It pays to save, save energy, get rewarded. Performance Contracting Brochure

Size: px
Start display at page:

Download "It pays to save, save energy, get rewarded. Performance Contracting Brochure"

Transcription

1 Performance Contracting Brochure It pays to save, save energy, get rewarded

2 Table of Contents About the programme...4 Key features...5 Key steps Proposal and evaluation Contracting Measurement and Verifi cation Project implementation Payment...9 Other Eskom energy effi ciency Standard product programme Standard offer programme ESCo funding process...12 Eskom advisory services...13

3 About the programme In this age of globalisation where business fl ows are dictated by minimising operating costs and maximising profi ts competition is fi erce and success is determined by the ability to adjust, change, optimise and switch to new, and effi cient solutions and practices in a quest to improve net earnings. Eskom, as the premier supplier of electricity in South Africa is strategically committed to save energy and empower its customers to make the switch to energy-effi cient technologies as a measure to improve profi tability. This commitment has seen Eskom launching the Performance Contracting Rebate Programme in the service of Project Developers and large energy users, specifi cally in the commercial and industrial sectors of the South African economy. Performance Contracting pays for verified bulk savings achieved over a period of three years, on a quarterly basis, as a result of the switch to energy-effi cient solutions at multiple sites across many technologies. Payment is performance-based up to an agreed maximum, equivalent to the Rand value of the total three-year forecast energy savings plus 10%. Eskom will primarily contract for energy savings during high-rate daytime from 6am to 10pm weekdays. Savings during other periods (10pm to 6am on weekdays as well as the weekend periods) will also be compensated, but at a lower rate, in order to incentivise off-peak savings as well. Payment rates are fi xed for the duration of the three-year contract as follows: PERIOD BASE RATE REDUCED RATE High-rate period 55c/kWh excl. VAT 42c/kWh excl. VAT Low-rate period 10c/kWh excl. VAT 0/kWh PAGE 3 4 PAGE

4 Key features: The programme was developed to signifi cantly improve sustainability and reduce: - Administrative requirements regarding project approvals - Contractual complexity - Project lead times. Eskom does not provide up-front fi nancing: - Project Developers are responsible for fi nancing all capital costs incurred to achieve the bulk energy savings. A copy of the signed contract can be used as a bankable instrument in order to receive third party fi nancing. Projects must propose minimum energy savings of 30GWh during the high-rate period over three years. Only Eskom approved energy-efficient technologies in line with the NERSA guidelines will be considered. A maximum payment value will be agreed upon in a contract between Eskom and respective successful respondents, namely a contractor or the customer itself, which is called a Project Developer. Payments will only be made based on energy savings verifi ed by an independent, accredited Measurement and Verifi cation (M&V) expert. Components of a project too costly or complex to measure and verify relative to the value of the energy savings, will not be included in the contracted savings. Any estimated savings outside high-rate daytime, will be excluded from the minimum size for evaluation purposes. In the event that maximum payment value has been made and verifi ed savings exceed the forecast energy savings, Eskom will in its complete and sole discretion pay for excess savings. PAGE 5 6 PAGE

5 Key steps 1. Proposal and evaluation Large energy users or Project Developers on behalf of large energy users request proposals, go out into the market allowing any party to submit a proposal to Eskom. M&V plans and metering solutions should be submitted as part of the proposal. Eskom evaluates and approves the proposal based on fi xed evaluation criteria, taking into consideration: - Delivery time frames - Savings size - M&V complexity - Requirements in respect of supplier development and localisation* - Strategy for safe disposal of the replaced technologies (in line with Eskom s current disposal mechanisms and any other legal or environmental specifi cations). *Eskom s Supplier Development and Localisation requirements will form part of the evaluation and selection criteria. These criteria incorporate government s requirements of Broad-Based Black Economic Empowerment (B-BBEE), Accelerated and Shared Growth Initiative South Africa (ASGI-SA), Competitive Supplier Development Programme (CSDP) and the New Growth Path (NGP) Framework. 2. Contracting A performance contract is signed between Eskom and the successful large energy user or Project Developer for a period of three years (subject to the provision of proof of financing within 60 days after signing). 3. Measurement and Verification (M&V) plan An independent, accredited M&V expert is appointed by Eskom. Eskom, the large energy user or Project Developer, and the M&V expert, agree on and sign-off the M&V plan. A savings baseline is established by the M&V expert in accordance with the stipulations of the plan and agreed to by Eskom and the large energy user or Project Developer. Metering equipment is procured, installed and maintained in accordance with the plan and at own cost. Eskom does not purchase or own any measurement equipment, but only pays for the services provided by the M&V team. 4. Project implementation Eskom provides a written approval to the large energy user or Project Developer to proceed with the installation of energy-effi cient technologies, and the safe removal and disposal of the replaced technologies. The large energy user or Project Developer must inform Eskom and the M&V expert about the completion of the project. PAGE 7 8 PAGE

6 5. Payment The M&V expert issues Performance Assessment (PA) Certifi cates in accordance with the M&V Plan. The Project Developer is in a position to submit an invoice to Eskom for savings realised in line with the value stipulated on the PA Certifi cate. Eskom starts paying the large energy user or Project Developer upon receipt of the invoices and validation thereof, and will continue to pay for verifi ed savings over the period of the contract subject to payment limitations. Payments are at fixed intervals based on measured and verifi ed savings. Timeous energy savings delivery is incentivised through Eskom s rates, payment levels could be reduced in case of late delivery. Over-delivery could be compensated up to a total of 10% of the maximum contracted energy-saving. Note: Eskom will periodically issue large energy savings blocks (e.g. 1,000GWh) through a tendering process. PAGE 9 10 PAGE

