1 US 290 DOING MORE WITH LESS Michael E. Carlson, P.E. TxDOT Houston District Bridge Design

2 THE US 290 CORRIDOR

3 US 290 DOING MORE WITH LESS $49 million* July 2014 Williams Brothers Construction Co. Table Revised: 11/6/2013 Added C-2 Details: 9/26/2014 3

4 US 290 DOING MORE WITH LESS US 290 INTRODUCTION & SCOPE 13 Total Segments (Approx. 38 Miles) Our Design Began Late 2009 Foresaw Compressed Letting Schedule HNTB is the Project Management Coordinator. Provided Bridge Layouts By a Variety of Consultants Layouts Were Created In-House In Later Segments ABOUT TxDOT HOUSTON DISTRICT BRIDGE Currently 23 Total Employees 14 P.Es (10 P.Es designing) 4 Cad Operators BRINSAP Personnel & Administrative 33 Employees Back in August 2006 (When J.C. Liu Retired) 2/3 the Staff, Staff is Less Experienced, & Every Job is Now a Rush Job. 14 People Involved When US 290 Design Began 4

5 US 290 DOING MORE WITH LESS Segment CSJ Type * # of Bridges Let Date Winning Bid (Millions) * Total Bridge Sheets Seg K (2) Recon 20 May-11 $ Seg G (6) Recon 9 Sep-12 $ Seg J1 (1) Recon 10 Oct-12 $ Seg F (7) Widen 12 Mar-13 $ Seg E (8) Recon 6 Apr-13 $ Seg H (5) Recon 16 Apr-13 $ Seg I (4) Recon 11 May-13 $ Seg J2 (3) Recon 6 Nov-13 $ Seg D (9) Widen 12 Nov-13 $ Seg C (10) Widen 5 (C1 & C2) Jul-14 (C1) $45.6 (C1) 137 (C1 & C2) Seg B (11) Widen 6 Seg A (12) Widen 14 * Includes Only Bridges Designed By & Signed & Sealed Sheets Provided By TxDOT Houston District Bridge Foundation Layout Redlines Provided By By TxDOT Houston District Bridge, However Signed & Sealed By Consultants Total of $1.1 Billion Total of 5058 Bridge Sheets 5

6 US 290 DOING MORE WITH LESS US 290 Corridor Compressed Schedule By Segment 100% 90% % Design Time 80% 70% 60% 50% 40% 30% 20% 10% Seg K Seg 6 Seg J1 Seg 7 Seg 8 Seg 5 Seg 4 Seg J2 Seg 9 Seg 10 Seg 11 Seg 12 0% Design Year (Fiscal Year) 6

7 HOW DID WE DO IT? Changing the Responsibilities & Division of Work Amongst Personnel.

8 The Traditional Way We Design Bridges District Bridge Engineer Assigns New Bridge to Team Team Leader A Project Manager Team Leader B Project Manager Team Leader C Project Manager Coordinates with other designers outside of bridge & distributes work amongst designers within bridge. Supports team personnel. Design Engineer Design Engineer or EIT Cad Operator Does majority of design, works with EITs and CAD Operators. Does drafting for majority of the bridge details. 8

9 The Mass Production Design of Bridges Steel superstructures require the most design and detailing time. A specific engineer and CAD operator is designated to this task. District Bridge Engineer BGS is created as soon as Bridge layouts are confirmed Coordination begins to create superstructure design sheets. Design Engineer BGS Cad Operator Steel Design Engineer Steel Superstructure Team Leader coordinates with PMC, assigns work loads, and offers design support. Team Leader Project Manager Design Engineer Concrete Superstructure Cad Operator Superstucture Design Engineer Support / Other Design Engineer Substructure Design Engineer Foundations Design Engineer / EIT Quantities As soon as the superstructure is laid out, substructure engineers begin coordinating with CAD operators to produce sheets. Cad Operator Substructure Foundation loading is calculated and documented for Geotech engineers. Foundations are designed and detailed. Quantities are calculated and tabulated for the entire bridge and are inserted on design sheets. 9

10 US 290 DOING MORE WITH LESS Mass Production Pros Encourages Standardization For Each Design Element Greatly Increases Speed of Design, Drafting, & Later Calculations Provides Consistency That Aids Contractor Later During Construction. Provides Consistency of Architectural Elements. Reduces Redesign of Similar Elements Designs Can Be Grouped and Re-Referenced A Similar Design May Already Exist on Another Bridge. Pull and Document the Previous Design. Make a Library. As the Library Grows Design Becomes Even More Efficient. 10

11 US 290 DOING MORE WITH LESS Mass Production Challenges Requires Complete Bridge Layouts Increased Collaboration Between Multiple Engineers / CAD Operators CAD File Ownership Concerns Increased Burnout Amongst Personnel Engineers Become Rusty on Designing Elements Outside Their Mass Production Task 11

12 STANDARDIZE Architecture, Design, & Detailing.

13 Houston Area Green Ribbon Project Developed with the Katy Freeway Reconstruction. Comprised of 4 Schemes Vertical Scheme Horizontal Scheme Wave Scheme Interchange Scheme (Similar to Horizontal Scheme with more robust structural elements) 13

14 Houston Area Green Ribbon Project Green Ribbon Requirements US 290 comprised of Vertical Scheme & Interchange Scheme Columns Standardizes Use of Inverted-T Caps, U-Beams, and Steel Tub Girders. Architectural Details & Rustication is Defined. We Went One Step Further Encouraged standardization of engineering details through standardization of architectural elements. Standardized Inverted-T Cap Dimensions Throughout. U54 Beams Used Throughout Reconstructed Areas Unless Steel Tubs Required. Column Details Were All Standardized and a Library was Developed. Footing Details Were All Standardized and a Library was Developed. 14

15 Standardizing Designs Design Engineer Pros Engineer is encouraged to adapt methods of increasing design efficiency when faced with hundreds of elements to design. Engineer is encouraged to tabularize results or create a library of previous designs. Engineer is encouraged to pull previous designs for other similar elements. CAD Operator Pros Drafting takes a long time. Encouraged to reuse as much as possible. Using existing goby's prevents missing callouts and notes. CAD Operator becomes more familiar with details can catch dimension errors. 15

16 CHANGE PRIORITIES Changing the Priority and Order of Work.

17 Prioritize Your Work Manage Employee Work Loads Start drawing sheets before design. Some sheet may not need to be drawn to the perfect scale. As long as dimensions and callouts are correct. Minimize down time. Be Smart With Your Redlines Breakdown and simplify redlines between CAD Operator and Engineer. Make sure one element is perfect then copy to minimize having to make the same change later to multiple elements. What Really Needs to Be Shown on the Plans Eliminate repeated design information on different sheets. Can it be built with what is provided? Minimizes the locations of revisions if something changes. 17

