DOCUMENT OF THE WORLD BANK IDF GRANT FOR COMBATING CORRUPTION: STRENGTHENING ANTI-CORRUPTION CAPACITY IN THE OFFICE OF THE PROSECUTOR GENERAL

Size: px
Start display at page:

Download "DOCUMENT OF THE WORLD BANK IDF GRANT FOR COMBATING CORRUPTION: STRENGTHENING ANTI-CORRUPTION CAPACITY IN THE OFFICE OF THE PROSECUTOR GENERAL"

Transcription

1 DOCUMENT OF THE WORLD BANK IMPLEMENTATION COMPLETION AND RESULTS MEMORANDUM (IDF GRANT TF-58170) REPUBLIC OF BULGARIA IDF GRANT FOR COMBATING CORRUPTION: STRENGTHENING ANTI-CORRUPTION CAPACITY IN THE OFFICE OF THE PROSECUTOR GENERAL JUNE 28, 2011 Poverty Reduction and Economic Management Department Central Europe and the Baltic Countries Department Europe and Central Asia Region

2 Contents Data Sheet... 3 Implementation Completion and Results Memorandum Grant Description, Development Objective and Design Key Factors Affecting Implementation and Outcomes Assessment of Outcomes (Ratings are available in ICM Data Sheet) Risk to Development Outcome: Moderate Bank and Recipient Performance Lessons Learned Follow up Activities Other Comments Annex 1. Grant Costs and Financing by Category, Disbursement profile Annex 2. Outputs by Component Annex 3. List of Supporting Documents

3 IMPLEMENTATION COMPLETION AND RESULTS MEMORANDUM Bulgaria IDF Grant TF for REPUBLIC OF BULGARIA: IDF GRANT FOR COMBATING CORRUPTION: STRENGTHENING ANTI-CORRUPTION CAPACITY IN THE OFFICE OF THE P ROSECUTOR GEN P Data Sheet A. Basic Information ICM Date: 06/28/2011 Region : Country: Trust Fund Name: Project ID: TF Number: Europe and Central Asia Bulgaria Republic of Bulgaria: IDF Grant for Combating Corruption: Strengthening Anti- Corruption Capacity in the Office of the Prosecutor General P TF Grant Amount: USD 475, Disbursed Amount: USD 421, Cancellation Amount: USD 53, Recipient: Implementing Agency (ies): Other Donors/External Partners: B. Key Dates Republic of Bulgaria Office of the Prosecutor General Process Original Date Revised / Actual Date(s) Approval: 12/20/ /29/2007 Effectiveness: 03/16/ /08/2007 Restructuring(s): Operational Closing: 05/08/ /08/2010 C. Project Team Members Title At ICM At Approval Country Director: Sereen Juma Anand K. Seth Sector Manager: William Leslie Dorotinsky Ronald E. Myers Project Team Leader: Stella Ilieva Kathy Lalazarian ICM Regional Coordinator: Michael G. Nelson Procurement Specialist : Blaga Djourdjin Blaga Djourdjin Financial Management Specialist : Bogdan Constantinescu Mirela Mart 3

4 LOA Specialist : Egli Ilic Nicholay Chistyakov Legal Counsel : Ruxandra Costache Jean-Charles De Daruvar D. Ratings Summary D.1 Performance Rating (ICM) Overall Grant Performance Relevance Efficacy Efficiency Overall Outcome Performance: Risk to Development Outcome (Sustainability): Overall Outcome Performance Bank Performance Satisfactory Satisfactory Satisfactory Satisfactory Moderate Satisfactory Recipient Performance Satisfactory D.2 Bank and Recipient Performance Rating Bank Ratings Recipient Ratings Ensuring Quality at Entry: Quality of Supervision: Satisfactory Moderately Satisfactory Government: Implementing Agency/Agencies: See Overall Outcome Performance See Overall Outcome Performance E. Results Framework Analysis Program Development Objective (from Program Document): The development objective of the Grant was to strengthen the capacity and effectiveness of the Office of the Prosecutor-General of Bulgaria (OPG) to track and combat corruption, especially among prosecutors. Corruption among prosecutors in the OPG was considered to be a serious issue. The Prosecutor-General was committed to reduce corruption within the ranks of the OPG, with suspension or initiation of dismissal of prosecutors who do not demonstrate a high level of integrity. The proposed IDF grant played an important role in spearheading this initiative. In particular, the grant supported the OPG in: (i) implementing its anti-corruption reform program through provision of expert advice and international best practices to strengthen accountability, professionalism and institutional capacity in a strategic manner; (ii) building administrative and technical capacity for anti-corruption program implementation by improving the IT systems such as the case management system and a module for prosecutors' declarations of income and assets; and (iii) expanding its existing cooperation with civil society to increase the external transparency, public accountability and credibility of its institutional integrity and anti-corruption work. Monitoring by civil society organizations provided an external check to ensure that the OPG's anti-corruption efforts are not formalistic. Increased scrutiny by civil society and the media helped the OPG improve public perceptions of its integrity. Revised Program Development Objective (if any, as approved by the original approving authority): PDO Indicator(s) PDO Indicator 1 1. Visible cases of suspension and / or initiation of criminal proceedings against allegedly corrupt prosecutors. Measurements (Number or Text) Date 4

5 Baseline Value Original Target Values (from approval documents) Formally Revised Target Values Actual Value Achieved at Completion or Target Years Comments (incl. % achievement) PDO Indicator 2 No prosecutor has been dismissed or prosecuted for corruption to date. Seven cases against prosecutors are currently pending. All existing cases (pre-idf activity) against allegedly corrupt prosecutors will have been concluded. Where evidence of wrong doing has been found, prosecutors will have been dismissed. 10/02/ /04/2009 All existing cases (pre-idf activity) 06/30/2010 against allegedly corrupt prosecutors have been concluded. Where evidence of wrongdoing has been found, prosecutors have been dismissed. The number of concluded disciplinary sanctions against prosecutors more than tripled between 2007 and 2009-from 14 to 46 wit h the highest disciplinary sanctions (dismissal and salary reduction) imposed on 6 prosecutors in 2009 up from 3 in Rate of completion of prosecutorial work in corruption cases (in days) Measurements (Number or Text) Date Baseline Value days 04/02/2007 Original Target Values (from approval documents) The average duration of open cases will be shortened by 100 days. 03/02/2010 Formally Revised Target Values Actual Value Achieved at Completion or Target Years days 06/01/2010 Comments (incl. % achievement) The target was overachieved by close to 50%. PDO Indicator 3 Public confidence in the anti-corruption work of the OPG. Measurements (Number or Text) Date Baseline Value 11.9% 07/31/2009 Original Target Values (from approval documents) 05/31/2010 Formally Revised Target Values Public confidence in the institutional integrity of the OPG and in the effectiveness in fighting corruption will have increased by 10 percentage points respectively. 5

6 Actual Value Achieved 20.8% 09/30/2010 at Completion or Target Years Comments (incl. % achievement) Confidence in the effectiveness of prosecution work grew in line with the target under the Grant. F. Ratings of Project Performance in Progress Reports: No. Date Archived DO IP Actual Disbursements (USD) 1 10/18/2007 Moderately Satisfactory Moderately Satisfactory /18/2007 Moderately Satisfactory Moderately Satisfactory /31/2008 Moderately Satisfactory Moderately Satisfactory /29/2009 Moderately Unsatisfactory Moderately Satisfactory /26/2010 Moderately Satisfactory Moderately Satisfactory /21/2010 Satisfactory Satisfactory G. Restructuring (if any) H. Disbursement Graph 6

7 Implementation Completion and Results Memorandum IDF Grant TF for IDF GRANT FOR COMBATING CORRUPTION: STRENGTHENING ANTI-CORRUPTION CAPACITY IN THE OFFICE OF THE PROSECUTOR GENERAL P Grant Description, Development Objective and Design The IDF grant was designed to strengthen the capacity and effectiveness of the Prosecution Office of the Republic of Bulgaria (PORB) to track and combat corruption. In particular, the grant supported the PORB in: (i) implementing its anticorruption reform program through provision of expert advice and international best practices to strengthen accountability, professionalism and institutional capacity in a strategic manner; (ii) building administrative and technical capacity for anticorruption program implementation by improving the business processes and IT system for case management system and introducing a system for management of incomes and assets declarations of prosecutors and PORB management; and (iii) expanding its existing cooperation with civil society to increase the external transparency, public accountability and credibility of its institutional integrity and anti-corruption work. 1.1 Original Development Objective (DO) (as approved) The development objective of the Grant is to strengthen the capacity and effectiveness of the Prosecution Office of the Republic of Bulgaria (PORB) to track and combat corruption, especially among prosecutors. 1.2 Revised Development Objective (as approved by RIC) and reasons/justification The development objective was not revised. 1.3 Link to Country Partnership Strategy The FY07-09 Country Partnership Strategy (CPS) built on Bulgaria's considerable achievements over the previous eight years which helped create the conditions for the country to accede to the European Union (EU). The CPS sought to help Bulgaria meet the EU accession challenges and facilitated Bulgaria's economic and social integration into the EU. Accelerated judicial reform to ensure a transparent, honest and efficient judiciary was a key area highlighted in the EU Monitoring Report of October 2005 and referred to in the CPS which also stressed that judicial reform remained a serious challenge in improving Bulgaria's institutional framework and its readiness for EU membership. This IDF grant was in line with the CPS outline identifying judicial reform as a top priority for World Bank support. Also, the grant was consistent with the second and third Programmatic Adjustment Loans (PAL2 and PAL3, both closed) for Bulgaria which focused on improving public sector 7