7 Other Eskom energy efficiency funding programmes include: Standard product programme Offers funding for the implementation of small and medium-sized projects that enable the switch from the most commonly used energy hungry technologies to off-the-shelf energy-effi cient alternatives, such as Light Emitting Diode (LED) lighting, energy and water saving shower heads, and heat pumps. A comprehensive list of participating technologies are published on the website. Key features: Funding capped at R1,875 million per project Electricity savings to be achieved from 1kW to 250kW Annual electricity savings to be achieved greater than 2MWh Project approval could be as quick as two weeks after submission of a detailed proposal. Standard offer programme Offers funding for the implementation of large projects, with potential electricity savings from 50kW to 5MW, that enable the switch to energy-efficient technologies and processes, such as building management systems, hot water systems, industrial and commercial solar water heating systems, process optimisation systems, energy-effi cient lighting technologies and small scale demand side renewable technologies (pilot programme). Key features: Electricity savings to be achieved from 50kW to 5MW Programme focus is on electricity usage during the 16 daytime hours between 6am and 10pm weekdays Contract duration three years Total programme amount capped at R250 million If successful, funding will be via fi xed amounts per kwh over a period of three years Project approval could be achieved within four to six months. ESCo funding process Offers funding for the implementation of large projects, with potential electricity savings of 500kW or more, that enable the switch to energy-effi cient technologies and processes. The programme is aimed specifi cally at Eskom accredited Project Developers who specialise in specifi c target markets, identify energy effi ciency opportunities for achieving reductions in electricity consumption, and scope and execute projects. Project Developers utilise their knowledge of demand management technologies to determine the best and most suitable way of obtaining electricity savings at a business, as basis for establishing a four-way partnership via legal contracts between Eskom, the customer, the Project Developer, and an independent, Eskom accredited Measurement and Verifi cation expert. Due to the legal complexities, the process is characterised by longer lead times. PAGE PAGE

8 Eskom advisory services Country wide support Eskom s advisory teams are located conveniently across the country, to provide industrial, commercial, agricultural and residential customers, large and small, with close and easy access to energy advisory services. To assist customers to locate their closest Energy Advisor, refer to the table below. Energy Advisors can assist with techniques and technologies that are available for the purpose of saving energy. To log a call, customers can also call the Eskom Customer Contact Centre on or visit Southern region Eastern region North West region Eastern Cape region (including Port Elizabeth and East London including Butterworth, East London, King Williams Town, Adelaide, Albany, Alexandria, Alice, Grahamstown, Humansdorp, Joubertina, Kirkwood, Port Elizabeth, Aliwal North, Cradock, Graaff-Reinet, Lady Frere, Queenstown, Elliot, Lusikisiki, Mthatha North, Mthatha South KwaZulu-Natal Free State Province, Ekurhuleni (including East Rand, Gauteng) Frances Baard District Municipal area (including Kimberley), Pixley ka Seme District Municipal area (including De Aar, Colesberg), Siyanda District Municipal area (including Postmasburg) in the Northern Cape. Rene de Kock Clive Nicosia Barney Kakora rene.dekock@eskom.co.za clive.nicosia@eskom.co.za kakorab@eskom.co.za Eskom regional office Areas covered Contact person address Western Cape region Entire Western and Northern Cape (excluded are Frances Baard District Municipal area including Kimberley), Pixley ka Seme District Municipal area (including De Aar, Colesberg), Siyanda District Municipal area (including Postmasburg) in the Northern Cape. Wayne Fortuin wayne.fortuin@eskom.co.za Central region Northern region Johannesburg, Midrand, Sandton, Randburg, Roodepoort, Krugersdorp, Randfontein, Carletonville, Westonaria, Fochville, Vanderbijlpark, Vereeniging, Potchefstroom, Klersdorp, Mmabatho, Vryburg. Pretoria, Centurion, Rustenburg, Mpumalanga and Limpopo. Arend Louw Victor Martins arend.louw@eskom.co.za victor.martins@eskom.co.za PAGE PAGE

9 Call the Eskom Customer Contact Centre on for assistance by an Energy Advisor on any of Eskom s energy efficiency funding programmes. Visit for detailed information. Issued by Eskom Integrated Demand Management December 2012 Eskom Holdings SOC Limited Reg No 2002/015527/06

TERMS OF REFERENCE Events Management: Gender Based Violence Conference REQUEST FOR PROPOSALS AUGUST 2017

TERMS OF REFERENCE Events Management: Gender Based Violence Conference REQUEST FOR PROPOSALS AUGUST 2017 TERMS OF REFERENCE Events Management: Gender Based Violence Conference REQUEST FOR PROPOSALS AUGUST 2017 SUMMARY Title Events Management: Gender Based Violence Conference Description (Summary for website

More information

ENHANCING OF THE PUBLIC ORDER POLICING CAPACITY WITHIN THE SAPS BRIEFING TO THE PORTFOLIO COMMITTEE ON POLICE

ENHANCING OF THE PUBLIC ORDER POLICING CAPACITY WITHIN THE SAPS BRIEFING TO THE PORTFOLIO COMMITTEE ON POLICE ENHANCING OF THE PUBLIC ORDER POLICING CAPACITY WITHIN THE SAPS BRIEFING TO THE PORTFOLIO COMMITTEE ON POLICE 3 September 2014 PURPOSE To brief the Committee on the State of Public Order Policing and plans

More information

ZIMELE. Presentation to: SME s and Technology Transfer. Alugumi Dzebu Senior Investment Manager: Partnership Funds 20 May 2015

ZIMELE. Presentation to: SME s and Technology Transfer. Alugumi Dzebu Senior Investment Manager: Partnership Funds 20 May 2015 ZIMELE Presentation to: SME s and Technology Transfer Alugumi Dzebu Senior Investment Manager: Partnership Funds 20 May 2015 PRESENTATION OUTLINE Background on Zimele Funds Performance Hub network Competitive

More information

FIVE-YEAR OVERVIEW. 1 April 2000 to 31 March A separate insert to the Fasset Annual Report for the period 1 April 2004 to 31 March 2005.

FIVE-YEAR OVERVIEW. 1 April 2000 to 31 March A separate insert to the Fasset Annual Report for the period 1 April 2004 to 31 March 2005. FIVE-YEAR OVERVIEW 1 April 2 to 31 March 25 A separate insert to the Fasset Annual Report for the period 1 April 24 to 31 March 25. Key CPE1 Capital Gains Tax (1/21) CPE2 Labour Legislation & Tax Update

More information

Request for Proposals (RFP)

Request for Proposals (RFP) Request for Proposals (RFP) The provision of services to undertake RECP assessment at an Agro-Processing company located in Swellendam, Western Cape on behalf of the CSIR RFP No. 780/14/08/2017 Date of

More information

Tourism Incentive Programme

Tourism Incentive Programme Tourism Incentive Programme Select Committee on Trade and International Relations 29 July 2015 Department of Tourism www.tourism.gov.za Slide 1 A force for change Tourism brings socio-economic development

