1 Expedited Bridge Replacement Program Proposed program for select BRX BRO & BRZ KYTC & FHWA Kevin F. Damron, P.E. Executive Director for Office of Project Development Kentucky Transportation Cabinet

2 EBRP Is Not For This Project! The Louisville - Southern Indiana Ohio River Bridges Project

3 EBRP Is Not This Project!

4 EBRP Is Not Even For This Project! Eggner s Ferry Bridge Over Kentucky Lake

5 EBRP Is For This Project! CR 1096 in Muhlenberg County (2-1087)

6 EBRP Is For This Project! KY 2124 in Hancock County (2-1082)

7 Expedited Bridge Replacement Program Nationally: 605,000 Bridges 11% Structurally Deficient Kentucky: 14,000 Bridges WHY EBRP? 9% Structurally Deficient State City County Total (14,000) 8, ,820 Structurally Deficient Functionally Obsolete 3, ,489

8 WHY EBRP? 192 Bridge Projects in the 2010 Highway Plan 31 Projects Let and Awarded for Construction 57 Projects R/W Authorized & Letting Scheduled 104 Projects Only in Design Stage 259 Bridge Projects in the 2012 Highway Plan 112 New Bridge Projects 147 Bridge Projects from 2010 Highway Plan Project Development is not Keeping Up!

9 Project Development Process Same for All+ Projects (reviews, submittals, approvals, etc.) Large or Small Complex or Not Major or Minor Impacts

10 Expedited Bridge Replacement Program SIMPLER PROCESS FOR SIMPLER PROJECTS Typical Bridge Replacement Costs Roadway Design 47% $117,500 Bridge Plans 13% $32,500 Geotechnical 13% $32,500 Environmental 10% $25,000 Survey 9% $22,500 Drainage 5% $12,500 Miscellaneous 3% $7,500 Total Design Cost $250,000

11 Expedited Bridge Replacement Program SIMPLER PROCESS FOR SIMPLER PROJECTS Expedited Bridge Replacement Study EBRP Projects Qualified by Planning (DNA)Document Apply Betterment Standards / Practical Design Completes Preliminary Engineering & Hydraulics Completes Environmental Approval (CE Level 1) Eligible for Final Design, R/W, Utilities Funding Opportunities to Group Projects for Design & Const Simpler Project Requires Less R/W & Utilities Delivers Project to Letting in the Biennium (2 years)

12 2012 Highway Plan Evaluation 259 Bridge Replacement Projects 2012 Highway Plan included 112 New Bridge Projects

13 91 Bridge Replacement Projects ADT < 1500 Vehicles Local & Collector Highways 2012 Highway Plan included 112 New Bridge Projects

14 60 Bridge Replacement Projects At Current Location or Adjacent to Existing 2012 Highway Plan included 112 New Bridge Projects

15 54 Bridge Replacement Projects Minimal or No FEMA Floodway Concerns 2012 Highway Plan included 112 New Bridge Projects

16 48 Bridge Replacement Projects Eligible for EBRP CE Level 1 Approval 2012 Highway Plan included 112 New Bridge Projects

17 2012 Highway Plan Conclusion Expedited Bridge Replacement Program 48 Bridge Projects 2012 Highway Plan included 112 New Bridge Projects

18 Bridges in the 2014 Highway Plan 192 Bridge Projects in the 2010 Highway Plan 31 Projects Let and Awarded for Construction 259 Bridge Projects in the 2012 Highway Plan 112 New Bridge Projects 147 Bridge Projects from 2010 Highway Plan 291 Bridge Projects in Draft 2014 Highway Plan 75 New Bridge Projects 216 Bridge Projects from 2012 Highway Plan

19 2014 Draft Highway Plan Bridge Maintenance Identified 176 Candidates

20 2014 Draft Highway Plan Fall EBRP Bridge Project Candidates Completed through Phase I Design with CE I Approval

21 2014 Draft Highway Plan January EBRP Bridge Projects Out of 75 Total New Bridges

22 2014 Draft Highway Plan 12 EBRP Bridge Projects (DRUC) 14 Bridges with Design Funded in the Biennium

23 Expedited Bridge Replacement Program SIMPLER PROCESS FOR SIMPLER PROJECTS Expedited Bridge Replacement Study EBRP Projects Qualified by Planning (DNA)Document Apply Betterment Standards / Practical Design Completes Preliminary Engineering & Hydraulics Completes Environmental Approval (CE Level 1) Eligible for Final Design, R/W, Utilities Funding Opportunities to Group Projects for Design & Const Simpler Project Requires Less R/W & Utilities Delivers Project to Letting in the Biennium (2 years) Anticipated to be a Consultant Driven Program

24 Questions? Bridge Seminar February 4, 2014 KYTC will use these 12 projects to Pilot the EBRP concept through construction

US Army Corps of Engineers Periodic Inspection Report 9 Update. Dallas City Council June 3, 2009

US Army Corps of Engineers Periodic Inspection Report 9 Update. Dallas City Council June 3, 2009 US Army Corps of Engineers Periodic Inspection Report 9 Update Dallas City Council June 3, 2009 1 Briefing Overview Flood Protection is of primary importance to the City. The Dallas Floodway System protects

More information

KYOVA Interstate Planning Commission

KYOVA Interstate Planning Commission KYOVA Interstate Planning Commission Sub-allocated Funding Process and Application Package This packet includes information and guidance about the process used by KYOVA Interstate Planning Commission to

More information

RESOLUTION OF THE BOARD OF DIRECTORS OF THE OHIO KENTUCKY INDIANA REGIONAL COUNCIL OF GOVERNMENTS

RESOLUTION OF THE BOARD OF DIRECTORS OF THE OHIO KENTUCKY INDIANA REGIONAL COUNCIL OF GOVERNMENTS OKI 2015 RESOLUTION OF THE BOARD OF DIRECTORS OF THE OHIO KENTUCKY INDIANA REGIONAL COUNCIL OF GOVERNMENTS CONCERNING AMENDMENT #1 OF THE FISCAL YEARS 2016 2019 TRANSPORTATION IMPROVEMENT PROGRAM WHEREAS,

