Preliminary Engineering Guideline July, 2017

Size: px
Start display at page:

Download "Preliminary Engineering Guideline July, 2017"

Transcription

1 Preliminary Engineering Guideline July, 2017 Check the Capital Project Delivery website to ensure this is the current version

2 Table of Contents Purpose...1 Introduction...1 Environmental Regulations...1 National Environmental Policy Act of Executive Order Initiate Preliminary Engineering...2 Mapping...2 Pavement...5 Alternatives Analysis...7 Utilities...8 Engineering and Plans Right of Way Technical Environmental Studies Section New Jersey Register of Historic Places Section 4(f) Process Green Acres Air Quality Ecology Socioeconomic Noise Hazardous Waste Environmental Documents Certified Categorical Exclusion Document Categorical Exclusion Document Environmental Assessment Environmental Impact Statement... 41

3 NJ Executive Order Construction Support Design Exceptions Preliminary Engineering Report Major Projects Preliminary Engineering Approvals FD Designer Preliminary Engineering Closeout... 57

4 Purpose The purpose of this document is to provide guidance on performing engineering and environmental activities in the Preliminary Engineering (PE) Phase of the New Jersey Department of Transportation (NJDOT) Project Delivery Process. This guide is primarily intended for Division of Project Management Project Managers, environmental coordinators and NJDOT Subject Matter Experts (SMEs) and other stakeholders involved in the project delivery process. The following documents can be referenced for additional information: Preliminary Engineering Phase Network Diagram Preliminary Engineering Phase Activity Descriptions Preliminary Engineering Phase Work Breakdown Structure (WBS) and WBS Dictionary This guide is divided into sections reflecting the major areas of the engineering and environmental process for the PE phase. All PE design decisions, including environmental commitments, need to be recorded in the Design Communications Report (DCR). Introduction The primary objectives of the PE Phase are to obtain the approved environmental document and an approved Design Exception Report, if required. The required environmental document is determined based on factors such as funding sources and the project type. Federally funded projects are governed by the National Environmental Policy Act of 1969 (NEPA). State funded projects are governed by New Jersey Executive Order 215. A Design Exception Report may be required if a project design proposes one or more controlling substandard design elements. A design exception may be approved when it can be documented that a lesser design value is the best practical alternative. An approved environmental document or design exception report is obtained utilizing varying degrees of engineering design. Engineering design also establishes the right of way impacts in order to secure the appropriate level of funding for Final Design. The Division of Project Management (DPM) conducts all PE Phase projects, except in cases where another entity other than the Department such as an MPO, local municipalities or counties serve as the lead agency. In that case, a DPM or Local Aid staff member is assigned to work with the lead agency and provide guidance during this phase of work. Environmental Regulations National Environmental Policy Act of 1969 NEPA requires an agency using Federal funds to conduct a review of the social, economic and environmental impacts that a proposed action would have on the environment. NEPA makes clear the need to analyze these impacts and promotes the use of the social sciences to assess the effects on the human environment. NEPA was reinforced by the Federal Aid Highway Act of 1970 (23 USC 109(h)), which defines specific adverse economic, social and environmental impacts to communities that must be considered when developing a project on any Federal-aid system. The act calls for final decisions to be made "in the best overall public interest" balancing the need for fast, safe, and efficient transportation, public services, and the costs of "eliminating or minimizing such effects as: Revision 9 Page 1 of 57 Released: 07/2017

5 air, noise and water pollution; destruction or disruption of man-made and natural resources, aesthetic values, community cohesion, and the availability of public facilities and services; adverse employment effects, and tax and property value losses; injurious displacement of people, businesses, and farms; and disruption of desirable community and regional growth. Executive Order 215 Signed on September 11, 1989, New Jersey Executive Order 215 requires State departments, agencies and authorities to prepare and submit to the New Jersey Department of Environmental Protection (DEP) an Environmental Assessment (EA) or Environmental Impact Statement (EIS) in support of major construction projects in order to reduce or eliminate potential adverse environmental impacts of projects initiated or funded by the State. Initiate Preliminary Engineering Overview A kickoff meeting is intended to bring all the major players together (Project Manager, Division of Community and Constituent Relations (CCR), and Designer) to discuss the project and highlight potential issues and decisions documented in the Design Communications Report (DCR). If necessary, a similar meeting can be scheduled for local officials. This is recommended if a long time has elapsed between the conclusion of Concept Development and the beginning of Preliminary Engineering. The Project Manager will determine if this is necessary and will instruct CCR to schedule. Major Tasks Initiate Preliminary Engineering (3005) The Project Manager schedules and holds a kickoff meeting with the Designer to discuss the project, including the design decisions documented in the Design Communications Report and commence PE. The Designer prepares meeting minutes documenting the kickoff meeting and, after they are reviewed by the Project Manager, distributes to the meeting attendees. The Project Manager updates the Project Reporting System (PRS) indicating the start of PE. The Project Manager notifies CCR to schedule a kickoff meeting with the local officials. CCR contacts the applicable municipal officials to schedule the kickoff meeting. The purpose of the meeting is to introduce the PE Designer and CCR representative and discuss the proposed project. The Designer prepares Meeting Minutes documenting the local officials kickoff meeting, and after they are reviewed by the Project Manager, distributes to the meeting attendees. Mapping Overview Design level mapping is obtained during PE to support engineering and design activities during PE and FD. Components of mapping include a control survey report, topographic survey, base maps and horizontal and vertical geometry. Note that due to limited seasonal availability to conduct aerial Revision 9 Page 2 of 57 Released: 07/2017

6 survey, Limited Scope projects may acquire design level mapping under a separate agreement. If so, the mapping is then provided to the Designer to be used during the PE Phase. Consult with Survey Services to determine if mapping has already been acquired. A control survey report consists of the control survey and data required to establish primary and photogrammetry control. The control survey and data are utilized in the completion of the topographic survey. A topographic survey provides documentation, within specific project limits and offsets, of the site s existing field conditions including but not limited to existing and proposed baselines, centerlines, existing and proposed right of way lines, structure clearances, drainage systems, utility lines, Intelligent Transportation Systems (ITS) facilities, soil borings, control points and elevations. The topographic survey may supplement any necessary photogrammetric survey or GIS work. Utilizing the topographic survey, base maps are developed which depict in detail the required existing topography. The base maps also include the mainline and secondary road baselines, baseline information and existing right of way deed search results. This data is to be provided in accordance with Article 51, Standards and Procedures, and current NJDOT CADD Standards. The horizontal and vertical geometry are tied into the existing base map to produce an accurate depiction of the proposed impacts. The Preliminary Preferred Alternative (PPA) is utilized as a guide to layout the proposed horizontal and vertical geometric alignment. The calculated geometry, roadway and bridge sections, driveways, and slopes are necessary to determine right of way, utility, and environmental impacts and the need for Design Exceptions. Major Tasks Prepare Control Survey Report (3015) The Designer conducts a control survey and prepares a Control Survey Report. This report consists of the control survey and data required to establish primary and photogrammetry control. The Designer completes the Control Survey Report and submits it to the Geodetic Survey Unit and Project Manager for review and comment. The Project Manager reviews the Control Survey Report for completeness. The Geodetic Survey Unit reviews the control survey report for technical accuracy. The Project Manager compiles the DPM and Geodetic Survey Unit comments and provides written comments to the Designer. The Designer addresses comments and resubmits the report to the Geodetic Survey Unit and Project Manager for approval. After the Geodetic Survey Unit approves the final report, the final primary and photogrammetry Control Survey Report is distributed to the Project Manager, Regional Survey Office and the Geodetic Survey Unit. The Designer includes a summary of the Control Survey Report in the Draft PE Report. Conduct Topographic Survey (3020) Once the control survey points are established, the topographic survey may begin. This activity may be performed by the Designer or by the Regional Survey Office if the project is being designed by inhouse staff. If the topographic survey is to be performed by the Regional Survey Office, the Project Revision 9 Page 3 of 57 Released: 07/2017

7 Manager prepares a survey request to notify the Regional Survey Office to conduct a topographic survey. The Designer or the Regional Survey Office: Performs a site investigation and document research. Reconnaissance should be made prior to starting the survey work. Requests control criteria from the Geodetic Survey Unit or utilizes the project approved survey primary control report. Evaluates the geodetic survey information and incorporates into the field survey work. Researches and recovers the geodetic survey monumentation as needed. Establishes existing and proposed base line(s) and ROW lines (field determined), and recovers existing baseline control. Performs bench run, based on recovered survey control. Conducts topographic survey, utility location survey and ROW location survey as needed. If utility marking was requested, locate all paint markings and identify owner/contact number. Provides traffic control and safety as needed. Prepares field notes and/or a summary of the investigation. Prepares a project survey report and submits to the Regional Survey Office for review and approval. Prepare Base Maps (3025) Upon completion of the topographic survey, base maps are developed which depict, in detail, the required existing topography along with mainline and secondary road baselines and baseline information. The Base maps are prepared in MicroStation CADD format in accordance with Article 51, Standards and Procedures, of the Agreement. The Designer: Reviews existing base maps or reference sources. Incorporates the horizontal/vertical control onto base maps. Conducts deed search and plots deeds. Checks existing alignment and adds final details and description. Prepares the base maps. Prepare Horizontal & Vertical Geometry (3030) The Horizontal and Vertical geometry of the PPA is essential to the completion of critical environmental and ROW tasks during Preliminary Engineering. The Designer: Calculates the roadway horizontal and vertical geometry sufficient to evaluate specific proposed improvements or impacts. Develops typical section(s) to depict proposed roadway design elements such as lane, shoulder, median and border widths and cross slopes. Revision 9 Page 4 of 57 Released: 07/2017