More information

NATIONAL LOTTERY DISTRIBUTION TRUST FUND (NLDTF) SPORT AND RECREATION SECTOR 2015 BUSINESS AND IMPLEMENTATION PLAN

NATIONAL LOTTERY DISTRIBUTION TRUST FUND (NLDTF) SPORT AND RECREATION SECTOR 2015 BUSINESS AND IMPLEMENTATION PLAN 1 NATIONAL LOTTERY DISTRIBUTION TRUST FUND (NLDTF) SPORT AND RECREATION SECTOR 2015 BUSINESS AND IMPLEMENTATION PLAN NAME OF APPLICANT ORGANISATION: ADDRESS: INDICATE THE PROVINCE/S WHERE THE FUNDING (IF

More information

ZIMELE COMMITTED TO ENTERPRISE DEVELOPMENT

ZIMELE COMMITTED TO ENTERPRISE DEVELOPMENT ZIMELE COMMITTED TO ENTERPRISE DEVELOPMENT 4 FUNDS R567 MILLION INVESTED 1,085 BUSINESSES 36% 48% OF BENEFICIARIES ARE WOMEN OF BENEFICIARIES ARE THE YOUTH 19,575 PEOPLE EMPLOYED 1,481 TRANSACTIONS R2,3

More information

NON-STATE SECTOR PROGRAMME NPO INTAKE TERMS OF REFERENCE

NON-STATE SECTOR PROGRAMME NPO INTAKE TERMS OF REFERENCE NON-STATE SECTOR PROGRAMME NPO 2017 2019 INTAKE TERMS OF REFERENCE 1 TERMS OF REFERENCE FOR NPOs PARTICIPATION IN THE EPWP PHASE 3 NON-STATE SECTOR PROGRAMME 2017 2019 INTAKE 1. PURPOSE The purpose of

More information

REDUCING POVERTY AND CREATING OPPORTUNITIES FOR GROWTH AND JOBS

REDUCING POVERTY AND CREATING OPPORTUNITIES FOR GROWTH AND JOBS REDUCING POVERTY AND CREATING OPPORTUNITIES FOR GROWTH AND JOBS 9 January 2014 Minister Alan Winde SA Today 2 Unemployment rates per Province SA unemployment rate is 24.7% Expanded Unemployment Rate is

More information

BUSINESS. New Construction. Save money on qualified construction projects. Read about rebates for your home and business at mid.

BUSINESS. New Construction. Save money on qualified construction projects. Read about rebates for your home and business at mid. BUSINESS New Construction Save money on qualified construction projects Read about rebates for your home and business at mid.org/rebates REV06.2018 PURPOSE The MPower Business: New Construction Rebate

More information

United Nations Development Programme

United Nations Development Programme United Nations Development Programme Title: Status and Analysis Wind Energy Training Education Skills and Capacity development Location: South Africa Application Deadline: 14 July 2017 Category: Climate

More information

Contents. Introduction. Types of grants

Contents. Introduction. Types of grants 2017/18 Contents Introduction Types of grants What do you need to apply Where do you apply for a grant Date of approval Unsuccessful application Methods of payment Suspension of grants Restoration of grants

More information

NON-STATE SECTOR PROGRAMME NPO INTAKE TERMS OF REFERENCE

NON-STATE SECTOR PROGRAMME NPO INTAKE TERMS OF REFERENCE NON-STATE SECTOR PROGRAMME NPO 2016 2017 INTAKE TERMS OF REFERENCE 1 TERMS OF REFERENCE FOR NPOs PARTICIPATION IN THE EPWP PHASE 3 NON-STATE SECTOR PROGRAMME 2016 2017 INTAKE 1. PURPOSE The purpose of

More information

Power NI Variable Speed Drive Grant 2015/16

Power NI Variable Speed Drive Grant 2015/16 Power NI Variable Speed Drive Grant 2015/16 Power NI is offering small and medium sized enterprises in Northern Ireland the opportunity to install Variable Speed Drives (VSDs) with grant assistance. Funded

More information

RESIDENTIAL AND SMALL COMMERCIAL STANDARD OFFER PROGRAM

RESIDENTIAL AND SMALL COMMERCIAL STANDARD OFFER PROGRAM RESIDENTIAL AND SMALL COMMERCIAL STANDARD OFFER PROGRAM Incorporates changes approved at the PUCT 8/21/03 Open Meeting PROGRAM OVERVIEW Description The Residential and Small Commercial Standard Offer Program

More information

Request for Tender. SANBI Pretoria Private Bag X101 Silverton 0184

Request for Tender. SANBI Pretoria Private Bag X101 Silverton 0184 Request for Tender APPOINTMENT OF AN ENVIRONMENTAL SUSTAINABILITY DESIGN CONSULTANT TO CONDUCT A FEASIBILITY STUDY ON ENVIRONMENTALLY SUSTAINABLE SOLUTIONS AND TO FACILITATE IMPLEMENTATION OF RECOMMENDED

More information

Stakeholder engagement SA

Stakeholder engagement SA 72 Stakeholder engagement SA At Netcare, communication with our stakeholders is integral to the way we do business. The eight stakeholder groups below have been identified on the basis of the extent to

More information

CHARITIES SECTOR OPEN CALL FOR APPLICATIONS GUIDELINES FOR APPLICANTS. The Charities call for applications consists of the following documents (pack):

CHARITIES SECTOR OPEN CALL FOR APPLICATIONS GUIDELINES FOR APPLICANTS. The Charities call for applications consists of the following documents (pack): CHARITIES SECTOR OPEN CALL FOR APPLICATIONS GUIDELINES FOR APPLICANTS The Charities call for applications consists of the following documents (pack): FORM 2010/1 (for applications greater than R500 000.00)

More information

Government Gazette Staatskoerant

Government Gazette Staatskoerant Government Gazette Staatskoerant REPUBLIC OF SOUTH AFRICA REPUBLIEK VAN SUID-AFRIKA Vol. 568 Pretoria, 2 October Oktober 2012 No. 35737 N.B. The Government Printing Works will not be held responsible for

More information

A Review of Direct and Indirect Conditional Grants in South Africa Case Study of CHAPTER 3. Selected Conditional Grants

A Review of Direct and Indirect Conditional Grants in South Africa Case Study of CHAPTER 3. Selected Conditional Grants A Review of Direct and Indirect Conditional Grants in South Africa Case Study of CHAPTER 3 Selected Conditional Grants CHAPTER 3 A Review of Direct and Indirect Conditional Grants in South Africa Case

More information

NON GOVERNMENTAL ORGANIZATIONS SUPPORT PROGRAMME FUNDING APPLICATION 1. NAME OF THE ORGANIZATION: 2. PHYSICAL ADDRESS: 3.