More information

Ohio Department of Transportation. Transportation Funding for LPAs

Ohio Department of Transportation. Transportation Funding for LPAs Ohio Department of Transportation Transportation Funding for LPAs Christopher L. Brown, P.E., District Three LPA Errol R. Scholtz, E.I., District Three LPA John R. Kasich, Governor Jerry Wray, Director

More information

LPA Programs How They Work

LPA Programs How They Work LPA Programs How They Work Ann Wills, P.E. Transportation Engineering Conference 2018 www.dotd.la.gov Requirements For ALL LPA Projects 1. Risk Assessment 2. Entity-State Agreement 3. Responsible Charge

More information

Texas Department of Transportation Corpus Christi District

Texas Department of Transportation Corpus Christi District Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Public Scoping Meeting August 9, 2011 Welcome John A. Casey,

More information

Five-Year County Highway and Bridge Improvement Plan Guide

Five-Year County Highway and Bridge Improvement Plan Guide 2019-2023 Five-Year County Highway and Bridge Improvement Plan Guide Office of Local Government Assistance Table of Contents A. What is the Five-Year County Highway and Bridge Improvement Plan?... 3 B.

More information

In-Step, In Line, On Time. Robert F. Tally Jr. FHWA Indiana Division Administrator Monday, November 16, 2009

In-Step, In Line, On Time. Robert F. Tally Jr. FHWA Indiana Division Administrator Monday, November 16, 2009 In-Step, In Line, On Time Robert F. Tally Jr. FHWA Indiana Division Administrator Monday, November 16, 2009 I-69 Corridor 1 I-69 Corridor I-69 is expected to create more than 27,000 new jobs by 2025, resulting

More information

HIGH COUNTRY RURAL PLANNING ORGANIZATION (RPO) 2015 STIP PROJECT SOLICITATION AND RANKING PROCESS

HIGH COUNTRY RURAL PLANNING ORGANIZATION (RPO) 2015 STIP PROJECT SOLICITATION AND RANKING PROCESS HIGH COUNTRY RURAL PLANNING ORGANIZATION (RPO) 2015 STIP PROJECT SOLICITATION AND RANKING PROCESS Introduction The North Carolina Department of Transportation (NCDOT) and North Carolina General Assembly

More information

QUALIFICATIONS BASED SELECTION FOR PROFESSIONAL SERVICES GUIDELINES FOR QUALIFICATION STATEMENTS INDEPENDENCE, OHIO JANUARY 2014 PREPARED BY:

QUALIFICATIONS BASED SELECTION FOR PROFESSIONAL SERVICES GUIDELINES FOR QUALIFICATION STATEMENTS INDEPENDENCE, OHIO JANUARY 2014 PREPARED BY: QUALIFICATIONS BASED SELECTION FOR PROFESSIONAL SERVICES GUIDELINES FOR QUALIFICATION STATEMENTS INDEPENDENCE, OHIO JANUARY 2014 PREPARED BY: DONALD J. RAMM, P.E. CITY ENGINEER QUALIFICATION STATEMENT

More information

Appendix B Review Matrix Text & Table Footnotes

Appendix B Review Matrix Text & Table Footnotes Review Submissions The PDP includes a series of review submissions designed to ensure that all projects are developed in accordance with ODOT policies. The PDP Products Review Matrix found in this Appendix

More information

2015 Five-Year County Highway and Bridge Improvement Plan Guide

2015 Five-Year County Highway and Bridge Improvement Plan Guide 2015 Five-Year County Highway and Bridge Improvement Plan Guide Table of Contents A. What is the Five-Year County Highway and Bridge Improvement Plan?... 1 B. State Requirements 1 C. Developing and Updating

More information

2013 Louisiana Transportation Conference

2013 Louisiana Transportation Conference February 20, 2013 Baton Rouge River Center 2013 Louisiana Transportation Conference Partnerships for Progress in Transportation Mega Projects Session (I-12 to Bush) I-12 to Bush Agenda Inclusion into TIMED

More information

CITY OF SPOKANE VALLEY Request for Council Action

CITY OF SPOKANE VALLEY Request for Council Action CITY OF SPOKANE VALLEY Request for Council Action Meeting Date: May 7, 2013 Department Director Approval: Check all that apply: consent old business new business public hearing information admin. report

More information

Georgia DOT Local Maintenance Improvement Grant Program. Todd Long, P.E., Deputy Commissioner

Georgia DOT Local Maintenance Improvement Grant Program. Todd Long, P.E., Deputy Commissioner Georgia DOT Local Maintenance Improvement Grant Program Todd Long, P.E., Deputy Commissioner GDOT Local Assistance Programs Funded by State Motor Fuel Tax Collections Prior to 2009: Governor and General

More information

I-95 Southbound Collector-Distributor (CD) Lanes - Rappahannock River Crossing From Exit 130 (Route 3) To Exit 133 (Route 17)

I-95 Southbound Collector-Distributor (CD) Lanes - Rappahannock River Crossing From Exit 130 (Route 3) To Exit 133 (Route 17) I-95 Southbound Collector-Distributor (CD) Lanes - Rappahannock River Crossing From Exit 130 (Route 3) To Exit 133 (Route 17) Initial Financial Plan January 31, 2017 State Project Number(s): 0095-111-259,

More information

Local Evaluation of Requests for Letters of Map Change Year Seven

Local Evaluation of Requests for Letters of Map Change Year Seven Local Evaluation of Requests for Letters of Map Change Year Seven Final Report FEMA Grant No. EMD 2007 GR 0795 August, 2008 1 Final Report FEMA Grant No. EMD 2007 GR 0795 Local Evaluation of Requests for

