1 AASHTO PROJECT FINANCE INSTITUTE AN INSTITUTIONAL FRAMEWORK FOR PROJECT FINANCE July 7-8, 2005 Boston, Massachusetts GEOFFREY S. YAREMA NOSSAMAN GUTHNER KNOX & ELLIOTT LLP The information contained herein does not constitute a legal opinion and should not be relied upon by the reader as legal advice or be regarded as a substitute for legal advice. Copyright, 2005 Nossaman Guthner Knox & Elliott, LLP. All Rights Reserved. 1

2 Nossaman Law and consulting firm with unique specialty in procuring, contracting and financing large infrastructure projects Work exclusively for owners, not civil contractors Honored to work for more than 30 State DOTs and regional transportation authorities around the country Named by Public Works Financing as the #1 owner advisor each year since rankings began Projects named #1 of the year by AASHTO, Institutional Investor, Bond Buyer, ASCE, DBIA, ARTBA and many others Proud of our clients record of success 2

3 Focus of Discussion 1.0 Key Elements of a Successful Institutional Framework 2.0 Selecting a Project Delivery Plan 3.0 Implementing the Project Delivery Plan 4.0 Private Concessions: the Next Frontier? 3

4 Key Elements of Successful Institutional Framework 1.1 Anticipating sources of funds and knowing legal or market requirements each will impose 1.2 Identifying entity(ies) that will own and operate project and assuring they have needed state-level organization and legal powers 1.3 Securing the third party approvals required to build and operate 1.4 Are there good reasons to deliver project differently? 4

5 1.1 Sources of Funds Each funding source has its own: Legal strings Market strings As a result, finance/funding plan is key driver of project delivery strategy 5

6 1.1 Sources of Funds: Examples Federal funds Title 23/49 purposes Procurement restrictions Design-Build Rule SEP 14, 15 TE-045 Davis Bacon Tax-exempt debt Great asset BUT current IRS restrictions No long-term concessions No revenue sharing No private equity Proposed changes to private activity bond rules 6

7 1.1 Sources of Funds: Examples Borrowing against project revenues Completion date certainty Capital/OM cost certainty Other indenture issues Gross v. net pledge Borrowing against other dedicated revenue streams Cost and schedule predictability less critical BUT Overruns and delays make other projects suffer TIFIA Eligibility criteria Springing lien 7

8 Goals 1.2 State Level Organization and Legal Powers Institutional commitment to project Efficient project administration Need to ensure government sponsor(s) possesses all powers project will require Organizational Options Existing government agency Pass state legislation to supplement existing agency powers Create special office or division within existing agency Form and empower new special purpose agency to finance, build and operate Form special purpose agency to build and then transfer to existing agency to operate 8

9 1.2 State Level Organization and Legal Powers Selected Legal Powers Pre-Qualification Negotiation Best value selection Best project plan selection Long term durations Unsolicited proposals Call for projects Flexible agreement terms and conditions Utilize range of financing tools 9

10 1.3 Third Party Approvals Arising from land use NEPA and/or State equivalent Federal, state and local resource agency permits Arising from use of special assets Connecting to networks, like state highway systems Tolling interstate highways Concessioning existing assets originally funded with government grants 10

11 1.3 Third Party Approvals Arising from public debt issuance restrictions Volume caps Vote requirements Referenda Off balance sheet options Europe: shadow tolls USA: non-profit corporations 11

12 1.4 Are There Good Reasons to Deliver Project Differently? To justify deviating from tried and true, project delivery plans should offer significant advantages: Accelerate project delivery Fix costs/schedule early in design phase Involve private sector early in project development process Shift risk and reduce claims Use private capital to leverage limited traditional government funding 12

13 2.0 Selecting a Project Delivery Plan 2.1 Options 2.2 Inputs and outputs for decision-making 2.3 How to make the decisions 13

14 2.1 Selecting a Project Delivery Plan: Options Every project is delivered through a publicprivate partnership! Continuum from traditional approach to privatization What are the major options to consider? 14

15 2.1 Selecting a Project Delivery Plan: Options Traditional Pay-As-You-Go Tax Funding using Design-Bid-Build and Public Operations / Maintenance Most all U.S. surface transportation projects! Widely authorized by state legislatures with built-in federal bias Compelled in many jurisdictions Alternatives frequently require special state legislation and, where federalized, sometimes federal exemptions 15

16 2.1 Selecting a Project Delivery Plan: Options Traditional Funding Using Design-Build and Public Operations Utah I-15 Colorado T-REX Minnesota Hiawatha LRT and Highway Program Reno ReTRAC Pasadena Gold Line LRT 16

17 2.1 Selecting a Project Delivery Plan: Options Traditional Funding using DBOM River Line LRT Hudson-Bergen LRT 17

18 2.1 Selecting a Project Delivery Plan: Options Dedicated Revenue Stream using DBOM or DBM Massachusetts Route 3 North Seattle Monorail Project 18

19 2.1 Selecting a Project Delivery Plan: Options Project Revenue Financing Using Design-Build and Public Operations TCA San Joaquin Hills and Eastern TxDOT SH 130 (Private Capital Maintenance) Colorado E-470 WSDOT Tacoma Narrows Bridge (GO Bonds sized to match anticipated toll revenues) 19

20 2.1 Selecting a Project Delivery Plan: Options Project Revenue Financing Using Non-Profit Concession Las Vegas Monorail SCDOT - Greenville Connector VDOT - Pocahontas Parkway 20

21 2.1 Selecting A Project Delivery Plan: Options Project Revenue Financing Using For-Profit Concession Caltrans - CPTC SR-91 (pre-acquisition) Caltrans - CTV SR-125 VDOT - Dulles Greenway Provinance of Ontario - Toronto Highway 407 TxDOT Cintra/Zachry SH 130 (5-6) (under negotiation) TxDOT - I-635, SH 121, I-820/SH 183 (under procurement) 21

22 2.2 Inputs and Outputs for Decision-Making INPUTS OUTPUTS Project Characteristics Contract Structure Sponsor Priorities Competition Structure 22

23 2.2.1 Input: Project Characteristics How mature are: Project definition and configuration Environmental process Regulatory approvals Engineering and technical investigations ROW acquisitions Finance plan Traffic and revenue studies? How neatly packaged and ready for hard proposals/bids is a project? Has project progressed to point where private sector is willing to invest sweat equity and costshare to help owner achieve feasibility? 23

24 2.2.1 Input: Sponsor Priorities Congestion relief? Reduce impact to public? Encourage innovation? Accelerate project delivery? Leverage limited traditional government funding? 24

25 2.2.2 Output: Contract Structure Pre-Development Agreement v. Implementation Agreement Design-Build DBM or DBOM Concession Private Equity with return on investment Tax-exempt financing with fees for services 25

