1 Contra Costa County Local Hazard Mitigation Plan Update Information on the process

2 What is Mitigation? Preparedness Mitigation Response Recovery Sustained action taken to reduce or eliminate long-term risk to life and property (Prevention)

3 What is the Disaster Mitigation Act (DMA)? Federal legislation that establishes a pre-disaster hazard mitigation program and new requirements for the national post-disaster Hazard Mitigation Grant Program (HMGP). The DMA encourages and rewards local and state pre-disaster planning. Promotes sustainability. Seeks to integrate State and local planning with an overall goal of strengthening statewide hazard mitigation. Results in faster more efficient allocation of funding and more effective risk reduction projects.

4 The Disaster Mitigation Act (DMA) Facts: Requires local hazard mitigation plans for Hazard Mitigation Grant Fund (project) eligibility for declared disasters. Establishes Pre-disaster Mitigation program. Mandates a prescriptive planning process Re-defined local government All approved plans must be updated every 5- years.

5 The Disaster Mitigation Act (DMA) Fiction: All post-disaster financial assistance requires an approved plan. If you don t have a plan by November 1, 2004, you will not be eligible for HMGP project funds. DMA plan must include non-natural hazards.

6 What is a local government? Any county, municipality, city, town, township, public authority, school district, special district, intrastate district, council of governments (regardless of whether the council of governments is incorporated as a nonprofit corporation under State law), regional or interstate government entity, or agency or instrumentality of a local government; any Indian tribe or authorized tribal organization, or Alaska Native village or organization; and any rural community, unincorporated town or village, or other public entity.

7 Why do a Hazard mitigation Plan? Grant Funding eligibility. Pro-active vs. reactive. Sustainability. Key element in emergency management. Can set the course for response and recovery to impacts from Natural disasters. Requires commitment and support from both the political faction and your constituency.

8 The Response to the DMA in Contra Costa County 17 local Governments have adopted plans within the County ( 12 cities, 5 Districts). 7 cities and numerous Special Purpose districts have not adopted plans and are therefore not eligible to apply for funding.

9 Have adopted Plans: Clayton Concord Danville El Cerrito Lafayette Moraga Orinda Pleasant Hill Richmond San Pablo San Ramon Walnut Creek Bethel Island MID Contra Costa Water District Eastern C. C Transit Authority Moraga/Orinda FD San Ramon Valley FD Do not have adopted plans: Antioch Brentwood Hercules Martinez Oakley Pinole Pittsburg Every Special Purpose District within the County that fits the definition of Local Government not currently covered by a plan.

10 The ABAG Plan The Association of Bay Area Governments responded to the DMA by creating a Regional template for local Governments to follow. They created a regional risk assessment and a comprehensive catalog of mitigation actions. This process was meant to be a platform for which local governments could build upon. All approved plans within CCC are ABAG plans.

11 The ABAG plan ABAG does plan on updating its regional plan (time frame to be determined) The Contra Costa County effort will be separate from the ABAG update effort ABAG will be coordinated with during this process to promote regional consistency.

12 So what s the deal? Contra Costa County Department of Public Works has received a FEMA grant to update the LHMP for the County. The sell point for this grant was for this effort to be multi-jurisdictional, which would get all planning partners on the same planning cycle. The County has hired Tetra Tech to facilitate this process.

13 Why Update? Because it is required. Section CFR states that approved LHMP s must be updated at least every 5 years to remain eligible under the DMA. Because plans are no good if they sit on a shelf. Effective plans are dynamic which means they are reviewed and enhanced regularly.

14 What is required in a Plan update? FEMA has drafted required elements for updates to LHMP s. These Requirements are comprehensive and include: Reengaging the public Review\revise risk assessment Review\revise goals and objectives Review\revise action plan

15 The benefits of Multi- Jurisdictional Planning This planning approach provides the following benefits: Pools resources Reduces the level of effort for each partner Consistency within a defined planning area Enhanced grant opportunities Approached preferred by FEMA/CAOES

16 The Work-Plan Will Follow a script prescribed by a Federal Program known as the Community Rating System (CRS). Primary objective of this work-plan is to provide multiple program compliance to all planning partners. Scope of work has five (5) principal phases.

17 Phase 1: Organize Resources The principle objectives of this phase are: Organize the planning partnership Select a Steering Committee Review the existing plan Make recommendations for enhancement/revision Coordinate with other agencies (ABAG) Review existing programs

18 Planning Partners Cities: Antioch Brentwood Concord Contra Costa County Danville El Cerrito Kensington Martinez Pinole Pleasant Hill San Pablo San Ramon Walnut Creek

19 Planning Partners Special Purpose Districts Bethel Island Municipal Improvement District Brentwood Union School District Delta Diablo Sanitation District Central Contra Costa Sanitary District East Bay MUD Reclamation District 800 (Byron Tract) Mt. Diablo Unified School District Knightsen Community Services District West Contra Costa Unified School District Ironhouse Sanitary District Contra Costa Consolidated Fire District Contra Costa County Office of Education San Ramon Valley Fire Protection District Pittsburg Unified School District East Contra Costa Fire District Antioch Unified School District Diablo Water District Canyon Elementary School District Liberty Union High School District Reclamation District 830 (Jersey Island) Contra Costa Community College district Rodeo-Hercules Fire District

20 Phase 2: Risk Assessment This phase will focus primarily on updating the flood and earthquake components of the risk assessment. HAZUS-MH will be utilized The Risk Assessment will be formatted to better suit the needs of CCC and its planning partners (to better support the grant application process). Will include a comprehensive review of alternatives for each hazard (Creation of a mitigation catalog).