More information

BRF-009-9(73) IA 9 Black Hawk Bridge

BRF-009-9(73) IA 9 Black Hawk Bridge BRF-009-9(73) 38-03 IA 9 Black Hawk Bridge Request for Proposal Iowa Department of Transportation Introduction The Iowa Department of Transportation s Office of Location and Environment (Department), in

More information

NAPA COUNTY BOARD OF SUPERVISORS Board Agenda Letter

NAPA COUNTY BOARD OF SUPERVISORS Board Agenda Letter Agenda Date: 8/20/2013 Agenda Placement: 9D Set Time: 9:30 AM Estimated Report Time: 30 Minutes NAPA COUNTY BOARD OF SUPERVISORS Board Agenda Letter TO: FROM: Board of Supervisors Lederer, Steven - Director

More information

VERMONT AGENCY OF TRANSPORTATION. FY2018 Budget. Joe Flynn, Secretary of Transportation House Appropriations Committee February 27, 2017

VERMONT AGENCY OF TRANSPORTATION. FY2018 Budget. Joe Flynn, Secretary of Transportation House Appropriations Committee February 27, 2017 VERMONT AGENCY OF TRANSPORTATION FY2018 Budget Joe Flynn, Secretary of Transportation House Appropriations Committee February 27, 2017 Today s Presentation FY2018 Governor s Recommended overview and program

More information

STATE HIGHWAY (SH) 34 FEASIBILITY STUDY PUBLIC MEETING

STATE HIGHWAY (SH) 34 FEASIBILITY STUDY PUBLIC MEETING STATE HIGHWAY (SH) 34 FEASIBILITY STUDY PUBLIC MEETING From FM 2578 in Terrell to SH 243 in Kaufman CSJ: 0173-04-056 June 28, 2018 WHAT IS A FEASIBILITY STUDY WHAT IS A FEASIBILITY STUDY? A feasibility

More information

Preliminary Review and. Reference Guide Sections 4.2 and 4.3

Preliminary Review and. Reference Guide Sections 4.2 and 4.3 Preliminary Review and Early Coordination Reference Guide Sections 4.2 and 4.3 Preliminary Review and Early Coordination (Reference Guide Sections 4.2 and 4.3) Overview Preliminary Review Preliminary Review

More information

Bridging the Gap: Transition into Practice for the New Nurse

Bridging the Gap: Transition into Practice for the New Nurse Bridging the Gap: Transition into Practice for the New Nurse NEONI s goal is to bring nursing leaders, clinical agencies, educators and organizations together to address and seek solutions for healthcare

More information

Request for Qualifications For

Request for Qualifications For D E L A W A R E V A L L E Y R E G I O N A L P L A N N I N G C O M M I S S I ON The ACP Building, 190 N. Independence Mall West Telephone: (215) 592-1800 Philadelphia, PA 19106-1520 FAX: (215) 592-9125

More information

Memorandum. Trinity River Corridor Project Committee Members: David A. Neumann (Chairman) Vonciel Jones Hill Steve Salazar (Vice-Chair) Delia Jasso

Memorandum. Trinity River Corridor Project Committee Members: David A. Neumann (Chairman) Vonciel Jones Hill Steve Salazar (Vice-Chair) Delia Jasso Memorandum DATE October 7, 2010 TO Trinity River Corridor Project Committee Members: David A. Neumann (Chairman) Vonciel Jones Hill Steve Salazar (Vice-Chair) Delia Jasso Mayor Pro Tern Dwaine Caraway

More information

Appendix E Federal and State Funding Categories

Appendix E Federal and State Funding Categories Appendix E Federal and State Funding Categories This page left blank intentionally. Federal and State Funding Categories Appendix E E 3 Appendix E Federal and State Funding Categories Highway Programs

More information

Genoa Township Area Road and Bridge Projects

Genoa Township Area Road and Bridge Projects Genoa Township Area Road and Bridge Projects Delaware County Engineer s Office May 18, 2017 Delaware County Engineer s Office 2016 Construction Highlights Biggest construction year in Delaware County Engineer

More information

Workshop on Context-Sensitive Solutions. John Deatrick, Chair, AASHTO Task Force on CSS Subcommittee on Design Annual Meeting June 12, 2007

Workshop on Context-Sensitive Solutions. John Deatrick, Chair, AASHTO Task Force on CSS Subcommittee on Design Annual Meeting June 12, 2007 Workshop on Context-Sensitive Solutions John Deatrick, Chair, AASHTO Task Force on CSS Subcommittee on Design Annual Meeting June 12, 2007 Why are we here anyway?? 1. We must do it. It is a priority of

More information

L e t t e r o f I n t e r e s t : S t r u c t u r e s D e s i g n ( B r i d g e ) - S t a t e w i d e

L e t t e r o f I n t e r e s t : S t r u c t u r e s D e s i g n ( B r i d g e ) - S t a t e w i d e November 15, 2013 LPA Advisory Committee Re: Letter of Interest Structures Design (Bridge) Services LPA On-Call Services: Statewide Dear Committee Members: The Team we have assembled is very excited to

More information

Federal, State, Local Funding and Assistance Programs. Nicole Fox, Iowa DOT Office of Local Systems

Federal, State, Local Funding and Assistance Programs. Nicole Fox, Iowa DOT Office of Local Systems Federal, State, Local Funding and Assistance Programs Nicole Fox, Iowa DOT Office of Local Systems 1 RISE Revitalize Iowa s Sound Economy Construction or Improvement of a Roadway Immediate Opportunity

More information

Route 58 PPTA Project Finance Plan Annual Update Hillsville to Stuart Corridor. Submitted By:

Route 58 PPTA Project Finance Plan Annual Update Hillsville to Stuart Corridor. Submitted By: Route 58 PPTA Project Finance Plan Annual Update Hillsville to Stuart Corridor Submitted By: Robert P. Williams District Construction Engineer Salem District Virginia Department of Transportation Submitted

More information

JOINT PROCESS REVIEW OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION S LOCAL GOVERNMENT ADMINISTERED FEDERAL-AID PROGRAM

JOINT PROCESS REVIEW OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION S LOCAL GOVERNMENT ADMINISTERED FEDERAL-AID PROGRAM JOINT PROCESS REVIEW OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION S LOCAL GOVERNMENT ADMINISTERED FEDERAL-AID PROGRAM By Federal Highway Administration Virginia Division And Virginia Department of Transportation

More information

BOWLING GREEN - WARREN COUNTY METROPOLITAN PLANNING ORGANIZATION

BOWLING GREEN - WARREN COUNTY METROPOLITAN PLANNING ORGANIZATION BOWLING GREEN - WARREN COUNTY METROPOLITAN PLANNING ORGANIZATION Fiscal Year 2016 Annual Performance and Expenditure Report July 1, 2015 June 30, 2016 September 2016 Prepared and submitted by: Bowling

More information

Appendix F Public Meeting Summaries. F1: May 2013 Public Meeting Summary F2: September 2013 Public Meeting Summary

Appendix F Public Meeting Summaries. F1: May 2013 Public Meeting Summary F2: September 2013 Public Meeting Summary Loop 9 Southeast Corridor/Feasibility Study Appendix F Public Meeting Summaries F1: May 2013 Public Meeting Summary F2: September 2013 Public Meeting Summary Loop 9 Southeast Corridor/Feasibility Study

More information

EMERGENCY OPERATIONS DISASTER RECOVERY

EMERGENCY OPERATIONS DISASTER RECOVERY REIMBURSEMENT FUNDING FOR DISASTERS FEDERAL HIGHWAY ADMINISTRATION (FHWA) FEDERAL EMERGENCY MANAGEMENT AGENCY (FEMA) Louisiana Transportation Conference February 27, 2018 After a Declared Disaster, Federal

More information

INDIAN RIVER COUNTY METROPOLITAN PLANNING ORGANIZATION

INDIAN RIVER COUNTY METROPOLITAN PLANNING ORGANIZATION 2016 PRIORITY PROJECTS REPORT INDIAN RIVER COUNTY METROPOLITAN PLANNING ORGANIZATION This document was produced in cooperation with the Florida Department of Transportation and the Federal Highway Administration

More information

Federal-Aid LPA Design Process Overview. MoDOT St. Louis District Local Programs

Federal-Aid LPA Design Process Overview. MoDOT St. Louis District Local Programs Federal-Aid LPA Design Process Overview MoDOT St. Louis District Local Programs November 2017 Local Program Contacts St. Louis District Note: North St. Louis County = Along and north of Page Avenue Programming,

More information

State Project No. XXXXXX City Project No. c401807

State Project No. XXXXXX City Project No. c401807 June 29, 2017 Request for Qualifications Design and Environmental Services for the SLR Parkway Phase III Project also known as a portion of the MBSST (Rail Trail) Segment 8 (San Lorenzo River Railroad

More information

Better Cultural, Arts and Recreational Amenities. Trinity Watershed Management

Better Cultural, Arts and Recreational Amenities. Trinity Watershed Management Total KEY FOCUS AREA: Better Cultural, Arts and Recreational Amenities AGENDA DATE: May 26, 2010 COUNCIL DISTRICT(S): 2, 7 DEPARTMENT: Trinity Watershed Management CMO: Jill A. Jordan, P.E., 6705299 MAPSCO:

More information

Memo. Office of State Aid Metro District 1500 West County Rd B2 Roseville, MN Date: April 24, METRO DISTRICT COUNTIES and CITIES

Memo. Office of State Aid Metro District 1500 West County Rd B2 Roseville, MN Date: April 24, METRO DISTRICT COUNTIES and CITIES Office of State Aid Metro District 1500 West County Rd B2 Roseville, MN 55113-3174 Memo Date: April 24, 2017 To: METRO DISTRICT COUNTIES and CITIES From: Phillip Bergem Metro State Aid RE: MnDOT Fiscal

More information

Smart Portal State of Good Repair Pavement and Bridge. November 8, 2017

Smart Portal State of Good Repair Pavement and Bridge. November 8, 2017 Smart Portal State of Good Repair Pavement and Bridge November 8, 2017 Today s Agenda SGR Local Program Overview SGR Local Pavement Overview SGR Smart Portal Review and Demonstration Pavement SGR Local

More information

RESOLUTION NO. WHEREAS, the City of Cheyenne desires to participate in the Business Ready Community, Community Readiness Grants Program; and

RESOLUTION NO. WHEREAS, the City of Cheyenne desires to participate in the Business Ready Community, Community Readiness Grants Program; and RESOLUTION NO. ENTITLED: A RESOLUTION AUTHORIZING THE SUBMISSION OF A BUSINESS READY COMMUNITY, COMMUNITY READINESS GRANT APPLICATION TO THE WYOMING BUSINESS COUNCIL ON BEHALF OF THE GOVERNING BODY OF

More information

CONTENTS HIGHWAY BRIDGE REPLACEMENT AND REHABILITATION PROGRAM (HBRRP) 6.1 INTRODUCTION

CONTENTS HIGHWAY BRIDGE REPLACEMENT AND REHABILITATION PROGRAM (HBRRP) 6.1 INTRODUCTION Chapter 6 CHAPTER 6 CONTENTS HIGHWAY BRIDGE REPLACEMENT AND REHABILITATION PROGRAM (HBRRP) 6.1 INTRODUCTION... 6-1 6.1.1 Glossary... 6-1 6.1.2 HBRRP Website... 6-3 6.1.3 How to Apply for HBRRP Funds...