8 governance including judicial reform and anti-corruption initiatives. The objective of the judicial reforms in the PALs was to enhance the enforceability of contracts and strengthen the administrative justice system, which together served to promote private sector development and improve the investment climate. 1.4 Main Beneficiaries (Original and revised, briefly describe the primary target group, as well as any other individuals and organizations who benefited from the Grant) The main direct beneficiary of the Grant is the Prosecution Office of the Republic of Bulgaria, which is part of the judiciary in Bulgaria. The Grant supported the PORB's own anti-corruption reform program. It provided expert advice to strengthen accountability, professionalism and institutional capacity. It assisted the PORB in getting to know international best practices on organizational models, investigation procedures, and transparent prosecution of corruption cases and made possible the enhancement of its information system, and helped improve the monitoring of the prosecutorial work both internally and externally. The effective fight against corruption is one of the key commitments of the Government of Bulgaria under the Cooperation and Verification Mechanism agreed with the European Council upon Bulgaria s accession to the European Union. The activities implemented under the Grant have been an integral part of the Government s anti-corruption reform program. Increased transparency and accountability targeted under the Grant benefit the society as a whole. Better understanding of the anti-corruption work of the PORB is key to ensure effective public support for the prosecution. 1.5 Grant Components The Grant consisted of two components: COMPONENT 1: Strengthening of PORB strategic focus, accountability, professionalism and institutional capacity, through formulation of a strategy document, provision of training and development of case tracking and management system and automated income and asset declaration system in PORB. The activities under this component included: (i) review of national legal framework and ethical norms in place for combating and preventing corruption among prosecutors and assessment of training needs of prosecutors for fighting high-level corruption. (ii) review of anti-corruption legislation, regulation and Ethics Codes to identify best practices in the EU, U.S. and other countries in combating and preventing corruption. In addition to the analysis of international best practices, four focus groups consisting of prosecutors and investigators (80 participants in total) discussed candidly key bottlenecks 8

9 in effective resolution of corruption cases, analyzed inconsistencies in dealing with such cases at regional level and results of the surveys carried out among prosecutors and citizens. (iii) carrying out three two-day training sessions/workshops with curricula developed based on the training needs analysis and focused on best practices in other countries in combating and preventing corruption, internal control mechanisms in place, partnerships with civil society, methodology for investigation and prosecution of corruption crimes, and effective implementation of the Code of Ethics. The seminars took place in Plovdiv, Veliko Tarnovo, and Bankia, and one closing workshop in Sofia with 284 participants from all over the country, including close to 200 prosecutors and investigators and 84 participants from other law enforcement institutions (Ministry of Interior, State Agency for National Security, National Revenue Agency, Customs Agency, Commission for Establishing of Property Acquired from Criminal Activity), and media and civil society. All training materials were posted on the PORB intranet for subsequent reference and use by all prosecutors and investigators. (iv) development of a catalogue of best practices from EU, U.S. and other countries in combating corruption. On the basis of the discussions organized during the training sessions and the catalogue of good practices, the PORB developed a set of proposals for amendments to existing legislation and submitted these recommendations to the Legislative Council Directorate of the Ministry of Justice. (v) development of a system for tracking and management of income and assets declarations of prosecutors; development of a Data Warehouse that allows production of various reports which were previously prepared on the basis of paper records which was costly and inefficient; and, development of an optimized business model and technical specifications for enhancement of the Unified Information System (UIS) of the PORB. The enhancement of the UIS would create the technical conditions for automatically feeding with statuary data the Integrated Information System for Combating Crime (IISCC) which is the IT system for the judiciary. The enhancement of the IT system is expected to be financed by EU funds under the Operation Program Administrative Capacity. The PORB is currently preparing the application for financing of this activity. COMPONENT 2: Improvement of transparency and accountability of PORB functions though forming partnership between the PORB and civil society in monitoring progress of anti-corruption efforts, and public information campaign with regard to PORB s anti-corruption efforts. Two major activities were included under this component: (i) Two surveys of public opinion and of prosecutors about the effectiveness of prosecution in combating and preventing corruption which allowed analysis over time of changes in perceptions about the integrity and commitment of prosecutors to fight corruption. The results of the survey were presented and discussed publicly at the closing workshop in Sofia and posted on the PORB s website. The surveys provide a good basis for understanding the attitudes and concerns of society and of prosecutors about bottlenecks in the fight against corruption and for designing measures to improve 9

10 effectiveness of anti-corruption work. The candid discussions of the results of the surveys helped strengthen transparency and accountability of the PORB work. (ii) A short documentary was developed to present to society the work of the PORB. The documentary was broadcast at the closing workshop in Sofia and is posted on PORB s website. 1.6 Revised Components (if restructured) The grant components were not revised. 1.7 Other significant changes (In design, scope and scale, implementation arrangements, schedule, and funding allocations) No significant changes were made to the design and scope of the grant. Several changes were made to the implementation arrangements, schedule and funding allocations that did not affect the achievement of the intended development objective. These included: (i) The Grant implementation was extended by 5 months to October 8, 2010 to ensure the completion of the enhancement of the IT system, which is the key activity under the Grant, constituting more than half of Grant s funds and with significant impact on intended development objectives. (ii) A consultant was selected to facilitate the preparation of bidding documents, speed up project implementation, and upgrade capacity of the PORB to execute the procurement under the project, including complex procurement of information system. The consultancy was financed by the Grant representing 0.8 percent of original Grant proceeds and with contribution from PORB s budget amounting to 17 percent of the total value of the services. It was the first time the PORB was executing a project financed by the World Bank and it, therefore, lacked experience with the Bank s methodology for procurement of goods and consultants. It was particularly difficult for the PORB to prepare terms of reference for the numerous activities of the grant, and impossible for the PORB to execute by themselves the complex procurement of information systems. (iii) One activity was cancelled during project implementation translation and interpretation services. This activity was directly related to the selection of consultants for the training seminars. With no foreign consultants there was no need of interpretation services while all translation services under the Grant were financed by PORB. (iv) two activities were implemented with financing from PORB or EU funds the preparation of the strategy and action plan for fighting corruption and twinning programs with equivalent institutions in the EU. (v) The final change included small reallocation of proceeds (approved in September 2010) from consultant services to the Goods Category to reflect the separation of the printing of the Catalogue of Best Practices from its production. 10

11 2. Key Factors Affecting Implementation and Outcomes The preparation of the Grant built on the technical assistance provided to the judiciary by the Governments of the Netherlands and Spain financed under EU Phare, and U.S. under the USAID program. This technical assistance was targeted mainly at the courts system and provision of technical assistance on strengthening the judiciary as a whole. The Grant was unique of its kind in Bulgaria and in the ECA region as it provided support to the prosecution which in Bulgaria is independent from the Government. The grant suffered from an initial slow pace of implementation as the PORB and the World Bank teams had to address a number of challenges. The PORB staff had no prior experience in managing the procurement under World Bank projects and in developing terms of reference for complex projects, including IT system development. In addition, the team members tasked to manage the implementation of Grant activities were changed several times as a result of high turnover of staff and significant overload as the same staff was also working on EU funded projects in addition to their day-to-day responsibilities in the PORB. Two PORB staff attended training on World Bank procurement rules and procedures to help build capacity for project management at PORB. In addition, PORB staff collaborated with Project Management Unit staff from other agencies in Bulgaria with experience in management of World Bank projects. Finally, a consultant experienced in World Bank projects was hired to facilitate speeding up the preparation of the terms of reference and procurement for the Grant activities and build capacity for procurement of complex activities such as enhancements of the IT system. Changes in World Bank teams and limited resources for supervision of complex IT system development project led to delays in processing of no objections. To ensure day-to-day support on project management issues, the Bank task team leader was changed with leadership responsibilities transferred to the field. Project outcomes have been achieved through diligent implementation of the grant by the PORB, with a strong effort during the last 18 months of implementation when practically most of the activities were procured and executed, including the procurement of a complex information system. Key factors for the acceleration of project implementation and achievement of the intended results were: build-up of experience in managing projects at PORB, stabilization of project management staff both at PORB and the Bank. The PORB allocated more resources than committed at the start of the Grant to provide financing for licenses for the IT system and ensure implementation of the system in all regional offices. The achievement of the development objectives was positively affected by key initiatives undertaken by PORB as well as important legislative changes aimed at improving the effectiveness of the prosecution and of the judiciary. These include: (i) approval of a Strategy for Development of the Prosecution, and adoption of the Integrated Strategy and Action Plan for Counteracting Organized Crime and Corruption in November 2009; (ii) modernization of the organizational structure of the Prosecution, including the establishment of an Inspectorate tasked to strengthen supervisory and 11