18 WORK SMARTER Let The Computer Do The Heavy Lifting.

19 Let the Computer Do the Heavy Lifting The Biggest Waste of Time For Engineers & CAD Operators DATA MANAGEMENT! 19

20 Let the Computer Do the Heavy Lifting Design Spreadsheet Tools Smartly Let standardization work for you. Engineer is automatically encouraged to make tools to enhance productivity while designing hundred of similar elements Design spreadsheets to require as little tampering as possible but also so they can be easily modified for different situations. One tool is not required to do everything. Simplify each tool. Improve your tools when downtime permits between jobs. When possible, design tools to work together. Design tools that require inputs only once. 20

21 Let the Computer Do the Heavy Lifting Do Not 10 Key! Use Axiom importer as much as possible for all data (bar tables, etc) Design your tools around Axiom. However. This requires cooperation between Engineers and CAD Operators. Originally this was a challenge as CAD Operators were concerned of allowing others access to drawings. Everyone is happier now. 21

22 Let the Computer Do the Heavy Lifting Example: BGS Extractors BGS output format is very predicable. Spreadsheet Visual Basic macros developed in house. Extract bearing seat elevations, bearing taper reports, slab data, & beam data from BGS outputs. Tabulation of quantities summarized Working to be even more Axiom friendly Results in major decrease of time and reduction of errors. Factoid: Is This Really Necessary? Connector C (Located In Segment J1) Connects 2 Lanes of IH-10 Traffic to US 290 Westbound. It is 95 Spans Long (11,690ft). Would you like to copy and paste all that BGS output data to summarize you EQ sheet? 22

23 Let the Computer Do the Heavy Lifting Example: BGS Extractors 23

24 Let the Computer Do the Heavy Lifting Example: Rebar Quantity Tables This Excels with standardization. Setup for direct Axiom from calculations to CAD bar table. Revised, and revised again to be easily adaptable for different bents. Easily adopt to bents with similar rebar details. Change the length, skew, bar spacing and go on Does not require re-drawing of bent that changed slightly. A disadvantage of Bentley Rebar. Resulted in a major decrease of time and reduction of errors. Factoid: No Errors! No substantial quantity errors have been found since letting using these tools. There have been very limited field change orders resulting from these techniques. 24

25 Let the Computer Do the Heavy Lifting Example: Rebar Quantity Tables 25

26 Let the Computer Do the Heavy Lifting Example: Column & Foundation Tables Library of columns & footings developed for Green Ribbon. Every footing and column used along the corridor has a unique name. Aka: Footing DSF-2, or Column Type A is always the same no matter what segment of US 290 you are on. Footing dimensions, quantities are looked up from the master library. Column and foundation spreadsheets are setup to require very little modification and are formatted the same to allow data to be easily migrated between each spreadsheet. Fully Axiom supported. Resulted in a major decrease of time and reduction of errors. 26

27 Let the Computer Do the Heavy Lifting Example: Column Tables 27

28 Let the Computer Do the Heavy Lifting Example: Foundation Tables 28

29 Let the Computer Do the Heavy Lifting Example: Foundation Tables 29

30 Let the Computer Do the Heavy Lifting Superstructure U-Beam Design We had to design many, many, many U-Beams. How to Design U-Beams (We started this before PGSuper). Run BGS 2 Times. Compute LLDF using Bridge Division Spreadsheets. Compute your loadings due to dead loads. Create a PSTRS14 Input file Run PSTRS14 Use a spreadsheet to compute drops and slab section depths with BGS and PSTRS14 output data. Run BGS one last time...and it better all have satisfied the design requirements, otherwise start from the top again. How long should it take an engineer to perform the tasks after creating BGS for a 20 span 28 wide connector? 30

31 Let the Computer Do the Heavy Lifting Example: Corbett Automatic Superstructure Design We can do it in less than 10 minutes. Remember the biggest waste of time is data management so let the computer do the heavy lifting. Envisioned by John F. Corbett back in Revived and improved upon back in 2009, and again in Automatically integrates BGS, LLDF, PSTRS14, and Bearing Drop data. Automatically Imports BGS LS2 Data (# of Beams, Beam Lengths, Spacing's & Skews. Provides user capable automatic calculation and distribution of dead loads such as railings, medians, sidewalks, and haunch weights. Automatically calculates LLDF using Bridge Division spreadsheets for each beam using exact BGS output data. Automatically creates and runs PSTRS14 input files Automatically imports PSTRS14 outputs such as number of strands, f ci, f c, deflections and cambers. Automatically calculates bearing drops and slab depth sections. Automatically summarizes BGS drops and slab depth sections. 31

32 Let the Computer Do the Heavy Lifting Example: Corbett Automatic Superstructure Design 32

33 Let the Computer Do the Heavy Lifting Example: Corbett Automatic Superstructure Design 33

34 Let the Computer Do the Heavy Lifting Example: Corbett Automatic Superstructure Design 34

35 SOFTWARE New Software Used.

36 Software Viathor VBent Uses beam element finite element modeling Allowed for a quick cap design or CAP18 check. Program includes load combinations, no need to spend hours specifying. Program includes wind loading, and breaking forces, along with dead load and HL-93 automatic calculation. Quick and easy calculation of single column foundation loadings. Basic post-tensioning capabilities. Allowed for quick special designs: irregular footings, straddle bents, eccentric Bents, & unsymmetrical bents. A model can take minutes to develop versus a week to develop a STAAD model. Very reasonable software cost to TxDOT. 36

37 Software Viathor Vbent Example: Single Column Bent Model Inputs - Deck - Cap - Reinforcing 37

38 Software Viathor Vbent Example: Single Column Bent Model Inputs - Column - Foundation - Reinforcing - Live Loads 38

39 Software Viathor Vbent Example: Single Column Bent Reports - Summary - Cap Flexure - Foundation Loads 39

40 Software Viathor Vbent Example: Single Column Ecc. Post Tensioned 40

41 Software Viathor Vbent Example: Straddle Caps 41

42 RESULTS Conclusions & Results.

43 US 290 DOING MORE WITH LESS US 290 Corridor Timesheet Billed Engineering Hours / Signed Bridge Sheet US 290 Corridor - Timesheet Billed Engineering Hours / Signed Bridge Sheet TxDOT Houston District Bridge Design Billed Hrs (Functions 164 & 170) Per Signed & Sealed Bridge Sheet Seg K (2) Seg G (6) 17.6 Seg J1 (1) Average 21Hrs / Sheet 11.4 Seg F (7) Seg E (8) Seg H (5) Seg I (4) Seg J2 (3) Seg D (9) US 290 Job Segment - In Order of Lettings ( ) 21.6 Seg C (10) Seg B (11) Seg A (12) Currently in Design 43