8 Develops roadside details such as berm, curb, or umbrella section, beam guiderail offset, utility pole location, sidewalk location, cut and fill slopes, swales, ditches, ROW line and proposed pavement. Identifies the locations and offsets of structural elements such as retaining walls, noise barriers, bridge piers and parapets, culverts and overhead sign structure supports. Ties geometry into the existing base map to produce an accurate depiction of the proposed impacts. The calculated geometry is necessary to determine ROW impacts and the need for design exceptions. Identifies all substandard horizontal geometric design elements including those not contained in the Concept Development report. Calculates horizontal alignment in accordance with governing design standards to evaluate critical design elements. Calculates profiles in accordance with governing design standards including tangent grades, vertical curve lengths, vertical clearances, and low and high points of the roadway to evaluate critical design elements. Identifies all substandard vertical design elements. Develops proposed cross slopes, superelevation rates and transitions, roadway widths and any other controlling design elements as needed to evaluate critical project needs and identify substandard design elements. Develops critical cross sections to identify slope impacts at critical locations based on the calculated horizontal and vertical control alignments. Develops modifications to driveways where needed to conform to acceptable access and geometric standards. Pavement Overview The objective of the pavement effort in PE is to gather the existing pavement and subsurface information and determine the proposed traffic data to prepare the pavement recommendation for the project. The Pavement Recommendation identifies the proposed pavement materials and the desired thicknesses of the roadway pavement box. Depending on the project, the pavement box may involve the traveled way and the shoulder. Major Tasks Obtain Pavement Design Data (3960) To develop the pavement recommendation for each roadway section, the Designer must obtain traffic volume and load projections for the roadway section to be improved. Unless otherwise indicated, counts should be taken for at least hours on Tuesdays, Wednesdays and Thursdays during non-holiday weeks. Turning movement counts should be conducted during AM and PM peak hours. Roadways with seasonal characteristics may require counts to be taken on Saturdays and possibly on weekends. Weekend counts should also be included for staging and detour analysis. Revision 9 Page 5 of 57 Released: 07/2017

9 For in-house projects, the Project Manager provides the Pavement Design Data to the Pavement Design Unit. The Designer: Conducts traffic counts (if necessary) and submits traffic count data to the Bureau of Transportation Data Development. Determines Average Annual Daily Traffic (AADT) for Construction and Future Years. Determines heavy truck % (classification count). Determines directional distribution. Determines axle loads. Collect Existing Pavement and Subgrade Soil Information (3970) The NJDOT Pavement Management System maintains existing pavement data, which can be researched through NJDOT TRANSINFO or requested from the Manager of the Pavement Management System by the Project Manager. The Designer: Gathers and reviews current Pavement Management System condition data and functional condition information (Surface Distress Index (SDI), International Roughness Index (IRI), skid number), subsurface soil information, and as-built typical sections. Determines the load bearing capacity by analyzing the existing condition of the subgrade soil. Evaluates the need for in-situ pavement testing (Falling Weight Deflectometer (FWD), Dynamic Cone Penetrometer (DCP), Ground Penetrating Radar (GPR), soil borings, pavement coring) and/or roadway subsurface exploration to determine material parameters for pavement structure analysis. Conduct Pavement Testing Program (3975) A Pavement Testing Program is developed for the project area to determine the existing structural adequacy of the pavement. Data obtained from the testing program is used to prepare the pavement recommendation. The Designer: Performs field testing to determine the structural properties of existing pavement structures. Prepares a FWD testing plan and the number and locations of pavement cores, DCP tests, soil borings, test pits and laboratory tests and includes within the Pavement Recommendation. If required, procures the services of a Pavement Engineering Consultant and/or specialty contractor to perform the pavement testing, coring, etc. Conducts FWD testing, pavement coring, DCP, Ground Penetrating Radar (GPR), soil borings and other in-situ testing. Sends the soil samples for laboratory analysis. Prepares the lab and field testing report and includes with the pavement recommendation. Revision 9 Page 6 of 57 Released: 07/2017

10 Prepare Pavement Recommendation (3980) The Pavement Recommendation provides the pavement design criteria for a roadway section based on the results of the pavement design data and the pavement testing. The Pavement Recommendation identifies the materials to be used and desired thickness for the anticipated load. The Designer: Performs pavement structural design calculations to determine the required pavement thickness. Conducts a structural performance analysis and evaluates technically viable alternatives. Recommends the pavement structure to accommodate traffic for the intended design period. Prepares and submits the pavement recommendation to the Pavement Design Unit for approval. Utilizes the current AASHTO Geometric Design of Highways and Streets to determine the pavement recommendation. The Pavement Design Unit provides written approval to the Designer. The Designer includes a summary of the approved pavement recommendation in the Draft PE Report and includes the pavement recommendation as an attachment to the Draft PE Report. Alternatives Analysis Overview The identification, consideration and analysis of alternatives are key to the National Environmental Policy Act (NEPA) process and goal of objective decision making. Consideration of alternatives leads to a solution that satisfies the transportation need and protects environmental and community resources. The Council on Environmental Quality (CEQ) refers to the alternatives analysis section as the "heart of the Environmental Impact Statement (EIS)," and requires agencies to: Rigorously explore and objectively evaluate all reasonable alternatives and, for alternatives which were eliminated from detailed study, briefly discuss the reasons for their having been eliminated. Devote substantial treatment to each alternative considered in detail including the proposed action so that reviewers may evaluate their comparative merits. Include reasonable alternatives not within the jurisdiction of the lead agency. Include the alternative of No Action. Identify the agency's preferred alternative or alternatives, if one or more exists, in the draft EIS and identify such alternative in the final EIS unless another law prohibits the expression of such a preference. Include appropriate mitigation measures not already included in the proposed action or alternatives. Revision 9 Page 7 of 57 Released: 07/2017

11 Major Task Prepare Alternatives Analysis Report (3635) An Alternatives Analysis (AA) Report is a document that is required to be prepared for an EA or EIS. An AA Report clearly indicates why and how a range of project alternatives were developed, including what kind of public and agency input was involved. In addition, the AA Report should explain why and how alternatives were eliminated from consideration and how or why an alternative doesn't meet the Purpose and Need. Information obtained during the Concept Development alternative analysis should be evaluated. It must be made clear what criteria were used to eliminate alternatives, at what point in the process the alternatives were removed, who was involved in establishing the criteria for assessing alternatives and the measures for assessing the alternatives' effectiveness. The no action alternative (which might include short-term minor activities) must always be included in the analysis and serves as a baseline against which the other alternatives can be compared. The Designer prepares the AA Report and submits to the Project Manager for completeness and accuracy. The Project Manager determines if an NJDOT SME review is needed. The Project Manager compiles the DPM and SME comments and provides written comments to the Designer. The Designer includes the AA Report as an attachment to the Draft PE Report. Utilities Overview The objective of the utility effort in PE is to prepare and update the utility base plans, establish utility engineering funding and prepare and execute a utility engineering agreement. The funding and agreement allow the utility companies to be compensated for providing utility engineering design work. Under the proposed Utility Accommodation Policy, the utility companies will not be compensated for verifying their facilities on the utility base plans. A summary of the utility engineering is included in the Draft PE Report. Subsurface utility engineering (SUE) is performed to determine the exact location of underground utilities. Depending upon the type of utility and potential design conflict, several SUE methods can be utilized. If only horizontal location is needed, underground utilities may be located remotely using ground penetrating radar, metal detectors or similar devices. This method will not provide utility depth. If depths of utilities are needed, a subsurface test pit may be required. Test pits are not needed to locate every utility and should only be used in locating utilities that have a potential conflict. Major Tasks Prepare Utility Base Plans (3035) The precise location of utility facilities is essential to determine potential conflicts and impacts on the project s design, cost, schedule and construction. The utility base plans are prepared by the Designer to identify the location of all existing utilities from the topographic survey field data. Revision 9 Page 8 of 57 Released: 07/2017

12 These plans are the base plans for the alternatives of accommodation and the Utility Agreement Plan. The utilities on the base plans may include signs or markers showing the presence of underground utilities, drainage inlets, valves, manholes, pumps, backflow preventers, vents, meters, poles and guy wires. Establish Utility Engineering Funding (3040) Utilizing the utility preliminary engineering estimate obtained in Concept Development from the Utility Contact Letter, the Project Manager requests preliminary engineering funding from Program Coordination. If no preliminary engineering estimate was received, an anticipated utility design estimate is projected for the corresponding utility company. Program Coordination authorizes utility engineering funding. Program Coordination authorizes utility engineering funding. The Project Manager prepares and submits a memorandum to Program Coordination requesting preliminary engineering funding. Program Coordination reviews the funding request and provides the Funding Year and Item Number to the Project Manager. Send Utility Verification Request Letter (3045) The Designer sends the Utility Verification Request Letter and two sets of utility base plans to the contact person of each utility company within the project limits. The utility company is requested to verify the location of all their existing facilities shown on the plans. The information shown includes the size, location and type of any underground and overhead utility facilities. Prepare Utility Agreement (3050) Utilizing the standard model for utility agreements, the Project Manager prepares and sends a Utility Engineering Construction Agreement (UECA) and a transmittal letter to each affected utility company contact for signature. The transmittal letter includes an effective date for the utility company to begin incurring costs. Update Base Plans & Identify Conflicts (3055) The utility company submits the marked-up utility base plans to the Designer. The precise location of utility facilities is essential to determine potential conflicts and impacts on the project s design, cost, schedule and construction. The Designer reviews the marked-up utility base plans and overlays the proposed roadway design features (geometry, drainage, structures, etc.) to identify any potential utility conflicts. These are the base plans for the alternatives of accommodation and the Utility Agreement Plan. The utilities on the base plans may include signs or markers showing the presence of underground utilities, drainage inlets, valves, manholes, pumps, backflow preventers, vents, meters, poles and guy wires. If necessary, the Designer makes a recommendation to the Project Manager for test pits to confirm the location of specific utility facilities to avoid any conflicts. Execute Utility Agreement (3060) Each utility company signs and returns the UECA to the Project Manager. The Project Manager reviews the signed UECAs to ensure that the agreement language was not modified by the utility company. The Project Manager prepares a transmittal letter and forwards the signed UECAs to the Deputy Attorney General (DAG) for review and approval. Upon receiving the approval from the DAG, the Project Manager prepares a Department Action Slip (AD-12) for each UECA, signs the Revision 9 Page 9 of 57 Released: 07/2017