12 control activities over prosecutors at lower levels and check signals for disciplinary violations by prosecutors. Units of this inspectorate were established in all appellate prosecution offices; (ii) roll-out of the Unified Information System to (UIS) to all regional prosecution offices; (iii) enhanced collaboration with other institutions including Ministry of Interior, the State Agency for National Security, through a signing of Memorandum of Understanding for the establishment of specialized inter-agency investigative units; (iv) amendments to the penal procedures and administrative procedures, and others. Amendments to the Judiciary Act and strengthening the role of the Supreme Judiciary Council in preventing corruption in the judiciary also had a positive effect on the performance of the Prosecution and on perception of society about the effectiveness of the PORB in combating and preventing corruption. The exceptional anti-corruption focus of the new government, sworn in July 2009, helped magnify the achievement of the Grant s objectives and contributed to increased trust in the work of the prosecution as evidenced from the results of the surveys conducted under the Grant. The July 2010 EC report under the Cooperation and Verification Mechanism acknowledges the strong reform momentum and results achieved in Bulgaria: approval of a new strategy for judicial reform and anti-corruption, improvements in penal procedures, higher numbers of indictments for organized crime, and high-level corruption cases. The report also points to the need for tangible results in removing deficiencies in judicial practice, prevention of corruption, and protection against conflict of interest. 3. Assessment of Outcomes (Ratings are available in ICM Data Sheet) Key performance indicators of the Grant show that intended outcomes have been substantially achieved and, in some cases exceeded to a great extent: All existing cases (pre-idf activity) against allegedly corrupt prosecutors have been concluded. All pre-trial cases against prosecutors (and other magistrates) are being monitored by the Inspectorate under a special supervision mechanism. In 2009 the PORB Inspectorate supervised 1742 cases with nearly two-thirds of the cases concluded within one month, the rest within six months. Of the total number of supervised cases, 51 are cases against prosecutors and 16 against investigators 1. Between 2007 and June 2010 ten indictments on corruption cases were issued against 12 prosecutors. While the annual number of new corruption cases among prosecutors remained almost unchanged throughout the years, administrative actions against allegedly corrupt prosecutors increased substantially. The number of concluded disciplinary sanctions against prosecutors more than tripled between 2007 and 2009-from 14 to 46 with the highest disciplinary measures (dismissal and salary reduction) imposed on 6 prosecutors in 2009 up from 3 in 2007 (Table 1). 1 Since 2009 in compliance with amendments to the Judicial Power Act the National Investigation Service had been transferred to the Public Prosecution Office. 12

13 The shortening of the duration of corruption cases is much higher than the target of 100 days defined under the grant. The average length of prosecutorial cases for corruption was reduced from approximately days in 2007 to days in 2009 and days in the first half of 2010, which is an overachievement of close to 50% of the target. Public confidence in the anti-corruption work of the prosecution improved substantially as shown by the two surveys conducted under the Grant by Transparency International in July 2009 and September The approval rating for the prosecution improved by 11.2 percentage points in a year s time and is fully in line with the target under the grant. In addition, corruption among prosecutors is seen as less of a reason for the low effectiveness of PORB-- according to 41% of the respondents in 2010 compared to 65% of the respondents in Table 1. Key Performance Indicators Visible cases of suspension or initiation of criminal proceedings against allegedly corrupt prosecutors Rate of completion of prosecutorial work in corruption cases Public confidence in anti-corruption work of the Public Persecution (see Annex III for more details) Jan-Jun 2010 Target 3 indictments 3 cases 2 indictments 2 indictments number of (against 4 indictments (against 3 (against 2 cases prosecutors); (against 3 prosecutors) prosecutors) 14 disciplinary prosecutors) disciplinary sanctions 32 disciplinary sanctions against disciplinary sanctions against prosecutors, of sanctions against prosecutors, of which 3 against prosecutors, which 5 dismissals or prosecutors, of which 6 dismissals or paycheck of which 3 dismissals or paycheck reduction dismissals or paycheck reduction paycheck reduction reduction shortened by 100 days 11.9% % higher by 10 percentag e points Source: PORB Note: Every indictment issued and brought to court or action undertaken for arrest at the time of corruption perpetration by prosecutors and by other magistrates is publicly announced to the media and on the web site of the PPO The same is done also in all cases of public interest. According to the July 2010 EC report 3 under the Cooperation and Verification Mechanism Bulgaria has made further efforts to fight high-level corruption. Since 2 The indicators are from the two Public Opinion Surveys done under the Grant in July 2009 and in September 2010 and refer to the share of respondents that answered Yes and Rather Yes to the question Do you think the prosecution makes every effort to effectively fight corruption? 13

14 July 2009 a number of indictments were registered against Members of Parliament, former ministers and deputy minister, and against an acting minister. Overall, the registered new cases for corruption crimes increased in 2009 compared to 2008 (to 595 from 490) as well as the number of sentences on corruption cases (to 192 from 140). It is important to note that further gains in effectiveness are expected to take place once the enhancements of the IT system are fully deployed. The Data Warehouse is expected to be rolled over to all regional offices in the second quarter of 2011 and would provide valuable information to decision making in PORB in real time. The technical specification for the development of the Unified Information System defines improvements of the system that would take place in the next 5 years and that are key for the enhancement of the IISCC. Finally, the income and assets declaration application software awaits the approval of internal rules on its implementation as an internal management tool to monitor and in real time changes in incomes and assets of prosecutors and identify risks for corruption among prosecutors. 3.1 Relevance of Objectives: Satisfactory (Relevance of grant objectives in relation to country needs/priorities and Bank strategies) Comments: Strengthening the anti-corruption capacity of the PORB is a key element of the judicial reform in Bulgaria and of Bulgaria s convergence to EU standards. While Bulgaria s legislation was to a large extent harmonized prior to EU accession by 2007 important challenges remained in aligning enforcement of legislation and practices to EU norms and standards. To help Bulgaria improve the effectiveness of its judiciary and track progress achieved in the fight against corruption and organized crime, the European Commission (EC) agreed with Bulgaria (and Romania) a Cooperation and Verification Mechanism. Each year the EC publishes two progress reports identifying achievements against agreed benchmarks. The last two reports 4 acknowledge the strong reform momentum since July 2009 and commitment of Bulgaria to implement its judicial reform strategy and identified steps to improve the functioning of the judiciary. Key recommendations regarding the fight against corruption going forward included: (i) aligning judicial practices in high-level fraud and corruption cases with best practices in EU member states; (ii) strengthening the law on the prevention of conflicts of interest; and, (iii) strengthen the implementation of public procurement legislation. In its Strategy to Continue the Judicial Reform in the Conditions of Full EU Membership adopted in 2010, the Government recognized the fight against corruption in the judiciary 3 Report from the Commission to the European Parliament and the Council on Progress in Bulgaria under the Cooperation and Verification Mechanism, Brussels, July Report from the Commission to the European Parliament and the Council on Progress in Bulgaria under the Cooperation and Verification Mechanism, Brussels, July 2010, and Interim Report From the European Commission to the European Parliament and the Council On Progress in Bulgaria under the Co-operation and Verification Mechanism, Brussels, February 18,

15 as a key strategic goal of the judicial reform in Bulgaria and identified measures to implement this goal. 3.2 Efficacy: Satisfactory (Extent to which the development objectives have been achieved) Comments: The Development Objective of the Grant was achieved. The PORB s capacity and effectiveness to track and combat corruption was enhanced due to: (i) The technical assistance provided in identifying best practices in countering and preventing corruption, review of internal control mechanism, identifying effective partnerships with Government bodies, business associations, media, and civil society; methodology for investigation and criminal prosecution of corruption related offences; strengthening the ethical norms and standards of behavior of prosecutors in the prevention of and fight against corruption. (ii) Training of PORB staff and staff of law enforcement or revenue collection agencies on best practices in combating corruption in the EU, U.S. and other countries. (iii)development of a catalogue of best practices and distributed among prosecutors and investigators in the country and representatives of other agencies participating in the training seminars. Proposals for amendments to the national legislation were drafted based on the findings in the catalogue and submitted to the Ministry of Justice for consideration. (iv) Expanding PORB s cooperation with civil society and media through the three seminars attended by civil society and business associations and media, thus the way for increased transparency, public accountability and credibility of its institutional integrity and anti-corruption work. (v) Surveys of public opinion regarding the effectiveness and constraints of the anticorruption efforts of the prosecution and similar surveys among prosecutors. The results of the survey were widely discussed and provided important insights to address existing bottlenecks. (vi) Implementation of improved business processes and information systems for case management system and the management of income and assets declarations for prosecutors and PORB management. 3.3 Efficiency: Satisfactory (Cost effectiveness, e.g. benefits and costs compare with the expectations when grant was made, to what extent the grant is adding value to the client country and other partners work programs in the country/region) Comments: The grant suffered from an initial slow pace of disbursement because the PORB lacked the terms of reference and procurement experience to efficiently execute the grant activities. As it gained experience the PORB accelerated the pace of implementation and was able to execute all planned activities within the extended grant period. Project funds have been adequately targeted and efficiently used, resulting in successful achievement of the agreed objectives, within the foreseen budget. Strengthening of the local currency in 15

16 relation to the dollar and cancellation of one activity (translation services) made possible for PORB to generate a small savings of about 12% of the grant funds. With a relatively small budget and in a short period of time two systems have been developed and implemented a pilot Data Warehouse and a system for tracking and management of incomes and assets declarations of prosecutors. In addition technical specifications were developed for the enhancement of the UIS involving a new business model for the prosecution. According to PORB similar IT development projects take longer to implement and with a larger budget. The contract was managed diligently under a very tight schedule and in a cost effective manner. The valuable experience gained by PORB staff in managing this complex IT contract would be useful in preparation and implementation of the enhancement of the Integrated Information System for Combating Crime (IISCC) using funds from Operational Program Administrative Capacity. As expected during grant preparation, the PORB contributed a significant amount of resources to the execution of the grant. The counterpart funding to the Grant accounted for close to $90,000 instead of $50,000 initially planned which shows the high commitment of the PORB to the development objectives of the Grant. 3.4 Overall Outcome Performance Rating: Satisfactory The IDF Grant made quite an important contribution in strengthening the anti-corruption capacity of the prosecution and in increasing transparency and accountability of its work. Despite initial delays the intended results were to a large extent achieved within the extended period of the Grant. Ten indictments on corruption cases were issued against 12 prosecutors between 2007 and mid The number of concluded disciplinary sanctions against prosecutors more than tripled between 2007 and 2009 from 14 to 46 with the highest disciplinary measures (dismissal and salary reduction) imposed on 6 prosecutors in 2009 up from 3 in The duration of pre-trial corruption cases was shortened significantly by close to 150 days between 2007 and mid-2010, beyond the target of the Grant (of 100 days). Close to 68% of the cases were completed within a year in 2009 and 72% in the first half of 2010 compared to only 54% in Public confidence in the anti-corruption work of the public prosecution, albeit low, improved by 10 percentage points between 2009 and 2010 while public approval for prosecution grew by 11.2 percentage points to 22.8%. While in 2009 nearly 65% of the respondents in the survey perceived corruption among prosecutors as the second largest constraint to the effective fight against corruption (the first constraint being political pressures), in 2010 this share declined to 40.5%. Imperfections of the legal framework and low public pressure for dealing with corruption have received higher weight in the list of constraints to effective anti-corruption work the share of respondents pointing legal framework as constraint increased from 54% of respondents in 2009 to 57% in 2010 while low pressure from society was viewed as a problem by close to 60% of the respondents in 2010 compared to 50% in The full implementation of the enhanced information system, including the roll-out of the Data Warehouse and the system for tracking incomes and assets of prosecutors declaration, are expected to lead to further gains in effectiveness of anti-corruption work of the prosecution. 16

