Partnership for Action on Computing Equipment (PACE)

Size: px
Start display at page:

Download "Partnership for Action on Computing Equipment (PACE)"

Transcription

1 Approved: February 28, 2014 Partnership for Action on Computing Equipment (PACE) TERMS OF REFERENCE PACE Project Group 5.1: on Strategies, Actions and Incentives to promote Environmentally Sound Management. Title: 1. PACE Project Group 5.1: on Strategies, Actions and Incentives to promote Environmentally Sound Management. Background: 2. Following Decision VI/32 of the sixth meeting of the Conference of the Parties to promote partnerships, Decision VIII/2 of the eighth meeting of the Conference of the Parties to target the environmentally sound management of e-waste, and the success of the Mobile Phone Partnership Initiative (MPPI), the PACE was initiated by Decision IX/9 of the ninth meeting of the Conference of the Parties. 2bis. As per decision BC-11/15 adopted by the eleventh Conference of the Parties of the Basel Convention, the mandate of the Partnership was extended until the end of 2015 to complete the work programme for which inter alia includes the following tasks: (g) Continue to identify actions and incentives that can be taken to promote environmentally sound reuse, refurbishment, repair, recycling and material recovery of used and endoflife computing equipment through the implementation of the Partnership guidelines and existing certification schemes; (h) Continue to assess the possibility of using facility certification as a tool for assuring the environmentally sound management of used and end-of-life computing equipment. 3. Within the PACE Working Group, a decision was made to address new PACE activities as reflected in the annex to the COP10 decision on PACE. It is to develop strategies on the environmentally sound management of used and end-of-life computing equipment, to identify actions and incentives that can be taken to promote environmentally sound reuse, refurbishment, repair, recycling and material recovery of used and end-of life computing equipment through the implementation of the Partnership guidelines and existing certification schemes, and assess the possibility of using facility certification as a tool for assuring the environmentally sound management of used and end-of-life computing equipment environmentally sound material recovery and recycling of computing equipment. Objectives: 4. The objective of the Project Group is to develop strategies, identify incentives and actions that can be taken to promote environmentally sound management, to include to: (g) Develop strategies on the environmentally sound management of used and end-of-life computing equipment; (i) Identify actions and incentives that can be taken to promote environmentally sound reuse, refurbishment, repair, recycling and material recovery of used and endof life computing equipment through the implementation of the Partnership guidelines and existing certification schemes; (j) Assess the possibility of using facility certification as a tool for assuring the environmentally sound management of used and end-of-life computing equipment.

2 Membership and Operation: 5. Project Group participants have indicated that they possess expertise or significant interest in the field of environmentally sound refurbishment and repair of used and/or waste electronic equipment. 6. A current and official list of members will be maintained by the co-chairs, with contact information as provided by the members. (Annex 1) 7. Alternate participants may attend meetings in proxy for group members, provided that the group member has provided advance notice to the co-chairs regarding the identity and qualifications of such alternate participant, and an assurance that the alternate participant is adequately prepared to participate. Alternate participants should be aware of Rules of Procedure and obligations of confidentiality. 8. The Project Group will operate pursuant to the Rules of Procedure of the PACE Working Group, applicable mutatis mutandis. Non-Member Technical and Other Experts: 9. In accordance with paragraph 30 of the Terms of Reference of the PACE, the co-chairs of the Project Group may decide to invite non-member experts possessing specialized technical knowledge on an issue to be discussed at a meeting to participate in that meeting, or parts thereof. In addition, non-members wishing to participate as experts should send their interest, which should be endorsed by an existing PACE Working Group member, a brief written proposal (2 pages maximum) to the Secretariat of the Basel Convention who would consult the PACE Working Group for their views and a decision on the expert s participation made through a written procedure by the Working Group. Non-member expert participants should be aware of Rules of Procedure and obligations of confidentiality. Meetings of the Project Group: 10. The Project Group will meet by teleconference, as needed and anticipated to be conducted once per month, with interim communication through to prepare for and report developments. Dates and times of such meetings will be set by the Co-chairs in consultation with the members Physical meetings may be held if the Project Group determines that such meetings will be beneficial and feasible, at such times and venues as the Project Group shall determine, but normally in conjunction with physical meetings of the PACE Working Group. Such meetings will be arranged taking account of other project group activities in order to maximise the use of contributors time and travel arrangements where practicable. 12. Meeting documents will be distributed to Project Group members in advance of each meeting, and a meeting summary report will be distributed following each meeting. Duties and Responsibilities: 13. Members of the Project Group will participate actively through meetings, maintain current awareness of Project Group issues and developments, and share their expertise to further the objectives of the group.

3 14. Project Group Co-chairs will attend all meetings, prepare meeting agendas, lead discussions, prepare and file reports of group meetings and developments, and generally seek to facilitate and guide group members to achieve group objectives. 15. Meeting documents will be distributed to participants prior to the meeting date. A meeting summary report will also be distributed to participants of the project group following each meeting. Every effort will be made to ensure that meeting documents and summary reports are distributed to participants in a timely fashion. 16. Confidentiality will be maintained by all members in accordance with the provisions set forth in the Terms of Reference of the PACE Working Group. 17. Other duties and Responsibilities will be decided by consensus by the project group participants, members and technical experts as listed in Annex I. Annex I will be revised from time to time as new participants join the project group or as participants leave the project group. Reporting Arrangements and Approvals: 18. Official reports and communications from the Project Group will be disseminated by the Project Group co-chairs, or by the Secretariat on behalf of the Project Group co-chairs. Communications by other members of the Project Group will not officially represent the group or the views of other members of the group. 19. Project Group meeting summary reports, following review and approval of the group in a subsequent meeting, will be distributed to the co-chairs of the PACE Working Group, and to the Secretariat of the Basel Convention. 20. All work products prepared by the Project Group will be submitted by co-chairs to the PACE Working Group for review and final approval. 21. Project Tasks are set out in Annex 2. Project Tasks: Project Start and Deliverables: 22. The PACE Project Group 5.1 started with the first teleconference call on 27th March Noting that any input to COP XII would need to be prepared by end-february 2015, the final delivery of findings, conclusions and recommendations from Project Group 5.1 to the PACE Working Group is scheduled not later than the end of Project Costs: 23. The Project Group does not anticipate the need for substantial financial resources, relying instead upon in-kind contributions of participants, including the provision of teleconference facilities, and the support and services of the Secretariat of the Basel Convention, all of which are gratefully acknowledged,. However, the Project Group s work will rely on the facilitation of the consultancy support available to the PACE more generally and funded through the PACE budget provided to the Secretariat of the Basel Convention. 24. Thus financial contributions to PACE and to the Basel Convention that support the work of the PACE, and the work of the Project Group, are gratefully acknowledged. 25. Costs of physical meeting arrangements, if any, including sponsored travel of Project Group members from developing countries and countries with economies in transition, will be

4 funded in accordance with the terms of the the Basel Convention. PACE budget managed by the Secretariat of