13 AD-12s and circulates the AD-12s and attached UECAs for Department signatures. Once approved and signed, the AD-12s and UECAs are returned to the Project Manager. The Project Manager prepares transmittal letters and distributes the executed UECAs to the utility companies. Conduct Subsurface Utility Engineering (3080) Subsurface Utility Engineering (SUE) may be necessary to locate underground utilities. The Designer recommends the appropriate methodology based on the utility and the potential impact. Test pits are commonly used but other methods (e.g., ground penetrating radar, metal detectors) are also utilized. The number and location of test pits are approved by the Project Manager. The Designer: Recommends the method (remote locating or test pits) of SUE to be used. Determines if previous SUE testing was done and whether the data is available. Confirms with the utility company if previous SUE test pits have been performed for the conflict area and horizontal and vertical data exists. Arranges for a SUE Contractor or the utility company to dig subsurface test pits. Determines the exact location of utility facilities. Prepares a report to summarize the findings of the test pits. Utilizes the report information to eliminate design conflicts. Includes a summary of the SUE report in the Draft PE Report. Update Utility Risk Assessment Plan (3985) This updated plan is utilized as a reference to address utility risks and to prepare the updated construction staging plans and preliminary roadway plans. The Designer informs the Project Manager of any new project specific utility risks or changes to previously identified utility risks. The Project Manager may include these within the project Risk Register. The Designer: Updates the Utility Risk Assessment Plan based upon information received by the utility companies and subsurface utility engineering. Engineering and Plans Overview The engineering performed in the PE Phase is in support of obtaining approval of an environmental document and a Design Exception Report, if necessary. The PE engineering work generally consists of SUE, preliminary drainage design, preliminary Intelligent Transportation Systems (ITS) facility design, traffic engineering facility location identification, preliminary geotechnical work and preliminary structural design. An access plan and impact summary are also prepared to understand how the engineering design affects access and right of way (ROW). Revision 9 Page 10 of 57 Released: 07/2017

14 The preliminary drainage design shows the footprint of the proposed storm water runoff system. The footprint includes the size, shape and location of inlets, manholes, pipes and Storm Water Management (SWM) Best Management Practices (BMP). Traffic engineering facility locations are plotted onto the base maps to determine ROW needs. The preliminary ITS facility design plans show existing and proposed ITS facilities based on the ITS Inventory Database and Systems Engineering Review Form (SERF) executed during the Concept Development (CD) Phase. The Preliminary Geotechnical Engineering Report identifies soil-structure interaction, stability and anticipated settlement for the roadway, major and special geotechnical features and geotechnical construction concerns. The Structural Design Recommendation Summary documents the structural selection process, the recommended structure type, aesthetic treatments and utility, right of way and environmental impacts. Major Tasks Prepare Preliminary Drainage Design (3085) The preliminary drainage design shows the footprint of the proposed storm water runoff system. The design must attempt to maintain compatibility and minimize interference with existing drainage patterns, control flooding of the roadway surface and minimize environmental impacts from highway related storm water runoff. Consideration should be given to avoid deep cuts, utilities, hazardous material, archeology sites, acid producing soils and ecologically sensitive areas whenever possible. The Designer: Performs a field investigation and evaluates the existing drainage and topography. Obtains appropriate drainage area maps. Delineates tributary drainage areas. Investigates conceptual schemes to minimize utility conflicts and impacts to private property. Selects an optimal preliminary drainage system scheme that considers storm water management regulations. The drainage system collects storm water runoff from the roadway surface, right of way, and tributary off-site areas and discharges it to an adequate receiving area without causing adverse impacts. Determines the need for and potential locations of storm water management basins or structures. Determines the location for storm water discharge and any warranted outlet protection. Determines the location of swales and ditches required to convey runoff. Determines if easements and ROW are needed to accommodate the proposed drainage system. Plots the preliminary drainage design information on the base maps. Prepares and submits a Preliminary Drainage Design Report to the Project Manager for review. Determine Traffic Engineering Facility Locations (3090) Traffic engineering facility locations are plotted onto the base maps to determine ROW needs. ROW needs may include locations of overhead sign and lighting structures or traffic signal facilities. If the Revision 9 Page 11 of 57 Released: 07/2017

15 conceptual level plans include a traffic signal, the Designer submits the signal design to the Bureau of Traffic Signal and Safety Engineering (TSSE) for review and approval. The Designer: Updates the peak hour capacity analyses to validate the operation (if necessary). Prepares conceptual level plans for the layout of lighting design, guide signs, regulatory traffic control devices and signal design to determine any associated ROW needs. Establishes the traffic signal pole layout. Identifies and resolves any potential underground or aerial utility conflicts. Prepares and submits a Lighting Warrant Analysis Report to the Bureau of TSSE for review and comment. Includes a traffic engineering summary in the Draft PE Report. Prepare Preliminary ITS Facility Design (3065) Preliminary ITS facility design plans show the existing and proposed ITS facilities. The design should reflect the information collected from the ITS inventory database and the information included in the SERF. The Federal Regulation outlining ITS requirements is 23 CFR 940. The Designer: Follows Federal Regulation, the NJ Statewide ITS Architecture Report, the ITS Design Manual and ITS Interim Guidelines Prepares conceptual level plans for the layout of ITS facilities. Revises the SERF prepared in the CD Phase if additional ITS facilities are needed. Submits the revised SERF to Traffic Operations for review and approval. Shows all existing ITS facilities on the ITS plan sheets with any proposed construction impacts. Identifies and resolves any potential utility, ROW and network conflicts. Resolves any conflicts associated with the conduit and ITS facility layout. Confirms the availability of power and communication services for the proposed ITS facilities. Includes an ITS facility design summary in the Draft PE Report. Coordinates with Traffic Operations to determine the location of any temporary ITS devices such as portable CCTV, portable VMS, real time work zone travel time system, etc. Coordinates with the Bureau of Transportation Data Development for any proposed Traffic Volume System or Weigh-in-Motion System. Coordinates with Maintenance Engineering Electrical for any proposed Roadway Weather Information System. Prepare Preliminary Geotechnical Engineering Report (3095) A subsurface exploration program including soil borings, cone penetration tests (CPT), other in-situ tests and laboratory tests that may be necessary will be determined on a project-by-project basis with the Project Manager and NJDOT SME input. The Designer: Revision 9 Page 12 of 57 Released: 07/2017

16 Gathers the existing soil information using NJDOT GDMS (on-line soil boring data), Engineering Soil Survey Report by Rutgers University, available geologic publications and as-built plans. Evaluates the collected soil information. Conducts a geotechnical study of the applicable project area. Prepares a Preliminary Geotechnical Engineering Report and submits to the Project Manager for review. Summarizes the Preliminary Geotechnical Engineering Report findings within the Draft PE Report. The Preliminary Geotechnical Engineering Report evaluates and identifies: Soil-structure interaction for the required bearing strength, stability and anticipated settlements that pertain to the foundation system supporting the proposed bridges and other structures/walls. Stability and anticipated settlement (embankments and cuts) for the proposed roadway. If rock slope is within the project, a rock mechanics study should be performed to evaluate the stability of existing and proposed slopes. Major and special geotechnical features (e.g., ground improvements, large diameter (36 inches and greater) piles and drilled shafts, soil nails, ground anchors) required to support bridges, structures and roadways. Construction concerns, vibration impacts, potential settlement associated with anticipated construction means and methods (dewatering, cofferdam, sheeting, etc.), ROW and easements that are required for tie-backed retaining systems, and rock slope excavation and its impacts. Prepare Structural Design Recommendation Summary (3100) The Structural Design Recommendation Summary documents the structural selection process, the recommended structure type, aesthetic treatments and utility, right of way and environmental impacts. The Designer: Reviews the horizontal and vertical geometry and hydrologic and hydraulic analysis. Determines the structural type (if not determined in CD), length, width and footprint. Develops general structural plans and elevations if needed for the environmental document or Design Exception Report. Prepares a Structural Design Recommendation Summary and submits to the Project Manager for review. Includes the Structural Design Recommendation Summary in the Draft PE Report. Prepare Project Access Plans and Access Impact Summary (3105) The Project Access Plan (PAP) is prepared in accordance with the NJDOT Access Management Guidelines. It identifies each driveway within the project area and any proposed alterations of each property s access. This includes the identification of NJ State Highway Access Management Code implications and the identification and elimination of any potential fatal flaw access issues. The Designer: Revision 9 Page 13 of 57 Released: 07/2017

17 Determines whether the PPA, has the potential to impact access and/or parking and determines whether the impacts can be mitigated on-site. Reviews and analyzes all existing driveways within the project limits. Verifies the property owners of record. Verifies the existing topographic features for each impacted property. Identifies the types of access alterations for each property. Confirms the use and operation of the affected properties. Prepares an Access Impact Summary (AIS). Identifies any warranted "waivers" to the Access Code requirements with justifications listed within the AIS. Prepares and submits the PAP and the AIS to the Office of Access Design (OAD) for review and acceptance. Addresses all OAD comments. Prepares and submits a Comment Resolution Summary to OAD. Updates the PAP and AIS accordingly. Includes a summary of the PAP and AIS in the Draft PE Report. Prepare Preliminary Roadway Plans (3070) The preliminary roadway plans include the topographic survey results, the proposed horizontal and vertical geometry and all other preliminary engineering design. Utilizing the NJDOT Sample Plans and agreed upon design standards, the Designer incorporates the project design and details onto the plan sheets. The Designer includes the preliminary roadway plans as an attachment to the Draft PE Report. Hold Diagnostic Team Meeting (3075) The purpose of the Diagnostic Team Meeting (DTM) is to coordinate railroad issues with the affected stakeholders. Meeting attendees discuss the grade crossing, gather expert testimony and develop recommendations for modifications to the grade crossing. The Designer creates plans identifying the proposed roadway improvements across the grade crossing (conceptual level plans for the layout of lighting design, guide signs, regulatory traffic control devices and signal design) to the Railroad Engineering and Safety Engineer for the DTM. The Designer provides the DTM information to the Project Manager who forwards it to the Railroad Engineering and Safety Unit, Diagnostic Team Leader (DTL). The DTL coordinates with the meeting invitees and schedules an on-site DTM. The attendees may include the railroad operator, local officials, engineer, school and emergency services, Project Manager, Designer and any NJDOT unit or entity deemed relevant. The DTL holds the on-site DTM and prepares the Memorandum of Record documenting the results of the DTM. The DTL distributes the final meeting minutes to the meeting attendees. The Designer incorporates any design changes that result from the DTM into the roadway plans. The Designer includes a summary of the DTM in the Draft PE Report. Revision 9 Page 14 of 57 Released: 07/2017