17 4. Risk to Development Outcome: Moderate Comments: Overall sustainability of grant outcomes is likely, with moderate risks of gains being reversed. The information systems delivered under the project for tracking incomes and assets of prosecutors and the Data Warehouse are key elements of the action plan of the Ministry of Justice and the Judiciary in the implementation of the measures agreed with the EC under the Cooperation and Verification Mechanism. This suggests that internal and external pressures are high to maintain those systems in operation. The enhancements in PORB s interaction with civil society at large are equally difficult to be reversed and actual expectation is that they will have to be enhanced further as society demands a much more efficient, transparent and honest Judiciary in the country. 5. Bank and Recipient Performance 5.1 Bank Performance (a) Bank Performance in Ensuring Quality at Entry: Moderately Satisfactory The Grant was technically well designed in close consultations with the PORB and other interested partners, the Supreme Judicial Council, the Ministry of Justice as well as other international partners providing technical assistance to the PORB and judiciary as a whole. This ensured the relevance of the Grant and its objectives to the overall anticorruption strategy of the Government and reform strategy of the judiciary. All Grant activities were important and contributed to the development objective of the grant and to the PORB s own reform agenda. The PORB appreciated highly the World Bank s assistance and fully shared the vision encapsulated in the Grant. The PORB requested technical assistance from the World Bank for the preparation of terms of reference and procurement for the Grant activities, including the complex contract for the enhancement of the IT system, which were beyond the level of internal resources commonly allocated for the preparation of grants. The technical assistance provided by the Bank at the preparation stage on the procurement of the information system proved insufficient to ensure quick implementation of this activity which comprised 60 percent of the Grant. As a result, there was a need to extend the Grant closing date. Successful remedial actions were undertaken (hiring of a procurement consultant knowledgeable in Bank procurement and closer interaction with PORB) which helped implement this important activity within the extended Grant period. (b) Quality of Supervision: Satisfactory Overall quality of Bank s supervision during the implementation of the Grant was satisfactory, although in the early stages of implementation the performance was moderately satisfactory. The grant was adequately supervised and closely monitored with a balanced approach giving equal focus on the accomplishment of the development 17

18 objective and implementation issues. Procurement included two contracts for goods and six contracts for technical assistance, one of which was a complex contract for the enhancement of the IT system and required specialized skills. Advice on procurement and disbursement was frequently sought and provided in a timely manner with Bank procurement specialist based in Sofia and the disbursement support provided both by staff in Sofia and regional office in Zagreb. Financial management of the Grant was assessed as satisfactory in all supervision missions conducted at least once a year. Changes of the Grant TTLs (2 TTLs within the 3 years of grant design and implementation) and team members, while not affecting visibly the implementation quality, did create certain temporary inefficiencies. Supervision required access to technical skills beyond the level that can be commonly supported by grant supervision funds. Transferring of task team leadership to the field as well as day-to-day guidance and support from the procurement and disbursement teams based in Sofia and Zagreb helped accelerate processing of no-objections and project implementation. (c) Rating for Overall Bank Performance: Satisfactory The overall performance of the Bank team has been satisfactory the grant design was well developed and highly relevant to country priorities. Collaboration with the implementing agency was excellent even when implementation was not proceeding at a desirable pace. Risks to Grant implementation were proactively managed. Fiduciary supervision was carried out adequately and flexibility of Bank staff helped to better adjust implementation with specific circumstances. 5.2 Recipient (a) Recipient Performance: Satisfactory The Grant recipient was also the implementing agency. See (b) (b) Implementing Agency or Agencies Performance: Satisfactory The PORB has preserved its commitment to the Grant throughout its implementation. This commitment was visible both at senior level the increased counterpart funding for the Grant and assignment of the then Deputy Prosecutor General for Project Manager, but also at the staff of PORB involved in implementation of key activities f the project, such as the enhancement of the IT system and the training seminars. Preparation of the tender document for the main IT activity under the grant Enhancement of the Unified Information System under World Bank guidelines was a significant challenge. The small IT team of PORB managed well and with high professional standards the procurement and the implementation of this complex IT development activity and succeeded to make up for the initial delays and finalized the project within a tight schedule. Despite some changes in staff due to turnover of staff in PORB, the project manager of the Grant remained throughout project implementation ensuring overall continuity. Financial management arrangements, including the audit of the Grant were satisfactory. 18

19 (c) Rating for Overall Recipient Performance: Satisfactory Overall the PORB executed the project in a satisfactory way, assessed by the success in achieving the Grant s objectives and in fulfillment of its fiduciary duties. Effective measures were taken to address delays in implementation and achieve the intended results. 6. Lessons Learned (Both project-specific and of wide general application) (i) Preparing a Client new to World Bank processes and procedures. Project preparation teams need to pay extraordinary attention to the preparation of clients who are new to World Bank processes and procedures beyond the preparation of the grant management unit. Terms of reference for all work planned under the grant should be developed, discussed, and cleared prior to starting execution of the grant. (ii) Procuring complex information systems. Procurement of complex information systems is a well-known source of implementation problems and delays. Grants including such procurement must include sufficient resources to finance technical assistance for the preparation of the bidding document, evaluation of bids, and management of the contract, as well as for the supervision team to supervise the activity. 7. Follow up Activities. The Grant has provided the technical specifications and a design of an optimized business model for the UIS and its link with the Integrated ISCC of the judiciary. The application for financing of the enhancement of the UIS is currently being prepared by PORB to be financed under the Operational Program Administrative Capacity. 8. Other Comments 19

20 Annex 1. Grant Costs and Financing by Category, Disbursement profile (a) Project Cost by Expense Category (in USD) Category Estimate at Actual (USD) approval (USD) TF58170 GOODS 15, , TF58170 CS, AUDIT 377, , TF58170 TRAINING 81, , Designated account

21 Annex 2. Outputs by Component (Please describe the outputs for each activity under the grant) COMPONENT 1: Strengthening of PORB strategic focus, accountability, professionalism and institutional capacity, through formulation of a strategy document, provision of training and development of case tracking and management system and automated income and asset declaration system in PORB. The activities under this component included: Activity A. Consultations/Training Seminars/Workshops focused on improvements in legal framework and ethical norms for combating and preventing corruption among prosecutors. A1. Review of national, EU and other countries anti-corruption legislation and practices in fighting and preventing corruption; assessment of training needs of prosecutors and development of a training agenda for the training seminars. Outputs: Training needs analysis and six modules for the training seminars developed. A2. Three two-day seminars on the legal framework and ethical standards for combating and preventing corruption, taking place in Veliko Turnovo, Plovdiv, and Bankia, and a closing workshop in Sofia to present summary of training seminars and results from the surveys among prosecutors and citizens. Outputs: 161 prosecutors and 45 investigators trained, 63 representatives of other agencies trained, and 15 representatives from media; improved cooperation with other agencies involved in anti-corruption work and increased transparency and accountability. A3. Development of a Catalogue of Best Practices in the EU, U.S. and other states in counteracting corruption. Outputs: Proposals for improvements to legislation submitted to Ministry of Justice. Activity B. Activity B. Enhancement of the Case Management and Tracking System and development a system for income and assets declarations of prosecutors B1. Development of a Data Warehouse Outputs: The Data Warehouse developed and currently rolled out to regional offices. It makes possible the production of various reports to track and manage cases, workload analysis and others. These reports were previously prepared on the basis of paper records which was costly and inefficient. B2. Development of an optimized business model and technical specifications for enhancement of the Unified Information System (UIS) of the PORB. Outputs: The enhancement of the UIS would create the technical conditions for automatically feeding with statuary data the Integrated Information System for Combating Crime (IISCC) which is the IT system for the judiciary as a whole. 21

22 B3. Development of a system for tracking incomes and asses declarations of prosecutors. Outputs: The system is developed and awaits approval of procedure for its use by the Supreme Judicial Council. The system maintains up-to-date information about the incomes and properties of prosecutors and would be used by the Inspectorate of the SJC when inspecting magistrates. The system facilitates prosecutors by automatically generating the declarations to be submitted to the National Audit office annually. B4. Development of terms of reference for B1, B2, B3. Activity C. Purchase of equipment, computer configurations and consumables for provision of training seminars under Activity A and closing workshop presenting summary of training and results of surveys implemented under Activity C. Outputs: Laptop, a copy machine and portable audio equipment purchased and used in the seminars under the Grant and in other events presentations organized by OPG aimed at increasing transparency and accountability of the PORB. Activity D. Printing of Catalogue of Best Practices Outputs: 3,200 copies printed and distributed among prosecutors and investigators as well to participants in the three training seminars from other agencies. Activity E. Procurement Consultancy Outputs: Terms of references prepared on time and procurement accelerated. COMPONENT 2: Improvement of transparency and accountability of PORB functions though forming partnership between the PORB and civil society in monitoring progress of anti-corruption efforts, and public information campaign with regard to PORB s anti-corruption efforts. Two major activities were included under this component: Activity F. Public opinion surveys and a documentary on PORB s work F1. Two surveys of public opinion and of prosecutors about the effectiveness of prosecution in combating and preventing corruption. Output: Analysis over time of changes in perceptions about the integrity and commitment of prosecutors to fight corruption. The results of the two surveys were presented and discussed publicly, and posted on the PORB s website. F2. Development of a short documentary to present to society the work of the PORB. Output: The documentary was broadcast at the closing seminar in Sofia and is posted on PORB s website. Activity G. Audit of the grant Outputs: Clean opinion issued on the use of Grant funds. Activity H. Interpretation and translation services- cancelled. 22