5 Project Timelines: 26. Project Timelines are identified in Annex 3.

6 Annex 1: Project Group Co- chairs and Participants Co-chairs: 1. Leila Devia, BCRC-Argentina 2. Ross Bartley, BIR Participants: 3. Alberto Santos Capra, Argentina 4. Dana Lapesova, BCRC-Slovakia 5. David Seligson, ILO 6. Donovan McLaren, Kevoy Community Development Institute 7. Eric Harris, ISRI 8. Erica Logan, ITI 9. Gina Killikelly, Dell 10. Ibrahim Shafii, BRS-SSB 11. Isabelle Baudin, Switzerland 12. Jean Claude Salama, Madagascar 13. Jim Puckett, BAN 14. Jinhui Li, BCRC-ChinaJunya Kikuhara, Asian Network 15. Karen Pollard, USA 16. Lixia Zheng, BCRC, China 17. Marco Buletti, Switzerland 18. Mathias Schluep, EMPA 19. Matthias Kern, SBC 20. Michael VanderPol, Canada 21. Miguel Araujo, BCRC-CAM 22. Otmar Deubzer, UNU 23. Oladele Osibanjo, BCRC-Nigeria 24. Patricia Whiting, SIMS 25. Patrick Micheli, Consultant to SBC 26. Paul Hagen, ITI 27. Renee St.Denis, Sims Recycling Solutions 28. Ridwan Tamin, BCRC-SEA, Indonesia 29. Ruediger Kuehr, UNU 30. Sanaz Sabeti Mohammadi, BCRC-Tehran 31. Sarah Westervelt, BAN 32. Shiri Garakani, BCRC-Tehran 33. Shunichi Honda, Japan 34. Wen-Ling Chiu, IER 35. Willie Cade, PCRR 36. Yorg Aerts, OVAM, Belgium

7 Annex 2: Tasks and Priorities Tasks and Priorities were revised at the 6 th physical PACE meeting in South Africa on September 23-25, Annex 2 may be revised as agreed by the Project Group. (g) Develop strategies on the environmentally sound management of used and end-of-life computing equipment Tasks Task 1: Develop short and succinct requirements of a national and regional strategy for environmentally sound management of computer equipment waste and give guidance to developing countries and countries with economies in transition in their policy formulation and implementation including consideration of incentive schemes (for example: voluntary, financial, regulatory, and administrative). Task 2: Identify current examples of strategies for ESM, both industry-led and Government, voluntary and mandatory. Priority High Low (i) Identify actions and incentives that can be taken to promote environmentally sound reuse, refurbishment, repair, recycling and material recovery of used and end-of life computing equipment through the implementation of the Partnership guidelines and existing certification schemes Tasks Task 3: Identifying options to overcome the barriers that prevent developing countries and countries with economies in transition from implementing collection and take-back schemes as well as other strategic activities including incentive schemes (for example: voluntary, financial, regulatory, and administrative). Identifying options to overcome barriers to producers from starting up voluntary schemes in certain countries which would help to determine what incentives/support could be provided; for example geographical challenges, ensuring level playing field to producers, economic viability, lack of consumer demand, no viable end-use markets, etc Priority High (j) Assess the possibility of using facility certification as a tool for assuring the environmentally sound management of used and end-of-life computing equipment In carrying out this activity the Project Group will collaborate with the Basel Convention s Technical Expert Group (TEG) on ESM on the certification issues to prevent duplication of effort and ensure the outcomes are aligned, and with the Secretariat of the "Solving the E-Waste Problem" (StEP) Initiative, hosted by the United Nations University, on their development of Standards for Collection, Storage, Transport and Treatment of E-waste: Principles, Requirements and Conformity Assessment (StEP's Green Paper). Tasks Task 4: Identify and make publicly accessible information on existing certification schemes, possible use of Ad Interim Group report on ESM criteria recommendations as a start. Collect information on existing certification schemes, an assessment of the extent to which they are currently used, and the elements that appear common in the establishment of credible and reliable programs. Key items to be explored could include: - What are the key steps to get certified? Priority High

8 - Gather links to information/databases of certifications and registrations regarding handling of used and end-of-life computing equipment under various schemes. - What are the key components or elements that are present in widely recognized guidelines and certification schemes? - Are the existing standards used to certify facility ESM practices compatible with PACE guidelines? - How are governments, NGOs and industry using facility certification mechanisms now? - How could certification schemes be used in the future to ensure ESM and also guide decisions on TBM approvals by governments?

9 Annex 3 Project Timetable - Project Group 5.1 Years Months (g) Develop strategies on the environmentally sound management of used and end-of-life computing equipment Task 1: Develop short and succinct requirements of a national and regional strategy for environmentally sound management of computer equipment waste and give guidance to developing countries and countries with economies in transition in their policy formulation and implementation including consideration of incentive schemes (for example: voluntary, financial, regulatory, and administrative). 1.1 National Strategies Collect information Draft requirements 1.2 Regional Strategies Collect information Draft requirements Task 2: [LOW PRIORITY]Identify current examples of strategies for ESM, both industry-led and Government, voluntary and mandatory. 2.1 Collect information 2.2 Draft report

10 Years Months (i) Identify actions and incentives that can be taken to promote environmentally sound reuse, refurbishment, repair, recycling and material recovery of used and end-of life computing equipment through the implementation of the Partnership guidelines and existing certification schemes Task 3: Identifying options to overcome the barriers that prevent developing countries and countries with economies in transition from implementing collection and take-back schemes as well as other strategic activities including incentive schemes (for example: voluntary, financial, regulatory, and administrative). Identifying options to overcome barriers to producers from starting up voluntary schemes in certain countries which would help to determine what incentives/support could be provided; for example geographical challenges, ensuring level playing field to producers, economic viability, lack of consumer demand, no viable end-use markets, etc 3.1 Countries Collect information Identify options Draft report 3.2 Producers Collect information Identify options Draft report

11 Years Months (j) Assess the possibility of using facility certification as a tool for assuring the environmentally sound management of used and end-of-life computing equipment In carrying out this activity the Project Group will collaborate with the Basel Convention s Technical Expert Group (TEG) on ESM on the certification issues to prevent duplication of effort and ensure the outcomes are aligned, and with the Secretariat of the "Solving the E-Waste Problem" (StEP) Initiative, hosted by the United Nations University, on their development of Standards for Collection, Storage, Transport and Treatment of E-waste: Principles, Requirements and Conformity Assessment (StEP's Green Paper). Task 4: Identify and make publicly accessible information on existing certification schemes, possible use of Ad Interim Group report on ESM criteria recommendations as a start. Collect information on existing certification schemes, an assessment of the extent to which they are currently used, and the elements that appear common in the establishment of credible and reliable programs. Key items to be explored could include: - What are the key steps to get certified? - Gather links to information/databases of certifications and registrations regarding handling of used and end-of-life computing equipment under various schemes. - What are the key components or elements that are present in widely recognized guidelines and certification schemes? - Are the existing standards used to certify facility ESM practices compatible with PACE guidelines? - How are governments, NGOs and industry using facility certification mechanisms now? - How could certification schemes be used in the future to ensure ESM and also guide decisions on TBM approvals by governments? 4.1 Gather links 4.2 Make assessment 4.3 Draft report Task 5: Delivery of findings, conclusions and recommendations to the PACE Working Group 5.1

12

Report on project experiences and lessons learned

Report on project experiences and lessons learned Report on project experiences and lessons learned 13 March 2017 Table of Contents Acknowledgements... 2 Abbreviations... 3 Project group participants... 4 I. Executive summary... 6 II. Introduction...

