Norway-Oslo: Architectural, construction, engineering and inspection services 2016/S Design contest notice

Size: px
Start display at page:

Download "Norway-Oslo: Architectural, construction, engineering and inspection services 2016/S Design contest notice"

Transcription

1 1 / 6 This notice in TED website: Norway-Oslo: Architectural, construction, engineering and inspection services 2016/S Design contest notice This contest is covered by: Directive 2004/18/EC Section I: Contracting authority/entity I.1) Name, addresses and contact point(s) Statsbygg Hovedkontor (The Directorate of Public Construction and Property Head Office) Postbok 8106 Dep. (Biskop Gunnerusgt. 6) For the attention of: Knut Jørgensen 0032 Oslo Norway Telephone: prosjekt @statsbygg.no Fax: Internet address(es): General address of the contracting authority/entity: Address of the buyer profile: Electronic access to information: Further information can be obtained from: The above mentioned contact point(s) Specifications and additional documents (including documents for competitive dialogue and a dynamic purchasing system) can be obtained from: The above mentioned contact point(s) Tenders or requests to participate must be sent to: The above mentioned contact point(s) I.2) Type of the contracting authority Body governed by public law 1.3) Main activity Other: building and construction works 1.4) Contract award on behalf of other contracting authorities/entities The contracting authority/entity is purchasing on behalf of other contracting authorities/entities: no Section II: Object of the design contest/description of the project II.1) Description II.1.1) II.1.2) Title attributed to the design contest/project by the contracting authority/entity: New Government Block Engineering Design Services, contract H102. Short description: New Government Block H102 Engineering Design Services. Qualification for a design competition: Restricted tender contest with a subsequent negotiated procedure for the award of a contract with a multidisciplinary engineering design group. The Directorate of Public Construction and Property invites engineering design groups to apply for participation in a restricted design competition for the new government block, project , in Oslo. 1 / 6

2 2 / 6 II.1.3) The Ministry of Local Government and Modernisation (KMD) has given the Directorate of Public Construction and Property the task of planning the future government block in Oslo. The project shall co-house the ministries and create a joint government block. The project's scope is extensive and it comprises the renovation of existing buildings (approx m 2 ), new buildings ( m 2 ), basement and infrastructure ( m 2 ) as well as outside areas, park, open spaces and streets. The project's main aims are: To create a flexible and efficient ministry fellowship with good and future orientated workplaces; To create a government block with a sufficient degree of security at the same time as being open and inviting; To create a government block that gives historical continuity and that is well adapted to the complex urban situation. See the detailed description in the attached qualification documentation. Common procurement vocabulary (CPV) , , , , Section III: Legal, economic, financial and technical information III.1) Criteria for the selection of participants: The qualification requirements that will form the basis of the evaluation of the participants are as follows: The competence and experience of the personnel who shall carry out the engineering design services will not be requested in the design competition, but in the subsequent competition with negotiations. 1. Technical and professional qualifications: Professional qualifications for the engineering design group manager (PGL) Competence and experience: Good competence and experience is required for the management of multi-disciplinary engineering design assignments with a transferable value, especially as regards: Multi-disciplinary extent, complexity, size and type of project; Planning, resource management and cost control (both for engineering design costs and project costs); Professional qualifications ARK Competence and experience: Urbanism and context understanding when building in towns; Architecture quality, including functionality and flexibility; Cultural memorials, protection and transformation; Complex buildings, programme organisation and user understanding; Professional qualifications LARK Competence and experience: Good competence and experience is required from engineering design services for outdoor installations with a Green parks in an urban context; Town areas and open spaces in an urban context; Availability and design; Competence is wanted within handling surface water and integrated security design; Professional qualifications RIB Competence and experience: 2 / 6

3 3 / 6 III.2) Complexity and size; Taking care of security requirements when choosing technical systems and the dimensions of constructions; Professional qualifications RIV Competence and experience: Complexity and size; Energy and environment systems; Taking care of security requirements in technical systems. Professional qualifications RIE Competence and experience: Complexity and size; Taking care of security requirements in technical systems. Capacity PGL/ARK/LARK/RIB/RIV/RIE: Participants are required to have sufficient capacity to execute the project, see the capacity requirements in the qualification documentation. 2. Organisational and legal position: Participants are required to have a legally established company (1 or several companies). 3. The companies' financial and economic standing: Tenderers shall have sound financial implementation ability. 4. Tax certificates: Tenderers shall have their tax and duty payments in order. 5. Ability to handle security graded information: Participants shall, during the competition and in the execution of the contract, have the ability to handle and store security graded information to the extent and degree of security set for the procurement. See the qualification documentation for further details on the qualification requirements and the requirements for documenting them. Selection criteria in this competition: For this competition the contracting authority will select the 4-7 best qualified participants for participation in the design competition, provided that there are a sufficient number of suitable registered participants. The best qualified will be assessed on the following: The qualification requirement technical and professional qualifications, cf. point in the qualification documentation, in which competence, experience and reference projects with the greatest transferable value to this project will be emphasised; A description of how the composition of the whole group ensures that the engineering design assignment can be solved in a way that fulfils the project's aims. Furthermore, a description of methodology and competence within planning, management and control of major engineering design groups, with a view to multi-disciplinary, efficient and good processes as well as delivery within the time, cost and quality; Ability to handle security graded information. See the qualification documentation for further details on the selection criteria and the requirements for documenting them. Information about a particular profession Participation is reserved to a particular profession: no 3 / 6