44 US 290 DOING MORE WITH LESS Segment CSJ Type * # of Bridges * Total Hrs * Total Bridge Sheets * Hrs / Sheet Seg K (2) Recon 20 22,330 1, Seg G (6) Recon 9 12, Seg J1 (1) Recon 10 16, Seg F (7) Widen 12 6, Seg E (8) Recon 6 6, Seg H (5) Recon 16 9, Seg I (4) Recon 11 8, Seg J2 (3) Recon 6 9, Seg D (9) Widen 12 3, Seg C (10) Widen 5 2, Seg B (11) Widen 6 Seg A (12) Widen 14 * Includes Only Bridges Designed By & Signed & Sealed Sheets Provided By TxDOT Houston District Bridge Foundation Layout Redlines Provided By By TxDOT Houston District Bridge, However Signed & Sealed By Consultants 44

45 QUESTIONS? THANK YOU US DOING MORE WITH LESS Michael E. Carlson, P.E TxDOT Houston District Bridge Design Michael.Carlson@txdot.gov

Request for Qualifications For

Request for Qualifications For D E L A W A R E V A L L E Y R E G I O N A L P L A N N I N G C O M M I S S I ON The ACP Building, 190 N. Independence Mall West Telephone: (215) 592-1800 Philadelphia, PA 19106-1520 FAX: (215) 592-9125

More information

Expected Roadway Project Crash Reductions for SMART SCALE Safety Factor Evaluation. September 2016

Expected Roadway Project Crash Reductions for SMART SCALE Safety Factor Evaluation. September 2016 Expected Roadway Project Crash Reductions for SMART SCALE Safety Factor Evaluation September 2016 SMART SCALE Safety Factors Evaluation 1. Using Crash Modification Factors for SMART SCALE Safety Evaluation

More information

SCOTT COUNTY COMMUNITY SERVICES DIVISION

SCOTT COUNTY COMMUNITY SERVICES DIVISION SCOTT COUNTY COMMUNITY SERVICES DIVISION PHYSICAL DEVELOPMENT 600 COUNTRY TRAIL EAST JORDAN, MN 55352-9339 (952) 496-8346 Fax: (952) 496-8365 www.co.scott.mn.us MITCHELL J. RASMUSSEN, P.E. COUNTY ENGINEER

More information

VALUE ENGINEERING PROGRAM

VALUE ENGINEERING PROGRAM Approved: Effective: May 17, 2017 Review: March 30, 2017 Office: Production Support Office Topic No.: 625-030-002-i Department of Transportation PURPOSE: VALUE ENGINEERING PROGRAM To provide a consistent

More information

Grant Reporting for Faculty Grant Expense Detail

Grant Reporting for Faculty Grant Expense Detail Grant Reporting for Faculty Grant Expense Detail This report provides line item detail expenses for a user-specified Sponsored Program. The report allows faculty and department administrators to more easily

More information

Chris Bridges CYMPO Administrator

Chris Bridges CYMPO Administrator Chris Bridges CYMPO Administrator What is CYMPO? Why do we have an MPO? Federal law requires Urbanized Areas over 50,000 people to have an MPO in order to receive federal funds 2003 the Governor of Arizona

More information

ALBERTA TRANSPORTATION North Central Region Edson Area Instrumentation Monitoring Results

ALBERTA TRANSPORTATION North Central Region Edson Area Instrumentation Monitoring Results ALBERTA TRANSPORTATION North Central Region Edson Area Instrumentation Monitoring Results Fall 1 Section D Data Presentation Site NC3: Hwy :3 Lazy S -15 -.5.5 15 LEGEND Initial 1 Sep 1 Sep -75-37.5 37.5

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS ENGINEERING/ARCHITECTURAL DESIGN SERVICES FOR THE NORTHEAST STOCKTON LIBRARY AND RECREATION CENTER CITY PROJECT NO. PW1724 City of Stockton Public Works Department 22 E. Weber Avenue,

More information

STATE HIGHWAY (SH) 34 FEASIBILITY STUDY PUBLIC MEETING

STATE HIGHWAY (SH) 34 FEASIBILITY STUDY PUBLIC MEETING STATE HIGHWAY (SH) 34 FEASIBILITY STUDY PUBLIC MEETING From FM 2578 in Terrell to SH 243 in Kaufman CSJ: 0173-04-056 June 28, 2018 WHAT IS A FEASIBILITY STUDY WHAT IS A FEASIBILITY STUDY? A feasibility

More information

Contact person: Ernestine Mbroh (405)

Contact person: Ernestine Mbroh (405) OKLAHOMA DEPARTMENT OF TRANSPORTATION Project Management Division 200 N.E. 21 st Street Oklahoma City, OK 73105-3204 Division Phone: (405) 522-7601 Division FAX: (405) 522-7612 DATE: June 29, 2010 TO:

More information

Guidance. Historical Studies Review Procedures

Guidance. Historical Studies Review Procedures Guidance Historical Studies Review Procedures This guidance document provides instructional material regarding how to review and process project activities in accordance with TxDOT s Section 106 of the

More information

NCHRP Leveraging Resources for Better Transportation

NCHRP Leveraging Resources for Better Transportation NCHRP Leveraging Resources for Better Transportation Waseem Dekelbab, PhD, PE, PMP Sr. Program Officer National Cooperative Highway Research Program Transportation Research Board Overview Organization

More information

Strategic Projects Division

Strategic Projects Division Strategic Projects Division DESIGN BUILD: The Texas Story 2012 AASHTO Conference May 2, 2012 Portland, Oregon Don Toner, Jr., SRWA Director Strategic Projects Right of Way Strategic Projects Division Texas

More information

REQUEST FOR PROPOSALS. PROFESSIONAL SERVICES FOR PARKING GARAGES FACILITY CONDITION STUDY Activity ID

REQUEST FOR PROPOSALS. PROFESSIONAL SERVICES FOR PARKING GARAGES FACILITY CONDITION STUDY Activity ID REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR PARKING GARAGES FACILITY CONDITION STUDY Activity ID 01-2016-008 1. Purpose: The City of Des Moines, Iowa, (City) is hereby soliciting consultant proposals

More information

TxDOT Funding and Accelerated Construction Program

TxDOT Funding and Accelerated Construction Program TxDOT Funding and Accelerated Construction Program RANDY C. HOPMANN, P.E. DIRECTOR OF DISTRICT OPERATIONS TXAPA s 42nd Annual Meeting September 22, 2016 Highway Transportation in Texas: Today and Our Future

More information

National Capital Region Transportation Planning Board

National Capital Region Transportation Planning Board National Capital Region Transportation Planning Board 777 North Capitol Street, N.E., Suite 300, Washington, D.C. 20002-4290 (202) 962-3310 Fax: (202) 962-3202 Item #5 MEMORANDUM January 8, 2010 To: From:

More information

Standard Training Prospectus.