Key Dates. Project Development Objectives. Components. Overall Ratings. Implementation Status and Key Decisions

Key Dates. Project Development Objectives. Components. Overall Ratings. Implementation Status and Key Decisions The World Bank EUROPE AND CENTRAL ASIA Kyrgyz Republic Procurement Global Practice Institutional Development Fund FY 2014 Seq No: 2 ARCHIVED on 08-Jun-2015 ISR19571 Implementing Agencies: Public Procurement

More information

Public Disclosure Copy. Implementation Status & Results Report Global Partnership for Education Grant for Basic Education Project (P117662)

Public Disclosure Copy. Implementation Status & Results Report Global Partnership for Education Grant for Basic Education Project (P117662) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized AFRICA Liberia Education Global Practice Recipient Executed Activities Specific Investment

More information

TERMS OF REFERENCE CONTRACT NO: 2017/ , PREVENTION AND FIGHT AGAINST CORRUPTION

TERMS OF REFERENCE CONTRACT NO: 2017/ , PREVENTION AND FIGHT AGAINST CORRUPTION TERMS OF REFERENCE CONTRACT NO: 2017/386-597, PREVENTION AND FIGHT AGAINST CORRUPTION OBJECTIVE(S): 1) STRENGTHENED CAPACITIES FOR REPRESSION OF CORRUPTION BY IMPROVING QUALITY OF INVESTIGATION, PROSECUTION

More information

Implementation Status & Results Brazil BR-Housing Sector TAL (P050761)

Implementation Status & Results Brazil BR-Housing Sector TAL (P050761) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil BR-Housing Sector TAL (P050761) Operation Name: BR-Housing Sector TAL (P050761) Project Stage:

More information

THE REPUBLIC OF BULGARIA THE COUNCIL OF MINISTERS. DECREE No. 121 dated May 31 st, 2007

THE REPUBLIC OF BULGARIA THE COUNCIL OF MINISTERS. DECREE No. 121 dated May 31 st, 2007 THE REPUBLIC OF BULGARIA THE COUNCIL OF MINISTERS Copy DECREE No. 121 dated May 31 st, 2007 RE: Lying down the provisions for awarding of grants under the operational programmes cofinanced by the Structural

More information

March 9, Honourable Winston Dookeran Minister of Finance Eric Williams Finance Building Independence Square Port of Spain Trinidad and Tobago

March 9, Honourable Winston Dookeran Minister of Finance Eric Williams Finance Building Independence Square Port of Spain Trinidad and Tobago Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized OFM'CIAL (116 3Y) The World Bank e NW. (202) 473-1000 INTERNATIONAL BANK FOR RECONSTRUCTION

More information

REPUBLIC OF ARMENIA PROSECUTOR S SCHOOL

REPUBLIC OF ARMENIA PROSECUTOR S SCHOOL REPUBLIC OF ARMENIA PROSECUTOR S SCHOOL State noncommercial organization BRIEF ABOUT THE PROSECUTOR S SCHOOL OF THE REPUBLIC OF ARMENIA Prosecutor s School of RA INTRODUCTION The commendable legal system

More information

Implementation Status & Results West Bank and Gaza Gaza II Emergency Water Project (P065920)

Implementation Status & Results West Bank and Gaza Gaza II Emergency Water Project (P065920) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results West Bank and Gaza Gaza II Emergency Water Project (P065920) Operation Name: Gaza II Emergency Water

More information

between ARAB REPUBLIC OF EGYPT and

between ARAB REPUBLIC OF EGYPT and Public Disclosure Authorized GRANT NUMBER TF0A1553 Public Disclosure Authorized MIDDLE EAST AND NORTH AFRICA TRANSITION FUND Grant Agreement Public Disclosure Authorized Public Disclosure Authorized EQUAL

More information

CALL FOR PROPOSALS LOCAL INITIATIVES ON INTER-MUNICIPAL COOPERATION IN MOLDOVA

CALL FOR PROPOSALS LOCAL INITIATIVES ON INTER-MUNICIPAL COOPERATION IN MOLDOVA CALL FOR PROPOSALS LOCAL INITIATIVES ON INTER-MUNICIPAL COOPERATION IN MOLDOVA European Union/Council of Europe Programmatic Cooperation Framework (PCF) for Armenia, Azerbaijan, Georgia, Moldova, Ukraine

More information

The report is based on the following documents regulations for the operation of the administration of the prosecutors offices and the courts,

The report is based on the following documents regulations for the operation of the administration of the prosecutors offices and the courts, 15 STATUS AND PROBLEMS IN THE USE OF ICT IN THE JUDICIARY IN BULGARIA INTRODUCTION The present report examines the methods for collection, processing and retrieval of information related to the phases

More information

The World Bank Kenya GPE Primary Education Development Project (P146797)

The World Bank Kenya GPE Primary Education Development Project (P146797) Public Disclosure Authorized AFRICA Kenya Education Global Practice Recipient Executed Activities Investment Project Financing FY 2015 Seq No: 6 ARCHIVED on 01-Nov-2017 ISR29517 Implementing Agencies:

More information

OFFICIAL r0 4 DOCUMENTS

OFFICIAL r0 4 DOCUMENTS Public Disclosure Authorized OFFICIAL r0 4 DOCUMENTS The World Bank 1818 H Street N.W. (202) 473-1000 INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Washington, D.C. 20433 Cable Address: INTBAFRAD

More information

STANDARD SUMMARY PROJECT FICHE. Project Number

STANDARD SUMMARY PROJECT FICHE. Project Number STANDARD SUMMARY PROJECT FICHE Project Number 2003.004-341.05.02 1. Basic Information Objective 5 - Justice and Home Affairs 1.1 CRIS Number: 2003.004-341.05.02 1.2 Title: Strengthening the National Capacities

More information

The World Bank Skills Strengthening for Industrial Value Enhancement Operation (P156867)

The World Bank Skills Strengthening for Industrial Value Enhancement Operation (P156867) Public Disclosure Authorized SOUTH ASIA India Education Global Practice IBRD/IDA Program-for-Results FY 2017 Seq No: 1 ARCHIVED on 27-Jun-2017 ISR28685 Implementing Agencies: Ministry of Skill Development

More information

Overview. Nicaraguan Code Reform and Modernization Project. Scope of work Modification No. 11. Center for the Administration of Justice

Overview. Nicaraguan Code Reform and Modernization Project. Scope of work Modification No. 11. Center for the Administration of Justice Overview Nicaraguan Code Reform and Modernization Project Scope of work Modification No. 11 Center for the Administration of Justice Florida International University Current Program Most Salient Accomplishments

More information

Implementation Status & Results Benin ebenin Project (P113370)

Implementation Status & Results Benin ebenin Project (P113370) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Benin ebenin Project (P113370) Operation Name: ebenin Project (P113370) Project Stage: Implementation

More information

Global Partnership on Output-based Aid Grant Agreement

Global Partnership on Output-based Aid Grant Agreement Public Disclosure Authorized CONFORMED COPY GPOBA GRANT NUMBER TF096551-BD Public Disclosure Authorized Global Partnership on Output-based Aid Grant Agreement (Rural Electrification and Renewable Energy

More information

Policy Rules for the ORIO Grant Facility

Policy Rules for the ORIO Grant Facility Policy Rules for the ORIO Grant Facility Policy Rules grant facility ORIO 2012 1. What is ORIO?... 3 2. Definitions... 3 3. The role of infrastructure... 4 4. Implementation... 5 5. Target group... 5 6.

More information

Implementation Status & Results Indonesia ID SPADA in Aceh and Nias (P097605)

Implementation Status & Results Indonesia ID SPADA in Aceh and Nias (P097605) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia ID SPADA in Aceh and Nias (P9765) Operation Name: ID SPADA in Aceh and Nias (P9765) Project

More information

The World Bank Research and Innovation in Science and Technology Project (P121842)

The World Bank Research and Innovation in Science and Technology Project (P121842) Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Education Global Practice IBRD/IDA Specific Investment Loan FY 2013 Seq No: 8 ARCHIVED on 22-Jun-2017 ISR27107 Implementing Agencies: Ministry

More information

ACEH ECONOMIC DEVELOPMENT FINANCING FACIILITY (EDFF) ANNEX 1: ANTI-CORRUPTION ACTION PLAN

ACEH ECONOMIC DEVELOPMENT FINANCING FACIILITY (EDFF) ANNEX 1: ANTI-CORRUPTION ACTION PLAN ACEH ECONOMIC DEVELOPMENT FINANCING FACIILITY (EDFF) ANNEX 1: ANTI-CORRUPTION ACTION PLAN 1. The EDFF project designed to assist the Government of Aceh (GoA) and the Government of Indonesia (GOI) to Build

More information

The World Bank Kenya GPE Primary Education Development Project (P146797)

The World Bank Kenya GPE Primary Education Development Project (P146797) Public Disclosure Authorized AFRICA Kenya Education Global Practice Recipient Executed Activities Investment Project Financing FY 2015 Seq No: 4 ARCHIVED on 15-Feb-2017 ISR26822 Implementing Agencies:

More information

Support for regional and local communities to prevent drug addiction on the local level - continuation

Support for regional and local communities to prevent drug addiction on the local level - continuation - continuation 1. Basic information 1.1. CRIS Number: 2006/018-180.05-04 Twinning No: PL/06/IB/JH/04/TL 1.2. Title: Support for regional and local communities to prevent drug addiction on the local level

More information

Global Environment Facility Grant Agreement

Global Environment Facility Grant Agreement Public Disclosure Authorized CONFORMED COPY GEF TF GRANT NUMBER TF097126 Public Disclosure Authorized Global Environment Facility Grant Agreement (Financing Energy Efficiency at MSMEs Project) Public Disclosure

More information

Implementation Status & Results Congo, Democratic Republic of Emergency Demobilization and Reintegration Project (P078658)

Implementation Status & Results Congo, Democratic Republic of Emergency Demobilization and Reintegration Project (P078658) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Congo, Democratic Republic of Emergency Demobilization and Reintegration Project (P078658) Operation

More information

Implementation Status & Results Kazakhstan Agricultural Competitiveness Project (P049721)

Implementation Status & Results Kazakhstan Agricultural Competitiveness Project (P049721) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Kazakhstan Agricultural Competitiveness Project (P49721) Operation Name: Agricultural Competitiveness

More information

OBA Urban Sanitation Facility for the Greater Accra Metropolitan Area (GAMA) (P145139)

OBA Urban Sanitation Facility for the Greater Accra Metropolitan Area (GAMA) (P145139) Public Disclosure Authorized AFRICA Ghana Water Global Practice Recipient Executed Activities Investment Project Financing FY 2014 Seq No: 3 ARCHIVED on 10-May-2017 ISR25522 Implementing Agencies: Public

More information

STANDARD SUMMARY PROJECT FICHE

STANDARD SUMMARY PROJECT FICHE STANDARD SUMMARY PROJECT FICHE 1. Basic Information 1.1. Désirée Number: 2002/000-266.03.01 1.2. Title: Improving the effectiveness of criminal procedure 1.3. Sector: Justice and Home Affairs Twinning

More information

The World Bank Serbia Research, Innovation and Technology Transfer Project (P145231)

The World Bank Serbia Research, Innovation and Technology Transfer Project (P145231) Public Disclosure Authorized EUROPE AND CENTRAL ASIA Serbia Trade & Competitiveness Global Practice Recipient Executed Activities Technical Assistance Loan FY 2015 Seq No: 1 ARCHIVED on 30-Oct-2015 ISR20707

More information

The World Bank Swaziland Health, HIV/AIDS and TB Project (P110156)

The World Bank Swaziland Health, HIV/AIDS and TB Project (P110156) Public Disclosure Authorized AFRICA Swaziland Health, Nutrition & Population Global Practice IBRD/IDA Specific Investment Loan FY 2011 Seq No: 10 ARCHIVED on 27-Jun-2016 ISR24063 Implementing Agencies:

More information

January 21, Hon. Patrick itch, MP Minister fo reasury Dep t of Treasury. -tc Haus 40' Floor P. aigani, 131 NCD apua New Guinea

January 21, Hon. Patrick itch, MP Minister fo reasury Dep t of Treasury. -tc Haus 40' Floor P. aigani, 131 NCD apua New Guinea Public Disclosure Authorized The World Bank 1818 H Street N.W. (202) 477-1234 INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Washington, D.C. 20433 Cable Address: INTBAFRAD INTERNATIONAL DEVELOPMENT

More information

Implementation Status & Results Swaziland Swaziland Health, HIV/AIDS and TB Project (P110156)

Implementation Status & Results Swaziland Swaziland Health, HIV/AIDS and TB Project (P110156) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Swaziland Swaziland Health, HIV/AIDS and TB Project (P110156) Operation Name: Swaziland Health,

More information

Bd. Regina Maria nr. 35, Bucharest (Romania)

Bd. Regina Maria nr. 35, Bucharest (Romania) Curriculum vitae PERSONAL INFORMATION Bd. Regina Maria nr. 35, 040122 Bucharest (Romania) +4 0740 167 499 pavel.abraham@sas.unibuc.ro, pavelabraham@yahoo.com Sex Male Date of birth 21/10/1948 Nationality

More information

TF ID (PEACH Grant for Sub-National Public Financial Management Capacity Building Project)

TF ID (PEACH Grant for Sub-National Public Financial Management Capacity Building Project) Public Disclosure Authorized CONFORMED COPY Letter No. CD-490/UGM/XI/2010 November 15, 2010 Public Disclosure Authorized Prof. Ir. Sudjarwadi M.Eng, Phd Rector Universitas Gadjah Mada Bulaksumur Yogyakarta

More information

STANDARD TERMS AND CONDITIONS ON NORWAY GRANTS FROM INNOVATION NORWAY

STANDARD TERMS AND CONDITIONS ON NORWAY GRANTS FROM INNOVATION NORWAY STANDARD TERMS AND CONDITIONS ON NORWAY GRANTS FROM INNOVATION NORWAY 1 Scope of the Project Contract The Grant to the Project Promoter is offered on the terms and conditions laid down in the Grant Offer

More information

REQUEST FOR APPLICATIONS (RFA-JAG ) Support to Investigative Journalism

REQUEST FOR APPLICATIONS (RFA-JAG ) Support to Investigative Journalism Justice for All Project Albania REQUEST FOR APPLICATIONS (RFA-JAG-2017-004) Support to Investigative Journalism I. PROJECT DESCRIPTION USAID Justice for All Project (hereinafter referred to as the Project

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

Afghanistan Reconstruction Trust Fund Grant Agreement

Afghanistan Reconstruction Trust Fund Grant Agreement Public Disclosure Authorized OFFICIAL DOCUMENTS ARTF GRANT NUMBER TFOAO730 Public Disclosure Authorized Public Disclosure Authorized Afghanistan Reconstruction Trust Fund Grant Agreement (Higher Education

More information

OFFICIAL DOCUMENTS. Global Partnership for Education Fund Grant Agreement

OFFICIAL DOCUMENTS. Global Partnership for Education Fund Grant Agreement Public Disclosure Authorized OFFICIAL DOCUMENTS GRANT NUMBER TF0A4619 Public Disclosure Authorized Public Disclosure Authorized Global Partnership for Education Fund Grant Agreement (Additional Financing

More information

Financing Agreement. (Zanzibar Basic Education Improvement Project) between THE UNITED REPUBLIC OF TANZANIA. and

Financing Agreement. (Zanzibar Basic Education Improvement Project) between THE UNITED REPUBLIC OF TANZANIA. and Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 4293-TA Public Disclosure Authorized Financing Agreement (Zanzibar Basic Education Improvement Project) between Public Disclosure Authorized THE

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized EAST ASIA AND PACIFIC China Health, Nutrition & Population Global Practice IBRD/IDA Program-for-Results FY 2017 Seq No: 2 ARCHIVED on 25-Feb-2018 ISR31105 Implementing Agencies:

More information

Support for Applied Research in Smart Specialisation Growth Areas. Chapter 1 General Provisions

Support for Applied Research in Smart Specialisation Growth Areas. Chapter 1 General Provisions Issuer: Minister of Education and Research Type of act: regulation Type of text: original text, consolidated text In force from: 29.08.2015 In force until: Currently in force Publication citation: RT I,

More information

The World Bank Romania Secondary Education Project (P148585)

The World Bank Romania Secondary Education Project (P148585) Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF ROMANIA SECONDARY EDUCATION PROJECT APPROVED ON MARCH 16, 2015 TO ROMANIA

More information

Public Disclosure Copy. Implementation Status & Results Report Second Private Sector Competitiveness and Economic Diversification Prj (P144933)

Public Disclosure Copy. Implementation Status & Results Report Second Private Sector Competitiveness and Economic Diversification Prj (P144933) Public Disclosure Authorized AFRICA Lesotho Finance, Competitiveness and Innovation Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 10 ARCHIVED on 08-May-2018 ISR30476 Implementing

More information

Implementation Status & Results Montenegro Healthcare System Improvement Project (Montenegro) (P082223)

Implementation Status & Results Montenegro Healthcare System Improvement Project (Montenegro) (P082223) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Montenegro Healthcare System Improvement Project (Montenegro) (P082223) Operation Name: Healthcare

More information

OFFICIAL DOCUMENTS, Democratic Republic of Congo: IDF Grant for the Private Sector Development and Competitiveness Project IDF Grant No.