4 4 / 6 Section IV: Procedure IV.1) Type of contest Restricted Envisaged number of participants minimum number 4. /maximum number 7 IV.2) IV.3) IV.4) IV.4.1) IV.4.2) IV.4.3) IV.4.4) IV.4.5) IV.5) IV.5.1) IV.5.2) IV.5.3) IV.5.4) IV.5.5) Names of participants already selected Criteria to be applied in the evaluation of projects: Administrative information File reference number attributed by the contracting authority/entity: H102 Conditions for obtaining contractual documents and additional documents Time-limit for receipt of projects or requests to participate Date: :00 Date of dispatch of invitations to participate to selected candidates Language(s) in which projects or requests to participate may be drawn up Other Norwegian. Rewards and jury Information about prize(s): A prize/prizes will be awarded: yes Details of payments to all participants Follow-up contracts Any service contract following the contest will be awarded to the winner or one of the winners of the contest: yes Decision of the jury The decision of the jury is binding on the contracting authority/entity: yes Names of the selected members of the jury Section VI: Complementary information VI.1) Information about European Union funds The contract is related to a project and/or programme financed by European Union funds: no VI.2) Additional information: Security Graded Procurement Strict Requirements: The Security Act and Criminal Liability: Security is fundamental and security measures shall be integrated in the planning of the new government block. Large parts of the project will be security graded in accordance with the Act dated No 10 on preventive security services (the Security Act), as the engineering design services involve the handling and production of security graded information/security graded materials. The Security Act and accompanying regulations have particular requirements that the participants in the competition must comply with. Breaches of the security provisions can lead to criminal liability. The new government block will be exposed to threats of different characters, not least intelligence threats from different states, but also a terror threat. It is, therefore, considered that the procurement is of such a character that it entitles certain exemptions from the procurement regulations in accordance with the EEA contract's art. 123, cf. the Public Procurement Act 3 and the public procurement regulations 1-3 (2). In order to limit the risk of spreading information that is of significant security interest, cf. the mentioned article 123, it is considered to 4 / 6

5 5 / 6 be necessary to set requirements on, amongst other things, Norwegian personnel clearance and requirements on how and where suppliers handle security graded information. Thus, for security reasons, foreign authorities' security clearance of their citizens will not be accepted. Requirements for security in the competition phase security contract and authorisation: In the design competition, parts of the tender documentation and the submitted material can be security graded at level Restricted (hereafter R), cf. the Security Act 11. The Directorate of Public Construction and Property will therefore enter into security contracts at 1 or several companies at the participants who are pre-qualified. The participants will choose, in consultation with the Directorate of Public Construction and Property, which company/companies a security contract shall be signed with. The company that a security contract is signed with is required to have premises in Norway for handling graded material at level R. In order to achieve a security contract, there will also be a check on the company that uses the premises, in which, amongst other things, the conditions of the owners, board and manager will be assessed (including nationality), as well as a check of the premises' suitability for security. All who are given access to the tender documentation/security graded information, must be authorised at level R beforehand, cf. the Security Act 19 and the regulations on personnel security, in particular see chapter 5, and 2-1 to 2-2. The Directorate of Public Construction and Property will hold authorisation discussions with the manager of the company/companies a security contract will be signed with, and central key personnel in the company/companies. The discussion will take place to give information on the actual security provisions and to assess the person's security conduct. Security conduct will be assessed based on the Security Act 21 and 22, as well as the regulations on personnel security, particularly 2-2, 3-7, 5-2, 5-5 and 5-8. The security contract with the actual companies, as well as authorisation of the daily manager, must be in place within 5 weeks of the company being notified that they are pre-qualified. Participants who do not achieve this by the deadline risk losing the right to participate in the design competition. Requirements for security during the subsequent service contract for engineering design services personnel clearance and authorisation, as well as security contract and authorisation: The execution of the service contract and the engineering design services for the new government block will involve that access is given to security graded information on level Confidential (hereafter C). This has led to it being necessary to set requirements that all those who shall work on the project must be able to get Norwegian personnel clearance and authorisation up to and including level C. The minimum number of employees with relevant competence who can achieve personnel clearance and authorisation is in the qualification documentation. For security reasons, foreign authorities' security clearance of their citizens will not be accepted. In practice the requirement for Norwegian personnel clearance means that it will mainly be Norwegian citizens who can get clearance and work on the project. Foreign citizens will also be able to get personnel clearance and authorisation, but only Norwegian citizens are deemed as sufficiently loyal and having associations to Norway. The importance of the home country's security will also be relevant. Foreign citizens who do not live or who have never lived in Norway, or who are only in Norway for work, will not normally be cleared. In addition to this, the degree of loyalty and association, including the home country's security importance, will be particularly emphasised when assessing personnel clearance. During the personnel clearance, information is also obtained on, amongst other things, personal finances, associations with other countries, health and any criminal records see the Security Act 21 and 22, as well as the regulations on personal security, particularly chapters 3 and 3-4. The actual clearance and authorisation will take place after the contract has been signed. These processes take time and if there are negative security conditions attached to an applicant, the processing time is longer. Attention is drawn to the fact that it will be the participants' risk that personnel clearance and authorisation is 5 / 6

6 6 / 6 VI.3) VI.3.1) VI.3.2) VI.3.3) VI.4) refused or not achieved within specific deadlines that the Directorate of Public Construction and Property will set, based on the ordinary processing time for applicants for clearance and authorisation. Detailed sanction rules for a breach of security provisions, missing clearance, loss of clearance, etc. will be in the invitation to the negotiated procedure, but we would like to mention here that the conditions can be deemed as a significant breach, which in the worst case, can lead the contract being cancelled. In the engineering design phase the Directorate of Public Construction and Property will establish a separate project office in Norway with a security certified ICT network. Personnel clearance will be a requirement for getting permanent access to the project office and the ICT network. The engineering design services will mainly be carried out in these premises, so it is expected that there is no need for supplier clearance of the company. However, it cannot be ruled out that the engineering design services up to level R must take place at an estimated 1 or 2 or the companies that are awarded the engineering design assignment, and then in premises that are in Norway. These companies must, therefore, fulfil the requirements for signing a security contract at level R, including having premises in Norway. The participants have, in the same way as for personnel clearance/authorisation, the risk of the necessary security contract/authorisation being achieved after the contract is signed, cf. the information above. Koro: The tenderer that is awarded the contract will be obliged to carry out works for Koro or the artist relating to public art for this construction project. Koro and the artist will be able to place orders subject to the same conditions as Statsbygg can place supplementary orders under in accordance with the contract. Procedures for appeal Body responsible for appeal procedures Lodging of appeals Service from which information about the lodging of appeals may be obtained Date of dispatch of this notice: / 6

United Kingdom-Sheffield: Urban planning and landscape architectural services 2016/S Contract notice. Services

United Kingdom-Sheffield: Urban planning and landscape architectural services 2016/S Contract notice. Services 1 / 5 This notice in TED website: http://ted.europa.eu/udl?uri=ted:notice:182878-2016:text:en:html United Kingdom-Sheffield: Urban planning and landscape architectural services 2016/S 102-182878 Contract

More information

2, rue Mercier, 2985 Luxembourg, Luxembourg Fax: Town: København S Postal code: 2300 Country: Denmark (DK)

