PNPM Peduli PID May 2011 Page 1

Size: px
Start display at page:

Download "PNPM Peduli PID May 2011 Page 1"

Transcription

1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.:75942 (The report # is automatically generated by IDU and should not be changed) Project Name PNPM Peduli Region East Asia Pacific Region Country Indonesia Sector Social Development Project ID P Implementing Agency TBD (To be Determined) Environmental Screening B Partial Assessment Category Date PID Prepared 13 May 2011 Estimated Date of Appraisal 30 June 2011 Completion Decision Other Decision I. Country Context In President SBY s second term, the Government adopted Indonesia's Medium-Term Development Plan (RPJMN) , with the target of increasing economic growth to 7 percent and reducing the poverty rate to 8-10 percent by The RPJMN highlights the need for growth with equity and a range of cross-cutting policies to ensure that development is both sustainable and inclusive. Indonesia managed to weather the global economic downturn of and regain its growth momentum. The social impact of the global crisis was also limited in Indonesia. Despite strong economic growth and falling poverty in the last decade, inequality is rising. The gap between the poor and non-poor is also widening. The Gini coefficient has increased from 0.32 in 1999 to approximately 0.41 in Growing intolerance of minority groups, including sexual and religious minorities, threatens social cohesion and stability. Social and economic exclusion, together with internalized and external stigmatisation prevents marginalized individuals and groups from accessing the country s mainstream development programs. As a result, their needs remain invisible and opportunities for their participation and contribution are limited. In addition they internalize this stigma and feel less entitled which increases their sense of isolation from society. Positive engagement with the broader community and government helps to influence perceptions about the potential of marginalized groups. This in turn builds social harmony and social capital. In addition to being a Millenium Development Goal (MDG), specific attention to marginalized women has a multiplier effect as it not only promotes gender equality, but in turn brings about exponential social and economic benefits for their families and wider communities Gender Equality as Smart Economics, A Work in Progress, World Bank, Washington PNPM Peduli PID May 2011 Page 1

2 II. Sectoral and Institutional Context The Government of Indonesia s National Program for Community Empowerment (PNPM Mandiri) is the Government s flagship program for poverty alleviation. It is a community-driven development program that encourages local communities to participate in the planning process; provides financial support to communities for direct and transparent funding of povertyalleviation activities; and enhances the partnership of central and local governments to best provide services where most needed. An AKATIGA study in 2010 on marginalized groups in PNPM Mandiri concluded that although some marginalized groups received some benefits from poverty reduction programs, the broad brush stroke of PNPM Mandiri was not able to effectively reach the most marginalized. They were often left out of planning processes, or their needs and aspirations not reflected in community decision-making. 2 Marginalized individuals and groups are not always defined by their economic status and can cross or overlap economic, cultural, religious, political and social groups. These are the people with fewer assets, lack access to resources and information, have lower levels of education, are poor and stigmatized for their sexual orientation or lifestyle choice, of ethnic or religious minority, people living with disabilities and widows. But they are also those who have limited access to services, social, economic and political life due to social constructs. These individuals and groups lack resources, access to information and economic opportunities, and confidence. Since inception, PNPM Mandiri has been envisaged as a broad-based effort to reduce poverty. Such an effort requires multi stakeholder participation and support for the program. This includes the need for promoting greater involvement of civil society organizations (CSOs) 3 in the implementation of PNPM Mandiri. CSOs are recognized for their comparative advantsge in reaching the most marginalized and working with and for these groups at the grassroots level in a way that large poverty programs are often not able to. The Government of Indonesia has a long and somewhat underappreciated track record of cooperation with CSOs within PNPM Mandiri. From the time of its launch in 1998 (in form of its precursor program, the Kecamatan Development Program - KDP), the program operations and the participation of communities in PNPM Mandiri have been monitored by independent journalists and CSOs. These entities were given blind contracts through PNPM Mandiri which financed travel and publication costs, but required no prior review on behalf of the GOI for the content of their reports. This mechanism supported the transparency of PNPM Mandiri s planning and implementation processes, and substantiated CSO s in a de-facto watchdog capacity. PNPM Mandiri has also had some limited experience in directly financing CSO activities to further efforts to reduce poverty. There have been two pilot programs which provide funding to the South Sulawesi CSO forum and to a church-based CSO in Papua. Similar arrangements have led to the development of the large and highly successful Program for Women Headed Households in Indonesia, or better known by its Indonesian acronym, PEKKA. 2 Akatiga (2010) Marginalization and PNPM Mandiri study. 3 Throughout this document, the term Civil Society Organization and CSO also refers to local Non- Governmental Organizations (NGOs). PNPM Peduli PID May 2011 Page 2