More information

Progress of Expert Working Group on ESM (EWG)

Progress of Expert Working Group on ESM (EWG) Workshop 2016 of the Asian Network for Prevention of Illegal Transboundary Movement of Hazardous Wastes 6-8 September 2016, Semarang, Indonesia Progress of Expert Working Group on ESM (EWG) Michikazu Kojima

More information

Basel Convention Regional Centre for Asia and the Pacific (BCRC China) and Its Regional Delivery

Basel Convention Regional Centre for Asia and the Pacific (BCRC China) and Its Regional Delivery Basel Convention Regional Centre for Asia and the Pacific (BCRC China) and Its Regional Delivery Lixia Zheng Basel Convention Regional Centre for Asia and the Pacific Stockholm Convention Regional Centre

More information

THE WORK ON INTERNATIONAL INNOVATIVE FINANCIAL INSTRUMENTS UNDER THE CBD

THE WORK ON INTERNATIONAL INNOVATIVE FINANCIAL INSTRUMENTS UNDER THE CBD THE WORK ON INTERNATIONAL INNOVATIVE FINANCIAL INSTRUMENTS UNDER THE CBD OECD/WGEAB Workshop on Innovative International Financing for Biodiversity Conservation and Sustainable Use Paris, 2 July 2009 Dr.

More information

Regional meeting on the Strategic Approach to International Chemicals Management

Regional meeting on the Strategic Approach to International Chemicals Management Distr.: General 18 January 2018 English only Regional meeting on the Strategic Approach to International Chemicals Management Update on the Special Programme to support institutional strengthening at the

More information

Appointment of Experts of the Independent Technical Advisory Panel

Appointment of Experts of the Independent Technical Advisory Panel Appointment of Experts of the Independent Technical Advisory Panel GCF/B.10/15 7 July 2015 Meeting of the Board 6-9 July 2015 Songdo, Republic of Korea Agenda item 17 Page a Recommended action by the Board

More information

Technology Bank for the Least Developed Countries

Technology Bank for the Least Developed Countries United Nations A/71/363 General Assembly Distr.: General 29 August 2016 Original: English Seventy-first session Item 13 of the provisional agenda* Integrated and coordinated implementation of and follow-up

More information

Second Workshop for the Stockholm Convention regional and subregional centres 28 September - 2 October 2009 AGENDA

Second Workshop for the Stockholm Convention regional and subregional centres 28 September - 2 October 2009 AGENDA Second Workshop for the Stockholm Convention regional and subregional centres 28 September - 2 October 2009 International Environment House- Geneva AGENDA Module I: Coordination among the Stockholm Convention

More information

PART I: GENERAL APPROACH TO THE REVIEW. A. [Applicability

PART I: GENERAL APPROACH TO THE REVIEW. A. [Applicability (unedited version) Draft guidelines for the technical review of information reported under the Convention related to greenhouse gas inventories, biennial reports and national communications by Parties

More information

Global strategy and plan of action on public health, innovation and intellectual property

Global strategy and plan of action on public health, innovation and intellectual property EXECUTIVE BOARD EB142/14 Rev.1 142nd session 26 January 2018 Agenda item 3.7 Global strategy and plan of action on public health, innovation and intellectual property Report by the Director-General 1.

More information

Follow-up of the report of the Consultative Expert Working Group on Research and Development: Financing and Coordination

Follow-up of the report of the Consultative Expert Working Group on Research and Development: Financing and Coordination SIXTY-SIXTH WORLD HEALTH ASSEMBLY A66/23 Provisional agenda item 17.2 11 March 2013 Follow-up of the report of the Consultative Expert Working Group on Research and Development: Financing and Coordination

More information

Agreed outcome pursuant to the Bali Action Plan

Agreed outcome pursuant to the Bali Action Plan Decision 1/CP.18 Agreed outcome pursuant to the Bali Action Plan The Conference of the Parties, Recalling decisions 1/CP.13 (Bali Action Plan), 1/CP.15, 1/CP.16 and 2/CP.17, Acknowledging the significant

More information

SUMMARY REPORT OF THE 17 th ACCSQ MDPWG MEETING

SUMMARY REPORT OF THE 17 th ACCSQ MDPWG MEETING SUMMARY REPORT OF THE 17 th ACCSQ MDPWG MEETING INTRODUCTION 1) The 17 th Meeting of the Medical Device Product Working Group (MDPWG) was held on 25-26 April 2013 in Petaling Jaya, Malaysia. The Meeting

More information

Regulation on the implementation of the European Economic Area (EEA) Financial Mechanism

Regulation on the implementation of the European Economic Area (EEA) Financial Mechanism the European Economic Area (EEA) Financial Mechanism 2009-2014 adopted by the EEA Financial Mechanism Committee pursuant to Article 8.8 of Protocol 38b to the EEA Agreement on 13 January 2011 and confirmed

More information

United Nations Environment Programme

United Nations Environment Programme UNITED NATIONS EP United Nations Environment Programme Distr. GENERAL UNEP/OzL.Pro/ExCom/81/56 21 May 2018 EXECUTIVE COMMITTEE OF THE MULTILATERAL FUND FOR THE IMPLEMENTATION OF THE MONTREAL PROTOCOL Eighty-first

More information

Framework Convention on Climate Change

Framework Convention on Climate Change United Nations Framework Convention on Climate Change FCCC/SBI/2011/10 Distr.: General 3 November 2011 Original: English Subsidiary Body for Implementation Thirty-fifth session Durban, 28 November to 3

More information

DRAFT GUIDANCE NOTE ON THE FRAMEWORK FOR FINANCIAL RESOURCE MOBILISATION FOR IMPLEMENTING THE STRATEGIC PLAN FOR THE BASEL CONVENTION

DRAFT GUIDANCE NOTE ON THE FRAMEWORK FOR FINANCIAL RESOURCE MOBILISATION FOR IMPLEMENTING THE STRATEGIC PLAN FOR THE BASEL CONVENTION BC Distr GENERAL UNEP/SBC/BUREAU/6/2/INF/4 9 October 2003 ENGLISH ONLY SECOND MEETING OF THE EXPANDED BUREAU OF THE SIXTH MEETING OF THE CONFERENCE OF THE PARTIES TO THE BASEL CONVENTION Geneva, 25 October