18 Determine and Calculate Deforested Areas (3010) The acreage of proposed deforested area is calculated to assess the impact and to determine the type and amount of deforestation compensation. If the total area of deforestation: Is less than ½ acre, no additional action is required. Is equal to or greater than ½ acre, a reforestation plan is required. Is one acre or larger, a Public Information Center (PIC) is required in addition to a reforestation plan. When required, the PIC shall be held at least 180 calendar days before deforestation. The Designer provides the Office of Landscape Architecture (OLA) with the project base plans. OLA determines the total area of proposed deforestation and notifies the Project Manager. OLA prepares an initial deforestation/reforestation plan demarcating areas of deforestation and possible reforestation and provides the plan to the Designer. The initial deforestation/reforestation plan is utilized at a PIC if one acre or larger of deforestation is proposed. The Designer includes a summary of the PIC and a summary of the initial deforestation/reforestation plan in the Draft PE Report. Right of Way Overview The preliminary right of way (ROW) work performed in the PE Phase is in support of obtaining approval of an environmental document and a Design Exception Report, if necessary. The ROW work consists of preparing a ROW report, initiating a ROW impact plan, holding a ROW kickoff meeting and preparing an initial ROW estimate. Major Tasks Prepare ROW Report (3110) The Right of Way (ROW) Report reflects the potential acquisition of all real property and property easements required for all roadway improvement projects. An individual ROW Report is prepared and issued for each project. The report is to be used as the basis for the presentation at the ROW Kickoff Meeting. The report is to be updated and submitted at all ROW submissions. Utilize the ROW Engineering Guidelines in preparation of the ROW Report. The Designer: Prepares the ROW Report. Includes a ROW Report summary in the Draft PE Report. Initiate ROW Impact Plan (3115) The ROW Impact Plan accurately depicts all ROW impacts (acquisitions) required for the proposed improvements, inclusive of potential sites for reforestation, wetland and riparian buffer mitigation, if anticipated. The ROW Impact Plan consists of the preliminary General Property Parcel Maps (GPPM) that indicate the block and lot numbers along with the owners names and the acquisition area for each parcel. The ROW Impact Plan will also indicate any recent preliminary and final site Revision 9 Page 15 of 57 Released: 07/2017

19 plan approvals. This plan will be used at the ROW Kickoff Meeting and updated following the meeting to address comments. This plan also will be used to prepare the Initial ROW Estimate. The Designer: Prepares the ROW Impact Plan. Includes the ROW Impact Plan as an attachment to the Draft PE Report. Hold ROW Kickoff Meeting (3120) The purpose of the ROW Kickoff Meeting is to present and discuss the ROW Report and the ROW Impact Plan to the meeting attendees. The Project Manager coordinates with the Manager of the Office of Access Design and ROW Engineering and schedules and holds the ROW Kickoff meeting. Meeting attendees may include the ROW SMEs and the Designer. The Designer or Project Manager presents the ROW Impact Plan and the ROW Report for discussion and concurrence. During this meeting, the Project Manager will request that ROW Engineering provide parcel numbers which will be used to update the ROW Impact Plan. The Designer prepares meeting minutes documenting the ROW Kickoff meeting and, after they are reviewed by the Project Manager, distributes to the meeting attendees. Prepare Initial ROW Estimate (3125) An initial ROW Estimate is based on the agreed upon ROW Impact Plan, inclusive of potential sites for reforestation, wetland and riparian buffer mitigation. If specific environmental mitigation parcels have not been identified, an anticipated cost should be included for all environmental mitigation. The Designer provides the Project Manager with the necessary plans and other pertinent materials needed to request the Initial ROW Estimate. The Project Manager requests the Division of ROW and Access Management to develop the Initial ROW Estimate. The Division of ROW and Access Management develops the estimate and sends it to the Project Manager for review and comment. Once finalized, the Project Manager sends the Initial ROW Estimate to the Designer and enters the Initial ROW Estimate into the Project Reporting System (PRS). The Designer includes a summary of the initial ROW Estimate in the Draft PE Report and includes the initial ROW Estimate as an attachment to the Draft PE Report. Technical Environmental Studies Section 106 Overview The following major tasks describe, in detail, the steps required to comply with Section 106 of the US Historic Preservation Act and related statutes. FHWA is responsible for implementation of the process and for making key decisions in consultation with the State Historic Preservation Office (SHPO), the Advisory Council on Historic Preservation and Consulting/Interested Parties as appropriate. Most activities are completed by NJDOT staff and NJDOT-managed consultants. NJDOT Technical Scopes of Work must be followed and all reports/documents/surveys must conform to guidelines developed by the NJ Historic Preservation Office. For projects within the Revision 9 Page 16 of 57 Released: 07/2017

20 Pinelands Commission's jurisdiction, reports and documents must conform to guidelines established by the Commission. Public Involvement requirements of the Section 106 Process are integrated with the overall public involvement activities for the overall project. (36 CFR Part 800, 23 CFR 771) All Federal actions are subject to the requirements of Section 106 of the National Historic Preservation Act of 1966 as amended [16 U.S.C. 470 et seq.]. The work required to comply with this law is described in 36 CFR 800. Review the text of the Code of Federal Regulation (CFR) prior to initiating any work. The following is designed only to familiarize the user with the basic steps of the process. Technical assessments must be made by or under the direction of personnel meeting the Secretary of the Interior s Professional Qualifications Standards [48 FR ]. Decisions about eligibility for listing in the National Register of Historic Places are based on the Criteria for Evaluation, contained in 36 CFR 60. FHWA (or other Lead Federal Agency) retains the regulatory authority for compliance, although a recent programmatic agreement allows NJDOT to complete a number of the steps in the process independently of the FHWA. Projects not involving a Federal action are subject to the N.J. Register of Historic Places Act [P.L. 1970, c.268, N.J.S.A. 13:1B , et seq.]. The Section 106 process is comprised of five basic steps: 1. Identification of significant resources (listed/eligible for listing in the National Register of Historic Places) 2. Determination of the effects of the project (none, no adverse or adverse effects) 3. If the effects are adverse: a. Consult with SHPO on ways to avoid or minimize the effects. b. Develop a Memo of Agreement (MOA) for the project if the adverse effect(s) cannot be avoided. 4. Prepare the appropriate documentation to substantiate the finding and, when appropriate, the MOA. 5. Providing the Advisory Council the opportunity to comment on the findings for the project. Eligibility - If SHPO disagrees on the assessment of eligibility, attempt to resolve disagreement. (This may involve additional research to respond to specific and general concerns.) If efforts to resolve disagreements are unsuccessful, inform CPM managers and seek the assistance of the FHWA in resolving the disagreements. If further efforts fail to resolve disagreements regarding eligibility, the Bureau of Landscape Architecture Environmental Solutions (BLAES) Cultural Resources (CR) Specialist will prepare appropriate documentation and forward it to the FHWA for transmittal to the Keeper of the Register. Procedures for this are contained in 36 CFR 63. This provides a 45-day review period for consideration of requests for determinations of eligibility. The opinion of the Keeper on issues of eligibility is final. Effect - If there is disagreement on the finding of effect, attempt to resolve disagreement. If unsuccessful, inform CPM managers and seek the assistance of the FHWA in resolving the disagreements. If further efforts fail to resolve disagreements regarding effects, the BLAES CR Specialist will prepare appropriate documentation as per the provisions of 36 CFR 800.8(d) and forward it to the FHWA for transmittal to the Advisory Council. The Council shall provide its comments to the FHWA within 60 days; the FHWA must consider the comments of the Council before reaching a final finding of effect. Revision 9 Page 17 of 57 Released: 07/2017

21 Mitigation - Unless the cooperation of the property owner is obtained, many mitigation activities cannot be initiated until after ROW has been purchased or, in the case of condemnation proceedings, legal access to a parcel has been obtained. As a goal, mitigation should be completed before the project can be authorized by FHWA for construction. Historic American Building Survey/Historic American Engineering Record (HABS/HAER) recording must be completed and at least conditionally accepted by the National Park Service. The SHPO staff archeologists should be consulted to reach concurrence that archeological mitigation activities meet the goals of the mitigation plan and no additional work is needed. Activities which do not generally impede construction such as preparation of a study, non-technical report, article or book, development of a museum-quality exhibit, development of a walking tour, preparation of a National Register nomination, etc. with the FHWA concurrence, can be completed after the initiation of construction activities as long as any pertinent data or resources have been collected. Major Tasks Initiate Environmental Technical Studies (3880) The Environmental Coordinator confirms which Environmental Technical Studies need to be completed and informs the Designer to begin their preparation. The Environmental Technical Studies to be completed may include Air Quality, Noise, Ecology, Cultural Resources, Hazardous Waste, Section 4(f) and Socio-Economics. The Environmental Coordinator determines the level of Section 4(f) evaluation (Individual, Programmatic or Not Applicable) for Parkland. The level of Section 4(f) evaluation for historic sites is determined following State Historic Preservation Office (SHPO) concurrence of Adverse Effect. Initiate Cultural Resource Process Initiate Cultural Resources (Section 106) Process (3300) The first major task in Section 106 is to initiate the cultural resource process. The BLAES CR Specialist initiates the Cultural Resources (Section 106) process by consulting with the State Historic Preservation Officer (SHPO). Initiation consists of determining the Area of Potential Effect (APE) for architecture and archaeology and identifying Consulting/Interested parties. The BLAES CR Specialist meets with SHPO to submit and discuss the APE Package. SHPO reviews and approves the APE Package by providing written concurrence. The BLAES CR Specialist determines the APE as required by 36 CFR and (d). Elements of the Area of Potential Effects include: APE for architecture drawn on tax maps. APE for archaeology includes the footprint of disturbance and any staging areas if known, shown on draft plan sheets. List of Consulting/Interested Parties. PE Public Involvement Action Plan (PIAP) Revision 9 Page 18 of 57 Released: 07/2017