OFFICIAL DOCUMENTS, Democratic Republic of Congo: IDF Grant for the Private Sector Development and Competitiveness Project IDF Grant No. Public Disclosure Authorized OFFICIAL DOCUMENTS, Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank 1818 H Street N.W. (202) 477-1234 INTERNATIONAL BANK

More information

Re: Philippines: Cities Alliance Multi-Donor Trust Fund: Development of the National Slum Upgrading Strategy Grant No. TF099881

Re: Philippines: Cities Alliance Multi-Donor Trust Fund: Development of the National Slum Upgrading Strategy Grant No. TF099881 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized )rid Bank 1818 H Street N.W. (202) 477-1234 ZONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

More information

CALL FOR PROPOSALS. GRANT FOR ROMACT "SUPPORT ORGANISATIONS" IN SLOVAKIA SRSGRoma/SPU/2017/27. Joint EU/CoE Projects ROMACT3 and ROMACT4

CALL FOR PROPOSALS. GRANT FOR ROMACT SUPPORT ORGANISATIONS IN SLOVAKIA SRSGRoma/SPU/2017/27. Joint EU/CoE Projects ROMACT3 and ROMACT4 CALL FOR PROPOSALS GRANT FOR ROMACT "SUPPORT ORGANISATIONS" IN SLOVAKIA SRSGRoma/SPU/2017/27 Project Joint EU/CoE Projects ROMACT3 and ROMACT4 Awarding entity Funding COUNCIL OF EUROPE Directorate General

More information

OFFICIAL DOCUMENTS. Grant Agreement. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized LEBANESE REPUBLIC

OFFICIAL DOCUMENTS. Grant Agreement. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized LEBANESE REPUBLIC Public Disclosure Authorized OFFICIAL DOCUMENTS LSCTF GRANT NUMBER TF0A4753 Public Disclosure Authorized Grant Agreement (SUPPORT TO REACHING ALL CHILDREN WITH EDUCATION (RACE 2) PROGRAM) Public Disclosure

More information

Grant Agreement. The. - hereinafter referred to as "the Recipient" and

Grant Agreement. The. - hereinafter referred to as the Recipient and The - hereinafter referred to as "the Recipient" and Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH Dag-Hammarskjöld-Weg 1-5 65760 Eschborn Federal Republic of Germany - hereinafter

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES22380 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

APPLICATION MANUAL MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS. PHARE National Programme 2004 III part

APPLICATION MANUAL MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS. PHARE National Programme 2004 III part CONTRACTING AUTHORITY: MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS PHARE National Programme 2004 III part APPLICATION MANUAL Conditions and procedures for Bulgarian partners participating within

More information

Global Partnership on Output-based Aid Grant Agreement

Global Partnership on Output-based Aid Grant Agreement Global Partnership on Output-based Aid GRANT NUMBERS TF057614 AND TF057615 Global Partnership on Output-based Aid Grant Agreement (Kenya - Microfinance for Community-Managed Water Projects) between K-REP

More information

LAW FOR THE PROTECTION OF THE CLASSIFIED INFORMATION. Chapter one. GENERAL PROVISIONS

LAW FOR THE PROTECTION OF THE CLASSIFIED INFORMATION. Chapter one. GENERAL PROVISIONS LAW FOR THE PROTECTION OF THE CLASSIFIED INFORMATION Prom. SG. 45/30 Apr 2002, corr. SG. 5/17 Jan 2003, amend. SG. 31/4 Apr 2003, amend. SG. 52/18 Jun 2004, suppl. SG. 55/25 Jun 2004, suppl. SG. 89/12

More information

Implementation Status & Results Central African Republic Multisectoral HIV/AIDS Project (P073525)

Implementation Status & Results Central African Republic Multisectoral HIV/AIDS Project (P073525) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Central African Republic Multisectoral HIV/AIDS Project

More information

III. The provider of support is the Technology Agency of the Czech Republic (hereafter just TA CR ) seated in Prague 6, Evropska 2589/33b.

III. The provider of support is the Technology Agency of the Czech Republic (hereafter just TA CR ) seated in Prague 6, Evropska 2589/33b. III. Programme of the Technology Agency of the Czech Republic to support the development of long-term collaboration of the public and private sectors on research, development and innovations 1. Programme

More information

MINISTRY OF EDUCATION AND HUMAN RESOURCES DEVELOPMENT DRAFT POLICY STATEMENT AND GUIDELINES FOR GRANTS TO EDUCATION AUTHORITIES IN SOLOMON ISLANDS

MINISTRY OF EDUCATION AND HUMAN RESOURCES DEVELOPMENT DRAFT POLICY STATEMENT AND GUIDELINES FOR GRANTS TO EDUCATION AUTHORITIES IN SOLOMON ISLANDS MINISTRY OF EDUCATION AND HUMAN RESOURCES DEVELOPMENT DRAFT POLICY STATEMENT AND GUIDELINES FOR GRANTS TO EDUCATION AUTHORITIES IN SOLOMON ISLANDS 24th of October 2008 Table of contents Abbreviations...

More information

Roma inclusion in the EEA and Norway Grants

Roma inclusion in the EEA and Norway Grants Roma inclusion in the EEA and Norway Grants Mainstreaming for results Financial Mechanism Office Rue Joseph II, 12-16 1000 Brussels, Belgium fmo@efta.int www.eeagrants.org Background The Roma is Europe

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE MULTI DONOR TRUST FUND FO THE INSTITUTIONAL REFORM AND CAPACITY BUILDING PROJECT TO THE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE MULTI DONOR TRUST FUND FO THE INSTITUTIONAL REFORM AND CAPACITY BUILDING PROJECT TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

Global Environment Facility Trust Fund Grant Agreement

Global Environment Facility Trust Fund Grant Agreement CONFORMED COPY GEF TRUST FUND GRANT NUMBER TF099857 Global Environment Facility Trust Fund Grant Agreement (Nyika Transfrontier Conservation Area Project) between REPUBLIC OF MALAWI and INTERNATIONAL BANK

More information

NGO Programme - Greece EEA Financial Mechanism APPLICATION FORM FOR THE OUTCOME DEMOCRATIC VALUES, INCLUDING HUMAN RIGHTS, PROMOTED

NGO Programme - Greece EEA Financial Mechanism APPLICATION FORM FOR THE OUTCOME DEMOCRATIC VALUES, INCLUDING HUMAN RIGHTS, PROMOTED NGO Programme - Greece EEA Financial Mechanism 2009-2014 APPLICATION FORM FOR THE OUTCOME DEMOCRATIC VALUES, INCLUDING HUMAN RIGHTS, PROMOTED Athens September 2014 1 Before filling in the application,

More information

EU Grant Agreement DOC8UMEW. Public Disclosure Authorized GRANT NUMBER TF0A2379. Public Disclosure Authorized. (Access to Sustainable Energy Project)

EU Grant Agreement DOC8UMEW. Public Disclosure Authorized GRANT NUMBER TF0A2379. Public Disclosure Authorized. (Access to Sustainable Energy Project) Public Disclosure Authorized DOC8UMEW GRANT NUMBER TF0A2379 Public Disclosure Authorized Public Disclosure Authorized EU Grant Agreement (Access to Sustainable Energy Project) between INTERNATIONAL BANK

More information

INDONESIA: IMPROVING TEACHER PERFORMANCE AND ACCOUNTABILITY (KIAT GURU)

INDONESIA: IMPROVING TEACHER PERFORMANCE AND ACCOUNTABILITY (KIAT GURU) Public Disclosure Authorized INDONESIA: IMPROVING TEACHER PERFORMANCE AND ACCOUNTABILITY (KIAT GURU) (P159191) EAST ASIA AND PACIFIC Indonesia Social, Urban, Rural and Resilience Global Practice Global

More information

United Nations Peace Building Fund Grant Agreement

United Nations Peace Building Fund Grant Agreement Public Disclosure Authorized OFFICIAL DOCUMENTS Public Disclosure Authorized GRANT NUMBER TF018255 United Nations Peace Building Fund Grant Agreement (Additional Financing for the Productive Social Safety

More information

Counterpart International Afghanistan Afghan Civic Engagement Program (ACEP)

Counterpart International Afghanistan Afghan Civic Engagement Program (ACEP) Counterpart International Afghanistan Afghan Civic Engagement Program (ACEP) Request for Applications (RFA) Key CSO Partner Policy & Advocacy Grants Counter trafficking in Persons (C-TiP) Note: The translated

More information

THE WORLD BANK BANKGROUP. DOCUMENTS 15 ap

THE WORLD BANK BANKGROUP. DOCUMENTS 15 ap Public Disclosure Authorized THE WORLD BANK BANKGROUP DOCUMENTS 15 ap Public Disclosure Authorized Hon. Patrick Anthony Chinamasa Minister of Finance and Economic Development Ministry of Finance and Economic

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized AFRICA Ethiopia Finance & Markets Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 3 ARCHIVED on 25-May-2017 ISR27984 Implementing Agencies: National Bank

More information

Public Disclosure Copy

Public Disclosure Copy LATIN AMERICA AND CARIBBEAN Brazil Recipient Executed Activities Investment Project Financing FY 2016 Seq No: 1 ARCHIVED on 17-May-2017 ISR27363 Implementing Agencies: Key Dates Key Project Dates Bank

More information

Republic of Latvia. Cabinet Regulation No. 50 Adopted 19 January 2016

Republic of Latvia. Cabinet Regulation No. 50 Adopted 19 January 2016 Republic of Latvia Cabinet Regulation No. 50 Adopted 19 January 2016 Regulations Regarding Implementation of Activity 1.1.1.2 Post-doctoral Research Aid of the Specific Aid Objective 1.1.1 To increase

More information

The World Bank Swaziland Health, HIV/AIDS and TB Project (P110156)

The World Bank Swaziland Health, HIV/AIDS and TB Project (P110156) Public Disclosure Authorized AFRICA Swaziland Health, Nutrition & Population Global Practice IBRD/IDA Specific Investment Loan FY 2011 Seq No: 12 ARCHIVED on 29-Jun-2017 ISR28124 Implementing Agencies:

More information

Implementation Status & Results Rwanda Second Emergency Demobilization and Reintegration Project (P112712)

Implementation Status & Results Rwanda Second Emergency Demobilization and Reintegration Project (P112712) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Rwanda Second Emergency Demobilization and Reintegration Project (P112712) Operation Name: Second

More information

Public Diplomacy, Policy Research and Outreach Devoted to the European Union and EU-Canada Relations

Public Diplomacy, Policy Research and Outreach Devoted to the European Union and EU-Canada Relations Public Diplomacy, Policy Research and Outreach Devoted to the European Union and EU-Canada Relations CALL FOR PROPOSALS Application Deadline: 22 September, 2009 This Call for Proposals is designed to pursue

More information

Transatlantic Strategy Forum

Transatlantic Strategy Forum EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR EXTERNAL RELATIONS Transatlantic Strategy Forum CALL FOR PROPOSALS N o RELEX/C1/2009/TSF Application Deadline: 14 April 2009 An amount of EUR 50,000 was earmarked