2, rue Mercier, 2985 Luxembourg, Luxembourg Fax: Town: København S Postal code: 2300 Country: Denmark (DK) European Union Publication of Supplement to the Official Journal of the European Union 2, rue Mercier, 2985 Luxembourg, Luxembourg Fax: +352 29 29 42 670 E-mail: ojs@publications.europa.eu Info & on-line

More information

2, rue Mercier, 2985 Luxembourg, Luxembourg Fax: Town: København S Postal code: 2300 Country: Denmark (DK)

2, rue Mercier, 2985 Luxembourg, Luxembourg Fax: Town: København S Postal code: 2300 Country: Denmark (DK) European Union Publication of Supplement to the Official Journal of the European Union 2, rue Mercier, 2985 Luxembourg, Luxembourg Fax: +352 29 29 42 670 E-mail: ojs@publications.europa.eu Info & on-line

More information

Contract notice. Works

Contract notice. Works 1 / 5 This notice in TED website: http://ted.europa.eu/udl?uri=ted:notice:29148-2017:text:en:html Indonesia-Jakarta: Landfill-gas electricity generating plant construction work 2017/S 018-029148 Contract

More information

2, rue Mercier, 2985 Luxembourg, Luxembourg Fax:

2, rue Mercier, 2985 Luxembourg, Luxembourg Fax: European Union Supplement to the Official Journal of the European Union 2, rue Mercier, 2985 Luxembourg, Luxembourg Fax: +352 29 29 42 670 E-mail: ojs@publications.europa.eu Info and online fms: http://simap.europa.eu

More information

Germany-Frankfurt-on-Main: ECB - Provision of travel services 2017/S Contract notice. Services

Germany-Frankfurt-on-Main: ECB - Provision of travel services 2017/S Contract notice. Services 1 / 8 This notice in TED website: http://ted.europa.eu/udl?uri=ted:notice:103028-2017:text:en:html Germany-Frankfurt-on-Main: ECB - Provision of travel services 2017/S 056-103028 Contract notice Services

More information

GENERAL TENDER CONDITIONS

GENERAL TENDER CONDITIONS GENERAL TENDER CONDITIONS F4E_D_27E7D9 v 2.2 Page 1 of 15 TABLE OF CONTENTS 1. Introduction... 3 2. Procurement rules... 3 3. Procurement procedures... 4 4. Compliance with requirements... 5 4.1. Completeness

More information

Council, 25 September 2014

Council, 25 September 2014 Council, 25 September 2014 Directive 2013/55/EU the revised Recognition of Professional Qualifications (RPQ) Directive challenges and opportunities for the Health and Care Professions Council (HCPC) Executive

More information

Policy Rules for the ORIO Grant Facility

Policy Rules for the ORIO Grant Facility Policy Rules for the ORIO Grant Facility Policy Rules grant facility ORIO 2012 1. What is ORIO?... 3 2. Definitions... 3 3. The role of infrastructure... 4 4. Implementation... 5 5. Target group... 5 6.

More information

Romania-Timisoara: Medical equipments 2015/S Contract award notice. Supplies

Romania-Timisoara: Medical equipments 2015/S Contract award notice. Supplies 1/5 This notice in TED website: http://ted.europa.eu/udl?uri=ted:notice:121898-2015:text:en:html Romania-Timisoara: Medical equipments 2015/S 068-121898 Contract award notice Supplies Directive 2004/18/EC

More information

STANDARD GRANT APPLICATION FORM 1 REFERENCE NUMBER OF THE CALL FOR PROPOSALS: 2 TREN/SUB

STANDARD GRANT APPLICATION FORM 1 REFERENCE NUMBER OF THE CALL FOR PROPOSALS: 2 TREN/SUB STANDARD GRANT APPLICATION FORM 1 PROGRAMME CONCERNED: 2 ACTIONS IN THE FIELD OF URBAN MOBILITY REFERENCE NUMBER OF THE CALL FOR PROPOSALS: 2 TREN/SUB 02-2008 [Before filling in this form, please read

More information

Public Diplomacy, Policy Research and Outreach Devoted to the European Union and EU-Canada Relations

Public Diplomacy, Policy Research and Outreach Devoted to the European Union and EU-Canada Relations Public Diplomacy, Policy Research and Outreach Devoted to the European Union and EU-Canada Relations CALL FOR PROPOSALS Application Deadline: 22 September, 2009 This Call for Proposals is designed to pursue

More information

Norwegian Programme for Research Cooperation with China (CHINOR)

Norwegian Programme for Research Cooperation with China (CHINOR) Norwegian Programme for Research Cooperation with China (CHINOR) Programme to promote research cooperation between China and Norway Work Programme 2009-2017 1. Introduction The Norwegian Programme for

More information

Programme for cluster development

Programme for cluster development Programme description Version 1 10 June 2013 Programme for cluster development 1 P a g e 1. Short description of the programme Through this new, coherent cluster programme, the three programme owners Innovation

More information

Guideline for Research Programmes Rules for the establishment and implementation of programmes falling under the Programme Area Research

Guideline for Research Programmes Rules for the establishment and implementation of programmes falling under the Programme Area Research Guideline for Research Programmes Rules for the establishment and implementation of programmes falling under the Programme Area Research EEA Financial Mechanism and Norwegian Financial Mechanisms 2014

More information

PART II: GENERAL CONDITIONS APPLICCABLE TO GRANTS FROM THE NORWEGIAN MINISTRY OF FOREIGN AFFAIRS

PART II: GENERAL CONDITIONS APPLICCABLE TO GRANTS FROM THE NORWEGIAN MINISTRY OF FOREIGN AFFAIRS PART II: GENERAL CONDITIONS APPLICCABLE TO GRANTS FROM THE NORWEGIAN MINISTRY OF FOREIGN AFFAIRS TABLE OF CONTENTS 1 IMPLEMENTATION PLAN AND BUDGET... 2 2 PROGRESS REPORT... 2 3 FINANCIAL REPORT... 2 4

More information

and Commission on the amended Energy Efficiency Directive and Renewable Energies Directives. Page 1

and Commission on the amended Energy Efficiency Directive and Renewable Energies Directives. Page 1 Information on financing of projects under the framework of the European Climate Initiative of the German Federal Ministry for the Environment, Nature Conservation, Building and Nuclear Safety (BMUB) Last

More information

Education and Training Committee, 5 June 2014

Education and Training Committee, 5 June 2014 Education and Training Committee, 5 June 2014 Directive 2013/55/EU the revised Recognition of Professional Qualifications (RPQ) Directive challenges and opportunities for the Health and Care Professions

More information

III. The provider of support is the Technology Agency of the Czech Republic (hereafter just TA CR ) seated in Prague 6, Evropska 2589/33b.