More information

THE CORRADINO GROUP. DRIC EPE/EIS Project; Job No TCG Project No Invoice No. 51 Progress Report. April 3, 2009

THE CORRADINO GROUP. DRIC EPE/EIS Project; Job No TCG Project No Invoice No. 51 Progress Report. April 3, 2009 THE CORRADINO GROUP April 3, 2009 Mr. Mohammed Alghurabi, Project Manager MDOT, Design Division 425 West Ottawa Lansing, MI 48933 RE: DRIC EPE/EIS Project; Job No. 802330 TCG Project No. 3600 - Invoice

More information

Update on Federal Rail Grants to NCDOT

Update on Federal Rail Grants to NCDOT Update on Federal Rail Grants to NCDOT Presented to Joint Legislative Transportation Oversight Committee Paul C. Worley, Director Engineering & Safety, Rail Division October 11, 2011 1 Federal Grants Applications

More information

ACTION TRANSMITTAL No

ACTION TRANSMITTAL No Transportation Advisory Board of the Metropolitan Council of the Twin Cities DATE: March 6, 2017 TO: FROM: ACTION TRANSMITTAL No. 2017-08 Transportation Advisory Board Technical Advisory Committee PREPARED

More information

Plan Quality and Review

Plan Quality and Review Ohio Department of Transportation John R. Kasich, Governor Jerry Wray, Director Plan Quality and Review Scott C. Boyer, P.E. LPA Coordinator District 7 Planning & Engineering October 4, 2016 Project Initiation

More information

Highway Safety Program Update

Highway Safety Program Update Highway Safety Program Update Urban Construction Initiative Annual Meeting May 21, 2015 Tracy Turpin HSIP Delivery Manager Stephen Read HSIP Planning Manager Funding for New Projects 2 Locally Administered

More information

Tribal Transportation Program Delivery Guide

Tribal Transportation Program Delivery Guide Tribal Transportation Program Delivery Guide Tribal Transportation Program Formally known as Indian Reservation Roads Program (IRR) The Tribal Transportation Program (TTP) is an important resource of a

More information

TABLE OF CONTENTS EXECUTIVE SUMMARY

TABLE OF CONTENTS EXECUTIVE SUMMARY TABLE OF CONTENTS EXECUTIVE SUMMARY v SECTION 1 BACKGROUND. 1 Coalfields Expressway.. 1 Route 460 Connector... 3 Corridor Q. 4 Project History.. 5 Current Activities.. 7 Project Implementation Schedule.

More information

Innovative Project Finance

Innovative Project Finance Innovative Project Finance National Governor s Association Utah State Planning Retreat on Public-Private Partnerships Ivan Marrero, P.E. Division Administrator, FHWA Utah October 7, 2016 The Status Quo:

More information

Central Florida Expressway Authority Multimodal Investment Assessment Status Report and Update

Central Florida Expressway Authority Multimodal Investment Assessment Status Report and Update Central Florida Expressway Authority Multimodal Investment Assessment Status Report and Update CFX Board Presentation Center for Urban Transportation Research, University of South Florida September 8,

More information

THE CORRADINO GROUP. RE: DRIC EPE/EIS Project; Job N TCG Project No Invoice No. 10 Progress Report.

THE CORRADINO GROUP. RE: DRIC EPE/EIS Project; Job N TCG Project No Invoice No. 10 Progress Report. THE CORRADINO GROUP November 7, 2005 Mr. Mohammed Alghurabi, Project Manager MDOT, Design Division 425 West Ottawa Lansing, MI 48933 RE: DRIC EPE/EIS Project; Job N. 802330 TCG Project No. 3600 - Invoice

More information

BOWLING GREEN - WARREN COUNTY METROPOLITAN PLANNING ORGANIZATION

BOWLING GREEN - WARREN COUNTY METROPOLITAN PLANNING ORGANIZATION BOWLING GREEN - WARREN COUNTY METROPOLITAN PLANNING ORGANIZATION Fiscal Year 2016 Unified Planning Work Program Approved by Policy Committee - April 13, 2015 Prepared by Bowling Green-Warren County Metropolitan

More information

Transportation Improvement Program for Lake, Porter, and LaPorte Counties, Indiana for

Transportation Improvement Program for Lake, Porter, and LaPorte Counties, Indiana for Transportation Improvement Program for Lake, Porter, and LaPorte Counties, Indiana for 2012-2015 Part II: TIP Development and Project Selection Processes MPO Planning Process The NIRPC Board of Commissioners

More information

New Draft Section 408 Policy Document EC

New Draft Section 408 Policy Document EC New Draft Section 408 Policy Document EC 11650-2-220 Presentation to the Lower American River Task Force Ryan Larson, P.E. March 13, 2018 US Army Corps of Engineers Outline 1. USACE Program Governance

More information

STIP. Van Argabright November 9, 2017

STIP. Van Argabright November 9, 2017 2018-2027 STIP Van Argabright November 9, 2017 2018-2027 State Transportation Improvement Program (STIP) Adopted by BOT in August 2017 2 nd STIP produced under the Strategic Transportation Investments

More information

MiTIP APPLICATION PACKET

MiTIP APPLICATION PACKET SFY 2022-2023 Illustrative Projects 2018-2021 INDIANAPOLIS REGIONAL TRANSPORTATION IMPROVEMENT PROGRAM (IRTIP) MiTIP APPLICATION PACKET Indianapolis Metropolitan Planning Organization October 2017 This

More information

REQUEST FOR QUOTATIONS

REQUEST FOR QUOTATIONS REQUEST FOR QUOTATIONS Professional Surveying Services for the Record Plan Survey of Project Area of KWA Contracts S-4005, S-4006 S-4007 and GCDC-WWS Contract S-5004 Issuing Agency: Lapeer County Road