3 Although these pilot programs have had notable successes over the years, it has proven to be challenge to coordinate their activities into a comprehensive poverty reduction strategy. Global best practice shows that channeling resources through civil society organizations (CSOs) that are working at the grassroots level with those that are marginalized enables the government to engage with these individuals and groups. Under the facilitation of Indonesian CSOs, marginalized groups are developing new skills; accessing services; learning about their rights; and connecting with others (including the broader community and local government). Best practice also shows that empowerment of citizens in this way requires a rights-based approach rather than one only focused on meeting direct and immediate needs. PNPN Peduli Project activities will directly support the World Bank s Country Strategy Core Engagement 3 - Community Development and Social Protection. Activities will foster inclusive growth providing support services and technical assistance to marginalized groups currently not able to access, or access easily, PNPM and other poverty reduction programs. The focus of the CPS is investment in Indonesian institutions, including a focus on non-state actors, such as civil society and community-based organizations. The project will provide capacity support to Indonesian civil society organizations working on poverty reduction activities. Investment in these institutions aims to improve accountability and build capacity of these non-state organizations to meet Indonesia s development objectives. III. Project Development Objectives In 2010, the Government of Indonesia conceptualized the PNPM Peduli program in response to awareness that the broad brush stroke of PNPM program was not able to reach marginalized populations 4. The program is given strategic guidance from the Ministry for People s Welfare (Menko Kesra) and managed by the PNPM Support Facility (PSF). 5 The program promotes a just society where marginalised people are recognized, respected and valued with the freedom to act and make choices about the quality of their lives. The main development objective of PNPM Peduli is to strengthen the capacities of Indonesian CSOs to reach and empower marginalized groups to improve their socio-economic conditions. PNPM Peduli aims to fill gaps of government poverty reduction programs in reaching marginalized groups by capitalising on the comparative advantage of local CSOs in reaching and working with these groups. It seeks to tap into and learn from the innovative and inclusive poverty reduction practices of Indonesian CSOs and strengthen their management capacities and sustainability. IV. Project Description 4 Akatiga (2010) Marginalization and PNPM Mandiri study. 5 The PSF is a mechanism established by the Government of Indonesia (GOI) and international development partners to support PNPM Mandiri. Through the PSF, development partners provide high-quality, coordinated, technical assistance, planning advice and dialogue, as well as targeted financial assistance to the GOI in its management of PNPM Mandiri. PNPM Peduli PID May 2011 Page 3

4 Program Components The program will have the following components: 1. Grants. Under PNPM Peduli, grants will be awarded through a competitive selection process by the PSF Trust Fund to around 3-4 Indonesian CSOs ( Executing Organizations hereafter called EOs) that are either: a) national grant-making organizations or NGOs working through a third-party (model A, or EO-A); or b) nationwide membership-based organizations working through their sub-national branches (model B, or EO-B). Grants will have a co-financing component where the Executing Organisation contributes either seed funding for activities or contribution in kind (resources, staffing and so on). The contribution will be 5% on top of the total value of the Grant Agreement. Contributions in kind will be based on their market value. 2. Sub-Grants. The EOs will then sub-grant to local CSOs (under EO-A) or allocate funds to their sub-national branches (under EO-B) implementing poverty reduction activities targeting marginalized groups. Thematic areas that can be considered for funding include: livelihood support, access to governance, access to justice, education, health, water and sanitation. Potential to expand the range of activities applicable under PNPM Peduli will be reviewed at the end of the pilot phase (June 2012). Marginalized groups that will be covered through the project are listed below in the Project Activities section. There will be no geographic focus of the project, the focus being on reaching targeted marginalized groups. However, EOs will have in place strategies for upscaling their reach and scope of activities to ensure that CSOs/branches throughout most of Indonesia s provinces are eligible for sub-grants. Sub-Grants for direct support provided by Executing Organisations to their implementing partners will comprise 80% of the total amount allocated to their implementing partner. 3. Capacity-Building to Executing Organsiations. An important objective of PNPM Peduli is to strengthen the capacities of Indonesian national and local-level CSOs. Capacity-building support will be provided to EOs based on their specific needs. The level and type of training for each EO will be assessed based on specific capacity development plans. EOs will in turn be responsible for providing capacity-building services to their sub-granted CSOs/branches. Support will be provided through appropriate strategies including technical assistance, mentoring, on-the-job training, workshops and seminar. 4. Capacity-Building to local CSOs/Branches. Capacity-building support will also be provided to the sub-grant CSOs/branches. This will initially include developing activity work plans and budgets, conducting monitoring and evaluation, and in reporting on subgrant funds and activities. The sub-granted CSOs/branches may also receive training on issues such as fiduciary management, fundraising, proposal writing, organizational learning, and governance and transparency. Capacity support provided by Executing Organisations to their implementing partners will comprise 20% of the total amount allocated to their implementing partner. This component will be implemented by Local CSOs (for Model A), branches or affiliated organisations (for Model B) funded by subgrants awarded to them by EO. The activities should directly support poverty reduction PNPM Peduli PID May 2011 Page 4

