&I PROCESS VFD APPLICATION FOR PRESCRIPTIVE REBATES WELCOME TO THE POWER MOVES C&I PROCESS VFD PROGRAM. We look forward to working with you. If you have questions after reading this application,
More informationCUSTOM INCENTIVE GUIDE
2017 CUSTOM INCENTIVE GUIDE NEED HELP? CALL 800.762.7077 HOW TO APPLY Custom incentives provide opportunities to upgrade equipment and receive incentives for technologies not available prescriptively.
More informationSustainable Jersey Smal Grants Program for Energy Initiatives Funded by The Gardinier Environmental Fund Announcement Date: Application Due Date:
Sustainable Jersey Small Grants Program for Energy Initiatives Funded by The Gardinier Environmental Fund 2017 Municipality and School District Grant Application Package Announcement Date: Monday, August
More informationEnergy Savings Bid Program 2007 Policy Manual
Energy Savings Bid Program 2007 Policy Manual Utility Administrator: San Diego Gas & Electric Jerry Humphrey Senior Market Advisor, (858) 654-1190, ghumphrey@semprautilities.com Kathleen Polangco Program
More informationFOCUS ON ENERGY BID FOR EFFICIENCY OFFERING. Frequently Asked Questions (FAQs)
FOCUS ON ENERGY BID FOR EFFICIENCY OFFERING Frequently Asked Questions (FAQs) CONTENTS GENERAL INFORMATION... 3 PROJECT ELIGIBILITY... 3 PRE-QUALIFICATION PROCESS... 5 EFFICIENCY AUCTION... 6 OFFERING
More informationRESIDENTIAL AND SMALL COMMERCIAL STANDARD OFFER PROGRAM
RESIDENTIAL AND SMALL COMMERCIAL STANDARD OFFER PROGRAM Incorporates changes approved at the PUCT 8/21/03 Open Meeting PROGRAM OVERVIEW Description The Residential and Small Commercial Standard Offer Program
More informationNew Jersey's Clean Energy Program Rebate Application Guidelines for State Energy Program, Non-IOU Funding (SEP non-iou)
New Jersey's Clean Energy Program Rebate Application Guidelines for State Energy Program, Non-IOU Funding (SEP non-iou) Program Description Select commercial and industrial components of New Jersey s Clean
More informationFREQUENTLY ASKED QUESTIONS
LOW INCOME WEATHERIZATION PROGRAM FREQUENTLY ASKED QUESTIONS Contents GENERAL QUESTIONS... 1 PROGRAM ELIGIBILITY... 2 PROGRAM PROCESS... 3 PROJECT MEASURES, TIMELINE, AND CONSTRUCTION... 4 ENERGY EFFICENCY
More information2016 Energy Efficiency Program Annual Report
2016 Energy Efficiency Program Annual Report June 26, 2017 TABLE OF CONTENTS Introduction... 3 Executive Summary... 4 Tariff Collections... 6 Regulatory Proceedings... 7 Summary of M&V Report Findings...
More informationEnergy Efficiency and Conservation Block Grant (EECBG) Complete Program Application Package
Energy Efficiency and Conservation Block Grant (EECBG) Complete Program Application Package Program Description The EECBG Rebate Program provides supplemental funding up to $20,000 for eligible New Jersey
More informationAPPLICATION FOR TECHNICAL ASSISTANCE PROGRAM CONTACT INFORMATION. Progress Energy Carolinas INCENTIVE PROGRAM
APPLICATION FOR TECHNICAL ASSISTANCE PROGRAM CONTACT INFORMATION Progress Energy Carolinas INCENTIVE PROGRAM Visit our website http://progress energy.com/carolinasbusiness or Call our program hotline 866.326.6059
More informationMULTIFAMILY UPGRADE CUSTOMER HANDBOOK
MULTIFAMILY UPGRADE CUSTOMER HANDBOOK PACIFIC GAS AND ELECTRIC COMPANY PACIFIC GAS AND ELECTRIC P.O. Box 997300, Sacramento, CA 95899-7300 This page is intentionally left blank. PG&E Multifamily Upgrade
More informationENERGY EFFICIENCY PROGRAM FOR BUSINESS Program Overview & Designated Trade Ally Training
ENERGY EFFICIENCY PROGRAM FOR BUSINESS 2018 Program Overview & Designated Trade Ally Training 1 ENERGY EFFICIENCY PROGRAM FOR BUSINESS Sean Pachuta Outreach 2 ENERGY EFFICIENCY PROGRAM FOR BUSINESS Safety
More informationINTRODUCTION. Organization Description
INTRODUCTION Ontario Centres of Excellence (OCE) is seeking proposals for the full-service design, implementation and administration of a comprehensive GHG reduction program targeting Small and Medium
More informationThe LGEA Program will provide incentives up to $100,000 per fiscal year, per local government agency to subsidize the cost of the energy audit.