26 2.2.2 Output: Competition Structure Initiating the Competition Soliciting Proposals Accepting unsolicited Call for projects v. project - specific RFPs Submittal Requirements and Evaluation Options Qualifications-Based Proposal with Development/Financing Plan Proposals include plan of development and plan of finance Use where one or more major project elements are uncertain Typically procured and executed before record of decision on environmental impact assessment 26

27 2.2.2 Output: Competition Structure Qualifications / Hard Pricing / Firm Financing Proposals Proposal includes definitive pricing and/or firm financing commitment Financial closing and notice to proceed expected within short time after selection Typically requires defined project with reasonable certainty and reasonably matured pre-development work May be procured and/or executed before or after record of decision on environmental impact assessment Best value (price and other factors) selection Results in concession or DB/DBOM 27

28 2.2.2 Output: Competition Structure Qualifications-based Proposals with Conditional Financing Proposals include conditional financing commitment Sufficient project definition and maturity of predevelopment work to enable a conditional financing commitment Developer completes pre-development work to achieve financial closing May be procured before or after record of decision on environmental impact assessment Best value selection Results in concession 28

29 2.3 Making the Decisions Private Sector Selects HOW ARE PROJECTS IDENTIFIED? DOT Selects DOT Accepts Unsolicited Proposals DOT Issues Call for Project Proposals and Qualifications DOT Selects Projects PATH 1 PATH 3 PATH 2 Paths are not mutually exclusive! 29

30 DOT Adopts Unsolicited Proposal Guidelines Private consortium submits unsolicited proposal Evaluate project against initial screening criteria Request supplemental information as needed Does DOT want to pursue? YES NO Notify consortium (Continued on next slide) 30

31 Select Non- Packaged Project YES Select Packaged Project Qualifications How is proposer selected? Request for competing proposals Best Value Packaged Project Request for competing proposals Qualifications based selection Best value selection Negotiate Negotiate 31

32 Call for Project Proposals and Qualifications Receive No Overlapping Projects Receive Overlapping Projects Request supplemental proposal information? NO YES Request supplemental proposal information Select projects based on project, qualifications, development plan, financing plan (no hard price) How many projects? One project Sequential projects Parallel projects Negotiate 32

33 Qualifications, Development Plan, Financing Plan DOT Selects Projects How many projects? How are proposers selected? One project Sequential projects Parallel projects Best Value RFP/RFQ Select based on qualifications, development plan, financing plan (no hard price) Negotiate Package projects(s): engineering, environmental, etc. RFQ Shortlist RFP Select based on best value (including hard price) Negotiate 33

34 3.0 Implementing the Project Delivery Plan Dept. Program Staff Dept. Regions Program Manager Legal Advisors Technical Consultants Private Partner Candidate Project Screening Project Selection Public Outreach Industry Outreach State & Federal EIS and Resource Permits Engineering Conceptual and Design PE Technical Procurement Final Design and Construct Finance Procurement & Contracting Traffic & Revenue Projections Contract Oversight A. Call for Projects Open Ended B. Call for Projects - Limited C. Solicited Procurement Project Specific Project not fully defined D. Solicited Procurement Project Specific Defined Project X. All approaches 34

35 4.0 Private Concessions: A New Frontier? No! Extensive International Experience Some U.S. Experience 35

36 4.0 Overview of Concessions 4.1 Nomenclature 4.2 Key Contractual Elements 4.3 Concession Market 36

37 4.1 Nomenclature Concession Franchise Public-Private Partnership (P3) Build-Operate-Transfer (BOT) Build-Transfer-Operate (BTO) Design-Build-Finance-Operate (DBFO) Private Finance Initiative (PFI) 37

38 4.2 Key Contractual Elements Developer takes over project Completes development and operates and maintains Meets DOT standard Specified maximum term/duration Developer to provide Project financing with limited/no DOT financial commitment Developer entitled to collect project revenues subject to one or more limitations Direct: Toll Rate Caps Indirect: ROI/ROE Caps 38

39 4.2 Key Contractual Elements If revenue positive project, revenue sharing and/or upfront payment to DOT Developer obligation to add capacity as LOS degrades or based on other measure/time DOT right to terminate for convenience with payment to Developer based upon pre-determined formula Extent (if any) to which DOT should compensate Developer for unanticipated economic effects on project revenues 39

40 4.3 Concession Market Examples Where Used Examples of Market Players U.S. Market Trends Role of Traditional U.S. Design-Builders 40

41 4.3.1 Examples Where Used US SR 125 (CA) SR 91 (CA) Dulles Greenway (VA) Canada 407 (Toronto) Sea to Sky Highway (BC) [non-tolled highway] UK M6 Toll N4-N6 Kinnegad-Kilcock (Ireland) Shadow Toll Projects Australia M2/M4/M5 Motorways M7 Western Sydney Orbital 41

42 4.3.1 Examples Where Used Europe A86 (Paris ring road) A28 (France) Radial-4 (Spain) Vasco de Gama Bridge (Portugal) South America Maipo (Chile) Talca-Chillan (Chile) Asia/Middle East Cross-Israel Highway (Highway 6) Manila North Tollway 42

43 4.3.2 Examples of Market Players Australia Macquarie Transurban Spain Cintra/Ferrovial Dragados Abengoa France Vinci Egis 43

44 4.3.2 Examples of Market Players UK AMEC Balfour Beatty Germany Hochtief Bilfinger Berger Hong Kong Cheung Kong Sweden Skanska 44

45 4.3.3 U.S. Market Trends Current U.S. tax laws generally preclude mixing of tax exempt financing with private equity/debt or revenue sharing Over the last 5-8 years, most US highway agencies/advisors have favored the tax-exempt markets as the most efficient tool for financing infrastructure Result = Less U.S. concessions 45

46 4.3.3 U.S. Market Trends Recent developments suggest a larger role for the private finance/concession model SR 125 (CA) and Detroit-Windsor Tunnel purchases by Macquarie Chicago Skyway Lease by between City of Chicago and Cintra Private Activity Bonds (PABs) included within current reauthorization bill would allow for up to $15 billion in tax exempt-financing to be mixed with private equity Trans-Texas Corridor 35 Agreement between TxDOT and Cintra Zachry 46

47 4.3.4 Role of Traditional U.S. Design-Builders TRADITIONAL DESIGN-BUILD TxDOT CONCESSIONS TxDOT Design-Builder Concessionaire Design Subs Construction Subs Design-Builder Design Subs Construction Subs 47

48 4.3.3 Role of Traditional U.S. Design-Builders Typical DB business model = design, build, get paid and leave Bringing significant $, retaining responsibility/risk during long-term O&M period poses challenges to them In concession, still have critical role, but less likely to lead teams unless they restructure their business model Concessionaire/Developer will award a DB contract to DB contractor team 48

49 Contact: Geoffrey S. Yarema Nossaman Guthner Knox & Elliott LLP 445 S. Figueroa Street Thirty-First Floor Los Angeles, CA (213)