21 HAZUS-MH Methodology For All Hazards Hazard Inventory Vulnerability Validation / Calibration HAZUS-MH Risk Assessment Risk = Hazard x Exposure x Vulnerability

22 Phase 3: Public Involvement Strategy This will be a key phase to meeting FEMA s plan update requirements. The Steering Committee will identify an outreach strategy that will meet the needs and capability of the partnership This strategy could include: Questionnaires Website(s) Public meetings Media releases

23 Phase 4: Assemble the Plan Under this phase, the planning team will assemble the plan in accordance with state and federal requirements for plan updates. Plan Must include for DMA compliance: 1. A description of the Planning process 2. Risk assessment (applicable to each planning partner) 3. Mitigation Strategy Goals Review of alternatives Prioritized action plan 4. Plan Maintenance section 5. Documentation of Adoption

24 The Plan layout The proposed layout for this plan will be in 2 volumes. Volume 1, will contain all elements that apply to the entire planning area. Description of planning process, risk assessment, goals and objectives, review of mitigation alternatives, plan maintenance, and county-wide initiatives. Volume 2 will contain the elements that are jurisdiction specific There will be a chapter for each planning partner The basis for Volume 2 will be the Jurisdictional Annex templates.

25 Phase 5: Plan Adoption Once pre-adoption approval has been provided by OES and FEMA, the adoption phase will begin. Plan will need to be adopted by ALL planning partners before FEMA will grant full eligibility to the partnership. Sample resolutions will be provided to the partners.

26 Timeline We anticipate this process will take up to 18 months to complete, depending on direction from Steering Committee.

27 Planning Partner Expectations Refer to hand out Letter of intent to participate Participate in process Support Steering Committee Complete Jurisdictional Annex template Mitigation strategy Action plan

28 Steering Committee Will oversee development of plan Multi-disciplined representation Planning partners representative(s) Citizens Stakeholders (Business, academia, government) Emergency Management Will meet periodically based on need during plan development.

29 SC Ground Rules The SC has 14 members. The SC is an advisory body Ground rules have been established to guide the Steering Committee s actions. SC meetings are advertised and open to the public.

30 Questions on this process can be directed to: Rob Flaner, CFM Tetra Tech, Inc. 90 South Blackwood Ave. Eagle, ID (208)

Whitman County Natural Hazard Mitigation Plan Update Planning Partner Kick-off Meeting

Whitman County Natural Hazard Mitigation Plan Update Planning Partner Kick-off Meeting Whitman County Natural Hazard Mitigation Plan Update Planning Partner Kick-off Meeting Wednesday, May 11, 2011 1 Tonight s Discussion The Planning Team The Disaster Mitigation Act FEMA requirements for

More information

Hazard Mitigation & Grant Workshop. San Mateo County Hazard Mitigation Plan April 25, 2018

Hazard Mitigation & Grant Workshop. San Mateo County Hazard Mitigation Plan April 25, 2018 Hazard Mitigation & Grant Workshop San Mateo County Hazard Mitigation Plan April 25, 2018 What Are We Going To Talk About? 2nd Annual Progress Report San Mateo County Hazard Mitigation Plan Year 1 in Review

More information

ALZHEIMER S/DEMENTIA RESOURCES FOR FAMILIES

ALZHEIMER S/DEMENTIA RESOURCES FOR FAMILIES ALZHEIMER S/DEMENTIA RESOURCES FOR FAMILIES There are many community services and resources to help families caring for persons with Alzheimer s disease. To help families find the services they need, Information

More information

City of Lafayette Staff Report

City of Lafayette Staff Report City of Lafayette Staff Report For: By: Lafayette City Council Steven Falk, City Manager Date: August 13, 2012 Subject: Grand Jury Report on Outsourcing Municipal Services Background and Summary Attached

More information

CHAPTER 1. Chapter 1 Introduction Mobile County Multi-Hazard Mitigation Plan. 1.1 Background. 1.2 Authority

CHAPTER 1. Chapter 1 Introduction Mobile County Multi-Hazard Mitigation Plan. 1.1 Background. 1.2 Authority Chapter 1 Introduction 1.1 Background 1.2 Authority 1.3 Funding 1.4 Eligibility for FEMA Hazard Mitigation Assistance Grants 1.5 Initial Plans 1.6 The 2010 Mobile County Multi-Hazard Mitigation Plan Update

More information

This appendix provides the following Federal and State Regulations related to the Hazard Mitigation Planning process.

This appendix provides the following Federal and State Regulations related to the Hazard Mitigation Planning process. APPENDIX A: APPLICABLE FEDERAL AND STATE REGULATIONS This appendix provides the following Federal and State Regulations related to the Hazard Mitigation Planning process. Federal Code of Federal Regulations

More information

MEETING MINUTES. Summary Prepared by: Jessica Cerutti and Caitlin Kelly 3/13/2016

MEETING MINUTES. Summary Prepared by: Jessica Cerutti and Caitlin Kelly 3/13/2016 MEETING MINUTES Date of Meeting: March 1, 2016 Location: 1 Twin Pines Lane, Belmont, CA 94002 Subject: Steering Committee No. 4 Project Name: In Attendance: Not Present: San Mateo County Hazard Mitigation

More information

Emergency Medical Services Agency

Emergency Medical Services Agency 2006/2007 Annual Program Report November 2007 1340 Arnold Drive, Suite 126 Martinez, CA 94553 (925) 646-4690 fax (925) 646-4379 www.cccems.org TABLE OF CONTENTS I. INTRODUCTION...1 A. OVERVIEW OF EMS...3

More information

emergency medical services CONTRA COSTA EMS SYSTEM PERFORMANCE REPORT

emergency medical services CONTRA COSTA EMS SYSTEM PERFORMANCE REPORT emergency medical services 2014 CONTRA COSTA EMS SYSTEM PERFORMANCE REPORT message from the director Contra Costa County s Emergency Medical Services (EMS) system withstood several tests in 2014, from

More information

Subject: Lifeline Cycle 4 Grant Funding

Subject: Lifeline Cycle 4 Grant Funding Agenda Item # 4.b. To: Board of Directors Date: May 11, 2015 From: Laramie Bowron, Manager of Planning Reviewed by: Subject: Lifeline Cycle 4 Grant Funding Summary: As part of County Connection s Lifeline

More information

EMERGENCY MEDICAL SERVICES CONTRA COSTA EMS SYSTEM PERFORMANCE REPORT

EMERGENCY MEDICAL SERVICES CONTRA COSTA EMS SYSTEM PERFORMANCE REPORT EMERGENCY MEDICAL SERVICES 2017 CONTRA COSTA EMS SYSTEM PERFORMANCE REPORT For more information visit ccchealth.org/ems MESSAGE FROM THE DIRECTOR 2017 An EMS System Striving for Optimization Contra Costa

More information

MOU with Central Contra Costa Transit Authority. Action Requested Receive staff report and approve MOU with Central Contra Costa Transit Authority.