Standard Training Prospectus. Power, efficiency, stability. Explore the possibilities that 12d Model delivers to your civil surface modelling projects. Standard Training Prospectus. Design software is only effective when the operator

More information

Scott E. Bennett, P.E. Director. Arkansas Asphalt Pavement Association

Scott E. Bennett, P.E. Director. Arkansas Asphalt Pavement Association Scott E. Bennett, P.E. Director Arkansas Asphalt Pavement Association Wednesday, January 3, 2018 Changes at the Department Arkansas Highway Commission Dick Trammel Tom Schueck Robert Moore Alec Farmer

More information

DESIGN BID BUILD IS ALIVE & WELL 2007 Texas Transportation Forum. Doug Pitcock, P.E. President and CEO Williams Brothers Construction Co., Inc.

DESIGN BID BUILD IS ALIVE & WELL 2007 Texas Transportation Forum. Doug Pitcock, P.E. President and CEO Williams Brothers Construction Co., Inc. DESIGN BID BUILD IS ALIVE & WELL 2007 Texas Transportation Forum Doug Pitcock, P.E. President and CEO Williams Brothers Construction Co., Inc. I. WHAT IS THE KATY FREEWAY PROJECT? Regional Map Bush Intercontinental

More information

February 12, Request for Proposal Overview Pre-bid Conference

February 12, Request for Proposal Overview Pre-bid Conference February 12, 2014 I-495 Northern Section Shoulder Use Project Request for Proposal Overview Pre-bid Conference I-495 Northern Section Shoulder Use Project Scope of Work Major Items Mill and overlay - Light

More information

Velino. by Haelvoet HOSPITAL - NURSING HOME FURNITURE

Velino. by Haelvoet HOSPITAL - NURSING HOME FURNITURE Velino by Haelvoet HAELVOET NV L. BEKAERTSTRAAT 8, 8770 INGELMUNSTER, BELGIUM T +32 (0) 51 48 66 95 F +32 (0) 51 48 73 19 INFO@HAELVOET.BE WWW.HAELVOET.BE HOSPITAL - NURSING HOME FURNITURE Velino perfect

More information

Major in FY2013/2014 (By and ing Source) Municipal Building Acquisition and Operations Balance $1,984, Contributions from Real Estate

Major in FY2013/2014 (By and ing Source) Municipal Building Acquisition and Operations Balance $1,984, Contributions from Real Estate Major in FY2013/2014 (By and ing Source) Environmental Services Solid Waste 4200 4200 06CON 4200 SWM01 Balance $13,753,504.00 Balance $4,631,754.00 Balance $2,738,918.00 ing Source Total: $21,124,176.00

More information

3 Multi-contract, 38-mile roadway project adapts to face challenges PMC manages 38-mile US 290 Program in Houston US 290 Program Office

3 Multi-contract, 38-mile roadway project adapts to face challenges PMC manages 38-mile US 290 Program in Houston US 290 Program Office The Resource for Transportation Professionals Winter 2017 THIS ISSUE: Program Management 3 Multi-contract, 38-mile roadway project adapts to face challenges PMC manages 38-mile US 290 Program in Houston

More information

I-35W Bridge. Khani Sahebjam, PE. From Tragedy to Triumph. Vice President HDR Engineering, Inc. Former Deputy Commissioner/Chief Engineer MnDOT

I-35W Bridge. Khani Sahebjam, PE. From Tragedy to Triumph. Vice President HDR Engineering, Inc. Former Deputy Commissioner/Chief Engineer MnDOT I-35W Bridge From Tragedy to Triumph Khani Sahebjam, PE Vice President HDR Engineering, Inc. Former Deputy Commissioner/Chief Engineer MnDOT History Bridge background Bridge completed 1967 1907 feet long

More information

Florida Job Growth Grant Fund Public Infrastructure Grant Proposal

Florida Job Growth Grant Fund Public Infrastructure Grant Proposal Florida Job Growth Grant Fund Public Infrastructure Grant Proposal Proposal Instructions: The Florida Job Growth Grant Fund Proposal (this document) must be completed by the governmental entity applying

More information

Occupation Description: Responsible for providing nursing care to residents.

Occupation Description: Responsible for providing nursing care to residents. NOC: 3152 (2011 NOC is 3012) Occupation: Registered Nurse Occupation Description: Responsible for providing nursing care to residents. Key essential skills are: Document Use, Oral Communication, Problem

More information

2018 Transportation Alternatives (TA) Program Overview Palm Beach Transportation Planning Agency

2018 Transportation Alternatives (TA) Program Overview Palm Beach Transportation Planning Agency The purpose of the s (TPA) Transportation Alternatives (TA) program is to help fund connected infrastructure for non-motorized users. Construction funding is typically provided three years out. Funding

More information

COMPRESSED NATURAL GAS UTILITY TRUCK BODIES

COMPRESSED NATURAL GAS UTILITY TRUCK BODIES REQUEST FOR PROPOSALS COMPRESSED NATURAL GAS UTILITY TRUCK BODIES April 2018 CITY OF SAN MATEO Public Works Department 330 West 20 th Avenue San Mateo, CA 94403 650/522-7300 650/522-7301 (fax) ***** 1

More information

Association of Metropolitan Planning Organizations Fixing America s Surface Transportation (FAST) Act

Association of Metropolitan Planning Organizations Fixing America s Surface Transportation (FAST) Act Association of Metropolitan Planning Organizations Fixing America s Surface Transportation (FAST) Act General Overview Total authorizations (Highway Trust Fund, HTF, Contract Authority plus General Funds

More information

I-69 Corridor Segment Committee 1 and 2 Kick-off Meeting April 15 Nacogdoches, Texas

I-69 Corridor Segment Committee 1 and 2 Kick-off Meeting April 15 Nacogdoches, Texas I-69 Corridor Segment Committee 1 and 2 Kick-off Meeting April 15 Nacogdoches, Texas 10:00 a.m. Welcome/ Introductions Mark Tomlinson Division Dir., Texas Turnpike Authority Div, TxDOT 10:15 a.m. Presentations

More information

ACO Practice Transformation Program

ACO Practice Transformation Program ACO Overview ACO Practice Transformation Program PROGRAM OVERVIEW As healthcare rapidly transforms to new value-based payment systems, your level of success will dramatically improve by participation in

More information

2015 Recruitment. TheStructuralEngineer. Reach a combined audience of 35,000 IN FULL FLIGHT FLIGHT IN FULL

2015 Recruitment.  TheStructuralEngineer. Reach a combined audience of 35,000 IN FULL FLIGHT FLIGHT IN FULL ENGENDERING EQUALITY SPECIALIST CONCRETE BRIDGES Volume 9 Issue TSE5_0 COVER v.indd /0/04 :0 An innovative approach to designing the Arena Fonte Nova s lightweight roof led to a delighted visitors in various

More information

SIXTH STREET VIADUCT REPLACEMENT PROJECT MONTHLY EXECUTIVE MEETING REPORT NOVEMBER 2012

SIXTH STREET VIADUCT REPLACEMENT PROJECT MONTHLY EXECUTIVE MEETING REPORT NOVEMBER 2012 SIXTH STREET VIADUCT REPLACEMENT PROJECT MONTHLY EXECUTIVE MEETING REPORT NOVEMBER 2012 Sixth Street Viaduct Replacement Project Monthly Executive Meeting Report November 2012 TABLE OF CONTENTS Project