TRANSPORTATION RESEARCH BOARD. 85th ANNUAL MEETING

TRANSPORTATION RESEARCH BOARD. 85th ANNUAL MEETING TRANSPORTATION RESEARCH BOARD 85th ANNUAL MEETING Panel on Public Private Initiatives: New Concepts in Transportation Project Delivery Recent Trends and Innovations January 23, 2006 Washington, DC GEOFFREY

More information

August 2007 Thomas Bohuslav Texas Department of Transportation

August 2007 Thomas Bohuslav Texas Department of Transportation Public Private Partnerships Activities in Texas AASHTO SOC 2007 Summer Meeting Biloxi Mississippi August 2007 Thomas Bohuslav Texas Department of Transportation Topics The Problem (Needs) Comprehensive

More information

FHWA/USDOT Role in Project Finance

FHWA/USDOT Role in Project Finance April 2008 Federal Tools for Project Finance Transportation Infrastructure Finance Workshop U.S. DOT/AASHTO Center for Excellence Chicago, IL Jennifer R. Mayer Federal Highway Administration Resource Center

More information

Financing Transit Projects with Traditional and Innovative Sources And Mechanisms

Financing Transit Projects with Traditional and Innovative Sources And Mechanisms Financing Transit Projects with Traditional and Innovative Sources And Mechanisms Exploring the Potential for Bus Rapid Transit and Transit- Oriented Development in the I- 287/Tappan Zee Bridge Corridor

More information

ORIGINAL. Public Private Transportation Proposal USR 460. Richmond PROPOSER. September 14, 2006 TEAM MEMBERS

ORIGINAL. Public Private Transportation Proposal USR 460. Richmond PROPOSER. September 14, 2006 TEAM MEMBERS PROPOSER 7700 Chevy Chase Dr, Building I - Suite 500-C Austin, TX 78752 Mr. F. Jeff Hetzer Program Manager Innovative Project Delivery Division Virginia Department of Transportation 1221 E. Broad Street,

More information

Local Taxes and Highway Tolls: The New Normal

Local Taxes and Highway Tolls: The New Normal Local Taxes and Highway Tolls: The New Normal Los Angeles County Metropolitan Transportation Authority Public-Private Partnership Program August 16, 2012 Transportation and Infrastructure Summit Michael

More information

Strategic Projects Division

Strategic Projects Division Strategic Projects Division DESIGN BUILD: The Texas Story 2012 AASHTO Conference May 2, 2012 Portland, Oregon Don Toner, Jr., SRWA Director Strategic Projects Right of Way Strategic Projects Division Texas

More information

Massachusetts Department of Transportation (MassDOT) Route 3 South Managed Lanes Project DRAFT FOR DISCUSSION PURPOSES ONLY

Massachusetts Department of Transportation (MassDOT) Route 3 South Managed Lanes Project DRAFT FOR DISCUSSION PURPOSES ONLY Massachusetts Department of Transportation (MassDOT) Project High Level P3 Project Suitability Assessment Report September 11, 2013 Contents Proposed Project Description Project Background and Status Commonwealth

More information

Public-Private Private Partnership Projects (P3P) Seminar

Public-Private Private Partnership Projects (P3P) Seminar Public-Private Private Partnership Projects (P3P) Seminar Speaker Information: Allen W. Estes, III Partner Gordon & Rees, LLP Practice Areas: Construction, Green Technology & Climate Change and Commercial

More information

State Route 91 Corridor Improvement Project Update. State Route 91 Advisory Committee June 4, 2010

State Route 91 Corridor Improvement Project Update. State Route 91 Advisory Committee June 4, 2010 State Route 91 Corridor Improvement Project Update State Route 91 Advisory Committee June 4, 2010 Presentation Agenda Recent Project Milestones Project Development Schedule Environmental Permitting Design-Build

More information

TRB/AASHTO Environment & Energy Research Conference June 6-9, 2010 Session 47: Lessons Learned from P3 Public Involvement Initiatives

TRB/AASHTO Environment & Energy Research Conference June 6-9, 2010 Session 47: Lessons Learned from P3 Public Involvement Initiatives TRB/AASHTO Environment & Energy Research Conference June 6-9, 2010 Session 47: Lessons Learned from P3 Public Involvement Initiatives Lessons Learned from Virginia P3 Projects Dana C. Nifosi, Venable LLP

More information

REQUEST FOR INFORMATION

REQUEST FOR INFORMATION REQUEST FOR INFORMATION OKLAHOMA TURNPIKE AUTHORITY GILCREASE EXPRESSWAY RFI Issue Date: January 2, 2018 RFI Response Due Date: January 31, 2018 The Oklahoma Turnpike Authority ( Authority ) is seeking

More information

Innovative Project Finance

Innovative Project Finance Innovative Project Finance National Governor s Association Utah State Planning Retreat on Public-Private Partnerships Ivan Marrero, P.E. Division Administrator, FHWA Utah October 7, 2016 The Status Quo:

More information

Overview of the Procurement and Project Milestones

Overview of the Procurement and Project Milestones Overview of the Procurement and Project Milestones November 3, 2016 Charles A. Kilpatrick, P.E. Commissioner of Highways Virginia Department of Transportation Project Development The Path to Date Summer

More information

Design-Build Procurement Overview Manual. Alternative Project Delivery

Design-Build Procurement Overview Manual. Alternative Project Delivery Design-Build Procurement Overview Manual Alternative Project Delivery Table of Contents Chapter 1: Introduction to Design-Build Procurements... 1 1.1 Introduction... 1 1.2 Scope... 1 1.3 Acronyms... 2

More information

Public-Private Partnerships for Transportation

Public-Private Partnerships for Transportation 2011 NCSL Fall Forum Public-Private Partnerships for Transportation Leon Corbett Project Finance Manager, FDOT Office of Comptroller November 30, 2011 Florida s History of Public-Private Partnerships Outsourcing

More information

Highway and Public Transportation Infrastructure Provision Using Public-Private Partnerships (P3s)

Highway and Public Transportation Infrastructure Provision Using Public-Private Partnerships (P3s) Highway and Public Transportation Infrastructure Provision Using Public-Private Partnerships (P3s) William J. Mallett Specialist in Transportation Policy March 5, 2014 Congressional Research Service 7-5700

More information

November 4, 2013 Office of Transportation Public Private Partnerships

November 4, 2013 Office of Transportation Public Private Partnerships November 4, 2013 Office of Transportation Public Private Partnerships Dear Sirs, Via email: i66ppta@vdot.virginia.gov Re: Response of Shikun & Binui Ltd. (a member of the Arison Group) to the Request for

More information

PROJECT DELIVERY MODELS ARKANSAS PLANNING RETREAT ON P3S. J. Douglas Koelemay, Director October 7, 2015

PROJECT DELIVERY MODELS ARKANSAS PLANNING RETREAT ON P3S. J. Douglas Koelemay, Director October 7, 2015 PROJECT DELIVERY MODELS ARKANSAS PLANNING RETREAT ON P3S J. Douglas Koelemay, Director October 7, 2015 VIRGINIA LEADERSHIP IN PUBLIC-PRIVATE PARTNERSHIPS Virginia and California first P3 legislation in