Program Planning Committee: Program Review Template Program Name: Local Government Energy Audit (LGEA) 1. 1. PROGRAM DESCRIPTION The Local Government Energy Audit Program provides incentives to subsidize
More informationADVERTISEMENT OF PUBLIC NOTICE
ADVERTISEMENT OF PUBLIC NOTICE Request for Proposals Notice is hereby given that pursuant to the New Jersey Public School Contracts Law competitive contracting process, N.J.S.A. 18A:4.1 through 4.5, sealed
More informationSouthern Kern Unified School District
Southern Kern Unified School District REQUEST FOR QUALIFICATIONS 18-01 FOR Energy Program Professional Services RESPONSES DUE BY November 8, 2017 SUBMIT TO Southern Kern Unified School District 2601 Rosamond
More informationNORTHWEST NATURAL GAS COMPANY P.U.C. Or. 25 Second Revision of Sheet Cancels First Revision of Sheet 320-1
P.U.C. Or. 25 Second Revision of Sheet 320-1 Cancels First Revision of Sheet 320-1 PURPOSE: To describe the Oregon Low-Income Energy Efficiency (OLIEE) program, which is funded through a designated portion
More informationUC/CSU/IOU Energy Efficiency Partnership
UC/CSU/IOU Energy Efficiency Partnership 1. Projected Program Budget $ 6,830,972 2. Projected Program Impacts MWh 2,596 MW (Summer Peak) 0.55 3. Program Cost Effectiveness TRC 2.18 PAC 2.22 4. Program
More informationEnergy Trust of Oregon New Buildings Request for Proposals
Energy Trust of Oregon New Buildings Request for Proposals RFP Submission Deadline: March 27, 2018, 5:00 p.m. (PPT) Carol Brimhall, Contractor 421 SW Oak St., Suite 300 Portland, OR 97204 503.548.1603
More informationNCR Streetscape Revitalization Grant Program FAQ. 1. Q. What is the NCR Streetscape Revitalization Grant Program?
NCR Streetscape Revitalization Grant Program FAQ 1. Q. What is the NCR Streetscape Revitalization Grant Program? A. The NCR Streetscape Revitalization Grant Program offers grants to municipalities to assist
More information2017 Custom Energy Efficiency Program Colorado Instructions and Guidelines
Instructions and Guidelines The Custom Energy Efficiency Program (Custom Program) offers financial incentives to promote the installation of energy efficiency measures for Atmos Energy customers. Any measure
More informationHome Energy Saving scheme. Application Guide Version 1.1
Home Energy Saving scheme Application Guide Version 1.1 IMPORTANT NOTICE It is the responsibility of each applicant to the Home Energy Saving scheme to ensure that they have read, and fully understand,
More information2017 Residential & Hard-to-Reach Standard Offer Programs Workshop. October 26, 2016
2017 Residential & Hard-to-Reach Standard Offer Programs Workshop October 26, 2016 2 2 AEP Contact Information AEP Texas Central Company (TCC) Residential: Jim Fowler 361-881-5790 jjfowler@aep.com Hard-to-Reach:
More informationConnecticut Zero Energy Challenge
Connecticut Zero Energy Challenge 2009-2010 Purpose of the Challenge: To identify, encourage and promote builders and developers of super high efficiency (near zero energy) homes in Connecticut in order
More informationRefer to section 2.C. for more information on the evaluation criteria.