More information

The World Bank Vietnam Climate Innovation Center (VCIC) RETF (P155260)

The World Bank Vietnam Climate Innovation Center (VCIC) RETF (P155260) Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF VIETNAM CLIMATE INNOVATION CENTER (VCIC) RETF APPROVED ON OCTOBER 30,

More information

Global Partnership on Output-based Aid Grant Agreement

Global Partnership on Output-based Aid Grant Agreement Public Disclosure Authorized GPOBA GRANT NUMBER TF010757 Public Disclosure Authorized Public Disclosure Authorized Global Partnership on Output-based Aid Grant Agreement (Philippines Public Health Project)

More information

Trust Fund Grant Agreement

Trust Fund Grant Agreement Public Disclosure Authorized CONFORMED COPY GRANT NUMBER TF094521 GZ Public Disclosure Authorized Trust Fund Grant Agreement (Additional Financing for the Palestinian NGO-III Project) Public Disclosure

More information

OFFICIALf DOCUMENTS. Re: REPUBLIC OF DJIBOUTI JSDF Grant for Enhancing Income Opportunities Project Grant No. TFOAO350

OFFICIALf DOCUMENTS. Re: REPUBLIC OF DJIBOUTI JSDF Grant for Enhancing Income Opportunities Project Grant No. TFOAO350 Public Disclosure Authorized OFFICIALf DOCUMENTS The World Bank 1818 H Street N.W. (202) 477-1234 INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Washington, D.C. 20433 Cable Address: INTBAFRAD INTERNATIONAL

More information

MATRA EMBASSY PROGRAM. Introduction

MATRA EMBASSY PROGRAM. Introduction MATRA EMBASSY PROGRAM Introduction Matra is a major program run by the Dutch Ministry of Foreign Affairs through which the Netherlands supports countries of the Southeast Europe with their EU accession

More information

Sub-granting. 1. Background

Sub-granting. 1. Background Sub-granting 1. Background The European Commission (EC) re-introduced in May 2007 the option of sub-granting in its grant contracts 1. Sub-granting is an indirect financial contribution through an EC grant

More information

State Aid Rules. Webinar TAFTIE Academy 22th of October 2015 Maija Lönnqvist, Tekes

State Aid Rules. Webinar TAFTIE Academy 22th of October 2015 Maija Lönnqvist, Tekes State Aid Rules Webinar TAFTIE Academy 22th of October 2015 Maija Lönnqvist, Tekes Topics of the seminar 1) What is state aid? 2) State aid modernisation 3) R&D rules 4) General Block Exemtion Regulation:

More information

Norwegian Trust Fund Grant Agreement

Norwegian Trust Fund Grant Agreement Public Disclosure Authorized CONFORMED COPY GRANT NUMBER TF097013 Public Disclosure Authorized Norwegian Trust Fund Grant Agreement (Co-financing of the Regional Transmission Development Project) Between

More information

Public Disclosure Copy. Implementation Status & Results Report Senegal: Extractive Industries Transparency Initiative Implementation (P131626)

Public Disclosure Copy. Implementation Status & Results Report Senegal: Extractive Industries Transparency Initiative Implementation (P131626) Public Disclosure Authorized AFRICA Senegal Energy and Mining Global Practice Recipient Executed Activities Technical Assistance Loan FY 2014 Seq No: 1 ARCHIVED on 18-Jun-2015 ISR19209 Implementing Agencies:

More information

Implementation Status & Results Dominican Republic Water and Sanitation in Tourist Areas (P054221)

Implementation Status & Results Dominican Republic Water and Sanitation in Tourist Areas (P054221) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Dominican Republic Water and Sanitation in Tourist Areas (P054221) Operation Name: Water and Sanitation

More information

1 under the Council of Europe project Support of the criminal justice reform in. Ukraine

1 under the Council of Europe project Support of the criminal justice reform in. Ukraine 1697 1 under the Council of Europe project Support of the criminal justice reform in Ukraine public prosecutor s offices representatives of mass media, heads of regional and local public prosecutor s

More information

Grant Agreement for Islamic Republic of Pakistan's Readiness Preparation Proposal Readiness Fund of the FCPF Grant No. TF018696

Grant Agreement for Islamic Republic of Pakistan's Readiness Preparation Proposal Readiness Fund of the FCPF Grant No. TF018696 The World Bank INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT INTERNATIONAL DEVELOPMENT ASSOCIATION 1818 H Street N.W. Washington, D.C. 20433 U.S.A. (202) 473-1000 Cable Address: INTBAFRAD Cable

More information

Specific Call for Proposals Mainstreaming Corporate Social Responsibility (CSR) Among SMEs Grant Programme 2005

Specific Call for Proposals Mainstreaming Corporate Social Responsibility (CSR) Among SMEs Grant Programme 2005 Ref. Ares(2014)77315-15/01/2014 EUROPEAN COMMISSION DIRECTORATE-GENERAL ENTERPRISE & INDUSTRY Specific Call for Proposals Mainstreaming Corporate Social Responsibility (CSR) Among SMEs Grant Programme

More information

The World Bank Sustainable Rural Sanitation Services Program for Results (P154112)

The World Bank Sustainable Rural Sanitation Services Program for Results (P154112) Public Disclosure Authorized MIDDLE EAST AND NORTH AFRICA Egypt, Arab Republic of Water Global Practice IBRD/IDA Program-for-Results FY 2016 Seq No: 1 ARCHIVED on 05-Nov-2015 ISR21200 Implementing Agencies:

More information

.DOCUMENTS OFFICIAL. TF 0 1Lf63

.DOCUMENTS OFFICIAL. TF 0 1Lf63 Public Disclosure Authorized OFFICIAL.DOCUMENTS l TF 0 1Lf63 The World Bank 1818 H Street N.W. (202) 477-1234 INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Washington, D.C. 20433 Cable Address:

More information

COMMISSION IMPLEMENTING DECISION. of

COMMISSION IMPLEMENTING DECISION. of EUROPEAN COMMISSION Brussels, 16.10.2014 C(2014) 7489 final COMMISSION IMPLEMENTING DECISION of 16.10.2014 laying down rules for the implementation of Decision No 1313/2013/EU of the European Parliament

More information

Education, Audiovisual and Culture Executive Agency GRANT DECISION FOR AN ACTION. Decision Nr

Education, Audiovisual and Culture Executive Agency GRANT DECISION FOR AN ACTION. Decision Nr Education, Audiovisual and Culture Executive Agency Creative Europe: Culture GRANT DECISION FOR AN ACTION Decision Nr of the Education, Audiovisual and Culture Executive Agency on the award of a grant

More information

Call for Proposals from Civil Society Organizations and Academic Institutions in Sierra Leone to Support Justice and Security Sector Reforms

Call for Proposals from Civil Society Organizations and Academic Institutions in Sierra Leone to Support Justice and Security Sector Reforms Call for Proposals from Civil Society Organizations and Academic Institutions in Sierra Leone to Support Justice and Security Sector Reforms I. BACKGROUND The United Nations Development Programme (UNDP)

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES22379 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

Common Challenges Shared Solutions

Common Challenges Shared Solutions PROJECT SHEET Common Challenges Shared Solutions EEA and Norway Grants FINANCING PROGRAM: Program name EEA and Norway Grants Fund for Regional Cooperation 3 donor countries: Iceland, Liechtenstein and

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2013 Seq No: 11 ARCHIVED on 03-May-2018

More information

Background Materials

Background Materials Background Materials Prepared by the Los Angeles City Ethics Commission May 2006 (213) 978-1960 http://ethics.lacity.org preserving the public trust City Ethics Commission Gil Garcetti President Bill Boyarsky

More information

Implementation Status & Results Indonesia Support for Poor and Disadvantaged Areas Project (P078070)

Implementation Status & Results Indonesia Support for Poor and Disadvantaged Areas Project (P078070) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Support for Poor and Disadvantaged Areas Project (P078070) Operation Name: Support for

More information

AUDIT UNDP BOSNIA AND HERZEGOVINA GRANTS FROM THE GLOBAL FUND TO FIGHT AIDS, TUBERCULOSIS AND MALARIA. Report No Issue Date: 15 January 2014

AUDIT UNDP BOSNIA AND HERZEGOVINA GRANTS FROM THE GLOBAL FUND TO FIGHT AIDS, TUBERCULOSIS AND MALARIA. Report No Issue Date: 15 January 2014 UNITED NATIONS DEVELOPMENT PROGRAMME AUDIT OF UNDP BOSNIA AND HERZEGOVINA GRANTS FROM THE GLOBAL FUND TO FIGHT AIDS, TUBERCULOSIS AND MALARIA Report No. 1130 Issue Date: 15 January 2014 Table of Contents

More information

PMR PROJECT IMPLEMENTATION STATUS REPORT (ISR)

PMR PROJECT IMPLEMENTATION STATUS REPORT (ISR) 1. SUMMARY INFORMATION Implementing Country/Technical Partner: PMR PROJECT IMPLEMENTATION STATUS REPORT (ISR) South Africa. Reporting Period: From 1/10/2017 to 30/09/2018 Report Date: 4 October 2018 Implementing

More information

REVIEW OF THE ATHENS-CLARKE COUNTY OFFICE. Report to the Mayor and Commission OF PROBATION SERVICES. October Prepared by:

REVIEW OF THE ATHENS-CLARKE COUNTY OFFICE. Report to the Mayor and Commission OF PROBATION SERVICES. October Prepared by: REVIEW OF THE ATHENS-CLARKE COUNTY OFFICE OF PROBATION SERVICES Report to the Mayor and Commission October 2011 Prepared by: Auditor s Office Unified Government of Athens-Clarke County

More information