NON GOVERNMENTAL ORGANIZATIONS SUPPORT PROGRAMME FUNDING APPLICATION 1. NAME OF THE ORGANIZATION: 2. PHYSICAL ADDRESS: 3. Reg.No. 2001/029882/08 Vat Registration No. 4820260695 REGISTERED OFFICE: PBO No. 930034723 NPO No. 094-536 522 Impala Road Glenvista 2058 PO Box 1127 Johannesburg 2000 South Africa Tel (011) 682 0911

More information

CCMDD: A vehicle towards universal access to Anti Retrovirals and other chronic medicines in South Africa. HST Project Manager: CCMDD Helecine Zeeman

CCMDD: A vehicle towards universal access to Anti Retrovirals and other chronic medicines in South Africa. HST Project Manager: CCMDD Helecine Zeeman CCMDD: A vehicle towards universal access to Anti Retrovirals and other chronic medicines in South Africa HST Project Manager: CCMDD Helecine Zeeman PROBLEM STATEMENT Long queues, long day, no medicines!

More information

Power NI Variable Speed Drive Grant 2017/18

Power NI Variable Speed Drive Grant 2017/18 Power NI Variable Speed Drive Grant 2017/18 Power NI is offering small and medium sized enterprises in Northern Ireland the opportunity to install Variable Speed Drives (VSDs) with grant assistance. Funded

More information

Upcoming Changes to the Solar Photovoltaic Incentive Programs December 15, 2006

Upcoming Changes to the Solar Photovoltaic Incentive Programs December 15, 2006 Upcoming Changes to the Solar Photovoltaic Incentive Programs December 15, 2006 Under the new California Solar Initiative, the state s goal to install 3,000 megawatts of solar capacity by 2017 brings together

More information

Request for Proposals (RFP)

Request for Proposals (RFP) Request for Proposals (RFP) The development of info-graphic instructional videos for the National Cleaner Production Centre South African (NCPC-SA) on behalf of the CSIR RFP No. 821/23/03/2018 Date of

More information

SANC CPD INFORMATION SHARING SESSION DATE: VENUE : PRESENTER:

SANC CPD INFORMATION SHARING SESSION DATE: VENUE : PRESENTER: SANC CPD INFORMATION SHARING SESSION DATE: VENUE : PRESENTER: Excellence in professionalism and advocacy for health care users 1 PRESENTATION OUTLINE 1. Introduction and background 2. CPD sessions 3. Inputs

More information

EXPRESSION OF INTEREST IN APPOINTING A PANEL OF ATTORNEYS

EXPRESSION OF INTEREST IN APPOINTING A PANEL OF ATTORNEYS EXPRESSION OF INTEREST IN APPOINTING A PANEL OF ATTORNEYS UNIVERSITY OF KWAZULU-NATAL (UKZN) EXPRESSION OF INTEREST (EOI) EOI 01/2018 The University of KwaZulu-Natal ( UKZN ) invites all interested parties

More information

Request for Proposals (RFP) The provision of transport law specialist services for subsidised public transport contracts for the CSIR

Request for Proposals (RFP) The provision of transport law specialist services for subsidised public transport contracts for the CSIR Request for Proposals (RFP) The provision of transport law specialist services for subsidised public transport contracts for the CSIR RFP No. 3131/21/07/2017 Date of Issue Friday, 07 July 2017 Closing

More information

Chapter Two STATE FUNCTIONS FOR ENERGY EFFICIENCY PROMOTION Section I Governing Bodies

Chapter Two STATE FUNCTIONS FOR ENERGY EFFICIENCY PROMOTION Section I Governing Bodies Energy Efficiency Act Promulgated, SG No. 98/14.11.2008, effective 14.11.2008, supplemented, SG No. 6/23.01.2009, effective 1.05.2009, amended, SG No. 19/13.03.2009, effective 10.04.2009, supplemented,

More information

1. Research Customer Research the various types of renewable energy systems available and decide which system best fits your consumption needs.

1. Research Customer Research the various types of renewable energy systems available and decide which system best fits your consumption needs. 1 2 3 4 1. Research Customer Research the various types of renewable energy systems available and decide which system best fits your consumption needs. Research contractors and third party system owners

More information

MEDIUM GRANTS 2015 BUSINESS AND IMPLEMENTATION PLAN, BUDGET & PROJECT MOTIVATION

MEDIUM GRANTS 2015 BUSINESS AND IMPLEMENTATION PLAN, BUDGET & PROJECT MOTIVATION 1 NATIONAL LOTTERY DISTRIBUTION TRUST FUND (NLDTF) SPORT AND RECREATION SECTOR MEDIUM GRANTS 2015 BUSINESS AND IMPLEMENTATION PLAN, BUDGET & PROJECT MOTIVATION NAME OF APPLICANT ORGANISATION: ADDRESS:

More information

MANUFACTURING INCENTIVES. Small Business and Transformation Workshop 18 January 2017

MANUFACTURING INCENTIVES. Small Business and Transformation Workshop 18 January 2017 MANUFACTURING INCENTIVES Small Business and Transformation Workshop 18 January 2017 OUTLINE the dti: Mandate Background Support Programmes Available Incentives Incentive Performance 2015-2016 Application

More information

FAQ. Frequently Asked Questions

FAQ. Frequently Asked Questions FAQ Frequently Asked Questions CONTENTS General Efficiency... 3-4 Efficiency Auction.... 5 Pre-Qualification Process... 6 Project Eligibility Program... 7 Program Details... 8 Program Implementation...