III. The provider of support is the Technology Agency of the Czech Republic (hereafter just TA CR ) seated in Prague 6, Evropska 2589/33b. III. Programme of the Technology Agency of the Czech Republic to support the development of long-term collaboration of the public and private sectors on research, development and innovations 1. Programme

More information

The Act of 2 July 1999 No. 63 relating to Patients Rights (the Patients Rights Act)

The Act of 2 July 1999 No. 63 relating to Patients Rights (the Patients Rights Act) The Act of 2 July 1999 No. 63 relating to Patients Rights (the Patients Rights Act) Chapter 1. General provisions Section 1-1. Object of the Act The object of this Act is to help ensure that all citizens

More information

ModSim. Computational Mathematics. Developing New Applications of Modelling and Simulation for Austrian Business and Research

ModSim. Computational Mathematics. Developing New Applications of Modelling and Simulation for Austrian Business and Research ModSim Computational Mathematics Developing New Applications of Modelling and Simulation for Austrian Business and Research A funding initiative in the framework of FIT-IT Evaluation Manual for the Proposals

More information

MOBILITY PROJECT FOR YOUNG PEOPLE AND YOUTH WORKERS

MOBILITY PROJECT FOR YOUNG PEOPLE AND YOUTH WORKERS MOBILITY PROJECT FOR YOUNG PEOPLE AND YOUTH WORKERS The main budget of this Action is allocated to support transnational activities involving organisations and participants from Programme Countries. However,

More information

STA Funding Policies

STA Funding Policies STA Funding Policies Last Updated: 13 September 2018 Introduction The Sturbridge Tourist Association is a Town committee comprised of local residents and business owners whose authority comes from Chapter

More information

Guidelines for completing the Project Account Report

Guidelines for completing the Project Account Report Guidelines for completing the Project Account Report Unless otherwise specified in the contract documents, a project account report is to be completed by the end of each year as of 31 December and submitted

More information

ICTpsp I C T P O L I C Y S U P P O R T P R O G R A M M E. CIP ICT PSP Pilots A, Pilots B, Thematic Networks, Best Practice Networks, PPI Pilots

ICTpsp I C T P O L I C Y S U P P O R T P R O G R A M M E. CIP ICT PSP Pilots A, Pilots B, Thematic Networks, Best Practice Networks, PPI Pilots DG COMMUNICATIONS NETWORKS, CONTENT & TECHNOLOGY ICT Policy Support Programme Competitiveness and Innovation Framework Programme ICTpsp I C T P O L I C Y S U P P O R T P R O G R A M M E Guidance Notes

More information

Part I. Project identification and summary

Part I. Project identification and summary Application for Action 1 - Youth for Europe Sub-Action 1.1 - Youth Exchanges Please fill in all relevant sections of this application. It is compulsory to annex ALL documents requested in the check list.

More information

Reporting and Monitoring Guidelines

Reporting and Monitoring Guidelines Reporting and Monitoring Guidelines The EEA Financial Mechanism & The Norwegian Financial Mechanism Adopted: 09 June 2005 Amended: 23 September 2007 Amended: 16 January 2008 FM0027-GDL-00008-E-V8 1 Contents

More information

Request for Proposals (RFP)

Request for Proposals (RFP) Request for Proposals (RFP) The development of info-graphic instructional videos for the National Cleaner Production Centre South African (NCPC-SA) on behalf of the CSIR RFP No. 821/23/03/2018 Date of

More information

RULES & REGULATIONS FIR-PRI Award Finance and Sustainability European Academic Research 13 th edition

RULES & REGULATIONS FIR-PRI Award Finance and Sustainability European Academic Research 13 th edition 2018 FIR-PRI Award Finance and Sustainability European Academic Research 13 th edition Foreword In 2005, FIR Award was launched to foster academic research on subjects in Finance and Sustainability. By

More information

Fundación Repsol Fondo de Emprendedores 5th Call. Terms and conditions

Fundación Repsol Fondo de Emprendedores 5th Call. Terms and conditions Fundación Repsol Fondo de Emprendedores 5th Call Terms and conditions The Fundación Repsol Fondo de Emprendedores (hereunder, the Fondo ) promotes the development of business projects to improve efficiency

More information

PROCUREMENT PROCEDURE FOR A PROJECT INFORMATION MANAGEMENT SYSTEM

PROCUREMENT PROCEDURE FOR A PROJECT INFORMATION MANAGEMENT SYSTEM PARTICIPATE 1 (6) PROCUREMENT PROCEDURE FOR A PROJECT INFORMATION MANAGEMENT SYSTEM The Finnish Red Cross (FRC) invites all interested suppliers to submit a request to participate in a procurement procedure

More information

Request for Proposals (RFP)

Request for Proposals (RFP) Request for Proposals (RFP) The provision of services to undertake RECP assessment at an Agro-Processing company located in Swellendam, Western Cape on behalf of the CSIR RFP No. 780/14/08/2017 Date of

More information

HEALTHCARE PROFESSIONALS MANUAL. November 17

HEALTHCARE PROFESSIONALS MANUAL. November 17 HEALTHCARE PROFESSIONALS MANUAL November 17 PREAMBLE The Department of Health (DOH), previously known as the Health Authority - Abu Dhabi (HAAD), is the regulator of the Abu Dhabi health system. The Health

More information

Model Agreement between Lead Partners and partners of an INTERREG IVC project (Partnership Agreement) 1

Model Agreement between Lead Partners and partners of an INTERREG IVC project (Partnership Agreement) 1 Model Agreement between Lead Partners and partners of an INTERREG IVC project (Partnership Agreement) 1 Having regard to Council Regulation (EC) No 1080/2006 of 5 July 2006, amended by Regulation (EC)

More information

EIT HEALTH WILD CARD PROJECTS CALL FOR APPLICATIONS 2018

EIT HEALTH WILD CARD PROJECTS CALL FOR APPLICATIONS 2018 EIT HEALTH WILD CARD PROJECTS CALL FOR APPLICATIONS 2018 DEADLINE: 9 MARCH 2018, 17.00 CET SECTION 1: GENERAL PROVISIONS 1.1. Purpose of the Call for Applications Wild Card Projects seek to transform healthcare