More information

FIRST MEETING OF THE AD HOC WORKING GROUP ESTABLISHED UNDER ARTICLE 21 OF THE FAO AGREEMENT ON PORT STATE MEASURES. Oslo, Norway, 1-2 June 2017

FIRST MEETING OF THE AD HOC WORKING GROUP ESTABLISHED UNDER ARTICLE 21 OF THE FAO AGREEMENT ON PORT STATE MEASURES. Oslo, Norway, 1-2 June 2017 May 2017 PSMA_WG/2017/2 E FIRST MEETING OF THE AD HOC WORKING GROUP ESTABLISHED UNDER ARTICLE 21 OF THE FAO AGREEMENT ON PORT STATE MEASURES Oslo, Norway, 1-2 June 2017 WORKING ARRANGEMENTS AND PRELIMINARY

More information

March 9, Honourable Winston Dookeran Minister of Finance Eric Williams Finance Building Independence Square Port of Spain Trinidad and Tobago

March 9, Honourable Winston Dookeran Minister of Finance Eric Williams Finance Building Independence Square Port of Spain Trinidad and Tobago Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized OFM'CIAL (116 3Y) The World Bank e NW. (202) 473-1000 INTERNATIONAL BANK FOR RECONSTRUCTION

More information

Evaluation of the Global Humanitarian Partnership between Save the Children, C&A and C&A Foundation

Evaluation of the Global Humanitarian Partnership between Save the Children, C&A and C&A Foundation Evaluation of the Global Humanitarian Partnership between Save the Children, C&A and C&A Foundation Terms of Reference Contents: I. INTRODUCTION 2 II. GLOBAL HUMANITARIAN PARTNERSHIP 3 III. SCOPE 4 IV.

More information

Measures to Strengthen International Co-operation in Nuclear, Radiation and Transport Safety and Waste Management

Measures to Strengthen International Co-operation in Nuclear, Radiation and Transport Safety and Waste Management International Atomic Energy Agency General Conference GC(47)/RES/7 Date: September 2003 General Distribution English Forty-seventh regular session Item 13 of the agenda (GC(47)/21) Measures to Strengthen

More information

Provisional agenda (annotated)

Provisional agenda (annotated) EXECUTIVE BOARD EB140/1 (annotated) 140th session 21 November 2016 Geneva, 23 January 1 February 2017 Provisional agenda (annotated) 1. Opening of the session 2. Adoption of the agenda 3. Report by the

More information

FEDERAL REPUBLIC OF NIGERIA

FEDERAL REPUBLIC OF NIGERIA Supplemental Letter No. 1 (Lagos Urban Transport Project) Section 9.02 of the General Conditions Financial and Economic Data In connection with the above Credit to the Republic of Nigeria for the Lagos

More information

Universal Periodic Review: information and guidelines for relevant stakeholders written submissions (Rev 17/03/2015)

Universal Periodic Review: information and guidelines for relevant stakeholders written submissions (Rev 17/03/2015) Universal Periodic Review: information and guidelines for relevant stakeholders written submissions (Rev 17/03/2015) The information contained in this document is intended for the use of all relevant stakeholders,

More information

United Nations Environment Programme

United Nations Environment Programme UNITED NATIONS EP United Nations Environment Programme Distr. GENERAL UNEP/POPS/INC.5/INF/2 13 October 2000 ENGLISH ONLY INTERGOVERNMENTAL NEGOTIATING COMMITTEE FOR AN INTERNATIONAL LEGALLY BINDING INSTRUMENT

More information

Prevention and control of noncommunicable diseases

Prevention and control of noncommunicable diseases SIXTY-FIFTH WORLD HEALTH ASSEMBLY A65/8 Provisional agenda item 13.1 22 March 2012 Prevention and control of noncommunicable diseases Implementation of the global strategy for the prevention and control

More information

FCCC/SBSTA/2017/INF.8

FCCC/SBSTA/2017/INF.8 United Nations FCCC/SBSTA/2017/INF.8 Distr.: General 27 October 2017 English only Subsidiary Body for Scientific and Technological Advice Forty-seventh session Bonn, 6 15 November 2017 Item 14(b) of the

More information

TABLE OF CONTENTS. Request for Proposals (RBFF-18-C-387) STRATEGIC PLANNING FACILITATOR I. Request for Proposals. II.

TABLE OF CONTENTS. Request for Proposals (RBFF-18-C-387) STRATEGIC PLANNING FACILITATOR I. Request for Proposals. II. TABLE OF CONTENTS Request for Proposals (RBFF-18-C-387) STRATEGIC PLANNING FACILITATOR - 2018 I. Request for Proposals II. Solicitation III. Background IV. Project Need V. Project Scope VI. Contractor

More information

INTERNATIONAL CONVENTION FOR THE CONTROL AND MANAGEMENT OF SHIPS' BALLAST WATER AND SEDIMENTS, 2004

INTERNATIONAL CONVENTION FOR THE CONTROL AND MANAGEMENT OF SHIPS' BALLAST WATER AND SEDIMENTS, 2004 E 4 ALBERT EMBANKMENT LONDON SE1 7SR Telephone: +44 (0)20 7735 7611 Fax: +44 (0)20 7587 3210 BWM.2/Circ.60 22 May 2017 INTERNATIONAL CONVENTION FOR THE CONTROL AND MANAGEMENT OF SHIPS' BALLAST WATER AND

More information

COUNCIL OF THE EUROPEAN UNION. Brussels, 29 May /06 COSDP 376 PESC 460 CIVCOM 207 FIN 207 CSC 26 CAB 19 BUDGET 27

COUNCIL OF THE EUROPEAN UNION. Brussels, 29 May /06 COSDP 376 PESC 460 CIVCOM 207 FIN 207 CSC 26 CAB 19 BUDGET 27 COUNCIL OF THE EUROPEAN UNION Brussels, 29 May 2006 9490/06 COSDP 376 PESC 460 CIVCOM 207 FIN 207 CSC 26 CAB 19 BUDGET 27 "I/A" ITEM NOTE From : PSC To : Coreper/Council Subject : Policy of the European

More information

Development of a draft five-year global strategic plan to improve public health preparedness and response

Development of a draft five-year global strategic plan to improve public health preparedness and response Information document 1 August 2017 Development of a draft five-year global strategic plan to improve public health preparedness and response Consultation with Member States SUMMARY 1. This document has

More information

PPEA Guidelines and Supporting Documents

PPEA Guidelines and Supporting Documents PPEA Guidelines and Supporting Documents APPENDIX 1: DEFINITIONS "Affected jurisdiction" means any county, city or town in which all or a portion of a qualifying project is located. "Appropriating body"

More information

AFGHANISTAN Afghanistan Reconstruction Trust Fund (Ref: TF050576)

AFGHANISTAN Afghanistan Reconstruction Trust Fund (Ref: TF050576) Public Disclosure Authorized CONFORMED COPY June 27, 2002 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Mr. Jukka Valtasaari Ambassador Embassy of Finland 3301