MOU with Central Contra Costa Transit Authority. Action Requested Receive staff report and approve MOU with Central Contra Costa Transit Authority. SUBJECT: FROM: MOU with Central Contra Costa Transit Authority Michael Tree, Executive Director DATE: October 2, 2017 Action Requested Receive staff report and approve MOU with Central Contra Costa Transit

More information

CITY OF SAN RAMON STRATEGIC PLAN FOR THE CITY OFFICE OF EMERGENCY SERVICES JANUARY 07, 2007

CITY OF SAN RAMON STRATEGIC PLAN FOR THE CITY OFFICE OF EMERGENCY SERVICES JANUARY 07, 2007 STRATEGIC PLAN FOR THE CITY OFFICE OF EMERGENCY SERVICES CITY OF SAN RAMON JANUARY 07, 2007 CITY OF SAN RAMON POLICE SERVICES DEPARTMENT 2222 CAMINO RAMON SAN RAMON, CA 94583 INTRODUCTION Purpose This

More information

FEMA Grant Program Comparison

FEMA Grant Program Comparison L11-11-044 FEMA Grant Program Comparison FEMA will offers five hazard mitigation assistance programs The Hazard Mitigation Grant Program, the Pre-Disaster Mitigation program, the Flood Mitigation Assistance,

More information

Emergency Mass Care and Shelter

Emergency Mass Care and Shelter Contact: Jim Mellander Foreperson 925-608-2621 Contra Costa County Grand Jury Report 1702 Emergency Mass Care and Shelter Are We Ready? TO: Board of Supervisors, Office of the Sheriff SUMMARY The Contra

More information

FEMA Planning Grants 1

FEMA Planning Grants 1 Brett Holt, FEMA Region 10 Mitigation Planning Program Manager Amanda Siok, FEMA Region 10 Mitigation Planner Kristen Meyers, FEMA Hazard Mitigation Assistance Branch Chief Angie Lane, Oregon State Hazard

More information

Contra Costa County Emergency Medical Services. STEMI System Performance Report

Contra Costa County Emergency Medical Services. STEMI System Performance Report Contra Costa County Emergency Medical Services STEMI System Performance Report Quarter 4, 2009 & Year to Date 2009 Contra Costa Emergency Medical Services STEMI System Performance Executive Report: Quarter

More information

IS-700.a National Incident Management System (NIMS) An Introduction Final Exam

IS-700.a National Incident Management System (NIMS) An Introduction Final Exam 1. Homeland Security Presidential Directive 5 (HSPD-5) requires all Federal departments and agencies to: a. Establish a panel that will evaluate activities at the State, tribal, and local levels to ensure

More information

EMERGENCY SERVICES POLICY BOARD

EMERGENCY SERVICES POLICY BOARD EMERGENCY SERVICES POLICY BOARD Monday, March 16, 2015 2:00 PM 651 Pine Street, Room 101, Martinez CA 94553 Chair David J. Twa, County Administrator Vice Chair David O. Livingston, Sheriff-Coroner Agenda

More information

KNIGHTSEN TOWN COMMUNITY SERVICES DISTRICT

KNIGHTSEN TOWN COMMUNITY SERVICES DISTRICT IX. KNIGHTSEN TOWN COMMUNITY SERVICES DISTRICT LOCATION, ADMINISTRATION AND OPERATIONS The Knightsen Town Community Services District (KCSD) was created in 2005, and encompasses approximately 5,100 acres.

More information

Presentation. I. HMGP Overview II. III. IV. Application Review Process Post Obligation Information Common Errors

Presentation. I. HMGP Overview II. III. IV. Application Review Process Post Obligation Information Common Errors 1 Presentation I. HMGP Overview II. III. IV. Application Review Process Post Obligation Information Common Errors 2 Hazard Mitigation Grant Program (HMGP) Activities that will reduce or eliminate future

More information

A-3 RECLAMATION NOTICE OF AVAILABILITY

A-3 RECLAMATION NOTICE OF AVAILABILITY A-3 RECLAMATION NOTICE OF AVAILABILITY Los Vaqueros Reservoir Expansion Project February 2009 Draft EIS/EIR 4310-MN-P DEPARTMENT OF THE INTERIOR Bureau of Reclamation Los Vaqueros Reservoir Expansion,

More information

HEALTHCARE SERVICES MUNICIPAL SERVICE REVIEW & SPHERE OF INFLUENCE UPDATES

HEALTHCARE SERVICES MUNICIPAL SERVICE REVIEW & SPHERE OF INFLUENCE UPDATES FINAL REPORT HEALTHCARE SERVICES MUNICIPAL SERVICE REVIEW & SPHERE OF INFLUENCE UPDATES APPENDICES Prepared for Contra Costa LAFCO Prepared by Berkson Associates In association with the Abaris Group richard@berksonassociates.com

More information

Karen C. Owens Emergency Operations Manager Virginia Office of Emergency Medical Services

Karen C. Owens Emergency Operations Manager Virginia Office of Emergency Medical Services Karen C. Owens Emergency Operations Manager Virginia Office of Emergency Medical Services Objectives Upon completion of this course participants will: Recognize the importance of a Continuity of Operations

More information

LIFELINE TRANSPORTATION PROGRAM CALL FOR PROJECTS

LIFELINE TRANSPORTATION PROGRAM CALL FOR PROJECTS DECEMBER 19, 2014 LIFELINE TRANSPORTATION PROGRAM CALL FOR PROJECTS The Contra Costa Transportation Authority (CCTA or the Authority ) is issuing a Call for Projects for the Lifeline Transportation Program.