More information

2015 Statewide Bridge Sufficiency Rating Report - Condensed

2015 Statewide Bridge Sufficiency Rating Report - Condensed Purdue University Purdue e-pubs Indiana Local Technical Assistance Program (LTAP) Publications Indiana Local Technical Assistance Program (LTAP) 10-2015 2015 Statewide Bridge Sufficiency Rating Report

More information

SCOTT COUNTY COMMUNITY SERVICES DIVISION

SCOTT COUNTY COMMUNITY SERVICES DIVISION SCOTT COUNTY COMMUNITY SERVICES DIVISION PHYSICAL DEVELOPMENT 600 COUNTRY TRAIL EAST JORDAN, MN 55352-9339 (952) 496-8346 Fax: (952) 496-8365 www.co.scott.mn.us MITCHELL J. RASMUSSEN, P.E. COUNTY ENGINEER

More information

Amendment 3 of Horizon 2030 Metropolitan Transportation Plan Amendment 3 of FY 2011 FY 2015 Transportation Improvement Program.

Amendment 3 of Horizon 2030 Metropolitan Transportation Plan Amendment 3 of FY 2011 FY 2015 Transportation Improvement Program. Amendment 3 of Horizon 2030 Metropolitan Transportation Plan Amendment 3 of FY 2011 FY 2015 Transportation Improvement Program November 2011 KIPDA ID State ID Project Name Project Description Project Sponsor

More information

CFLHD Organizational and Program Overview FEDERAL LAND ACCESS PROGRAM (FLAP) 55 th ACE Annual Conference

CFLHD Organizational and Program Overview FEDERAL LAND ACCESS PROGRAM (FLAP) 55 th ACE Annual Conference CFLHD Organizational and Program Overview FEDERAL LAND ACCESS PROGRAM (FLAP) 55 th ACE Annual Conference - 2016 Topics to Share Federal Lands Access Program History Funding Type of Projects PDC FLMA Coordination

More information

Quality Management Guideline July, 2017

Quality Management Guideline July, 2017 Quality Management Guideline July, 2017 Check the Capital Project Delivery website to ensure this is the current version. Table of Contents Quality Management Overview... 1 Interactive Communications...

More information

ftp://ftp.dot.state.oh.us/pub/districts/d06/download/january%202018%20programmatic/del /

ftp://ftp.dot.state.oh.us/pub/districts/d06/download/january%202018%20programmatic/del / 12-18-17 Posting Date Information for January 2018 Programmatic Group District 6, DEL-36-14.85, PID No. 107214 District Six has posted the draft scope of services and associated supporting documents to

More information

1.0 EXECUTIVE SUMMARY

1.0 EXECUTIVE SUMMARY 1.0 EXECUTIVE SUMMARY FEASIBILITY REPORT In November 2008, Measure R was approved by a significant two-thirds majority, committing a projected $40 billion to traffic relief and transportation upgrades

More information

NCAT Pavement Test Track

NCAT Pavement Test Track NCAT Pavement Test Track at Auburn University Research Update 10.0 million ESALs Washington Oregon California NCAT Pavement Test Track Nevada Idaho Utah Arizona Montana Wyoming Colorado New Mexico Pre-2012,

More information

UPDATE OF THE SIGNAL TIMING MANUAL

UPDATE OF THE SIGNAL TIMING MANUAL Project No. 3-103 COPY NO. X UPDATE OF THE SIGNAL TIMING MANUAL PRELIMINARY DRAFT FINAL REPORT Prepared for National Cooperative Highway Research Program Transportation Research Board of The National Academies

More information

Indiana LTAP. Local Government Asset Management and Pavement Preservation

Indiana LTAP. Local Government Asset Management and Pavement Preservation Indiana LTAP Local Government Asset Management and Pavement Preservation Reporting Indiana Local Road Conditions Indiana local roads are deteriorating and available funding has not kept pace Indiana LTAP

More information

Understanding the. Program

Understanding the. Program Understanding the Transportation Improvement Program Aka: TIP 101 Transportation Improvement Program (TIP) Federally Mandated for all MPO s by USDOT Short Range (no more than four years) All federally

More information

Urban Stuff Breakout Session # 3. September 19, 2018 Moderator Michael Fulcher Program Manager, VDOT Staunton District

Urban Stuff Breakout Session # 3. September 19, 2018 Moderator Michael Fulcher Program Manager, VDOT Staunton District Urban Stuff Breakout Session # 3 September 19, 2018 Moderator Michael Fulcher Program Manager, VDOT Staunton District Urban Program Overview Urban Maintenance Program Weldon Cooper Center Eligible Maintenance

More information

HIGH COUNTRY RURAL PLANNING ORGANIZATION (RPO) 2014 STIP PROJECT SOLICITATION AND RANKING PROCESS

HIGH COUNTRY RURAL PLANNING ORGANIZATION (RPO) 2014 STIP PROJECT SOLICITATION AND RANKING PROCESS HIGH COUNTRY RURAL PLANNING ORGANIZATION (RPO) 2014 STIP PROJECT SOLICITATION AND RANKING PROCESS Introduction The rth Carolina Department of Transportation (NCDOT) and rth Carolina General Assembly have

More information

ANNUAL REPORT. Pursuant to: Chapters 36 and 152 of the 2011 Acts of Assembly of the Virginia General Assembly

ANNUAL REPORT. Pursuant to: Chapters 36 and 152 of the 2011 Acts of Assembly of the Virginia General Assembly ANNUAL REPORT Pursuant to: Chapters 36 and 152 of the 2011 Acts of Assembly of the Virginia General Assembly Virginia Department of Transportation 1401 East Broad Street Richmond, Virginia 23219 November