SOLARIZE RALEIGH PILOT PROGRAM DRAFT Request for Proposals from Installers of Residential Solar Photovoltaic Systems Proposed Posting Date: February 4, 2014 I. OPPORTUNITY SUMMARY: The North Carolina Solar
More informationSustainable Jersey for Schools Small Grants Program Funded by the PSEG Foundation Application Information Package
Sustainable Jersey for Schools Small Grants Program Funded by the PSEG Foundation 2015 Application Information Package Announcement Date: Monday, February 23, 2015 Application Due Date: Midnight on Sunday
More informationGreen Fund Application
2011-2012 Green Fund Application Office of Sustainability Stanford University 2011-2012 Green Fund Application for Grant Cycle 2011-2012 (4 th year) An initiative of Office of Sustainability and Sustainable
More informationSustainable Jersey Grants Program for Energy Initiatives Funded by The Gardinier Environmental Fund Announcement Date: Application Due Date:
Sustainable Jersey Grants Program for Energy Initiatives Funded by The Gardinier Environmental Fund 2018 Municipality and School District Grant Application Package Announcement Date: Monday, August 4,
More informationCALIFORNIA ZNE SCHOOL RECOGNITION AWARDS Frequently Asked Questions (FAQs)
CALIFORNIA ZNE SCHOOL RECOGNITION AWARDS Frequently Asked Questions (FAQs) Who is sponsoring these awards? A ZNE Schools Recognition & Awards Program is being initiated for the state of California on behalf
More informationFAQ. Frequently Asked Questions
FAQ Frequently Asked Questions CONTENTS General Efficiency... 3-4 Efficiency Auction.... 5 Pre-Qualification Process... 6 Project Eligibility Program... 7 Program Details... 8 Program Implementation...
More information2018 NEW HAMPSHIRE ELECTRIC COOPERATIVE (NHEC) COMMERCIAL WEATHERIZATION PROGRAM
2018 NEW HAMPSHIRE ELECTRIC COOPERATIVE (NHEC) COMMERCIAL WEATHERIZATION PROGRAM Applications must be fully completed, submitted and pre approved for incentives by NHEC before installation of any measures
More information2013 Local Government Energy Audit Program Guidelines & Application Forms
2013 Local Government Energy Audit Program Guidelines & Application Forms The New Jersey Board of Public Utilities (BPU) has authorized an incentive program to subsidize the cost to New Jersey s local
More informationSECTION I Applicant/Project Information
FINANCIAL ASSISTANCE APPLICATION For use with projects requesting general City assistance (For projects requesting CRA property tax abatements and Income Tax Incentives, do not use this application) SECTION
More informationPA Conservation Works!
Briefing for: Governor s Center for Local Government Services July 7, 2009 1 Timeline Early July: available to public on recovery.pa.gov July 17: Application window open (Environmental egrants) August
More informationMay 6, 2002 Revision 2
Self-Generation Incentive Program Handbook May 6, 2002 Revision 2 Table of Contents 1. Introduction...5 1.1 Program Summary...5 1.2 Program Background...5 2. Program Eligibility Criteria and Requirements...6
More informationFY2016 RENEWABLE ELECTRIC STORAGE INCENTIVE PROGRAM STRAW PROPOSAL MAY 07, 2015
FY2016 RENEWABLE ELECTRIC STORAGE INCENTIVE PROGRAM STRAW PROPOSAL MAY 07, 2015 Purpose and Intent The New Jersey Board of Public Utilities Staff (Staff) and the Market Manager are issuing this straw proposal
More informationA. General provisions and other electrical systems are specified in other Sections of Division 26.