More information

Intro to - IS700 National Incident Management System Aka - NIMS

Intro to - IS700 National Incident Management System Aka - NIMS Intro to - IS700 National Incident Management System Aka - NIMS What is N.I.M.S.? N.I.M.S is a comprehensive, national approach to incident management that is applicable at all jurisdictional levels. Its

More information

National Preparedness Goal Project

National Preparedness Goal Project CITY OF CALABASAS OFFICE OF EMERGENCY MANAGEMENT National Preparedness Goal Project National Incident Management System (NIMS) Implementation Plan WORKING DRAFT February 1, 2006 / State of California Office

More information

Health Care for the Homeless Co-Applicant Governing Board WEDNESDAY, FEBRUARY 15, :00-12:30PM 597 CENTER AVENUE MARTINEZ, CA

Health Care for the Homeless Co-Applicant Governing Board WEDNESDAY, FEBRUARY 15, :00-12:30PM 597 CENTER AVENUE MARTINEZ, CA Health Care for the Homeless Co-Applicant Governing Board WEDNESDAY, FEBRUARY 15, 2017 11:00-12:30PM 597 CENTER AVENUE 94553 MARTINEZ, CA HCH Medical Outreach Presentation DR. JOSEPH MEGA HCH MEDICAL DIRECTOR

More information

2016 Community Health Improvement Plan

2016 Community Health Improvement Plan 2016 Community Health Improvement Plan Table of Contents 1. EXECUTIVE SUMMARY... 2. ABOUT OUR JOHN MUIR HEALTH... Mission, Vision, Values... Community Commitment... About Community Benefit... Communities

More information

Conservancy Work Plan: 2017 Summary and 2018 Work Plan

Conservancy Work Plan: 2017 Summary and 2018 Work Plan Program Administration (General) 1 Increase public awareness of the Plan and provide opportunities for involvement in the implementation of the Plan by the public, interested agencies, and others. Public

More information

Attachment A Guidance on Pre-award Cost Associated with HMGP Projects Pre-award costs are costs incurred by a sub-grantee before the grant was awarded. Any and all pre-award costs associated with an HMGP

More information

TABLE OF CONTENTS FROM SUPERVISOR GLOVER

TABLE OF CONTENTS FROM SUPERVISOR GLOVER Volume 3, Issue 2 Summer 2008 District 5 e-gram 315 East Leland Road, Pittsburg 94565 Antioch * Bay Point * Bethel Island * Oakley * Pittsburg TABLE OF CONTENTS Volunteers/homeless connect. 1 Books, coffee

More information

Request for Applications (RFA)

Request for Applications (RFA) Request for Applications (RFA) This is an Electronic Submission RESPONSE DUE April 28, 2017 Applications must be submitted via the link below: https://www.grantrequest.com/sid_946?sa=sna&fid=35415 Grant

More information

EMERGENCY SUPPORT FUNCTION (ESF) 3 PUBLIC WORKS AND ENGINEERING

EMERGENCY SUPPORT FUNCTION (ESF) 3 PUBLIC WORKS AND ENGINEERING EMERGENCY SUPPORT FUNCTION (ESF) 3 PUBLIC WORKS AND ENGINEERING Primary Agency: Chatham County Department of Public Works Support Agencies: Chatham Emergency Management Agency Chatham County Engineering

More information

REQUEST FOR PROPOSALS HAZARD MITIGATION PLAN UPDATE FOR LOWNDES COUNTY, GEORGIA

REQUEST FOR PROPOSALS HAZARD MITIGATION PLAN UPDATE FOR LOWNDES COUNTY, GEORGIA REQUEST FOR PROPOSALS HAZARD MITIGATION PLAN UPDATE FOR LOWNDES COUNTY, GEORGIA Introduction Lowndes County, Georgia, has received a Hazard Mitigation Planning Grant from the Georgia Emergency Management

More information

Section 3. LMS Team Organization and Operating Procedures

Section 3. LMS Team Organization and Operating Procedures Section 3. LMS Team Organization and Operating Procedures 3.1 Purpose of the LMS Team The purpose of the Bay County LMS Team is to recommend measures to decrease the vulnerability of the citizens, governments,

More information

3.1 Local Government Participation

3.1 Local Government Participation 3 PLANNING PROCESS Requirements 201.6(b) and 201.6(c)(1): An open public involvement process is essential to the development of an effective plan. In order to develop a more comprehensive approach to reducing

More information

Community Health Improvement Plan John Muir Health I. Executive Summary

Community Health Improvement Plan John Muir Health I. Executive Summary Community Health Improvement Plan John Muir Health 2013 I. Executive Summary 1 I. Executive Summary The Community Health Improvement Plan has been prepared in order to comply with federal tax law requirements

More information

Mitigation Planning and Funding Actions KAMM Regional Training

Mitigation Planning and Funding Actions KAMM Regional Training Mitigation Planning and Funding Actions 2016 KAMM Regional Training Floodplain 101 KY Flood Insurance Statistics 23,487 Policies $ 3,679,836,900 in Coverage $ 19,926,786 in Total Premiums 21,671 Total

More information

CONTRA COSTA COUNTY EAST BAY REGIONAL PARK DISTRICT LIAISON COMMITTEE

CONTRA COSTA COUNTY EAST BAY REGIONAL PARK DISTRICT LIAISON COMMITTEE REVISED Topic CONTRA COSTA COUNTY EAST BAY REGIONAL PARK DISTRICT LIAISON COMMITTEE Wednesday, May 3, 2017 11:30 a.m. 1:00 p.m. Meeting Location Change: Contra Costa County ZA Conference Room 30 Muir Road