More information

RESOLUTION FOR APPROVAL OF AMENDMENTS TO THE TRANSPORTATION IMPROVEMENT PROGRAM (TIP) AND 2040 REGIONAL TRANSPORTATION PLAN (RTP)

RESOLUTION FOR APPROVAL OF AMENDMENTS TO THE TRANSPORTATION IMPROVEMENT PROGRAM (TIP) AND 2040 REGIONAL TRANSPORTATION PLAN (RTP) TPC Agenda Item 6A Mailout 10/20/16 RESOLUTION FOR APPROVAL OF AMENDMENTS TO THE 2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM (TIP) AND 2040 REGIONAL TRANSPORTATION PLAN (RTP) Amendment Summary Amendment

More information

Request for Proposals

Request for Proposals Request for Proposals I-75/85 Connector Transformation Project: Atlanta Bridgescape Competition Public Relations and Communications Services Contact: Wilma Sothern Vice President of Marketing Central Atlanta

More information

UHF Quality Institute. Patient-Reported Outcomes in Primary Care New York PROPC-NY. Module 2 Webinar

UHF Quality Institute. Patient-Reported Outcomes in Primary Care New York PROPC-NY. Module 2 Webinar UHF Quality Institute Patient-Reported Outcomes in Primary Care New York PROPC-NY Module 2 Webinar Lucy Savitz, Assistant Vice President for Delivery System Science, Intermountain Healthcare January 24,

More information

Request for Qualifications B Geotechnical Investigations / Professional Services Firms. RFQ Due Date: October 8, :00 P.M.

Request for Qualifications B Geotechnical Investigations / Professional Services Firms. RFQ Due Date: October 8, :00 P.M. Request for Qualifications B13.017 Geotechnical Investigations / Professional Services Firms RFQ Due Date: October 8, 2013 2:00 P.M. Mr. Dale Switzer Senior Director of Facilities Planning, Development

More information

October 6, The proposal due date and time scheduled for Friday, November 3, at 04:30 P.M. remains unchanged.

October 6, The proposal due date and time scheduled for Friday, November 3, at 04:30 P.M. remains unchanged. October 6, 2017 Dear Sir/Madam Enclosed is Addendum No. 1 to SEPTA's Sealed Bid No. 17-00206-AMJP Elwyn to Wawa R3-2 Right of Way Improvements. The proposal due date and time scheduled for Friday, November

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 7 P-1 Line #18

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 7 P-1 Line #18 Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1611N: Shipbuilding and Conversion, Navy / BA 03: Amphibious Ships / BSA 1: Amphibious Ships ID Code (A=Service Ready, B=Not

More information

Page 3 of 3 September 18, 2018 Addendum #1 CUY-DOCK-REHAB Cleveland-Cuyahoga County Port Authority PID 80987 Notice to all Bidders and Suppliers to please be advised of Addendum #1. Please use the attached

More information

Application Process for Individual HCPs

Application Process for Individual HCPs HCF Program Training Application Process for Individual HCPs HCF Program Training I Application Process I September 2015 1 This training is just a general overview and starting point for applicants Every

More information

Agenda. Bridge history. Current bridge condition. Resident engagement results. Options and estimated costs. Staff recommendation / discussion

Agenda. Bridge history. Current bridge condition. Resident engagement results. Options and estimated costs. Staff recommendation / discussion Agenda Bridge history Current bridge condition Resident engagement results Options and estimated costs Staff recommendation / discussion Prior to 1965 (1939 aerial photo) Present Day Bridge History Original

More information

REQUEST FOR QUALIFICATIONS CONSULTING EXECUTIVE LANDSCAPE ARCHITECT HOPKINS LANE BIKE & PEDESTRIAN IMPROVEMENT UNIVERSITY OF CALIFORNIA, SAN DIEGO

REQUEST FOR QUALIFICATIONS CONSULTING EXECUTIVE LANDSCAPE ARCHITECT HOPKINS LANE BIKE & PEDESTRIAN IMPROVEMENT UNIVERSITY OF CALIFORNIA, SAN DIEGO REQUEST FOR QUALIFICATIONS CONSULTING EXECUTIVE LANDSCAPE ARCHITECT FOR HOPKINS LANE BIKE & PEDESTRIAN IMPROVEMENT FD&C Project No. 4952 Proposals due THURSDAY, JUNE 4, 2015 Issue Date May 19, 2015 I.

More information

State Project No. XXXXXX City Project No. c401807

State Project No. XXXXXX City Project No. c401807 June 29, 2017 Request for Qualifications Design and Environmental Services for the SLR Parkway Phase III Project also known as a portion of the MBSST (Rail Trail) Segment 8 (San Lorenzo River Railroad

More information

Eleganza 3XC. Designed for ICU

Eleganza 3XC. Designed for ICU Eleganza 3XC Designed for ICU Benefits of Eleganza 3XC 2 LINET Eleganza 3XC Everything needed to save lives Prevention of pulmonary and cardiac complications Falls protection and pressure ulcer prevention

More information

Camp Secretary s Annual Report. Department of Report for year 20

Camp Secretary s Annual Report. Department of Report for year 20 Sons of Union Veterans of the Civil War Camp Annual Report Form 27 (Two copies are due to the Department Headquarters on or before April 30 of each year Retain duplicate for Camp Records) Camp Secretary

More information

County CHSP Project Solicitation 12/08/05

County CHSP Project Solicitation 12/08/05 County CHSP Project Solicitation 12/08/05 Background On October 3, 2005 Mn/DOT State Aid sent a solicitation and to all county engineers for local CHSP projects. Each county could submit up a grant for

More information

REQUEST FOR PROPOSAL CITY OF PORT ARANSAS GAS DEPARTMENT FOR NATURAL GAS SUPPLY. RFP # Gas

REQUEST FOR PROPOSAL CITY OF PORT ARANSAS GAS DEPARTMENT FOR NATURAL GAS SUPPLY. RFP # Gas REQUEST FOR PROPOSAL BY CITY OF PORT ARANSAS GAS DEPARTMENT FOR NATURAL GAS SUPPLY RFP # Gas-20170501 Issue Date May 1, 2017 Questions Due Thursday, May 25, 2017 by 3pm Due Date & Time for Proposals Friday,

More information

DONOR RETENTION TOOLKIT

DONOR RETENTION TOOLKIT eguide DONOR RETENTION TOOLKIT How to retain every new and returning donor so they give again and again. Introduction Where does your nonprofit focus most of its fundraising energy? Chances are, the answer

More information

County Transportation Infrastructure Fund Grant Program Frequently Asked Questions

County Transportation Infrastructure Fund Grant Program Frequently Asked Questions County Transportation Infrastructure Fund Grant Program Frequently Asked Questions Updated Feb. 10, 2015 FREQUENTLY ASKED QUESTIONS County Transportation Infrastructure Fund Grant Program A. Deadlines