PART 1: GENERAL 1.01 DESCRIPTION: A. General provisions and other electrical systems are specified in other Sections of Division 26. B. Commissioning is an ongoing process and shall be performed throughout
More informationLeveraging NYSERDA Funds for Energy Efficiency Upgrades
Leveraging NYSERDA Funds for Energy Efficiency Upgrades Sarah Eckstein ERS, Energy & Resource Solutions Representing Willdan Energy Solutions as a NYSERDA Outreach Contractor 1 About ERS Energy Engineering
More informationCOUNTY OF DUNN, WISCONSIN REQUEST FOR PROPOSALS PROCUREMENT NO CSB CONSTRUCTION MANAGEMENT SERVICES
COUNTY OF DUNN, WISCONSIN REQUEST FOR PROPOSALS PROCUREMENT NO. 2018-19-CSB CONSTRUCTION MANAGEMENT SERVICES The County of Dunn is requesting proposals for Construction Management Services. The services
More informationEFFICIENCY MAINE TRUST REQUEST FOR QUALIFICATIONS FOR VIDEO SERVICES EM Date Issued: August 31, Closing Date: September 30, 2016
EFFICIENCY MAINE TRUST REQUEST FOR QUALIFICATIONS FOR VIDEO SERVICES EM-006-2017 Date Issued: August 31, 2016 Closing Date: September 30, 2016 SECTION 1 RFQ INFORMATION AND INSTRUCTIONS 1.1 Title and Purpose
More informationRecommendations and Best Practices for Revising Incentive Structure May 2014
Recommendations and Best Practices for Revising Incentive Structure May 2014 Opportunities and Challenges for Multifamily Incentive Restructuring In the fall of 2013, ACEEE completed a report identifying
More informationEnergy Efficiency Program for Business
2014 Energy Efficiency Program for Business 1 2014 Energy Efficiency Program for Business Program Overview 2 Program Overview Program purpose To help commercial and industrial contractors and customers*:
More informationINDIVIDUAL TRAINING ACCOUNT POLICY AND PROCEDURES
Attachment A ITA Policy and Procedures INDIVIDUAL TRAINING ACCOUNT POLICY AND PROCEDURES INTRODUCTION An Individual Training Account (ITA) is designed to provide services to customers who are in need of
More informationEXHIBIT A. SCOPE OF SERVICES For EMERGENCY MANAGEMENT SERVICES. Revised 3/10/15
EXHIBIT A SCOPE OF SERVICES For EMERGENCY MANAGEMENT SERVICES Revised 3/10/15 TABLE OF CONTENTS 1.0 PURPOSE... 3 2.0 PROJECT APPROACH... 3 3.0 SCOPE... 5 4.0 LENGTH OF SERVICE... 6 5.0 PERFORMANCE OF THE
More informationMINISTRY OF HEALTH AND LONG-TERM CARE. Summary of Transfer Payments for the Operation of Public Hospitals. Type of Funding
MINISTRY OF HEALTH AND LONG-TERM CARE 3.09 Institutional Health Program Transfer Payments to Public Hospitals The Public Hospitals Act provides the legislative authority to regulate and fund the operations
More informationBusiness Energy Saving Incentives (BESI) Alliance of Energy Professionals User Guide
Business Energy Saving Incentives (BESI) Alliance of Energy Professionals User Guide This user guide is intended for Alliance contractors and distributors who use the BESI online application. Table of
More informationSprinkler Cost Assistance Program Application
City of Mesa Sprinkler Cost Assistance Program Application In Fiscal Year 2010/2011, Mesa s City Council adopted a set of strategic initiatives aimed at guiding the efforts of City Staff. The Economic
More informationInternal Audit Follow-Up Report
Internal Audit Follow-Up Report Civil Rights Division Program Management TxDOT Internal Audit Division Objective To assess the status of corrective actions for high-risk Management Action Plans (MAPs)
More information1. Research Customer Research the various types of renewable energy systems available and decide which system best fits your consumption needs.
1 2 3 4 1. Research Customer Research the various types of renewable energy systems available and decide which system best fits your consumption needs. Research contractors and third party system owners
More informationHome Energy Saving (HES) scheme - Homeowner Application Form Version 1.0
Home Energy Saving (HES) scheme - Homeowner Application Form Version 1.0 Instruction for Completing the Application Form All fields in the form are MANDATORY. Incomplete applications will be returned.