More information

Eagle Project Update

Eagle Project Update Construction of Peña Bridge November 2012 Eagle Project Update Eagle P3 Project Update Rick Clarke Assistant General Manager, Capital Programs March 5, 2014 Regional Transportation District (RTD) Performs

More information

PUBLIC-PRIVATE PARTNERSHIP PROGRAM, HIGH DESERT CORRIDOR

PUBLIC-PRIVATE PARTNERSHIP PROGRAM, HIGH DESERT CORRIDOR 29 One Gateway Plaza Los Angeles, CA 90012-2952 213.922.2000 l metro. net PLANNING AND PROGRAMMING COMMITTEE MARCH 20, 2013 SUBJECT: ACTION: PUBLIC-PRIVATE PARTNERSHIP PROGRAM, HIGH DESERT CORRIDOR RECEIVE

More information

May 22, Pamela Bailey-Campbell. Vice President - North America Infrastructure Consultancy Jacobs Engineering, Inc.

May 22, Pamela Bailey-Campbell. Vice President - North America Infrastructure Consultancy Jacobs Engineering, Inc. May 22, 2013 Pamela Bailey-Campbell Vice President - North America Infrastructure Consultancy Jacobs Engineering, Inc. Public Partners Arizona Department of Transportation Office of P3 Initiatives City

More information

Build America Transportation Investment Center. Office of the Secretary U.S. Department of Transportation

Build America Transportation Investment Center. Office of the Secretary U.S. Department of Transportation Build America Transportation Investment Center Office of the Secretary U.S. Department of Transportation Background On July 17, 2014 the President announced the Build America Investment Initiative: a government-wide

More information

The Maryland Transportation Authority has. Staff Approve Resolution R to amend the FY TIP.

The Maryland Transportation Authority has. Staff Approve Resolution R to amend the FY TIP. ITEM 13 Action March 29, 2017 Approval to Amend the FY 2017-2022 Transportation Improvement Program (TIP) to Add the Governor Harry W. Nice Bridge Improvement Project For the Maryland Transportation Authority

More information

Project Report: Achieving Value for Money Charles Jago Northern Sport Centre

Project Report: Achieving Value for Money Charles Jago Northern Sport Centre Project Report: Achieving Value for Money Charles Jago Northern Sport Centre March 2007 Table of Contents Purpose of this Document...........................................i Executive Summary...............................................1

More information

PARTNERSHIPS ACCELERATE ECONOMIC DEVELOPMENT & JOB CREATION. J. Douglas Koelemay, Director

PARTNERSHIPS ACCELERATE ECONOMIC DEVELOPMENT & JOB CREATION. J. Douglas Koelemay, Director PARTNERSHIPS ACCELERATE ECONOMIC DEVELOPMENT & JOB CREATION J. Douglas Koelemay, Director VIRGINIA LEADERSHIP IN PUBLIC-PRIVATE PARTNERSHIPS PPTA enabling legislation 1995 2001, 2005, 2008 Revisions to

More information

Draft PPP Regulations

Draft PPP Regulations Legal Update Infrastructure PPP/PFI Vietnam 3 September 2010 Draft PPP Regulations Vietnam has an urgent need to upgrade and develop its infrastructure. However, having attained middle income status, the

More information

Partnership Financing: Improving Transportation Through Public Private Partnerships

Partnership Financing: Improving Transportation Through Public Private Partnerships Partnership Financing: Improving Transportation Through Public Private Partnerships Executive Summary Long-term funding sources for transportation are uncertain, and innovative alternatives for both financing

More information

VIRGINIA S P3 PROGRAM

VIRGINIA S P3 PROGRAM Commonwealth of Virginia Office of Transportation P3 s Tony Kinn, Director Jackie Cromwell VIRGINIA S P3 PROGRAM July 28, 2011 Office of Transportation Public-Private Partnerships OTP3 contacts: Tony Kinn,

More information

9. Positioning Ports for Grant Funding and Government Loan Programs

9. Positioning Ports for Grant Funding and Government Loan Programs 9. Positioning Ports for Grant Funding and Government Loan Programs 9.1. Grant Funding Overview Grant funding continues to be a key factor for ports in meeting capital investment requirements. Grants can

More information

North Carolina Turnpike Authority Joint Appropriations Committee on Transportation Beau Memory & Rodger Rochelle

North Carolina Turnpike Authority Joint Appropriations Committee on Transportation Beau Memory & Rodger Rochelle North Carolina Turnpike Authority Joint Appropriations Committee on Transportation Beau Memory & Rodger Rochelle March 17, 2015 Agenda Legislation Review / Turnpike Vision Beau Memory Turnpike Authority

More information

UNSOLICITED PROPOSALS

UNSOLICITED PROPOSALS VI-4 UNSOLICITED PROPOSALS 1.0 Applicability. This policy and procedure applies to Unsolicited Proposals received by RTD. It is not designed to address unsolicited proposals regarding the acquisition,

More information

Public-Private Partnership Program May 2015 Transit Coalition Update

Public-Private Partnership Program May 2015 Transit Coalition Update Public-Private Partnership Program May 2015 Transit Coalition Update Los Angeles County Metropolitan Transportation Authority Mark Linsenmayer Director Presentation Agenda Overview of Metro Public Private

More information

REQUEST FOR INFORMATION

REQUEST FOR INFORMATION REQUEST FOR INFORMATION REGARDING THE DEVELOPMENT OF AND PROCUREMENT PROCESS FOR THE GRAND PARKWAY PROJECT TEXAS DEPARTMENT OF TRANSPORTATION RFI Issuance Date: June 10, 2011 RFI Closing Date: July 6,

More information

Route 58 PPTA Project Finance Plan Annual Update Hillsville to Stuart Corridor. Submitted By:

Route 58 PPTA Project Finance Plan Annual Update Hillsville to Stuart Corridor. Submitted By: Route 58 PPTA Project Finance Plan Annual Update Hillsville to Stuart Corridor Submitted By: Robert P. Williams District Construction Engineer Salem District Virginia Department of Transportation Submitted

More information

Innovative Infrastructure Financing (Click on section to go to article) 6.1 Private Toll Roads 6.2 Public-Private Partnerships 6.