More information

Megan P. Hall, P.E. Local Programs Engineer. Federal Highway Administration Washington Division. March 14, 2017

Megan P. Hall, P.E. Local Programs Engineer. Federal Highway Administration Washington Division. March 14, 2017 Megan P. Hall, P.E. Local Programs Engineer Federal Highway Administration Washington Division March 14, 2017 1 Transportation Alternatives (TA) Recreational Trails Program (RTP) www.fhwa.dot.gov/environment/transportation_alternatives/overview/presentation/

More information

FHWA Initiatives. Mary Stringfellow Program Delivery Team Leader FHWA Louisiana Division PH

FHWA Initiatives. Mary Stringfellow Program Delivery Team Leader FHWA Louisiana Division PH FHWA Initiatives Mary Stringfellow Program Delivery Team Leader FHWA Louisiana Division PH 225-757-7610 mary.stringfellow@dot.gov Federal Requirements Federal Transportation Law (USC) programs & $$ Written

More information

Welcome to Webinar on Accelerated Bridge Construction

Welcome to Webinar on Accelerated Bridge Construction Welcome to Webinar on Accelerated Bridge Construction Featured Presentation: Everyday Solutions: ABC Standard Designs from SHRP2 Sponsored by Center for Accelerated Bridge Construction (ABC) Center at

More information

2011 ASFPM. Flood Risk Management: The Winning Ticket. Call For Presenters. May 15 20, 2011 Louisville, KY

2011 ASFPM. Flood Risk Management: The Winning Ticket. Call For Presenters. May 15 20, 2011 Louisville, KY May 15 20, 2011 Louisville, KY 2011 ASFPM Call For Presenters Flood Risk Management: The Winning Ticket The Premier Flood Conference The Association of State Floodplain Managers will convene the world

More information

Brownfields Conference Oklahoma City, OK May 22, What is FHWA?

Brownfields Conference Oklahoma City, OK May 22, What is FHWA? Brownfields Conference Oklahoma City, OK May 22, 2012 What is FHWA? 2 1 What does FHWA do? The Federal Highway Administration: Improves Mobility on the Nation s highways through National Leadership, Innovation

More information

REQUEST FOR PROPOSAL

REQUEST FOR PROPOSAL REQUEST FOR PROPOSAL FOR SERVICES TO CONDUCT THE BEADLE COUNTY MASTER TRANSPORTATION PLAN THE SOUTH DAKOTA DEPARTMENT OF TRANSPORTATION IN CONJUNCTION WITH BEADLE COUNTY, SOUTH DAKOTA AND THE FEDERAL HIGHWAY

More information

Proposal for the Tulare/Kern Funding Area

Proposal for the Tulare/Kern Funding Area Proposal for the Tulare/Kern Funding Area 1. Work collaboratively to involve DACs, CBOs, and stakeholders in IRWM planning efforts 2. Increase understanding and identify water management needs of DACs

More information

Big Sky Regional Peer Exchange on Federal-aid Highway Program Financial Management

Big Sky Regional Peer Exchange on Federal-aid Highway Program Financial Management Big Sky Regional Peer Exchange on Federal-aid Highway Program Financial Management Date: May 9-10, 2018 Location: Salt Lake City, UT (UDOT Learning Center) Overview This customized exchange will provide

More information

REQUEST FOR QUALIFICATIONS FOR PROFESSIONAL SERVICES

REQUEST FOR QUALIFICATIONS FOR PROFESSIONAL SERVICES Boone County, Kentucky INVITATION FOR BID #060817 REQUEST FOR QUALIFICATIONS FOR PROFESSIONAL SERVICES ACCEPTANCE DATE: Prior to 2:00 p.m., June 8, 2017 Local time ACCEPTANCE PLACE Boone County Fiscal

More information

Nevada Department of Transportation Traffic Operations Policy Memorandum Traffic Signal Warrant Approval Process

Nevada Department of Transportation Traffic Operations Policy Memorandum Traffic Signal Warrant Approval Process Nevada Department of Transportation Traffic Operations Policy Memorandum 2015-01 This document establishes procedures for the preparation of traffic signal warrant studies that meet NDOT requirements,

More information

PENNSYLVANIA TURNPIKE COMMISSION. Reference No. E-056

PENNSYLVANIA TURNPIKE COMMISSION. Reference No. E-056 PENNSYLVANIA TURNPIKE COMMISSION RETENTION OF AN ENGINEERING FIRM Southern Beltway Project U. S. Route 22 to Interstate 79 Section 55A2 West of S.R.4011 to S.R. 4012 Washington County, Pennsylvania Reference

More information

FEDERAL LANDS ACCESS PROGRAM

FEDERAL LANDS ACCESS PROGRAM FEDERAL LANDS ACCESS PROGRAM CEAC Transportation Policy Committee Presentation Wednesday, November 30, 2016 Chris Longley, CFLHD FLAP Program Manager CENTRAL FEDERAL LANDS HIGHWAY DIVISION 2 Overview Who

More information

TRANSPORTATION POLICY COMMITTEE 1:00 p.m., Thursday, January 24, 2008 KIPDA Conference Room AGENDA

TRANSPORTATION POLICY COMMITTEE 1:00 p.m., Thursday, January 24, 2008 KIPDA Conference Room AGENDA Kentucky Bullitt Henry Jefferson Oldham Shelby Spencer Trimble Indiana Clark Floyd 1. Call to Order, Welcome, Introductions TRANSPORTATION POLICY COMMITTEE 1:00 p.m., Thursday, January 24, 2008 Conference

More information

Guidance for Locally Administered Projects. Funded Through the NJDOT/MPO Program Funds Exchange. August 27, Revised September 15, 2014