More information

CCHS Health Care for the Homeless Co-Applicant Governing Board

CCHS Health Care for the Homeless Co-Applicant Governing Board CCHS Health Care for the Homeless Co-Applicant Governing Board WEDNESDAY, JANUARY 18, 2017 11:00AM- 12:30PM 597 CENTER AVENUE CONFERENCE ROOM 120 MARTINEZ, CA 94553 HCH Respite Care Center Presentation

More information

Reclamation District 2042 Bishop Tract. Emergency Operations Plan

Reclamation District 2042 Bishop Tract. Emergency Operations Plan Reclamation District 2042 Bishop Tract Emergency Operations Plan San Joaquin Operational Area December 2015 This document was last updated on December 15, 2015. Prepared by Kjeldsen Sinnock & Neudeck,

More information

Reclamation District 404 Boggs Tract. Emergency Operations Plan (California Water Code Section 9650)

Reclamation District 404 Boggs Tract. Emergency Operations Plan (California Water Code Section 9650) Reclamation District 404 Boggs Tract Emergency Operations Plan (California Water Code Section 9650) San Joaquin Operational Area October 2015 This document was last updated on October 19, 2015. Prepared

More information

Hazard Mitigation Assistance

Hazard Mitigation Assistance Hazard Mitigation Assistance Mitigation Division Region IX East Bay Municipal Engineers (EBME) 1 Hazard Mitigation What is Hazard Mitigation? Hazard mitigation is defined as any sustained action taken

More information

Reclamation District 1608 Lincoln Village West. Emergency Operations Plan (California Water Code Section 9650)

Reclamation District 1608 Lincoln Village West. Emergency Operations Plan (California Water Code Section 9650) Reclamation District 1608 Lincoln Village West Emergency Operations Plan (California Water Code Section 9650) San Joaquin Operational Area December 2015 This document was last updated on December 14, 2015.

More information

Idaho Statewide Implementation Strategy for the National Fire Plan

Idaho Statewide Implementation Strategy for the National Fire Plan Idaho Statewide Implementation Strategy for the National Fire Plan December 2006 Purpose Provide a collaborative framework for an organized and coordinated approach to the implementation of the National

More information

Program Manager Transportation Demand Management (TDM) Supplemental Questions required. See at the bottom of announcement.

Program Manager Transportation Demand Management (TDM) Supplemental Questions required. See at the bottom of announcement. Job Openings Program Manager Transportation Demand Management (TDM) Type: Full Time Salary/Pay Rate: $79,690-$96,863 CalPERS Retirement Posted Date: 8/14/2013 Deadline to Apply: 9/16/2013 Supplemental

More information

The Basics of Disaster Response

The Basics of Disaster Response The Basics of Disaster Response Thomas D. Kirsch, MD, MPH, FACEP Center for Refugee and Disaster Response Johns Hopkins Bloomberg School of Public Health Office of Critical Event Preparedness and Response

More information

FUNDING OPPORTUNITIES

FUNDING OPPORTUNITIES FUNDING OPPORTUNITIES ALASKA STATE PARK S 2016 ARTIST IN RESIDENCE PROGRAM for the summer at the ERNEST GRUENING STATE HISTORICAL PARK in Southeast Alaska. Deadline: March 1, 2106 Contact: Ryan Thomas

More information

Agency Information Collection Activities: Proposed Collection; Comment Request; AGENCY: Federal Emergency Management Agency, DHS.

Agency Information Collection Activities: Proposed Collection; Comment Request; AGENCY: Federal Emergency Management Agency, DHS. This document is scheduled to be published in the Federal Register on 02/27/2018 and available online at https://federalregister.gov/d/2018-03949, and on FDsys.gov Billing Code: 9111-47-P DEPARTMENT OF

More information

Section 6: Coordinating Local Planning

Section 6: Coordinating Local Planning Section 6: Coordinating Local Planning What s new (summary of updated information) Tables indicating the membership in the Mitigation Core Team and the State Hazard Mitigation Team have been streamlined

More information

FEMA Hazard Mitigation Grant Application for Seismic Retrofit of Live Oak Community Center

FEMA Hazard Mitigation Grant Application for Seismic Retrofit of Live Oak Community Center Page 1 of 7 14 Office of the City Manager CONSENT CALENDAR October 17, 2017 To: From: Honorable Mayor and Members of the City Council Dee Williams-Ridley, City Manager Submitted by: Scott Ferris, Director,

More information

ANNEX 4 ESF-4 - FIREFIGHTING. SC Department of Labor, Licensing, and Regulation, Division of Fire and Life Safety (Structural Fires)

ANNEX 4 ESF-4 - FIREFIGHTING. SC Department of Labor, Licensing, and Regulation, Division of Fire and Life Safety (Structural Fires) ANNEX 4 ESF-4 - FIREFIGHTING PRIMARY: SC Department of Labor, Licensing, and Regulation, Division of Fire and Life Safety (Structural Fires) SC Forestry Commission (Wildland Fires) SUPPORT: SC Department

More information

Response Protocols July 26,

Response Protocols July 26, Response Protocols July 26, 2011 1 Scope These protocols are applicable within the geographical boundaries of Santa Clara County and the sixteen jurisdictions within Santa Clara County. The protocols apply

More information

Pre- and Post-Katrina Planning in Pearl River County. Pearl River County

Pre- and Post-Katrina Planning in Pearl River County. Pearl River County Pre- and Post-Katrina Planning in Pearl River County A Proactive Approach to Staying Ahead of Development and Regulatory Curves Harold Holmes Pearl River County Planning and Development David Spector -

More information

FINANCING THE FLOOD. FEMA Public Assistance (PA) and Hazard Mitigation Grant Programs (HMGP) Facilitator: Corey Thomas Thompson Consulting Services

FINANCING THE FLOOD. FEMA Public Assistance (PA) and Hazard Mitigation Grant Programs (HMGP) Facilitator: Corey Thomas Thompson Consulting Services FINANCING THE FLOOD FEMA Public Assistance (PA) and Hazard Mitigation Grant Programs (HMGP) Facilitator: Corey Thomas Thompson Consulting Services Thompson Consulting Company Introduction Supporting state

More information

Meeting Summary was composed on January 30, 2017 by Denise Davis, Senior Emergency Management Specialist, Tetra Tech.