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE. Adaptable Program Loan P F-Financial Intermediary Assessment 08-May Nov-2012

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE. Adaptable Program Loan P F-Financial Intermediary Assessment 08-May Nov-2012 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country PROJECT INFORMATION DOCUMENT (PID) (P128748) OTHER World

More information

OFFICIAL r0 4 DOCUMENTS

OFFICIAL r0 4 DOCUMENTS Public Disclosure Authorized OFFICIAL r0 4 DOCUMENTS The World Bank 1818 H Street N.W. (202) 473-1000 INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Washington, D.C. 20433 Cable Address: INTBAFRAD

More information

The President of the Security Council presents his. compliments to the members of the Council and has the

The President of the Security Council presents his. compliments to the members of the Council and has the The President of the Security Council presents his compliments to the members of the Council and has the honour to transmit herewith, for their information, a copy of a letter dated 9 February 2018 from

More information

Guidelines for the United Nations Trust Fund for Human Security

Guidelines for the United Nations Trust Fund for Human Security Guidelines for the United Nations Trust Fund for Human Security Seventh Revision 1 9 November 2012 1 This sets out the revised Guidelines for the United Nations Trust Fund for Human Security, effective

More information

International Cooperation in Horizon 2020 Transport R&I area

International Cooperation in Horizon 2020 Transport R&I area No guarantee for accuracy or completeness of the information Your network of Transport National Contact Points International Cooperation in Horizon 2020 Transport R&I area Co-funded by the Horizon 2020

More information

TERMS OF REFERENCE (TOR) FOR CONTRACTS FOR RECP ASSESSMENTS AND SERVICES, IN MYANMAR. 19 October 2017

TERMS OF REFERENCE (TOR) FOR CONTRACTS FOR RECP ASSESSMENTS AND SERVICES, IN MYANMAR. 19 October 2017 TERMS OF REFERENCE (TOR) FOR CONTRACTS FOR RECP ASSESSMENTS AND SERVICES, IN MYANMAR A) General Background Information 19 October 2017 Appendix 1 The United Nations Industrial Development Organization

More information

INFORMATION CLEARING HOUSE COMMENTS AND OPTIONS

INFORMATION CLEARING HOUSE COMMENTS AND OPTIONS DEVELOPMENT AND TRANSFER ON TECHNOLOGIES UNFCCC EXPERT WORKSHOP Beijing, 18-19 April, 2002. INFORMATION CLEARING HOUSE COMMENTS AND OPTIONS Carlos A. Grezzi Uruguay Options to build an Information Clearing

More information

Ontario Quality Standards Committee Draft Terms of Reference

Ontario Quality Standards Committee Draft Terms of Reference Ontario Quality Standards Committee Draft Terms of Reference 1. Introduction The Ontario Health Quality Council (Health Quality Ontario) officially commenced operation on April 1st, 2010. Created under

More information

Green Industry Innovation Programme Poland. Call for Project Proposals

Green Industry Innovation Programme Poland. Call for Project Proposals Norwegian Financial Mechanism 2009-2014 (Norway Grants) Green Industry Innovation Programme Poland Call for Project Proposals The Green Industry Innovation Programme Poland (later referred to as the Programme)

More information

THE NEWCASTLE UPON TYNE HOSPITALS NHS FOUNDATION TRUST EXECUTIVE REPORT - CURRENT ISSUES

THE NEWCASTLE UPON TYNE HOSPITALS NHS FOUNDATION TRUST EXECUTIVE REPORT - CURRENT ISSUES THE NEWCASTLE UPON TYNE HOSPITALS NHS FOUNDATION TRUST EXECUTIVE REPORT - CURRENT ISSUES Agenda item A4(i) 1. Executive Team Particular attention is drawn to: i) Executive arrangements during the period

More information

Funding Opportunities with the Standards and Trade Development Facility (STDF) Guidance Note for Applicants

Funding Opportunities with the Standards and Trade Development Facility (STDF) Guidance Note for Applicants Funding Opportunities with the Standards and Trade Development Facility (STDF) Guidance Note for Applicants Table of Contents INTRODUCTION... 1 1. Who can apply for STDF funding?... 1 2. What type of

More information

Joint Israel-UK Research in Cyber Security

Joint Israel-UK Research in Cyber Security Joint Israel-UK Research in Cyber Security Call type: Invitation for proposals Closing date: 24 June 2014 Call available on Je-S: 16 June 2014 Related themes: Global uncertainties, ICT Summary Israel s

More information

Executive Council 103rd session Málaga, Spain, 9-11 May 2016 Provisional agenda item 8(a)

Executive Council 103rd session Málaga, Spain, 9-11 May 2016 Provisional agenda item 8(a) Executive Council 103rd session Málaga, Spain, 9-11 May 2016 Provisional agenda item 8(a) CE/103/8(a) Madrid, 16 March 2016 Original: English Affiliate Members (a) Report of the Chair of the Affiliate

More information

FIFTH ASEAN STATE OF THE ENVIRONMENT REPORT

FIFTH ASEAN STATE OF THE ENVIRONMENT REPORT ASEAN SECRETARIAT FIFTH ASEAN STATE OF THE ENVIRONMENT REPORT PROPOSAL MUST BE RECEIVED BY Tuesday, 2 August 2016 before 12.00 PM DELIVER/MAIL PROPOSAL TO: ASEAN Secretariat Jl. Sisingamangaraja 70A Jakarta

More information

Global Partnership on Output-based Aid Grant Agreement

Global Partnership on Output-based Aid Grant Agreement Public Disclosure Authorized CONFORMED COPY GPOBA GRANT NUMBER TF096551-BD Public Disclosure Authorized Global Partnership on Output-based Aid Grant Agreement (Rural Electrification and Renewable Energy

More information

NOTE BY THE DIRECTOR GENERAL PROGRESS IN THE ELIMINATION OF THE SYRIAN CHEMICAL WEAPONS PROGRAMME

NOTE BY THE DIRECTOR GENERAL PROGRESS IN THE ELIMINATION OF THE SYRIAN CHEMICAL WEAPONS PROGRAMME OPCW Executive Council Seventy-Sixth Session EC-76/DG.14 8 11 July 2014 25 June 2014 Original: ENGLISH NOTE BY THE DIRECTOR GENERAL PROGRESS IN THE ELIMINATION OF THE SYRIAN CHEMICAL WEAPONS PROGRAMME

More information

Report of the Global Environment Facility on the progress made in carrying out the Poznan strategic programme on technology transfer

Report of the Global Environment Facility on the progress made in carrying out the Poznan strategic programme on technology transfer UNITED NATIONS Distr. GENERAL FCCC/SBI/2010/4 14 May 2010 Original: ENGLISH SUBSIDIARY BODY FOR IMPLEMENTATION Thirty-second session Bonn, 31 May to 9 June Item 8 of the provisional agenda Development