More information

FMO External Monitoring Manual

FMO External Monitoring Manual FMO External Monitoring Manual The EEA Financial Mechanism & The Norwegian Financial Mechanism Page 1 of 28 Table of contents 1 Introduction...4 2 Objective...4 3 The monitoring plan...4 4 The monitoring

More information

HERCULE III PROGRAMME CALL FOR PROPOSALS REF. Hercule III 2014 ANTI-FRAUD TRAINING E PROGRA MME ANTI-FRAU

HERCULE III PROGRAMME CALL FOR PROPOSALS REF. Hercule III 2014 ANTI-FRAUD TRAINING E PROGRA MME ANTI-FRAU HERCULE III PROGRAMME 2014-2020 UL CALL FOR PROPOSALS REF. Hercule III 2014 ANTI-FRAUD TRAINING E PROGRA MME 2014-0 Deadline Monday 15 September 2014 Eligibility Period For Activities 13 April 2015 31

More information

CREATIVE EUROPE ( ) Culture Sub-programme. Call for proposals : EACEA 32/2014 : European cooperation projects

CREATIVE EUROPE ( ) Culture Sub-programme. Call for proposals : EACEA 32/2014 : European cooperation projects CREATIVE EUROPE (2014-2020) Culture Sub-programme Call for proposals : EACEA 32/2014 : European cooperation projects Implementation of the Culture Sub-programme schemes: European cooperation projects.

More information

STANDARD TERMS AND CONDITIONS ON NORWAY GRANTS FROM INNOVATION NORWAY

STANDARD TERMS AND CONDITIONS ON NORWAY GRANTS FROM INNOVATION NORWAY STANDARD TERMS AND CONDITIONS ON NORWAY GRANTS FROM INNOVATION NORWAY 1 Scope of the Project Contract The Grant to the Project Promoter is offered on the terms and conditions laid down in the Grant Offer

More information

General Conditions for Grants to Development Research Supported through Denmark s International Development Cooperation

General Conditions for Grants to Development Research Supported through Denmark s International Development Cooperation Danida Fellowship Centre December 2012 General Conditions for Grants to Development Research Supported through Denmark s International Development Cooperation Contents: 1. Introduction... 4 2. Anti-corruption

More information

Terms of Participation 2018

Terms of Participation 2018 1 Organiser of The Copernicus Masters The Copernicus Masters is organised under an ESA contract by Anwendungszentrum GmbH Oberpfaffenhofen ( the Organiser ) and is supported by various prize awarding partners

More information

EUROPEAN EXTERNAL ACTION SERVICE

EUROPEAN EXTERNAL ACTION SERVICE EUROPEAN EXTERNAL ACTION SERVICE Annex 1 Kosovo Specialist Chambers and Specialist Prosecutor s Office 2-2017 Call for Contributions - Internship Organisation: Job Location: Employment Regime: Vacancy

More information

The Nursing and Midwifery Order 2001 (SI 2002/253)

The Nursing and Midwifery Order 2001 (SI 2002/253) The Nursing and Midwifery Order 2001 (SI 2002/253) Unofficial consolidated text Effective from 28 July 2017 This consolidated text has been produced for internal use by the Nursing and Midwifery Council.

More information

CORRIGENDUM no.1 to Guidelines

CORRIGENDUM no.1 to Guidelines Contracting Authority: Agency for Vocational Education and Training, Department for Financing and Contracting of IPA Programme Regional network of local learning institutions CORRIGENDUM no.1 to Guidelines

More information

COMMISSION IMPLEMENTING REGULATION (EU)

COMMISSION IMPLEMENTING REGULATION (EU) L 253/8 Official Journal of the European Union 25.9.2013 COMMISSION IMPLEMENTING REGULATION (EU) No 920/2013 of 24 September 2013 on the designation and the supervision of notified bodies under Council

More information

Recognition of Foreign Qualifications in the EU

Recognition of Foreign Qualifications in the EU Recognition of Foreign Qualifications in the EU Gosia BINCZYK, European Commission CLEAR International Congress 2015 25 June 2015 The EU is not regulating professions - why do we care? Aims and competences

More information

CALL FOR PROPOSALS FOR THE CREATION OF UP TO 25 TRANSFER NETWORKS

CALL FOR PROPOSALS FOR THE CREATION OF UP TO 25 TRANSFER NETWORKS Terms of reference CALL FOR PROPOSALS FOR THE CREATION OF UP TO 25 TRANSFER NETWORKS Open 15 September 2017 10 January 2018 September 2017 1 TABLE OF CONTENT SECTION 1 - ABOUT URBACT III & TRANSNATIONAL

More information

Appendix 3 to AO/1-7094/12/NL/CO Page 1

Appendix 3 to AO/1-7094/12/NL/CO Page 1 Page 1 NOTE THE BIDDERS ATTENTION IS DRAWN TO THE FACT THAT THE GENERAL TENDER CONDITION PUBLISHED ON EMITS ARE NOT APPLICABLE TO THE PRESENT INVITATION TO TENDER. THE ONLY APPLICABLE TENDER CONDITIONS

More information

Transatlantic Strategy Forum

Transatlantic Strategy Forum EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR EXTERNAL RELATIONS Transatlantic Strategy Forum CALL FOR PROPOSALS N o RELEX/C1/2009/TSF Application Deadline: 14 April 2009 An amount of EUR 50,000 was earmarked

More information

Answers to questions following the call for tender for a Fund Operator for the EEA and Norway Grants Global Fund for Regional Cooperation

Answers to questions following the call for tender for a Fund Operator for the EEA and Norway Grants Global Fund for Regional Cooperation Answers to questions following the call for tender for a Fund Operator for the EEA and Norway Grants Global Fund for Regional Cooperation Question 1: Does re-granting experience refer to direct experience

More information

Regulations concerning Administrative Arrangements

Regulations concerning Administrative Arrangements Norwegian Labour Inspection Authority Order no. 706-ENG Regulations concerning Administrative Arrangements Regulations concerning administrative arrangements within the area of application of the Working

More information

3. Trustees and Governance 3.1 Charity and Clinical Governance

3. Trustees and Governance 3.1 Charity and Clinical Governance 3. Trustees and Governance 3.1 Charity and Clinical Governance This section outlines the governance responsibilities for air ambulances. The governance responsibilities and accountabilities for the NHS

More information

Request for Proposals (RFP) The provision of transport law specialist services for subsidised public transport contracts for the CSIR

Request for Proposals (RFP) The provision of transport law specialist services for subsidised public transport contracts for the CSIR Request for Proposals (RFP) The provision of transport law specialist services for subsidised public transport contracts for the CSIR RFP No. 3131/21/07/2017 Date of Issue Friday, 07 July 2017 Closing

More information

Request for Proposal (RFP) for Grant Writing Services

Request for Proposal (RFP) for Grant Writing Services 1. Background Request for Proposal (RFP) for Grant Writing Services The European Association for the Study of the Liver (EASL - www.easl.eu/) is a non-profit organisation based in Switzerland (Geneva).