Meeting Summary was composed on January 30, 2017 by Denise Davis, Senior Emergency Management Specialist, Tetra Tech. City of Los Angeles Hazard Mitigation Plan Revision Meeting Summary Steering Committee Meeting #2 January 26, 2017 9:00am 11:00am 500 E. Temple Street, Los Angeles, CA 90012 Meeting Summary was composed

More information

Creating a Quality Hazard Mitigation Plan

Creating a Quality Hazard Mitigation Plan Creating a Quality Hazard Mitigation Plan Friday, May 19 Our Mission To reduce the loss of life and property due to natural disasters by assisting Texas cities, counties and state agencies in creating

More information

ALTERNATIVE SOURCES OF FUNDING FOR

ALTERNATIVE SOURCES OF FUNDING FOR January 2017 ALTERNATIVE SOURCES OF FUNDING FOR Flood-Related General Water Management Water Supply Projects The following inventory contains information about a variety of funding programs offered by

More information

Draft 2016 Emergency Management Standard Release for Public Comment March 2015

Draft 2016 Emergency Management Standard Release for Public Comment March 2015 Draft 2016 Emergency Management Standard Release for Public Comment March 2015 Emergency Management Accreditation Program Publication Note The Emergency Management Standard by the Emergency Management

More information

Countywide Emergency Department Ambulance Patient Transfer of Care Report Performance Report

Countywide Emergency Department Ambulance Patient Transfer of Care Report Performance Report Countywide Emergency Department 9-1-1 Ambulance Patient Transfer of Care Report Performance Report Prepared by: Contra Costa Emergency Medical Services Visit us at www.cccems.org 2/28/2017 Patient Transfer

More information

Any observations not included in this report were discussed with your staff at the informal exit conference and may be subject to follow-up.

Any observations not included in this report were discussed with your staff at the informal exit conference and may be subject to follow-up. Larry Mandel Vice Chancellor and Chief Audit Officer Office of Audit and Advisory Services 401 Golden Shore, 4th Floor Long Beach, CA 90802-4210 562-951-4430 562-951-4955 (Fax) lmandel@calstate.edu March

More information

Tri Delta Transit Senior Paratransit Application Packet.

Tri Delta Transit Senior Paratransit Application Packet. Tri Delta Transit Senior Paratransit Application Packet. This packet contains the following: 1) Information about Senior Paratransit Service including service area maps (pages 1-4) 2) Senior Paratransit

More information

Averting a Second Disaster: Leading Financial Oversight Practices in Mitigation and Disaster Grant Programs ASFPM 2016 June 14, 2016

Averting a Second Disaster: Leading Financial Oversight Practices in Mitigation and Disaster Grant Programs ASFPM 2016 June 14, 2016 Averting a Second Disaster: Leading Financial Oversight Practices in Mitigation and Disaster Grant Programs ASFPM 2016 June 14, 2016 Introductions Matt Jadacki Executive Director Ernst & Young Matt.Jadacki@ey.com

More information

The LSU Multi-Hazard Mitigation Plan and Disaster Science 101 at Baton Rouge Community College

The LSU Multi-Hazard Mitigation Plan and Disaster Science 101 at Baton Rouge Community College The LSU Multi-Hazard Mitigation Plan and Disaster Science 101 at Baton Rouge Community College Rusti Liner LSU/DSM Affiliate BRCC Adjunct Faculty Fifth National Emergency Management Summit September 14,

More information

Appendices. City of Santa Cruz Local Hazard Mitigation Plan Update Adopted by City Council xxxxx xx, 20xx

Appendices. City of Santa Cruz Local Hazard Mitigation Plan Update Adopted by City Council xxxxx xx, 20xx Appendices City of Santa Cruz Local Hazard Mitigation Plan Update 2012 Adopted by City Council xxxxx xx, 20xx LIST OF APPENDICES A B C D E F G H I J K L M N Hazards That Are Not a Significant Risk Acronyms

More information

CHAPTER 2 PLANNING PROCESS

CHAPTER 2 PLANNING PROCESS CHAPTER 2 PLANNING PROCESS The 2011 Wyoming Multi-Hazard Mitigation Plan (Plan) is the product of cooperation among local, state, and federal organizations over a period of several years. The State directed

More information

Yolo Operational Area Oil & Hazardous Materials Response Executive Summary

Yolo Operational Area Oil & Hazardous Materials Response Executive Summary This document outlines the planning and organizational responsibilities of the Oil and Hazardous Materials (ESF #10) coordinating agencies for the Yolo Operational Area Yolo Operational Area Oil & Hazardous

More information

Mike Chard Paul Eller

Mike Chard Paul Eller Why Should I have or be involved in an Emergency Management Program? Bruce Holloman Mike Chard Paul Eller www.dhsem.state.co.us Why As Political Subdivisions of Government and elected officials you have

More information

Texas Department of Public Safety. Division of Emergency Management

Texas Department of Public Safety. Division of Emergency Management Texas Department of Public Safety Division of Emergency Management Newly Elected County Judges & Commissioners January 15, 2015 TDEM Initiatives Ensure the state and its local governments prepare for,

More information

Federal Emergency Management Agency Public Assistance Program. Marcie Stone Recovery Division Deputy Director FEMA Region IX August 23, 2016

Federal Emergency Management Agency Public Assistance Program. Marcie Stone Recovery Division Deputy Director FEMA Region IX August 23, 2016 Federal Emergency Management Agency Public Assistance Program Marcie Stone Recovery Division Deputy Director FEMA Region IX August 23, 2016 PA Overview The Public Assistance Program assists in the restoration

More information

Presidential Policy Directive/ PPD 8 Update

Presidential Policy Directive/ PPD 8 Update Presidential Policy Directive/ PPD 8 Update Region VI RRT Meeting Little Rock, AR June 14, 2011 John Temperilli Industry Work Group Presidential Directive March 30, 2011 Subject: National All Hazard Preparedness

More information

VERMONT S RESILIENCE PROGRESS REPORT ROADMAP. August 20, 2015 BACKGROUND WHAT IS RESILIENCE? TRACKING OUR PROGRESS.