More information

33 C. General Conference 33rd session, Paris C/74 11 October 2005 Original: English. Item 5.20 of the agenda

33 C. General Conference 33rd session, Paris C/74 11 October 2005 Original: English. Item 5.20 of the agenda U General Conference 33rd session, Paris 2005 33 C 33 C/74 11 October 2005 Original: English Item 5.20 of the agenda PROPOSAL FOR THE ESTABLISHMENT OF THE REGIONAL CENTRE ON URBAN WATER MANAGEMENT FOR

More information

Regular Process for Global Reporting and Assessment of the State of the Marine Environment, including Socioeconomic Aspects

Regular Process for Global Reporting and Assessment of the State of the Marine Environment, including Socioeconomic Aspects Regular Process for Global Reporting and Assessment of the State of the Marine Environment, including Socioeconomic Aspects Workshop under the auspices of the United Nations, in support of the Regular

More information

RESOLUTION MSC.298(87) (adopted on 21 May 2010) ESTABLISHMENT OF A DISTRIBUTION FACILITY FOR THE PROVISION OF LRIT INFORMATION TO SECURITY FORCES

RESOLUTION MSC.298(87) (adopted on 21 May 2010) ESTABLISHMENT OF A DISTRIBUTION FACILITY FOR THE PROVISION OF LRIT INFORMATION TO SECURITY FORCES ANNEX 15 RESOLUTION MSC.298(87) Annex 15, page 1 ESTABLISHMENT OF A DISTRIBUTION FACILITY FOR THE PROVISION OF LRIT INFORMATION TO SECURITY FORCES OPERATING IN WATERS OF THE GULF OF ADEN AND THE WESTERN

More information

General Assembly Twenty-first session Medellin, Colombia, September 2015 Provisional agenda item 8(II)(c)

General Assembly Twenty-first session Medellin, Colombia, September 2015 Provisional agenda item 8(II)(c) General Assembly Twenty-first session Medellin, Colombia, 12-17 September 2015 Provisional agenda item 8(II)(c) A/21/8(II)(c) rev.1 Madrid, 5 August 2015 Original: English Report of the Secretary-General

More information

INTEGRATED CASE MANAGEMENT ANNEX A

INTEGRATED CASE MANAGEMENT ANNEX A INTEGRATED CASE MANAGEMENT ANNEX A NAME OF AGENCY: CONTRACT NUMBER: CONTRACT TERM: TO BUDGET MATRIX CODE: 32 This Annex A specifies the Integrated Case Management services that the Provider Agency is authorized

More information

Guidance for Authorities. Submitting a Proposal to host the. International Conference of Data Protection and Privacy Commissioners

Guidance for Authorities. Submitting a Proposal to host the. International Conference of Data Protection and Privacy Commissioners Guidance for Authorities Submitting a Proposal to host the International Conference of Data Protection and Privacy Commissioners Any accredited authority that wishes to be considered as a possible host

More information

CONTRACTUAL STATUS OF STAFF. Report by the Director-General

CONTRACTUAL STATUS OF STAFF. Report by the Director-General WORLD HEALTH ORGANIZATION ORGANISATION MONDIALE DE LA SANTÉ EB75/16 8 November 1984 EXECUTIVE BOARD Seventy-fifth Session Provisional agenda item 15 CONTRACTUAL STATUS OF STAFF Report by the Director-General

More information

Program Guidelines Accelerating Food Innovation in Alberta: Application of Research or Technology for New Product Development

Program Guidelines Accelerating Food Innovation in Alberta: Application of Research or Technology for New Product Development Program Guidelines 2017 18 Accelerating Food Innovation in Alberta: Application of Research or Technology for New Product Development 2 Program Guidelines 1.1 Purpose The 2017 18 Accelerating Food Innovation

More information

Waste Research Development and Innovation Roadmap 2018 CALL FOR PROPOSALS

Waste Research Development and Innovation Roadmap 2018 CALL FOR PROPOSALS Waste Research Development and Innovation Roadmap Research, development and innovation (RDI) to advance the South African waste sector 2018 CALL FOR PROPOSALS The Department of Science and Technology (DST)

More information

Solicitation for the 2016 Principal Campaign Fund Organization (PCFO)

Solicitation for the 2016 Principal Campaign Fund Organization (PCFO) Solicitation for PCFO Norcal CFC Solicitation for the Principal Campaign Fund Organization (PCFO) Thank you for your interest in the PCFO selection process. The Office of Personnel Management (OPM) has

More information

Economic and Social Council

Economic and Social Council UNITED NATIONS E Economic and Social Council Distr. GENERAL ECE/ENERGY/WP.4/2009/8 24 March 2009 Original: ENGLISH ECONOMIC COMMISSION FOR EUROPE COMMITTEE ON SUSTAINABLE ENERGY Steering Committee of the

More information

COMMISSION DIRECTIVE 2011/18/EU

COMMISSION DIRECTIVE 2011/18/EU 2.3.2011 Official Journal of the European Union L 57/21 DIRECTIVES COMMISSION DIRECTIVE 2011/18/EU of 1 March 2011 amending Annexes II, V and VI to Directive 2008/57/EC of the European Parliament and of

More information

The standard questionnaire prepared by the Paris MoU for use by PSCOs during the CIC can be found reproduced on page 3 of this document.

The standard questionnaire prepared by the Paris MoU for use by PSCOs during the CIC can be found reproduced on page 3 of this document. Guidance to assist with preparations for the Concentrated Inspection Campaign on the ILO Maritime Labour Convention being conducted in the Paris MoU region in 2016 The Paris MoU will conduct a Concentrated

More information

Draft outline of the Asia-Pacific Plan of Action for Space Applications ( ) **

Draft outline of the Asia-Pacific Plan of Action for Space Applications ( ) ** Distr.: General 8 October 2017 English only Economic and Social Commission for Asia and the Pacific Intergovernmental Consultative Committee on the Regional Space Applications Programme for Sustainable

More information

Strategic Japanese-Swiss Science and Technology Program (SJSSTP) Joint Research Projects: Call for Proposals 2018

Strategic Japanese-Swiss Science and Technology Program (SJSSTP) Joint Research Projects: Call for Proposals 2018 www.snsf.ch Wildhainweg 3, P.O. Box, CH-3001 Berne Switzerland www.jsps.go.jp International Policy Planning Division 5-3-1 Kojimachi, Chiyoda-ku, Tokyo 102-0083 Japan Strategic Japanese-Swiss Science and

More information

THE REVISED GUIDING PRINCIPLES AND GENERAL OPERATING RULES TO GOVERN THE PROVISION OF TECHNICAL ASSISTANCE BY THE AGENCY

THE REVISED GUIDING PRINCIPLES AND GENERAL OPERATING RULES TO GOVERN THE PROVISION OF TECHNICAL ASSISTANCE BY THE AGENCY INFCIRC/267 March 1979 INF International Atomic Energy Agency GENERAL Distr. INFORMATION CIRCULAR Original: ENGLISH (Unofficial electronic edition) THE REVISED GUIDING PRINCIPLES AND GENERAL OPERATING