Innovative Infrastructure Financing (Click on section to go to article) 6.1 Private Toll Roads 6.2 Public-Private Partnerships 6. Innovative Infrastructure Financing (Click on section to go to article) 6.1 Private Toll Roads 6.2 Public-Private Partnerships 6.3 Marketization STRATEGY: INNOVATIVE INFRASTRUCTURE FINANCING NO. 6.1.1

More information

Project ID: NTC2015-SU-R-04

Project ID: NTC2015-SU-R-04 Project ID: NTC2015-SU-R-04 ANALYSIS OF FUNDING STREAMS FOR PUBLIC PRIVATE PARTNERSHIPS (PPP) IN THE U.S. TRANSPORTATION SECTOR A STUDY OF DESIGN-BUILD-FINANCE-OPERATE- MAINTAIN (DBFOM) Final Report by

More information

Florida s Future: Funding Growth Through Public Private Partnerships. Ed Turanchik. March 10, 2014

Florida s Future: Funding Growth Through Public Private Partnerships. Ed Turanchik. March 10, 2014 Florida s Future: Funding Growth Through Public Private Partnerships Ed Turanchik March 10, 2014 Fla. Statute 287.05712 Effective July 1, 2013, Florida s new public-private partnership statute introduces

More information

REQUEST FOR QUALIFICATIONS (RFQ)

REQUEST FOR QUALIFICATIONS (RFQ) REQUEST FOR QUALIFICATIONS (RFQ) Public-Private Partnership Legal Advisor Services for the Diversion Channel and Associated Infrastructure Work Package of the Fargo-Moorhead Area Diversion Project Issue

More information

S E N A T E F I S C A L O F F I C E I S S U E B R I E F 2016-S RhodeWorks FEBRUARY 2, 2016

S E N A T E F I S C A L O F F I C E I S S U E B R I E F 2016-S RhodeWorks FEBRUARY 2, 2016 2016-S-2246 - RhodeWorks FEBRUARY 2, 2016 SUMMARY 2016-S-2246 - The Rhode Island Bridge Replacement, Reconstruction and Maintenance Fund Act of 2016, also known as RhodeWorks, does the following: Allows

More information

RCTC Toll Program and Projects

RCTC Toll Program and Projects RCTC Toll Program and Projects for CMAA Southern California Chapter October 13, 2011 Presenta(on Agenda I 15 Corridor Improvement Project SR 91/71 Interchange Improvements Project SR 91 Corridor Improvement

More information

TEXAS GENERAL LAND OFFICE COMMUNITY DEVELOPMENT & REVITALIZATION PROCUREMENT GUIDANCE FOR SUBRECIPIENTS UNDER 2 CFR PART 200 (UNIFORM RULES)

TEXAS GENERAL LAND OFFICE COMMUNITY DEVELOPMENT & REVITALIZATION PROCUREMENT GUIDANCE FOR SUBRECIPIENTS UNDER 2 CFR PART 200 (UNIFORM RULES) TEXAS GENERAL LAND OFFICE COMMUNITY DEVELOPMENT & REVITALIZATION PROCUREMENT GUIDANCE FOR SUBRECIPIENTS UNDER 2 CFR PART 200 (UNIFORM RULES) The Texas General Land Office Community Development & Revitalization

More information

Massachusetts Department of Transportation (MassDOT) The South Coast Rail Project DRAFT FOR DISCUSSION PURPOSES ONLY

Massachusetts Department of Transportation (MassDOT) The South Coast Rail Project DRAFT FOR DISCUSSION PURPOSES ONLY Massachusetts Department of Transportation (MassDOT) The High Level P3 Project Suitability Assessment Report September 11, 2013 Contents Proposed Project Description Project Background and Status Commonwealth

More information

APPENDIX D CHECKLIST FOR PROPOSALS

APPENDIX D CHECKLIST FOR PROPOSALS APPENDIX D CHECKLIST FOR PROPOSALS Is proposal content complete, clear, and concise? Proposals should include a comprehensive scope of work, and have enough detail to permit the responsible public entity

More information

REQUEST FOR PROPOSALS. For. Rental Assistance Demonstration (RAD) Consulting. For HOUSING AUTHORITY OF THE CITY OF SAN BUENAVENTURA, CALIFORNIA

REQUEST FOR PROPOSALS. For. Rental Assistance Demonstration (RAD) Consulting. For HOUSING AUTHORITY OF THE CITY OF SAN BUENAVENTURA, CALIFORNIA REQUEST FOR PROPOSALS For Rental Assistance Demonstration (RAD) Consulting For HOUSING AUTHORITY OF THE CITY OF SAN BUENAVENTURA, CALIFORNIA Date Issued: September 11, 2012 Closes: September 25, 2012 at

More information

PPP Highways Experiences: Chile and Mexico. John Hodges INF Vice Presidency Belgrade Workshop June 6, 2006

PPP Highways Experiences: Chile and Mexico. John Hodges INF Vice Presidency Belgrade Workshop June 6, 2006 PPP Highways Experiences: Chile and Mexico John Hodges INF Vice Presidency Belgrade Workshop June 6, 2006 International PPP Experiences First Programs: France, Spain Pioneering Developing Countries: Argentina,

More information

Los Angeles County One Gateway Plaza z13.gzz.zooo Tel Metropolitan Transportation Authority Los Angeles, CA gooi2-zp52 metro.net

Los Angeles County One Gateway Plaza z13.gzz.zooo Tel Metropolitan Transportation Authority Los Angeles, CA gooi2-zp52 metro.net @ Metro 9 Los Angeles County One Gateway Plaza z13.gzz.zooo Tel Metropolitan Transportation Authority Los Angeles, CA gooi2-zp52 metro.net PLANNING AND PROGRAMMING COMMITTEE OCTOBER 14,2009 SUBJECT: PUBLIC-PRIVATE

More information

REQUEST FOR QUALIFICATIONS: RFQ PROGRAM/PROJECT MANAGEMENT SERVICES TO SUPPORT MUNICIPAL FACILITIES & CAPITAL IMPROVEMENTS PROJECTS

REQUEST FOR QUALIFICATIONS: RFQ PROGRAM/PROJECT MANAGEMENT SERVICES TO SUPPORT MUNICIPAL FACILITIES & CAPITAL IMPROVEMENTS PROJECTS REQUEST FOR QUALIFICATIONS: RFQ 2018-100-1 PROGRAM/PROJECT MANAGEMENT SERVICES TO SUPPORT MUNICIPAL FACILITIES & CAPITAL IMPROVEMENTS PROJECTS The City of Cedar Hill, Texas is soliciting statements of

More information

Staff Approve Resolution R to amend the FY TIP.

Staff Approve Resolution R to amend the FY TIP. ITEM 11 Action April 19, 2017 Approval to Amend the FY 2017-2022 (TIP) to add nine New Projects to the FY 2017-2022 TIP, As Requested By the Virginia Department of Transportation (VDOT) Staff Recommendation:

More information

US TOLL ROAD REDUX RAYMOND H. ELLIS, MANAGING DIRECTOR DMJM HARRIS, AECOM TECHNOLOGY CORP.