More information

RECAPITALISATION AND DEVELOPMENT PROGRAMME PRESENTATION TO THE PORTFOLIO COMMITTEE ON RURAL DEVELOPMENT AND LAND REFORM 23 OCTOBER 2013

RECAPITALISATION AND DEVELOPMENT PROGRAMME PRESENTATION TO THE PORTFOLIO COMMITTEE ON RURAL DEVELOPMENT AND LAND REFORM 23 OCTOBER 2013 RECAPITALISATION AND DEVELOPMENT PROGRAMME PRESENTATION TO THE PORTFOLIO COMMITTEE ON RURAL DEVELOPMENT AND LAND REFORM 23 OCTOBER 2013 HISTORY OF RECAPITILISATION AND DEVELOPMENT PROGRAMME In 2009, the

More information

NATIONAL HEALTH INSURANCE PILOTS. Forum for Professional Nurse Leaders Conference Sliverstar Casino, Krugersdorp 8 th MAY 2012

NATIONAL HEALTH INSURANCE PILOTS. Forum for Professional Nurse Leaders Conference Sliverstar Casino, Krugersdorp 8 th MAY 2012 NATIONAL HEALTH INSURANCE PILOTS Forum for Professional Nurse Leaders Conference Sliverstar Casino, Krugersdorp 8 th MAY 2012 Outline WHO Dimensions for UHC Constitutional Obligation Principles of NHI

More information

External Bursary Application Form 2017

External Bursary Application Form 2017 External Bursary Application Form 2017 Legal Expenses Insurance Southern Africa Limited Reg No 1984/010574/06 An Authorised Financial Services Provider Please complete the application form thoroughly and

More information

Carbon Neutral Adelaide

Carbon Neutral Adelaide Carbon Neutral Adelaide SUSTAINABILITY INCENTIVES SCHEME Solar Photovoltaic Systems Updated March 2017 Rebate Application Form How to Apply 1. Please read and understand all sections of this application

More information

APPROVED FIRST AID TRAINING ORGANISATIONS

APPROVED FIRST AID TRAINING ORGANISATIONS DEPARTMENT OF LABOUR APPROVED FIRST AID TRAINING ORGANISATIONS INFORMATION BROCHURE NO 2: Prepared by the Chief Directorate of Occupational Health and Safety This information brochure is aimed at persons

More information

Local Government Sector Education Training Authority

Local Government Sector Education Training Authority Local Government Sector Education Training Authority Delegation: Chairperson- Mr. Mziwonke Sebezo Deputy Chairperson- Mayor Hazel Jenkins Chief Executive Officer- Mr. Sidwell Mofokeng Sector Skills Planning

More information

Carbon Neutral Adelaide

Carbon Neutral Adelaide Carbon Neutral Adelaide SUSTAINABILITY INCENTIVES SCHEME Hot Water Systems Updated January 2017 Updated Updated December March 2017 2016 Rebate Application Form How to Apply 1. Please read and understand

More information

SPORT AND RECREATION SECTOR

SPORT AND RECREATION SECTOR SPORT AND RECREATION SECTOR MEDIUM GRANTS BUSINESS & IMPLEMENTATION PLAN, BUDGET & PROJECT MOTIVATION Name of applicant organisation: Address: 1. Indicate the province/s where the funding (if granted)

More information

ESASTAP Plus Strengthening Technology, Research and Innovation Cooperation between Europe and South Africa

ESASTAP Plus Strengthening Technology, Research and Innovation Cooperation between Europe and South Africa ESASTAP Plus Strengthening Technology, Research and Innovation Cooperation between Europe and South Africa Constantine Vaitsas, coordinator ESASTAP Plus is.. A dedicated platform for the enhancement of

More information

Energy Savings Bid Program 2007 Policy Manual

Energy Savings Bid Program 2007 Policy Manual Energy Savings Bid Program 2007 Policy Manual Utility Administrator: San Diego Gas & Electric Jerry Humphrey Senior Market Advisor, (858) 654-1190, ghumphrey@semprautilities.com Kathleen Polangco Program

More information

A PERSPECTIVE ON THE EASTERN CAPE

A PERSPECTIVE ON THE EASTERN CAPE A PERSPECTIVE ON THE EASTERN CAPE 2013 MATRIC RESULTS Contact ECSECC Physical Address: 12 Gloucester Road, Vincent, East London, 5247 Postal Address: Postnet Vincent, P/Bag X9063, Suite No 302, Vincent,

More information

FULL APPLICATION FORM

FULL APPLICATION FORM Welcome to the Full Application Form for the ApexHi Charitable Trust. Only organisations who have been invited to complete this form, need proceed. The ApexHi Charitable Trust is administered by Tshikululu

More information

ARM s implementation of the Mining Charter Presentation to the Portfolio Committee 9 November 2011

ARM s implementation of the Mining Charter Presentation to the Portfolio Committee 9 November 2011 ARM s implementation of the Mining Charter Presentation to the Portfolio Committee 9 November 2011 1 Table of contents Page ARM overview 2 Implementation of Mining Charter: 16 Ownership 17 Procurement

More information

CSI FUNDING APPLICATION FORM

CSI FUNDING APPLICATION FORM Form CSI Funding Application Form Document Number Version Final Function CSI Date Approved 10 June 2013 Policy Author Donique de Figueiredo Policy Owner Andrew Skudder Pages 10 CSI FUNDING APPLICATION

More information

ENTERPRISE AND SUPPLIER DEVELOPMENT ADVANCEMENT PROGRAMME AUGUST 2017/MBOMBELA LOCAL MUNICIPALITY

ENTERPRISE AND SUPPLIER DEVELOPMENT ADVANCEMENT PROGRAMME AUGUST 2017/MBOMBELA LOCAL MUNICIPALITY PARTNERSHIP PROPOSAL 2 ND ANNUAL SMALL BUSINESS ENTERPRISE AND SUPPLIER DEVELOPMENT ADVANCEMENT PROGRAMME 2017 Small Business 10-11 AUGUST 2017/MBOMBELA LOCAL MUNICIPALITY Advancing small businesses to

More information

the dti: IDAD Qondani Mamase

the dti: IDAD Qondani Mamase the dti: IDAD Qondani Mamase 021 480 8054 cmamase@thedti.gov.za 1 the dti: THE ENTERPRISE ORGANISATION TEO s mission statement To stimulate and facilitate the development of sustainable, competitive enterprises

More information

Iconic Ventures (Pty) Ltd COMPANY PROFILE

Iconic Ventures (Pty) Ltd COMPANY PROFILE Iconic Ventures (Pty) Ltd COMPANY PROFILE Contents 1) Introduction...3 2) Achievements...3 2.1) Public Sector...3 2.2) Private Sector... 3 3) Business Overview...4 3.1) Vision Statement...4 3.2) Objectives...4

More information

1.4 On 19 May 2011 the WA State Government announced a reduction in the Subsidy rate from 40c/kWh to 20c/kWh effective from 1 July 2011.