More information

Terms of Reference. International Consultant GEF Project Development Specialist

Terms of Reference. International Consultant GEF Project Development Specialist Antigua and Barbuda Department of Environment GEF/UNDP Medium Sized Project (MSP) Monitoring and assessment of MEA implementation and environmental trends in Antigua and Barbuda Terms of Reference International

More information

Terms of Reference Approved 30 April 2015/ Revised 29 September 2016

Terms of Reference Approved 30 April 2015/ Revised 29 September 2016 COORDINATION DESK Terms of Reference Approved 30 April 2015/ Revised 29 September 2016 1. Introduction This document 1 describes the roles and working procedures for the Actors involved in the 10YFP Sustainable

More information

Annex Template for the call for input

Annex Template for the call for input Submission by Asian Development Bank on Actions undertaken by accredited observer organizations relevant to the in performing its functions 30 July 2012 (TEC) at it third Session made a decision to call

More information

Constitutive Document Revised JAN 2017

Constitutive Document Revised JAN 2017 Constitutive Document Revised JAN 2017 Table of Contents Introduction... 2 Vision... 2 Objectives... 2 Membership... 3 Governance Structure... 5 I. Executive Committee.... 5 II. Secretariat... 6 III. Technical

More information

Letter No. CD-064/INIS/III/2014 March 26, 2014

Letter No. CD-064/INIS/III/2014 March 26, 2014 Public Disclosure Authorized THE WORLD BANK I BANK DUNIA Sharing Development Solutions for an Emerging Indonesia Rodrigo A. Chaves Country Director, Indonesia Letter No. CD-064/INIS/III/2014 March 26,

More information

Follow-up of the report of the Consultative Expert Working Group on Research and Development: Financing and Coordination

Follow-up of the report of the Consultative Expert Working Group on Research and Development: Financing and Coordination EXECUTIVE BOARD EB138/39 138th session 18 December 2015 Provisional agenda item 10.3 Follow-up of the report of the Consultative Expert Working Group on Research and Development: Financing and Coordination

More information

Abu Dhabi Occupational Safety and Health System Framework (OSHAD-SF) Mechanisms

Abu Dhabi Occupational Safety and Health System Framework (OSHAD-SF) Mechanisms Abu Dhabi Occupational Safety and Health System Framework (OSHAD-SF) Mechanisms Mechanism 2.0 OSHAD-SF Administration Version 3.1 March 2017 Table of Contents 1. Introduction... 3 2. Roles and Responsibilities...

More information

STDF MEDIUM-TERM STRATEGY ( )

STDF MEDIUM-TERM STRATEGY ( ) STDF MEDIUM-TERM STRATEGY (2012-2016) 1. This Medium-Term Strategy sets outs the principles and strategic priorities that will guide the work of the Standards and Trade Development Facility (STDF) and

More information

ERN Assessment Manual for Applicants 2. Technical Toolbox for Applicants

ERN Assessment Manual for Applicants 2. Technical Toolbox for Applicants Share. Care. Cure. ERN Assessment Manual for Applicants 2. Technical Toolbox for Applicants An initiative of the Version 1.1 April 2016 1 History of changes Version Date Change Page 1.0 16.03.2016 Initial

More information

Economic and Social Council

Economic and Social Council United Nations Economic and Social Council E/ESCAP/RES/71/11 Distr.: General 2 June 2015 Original: English Economic and Social Commission for Asia and the Pacific Seventy-first session Agenda item 3 (f)

More information

FICSA Council. 65th Session World Health Organization Regional Office for Europe Copenhagen, 13 to 17 February Security Level System (SLS)

FICSA Council. 65th Session World Health Organization Regional Office for Europe Copenhagen, 13 to 17 February Security Level System (SLS) FICSA/C/65/FIELD/2 Provisional agenda item 10(d) FICSA Council 65th Session World Health Organization Regional Office for Europe Copenhagen, 13 to 17 February 2012 Security Level System (SLS) FEDERATION

More information

Carbon Sequestration Leadership Forum

Carbon Sequestration Leadership Forum Carbon Sequestration Leadership Forum Trude Sundset, Chair of Technical Group CSLF Innovation, deployment, diffusion and transfer of CCS technologies UNFCC SBSTA workshop 20 May 2006 1 The CSLF: An international

More information

LUX Photonics Consortium Industry-IHL Collaboration Seed Grant LUX Photonics Consortium Industry-IHL Collaboration Seed Grant Guidelines

LUX Photonics Consortium Industry-IHL Collaboration Seed Grant LUX Photonics Consortium Industry-IHL Collaboration Seed Grant Guidelines LUX Photonics Consortium Industry-IHL Collaboration Seed Grant Guidelines Page 1 of 9 1. Objective 1.1 Promote adoption of innovative technology / intellectual property (IP) developed at the IHL (NTU or

More information

2012/SMEMM/010 Agenda Item: 2.4. SMEWG Chair Report. Purpose: Information Submitted by: SMEWG Chair

2012/SMEMM/010 Agenda Item: 2.4. SMEWG Chair Report. Purpose: Information Submitted by: SMEWG Chair 2012/SMEMM/010 Agenda Item: 2.4 SMEWG Chair Report Purpose: Information Submitted by: SMEWG Chair 19 th Small and Medium Enterprises Ministerial Meeting St. Petersburg, Russia 2-3 August 2012 Item 2.4

More information

Consideration of funding proposals

Consideration of funding proposals Meeting of the Board 30 September 2 October 2017 Cairo, Arab Republic of Egypt Provisional agenda item 14(g) GCF/B.18/04/Rev.01 28 September 2017 Consideration of funding proposals Summary This document

More information

Linking Tourism and Conservation in the Arctic

Linking Tourism and Conservation in the Arctic Linking Tourism and Conservation in the Arctic Iceland Workshop February 4-5th 1998 Sponsored by WWF Arctic Programme Workshop Summary Introduction... 1 Summary of Workshop Discussions... 1 I. Development

More information

Brokerage for the first ProSafe Call Dina Carrilho Call Secretariat Foundation for Science and Technology (FCT), Portugal

Brokerage for the first ProSafe Call Dina Carrilho Call Secretariat Foundation for Science and Technology (FCT), Portugal Brokerage for the first ProSafe Call Dina Carrilho Call Secretariat ProSafe@fct.pt Foundation for Science and Technology (FCT), Portugal ProSafe is offering two main opportunities for the implementation

More information

PART I: PROJECT INFORMATION 1. PROJECT LINKAGE TO NATIONAL PRIORITIES, ACTION PLANS AND PROGRAMS

PART I: PROJECT INFORMATION 1. PROJECT LINKAGE TO NATIONAL PRIORITIES, ACTION PLANS AND PROGRAMS PART I: PROJECT INFORMATION 1. PROJECT LINKAGE TO NATIONAL PRIORITIES, ACTION PLANS AND PROGRAMS The GEF initial support on the implementation of the Stockholm Convention focuses on assisting Vietnam to