APPENDIX A PROGRAMMATIC AGREEMENT FOR MINOR TRANSPORTATION PROJECTS

APPENDIX A PROGRAMMATIC AGREEMENT FOR MINOR TRANSPORTATION PROJECTS APPENDIX A PROGRAMMATIC AGREEMENT FOR MINOR TRANSPORTATION PROJECTS PROGRAMMATIC AGREEMENT AMONG THE FEDERAL HIGHWAY ADMINISTRATION THE PENNSYLVANIA DEPARTMENT OF TRANSPORTATION, THE PENNSYLVANIA STATE

More information

Guidance for Locally Administered Projects. Funded Through the NJDOT/MPO Program Funds Exchange. August 27, Revised September 15, 2014

Guidance for Locally Administered Projects. Funded Through the NJDOT/MPO Program Funds Exchange. August 27, Revised September 15, 2014 1 Guidance for Locally Administered Projects Funded Through the NJDOT/MPO Program Funds Exchange August 27, 2013 Revised September 15, 2014 This document establishes guidelines for administering the program

More information

VALUE ENGINEERING PROGRAM

VALUE ENGINEERING PROGRAM Approved: Effective: May 17, 2017 Review: March 30, 2017 Office: Production Support Office Topic No.: 625-030-002-i Department of Transportation PURPOSE: VALUE ENGINEERING PROGRAM To provide a consistent

More information

Quality Management Guideline July, 2017

Quality Management Guideline July, 2017 Quality Management Guideline July, 2017 Check the Capital Project Delivery website to ensure this is the current version. Table of Contents Quality Management Overview... 1 Interactive Communications...

More information

Appendix B Review Matrix Text & Table Footnotes

Appendix B Review Matrix Text & Table Footnotes Review Submissions The PDP includes a series of review submissions designed to ensure that all projects are developed in accordance with ODOT policies. The PDP Products Review Matrix found in this Appendix

More information

STATUS OF REVIEW: ENGINEER ACKNOWLEDGED INFO COMMENT

STATUS OF REVIEW: ENGINEER ACKNOWLEDGED INFO COMMENT PROJECT NAME: SOUTHERN PIG AND CATTLE COMPANY PROJECT NUMBER: 2011050008 APPLICATION: MAJOR SITE PLAN #14999 Met with staff 12/11/14, DRC on 12/15/14 1. DEPARTMENT: ENGDRN - STORMWATER REVIEW REVIEW ITEM:

More information

APPENDIX 1 BROWARD COUNTY PLANNING COUNCIL PLAN AMENDMENT REQUIREMENTS AND PROCEDURES

APPENDIX 1 BROWARD COUNTY PLANNING COUNCIL PLAN AMENDMENT REQUIREMENTS AND PROCEDURES APPENDIX 1 BROWARD COUNTY PLANNING COUNCIL PLAN AMENDMENT REQUIREMENTS AND PROCEDURES Broward County Land Use Plan Amendment Requirements Amendments which are not within the rules of flexibility or more

More information

Guidance. Historical Studies Review Procedures

Guidance. Historical Studies Review Procedures Guidance Historical Studies Review Procedures This guidance document provides instructional material regarding how to review and process project activities in accordance with TxDOT s Section 106 of the

More information

THE SECTION 106 REVIEW PROCESS

THE SECTION 106 REVIEW PROCESS THE SECTION 106 REVIEW PROCESS Introduction Oklahoma State Historic Preservation Office Workshop May 4, 2016 OKLAHOMA STATE HISTORIC PRESERVATION OFFICE (OK SHPO) National Register of Historic Places (NRHP)

More information

Standard Training Prospectus.

Standard Training Prospectus. Power, efficiency, stability. Explore the possibilities that 12d Model delivers to your civil surface modelling projects. Standard Training Prospectus. Design software is only effective when the operator

More information

1. Introduction..3 a. Purpose of This Procedural Review Plan...3 b. Description and Information...3 c. References...3

1. Introduction..3 a. Purpose of This Procedural Review Plan...3 b. Description and Information...3 c. References...3 Contents 1. Introduction..3 a. Purpose of This Procedural Review Plan......3 b. Description and Information.....3 c. References...3 2. Review Requirements....5 a. Level of Review Required.....5 b. Review

More information

STANDARD DRAWINGS INDEX

STANDARD DRAWINGS INDEX STANDARD DRAWINGS INDEX DESCRIPTION GENERAL DRAWING NO. Typical Layout for Improvement Plans... 1 City of Stockton Standard Border and Title Block for 8.5 x 11 Sheet.. 1A City of Stockton Standard Map

More information

Route 44 Truck By-Pass and Du-Pont Port Access LOCAL CONCEPT DEVELOPMENT STUDY & PRELIMINARY ENGINEERING PHASE

Route 44 Truck By-Pass and Du-Pont Port Access LOCAL CONCEPT DEVELOPMENT STUDY & PRELIMINARY ENGINEERING PHASE PROFESSIONAL SERVICES DESCRIPTION FOR THE POSITION OF: Route 44 Truck By-Pass and Du-Pont Port Access LOCAL CONCEPT DEVELOPMENT STUDY & PRELIMINARY ENGINEERING PHASE SUBMISSION DEADLINE: February 17, 2016

More information

SMALL CITY PROGRAM. ocuments/forms/allitems.

SMALL CITY PROGRAM.  ocuments/forms/allitems. SMALL CITY PROGRAM The Small City Program provides Federal funds to small cities with populations from 5,000 to 24,999 that are NOT located within Metropolitan Planning Organizations' boundaries. Currently

More information

Archeological Sites and Cemeteries

Archeological Sites and Cemeteries Environmental Handbook Archeological Sites and Cemeteries This handbook outlines the process steps necessary to comply with the National Historic Preservation Act (NHPA), the Antiquities Code of Texas,

More information

Joint Application Form for Activities Affecting Water Resources in Minnesota

Joint Application Form for Activities Affecting Water Resources in Minnesota Joint Application Form for Activities Affecting Water Resources in Minnesota This joint application form is the accepted means for initiating review of proposals that may affect a water resource (wetland,

More information

TRANSPORTATION ALTERNATIVES (TA) SET ASIDE PROGRAM July 2016

TRANSPORTATION ALTERNATIVES (TA) SET ASIDE PROGRAM July 2016 Regional Transportation Commission TRANSPORTATION ALTERNATIVES (TA) SET ASIDE PROGRAM July 2016 Contents 1.0 Purpose and Eligibility... 2 2.0 Process... 5 3.0 Implementation of Funded Projects... 5 Attachment

More information

EXHIBIT "A" SCOPE OF SERVICES FOR DISTRICT WIDE NPDES CONSULTANT SERVICES FINANCIAL PROJECT NO

EXHIBIT A SCOPE OF SERVICES FOR DISTRICT WIDE NPDES CONSULTANT SERVICES FINANCIAL PROJECT NO EXHIBIT "A" SCOPE OF SERVICES FOR DISTRICT WIDE NPDES CONSULTANT SERVICES FINANCIAL PROJECT NO. 259401 1 72 11 Revised: 07/10/18 07/09/18 i TABLE OF CONTENTS I. PURPOSE... A-1 II. SERVICES... A-1 A. Facilities

More information

SR-86/AVENUE 50 NEW INTERCHANGE PROJECT

SR-86/AVENUE 50 NEW INTERCHANGE PROJECT REQUEST FOR PROPOSALS FOR PROFESSIONAL ENGINEERING SERVICES CITY PROJECT NO. ST-81 (File No. 2015-04) FEDERAL AID PROJECT NO. HPLULN - 5294(011) FOR THE SR-86/AVENUE 50 NEW INTERCHANGE PROJECT Preparation

More information

THE CORRADINO GROUP. RE: DRIC EPE/EIS Project; Job N TCG Project No Invoice No. 10 Progress Report.

THE CORRADINO GROUP. RE: DRIC EPE/EIS Project; Job N TCG Project No Invoice No. 10 Progress Report. THE CORRADINO GROUP November 7, 2005 Mr. Mohammed Alghurabi, Project Manager MDOT, Design Division 425 West Ottawa Lansing, MI 48933 RE: DRIC EPE/EIS Project; Job N. 802330 TCG Project No. 3600 - Invoice

More information

BRF-009-9(73) IA 9 Black Hawk Bridge

BRF-009-9(73) IA 9 Black Hawk Bridge BRF-009-9(73) 38-03 IA 9 Black Hawk Bridge Request for Proposal Iowa Department of Transportation Introduction The Iowa Department of Transportation s Office of Location and Environment (Department), in

More information

February 12, Request for Proposal Overview Pre-bid Conference

February 12, Request for Proposal Overview Pre-bid Conference February 12, 2014 I-495 Northern Section Shoulder Use Project Request for Proposal Overview Pre-bid Conference I-495 Northern Section Shoulder Use Project Scope of Work Major Items Mill and overlay - Light

More information

April 13, 2007 SUBJECT: GEOMETRIC IMPROVEMENTS OF CITY CONNECTING LINKS OF THE STATE HIGHWAY SYSTEM - FISCAL YEAR 2011

April 13, 2007 SUBJECT: GEOMETRIC IMPROVEMENTS OF CITY CONNECTING LINKS OF THE STATE HIGHWAY SYSTEM - FISCAL YEAR 2011 April 13, 2007 SUBJECT: GEOMETRIC IMPROVEMENTS OF CITY CONNECTING LINKS OF THE STATE HIGHWAY SYSTEM - FISCAL YEAR 2011 The Kansas Department of Transportation is announcing the continuation of its Geometric