More informationFACILITIES MANAGEMENT
FACILITIES MANAGEMENT Planning, Design & Construction March 17, 2015 Re: Request for Proposals- Commissioning Services Seamans Center for the Engineering Arts and Sciences-South Annex Addition University
More informationEVALUATION AND STATUS REPORT
NEW YORK S SYSTEM BENEFITS CHARGE PROGRAMS EVALUATION AND STATUS REPORT QUARTERLY REPORT TO THE PUBLIC SERVICE COMMISSION QUARTER ENDING SEPTEMBER 30, 2009 FINAL REPORT NOVEMBER 2009 NEW YORK STATE ENERGY
More informationThe Narragansett Electric Company d/b/a National Grid
The Narragansett Electric Company d/b/a National Grid Rhode Island Renewable Energy Growth Program Solicitation and Enrollment Process Rules for Solar (Greater than 25 kw), Wind, Hydro and Anaerobic Digester
More informationPUBLIC BENEFIT GRANTS PROGRAM New Alternative Fuel Vehicle Purchase Eligibility Criteria and Application Guidelines
PUBLIC BENEFIT GRANTS PROGRAM New Alternative Fuel Vehicle Purchase Eligibility Criteria and The San Joaquin Valley Air Pollution Control District (SJVAPCD) is currently accepting applications from public
More informationProgram Plan For the Energy Efficiency and Renewable Energy Technology Account Under New York s Clean Air Interstate Rules (CAIR)
Program Plan For the Energy Efficiency and Renewable Energy Technology Account Under New York s Clean Air Interstate Rules (CAIR) New York Battery and Energy Storage Technology Consortium Originally prepared
More informationPartner(s): City of Asheville, Duke Energy Progress, Green Built Alliance, Community Action Opportunities, NC Sustainable Energy Association (NCSEA)
Project Title: Blue Horizons - Efficiency Network Summary Statement: Buncombe County, the City of Asheville, Duke Energy Progress, and other partners propose a pilot program to centralize, enhance, and
More informationKnights Ferry Elementary School District
Knights Ferry Elementary School District REQUEST FOR PROPOSAL FOR THE IMPLEMENTATION OF ENERGY EFFICIENCY MEASURES FUNDED BY THE CLEAN ENERGY JOBS ACT - PROPOSITION 39 REQUEST FOR PROPOSAL SUBMITTAL DEADLINE
More informationMAIN STREET PALESTINE FAÇADE IMPROVEMENT PROGRAM GRANT APPLICATION PACKET
MAIN STREET PALESTINE FAÇADE IMPROVEMENT PROGRAM GRANT APPLICATION PACKET Program description and rules Design guidelines Application forms and documents www.palestinetexas.net Palestine Economic Development
More informationEl Paso Electric Company New Mexico Energy Efficiency and Load Management Programs
Company 2019 2021 New Mexico Energy Efficiency and Load Management Programs Request for Proposals RFP# EPE-50062135-MM Released on: October 9, 2017 Melissa Muñoz Contract Negotiator 100 N. Stanton, Loc.
More informationEconomic Development Incentives Programs Guide
Economic Development Incentives Programs Guide 2016 In an effort to enhance the local business environment and promote a healthy local economy, the Town of Wytheville offers access to a variety of economic
More informationOVERVIEW OF GRANTS ADMINISTRATION PROCESS
OVERVIEW OF GRANTS ADMINISTRATION PROCESS I. INTRODUCTION Implementation and management of Community Development Block Grant (CDBG) projects is an ongoing process that requires adherence to many state
More informationNew Jersey s Clean Energy Program 2013 Program Descriptions and Budgets. Office of Clean Energy
New Jersey s Clean Energy Program 2013 Program Descriptions and 2012-2013 Budgets Office of Clean Energy Energy Efficiency Programs, Renewable Energy Programs, and OCE Oversight Activities Including Programs
More informationThe following are the procedural steps required for a customer to apply for and receive a Steam Chiller Incentive payment:
Targeted Steam Air Conditioning Incentive Program PROGRAM GUIDELINES Steam Chiller Incentives To qualify for the Targeted Steam Air Conditioning Incentive Program ( Program or Incentive Program ), a signed
More informationINDUSTRIAL ENERGY OPTIMIZATION PROGRAM
INDUSTRIAL ENERGY OPTIMIZATION PROGRAM YOU VE GOT THE POWER TO SAVE Identify energy waste and reduce your production costs. Our efficiency experts will provide customized technical assistance to help you
More informationPROMOTIONAL PRACTICES SCHEDULE PRO
P.S.C. Mo. No. 5 Sec. 4 4 th Revised Sheet No. 8 Canceling P.S.C. Mo. No. 5 Sec. 4 3 rd Revised Sheet No. 8 A. Dealer Cooperative Advertising The Company may develop and implement various cooperative advertising
More informationChapter Two STATE FUNCTIONS FOR ENERGY EFFICIENCY PROMOTION Section I Governing Bodies
Energy Efficiency Act Promulgated, SG No. 98/14.11.2008, effective 14.11.2008, supplemented, SG No. 6/23.01.2009, effective 1.05.2009, amended, SG No. 19/13.03.2009, effective 10.04.2009, supplemented,
More informationThe Evolution of a Successful Efficiency Program: Energy Savings Bid
The Evolution of a Successful Efficiency Program: Energy Savings Bid Carrie Webber, KEMA, Inc. ABSTRACT San Diego Gas and Electric s Energy Savings Bid Program is a highly successful commercial energy-efficiency
More informationSouthern California Edison Original Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Cal. PUC Sheet No.