More information

TEMPLATE Competition Rules B2professional audience Microsoft NV 14/08/2014

TEMPLATE Competition Rules B2professional audience Microsoft NV 14/08/2014 1. DEFINITIONS COMPETITION RULES B2B PROFESSIONAL AUDIENCE 1. Competition : the competition named [So You Think You Can Demo] 2. Competition Period : period during which the participation in the competition

More information

Call for proposals 2013 for pilot projects EU AID VOLUNTEERS. Guidelines for Grant Applicants. Contents

Call for proposals 2013 for pilot projects EU AID VOLUNTEERS. Guidelines for Grant Applicants. Contents EUROPEAN COMMISSION DIRECTORATE-GENERAL HUMANITARIAN AID AND CIVIL PROTECTION - ECHO A.3 Policy and Implementation Frameworks Call for proposals 2013 for pilot projects EU AID VOLUNTEERS Guidelines for

More information

Chapter Two STATE FUNCTIONS FOR ENERGY EFFICIENCY PROMOTION Section I Governing Bodies

Chapter Two STATE FUNCTIONS FOR ENERGY EFFICIENCY PROMOTION Section I Governing Bodies Energy Efficiency Act Promulgated, SG No. 98/14.11.2008, effective 14.11.2008, supplemented, SG No. 6/23.01.2009, effective 1.05.2009, amended, SG No. 19/13.03.2009, effective 10.04.2009, supplemented,

More information

Part I. Project identification and summary

Part I. Project identification and summary Application for Action 5 Support for European Cooperation in the youth field Sub-Action 5.1 - Meetings of young people and those responsible in the youth field Please fill in all relevant sections of this

More information

2018 CALL FOR POST-DOCTORAL APPLICATIONS

2018 CALL FOR POST-DOCTORAL APPLICATIONS 2018 CALL FOR POST-DOCTORAL APPLICATIONS INED and the ipops Laboratory of Excellence are inviting applications for two post-doctoral positions: - One two-year post-doctoral position in one of INED's 11

More information

Recommendations of the CPU on the Marie Curie and Erasmus Mundus programmes April 2011

Recommendations of the CPU on the Marie Curie and Erasmus Mundus programmes April 2011 Recommendations of the CPU on the Marie Curie and Erasmus Mundus programmes April 2011 Interactions of the Marie Curie programme with other programmes of the DG EAC, in particular with, for example, the

More information

Standards conduct, accountability

Standards conduct, accountability Standards of conduct, accountability and openness Standards of conduct, accountability and openness Throughout this document: members refers to all members of a board the Chair, the non-executives, the

More information

Regulation on the implementation of the European Economic Area (EEA) Financial Mechanism

Regulation on the implementation of the European Economic Area (EEA) Financial Mechanism the European Economic Area (EEA) Financial Mechanism 2009-2014 adopted by the EEA Financial Mechanism Committee pursuant to Article 8.8 of Protocol 38b to the EEA Agreement on 13 January 2011 and confirmed

More information

Erasmus+ Application Form. Call: A. General Information. B. Context. B.1. Project Identification

Erasmus+ Application Form. Call: A. General Information. B. Context. B.1. Project Identification A. General Information This application form consists of the following main sections: - Context: this section asks for general information about the type of project proposal you want to submit; - Participating

More information

The mere fact of participating in the contest means that the contestant knows and fully accepts the present Rules.

The mere fact of participating in the contest means that the contestant knows and fully accepts the present Rules. RULES OF CONTEST The mere fact of participating in the contest means that the contestant knows and fully accepts the present Rules. 1. OBJECTIVES PURSUED There are several purposes for offering an inducement

More information

LA MODE ET LES CODES VESTIMENTAIRES PHOTO CONTEST RULES

LA MODE ET LES CODES VESTIMENTAIRES PHOTO CONTEST RULES LA MODE ET LES CODES VESTIMENTAIRES PHOTO CONTEST RULES ARTICLE 1 - CONTEST ORGANISATION AND DATES The Fondation Alliance Française, a state-approved, educational foundation with head offices at 101, Boulevard

More information

General terms and conditions of Tempo funding

General terms and conditions of Tempo funding 1 June 2017 1 (6) General terms and conditions of Tempo funding Contents 1 Scope of application and publicity of the funding decision... 2 2 Monitoring of costs... 2 3 Eligible costs... 2 3.1 Principles...

More information

CALL FOR PROPOSALS DG EAC No EAC/18/2011. Preparatory Action in the Field of Sport (Open call) (2011/C 131/09) Guidelines for Applicants

CALL FOR PROPOSALS DG EAC No EAC/18/2011. Preparatory Action in the Field of Sport (Open call) (2011/C 131/09) Guidelines for Applicants CALL FOR PROPOSALS DG EAC No EAC/18/2011 Preparatory Action in the Field of Sport (Open call) (2011/C 131/09) Guidelines for Applicants 1. INTRODUCTION This call for proposals serves to implement the Preparatory

More information

TERMS AND CONDITIONS

TERMS AND CONDITIONS TERMS AND CONDITIONS Please read these Terms and Conditions carefully before you enter the Competition. By submitting an entry, you accept these Terms and Conditions and agree to comply fully with them.

More information

JOB DESCRIPTION. Service Manager AMH Inpatient Services. Enhanced CRB with Both Barred List Check

JOB DESCRIPTION. Service Manager AMH Inpatient Services. Enhanced CRB with Both Barred List Check JOB DESCRIPTION JOB TITLE: BAND: HOURS AND: DURATION Service Manager AMH Inpatient Services Agenda for Change Band 8B As specified in the job advertisement and the Contract of Employment AGENDA FOR CHANGE

More information

Erasmus+ Application Form. Call: 2014 KA2 Cooperation and Innovation for Good Practices. A. General Information. B. Context

Erasmus+ Application Form. Call: 2014 KA2 Cooperation and Innovation for Good Practices. A. General Information. B. Context A. General Information This application form consists of the following main sections: - Context: this section asks for general information about the type of project proposal you want to submit; - Participating

More information

The City of Oxnard invites qualified consulting firms or individuals to submit qualifications for On-Call Permit Processing Services.