More information

NOTE BY THE TECHNICAL SECRETARIAT NEEDS ASSESSMENT AND COMPILATION OF TOOLS, GUIDANCE, AND BEST PRACTICES ON CHEMICAL SAFETY AND SECURITY MANAGEMENT

NOTE BY THE TECHNICAL SECRETARIAT NEEDS ASSESSMENT AND COMPILATION OF TOOLS, GUIDANCE, AND BEST PRACTICES ON CHEMICAL SAFETY AND SECURITY MANAGEMENT OPCW Technical Secretariat S/1483/2017 30 March 2017 ENGLISH only NOTE BY THE TECHNICAL SECRETARIAT NEEDS ASSESSMENT AND COMPILATION OF TOOLS, GUIDANCE, AND BEST PRACTICES ON CHEMICAL SAFETY AND SECURITY

More information

COUNCIL DECISION 2014/913/CFSP

COUNCIL DECISION 2014/913/CFSP L 360/44 COUNCIL DECISION 2014/913/CFSP of 15 December 2014 in support of the Hague Code of Conduct and ballistic missile non-proliferation in the framework of the implementation of the EU Strategy against

More information

GCP Inspection by PMDA

GCP Inspection by PMDA 2012 EU GCP Inspectors Working Group Workshop London, 12-14 November 2012 Practical Experience in GCP inspections, non EU/EEA countries GCP Inspection by PMDA Kazuko Natsui Inspector for GCP Inspection,

More information

2017/18 Fee and Access Plan Application

2017/18 Fee and Access Plan Application 2017/18 Fee and Access Plan Application Annex Ai Institution Applicant name: Applicant address: Main contact Alternate contact Contact name: Job title: Telephone number: Email address: Fee and access plan

More information

SOCIAL WORK STRATEGY INNOVATION SCHEME

SOCIAL WORK STRATEGY INNOVATION SCHEME SOCIAL WORK STRATEGY INNOVATION SCHEME 2015/2016 SOCIAL WORK STRATEGY INNOVATION SCHEME 1. Introduction The Innovation Scheme has been set up to support the implementation of the Social Work Strategy.

More information

*Note: An update of the English text of this Act is being prepared following the amendments in SG No. 59/ , SG No. 66/26.07.

*Note: An update of the English text of this Act is being prepared following the amendments in SG No. 59/ , SG No. 66/26.07. Energy Efficiency Act Promulgated, SG No. 98/14.11.2008, effective 14.11.2008, supplemented, SG No. 6/23.01.2009, effective 1.05.2009, amended, SG No. 19/13.03.2009, effective 10.04.2009, supplemented,

More information

SIXTY-EIGHTH WORLD HEALTH ASSEMBLY A68/11

SIXTY-EIGHTH WORLD HEALTH ASSEMBLY A68/11 00 SIXTY-EIGHTH WORLD HEALTH ASSEMBLY A68/11 Provisional agenda item 13.4 24 April 2015 Follow-up to the 2014 high-level meeting of the United Nations General Assembly to undertake a comprehensive review

More information

Working document QAS/ RESTRICTED September 2006

Working document QAS/ RESTRICTED September 2006 RESTRICTED September 2006 PREQUALIFICATION OF QUALITY CONTROL LABORATORIES Procedure for assessing the acceptability, in principle, of quality control laboratories for use by United Nations agencies The

More information

PROCEDURE FOR ACCREDITING INDEPENDENT ENTITIES BY THE JOINT IMPLEMENTATION SUPERVISORY COMMITTEE. (Version 06) (Effective as of 15 April 2010)

PROCEDURE FOR ACCREDITING INDEPENDENT ENTITIES BY THE JOINT IMPLEMENTATION SUPERVISORY COMMITTEE. (Version 06) (Effective as of 15 April 2010) UNFCCC/CCNUCC Page 1 PROCEDURE FOR ACCREDITING INDEPENDENT ENTITIES BY THE JOINT IMPLEMENTATION SUPERVISORY COMMITTEE (Version 06) (Effective as of 15 April 2010) UNFCCC/CCNUCC Page 2 Contents Page A.

More information

USER GUIDE INDIGENOUS PEOPLES AND GEF PROJECT FINANCING

USER GUIDE INDIGENOUS PEOPLES AND GEF PROJECT FINANCING USER GUIDE INDIGENOUS PEOPLES AND GEF PROJECT FINANCING 2 THE GLOBAL ENVIRONMENT FACILITY WHO WE ARE The Global Environment Facility (GEF) is a unique international partnership of governments, international

More information

MUSKOKA AND AREA HEALTH SYSTEM TRANSFORMATION COUNCIL TERMS OF REFERENCE

MUSKOKA AND AREA HEALTH SYSTEM TRANSFORMATION COUNCIL TERMS OF REFERENCE MUSKOKA AND AREA HEALTH SYSTEM TRANSFORMATION COUNCIL TERMS OF REFERENCE Table of Contents Background... 1 Vision for our Future... 1 Purpose of Health System Transformation Council... 2 Accountability...

More information

GENERAL INFORMATION Services/Work Description: Project/Program Title: Home-based with travel to Addis Ababa I. BACKGROUND

GENERAL INFORMATION Services/Work Description: Project/Program Title: Home-based with travel to Addis Ababa I. BACKGROUND TOR for reframe project proposal for Resilience and Livelihood support GENERAL INFORMATION Services/Work Description: Project/Program Title: Type of the contract: Duty Station: Duration: Expected Start

More information

Ministerial Ordinance on Good Laboratory Practice for Nonclinical Safety Studies of Drugs

Ministerial Ordinance on Good Laboratory Practice for Nonclinical Safety Studies of Drugs Provisional Translation (as of August 2012) Ministerial Ordinance on Good Laboratory Practice for Nonclinical Safety Studies of Drugs Ordinance of the Ministry of Health and Welfare No.21 of March 26,

More information

Method of work and work programme,

Method of work and work programme, United Nations United Nations Conference on Trade and Development Distr.: General 12 August 2016 Original: English TD/B/C.I/CPLP/2 Trade and Development Board Trade and Development Commission Intergovernmental

More information

SPLASH SANITATION RESEARCH CALL AND PROGRAMME

SPLASH SANITATION RESEARCH CALL AND PROGRAMME ERAC-CT-2006-036268 SPLASH SANITATION RESEARCH CALL AND PROGRAMME Consolidated report from the development of the research call to the implementation of the research programme Consolidated Deliverables

More information

(Energy Development and Access Project) between INTERNATIONAL DEVELOPMENT ASSOCIATION. and ARB APEX BANK LIMITED

(Energy Development and Access Project) between INTERNATIONAL DEVELOPMENT ASSOCIATION. and ARB APEX BANK LIMITED Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 4356-GH Public Disclosure Authorized Project Agreement (Energy Development and Access Project) between Public Disclosure Authorized INTERNATIONAL

More information