1.4 On 19 May 2011 the WA State Government announced a reduction in the Subsidy rate from 40c/kWh to 20c/kWh effective from 1 July 2011. Horizon Power Residential Net Feed-in Tariff Scheme Terms and Conditions 1. Background 1.1 The State Government has introduced a subsidy scheme to encourage the installation of residential renewable energy

More information

FEED-IN TARIFF LICENSEE TRANSFER

FEED-IN TARIFF LICENSEE TRANSFER ABOUT FEED-IN TARIFFS The Feed-in Tariff (FIT) scheme is an environmental programme introduced by Government to promote widespread uptake of a range of small-scale renewable and low carbon electricity

More information

Illinois Power Agency Long-Term Renewable Resources Procurement Plan. What s Next?

Illinois Power Agency Long-Term Renewable Resources Procurement Plan. What s Next? Illinois Power Agency Long-Term Renewable Resources Procurement Plan What s Next? Anthony Star Director Illinois Power Agency Institute for Regulatory Policy Studies Spring 2018 Conference Long-Term Renewable

More information

Energy Efficiency Alberta Residential and Commercial Solar Program Guidebook

Energy Efficiency Alberta Residential and Commercial Solar Program Guidebook Energy Efficiency Alberta Residential and Commercial Solar Program Guidebook This Guidebook provides an overview of the eligibility requirements, available funding, and process for municipalities to participate

More information

Request for proposals (RFP)

Request for proposals (RFP) Request for proposals (RFP) For the provision of professional consulting services to position the National Cleaner Production Centre as a Technical Reference Partner to the Energy and Water Seta as the

More information

DEPARTMENT OF FACILITIES MANAGEMENT MAINTENANCE AND SERVICES INVITATION TO TENDER

DEPARTMENT OF FACILITIES MANAGEMENT MAINTENANCE AND SERVICES INVITATION TO TENDER DEPARTMENT OF FACILITIES MANAGEMENT MAINTENANCE AND SERVICES INVITATION TO TENDER UNIVERSITY OF PRETORIA ELECTRICITY INFRASTRUCTURE SURVEY Tender No : FM/SUR/2014/104 Closing Date : 14 March 2014 Time

More information

SPORT AND RECREATION SECTOR 2017 OPEN CALL FOR APPLICATIONS

SPORT AND RECREATION SECTOR 2017 OPEN CALL FOR APPLICATIONS SPORT AND RECREATION SECTOR 2017 OPEN CALL FOR APPLICATIONS The Distributing Agency for Sport and Recreation, established in terms of the Lotteries Act, 1997 (No. 57 of 1997, as amended), is once again

More information

Solomon Mahlangu Scholarship Fund (SMSF) Application Form 2015 For study at University and University of Technology

Solomon Mahlangu Scholarship Fund (SMSF) Application Form 2015 For study at University and University of Technology Solomon Mahlangu Scholarship Fund (SMSF) Application Form 2015 For study at University and University of Technology 1 SOLOMON MAHLANGU SCHOLARSHIP FUND 2015 CLOSING DATE: 23 JANUARY 2015 APPLICANTS INTENDING

More information

CHARITIES SECTOR 2017 OPEN CALL FOR APPLICATIONS GUIDELINES FOR APPLICANTS

CHARITIES SECTOR 2017 OPEN CALL FOR APPLICATIONS GUIDELINES FOR APPLICANTS CHARITIES SECTOR 2017 OPEN CALL FOR APPLICATIONS GUIDELINES FOR APPLICANTS The Charities Call for Applications consists of the following documents that make up the Application Pack: FORM 2010/1 (for applications

More information

CHARITIES SECTOR 2017 OPEN CALL FOR APPLICATIONS GUIDELINES FOR APPLICANTS

CHARITIES SECTOR 2017 OPEN CALL FOR APPLICATIONS GUIDELINES FOR APPLICANTS CHARITIES SECTOR 2017 OPEN CALL FOR APPLICATIONS GUIDELINES FOR APPLICANTS The Charities Call for Applications consists of the following documents that make up the Application Pack: FORM 2010/1 (for applications

More information

Request for Proposals (RFP) The provision of Media Monitoring and Analyses services to the CSIR. RFP No. 770/09/06/2017

Request for Proposals (RFP) The provision of Media Monitoring and Analyses services to the CSIR. RFP No. 770/09/06/2017 Request for Proposals (RFP) The provision of Media Monitoring and Analyses services to the CSIR RFP No. 770/09/06/2017 Date of Issue Monday, 29 May 2017 Closing Date Friday, 09 June 2017 Place Tender box,

More information

AMSP Guidebook. February 2017

AMSP Guidebook. February 2017 AMSP Guidebook This Guidebook provides an overview of the eligibility requirements, available funding, and process for municipalities to participate in the Alberta Municipal Solar Program. February 2017

More information

Solar Electricity For Community Buildings Pilot Program. Workbook

Solar Electricity For Community Buildings Pilot Program. Workbook Solar Electricity For Community Buildings Pilot Program Workbook Index What is the Solar Electricity for Community Buildings Pilot Program? An Overview 1 How to use this workbook 2 Section 1 Are you eligible

More information

City of Burbank Energy Program

City of Burbank Energy Program City of Burbank Energy Program Welcome City of Burbank Residents! Welcome City of Burbank Residents! Eligo Energy, a leading retail electricity supplier based in Chicago, is proud to have been chosen as

More information

DRAFT USE ONLY. Disclaimer

DRAFT USE ONLY. Disclaimer DRAFT USE ONLY Disclaimer This document is a draft version of the proposed BEC 2017 Application form and is for information purposes only to allow interested parties to prepare the information required

More information

APPLICATION FOR FUNDING

APPLICATION FOR FUNDING P.O. Box 72501 Parkview Johannesburg South Africa 2122 APPLICATION FOR FUNDING Name of Organisation Applying for Financial Assistance Name of Project for which Assistance is being sought OFFICIAL USE Area

More information

PROGRAM OPPORTUNITY NOTICE EFFICIENCY MAINE TRUST CUSTOM INCENTIVE PROGRAM FOR DISTRIBUTED GENERATION PROJECTS PON EM

PROGRAM OPPORTUNITY NOTICE EFFICIENCY MAINE TRUST CUSTOM INCENTIVE PROGRAM FOR DISTRIBUTED GENERATION PROJECTS PON EM PROGRAM OPPORTUNITY NOTICE EFFICIENCY MAINE TRUST CUSTOM INCENTIVE PROGRAM FOR DISTRIBUTED GENERATION PROJECTS PON Opening: July 1, 2017 Closing: June 30, 2018 Updated: July 1, 2017 CONTENTS SECTION 1:

More information

Applicant Information Booklet

Applicant Information Booklet Solar Hot Water Rebate Program Applicant Information Booklet The Australian Government is helping Australian households install climate friendly hot water technologies. Rebates of $1000 are available in

More information

Request for Proposals and Specifications for a Community Solar Project

Request for Proposals and Specifications for a Community Solar Project Request for Proposals and Specifications for a Community Solar Project CPS Energy P.O. Box 1771 San Antonio, TX 78296-1771 October 9, 2014 PR # 10452716 INVITATION TO SUBMIT PROPOSALS 1. Introduction CPS

More information

Civil Society and local authorities thematic programme South Africa- CSO call for proposals

Civil Society and local authorities thematic programme South Africa- CSO call for proposals This is the presentation done at the information session on 27 January 2016 in Pretoria. Only the information provided the Call for proposals guidelines and the annexes documents constitute the sole authentic

More information

Industrial Optimization Program: Feasibility Study

Industrial Optimization Program: Feasibility Study Industrial Optimization Program: Feasibility Study The Feasibility Study is a detailed study of a specific process or system within an industrial facility to fully investigate an opportunity to use natural

More information

ARTS, CULTURE, AND NATIONAL HERITAGE SECTOR 2015 GUIDELINES

ARTS, CULTURE, AND NATIONAL HERITAGE SECTOR 2015 GUIDELINES ARTS, CULTURE, AND NATIONAL HERITAGE SECTOR 2015 GUIDELINES The 2015 Arts, Culture and National Heritage call for applications consists of the following portfolio of documents: FORM 2010/1 and FORM 2010/2

More information

Request for Proposals (RFP) Moving office furniture from building 3A to building 22 and other CSIR store areas (in building 35 and 36)

Request for Proposals (RFP) Moving office furniture from building 3A to building 22 and other CSIR store areas (in building 35 and 36) Request for Proposals (RFP) Moving office furniture from building 3A to building 22 and other CSIR store areas (in building 35 and 36) RFP No. 816/16/02/2018 Date of Issue Friday, 02 February 2018 Friday,

More information

Renewable Energy Bonus Scheme - solar hot water rebate. Guidelines and application form

Renewable Energy Bonus Scheme - solar hot water rebate. Guidelines and application form Renewable Energy Bonus Scheme - solar hot water rebate Guidelines and application form Under the Renewable Energy Bonus Scheme, the Australian Government is offering rebates of $1,000 to install a solar

More information

Customer Tailored Energy Efficiency Pilot Program FY18 PROGRAM GUIDE

Customer Tailored Energy Efficiency Pilot Program FY18 PROGRAM GUIDE Customer Tailored Energy Efficiency Pilot Program FY18 PROGRAM GUIDE JULY 1, 2017 JUNE 30, 2018 TABLE OF CONTENTS 1. INTRODUCTION... 1 2. PILOT PROGRAM DESIGN... 2 Eligibility... 2 Incentives... 2 Base

More information

Guidelines on a Grant on the Purchase of Roof Insulation and Double Glazing Products for Domestic Use that Reduce the Consumption of Energy.

Guidelines on a Grant on the Purchase of Roof Insulation and Double Glazing Products for Domestic Use that Reduce the Consumption of Energy. Guidelines on a Grant on the Purchase of Roof Insulation and Double Glazing Products for Domestic Use that Reduce the Consumption of Energy. 1. Overview of the scheme The application for a grant is made

More information

Community Energy Planning: Where Do You Want To Go? Rob Osborn Director of Community Relations Xcel Energy Colorado

Community Energy Planning: Where Do You Want To Go? Rob Osborn Director of Community Relations Xcel Energy Colorado Community Energy Planning: Where Do You Want To Go? Rob Osborn Director of Community Relations Xcel Energy Colorado Today s Presenter Rob Osborn The Community Relations Managers Contact your utility Community

More information

Smart Energy New Homes Program

Smart Energy New Homes Program Smart Energy New Homes Program 2014 Certification Guidelines TM Program Overview...Page 3 How To Participate...Page 4 FAQs...Page 5 2013 Participation Application & Agreement...Page 8 2013 Rebate Reservation

More information

Practice Number Region Town Functional Name P Type Hospital Group. Netcare Hospitals

Practice Number Region Town Functional Name P Type Hospital Group. Netcare Hospitals Practice Number Region Town Functional Name P Type Hospital Group Netcare Hospitals 0348090 Eastern Cape GRAHAMSTOWN Settlers Private Hospital 57 NET 0328871 Eastern Cape PORT ALFRED Port Alfred Private

More information

microfit FAQ Version 4.1

microfit FAQ Version 4.1 microfit FAQ Version 4.1 July 14, 2017 Introduction The microfit program is a stream of the (FIT) Program for renewable energy in Ontario. It is intended to encourage the development of micro-scale renewable

More information

Request for Proposals and Specifications for a Distributed Generation Solar Project entitled The Freeman Coliseum Solar Project

Request for Proposals and Specifications for a Distributed Generation Solar Project entitled The Freeman Coliseum Solar Project Request for Proposals and Specifications for a Distributed Generation Solar Project entitled The The Freeman Coliseum 3201 E. Houston St. San Antonio, TX 78219 September 25, 2016 Table of Contents 1. Introduction...

More information

WarmWise Business Custom Rebates Program Manual

WarmWise Business Custom Rebates Program Manual WarmWise Business Custom Rebates Program Manual January, 2015 Contents CONTENTS... 1 SECTION 1 INTRODUCTION... 2 1.1 PROGRAM OVERVIEW... 2 SECTION 2 ELIGIBILITY REQUIREMENTS... 3 2.1 QUALIFYING CUSTOMERS...