More information

Katy Trail Extension from McCommas Boulevard to White Rock Station

Katy Trail Extension from McCommas Boulevard to White Rock Station Katy Trail Extension from McCommas Boulevard to White Rock Station Presented to the Quality of Life Committee By Public Works and Transportation October 26, 2009 Purpose of Briefing Provide updates on

More information

The Coordinating Council of Broward (CCB) Broward County's Health, Education and Human Service Resources 2000

The Coordinating Council of Broward (CCB) Broward County's Health, Education and Human Service Resources 2000 The Coordinating Council of Broward (CCB) Broward County's Health, Education and Human Service Resources 2000 This document was produced with financial support from the Healthy Communities Initiative of

More information

SR59 SB Roadway Joint Sealant Experiment

SR59 SB Roadway Joint Sealant Experiment 2010 SR59 SB Roadway Joint Sealant Experiment Sealant Effectiveness Study This preliminary report, prepared by the Seal No Seal Committee (SNS), outlines an approach to study transverse joint sealant effectiveness

More information

PUBLIC MEETING. For I-10 East, I-410 to Loop 1604

PUBLIC MEETING. For I-10 East, I-410 to Loop 1604 PUBLIC MEETING For I-10 East, I-410 to Loop 1604 November 3, 2016 Welcome Thank you for participating in the Public Meeting for the proposed I-10 East, I-410 to Loop 1604 Project. The meeting is in an

More information

West Virginia Bridge Design & Build Statewide Contest 2018

West Virginia Bridge Design & Build Statewide Contest 2018 West Virginia Bridge Design & Build Statewide Contest 2018 Important Dates WV Statewide Qualifying Round Begins: October 2, 2017 Deadline for Teachers to Request Classroom Visit WV Statewide Qualifying

More information

CITY OF BEVERLY HILLS PUBLIC WORKS & TRANSPORTATION DEPARTMENT CIVIL ENGINEERING DIVISION REQUEST FOR PROPOSALS

CITY OF BEVERLY HILLS PUBLIC WORKS & TRANSPORTATION DEPARTMENT CIVIL ENGINEERING DIVISION REQUEST FOR PROPOSALS CITY OF BEVERLY HILLS PUBLIC WORKS & TRANSPORTATION DEPARTMENT CIVIL ENGINEERING DIVISION REQUEST FOR PROPOSALS WATER MAIN REPLACEMENT VARIOUS LOCATIONS PREPARED BY: Tristan D. Malabanan, P.E. City of

More information

Route 58 PPTA Project Finance Plan Annual Update Hillsville to Stuart Corridor. Submitted By:

Route 58 PPTA Project Finance Plan Annual Update Hillsville to Stuart Corridor. Submitted By: Route 58 PPTA Project Finance Plan Annual Update Hillsville to Stuart Corridor Submitted By: Robert P. Williams District Construction Engineer Salem District Virginia Department of Transportation Submitted

More information

Session 3 Highway Safety Manual General Overview. Joe Santos, PE, FDOT, State Safety Office November 6, 2013

Session 3 Highway Safety Manual General Overview. Joe Santos, PE, FDOT, State Safety Office November 6, 2013 Session 3 Highway Safety Manual General Overview Joe Santos, PE, FDOT, State Safety Office November 6, 2013 Workshop Series Wed. Oct. 30 Wed. Nov. 6 Wed. Nov. 13 Wed. Nov. 20 Wed. Dec 4 Wed. Dec. 11 Wed.

More information

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of July 14, 2018

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of July 14, 2018 ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of July 14, 2018 DATE: July 5, 2018 SUBJECT: Approval to Submit Applications to the Commonwealth of Virginia for the 2018 SMART SCALE Program

More information

Ave 2 Birthing Bed. Welcome to the world

Ave 2 Birthing Bed. Welcome to the world Ave 2 Birthing Bed Welcome to the world The journey begins AVE 2 is an ideal platform for safely performing labor exercises with an extra low heigh of 23.6 inches. The innovative design of the AVE 2 brings

More information

2015 Five-Year County Highway and Bridge Improvement Plan Guide

2015 Five-Year County Highway and Bridge Improvement Plan Guide 2015 Five-Year County Highway and Bridge Improvement Plan Guide Table of Contents A. What is the Five-Year County Highway and Bridge Improvement Plan?... 1 B. State Requirements 1 C. Developing and Updating

More information

Welcome to the Public Meeting for the State Highway 68 Project. SH 68 Project Office Information Environmental Constraints & Study Corridors

Welcome to the Public Meeting for the State Highway 68 Project. SH 68 Project Office Information Environmental Constraints & Study Corridors Welcome to the Public Meeting for the State Highway 68 Project ENTRANCE EXIT Registration & Handouts Comment Card Area Welcome Video Next Steps Project History Information Environmental Constraints & Study

More information

CRENSHAW/LAX TRANSIT CORRIDOR PROJECT: A New Beginning for the Crenshaw Corridor Through Use of Innovative Procurement Strategies

CRENSHAW/LAX TRANSIT CORRIDOR PROJECT: A New Beginning for the Crenshaw Corridor Through Use of Innovative Procurement Strategies CRENSHAW/LAX TRANSIT CORRIDOR PROJECT: A New Beginning for the Crenshaw Corridor Through Use of Innovative Procurement Strategies Robert Ball, PE Kimberly Ong, PE Los Angeles Metropolitan Transportation

More information

Facility and Equipment Assessments and Hands-on Equipment Training

Facility and Equipment Assessments and Hands-on Equipment Training SPH Training Series Session 2 Facility and Equipment Assessments and Hands-on Equipment Training Western New York Council on Occupational Safety & Health (WNYCOSH) This material was produced under grant

More information

Special State Funding Programs Breakout Session #5C Funding Programs Track. October 25, 2012

Special State Funding Programs Breakout Session #5C Funding Programs Track. October 25, 2012 Special State Funding Programs Breakout Session #5C Funding Programs Track October 25, 2012 SPECIAL STATE FUNDING PROGRAMS - REVENUE SHARING Debbi Webb-Howells Revenue Sharing Program Manager Local Assistance

More information

Beth Day Director, FTA Office of Project Planning RailVolution October 2011

Beth Day Director, FTA Office of Project Planning RailVolution October 2011 Beth Day Director, FTA Office of Project Planning RailVolution October 2011 What is a New or Small Start? New fixed guideways and extensions to existing systems Includes light rail, heavy rail, commuter

More information

CITY OF GRANTS PASS SURVEY

CITY OF GRANTS PASS SURVEY CITY OF GRANTS PASS SURVEY by Stephen M. Johnson OCTOBER 1998 OREGON SURVEY RESEARCH LABORATORY UNIVERSITY OF OREGON EUGENE OR 97403-5245 541-346-0824 fax: 541-346-5026 Internet: OSRL@OREGON.UOREGON.EDU

More information

Iowa DOT Update 2016 APWA Fall Conference JOHN E. DOSTART, P.E.