US TOLL ROAD REDUX RAYMOND H. ELLIS, MANAGING DIRECTOR DMJM HARRIS, AECOM TECHNOLOGY CORP. US TOLL ROAD REDUX RAYMOND H. ELLIS, MANAGING DIRECTOR DMJM HARRIS, AECOM TECHNOLOGY CORP. NORTHWESTERN UNIVERSITY TRANSPORTATION CENTER BUSINESS ADVISORY COUNCIL OCTOBER 3, 2007 KEY TOLL ROAD DRIVERS

More information

DEPARTMENT OF TRANSPORTATION. Notice of Intent to Prepare Environmental Impact Statement, I-495 & I-270 Managed

DEPARTMENT OF TRANSPORTATION. Notice of Intent to Prepare Environmental Impact Statement, I-495 & I-270 Managed This document is scheduled to be published in the Federal Register on 03/16/2018 and available online at https://federalregister.gov/d/2018-05354, and on FDsys.gov DEPARTMENT OF TRANSPORTATION [4910-22-P]

More information

State Project No. XXXXXX City Project No. c401807

State Project No. XXXXXX City Project No. c401807 June 29, 2017 Request for Qualifications Design and Environmental Services for the SLR Parkway Phase III Project also known as a portion of the MBSST (Rail Trail) Segment 8 (San Lorenzo River Railroad

More information

Miami-Dade County Expressway Authority. Policy For Receipt, Solicitation And Evaluation Of Public. Private Partnership Proposals

Miami-Dade County Expressway Authority. Policy For Receipt, Solicitation And Evaluation Of Public. Private Partnership Proposals Miami-Dade County Expressway Authority Policy For Receipt, Solicitation And Evaluation Of Public Private Partnership Proposals SECTION 1. Background Miami-Dade County Expressway Authority ( MDX ) finds

More information

CITY OF INGLEWOOD Residential Sound Insulation Program

CITY OF INGLEWOOD Residential Sound Insulation Program CITY OF INGLEWOOD Residential Sound Insulation Program REQUEST FOR QUALIFICATIONS/PROPOSALS FOR CONSTRUCTION MANAGEMENT SERVICES FOR THE CITY OF INGLEWOOD RESIDENTIAL SOUND INSULATION PROGRAM JANUARY 2008

More information

Housing Authority of the City of Santa Ana Project Based Vouchers Program Request for Proposals

Housing Authority of the City of Santa Ana Project Based Vouchers Program Request for Proposals Housing Authority of the City of Santa Ana Project Based Vouchers Program Request for Proposals The Housing Authority of the City of Santa Ana (SAHA) is soliciting applications from developers who are

More information

NCDOT Planning Summary for NCTA Projects

NCDOT Planning Summary for NCTA Projects NCDOT Planning Summary for NCTA Projects Page 1 Triangle Expressway Southeast Extension Wake and Johnston Counties (STIP Projects R-2721, R-2828, and R-2829) The Triangle Expressway Southeast Extension

More information

TEXAS DEPARTMENT OF TRANSPORTATION. Transportation and the Federal Government

TEXAS DEPARTMENT OF TRANSPORTATION. Transportation and the Federal Government TEXAS DEPARTMENT OF TRANSPORTATION Transportation and the Federal Government The Role of the Federal Government in State Transportation Programs U.S. Highway 290 BACKGROUND The Federal-Aid Highway Program

More information

APPENDIX A. I. Background & General Guidance. A. Public-private partnerships create opportunities for both the public and private sectors

APPENDIX A. I. Background & General Guidance. A. Public-private partnerships create opportunities for both the public and private sectors APPENDIX A POLICY AND RULES CONCERNING THE RECEIPT OF AND AWARD OF CONTRACTS PURSUANT TO UNSOLICITED PROPOSALS FOR PUBLIC-PRIVATE PARTNERSHIP INFRASTRUCTURE PROJECTS I. Background & General Guidance A.

More information

RESOLUTION NUMBER 2877

RESOLUTION NUMBER 2877 RESOLUTION NUMBER 2877 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PERRIS, STATE OF CALIFORNIA SETTING FORTH POLICIES INTENDED TO OBTAIN CONSISTENCY AND UNIFORMITY IN THE ADMINISTRATION OF THE FEDERALLY

More information

CHAPTER House Bill No. 5013

CHAPTER House Bill No. 5013 CHAPTER 2009-89 House Bill No. 5013 An act relating to transportation; amending s. 334.044, F.S.; revising the powers and duties of the Department of Transportation to provide for certain environmental

More information

Massachusetts Bay Transportation Authority. POLICIES & PROCEDURES Design Build Procurement Procedures April 2016

Massachusetts Bay Transportation Authority. POLICIES & PROCEDURES Design Build Procurement Procedures April 2016 Massachusetts Bay Transportation Authority POLICIES & PROCEDURES Design Build Procurement Procedures April 2016 Design Build Procurement Procedures April 2016 Massachusetts Bay Transportation Authority

More information

REQUEST FOR PROPOSAL (RFP) Posey County Long Range Transportation Plan

REQUEST FOR PROPOSAL (RFP) Posey County Long Range Transportation Plan October 23rd, 2015 Attention: Qualified and Interested Consultants REQUEST FOR PROPOSAL (RFP) Posey County Long Range Transportation Plan The Posey County Economic Development Partnership, cooperatively

More information

QUALIFICATIONS BASED SELECTION (QBS)

QUALIFICATIONS BASED SELECTION (QBS) QUALIFICATIONS BASED SELECTION (QBS) Transportation Professional Services Procurement Process LaSalle County Highway Department 1400 N.27 th Road Ottawa, IL 61350 Phone: (815) 434-0743 Fax: (815) 434-0747

More information

INDEPENDENT AUDITING SERVICES

INDEPENDENT AUDITING SERVICES SACRAMENTO TRANSPORTATION AUTHORITY 801 12 th Street Floor 5 SACRAMENTO, CA 95814-2947 (916) 323-0855 tim@sacta.org REQUEST FOR PROPOSALS INDEPENDENT AUDITING SERVICES FOR THE FISCAL YEAR ENDING JUNE 30,

More information

CONTRACTING AND PURCHASING

CONTRACTING AND PURCHASING CONTRACTING AND PURCHASING 2017 Educational Series CONTRACTING AND PURCHASING INTRODUCTION GOODS AND SERVICES Texas Department of Transportation (TxDOT) contracting activities are established and controlled

More information

KDOT Procurement Guidelines for STP/CMAQ Funded Planning, Education, and Outreach Projects Effective 10/1/12

KDOT Procurement Guidelines for STP/CMAQ Funded Planning, Education, and Outreach Projects Effective 10/1/12 KDOT Procurement Guidelines for STP/CMAQ Funded Planning, Education, and Outreach Projects Effective 10/1/12 Purpose These guidelines are intended to guide the procurement of goods and consultant services

More information

STATE OF MINNESOTA CAPITAL GRANTS MANUAL. A step-by-step guide that describes what grantees need to do to receive state capital grant payments

STATE OF MINNESOTA CAPITAL GRANTS MANUAL. A step-by-step guide that describes what grantees need to do to receive state capital grant payments STATE OF MINNESOTA CAPITAL GRANTS MANUAL A step-by-step guide that describes what grantees need to do to receive state capital grant payments Revised March 2010 The State of Minnesota Capital Grants Manual