More information

FLORIDA DEPARTMENT OF VETERANS AFFAIRS

FLORIDA DEPARTMENT OF VETERANS AFFAIRS FLORIDA DEPARTMENT OF VETERANS AFFAIRS STATE VETERANS HOMES PROGRAM SITE SELECTION CRITERIA FOR A STATE VETERANS HOME February 6, 2014 FLORIDA DEPARTMENT OF VETERANS AFFAIRS State Veterans ' Home Program

More information

POSITION DESCRIPTION

POSITION DESCRIPTION POSITION DESCRIPTION TITLE: ENGINEERING TECHNICIAN ASSISTANT Scope Of Responsibility: This is the journey level class in the Engineering Technician classification within the Public Works Department. Individuals

More information

Request for Qualifications For

Request for Qualifications For D E L A W A R E V A L L E Y R E G I O N A L P L A N N I N G C O M M I S S I ON The ACP Building, 190 N. Independence Mall West Telephone: (215) 592-1800 Philadelphia, PA 19106-1520 FAX: (215) 592-9125

More information

REQUEST FOR REQUEST FOR PROPOSAL (RFP) GIBSON ROAD PROJECT TOWN OF EASTON 1060 EASTON VALLEY ROAD EASTON, NH DATE FEBRUARY 1, 2016

REQUEST FOR REQUEST FOR PROPOSAL (RFP) GIBSON ROAD PROJECT TOWN OF EASTON 1060 EASTON VALLEY ROAD EASTON, NH DATE FEBRUARY 1, 2016 REQUEST FOR REQUEST FOR PROPOSAL (RFP) GIBSON ROAD PROJECT TOWN OF EASTON 1060 EASTON VALLEY ROAD EASTON, NH 03580 DATE FEBRUARY 1, 2016 TABLE OF CONTENTS 1. SUMMARY AND BACKGROUND... 2 2. PROPOSAL GUIDELINES...

More information

Subdivision Presubmittal Conference Submittal Package Cover Page

Subdivision Presubmittal Conference Submittal Package Cover Page Subdivision Presubmittal Conference Submittal Package Cover Page The Hillsborough County Development Services Department is pleased to offer a Presubmittal Conference to anyone seeking help in determining

More information

MOBILE ASSET DATA COLLECTION. Pavement Condition Index Ground Penetrating Radar Deflection Testing. Contact Information:

MOBILE ASSET DATA COLLECTION. Pavement Condition Index Ground Penetrating Radar Deflection Testing. Contact Information: City of Mercer Island MOBILE ASSET DATA COLLECTION: Pavement Condition Index Ground Penetrating Radar Deflection Testing Contact Information: Leah Llamas, GIS Analyst The City of Mercer Island 9611 SE

More information

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Transcontinental Gas Pipe Line Company, LLC Docket No. PF16-5-000 NOTICE OF INTENT TO PREPARE AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PLANNED

More information

The Maryland Transportation Authority has. Staff Approve Resolution R to amend the FY TIP.

The Maryland Transportation Authority has. Staff Approve Resolution R to amend the FY TIP. ITEM 13 Action March 29, 2017 Approval to Amend the FY 2017-2022 Transportation Improvement Program (TIP) to Add the Governor Harry W. Nice Bridge Improvement Project For the Maryland Transportation Authority

More information

3 Year On-Call Contract - Threatened and Endangered Species Services

3 Year On-Call Contract - Threatened and Endangered Species Services 3 Year On-Call Contract - Threatened and Endangered Species Services Request For Proposal Iowa Department of Transportation Introduction The Iowa Department of Transportation s Office of Location and Environment

More information

Module 2 Planning and Programming

Module 2 Planning and Programming Module 2 Planning and Programming Contents: Section 1 Overview... 2-2 Section 2 Coordination with MPO... 2-4 Section 3 Functional Classification... 2-6 Section 4 Minute Order for Designation as Access

More information

Quality Assurance/Quality Control Procedures for Environmental Documents

Quality Assurance/Quality Control Procedures for Environmental Documents Environmental Handbook Quality Assurance/Quality Control Procedures for Environmental s This handbook outlines processes to be used by the project sponsor and department delegate in quality assurance and

More information

SOUTHWEST LRT (METRO GREEN LINE EXTENSION)

SOUTHWEST LRT (METRO GREEN LINE EXTENSION) 10 Joint Development This chapter describes potential long-term direct and indirect and short-term (construction) direct and indirect effects that would result from the Southwest Light Rail Transit (LRT)

More information

FAIRFIELD AVENUE, EWING STREET, SUPERIOR STREET, AND WELLS STREET PRELIMINARY FEASIBILITY STUDY

FAIRFIELD AVENUE, EWING STREET, SUPERIOR STREET, AND WELLS STREET PRELIMINARY FEASIBILITY STUDY FAIRFIELD AVENUE, EWING STREET, SUPERIOR STREET, AND WELLS STREET PRELIMINARY FEASIBILITY STUDY Prepared for: City of Fort Wayne, Indiana Prepared by: American Structurepoint, Inc. 116 E. Berry Street

More information

Office of Surface Mining Reclamation and Enforcement

Office of Surface Mining Reclamation and Enforcement This document is scheduled to be published in the Federal Register on 09/22/2017 and available online at https://federalregister.gov/d/2017-20265, and on FDsys.gov 4310-05-P DEPARTMENT OF THE INTERIOR

More information

CITY OF ORANGE LOCAL CEQA GUIDELINES

CITY OF ORANGE LOCAL CEQA GUIDELINES CITY OF ORANGE LOCAL CEQA GUIDELINES Prepared by: City of Orange Community Development Department, Advance Planning Division 300 East Chapman Avenue, Orange, CA 92866 April 11, 2006 Page 2 TABLE OF CONTENTS

More information

Plan of Development Review Process County of Henrico, Virginia

Plan of Development Review Process County of Henrico, Virginia Plan of Development Review Process County of Henrico, Virginia October 27, 2000 (Revised January 8, 2007, December 7, 2007) (Revised September 11, 2015, effective September 14, 2015) POF011 TABLE OF CONTENTS

More information

MAP-21 and Project Delivery: A Legal Perspective

MAP-21 and Project Delivery: A Legal Perspective MAP-21 and Project Delivery: A Legal Perspective Webinar Presentation Sponsored by the National Association of Environmental Professionals (NAEP) March 12, 2013 Bill Malley Washington, DC Presenter: Bill

More information

DEPARTMENT OF THE ARMY JACKSONVILLE DISTRICT CORPS OF ENGINEERS 1002 WEST 23 RD STREET, SUITE 350 PANAMA CITY, FLORIDA

DEPARTMENT OF THE ARMY JACKSONVILLE DISTRICT CORPS OF ENGINEERS 1002 WEST 23 RD STREET, SUITE 350 PANAMA CITY, FLORIDA DEPARTMENT OF THE ARMY JACKSONVILLE DISTRICT CORPS OF ENGINEERS 1002 WEST 23 RD STREET, SUITE 350 PANAMA CITY, FLORIDA 32405 REPLY TO ATTENTION OF July 31, 2015 Regulatory Division North Permits Branch

More information

SAFETEA-LU. Overview. Background

SAFETEA-LU. Overview. Background SAFETEA-LU This document provides information related to the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) that was previously posted on the Center for

More information

Request for Qualifications B Geotechnical Investigations / Professional Services Firms. RFQ Due Date: October 8, :00 P.M.

Request for Qualifications B Geotechnical Investigations / Professional Services Firms. RFQ Due Date: October 8, :00 P.M. Request for Qualifications B13.017 Geotechnical Investigations / Professional Services Firms RFQ Due Date: October 8, 2013 2:00 P.M. Mr. Dale Switzer Senior Director of Facilities Planning, Development

More information

Nevada Department of Transportation Traffic Operations Policy Memorandum Traffic Signal Warrant Approval Process

Nevada Department of Transportation Traffic Operations Policy Memorandum Traffic Signal Warrant Approval Process Nevada Department of Transportation Traffic Operations Policy Memorandum 2015-01 This document establishes procedures for the preparation of traffic signal warrant studies that meet NDOT requirements,

More information

South Dakota Department of Transportation Consultant Engineer Training October 12, 2017

South Dakota Department of Transportation Consultant Engineer Training October 12, 2017 1 South Dakota Department of Transportation Consultant Engineer Training October 12, 2017 2 Goal: build a stronger partnership Cell phones Bathrooms Comments and questions 3 4 NEW CONSULTANT SERVICES MANUAL

More information

Mark A. Doctor, PE CAREER PATH

Mark A. Doctor, PE CAREER PATH Mark A. Doctor, PE Professional Profile A career of over 27 years with the Federal Highway Administration in various transportation engineering positions with diverse experiences and accomplishments in

More information

Value Engineering Program Administration Manual (05/16/2018)

Value Engineering Program Administration Manual (05/16/2018) 1. Value Engineering Value Engineering Program Administration Manual (05/16/2018) Value Engineering (VE) is defined by the Society of American Value Engineers International as "the systematic application

More information

STATE ENVIRONMENTAL REVIEW PROCESS FOR PENNSYLVANIA WASTEWATER PROJECTS. Clean Water State Revolving Fund Program

STATE ENVIRONMENTAL REVIEW PROCESS FOR PENNSYLVANIA WASTEWATER PROJECTS. Clean Water State Revolving Fund Program A STATE ENVIRONMENTAL REVIEW PROCESS FOR PENNSYLVANIA WASTEWATER PROJECTS Clean Water State Revolving Fund Program Pennsylvania Infrastructure Investment Authority & Pennsylvania Department of Environmental

More information

WHEREAS, Mn/DOT has been asked to participate in consultation for and to be an invited signatory to this Programmatic Agreement (PA); and

WHEREAS, Mn/DOT has been asked to participate in consultation for and to be an invited signatory to this Programmatic Agreement (PA); and PROGRAMMATIC AGREEMENT AMONG THE FEDERAL HIGHWAY ADMINISTRATION THE MINNESOTA STATE HISTORIC PRESERVATION OFFICE THE ADVISORY COUNCIL ON HISTORIC PRESERVATION THE DEPARTMENT OF THE ARMY, CORPS OF ENGINEERS,

More information

POSITION DESCRIPTION

POSITION DESCRIPTION POSITION DESCRIPTION TITLE: ENGINEERING TECHNICIAN Scope Of Responsibility: This is the advanced journey level class in the Engineering Technician classification within the Public Works department. Individuals

More information

PUBLIC NOTICE.