Iowa DOT Update 2016 APWA Fall Conference JOHN E. DOSTART, P.E. Iowa DOT Update 2016 APWA Fall Conference JOHN E. DOSTART, P.E. Hilton Garden Inn September 29, 2016 Member of the Day Personal Updates M.J. Charlie Purcell Promoted to Project Delivery Bureau Director

More information

Best Practices in Grant Writing

Best Practices in Grant Writing Best Practices in Grant Writing The Monsanto Sub Header Fund What is a Grant Proposal? A grant proposal is a clear statement of need, the plan to serve that need, and a specific request for funds to support

More information

REQUEST FOR INFORMATION

REQUEST FOR INFORMATION REQUEST FOR INFORMATION REGARDING THE DEVELOPMENT OF AND PROCUREMENT PROCESS FOR THE GRAND PARKWAY PROJECT TEXAS DEPARTMENT OF TRANSPORTATION RFI Issuance Date: June 10, 2011 RFI Closing Date: July 6,

More information

APPENDIX A PROGRAMMATIC AGREEMENT FOR MINOR TRANSPORTATION PROJECTS

APPENDIX A PROGRAMMATIC AGREEMENT FOR MINOR TRANSPORTATION PROJECTS APPENDIX A PROGRAMMATIC AGREEMENT FOR MINOR TRANSPORTATION PROJECTS PROGRAMMATIC AGREEMENT AMONG THE FEDERAL HIGHWAY ADMINISTRATION THE PENNSYLVANIA DEPARTMENT OF TRANSPORTATION, THE PENNSYLVANIA STATE

More information

Transportation. Fiscal Research Division. March 24, Justification Review

Transportation. Fiscal Research Division. March 24, Justification Review Fiscal Research Division Hiighway Fund and Hiighway Trust Fund Secondary Roads Program Transportation Justification Review March 24, 2007 The General Assembly should eliminate or reduce funding for the

More information

PENNSYLVANIA TURNPIKE COMMISSION RETENTION OF AN ENGINEERING OR CONSTRUCTION INSPECTION FIRM. Open-End Construction Inspection Services for

PENNSYLVANIA TURNPIKE COMMISSION RETENTION OF AN ENGINEERING OR CONSTRUCTION INSPECTION FIRM. Open-End Construction Inspection Services for PENNSYLVANIA TURNPIKE COMMISSION RETENTION OF AN ENGINEERING OR CONSTRUCTION INSPECTION FIRM Open-End Construction Inspection Services for Roadway and Bridge Reconstruction Northeast Extension, I-476,

More information

STANDARD DRAWINGS INDEX

STANDARD DRAWINGS INDEX STANDARD DRAWINGS INDEX DESCRIPTION GENERAL DRAWING NO. Typical Layout for Improvement Plans... 1 City of Stockton Standard Border and Title Block for 8.5 x 11 Sheet.. 1A City of Stockton Standard Map

More information

UTILIZING LEAN MANAGEMENT PRINCIPLES DURING A MEDITECH 6.1 IMPLEMENTATION

UTILIZING LEAN MANAGEMENT PRINCIPLES DURING A MEDITECH 6.1 IMPLEMENTATION UTILIZING LEAN MANAGEMENT PRINCIPLES DURING A MEDITECH 6.1 IMPLEMENTATION II UTILIZING LEAN MANAGEMENT PRINCIPLES DURING A MEDITECH 6.1 IMPLEMENTATION EXECUTIVE SUMMARY Healthcare may be the only industry

More information

FAIRFIELD AVENUE, EWING STREET, SUPERIOR STREET, AND WELLS STREET PRELIMINARY FEASIBILITY STUDY

FAIRFIELD AVENUE, EWING STREET, SUPERIOR STREET, AND WELLS STREET PRELIMINARY FEASIBILITY STUDY FAIRFIELD AVENUE, EWING STREET, SUPERIOR STREET, AND WELLS STREET PRELIMINARY FEASIBILITY STUDY Prepared for: City of Fort Wayne, Indiana Prepared by: American Structurepoint, Inc. 116 E. Berry Street

More information

TAC Agenda Item 5A Mailout - 04/13/16

TAC Agenda Item 5A Mailout - 04/13/16 TAC Agenda Item 5A Mailout - 04/13/16 RECOMMENDATION FOR TRANSPORTATION POLICY COUNCIL (TPC) APPROVAL OF AMENDMENTS TO THE 2015-2018 TRANSPORTATION IMPROVEMENT PROGRAM (TIP) AND 2040 REGIONAL TRANSPORTATION

More information

OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION

OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION REQUEST FOR PROPOSALS ( RFP ) PROFESSIONAL ENGINEERING AND CONSTRUCTION ADMINISTRATION AND INSPECTION SERVICES REF: REHABILITATION OF VARIOUS BRIDGES AT MILEPOSTS

More information

Massachusetts Department of Transportation (MassDOT) Route 3 South Managed Lanes Project DRAFT FOR DISCUSSION PURPOSES ONLY

Massachusetts Department of Transportation (MassDOT) Route 3 South Managed Lanes Project DRAFT FOR DISCUSSION PURPOSES ONLY Massachusetts Department of Transportation (MassDOT) Project High Level P3 Project Suitability Assessment Report September 11, 2013 Contents Proposed Project Description Project Background and Status Commonwealth

More information

Writing Winning Proposals

Writing Winning Proposals Shipley Nordic ApS Writing Winning Proposals Proposal Planner Note: This Proposal Planner is designed to be used by Writing Winning Proposals workshop participants, either during the workshop or on future

More information

County of Alpena Website Design and Development RFP

County of Alpena Website Design and Development RFP County of Alpena Website Design and Development RFP January 8 th, 2018 Contents 1. Introduction 1.1 Overview 1.2 About the County of Alpena 1.3 Project Timeline 1.4 County of Alpena County Information

More information

REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR THE BRIDGE REHABILITATION PROJECT. Issued by:

REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR THE BRIDGE REHABILITATION PROJECT. Issued by: REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR THE BRIDGE REHABILITATION PROJECT FEDERAL PROJECT NO. BPMP-5008 (157) CITY PROJECT NO. PW1603 Issued by: City of Stockton Public Works Department 22 E. Weber

More information

REQUEST FOR PROPOSAL TO PROVIDE AS-NEEDED ENGINEERING SERVICES FOR THE IMPLEMENTATION OF

REQUEST FOR PROPOSAL TO PROVIDE AS-NEEDED ENGINEERING SERVICES FOR THE IMPLEMENTATION OF REQUEST FOR PROPOSAL TO PROVIDE AS-NEEDED ENGINEERING SERVICES FOR THE IMPLEMENTATION OF PURPLE LINE EXTENSION PROJECT BY LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY Project No. 16-34 CITY