VERMONT S RESILIENCE PROGRESS REPORT ROADMAP.   August 20, 2015 BACKGROUND WHAT IS RESILIENCE? TRACKING OUR PROGRESS. PROGRESS REPORT August 20, 2015 VERMONT S ROADMAP TO RESILIENCE BACKGROUND Preparing for Natural Disasters and the Effects of Climate Change in the Green Mountain State In December 2013, following an 18-month

More information

ANNEX 13 ESF-13 - LAW ENFORCEMENT

ANNEX 13 ESF-13 - LAW ENFORCEMENT ANNEX 13 ESF-13 - LAW ENFORCEMENT PRIMARY: SUPPORT: South Carolina Law Enforcement Division SC National Guard; SC Department of Corrections; SC Forestry Commission; SC Department of Natural Resources,

More information

Hazard Mitigation Assistance Programs

Hazard Mitigation Assistance Programs Mississippi Emergency Management Agency Lee Smithson, Executive Director Hazard Mitigation Assistance Programs Overview Introduction A few words from those who made this webinar possible: Jana Henderson,

More information

DCMC PARTNERS. Alternative Procedures for Permanent Work (428) In Puerto Rico March 29, 2018

DCMC PARTNERS. Alternative Procedures for Permanent Work (428) In Puerto Rico March 29, 2018 Alternative Procedures for Permanent Work (428) In Puerto Rico March 29, 2018 DCMC Partners Overview The President signed Alternative Procedures (Section 428 of the Stafford Act) into law in January of

More information

Countywide Emergency Department Ambulance Patient Transfer of Care Report Performance Report

Countywide Emergency Department Ambulance Patient Transfer of Care Report Performance Report Countywide Emergency Department 9-1-1 Ambulance Patient Transfer of Care Report Performance Report Prepared by: Contra Costa Emergency Medical Services Visit us at www.cccems.org 2/11/2016 Contra Costa

More information

Reclamation District 2023 Venice Island. Emergency Operations Plan (California Water Code Section 9650)

Reclamation District 2023 Venice Island. Emergency Operations Plan (California Water Code Section 9650) Reclamation District 2023 Venice Island Emergency Operations Plan (California Water Code Section 9650) San Joaquin Operational Area December 2015 This document was last updated on December 15, 2015. Prepared

More information

Contra Costa Special Districts Association Newsletter

Contra Costa Special Districts Association Newsletter Contra Costa Special Districts Association Newsletter Contra Costa Chapter of the California Special Districts Association Summer 2013 CCSDA July 2013 Stege Sanitary Wins Prestigious CWEA Award On January

More information

STAFF REPORT CITY OF SOLANA BEACH

STAFF REPORT CITY OF SOLANA BEACH STAFF REPORT CITY OF SOLANA BEACH TO: Honorable Mayor and City Councilmembers FROM: Gregory Wade, City Manager MEETING DATE: September 14, 2016 ORIGINATING DEPT: City Manager s Department SUBJECT: Council

More information

ANNEX 4 ESF-4 - FIREFIGHTING. South Carolina Department of Labor, Licensing, and Regulation, Division of Fire and Life Safety (Structural Fires)

ANNEX 4 ESF-4 - FIREFIGHTING. South Carolina Department of Labor, Licensing, and Regulation, Division of Fire and Life Safety (Structural Fires) ANNEX 4 ESF-4 - FIREFIGHTING COORDINATING: PRIMARY: SUPPORTING: South Carolina Department of Labor, Licensing, and Regulation, Division of Fire and Life Safety (Structural Fires) South Carolina Forestry

More information

National Incident Management System (NIMS) Implementation Plan

National Incident Management System (NIMS) Implementation Plan INDIAN LAKE BOROUGH National Incident Management System (NIMS) Implementation Plan DATE Due to the compilation of potentially sensitive data, this NIMS Implementation Plan is marked FOR OFFICIAL USE ONLY

More information

LOCAL GOVERNMENTS & DISASTER PLANNING Disaster Cost Recovery Lessons Learned

LOCAL GOVERNMENTS & DISASTER PLANNING Disaster Cost Recovery Lessons Learned LOCAL GOVERNMENTS & DISASTER PLANNING Disaster Cost Recovery Lessons Learned Todd L. Rydstrom, Deputy Controller City & County of San Francisco October 26, 2015 Phases of Emergency Management Preparedness

More information

I. Scope and Purpose:

I. Scope and Purpose: To: Bay Area UASI Approval Authority Bay Area OES Managers From: Catherine Spaulding, Assistant General Manager Srijesh Thapa, Regional Project Manager Date: May 6, 2015 Re: WebEOC Assessment Project This

More information

APPENDIX D PUBLIC AND PRIVATE SECTOR PARTICIPATION PROGRESS REPORT. Hillsborough County Local Mitigation Strategy Appendix D-1

APPENDIX D PUBLIC AND PRIVATE SECTOR PARTICIPATION PROGRESS REPORT. Hillsborough County Local Mitigation Strategy Appendix D-1 APPENDIX D PUBLIC AND PRIVATE SECTOR PARTICIPATION PROGRESS REPORT Appendix D-1 PUBLIC-PRIVATE SECTOR PROGRESS REPORT The Local Mitigation Strategy Working Group adheres to the Government in the Sunshine