Southern California Edison Original Cal. PUC Sheet No. 52964-E Schedule Re-MAT Sheet 1 A. APPLICABILITY The Renewable Market Adjusting Tariff schedule (Re-MAT or this Schedule) implements the renewable
More informationBureau of Rail Freight, Ports and Waterways Grant Program Policy
Bureau of Rail Freight, Ports and Waterways Grant Program Policy A. Background The Rail Freight Assistance Program (RFAP) and Rail Transportation Assistance Program (RTAP), also known as Rail TAP in the
More informationHome Energy Saving (HES) scheme - Homeowner Application Form Version 10.0
Home Energy Saving (HES) scheme - Homeowner Application Form Version 10.0 Instructions for Completing the Application Form All fields in the form are MANDATORY. Incomplete applications will be returned.
More information2017 HeatSmart Massachusetts Pilot Table of Contents
2017 HeatSmart Massachusetts Pilot for Clean Heating & Cooling Technical Consultants RFP ID: MassCEC 2017-HSMP-02 Posting Date: July 24, 2017 Table of Contents 1. Opportunity Summary... 2 2. Program Description...
More informationGrant Assistance for Water Efficient Equipment Retrofits Grant Guidelines and Terms
Grant Assistance for Water Efficient Equipment Retrofits Grant Guidelines and Terms Grant Assistance Overview The SFPUC Grant Assistance for Large Indoor Water Conservation Retrofits (Grant Assistance)
More informationPowering Our Communities. Grant Guidelines
Powering Our Communities Grant Guidelines Powering Our Communities Grant Guidelines The Northeast Ohio Public Energy Council, Inc. ( NOPEC ) is pleased to invite its electric member communities of The
More informationMassachusetts School Building Authority. John K. McCarthy Executive Director. Deborah B. Goldberg Chairman, State Treasurer. Procurement Overview
Massachusetts School Building Authority Deborah B. Goldberg Chairman, State Treasurer John K. McCarthy Executive Director Procurement Overview February 5, 2015 Procurement Overview Agenda Introductions
More informationFLORIDA DEPARTMENT OF TRANSPORTATION
FLORIDA DEPARTMENT OF TRANSPORTATION ADDENDUM NO.: 1 Date: May 12, 2015 To: All Proposers From: Procurement Office RE: Questions and Answers RFP-DOT-14/15-9030-GH-ReAd: EMERGENCY MANAGEMENT SERVICES Notice
More informationPROPERTY IMPROVEMENT PROGRAM
Hollywood, Florida Community Redevelopment Agency PROPERTY IMPROVEMENT PROGRAM (PIP) December 2011 PROPERTY IMPROVEMENT PROGRAM (PIP) GUIDELINES PROGRAM PURPOSE AND BENEFITS: City of Hollywood, Florida
More informationEFFICIENCY MAINE TRUST REQUEST FOR PROPOSALS FOR TECHNICAL SERVICES TO DEVELOP A SPREADSHEET TOOL
EFFICIENCY MAINE TRUST REQUEST FOR PROPOSALS FOR TECHNICAL SERVICES TO DEVELOP A SPREADSHEET TOOL RFP EM-007-2018 Date Issued: January 31,2017 Closing Date: February 16, 2018-3:00 pm local time TABLE OF
More informationThe Green Initiative Fund
The Green Initiative Fund MISSION STATEMENT The Green Initiative Fund (TGIF) shall aim to empower students with active roles in reducing the University of California Irvine environmental footprint through
More informationHeritage Energy Retrofit Grant Terms and Conditions
Heritage Energy Retrofit Grant Terms and Conditions CONTENTS Summary House Eligibility Application Process Heritage Conservation Incentives Access to HERO And Oil to Heat Pump Incentive Programs Energy
More informationREQUEST FOR PROPOSAL TO PROVIDE AS-NEEDED ENGINEERING SERVICES FOR THE IMPLEMENTATION OF
REQUEST FOR PROPOSAL TO PROVIDE AS-NEEDED ENGINEERING SERVICES FOR THE IMPLEMENTATION OF PURPLE LINE EXTENSION PROJECT BY LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY Project No. 16-34 CITY