More information

* Passenger includes electronic and hydraulic elevators ** Pieces of equipment designated as 'unknown' do not receive a certificate of operation

* Passenger includes electronic and hydraulic elevators ** Pieces of equipment designated as 'unknown' do not receive a certificate of operation Elevator Advisory Board September 27, 2017 Elevator Contractors, Inspectors, & Equipment Licensing Statistics REGISTRANTS Total # of Active Contractors Total # of Active Inspectors Total # of Active Designee's

More information

13. Buckling of Columns *13.6 DESIGN OF COLUMNS FOR CONCENTRIC LOADING

13. Buckling of Columns *13.6 DESIGN OF COLUMNS FOR CONCENTRIC LOADING *13.6 DESIGN OF COLUMNS FOR CONCENTRIC LOADING To account for behavior of different-length columns, design codes specify several formulae that will best fit the data within the short, intermediate, and

More information

Improving Highway-Rail Grade Crossings Safety in Urban Area of Lagos State, Nigeria

Improving Highway-Rail Grade Crossings Safety in Urban Area of Lagos State, Nigeria International Journal of Traffic and Transportation Engineering 2016, 5(2): 32-39 DOI: 10.5923/j.ijtte.20160502.02 Improving Highway-Rail Grade Crossings Safety in Urban Area of Lagos State, Nigeria Olutaiwo

More information

Smart Portal State of Good Repair Pavement and Bridge. November 8, 2017

Smart Portal State of Good Repair Pavement and Bridge. November 8, 2017 Smart Portal State of Good Repair Pavement and Bridge November 8, 2017 Today s Agenda SGR Local Program Overview SGR Local Pavement Overview SGR Smart Portal Review and Demonstration Pavement SGR Local

More information

Georgia s Operational Improvement Program. Paul DeNard, P.E., PTOE State Traffic Operations Manager

Georgia s Operational Improvement Program. Paul DeNard, P.E., PTOE State Traffic Operations Manager Georgia s Operational Improvement Program Paul DeNard, P.E., PTOE State Traffic Operations Manager How do you address Capacity? We can t build our way out of the congestion problem Widening projects cost

More information

Operational Excellence: Lean

Operational Excellence: Lean Operational Excellence: Better Service By Working Smarter Lean Lean is a production practice that considers the expenditure of resources for any goal other than the creation of value for the end customer

More information

Advancing Accountability for Improving HCAHPS at Ingalls

Advancing Accountability for Improving HCAHPS at Ingalls iround for Patient Experience Advancing Accountability for Improving HCAHPS at Ingalls A Case Study Webconference 2 Managing your audio Use Telephone If you select the use telephone option please dial

More information

SCHEDULING COORDINATOR MANUAL GENERAL DENTIST. Scheduling Coordinator Manual

SCHEDULING COORDINATOR MANUAL GENERAL DENTIST. Scheduling Coordinator Manual GENERAL DENTIST Scheduling Coordinator Manual Note: The following policies and procedures comprise general information and guidelines only. The purpose of these policies is to assist you in performing

More information

REQUEST FOR PROPOSAL FOUNDATION REINFORCING STEEL PACKAGE NEW ORANGEBURG COUNTY DETENTION CENTER ORANGEBURG, SOUTH CAROLINA REQUISITION NO: FY

REQUEST FOR PROPOSAL FOUNDATION REINFORCING STEEL PACKAGE NEW ORANGEBURG COUNTY DETENTION CENTER ORANGEBURG, SOUTH CAROLINA REQUISITION NO: FY REQUEST FOR PROPOSAL FOUNDATION REINFORCING STEEL PACKAGE FOR NEW ORANGEBURG COUNTY DETENTION CENTER ORANGEBURG, SOUTH CAROLINA REQUISITION NO: FY17-1212 ISSUED NOVEMBER 21, 2017 RESPONSE DUE TUESDAY,

More information

City Bridge Trust Stepping Stones Fund

City Bridge Trust Stepping Stones Fund City Bridge Trust Stepping Stones Fund Application guidelines City Bridge Trust and UBS want to support high quality work that will help us meet our priorities. These guidelines are intended to help you

More information

AGC of TEXAS Highway, Heavy, Utilities & Industrial Branch

AGC of TEXAS Highway, Heavy, Utilities & Industrial Branch AGC of TEXAS Highway, Heavy, Utilities & Industrial Branch THOMAS L. JOHNSON, Executive Vice President Texas Transportation Commission Meeting Highlights September 18 and 24, 2014 September 18 Commissioner

More information

Commonwealth Transportation Board Briefing

Commonwealth Transportation Board Briefing Hampton Roads Crossing Study (HRCS) (SEIS) Commonwealth Transportation Board Briefing September 20, 2016 Angel Deem VDOT, Environmental Division Director HRCS History 1991: Federal funding allocated for

More information

REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR THE MARCH LANE/EAST BAY MUD BICYCLE AND PEDESTRIAN PATH CONNECTIVITY IMPROVEMENTS.

REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR THE MARCH LANE/EAST BAY MUD BICYCLE AND PEDESTRIAN PATH CONNECTIVITY IMPROVEMENTS. REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR THE MARCH LANE/EAST BAY MUD BICYCLE AND PEDESTRIAN PATH CONNECTIVITY IMPROVEMENTS Federal Project No. CML-5008(179) City Project No. PW1722 Issued by: City

More information

Bluewater Health. Sarnia/Lambton, Ontario, Canada. Case Study

Bluewater Health. Sarnia/Lambton, Ontario, Canada. Case Study Sarnia/Lambton, Ontario, Canada When began planning for a major renovation that combined two facilities under one roof and added five floors, they wanted maximum flexibility because they knew change was

More information

AIP CAPITAL PLANNING 101

AIP CAPITAL PLANNING 101 AIP CAPITAL PLANNING 101 Understanding ACIP Planning Practices Presented to: By: Jason Knipp and Doug Anderson, P.E. State Planners FAA Central Region Airports Division Date: Objectives Understand AIP

More information

August 2007 Thomas Bohuslav Texas Department of Transportation

August 2007 Thomas Bohuslav Texas Department of Transportation Public Private Partnerships Activities in Texas AASHTO SOC 2007 Summer Meeting Biloxi Mississippi August 2007 Thomas Bohuslav Texas Department of Transportation Topics The Problem (Needs) Comprehensive

More information

PSA 2017 Paper Improved Tornado Missile Risk Analysis Using Nonlinear Finite Element Analysis of Nuclear Power Plant Structures.

PSA 2017 Paper Improved Tornado Missile Risk Analysis Using Nonlinear Finite Element Analysis of Nuclear Power Plant Structures. Improved Tornado Missile Risk Analysis Using Nonlinear Finite Element Analysis of Nuclear Power Plant Structures PSA 2017 Paper 21892 September 25, 2017 1 Improved Tornado Missile Risk Analysis Using Nonlinear

More information