More information

Presenter: Janine Espin

Presenter: Janine Espin Presenter: Janine Espin EDS Core Business Interests Community Participation Facilitation Stakeholder Engagement (incl. Municipalities) Socio-Economic Development Enabling Economic Transformation Localisation

More information

EXTERNAL ADVERTISEMENT: VACANT POSTS FOR APPOINTMENT TO POSITIONS FROM SALARY LEVEL 5 TO 7: DIVISION: FORENSIC SERVICES: SOUTH AFRICAN POLICE SERVICE

EXTERNAL ADVERTISEMENT: VACANT POSTS FOR APPOINTMENT TO POSITIONS FROM SALARY LEVEL 5 TO 7: DIVISION: FORENSIC SERVICES: SOUTH AFRICAN POLICE SERVICE EXTERNAL ADVERTISEMENT: VACANT POSTS FOR APPOINTMENT TO POSITIONS FROM SALARY LEVEL 1. The posts contained in this circular are vacant and are advertised externally in the Rapport, Sunday Times and City

More information

Smart Energy New Homes Program

Smart Energy New Homes Program Smart Energy New Homes Program 2015-2016 Certification Guidelines TM Program Overview...Page 2 How To Participate...Page 4 FAQs...Page 6 2015-2016 Participation Application & Agreement...Page 8 2015-2016

More information

The Rural Household Infrastructure Grant

The Rural Household Infrastructure Grant The Rural Household Infrastructure Grant Presentation to the SC: Appropriations and PC: Human Settlements Presenters: Marissa Moore & Wendy Fanoe National Treasury 17 August 2012 Contents Constitutional

More information

PROGRAM OPPORTUNITY NOTICE EFFICIENCY MAINE TRUST CUSTOM INCENTIVE PROGRAM FOR ELECTRIC EFFICIENCY PROJECTS PON EM

PROGRAM OPPORTUNITY NOTICE EFFICIENCY MAINE TRUST CUSTOM INCENTIVE PROGRAM FOR ELECTRIC EFFICIENCY PROJECTS PON EM PROGRAM OPPORTUNITY NOTICE EFFICIENCY MAINE TRUST CUSTOM INCENTIVE PROGRAM FOR ELECTRIC EFFICIENCY PROJECTS PON Opening: July 1, 2017 Closing: June 30, 2018 Revised: February 6, 2018 {P1472575.1} CONTENTS

More information

CONDITIONS FOR THE ACQUISITION, TRANSPORT, STORAGE AND USE OF BLACK POWDER FOR PERSONAL USE

CONDITIONS FOR THE ACQUISITION, TRANSPORT, STORAGE AND USE OF BLACK POWDER FOR PERSONAL USE CONDITIONS FOR THE ACQUISITION, TRANSPORT, STORAGE AND USE OF BLACK POWDER FOR PERSONAL USE [Issued in terms of the Explosives Regulations of 1972, framed under Section 30 of the Explosives Act, 1956 (Act

More information

1 Customer and Contact Information

1 Customer and Contact Information Appalachian Power C&I Program Rebate Application Before you start Review the eligibility detail requirements and terms and conditions at the end of this application to verify that you are eligible for

More information

Refurbishment of the Basic Medical Sciences Building

Refurbishment of the Basic Medical Sciences Building RFI SUBMISSION DOCUMENT Refurbishment of the Basic Medical Sciences Building RFI No.: 2017/066 Closing Date: 25 August 2017 Closing Time: 12h00 1 REFURBISHMENT OF THE BASIC MEDICAL SCIENCE BUILDING OCCUPANCY

More information

FOCUS PROJECT MANAGEMENT

FOCUS PROJECT MANAGEMENT BACKGROUND D E V E L O P I N G T H E F U T U R E Crowie Projects history lies in the foundation of a small but dedicated construction company, Crowie Builders. Founded by Barry Crowie in 1971, the company

More information

Trade Ally WPS Bonus Bid Program

Trade Ally WPS Bonus Bid Program Trade Ally WPS Bonus Bid Program Table of Contents Introduction... 3 I. Program Goals... 3 II. Anticipated Funding... 3 III. Timeline... 4 IV. Definitions... 5 Program Information... 7 I. Program Introduction...

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS PO Box 3209, Houghton, South Africa, 2041 Block A, Riviera Office Park, 6-10 Riviera Road, Killarney, Johannesburg Phone +27 (0) 11 544 1000 Fax + 27 (0) 11 544 1006/7 www.thehda.co.za VAT Registration:

More information

meaning so assigned and, unless the context otherwise indicates -

meaning so assigned and, unless the context otherwise indicates - 49 Health Professions Act (56/1974): Regulations relating to the qualifications for registration of basic ambulance assistants, ambulance emergency assistants, operational emergency care orderlies and

More information

REGISTRATION AS PREFERRED SERVICE PROVIDERS AND SUPPLIERS OF GOODS AND SERVICES ON THE PROCUREMENT DATABASE

REGISTRATION AS PREFERRED SERVICE PROVIDERS AND SUPPLIERS OF GOODS AND SERVICES ON THE PROCUREMENT DATABASE REGISTRATION AS PREFERRED SERVICE PROVIDERS AND SUPPLIERS OF GOODS AND SERVICES ON THE PROCUREMENT DATABASE REF NO: TMT/DATABASE/2016 CLOSING DATE: 08 APRIL 2016 AT 12h00 Page 1 1. INTRODUCTION The Mvula

More information

ENGIE FEED IN TARIFF APPLICATION FORM. Version ENGIE FIT Application P a g e 0

ENGIE FEED IN TARIFF APPLICATION FORM. Version ENGIE FIT Application P a g e 0 ENGIE FEED IN TARIFF APPLICATION FORM Version 21.12.2017 ENGIE FIT Application P a g e 0 Completing the FIT form The FIT form won t take long to complete, but will ask for specific details throughout.

More information

2018 OPEN CALL FOR APPLICATIONS

2018 OPEN CALL FOR APPLICATIONS 2018 OPEN CALL FOR APPLICATIONS ARTS, CULTURE AND NATIONAL HERITAGE SECTOR PROJECT BUSINESS PLAN 1. Identifying particulars a) Name of organisation: b) Physical Address of Organisation: c) Nature of the

More information

VREDENDAL SOLAR POWER PARK (PTY) LTD.

VREDENDAL SOLAR POWER PARK (PTY) LTD. VREDENDAL SOLAR POWER PARK (PTY) LTD. NERSA Public Hearing on the the Application for a Generation License for Renewable Energy Power Plants 13 AUGUST 2012 Contents 1. Background and Project Company Structure

More information

CHAPTER RENEWABLE ENERGY TECHNOLOGIES AND ENERGY EFFICIENCY. This part implements the Florida Renewable Energy Technologies and Energy

CHAPTER RENEWABLE ENERGY TECHNOLOGIES AND ENERGY EFFICIENCY. This part implements the Florida Renewable Energy Technologies and Energy CHAPTER 62-16 RENEWABLE ENERGY TECHNOLOGIES AND ENERGY EFFICIENCY 62-16.100 General. This part implements the Florida Renewable Energy Technologies and Energy Efficiency Act, providing for grants for renewable

More information