More information

TRIBAL TRANSPORTATION PROGRAM SAFETY FUNDS APPLICATION TO: DESCRETIONARY GRANTS FOR FY2013

TRIBAL TRANSPORTATION PROGRAM SAFETY FUNDS APPLICATION TO: DESCRETIONARY GRANTS FOR FY2013 TRIBAL TRANSPORTATION PROGRAM SAFETY FUNDS APPLICATION TO: DESCRETIONARY GRANTS FOR FY2013 Bristol Bay Regional Transportation Safety Planning Project I. Identifier Information 1. Tribe/State: Bristol

More information

All Commonwealth of Pennsylvania State Agencies, Counties and Municipalities. By Direction of:

All Commonwealth of Pennsylvania State Agencies, Counties and Municipalities. By Direction of: PEMA Circular Number: C2011-03 Effective Date: July 5, 2011 Termination Date: November 5, 2011 Rescinds Circular Number: 2010-03 Subject: Unified Hazard Mitigation Grant Application Guidance Scope: All

More information

CHATHAM COUNTY EMERGENCY OPERATIONS PLAN

CHATHAM COUNTY EMERGENCY OPERATIONS PLAN CHATHAM COUNTY EMERGENCY OPERATIONS PLAN WORKER HEALTH AND SAFETY SUPPORT ANNEX C SEPTEMBER 2009 SEPTEMBER 2009 THIS PAGE INTENTIONALLY BLANK SEPTEMBER 2009 FOREWORD The Chatham Emergency Management Agency

More information

MEMORANDUM OF AGREEMENT

MEMORANDUM OF AGREEMENT MEMORANDUM OF AGREEMENT Tillamook County, Oregon Cities of Bay City, Garibaldi, Manzanita, Nehalem, Rockaway Beach, Tillamook, and Wheeler, Oregon and Oregon Department of Land Conservation and Development

More information

What is MITIGATION? An action that reduces or eliminates long-term risk to people and property from natural hazards and their effects.

What is MITIGATION? An action that reduces or eliminates long-term risk to people and property from natural hazards and their effects. What is MITIGATION? An action that reduces or eliminates long-term risk to people and property from natural hazards and their effects. Hurricane Andrew (1992) Flagler Co. Wildfires (1997) Port St. Lucie

More information

Alameda and Contra Costa Counties

Alameda and Contra Costa Counties UCSF Benioff Children s Hospital Oakland Alameda and Contra Costa Counties P a g e 1 UCSF Benioff Children s Hospital Oakland ACKNOWLEDGMENTS This report was prepared by Applied Survey Research (ASR) on

More information

State Applicant Briefing. and. FEMA Kick Off Meeting

State Applicant Briefing. and. FEMA Kick Off Meeting State Applicant Briefing and FEMA Kick Off Meeting Why is there a briefing? The briefing is designed to provide the potential PA applicants with an understanding of the PA process and the record keeping

More information

Health & Medical Coordinating Coalitions. Massachusetts Senior Care Association Webinar February 2, 2016

Health & Medical Coordinating Coalitions. Massachusetts Senior Care Association Webinar February 2, 2016 Health & Medical Coordinating Coalitions Massachusetts Senior Care Association Webinar February 2, 2016 AGENDA What are Health & Medical Coordinating Coalitions? 2 HMCC BUILD REGIONAL CAPACITY TO SUPPORT

More information

Mississippi Emergency Support Function #4 Firefighting Annex

Mississippi Emergency Support Function #4 Firefighting Annex ESF #4 Coordinator Mississippi Fire Marshal s Office Primary Agency Mississippi Insurance Department Federal ESF Coordinator Department of Agriculture/U.S. Forest Federal Primary Agency Department of Agriculture/U.S.

More information

Bay Area UASI. Introduction to the Bay Area UASI (Urban Areas Security Initiative) Urban Shield Task Force Meeting

Bay Area UASI. Introduction to the Bay Area UASI (Urban Areas Security Initiative) Urban Shield Task Force Meeting Bay Area UASI Introduction to the Bay Area UASI (Urban Areas Security Initiative) Urban Shield Task Force Meeting 1221 Oak Street Room 225, Oakland, CA March 10, 2017 About the Bay Area UASI Its mission

More information

Emergency Support Function #3 Public Works and Engineering Annex. ESF Coordinator: Support Agencies:

Emergency Support Function #3 Public Works and Engineering Annex. ESF Coordinator: Support Agencies: Emergency Support Function #3 Public Works and Engineering Annex ESF Coordinator: Department of Defense/U.S. Army Corps of Engineers Primary Agencies: Department of Defense/U.S. Army Corps of Engineers

More information

Homeland Security Advisory Committee Policy Manual for Grants FY

Homeland Security Advisory Committee Policy Manual for Grants FY LOWER RIO GRANDE VALLEY DEVELOPMENT COUNCIL Homeland Security Advisory Committee Policy Manual for Grants FY 2018-19 LRGVDC Public Safety Homeland Security 301 W. Railroad St. Weslaco, TX 78596 Phone (956)

More information

Emergency Support Function 14. Community Recovery and Mitigation

Emergency Support Function 14. Community Recovery and Mitigation Emergency Support Function 14 Community Recovery and Mitigation ESF COORDINATOR: PRIMARY AGENCY: SUPPORT AGENCIES: County Emergency Management Agency County Administrative Officer Chief Elected Officials

More information

REQUEST FOR PROPOSALS Long-Term Community Recovery Strategy Town of Union, NY

REQUEST FOR PROPOSALS Long-Term Community Recovery Strategy Town of Union, NY REQUEST FOR PROPOSALS Long-Term Community Recovery Strategy Town of Union, NY The Town of Union is seeking the assistance of a consultant to prepare a Long-Term Community Recovery Strategy. The deadline

More information

Chapter 3: Business Continuity Management

Chapter 3: Business Continuity Management Chapter 3: Business Continuity Management GAO Why we did this audit: Nova Scotians rely on critical government programs and services Plans needed so critical services can continue Effective management

More information