Guidance for Locally Administered Projects. Funded Through the NJDOT/MPO Program Funds Exchange. August 27, Revised September 15, 2014 1 Guidance for Locally Administered Projects Funded Through the NJDOT/MPO Program Funds Exchange August 27, 2013 Revised September 15, 2014 This document establishes guidelines for administering the program

More information

SCOPE OF SERVICES FOR CONSULTING ENGINEERING SERVICES PROJECT DEVELOPMENT AND ENVIRONMENT STUDY AND DESIGN

SCOPE OF SERVICES FOR CONSULTING ENGINEERING SERVICES PROJECT DEVELOPMENT AND ENVIRONMENT STUDY AND DESIGN I-295 from SR 13 (San Jose) to SR 21 (Blanding Blvd) FIN #: 213345-9-22-01 Federal Project #: TBD Duval County, Florida SCOPE OF SERVICES FOR CONSULTING ENGINEERING SERVICES PROJECT DEVELOPMENT AND ENVIRONMENT

More information

Public Notice No. PUBLIC NOTICE ANNOUNCING REGIONAL CONDITIONS AND WATER QUALITY CERTIFICATION FOR NATIONWIDE PERMITS

Public Notice No. PUBLIC NOTICE ANNOUNCING REGIONAL CONDITIONS AND WATER QUALITY CERTIFICATION FOR NATIONWIDE PERMITS Public Notice US Army Corps of Engineers Louisville District Public Notice No. Expiration Date: LRL-2011-6-pgj 18 Mar 2017 Please address all comments and inquiries to: U.S. Army Corps of Engineers, Louisville

More information

Virginia Beach. of One of America s. An Exciting Opportunity to Shape the Infrastructure. Most Amazing Big Cities!

Virginia Beach. of One of America s. An Exciting Opportunity to Shape the Infrastructure. Most Amazing Big Cities! Virginia Beach An Exciting Opportunity to Shape the Infrastructure of One of America s Most Amazing Big Cities! The City of Virginia Beach Seeks a Results Driven, Service Oriented Executive to Serve as

More information

CITY OF SPOKANE VALLEY Request for Council Action

CITY OF SPOKANE VALLEY Request for Council Action CITY OF SPOKANE VALLEY Request for Council Action Meeting Date: Department Director Approval: Check all that apply: consent old business new business public hearing information admin. report pending legislation

More information

Updated Hurricane Harvey s Fiscal Impact on State Agencies PRESENTED TO SENATE FINANCE COMMITTEE LEGISLATIVE BUDGET BOARD STAFF

Updated Hurricane Harvey s Fiscal Impact on State Agencies PRESENTED TO SENATE FINANCE COMMITTEE LEGISLATIVE BUDGET BOARD STAFF Updated Hurricane Harvey s Fiscal Impact on State Agencies PRESENTED TO SENATE FINANCE COMMITTEE LEGISLATIVE BUDGET BOARD STAFF DECEMBER 2017 LBB Hurricane Cost Survey The LBB is surveying state agencies

More information

VALUE ENGINEERING PROGRAM

VALUE ENGINEERING PROGRAM Approved: Effective: May 17, 2017 Review: March 30, 2017 Office: Production Support Office Topic No.: 625-030-002-i Department of Transportation PURPOSE: VALUE ENGINEERING PROGRAM To provide a consistent

More information

MULTI-STAKEHOLDER APPROACH TO VALUE-BASED HEALTHCARE

MULTI-STAKEHOLDER APPROACH TO VALUE-BASED HEALTHCARE MULTI-STAKEHOLDER APPROACH TO VALUE-BASED HEALTHCARE Randa Deaton, MA Corporate Director, UAW/Ford Community Healthcare Initiative Co-Executive Director, Kentuckiana Health Collaborative 1 WHO is the KHC?

More information

Click to edit Master title style

Click to edit Master title style Customer-Driven Customer First Mr. Greg Slater, Administrator 7/11/2018 1 1 Customer-Driven Customer First THIS MORNING S PRESENTATION MDOT/SHA Fifth Focus level Current state of our delivery and travel

More information

Mark A. Doctor, PE CAREER PATH

Mark A. Doctor, PE CAREER PATH Mark A. Doctor, PE Professional Profile A career of over 27 years with the Federal Highway Administration in various transportation engineering positions with diverse experiences and accomplishments in

More information

Subject: Request for Proposal Route 99 Interchanges at Hammett Road and Kiernan Avenue

Subject: Request for Proposal Route 99 Interchanges at Hammett Road and Kiernan Avenue DEPARTMENT OF PUBLIC WORKS Matt Machado Director 1010 10 th Street, Suite 3500, Modesto, CA 95354-0847 Phone: 209.525.6550 Date «FirstName» «LastName» «Company» «Address1» «City», «State» «PostalCode»

More information

Historic Bridge Rehabilitation and Approaches to Programmatic Agreements

Historic Bridge Rehabilitation and Approaches to Programmatic Agreements Historic Bridge Rehabilitation and Approaches to Programmatic Agreements Summary and Analysis of Current Practices Nationwide Prepared for Minnesota Department of Transportation Prepared by www.meadhunt.com

More information

Special State Funding Programs Breakout Session #5C Funding Programs Track. October 25, 2012

Special State Funding Programs Breakout Session #5C Funding Programs Track. October 25, 2012 Special State Funding Programs Breakout Session #5C Funding Programs Track October 25, 2012 SPECIAL STATE FUNDING PROGRAMS - REVENUE SHARING Debbi Webb-Howells Revenue Sharing Program Manager Local Assistance

More information

FHWA SAFETY UPDATE. Michael Griffith Director, Office of Safety Technologies

FHWA SAFETY UPDATE. Michael Griffith Director, Office of Safety Technologies FHWA SAFETY UPDATE Michael Griffith Director, Office of Safety Technologies 2 Strategic Highway Safety Plan Updates Month and Year September 2018 January 2019 February 2019 July 2019 September 2019 October

More information