PUBLIC NOTICE. US Army Corps Of Engineers Wilmington District PUBLIC NOTICE Issue Date: January 19, 2017 Comment Deadline: February 17, 2017 Corps Action ID Number: SAW-2011-01243 The Wilmington District, Corps of Engineers

More information

ATTACHMENT A GARDEN STATE HISTORIC PRESERVATION TRUST FUND PROGRAM REGULATIONS. (selected sections)

ATTACHMENT A GARDEN STATE HISTORIC PRESERVATION TRUST FUND PROGRAM REGULATIONS. (selected sections) ATTACHMENT A GARDEN STATE HISTORIC PRESERVATION TRUST FUND PROGRAM REGULATIONS (selected sections) GARDEN STATE HISTORIC PRESERVATION TRUST FUND GRANTS PROGRAM N.J.A.C. 5:101 (2008) (selected sections

More information

ENVIRONMENTAL SERVICES REQUEST FOR QUALIFICATIONS FOR THE FOLLOWING PROJECT. Nicholson Drive (LA 30) Segment #1 Lee/Brightside to South Gourrier

ENVIRONMENTAL SERVICES REQUEST FOR QUALIFICATIONS FOR THE FOLLOWING PROJECT. Nicholson Drive (LA 30) Segment #1 Lee/Brightside to South Gourrier ENVIRONMENTAL SERVICES REQUEST FOR QUALIFICATIONS FOR THE FOLLOWING PROJECT Nicholson Drive (LA 30) Segment #1 Lee/Brightside to South Gourrier City Parish Project No. 12-CS-HC-0016 R. F. Q. NO. 12-ES-PW-003

More information

PART ENVIRONMENTAL IMPACT STATEMENT

PART ENVIRONMENTAL IMPACT STATEMENT Page 1 of 12 PART 1502--ENVIRONMENTAL IMPACT STATEMENT Sec. 1502.1 Purpose. 1502.2 Implementation. 1502.3 Statutory requirements for statements. 1502.4 Major Federal actions requiring the preparation of

More information

CITY OF JOPLIN, MISSOURI

CITY OF JOPLIN, MISSOURI Engineering Department CITY OF JOPLIN 602 South Main Street Joplin, Missouri 64801 Phone (417) 624-0820 Ext. 530 Fax (417) 625-4738 CITY OF JOPLIN, MISSOURI ON-CALL ENGINEERING PROFESSIONAL SERVICES REQUEST

More information

State of Florida Department of Transportation. DISTRICT SIX Attachment A Scope of Services 1/19/2018

State of Florida Department of Transportation. DISTRICT SIX Attachment A Scope of Services 1/19/2018 State of Florida Department of Transportation DISTRICT SIX Attachment A Scope of Services 1/19/2018 District Six Signal Retiming Continuing Consultant Services Financial Project Number(s): 435201-4-32-01

More information

Transportation Alternatives (TA) Northeast Minnesota Workshop

Transportation Alternatives (TA) Northeast Minnesota Workshop Transportation Alternatives (TA) Northeast Minnesota Workshop October 4 th, 2016 1 What are TA Projects? Federally funded community based projects o Expand travel choices o Integrate modes o Improve cultural,

More information

EL PASO WATER - PUBLIC SERVICE BOARD REQUEST FOR SUBMITTALS RFS January 17, 2017

EL PASO WATER - PUBLIC SERVICE BOARD REQUEST FOR SUBMITTALS RFS January 17, 2017 EL PASO WATER - PUBLIC SERVICE BOARD REQUEST FOR SUBMITTALS RFS 2-17 January 17, 2017 TO: RE: Invited Firms Request for Submittals to El Paso Water-Public Service Board (EPWater) Statement of Work Professional

More information

Iowa DOT Update 2016 APWA Fall Conference JOHN E. DOSTART, P.E.

Iowa DOT Update 2016 APWA Fall Conference JOHN E. DOSTART, P.E. Iowa DOT Update 2016 APWA Fall Conference JOHN E. DOSTART, P.E. Hilton Garden Inn September 29, 2016 Member of the Day Personal Updates M.J. Charlie Purcell Promoted to Project Delivery Bureau Director

More information

REQUEST FOR PROPOSAL TO PROVIDE AS-NEEDED ENGINEERING SERVICES FOR THE IMPLEMENTATION OF

REQUEST FOR PROPOSAL TO PROVIDE AS-NEEDED ENGINEERING SERVICES FOR THE IMPLEMENTATION OF REQUEST FOR PROPOSAL TO PROVIDE AS-NEEDED ENGINEERING SERVICES FOR THE IMPLEMENTATION OF PURPLE LINE EXTENSION PROJECT BY LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY Project No. 16-34 CITY

More information

Request for Qualifications Professional Engineering Services

Request for Qualifications Professional Engineering Services Page 1 of 7 Combined Sewage Storage Tunnel Preparation of Preliminary Design, Detailed Design, Tender Documents and Services during Construction Requirement: The City of Ottawa, hereinafter referred to

More information

NDOT Local Public Agency Manual April 6, 2017

NDOT Local Public Agency Manual April 6, 2017 NDOT Local Public Agency Manual April 6, 2017 State of Nevada Brian Sandoval, Governor Department of Transportation Rudy Malfabon, P.E., Director Design Division Paul Frost, P.E., Chief Design Engineer

More information

Guide to Rezoning. Step 1. Step 2. Step 5. Step 6. Step 7. Step 8

Guide to Rezoning. Step 1. Step 2. Step 5. Step 6. Step 7. Step 8 Guide to Rezoning Introduction The Douglas County (DCD) is committed to providing an open, transparent application process to the public. This Guide has been developed to assist anyone with interest in

More information

MAP-21: Overview of Project Delivery Provisions

MAP-21: Overview of Project Delivery Provisions MAP-21: Overview of Project Delivery Provisions This paper provides an overview of the project delivery provisions in the Moving Ahead for Progress in the 21st Century Act (MAP-21). It also briefly summarizes

More information

UNMANNED AIRCRAFT SYSTEMS CORRIDOR STUDY

UNMANNED AIRCRAFT SYSTEMS CORRIDOR STUDY Scope of Work The Joint Land Use Study Implementation (JLUS) will be a series of projects that will address the recommendations in the Fort Riley Joint Land Use Study. The corridor between Fort Riley Army

More information

RFP for Bicycle/Pedestrian Scoping Study Page 1

RFP for Bicycle/Pedestrian Scoping Study Page 1 Town of Burke 212 School Street West Burke, VT 05871 (802) 467-3717 Request for Proposal Bicycle and Pedestrian Scoping Study Contact: Al Duey, Burke Planning Commission Date of Issue: June 9, 2014 Deadline:

More information

A DEFINITIONS AND ACRONYMS

A DEFINITIONS AND ACRONYMS Exhibit A DEFINITIONS AND ACRONYMS Addenda/Addendum means supplemental additions, deletions, and modifications to the provisions of the RFP after the release date of the RFP. Adjusted Available Public

More information

REQUEST FOR PROPOSAL. The City of Oneida, NY

REQUEST FOR PROPOSAL. The City of Oneida, NY REQUEST FOR PROPOSAL FOR A PERFORMANCE BASED ENERGY EFFICIENCY IMPROVEMENT PROJECT STREET LIGHTING TRANSFER TO OWNERSHIP AND LED CONVERSION For The City of Oneida, NY Letter of Public Notice The City of

More information

QUALIFICATIONS BASED SELECTION FOR PROFESSIONAL SERVICES GUIDELINES FOR QUALIFICATION STATEMENTS INDEPENDENCE, OHIO JANUARY 2014 PREPARED BY:

QUALIFICATIONS BASED SELECTION FOR PROFESSIONAL SERVICES GUIDELINES FOR QUALIFICATION STATEMENTS INDEPENDENCE, OHIO JANUARY 2014 PREPARED BY: QUALIFICATIONS BASED SELECTION FOR PROFESSIONAL SERVICES GUIDELINES FOR QUALIFICATION STATEMENTS INDEPENDENCE, OHIO JANUARY 2014 PREPARED BY: DONALD J. RAMM, P.E. CITY ENGINEER QUALIFICATION STATEMENT

More information

Your Development Project and the Public Works Department Part

Your Development Project and the Public Works Department Part Other useful publications available to help you through the development process: Title 8, Planning and Zoning, County Ordinance Code Title 9, Subdivisions, County Ordinance Code Your Development Project

More information

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Adelphia Gateway, LLC Docket No. CP18-46-000 NOTICE OF INTENT TO PREPARE AN ENVIRONMENTAL ASSESSMENT FOR THE PROPOSED ADELPHIA GATEWAY PROJECT,

More information

S One Hundred Seventh Congress of the United States of America AT THE FIRST SESSION

S One Hundred Seventh Congress of the United States of America AT THE FIRST SESSION An Act S.1438 One Hundred Seventh Congress of the United States of America AT THE FIRST SESSION To authorize appropriations for fiscal year 2002 for military activities of the Department of Defense, for

More information

Design-Build Procurement Overview Manual. Alternative Project Delivery

Design-Build Procurement Overview Manual. Alternative Project Delivery Design-Build Procurement Overview Manual Alternative Project Delivery Table of Contents Chapter 1: Introduction to Design-Build Procurements... 1 1.1 Introduction... 1 1.2 Scope... 1 1.3 Acronyms... 2

More information

Request for Statement of Qualifications for Professional Architectural, Engineering, Staff Augmentation, And Landscape Architecture Services