More information

Comparison of Federal and State Procurement Requirements For FEMA Public Assistance Grants to North Carolina Local Governments

Comparison of Federal and State Procurement Requirements For FEMA Public Assistance Grants to North Carolina Local Governments This document compares procurement and contracting requirements for local governments under federal law applicable to FEMA Public Assistance Grants and that under North Carolina state law. Because this

More information

Comparison of Federal and State Procurement Requirements For FEMA Public Assistance Grants to North Carolina Local Governments

Comparison of Federal and State Procurement Requirements For FEMA Public Assistance Grants to North Carolina Local Governments This document compares procurement and contracting requirements for local governments under federal law applicable to FEMA Public Assistance Grants and that under North Carolina state law. Because this

More information

Subject: Request for Proposal Route 99 Interchanges at Hammett Road and Kiernan Avenue

Subject: Request for Proposal Route 99 Interchanges at Hammett Road and Kiernan Avenue DEPARTMENT OF PUBLIC WORKS Matt Machado Director 1010 10 th Street, Suite 3500, Modesto, CA 95354-0847 Phone: 209.525.6550 Date «FirstName» «LastName» «Company» «Address1» «City», «State» «PostalCode»

More information

Vista Ridge Project Technical Advisor

Vista Ridge Project Technical Advisor Tim Skoglund, P.E. Senior Director Vista Ridge Maria Franco Contract Administrator SOQ Pre-Submittal Meeting Disclaimer Oral statements or discussion during the SOQ Pre-Submittal Meeting will not be binding,

More information

OVERVIEW OF UNSOLICITED PROPOSALS

OVERVIEW OF UNSOLICITED PROPOSALS OVERVIEW OF UNSOLICITED PROPOSALS APPLICABILITY This policy and procedure applies to unsolicited proposals received by the KCATA. The KCATA welcomes proposals from any interested vendor meeting the following

More information

KENYA INFRASTRUCTURE AND PPP PROJECT SOUTH EASTERN KENYA UNIVERSITY HOSTELS PPP PROJECT

KENYA INFRASTRUCTURE AND PPP PROJECT SOUTH EASTERN KENYA UNIVERSITY HOSTELS PPP PROJECT KENYA INFRASTRUCTURE AND PPP PROJECT SOUTH EASTERN KENYA UNIVERSITY HOSTELS PPP PROJECT DEVELOPMENT, OPERATION AND MAINTENANCE Tender Number: [SEKU/PPP/HP-01/2017-2018] ADDENDUM TO REQUEST FOR QUALIFICATION

More information

PPEA Guidelines and Supporting Documents

PPEA Guidelines and Supporting Documents PPEA Guidelines and Supporting Documents APPENDIX 1: DEFINITIONS "Affected jurisdiction" means any county, city or town in which all or a portion of a qualifying project is located. "Appropriating body"

More information

Page 1 of 10 Chicago Infrastructure Trust Joint Public Safety Training Academy - RFQ Clarifications - November 9, 2017

Page 1 of 10 Chicago Infrastructure Trust Joint Public Safety Training Academy - RFQ Clarifications - November 9, 2017 ANSWERS TO PRE-SUBMITTAL CONFERENCE QUESTIONS AND REQUESTS FOR CLARIFICATIONS 1 Project Budget and Project Design s 1 1.3 The City and the CIT have established a Project It is intended that all necessary

More information

WORK SESSION ITEM City Council

WORK SESSION ITEM City Council DATE: STAFF: October 25, 2016 Mark Jackson, PDT Deputy Director WORK SESSION ITEM City Council SUBJECT FOR DISCUSSION I-25 Northern Colorado Improvements. EXECUTIVE SUMMARY The purpose of this item is

More information

Opportunities and Roles for Consulting Engineers on P3 Projects

Opportunities and Roles for Consulting Engineers on P3 Projects 2 Opportunities and Roles for Consulting Engineers on P3 Projects Natasha Velickovic and Mike McArdle Introduction 37 Consulting Engineers for Project Owners and the Public Sector 38 Formulating and Presenting

More information

Cal Poly Pomona Request for Clarification for Lanterman Development Center Land Development Consultant RFC

Cal Poly Pomona Request for Clarification for Lanterman Development Center Land Development Consultant RFC Cal Poly Pomona Request for Clarification for Lanterman Development Center Land Development Consultant RFC 16-006 A. INTRODUCTION California State Polytechnic University, Pomona ( Cal Poly Pomona ), is

More information

The RTD FasTracks Plan

The RTD FasTracks Plan Citizens Advisory Committee Quarterly Meeting June 16, 2010 The RTD FasTracks Plan 122 miles of new light rail and commuter rail 18 miles of Bus Rapid Transit (BRT) 31 new park-n-rides with over 21,000

More information

TERMS and CONDITIONS of BUSINESS Executive Search and Recruitment Terms

TERMS and CONDITIONS of BUSINESS Executive Search and Recruitment Terms 1.1 These Terms and Conditions of business ( these Terms ) are between NextGen Global Executive Search, hereafter known as the Recruiting Firm, whose registered office is at 1717 North Naper Blvd., Suite

More information

SUMMARY OF THE GROW AMERICA ACT As Submitted to Congress on April 29, 2014

SUMMARY OF THE GROW AMERICA ACT As Submitted to Congress on April 29, 2014 SUMMARY OF THE ACT As Submitted to Congress on April 29, 2014 The U.S. Department of Transportation (USDOT) submitted the Generating Renewal, Opportunity, and Work with Accelerated Mobility, Efficiency,

More information

HB2 Update October, 2014

HB2 Update October, 2014 HB2 Update October, 2014 The revised draft of the FY15-20 SYIP was released for public comment in September and the public comment period is open through October 30th. This revision reflects revised revenue

More information

Panel 1 Canada s Investment Advantage

Panel 1 Canada s Investment Advantage Panel 1 Canada s Investment Advantage Competitive Alternatives 2014 - KPMG s Guide to International Business Location Costs 8 th Chinese Enterprises Outbound Investment Conference April 2014 Jamie Samograd

More information

REQUEST FOR QUALIFICATIONS (RFQ) FOR ARCHITECTURAL SERVICES FOR THE CONSTRUCTION OF A NEW PUBLIC SAFETY BUILDING/SUBSTATION

REQUEST FOR QUALIFICATIONS (RFQ) FOR ARCHITECTURAL SERVICES FOR THE CONSTRUCTION OF A NEW PUBLIC SAFETY BUILDING/SUBSTATION REQUEST FOR QUALIFICATIONS (RFQ) FOR ARCHITECTURAL SERVICES FOR THE CONSTRUCTION OF A NEW PUBLIC SAFETY BUILDING/SUBSTATION REQUEST FOR QUALIFICATIONS (RFQ) FOR ARCHITECTURAL SERVICES FOR A NEW PUBLIC