The City of Oxnard invites qualified consulting firms or individuals to submit qualifications for On-Call Permit Processing Services. Purchasing Division 300 West Third Street Oxnard, CA 93030 (805) 385-7478 www.ci.oxnard.ca.us August 22, 2016 Ladies and Gentlemen: The City of Oxnard invites qualified consulting firms or individuals

More information

Request for Proposal (RFP) For. Architectural Services. Lauderdale County, MS. Board of Supervisors

Request for Proposal (RFP) For. Architectural Services. Lauderdale County, MS. Board of Supervisors Request for Proposal (RFP) For Architectural Services Lauderdale County, MS Board of Supervisors 1 REQUEST FOR PROPOSAL (RFP) FOR ARCHITECTURAL SERVICES TABLE OF CONTENTS I. PURPOSE OF RFP... II. SITES

More information

EFTA SURVEILLANCE AUTHORITY DECISION OF 5 JULY 2006 ON AN AID SCHEME FOR RESEARCH, DEVELOPMENT AND INNOVATION IN THE MARITIME INDUSTRY (NORWAY)

EFTA SURVEILLANCE AUTHORITY DECISION OF 5 JULY 2006 ON AN AID SCHEME FOR RESEARCH, DEVELOPMENT AND INNOVATION IN THE MARITIME INDUSTRY (NORWAY) Event No: 363351 Case No: 59434 Decision No: 216/06/COL EFTA SURVEILLANCE AUTHORITY DECISION OF 5 JULY 2006 ON AN AID SCHEME FOR RESEARCH, DEVELOPMENT AND INNOVATION IN THE MARITIME INDUSTRY (NORWAY) THE

More information

Green Industry Innovation Programme Poland. Call for Project Proposals

Green Industry Innovation Programme Poland. Call for Project Proposals Norwegian Financial Mechanism 2009-2014 (Norway Grants) Green Industry Innovation Programme Poland Call for Project Proposals The Green Industry Innovation Programme Poland (later referred to as the Programme)

More information

EFTA Surveillance Authority Rue Belliard 35 B-1040 Brussel. Your ref

EFTA Surveillance Authority Rue Belliard 35 B-1040 Brussel. Your ref ROYAL NORWEGIAN MINISTRY OF HEALTH AND CARE SERVICES EFTA Surveillance Authority Rue Belliard 35 B-1040 Brussel Your ref 72376-772442 Our ref Date 16/155-3 May 2016 Subject: Observations to the supplementary

More information

Ocean Energy Prototype Research and Development. Programme Application Guide

Ocean Energy Prototype Research and Development. Programme Application Guide Ocean Energy Prototype Research and Development Programme Application Guide IMPORTANT NOTICES It is the responsibility of each applicant to ensure that they have read, and fully understand, this Application

More information

DESIGN COMPETITION GUIDELINES

DESIGN COMPETITION GUIDELINES DESIGN COMPETITION GUIDELINES 1 1. INTRODUCTION 1.1 design competitions explained The purpose of a design competition is to obtain new and original solution(s) to a given project theme or brief. To this

More information

EUROPEAN COMMISSION. CALL - EAC/A01/2015 Erasmus+ Vocational Education and Training Mobility Charter

EUROPEAN COMMISSION. CALL - EAC/A01/2015 Erasmus+ Vocational Education and Training Mobility Charter EUROPEAN COMMISSION CALL - EAC/A01/2015 Erasmus+ Vocational Education and Training Mobility Charter 2016-2020 1. Introduction This specific Call is based on Regulation (EU) No 1288/2013 of the European

More information

Request for Proposals (RFP) Moving office furniture from building 3A to building 22 and other CSIR store areas (in building 35 and 36)

Request for Proposals (RFP) Moving office furniture from building 3A to building 22 and other CSIR store areas (in building 35 and 36) Request for Proposals (RFP) Moving office furniture from building 3A to building 22 and other CSIR store areas (in building 35 and 36) RFP No. 816/16/02/2018 Date of Issue Friday, 02 February 2018 Friday,

More information

*Note: An update of the English text of this Act is being prepared following the amendments in SG No. 59/ , SG No. 66/26.07.

*Note: An update of the English text of this Act is being prepared following the amendments in SG No. 59/ , SG No. 66/26.07. Energy Efficiency Act Promulgated, SG No. 98/14.11.2008, effective 14.11.2008, supplemented, SG No. 6/23.01.2009, effective 1.05.2009, amended, SG No. 19/13.03.2009, effective 10.04.2009, supplemented,

More information

Rules of the DesignEuropa Awards. Industry and small/ emerging companies categories Lifetime Achievement category

Rules of the DesignEuropa Awards. Industry and small/ emerging companies categories Lifetime Achievement category Rules of the Industry and small/ emerging companies categories Lifetime Achievement category Industry and small/ emerging companies categories Industry and small/emerging companies categories The are

More information

EUROPEAN COMMISSION. CALL - EAC/A06/2017 Erasmus+ Vocational Education and Training Mobility Charter

EUROPEAN COMMISSION. CALL - EAC/A06/2017 Erasmus+ Vocational Education and Training Mobility Charter Ref. Ares(2017)5680072-21/11/2017 1. EUROPEAN COMMISSION CALL - EAC/A06/2017 Erasmus+ Vocational Education and Training Mobility Charter 1. Introduction This specific Call is based on Regulation (EU) No

More information

Ocean Energy Prototype Research and Development Programme. Application Guide. Date: 18/2/2015

Ocean Energy Prototype Research and Development Programme. Application Guide. Date: 18/2/2015 Ocean Energy Prototype Research and Development Programme Application Guide Date: 18/2/2015 This programme is supported by the Sustainable Energy Authority of Ireland (SEAI). SEAI is partly financed by

More information

Call for proposals DG EAC/21/06

Call for proposals DG EAC/21/06 Call for proposals DG EAC/21/06 AWARD OF GRANTS FOR ACTIVITIES (CONFERENCES/SEMINARS) TO EXPLOIT AND DISSEMINATE THE RESULTS OF LEONARDO DA VINCI PROJECTS 1. Background The Leonardo da Vinci (LdV) programme