Request for Statement of Qualifications for Professional Architectural, Engineering, Staff Augmentation, And Landscape Architecture Services Request for Statement of Qualifications for Professional Architectural, Engineering, Staff Augmentation, And Landscape Architecture Services The City of Commerce Public Works and Development Services Department

More information

OPERATING PERMITS FAQs

OPERATING PERMITS FAQs Oregon Department of Geology and Mineral Industries (DOGAMI) Mineral Land Regulation and Reclamation (MLRR) Program OPERATING PERMITS FAQs What is the purpose of an Operating Permit? The purpose of the

More information

Transportation Alternatives Program Guidance & Application Packet Call for Projects: April 5 th, 2018 May 11 th, 2018

Transportation Alternatives Program Guidance & Application Packet Call for Projects: April 5 th, 2018 May 11 th, 2018 Transportation Alternatives Program Guidance & Application Packet Call for Projects: April 5 th, 2018 May 11 th, 2018 Introduction The Region 1 Planning Council, in its capacity as the Metropolitan Planning

More information

Request for Statement of Interest (SOI) Traffic Engineering Services On-call Traffic Engineering Assistance

Request for Statement of Interest (SOI) Traffic Engineering Services On-call Traffic Engineering Assistance Request for Statement of Interest (SOI) Traffic Engineering Services On-call Traffic Engineering Assistance The Kane County Division of Transportation is in need of professional services from a qualified

More information

The purpose of the presentation is to provide an overview of the changes that occurred between the Pennsylvania State Programmatic General Permit-4

The purpose of the presentation is to provide an overview of the changes that occurred between the Pennsylvania State Programmatic General Permit-4 The purpose of the presentation is to provide an overview of the changes that occurred between the Pennsylvania State Programmatic General Permit-4 and the Pennsylvania State Programmatic General Permit-5

More information

DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS DIRECTOR S OFFICE PROFESSIONAL SURVEYORS GENERAL RULES

DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS DIRECTOR S OFFICE PROFESSIONAL SURVEYORS GENERAL RULES DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS DIRECTOR S OFFICE PROFESSIONAL SURVEYORS GENERAL RULES (By authority conferred on the board by section 308 of 1980 PA 299, MCL 339.308 and on the director

More information

2013 Louisiana Transportation Conference

2013 Louisiana Transportation Conference February 20, 2013 Baton Rouge River Center 2013 Louisiana Transportation Conference Partnerships for Progress in Transportation Mega Projects Session (I-12 to Bush) I-12 to Bush Agenda Inclusion into TIMED

More information

TEX Rail Corridor Memorandum of Agreement 1

TEX Rail Corridor Memorandum of Agreement 1 MEMORANDUM OF AGREEMENT AMONG THE FEDERAL TRANSIT ADMINISTRATION THE TEXAS STATE HISTORIC PRESERVATION OFFICER, AND THE FORT WORTH TRANSPORTATION AUTHORITY OF TARRANT COUNTY, TEXAS REGARDING THE TEX RAIL

More information

Culpeper, VA. Virginia Department of Transportation

Culpeper, VA. Virginia Department of Transportation Culpeper, VA Virginia Department of Transportation October 2011 FORWARD Greetings from VDOT s Enhancement Program staff! The purpose of this manual is to guide local Sponsors through the project development

More information

Scope of Services for Environmental Assessment for Projects

Scope of Services for Environmental Assessment for Projects Scope of Services for Environmental Assessment for Projects The Consultant shall submit a Scope and Fee for completion of all required studies, and final documentation in compliance with the National Environmental

More information

DEPARTMENT OF ENVIRONMENTAL PROTECTION OFFICE OF POLICY AND COMMUNICATIONS

DEPARTMENT OF ENVIRONMENTAL PROTECTION OFFICE OF POLICY AND COMMUNICATIONS DEPARTMENT OF ENVIRONMENTAL PROTECTION OFFICE OF POLICY AND COMMUNICATIONS DOCUMENT ID NUMBER: 012-0700-001 TITLE: AUTHORITY: IMPLEMENTATION OF THE PENNSYLVANIA STATE HISTORY CODE: POLICY AND PROCEDURES

More information

Planning Commission Public Hearing Exhibits. Powers Ready Mix Plant Oldcastle SW Group, Inc.

Planning Commission Public Hearing Exhibits. Powers Ready Mix Plant Oldcastle SW Group, Inc. Planning Commission Public Hearing Exhibits Powers Ready Mix Plant Oldcastle SW Group, Inc. Substantial Amendment to a Land Use Change Permit, Major Impact Review (File MPAA-02-16-8424) Applicant is CRC,

More information

Submission, Review, and Approval Procedures

Submission, Review, and Approval Procedures CHAPTER 2 Submission, Review, and Approval Procedures 2.0 Introduction Chapter 2, Submission, Review, and Approval Procedures, outlines the steps required to obtain Philadelphia Water Department (PWD)

More information

FY 2018 Local Safety Engineering Assistance Program

FY 2018 Local Safety Engineering Assistance Program FY 2018 Local Safety Engineering Assistance Program Pre Proposal Meeting May 23, 2018 Christine Mittman, Project Manager, Local Programs Angellita S. Young, Director Finance and Administration NJTPA Region

More information

January 19, To Whom It May Concern:

January 19, To Whom It May Concern: January 19, 2018 To Whom It May Concern: The Airport South Community Improvement District and the Airport West Community Improvement District, collectively known as the Aerotropolis Atlanta Community Improvement

More information

SMART SCALE Application Guide

SMART SCALE Application Guide SMART SCALE Application Guide prepared for Commonwealth Transportation Board Date, revised September 9, 2016 Table of Contents 1.0 Introduction... 3 1.1 Purpose of this Document... 3 1.2 Application Process...

More information

Public Notice NOTICE ANNOUNCING MINOR MODIFICATIONS TO THE LETTER OF PERMISSION AUTHORIZING TRANSPORATION PROJECTS

Public Notice NOTICE ANNOUNCING MINOR MODIFICATIONS TO THE LETTER OF PERMISSION AUTHORIZING TRANSPORATION PROJECTS Public Notice US Army Corps of Engineers Louisville, Huntington, Memphis, Nashville Districts Public Notice No. Date: Closing Date: LRL-2006-259-pgj 28 Oct 10 N/A Please address all comments and inquiries

More information

Memo. Office of State Aid Metro District 1500 West County Rd B2 Roseville, MN Date: April 24, METRO DISTRICT COUNTIES and CITIES

Memo. Office of State Aid Metro District 1500 West County Rd B2 Roseville, MN Date: April 24, METRO DISTRICT COUNTIES and CITIES Office of State Aid Metro District 1500 West County Rd B2 Roseville, MN 55113-3174 Memo Date: April 24, 2017 To: METRO DISTRICT COUNTIES and CITIES From: Phillip Bergem Metro State Aid RE: MnDOT Fiscal

More information

Competitive Grant Narrative Questions & Instructions Archaeology

Competitive Grant Narrative Questions & Instructions Archaeology The SHF online competitive application consists of two parts. The first part is four brief sections of fill-inthe-blank questions about the applicant organization, grant recipient contact, project and

More information

SCOTT COUNTY COMMUNITY SERVICES DIVISION

SCOTT COUNTY COMMUNITY SERVICES DIVISION SCOTT COUNTY COMMUNITY SERVICES DIVISION PHYSICAL DEVELOPMENT 600 COUNTRY TRAIL EAST JORDAN, MN 55352-9339 (952) 496-8346 Fax: (952) 496-8365 www.co.scott.mn.us MITCHELL J. RASMUSSEN, P.E. COUNTY ENGINEER

More information

CECIL COUNTY MARYLAND REQUEST FOR PROPOSALS. ENGINEERING SERVICES On-call Comprehensive Engineering Contracts Water and Wastewater

CECIL COUNTY MARYLAND REQUEST FOR PROPOSALS. ENGINEERING SERVICES On-call Comprehensive Engineering Contracts Water and Wastewater PROJECT DESCRIPTION CECIL COUNTY MARYLAND REQUEST FOR PROPOSALS ENGINEERING SERVICES On-call Comprehensive Engineering Contracts Water and Wastewater Cecil County Department of Public Works is seeking

More information

Public Notice U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT AND TEXAS COMMISSION ON ENVIRONMENTAL QUALITY

Public Notice U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT AND TEXAS COMMISSION ON ENVIRONMENTAL QUALITY Public Notice U.S. Army Corps Permit Application No: SWG-2012-00381 Of Engineers Date Issued: April 27, 2016 Galveston District Comments Due: May 30, 2017 U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT

More information

General Plan Land Use Amendment

General Plan Land Use Amendment PLANNING SERVICES DEPARTMENT 411 Main Street (530) 879-6800 P.O. Box 3420 Chico, CA 95927 Application No. APPLICATION FOR General Plan Land Use Amendment Applicant Information Applicant Daytime Phone Street

More information

Northern Arizona Council of Governments Annual Work Program Amendment 1

Northern Arizona Council of Governments Annual Work Program Amendment 1 Northern Arizona Council of Governments Annual Work Program Amendment 1 State Fiscal Year 2017 July 1, 2016 June 30, 2017 I. Work Program Purpose Each year the Arizona Department of Transportation Multimodal

More information

PPEA Guidelines and Supporting Documents

PPEA Guidelines and Supporting Documents PPEA Guidelines and Supporting Documents APPENDIX 1: DEFINITIONS "Affected jurisdiction" means any county, city or town in which all or a portion of a qualifying project is located. "Appropriating body"

More information

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Northern Natural Gas Company Docket No. PF18-1-000 NOTICE OF INTENT TO PREPARE AN ENVIRONMENTAL ASSESSMENT FOR THE PLANNED NORTHERN LIGHTS

More information

BILLING CODE P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP ]

BILLING CODE P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP ] This document is scheduled to be published in the Federal Register on 12/22/2014 and available online at http://federalregister.gov/a/2014-29872, and on FDsys.gov BILLING CODE 6717-01-P DEPARTMENT OF ENERGY

More information