More information

Funding Principles. Years Passed New Revenue Credit Score Multiplier >3 years 0% % % % After Jan %

Funding Principles. Years Passed New Revenue Credit Score Multiplier >3 years 0% % % % After Jan % Funding Principles I. Infrastructure Incentives Initiative: encourages state, local and private investment in core infrastructure by providing incentives in the form of grants. Federal incentive funds

More information

District Office Building Seismic Retrofit At Contra Costa Community College District 500 Court St. Martinez, CA March 21, 2016

District Office Building Seismic Retrofit At Contra Costa Community College District 500 Court St. Martinez, CA March 21, 2016 REQUEST FOR QUALIFICATIONS (RFQ) ARCHITECT/ENGINEER (A/E) PROFESSIONAL SERVICES For the At Contra Costa Community College District 500 Court St. Martinez, CA March 21, 2016 PART 1 GENERAL INTRODUCTION

More information

I-69 Corridor Segment Committee 1 and 2 Kick-off Meeting April 15 Nacogdoches, Texas

I-69 Corridor Segment Committee 1 and 2 Kick-off Meeting April 15 Nacogdoches, Texas I-69 Corridor Segment Committee 1 and 2 Kick-off Meeting April 15 Nacogdoches, Texas 10:00 a.m. Welcome/ Introductions Mark Tomlinson Division Dir., Texas Turnpike Authority Div, TxDOT 10:15 a.m. Presentations

More information

Procurement Process of PPP Projects in Korea

Procurement Process of PPP Projects in Korea Procurement Process of PPP Projects in Korea December, 2007 Public and Private Infrastructure Investment Management Center (PIMAC) Korea Development Institute 1. PPP Project Types in Korea 2. Procurement

More information

AGC of TEXAS Highway, Heavy, Utilities & Industrial Branch

AGC of TEXAS Highway, Heavy, Utilities & Industrial Branch AGC of TEXAS Highway, Heavy, Utilities & Industrial Branch THOMAS L. JOHNSON, Executive Vice President Texas Transportation Commission Meeting Highlights September 18 and 24, 2014 September 18 Commissioner

More information

REQUEST FOR CONSULTANT SERVICES. Economic Development Consultant. Town of Cortlandt 1 Heady Road, Cortlandt Manor NY, 10567

REQUEST FOR CONSULTANT SERVICES. Economic Development Consultant. Town of Cortlandt 1 Heady Road, Cortlandt Manor NY, 10567 REQUEST FOR CONSULTANT SERVICES Economic Development Consultant Town of Cortlandt 1 Heady Road, Cortlandt Manor NY, 10567 Prepared By Town of Cortlandt Department of Technical Services Engineering Division

More information

REQUEST FOR STATEMENTS OF QUALIFICATIONS CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES FOR CSJ: PASS-THROUGH FINANCE PROJECT

REQUEST FOR STATEMENTS OF QUALIFICATIONS CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES FOR CSJ: PASS-THROUGH FINANCE PROJECT REQUEST FOR STATEMENTS OF QUALIFICATIONS CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES FOR FM 471 (CULEBRA ROAD) KALLISON LANE TO FM 1560 CSJ: 0849-01-046 PASS-THROUGH FINANCE PROJECT Bexar County Public

More information

REQUEST FOR QUALIFICATIONS

REQUEST FOR QUALIFICATIONS FACILITIES MANAGEMENT 4202 EAST FOWLER AVENUE / OPM 100 TAMPA, FL 33620-7550 EDITION: NOVEMBER 1, 2016 PHONE: (813) 974-2845 FAX: (813) 974-3542 REQUEST FOR QUALIFICATIONS PROJECT NAME: USF CPT REPLACE

More information

Request for Proposal Number #512-11

Request for Proposal Number #512-11 Request for Proposal Number #512-11 Traffic and Transportation Feasibility Study Due: January 24, 2012 at 4:00pm Buyer: Steve Boyd Purchasing and Contracts Manager 831 Grand Avenue Glenwood Springs, CO

More information

SELECTION PROCESS & QUESTION DEVELOPMENT

SELECTION PROCESS & QUESTION DEVELOPMENT SELECTION PROCESS & QUESTION DEVELOPMENT Raul Ortega, P.E. Jessica Andrews, P.E. November 3, 2017 Table of Contents 1 2 3 4 Selection Process Federal Process RFQ Question Development Questions and Discussion

More information

REQUEST FOR QUALIFICATIONS & PROPOSAL

REQUEST FOR QUALIFICATIONS & PROPOSAL REQUEST FOR QUALIFICATIONS & PROPOSAL PROGRAM MANAGEMENT SERVICES The Measure J Traffic Congestion Relief Agency (TRAFFIX) is issuing a Request for Qualifications & Proposal (RFQ/RFP) from qualified consultants

More information

Level 3 and tw telecom: Strengthening Level 3 s Position as a Premier Global Communications Company. Level 3 To Acquire tw telecom

Level 3 and tw telecom: Strengthening Level 3 s Position as a Premier Global Communications Company. Level 3 To Acquire tw telecom Level 3 To Acquire tw telecom June 16, 2014 tw telecom s U.S.-based, enterprise-focused business is highly complementary to Level 3 s local-to-global business and positions Level 3 as a premier provider

More information

TRANSPORTATION ALTERNATIVES (TA) SET ASIDE PROGRAM July 2016

TRANSPORTATION ALTERNATIVES (TA) SET ASIDE PROGRAM July 2016 Regional Transportation Commission TRANSPORTATION ALTERNATIVES (TA) SET ASIDE PROGRAM July 2016 Contents 1.0 Purpose and Eligibility... 2 2.0 Process... 5 3.0 Implementation of Funded Projects... 5 Attachment

More information

Scheme of the Presentation

Scheme of the Presentation Scheme of the Presentation Legal framework & Institutional Setup for PPP Bombay Motor Vehicles Tax Act, 1958 (1994 amendment) Road Policy 1996 Gujarat Infrastructure Development Act, 1999 Permissible assistance

More information

Met r 0 Met"'fKK'ibn Transportation Authority

Met r 0 Met'fKK'ibn Transportation Authority ~ Los Angeles County Met r 0 Met"'fKK'ibn Transportation Authority One Gateway Plaza Los Angeles, CA 90012-2952 213.922.2000 Tel metro.net CONSTRUCTION COMMITTEE MARCH 19, 2015 SUBJECT: ACTION: ROSECRANS/MARQUARDT

More information

REQUEST FOR QUALIFICATIONS

REQUEST FOR QUALIFICATIONS REQUEST FOR QUALIFICATIONS PRE-DEVELOPMENT MANAGEMENT SERVICES THE STITCH: CAPPING THE I-75/85 CONNECTOR DOWNTOWN ATLANTA Introduction Central Atlanta Progress, Inc. (CAP) and the Atlanta Downtown Improvement

More information