More information

Rules of the DesignEuropa Awards. Industry and small/ emerging companies categories Lifetime Achievement category

Rules of the DesignEuropa Awards. Industry and small/ emerging companies categories Lifetime Achievement category Rules of the Industry and small/ emerging companies categories Lifetime Achievement category Industry and small/emerging companies categories The are organised by the European Union Intellectual Property

More information

NOTICE OF CALL FOR PROPOSALS. with a view to obtaining grants in the field of rail transport, in particular

NOTICE OF CALL FOR PROPOSALS. with a view to obtaining grants in the field of rail transport, in particular NOTICE OF CALL FOR PROPOSALS with a view to obtaining grants in the field of rail transport, in particular Telematics Applications for Passengers' services (TAP) DG MOVE/D2/SUB/446-2011 1. POLICY FRAMEWORK

More information

Jean Monnet Networks (policy debate with the academic world)

Jean Monnet Networks (policy debate with the academic world) Jean Monnet Networks (policy debate with the academic world) What is a Jean Monnet Network? Jean Monnet Networks foster the creation and development of consortia of international players (HEIs, Centres

More information

CARIBBEAN DEVELOPMENT BANK PROCEDURES FOR THE SELECTION AND ENGAGEMENT OF CONSULTANTS BY RECIPIENTS OF CDB FINANCING

CARIBBEAN DEVELOPMENT BANK PROCEDURES FOR THE SELECTION AND ENGAGEMENT OF CONSULTANTS BY RECIPIENTS OF CDB FINANCING CARIBBEAN DEVELOPMENT BANK PROCEDURES FOR THE SELECTION AND ENGAGEMENT OF CONSULTANTS BY RECIPIENTS OF CDB FINANCING P.O. Box 408, Wildey, St. Michael BB11000 Barbados, West Indies Telex: WB 2287 Tel:

More information

REGULATIONS. Level 3 NVQ Certificate in British/Irish Sign Language. Level 6 NVQ Certificate in British/Irish Sign Language

REGULATIONS. Level 3 NVQ Certificate in British/Irish Sign Language. Level 6 NVQ Certificate in British/Irish Sign Language Level 3 NVQ Certificate in British/Irish Sign Language Level 6 NVQ Certificate in British/Irish Sign Language Level 6 NVQ Diploma in Sign Language Interpreting Level 6 Diploma in Sign Language Translation

More information

NHS Constitution summary of rights and responsibilities

NHS Constitution summary of rights and responsibilities NHS Constitution summary of rights and responsibilities The Health Act 2009 which received Royal Assent in November 2009, places a legal responsibility upon all providers and commissioners of NHS care

More information

2) Objectives a) The Agency will: i) Provide support to the student(s) whilst engaging in the learning processes of a quality and diverse placement

2) Objectives a) The Agency will: i) Provide support to the student(s) whilst engaging in the learning processes of a quality and diverse placement 1) Purpose of the Agreement The provision of quality education and training of social work and social care professionals depends on the effective partnership between the Education Provider and the placement

More information

Discretionary Grants: Call for Applications for Non-Governmental Organisation (NGOs) to upskill their employees in short skills programmes

Discretionary Grants: Call for Applications for Non-Governmental Organisation (NGOs) to upskill their employees in short skills programmes 27 February 2018 2017-18 Discretionary Grants: Call for Applications for Non-Governmental Organisation (NGOs) to upskill their employees in short skills programmes The Services Sector Education and Training

More information

Title: UK-Harrogate: computer equipment and supplies Document Ref: Published By:

Title: UK-Harrogate: computer equipment and supplies Document Ref: Published By: ;;System.Web.Ex /w EPDw UKMTY2 Title: UK-Harrogate: computer equipment and supplies Document Ref: 374509-2012 Published By: Document Source: OJEU Tender Date Published: 27 November 2012 Deadline Date:

More information

Do terms like FP6, CORDIS, Specific Programme, Call for

Do terms like FP6, CORDIS, Specific Programme, Call for Community research EUROPEAN COMMISSION FP7 in Brief How to get involved in the EU 7 th Framework Programme for Research a pocket guide for newcomers 2 Step 1 What basics do I need to know? Do terms like

More information

RULES - Copernicus Masters 2017

RULES - Copernicus Masters 2017 RULES - Copernicus Masters 2017 ORGANISER OF THE COPERNICUS MASTERS The Copernicus Masters is organised under an ESA contract by Anwendungszentrum GmbH Oberpfaffenhofen ( the Organiser ) and is supported

More information

CONTRACT SPECIFICATION

CONTRACT SPECIFICATION SERVICE PROCUREMENT NOTICE Contract title: Multiple Framework contract to recruit short-term services in the exclusive interest of third countries benefiting from European Union external aid. Location

More information

Request for Proposal Sound and Lighting Technical Production Proposal Deadline: March 26, 2018 Issued by: City of Robinson Representative: Destiny DeLillo D.Delillo@RobinsonTexas.org (254) 662-1415 Purpose

More information

Ministry of Social Affairs and Health, Finland N.B. Unofficial translation. Legally valid only in Finnish and Swedish

Ministry of Social Affairs and Health, Finland N.B. Unofficial translation. Legally valid only in Finnish and Swedish Ministry of Social Affairs and Health, Finland N.B. Unofficial translation. Legally valid only in Finnish and Swedish No. 785/1992 ACT ON THE STATUS AND RIGHTS OF PATIENTS Issued in Helsinki on 17 th August

More information

Grant Scheme Rules for support to International Organisations and Networks Chapter post

Grant Scheme Rules for support to International Organisations and Networks Chapter post Approved for dispatch to the Ministry of Foreign Affairs: Villa Kulild, 13 November 2013 Approved by the Ministry of Foreign Affairs: 20 March 2014 Grant Scheme Rules for support to International Organisations

More information

WORK PLAN 2017 LAURENCE BALLIEUX NATIONAL FOCAL POINT. 1 EU 3rd HEALTH PROGRAMME

WORK PLAN 2017 LAURENCE BALLIEUX NATIONAL FOCAL POINT. 1 EU 3rd HEALTH PROGRAMME 1 EU 3rd HEALTH PROGRAMME 2014-2020 WORK PLAN 2017 LAURENCE BALLIEUX NATIONAL FOCAL POINT 2 3RD HEALTH PROGRAMME Published on 21 March 2014 4 overarching objectives: Promote health, prevent diseases and

More information