5 activities targeting highly marginalized groups. Sub-grants will support activities that reach vulnerable groups not easily accessed through current poverty reduction programs, such as PNPM. Poverty reduction activities are aimed to empower communities and bring them together with the aim of reversing declining standards of living and poor conditions. Of the programmatic costs, direct support comprises 75% of the sub-grant. Program Phases Phase 1 (pilot phase): January 2011 June This phase will involve: the establishment and signing of Grant Agreements between the World Bank and selected Executing Organisations; provision of initial training to Executing Organisations; the establishment of subgrant/funding agreements between Executing Organisations and their selected partners; the implementation of project activities by local CSOs/branches; and the provision of capacity support to these local partners under the sub-grant/funding agreement. The pilot phase will have a strong focus on learning and sharing and testing approaches to poverty reduction and reaching marginalized groups. Executing Organizations and their implementing partners will support and actively participate in the documentation of good practices and lessons learned managed by the Technical Support Group (TSG). The end of this phase will involve an evaluation and review of activities and extension of existing Grant Agreements based on satisfactory performance - with provision for additional funding to EOs for Phase 2. Executing Organisations will actively participate in the review of the pilot phase that will inform full implementation of the project in Phase Two. As required, the Operational Manual will be revised and fine tuned in preparation for Phase Two. Phase 2: June Phase 2 will commence following evaluation of Phase 1, with Executing Organisations continuing their existing sub-grant/funding agreements which will be extended and additional funds allocated according to the proposed and approved Activity Plans and linked budgets. Executing Organisations will implement their strategy to up-scale activities, develop new partnerships and reach new marginalized groups, specifically focusing on gaps identified through review at the end of Phase 1. Phase 2 will build on lessons learned and recommendations from the review of Phase 1. Innovation and good practice will be brought to scale. During Phase 2, PNPM Peduli will also seek to promote synergies between CSOs and government programs and promote integration of innovative approaches to social inclusion of marginalized groups into government poverty reduction government programs, including PNPM. There will be no delay in the transition between implementation of activities Phase 1 and continuation into Phase 2. Program Design Approach The pilot phase will be a design implement with a strong focus on learning by doing. The results framework, program definitions, reporting templates and monitoring and evaluation framework will be built in partnership with national CSO partners in the program start-up promoting a participatory approach that builds on CSO experience and expertise and ensures program mechanisms reflect the way grassroots CSOs work. An external review will be conducted close to the end of the pilot phase to assess what s working well and what can be built on for Phase II to inform the design. It is expected that a results framework will be updated for PNPM Peduli PID May 2011 Page 5

6 full implementation. The PDO and program outcomes may also be refined at this time and a full baseline developed. The rationale for a design implement approach is that social inclusion and marginalization is a new area of work and the first time the government and World Bank has partnered with Indonesian CSOs to address issues of inclusion. The pilot phase will have a strong focus on testing and learning what works and why. The approach to designing and setting up implementation structures for PNPM Peduli is also about forging a new business model for grant making with CSOs. This is about finding the right process that ensures that our quality, fiduciary, and safeguards requirements are met, while keeping the transaction costs for the CSOs at a minimum. This will involve educating CSOs on what information is required in the early stages, and building their capacity to provide that information in a form that is understandable for the Bank. Practical strategies have involved consultations to gain a better understanding of how these organizations work and providing Proposal Writing Clinics to educate CSOs on the requirements of the Bank. In this way, project implementation can maintain a light touch approach by working through existing CSO systems as far as possible to fully captialise on their strategic advantage in working with and for the most marginalized. As well as a learning process for the Bank and CSOs, through the PNPM Peduli model, the government anticipates it will learn from the innovative approaches to poverty reduction captured and to look for strategies to replicate and upscale these practices in other poverty reduction programs, including PNPM Mandiri. V. Financing Multi Donor Fund (JMC) US$ 4,215,000 Total - US$ 4,215,000 VI. Implementation Government of Indonesia: Indonesia s Ministry of People s Welfare (Menko Kesra) is a key decision maker concerning the overall direction of the Program and provides strategic and operational oversight and guidance to the program through Pokja Pengendali. This includes involvement in periodic reviews of the program and helping to draw in those ministries under its coordination to support implementation of the Program and learn from the knowledge generated. Strategic oversight is also provided by Indonesia s National Agency for Development Planning (BAPPENAS). Joint Management Committee (JMC): JMC is the governing body of the PSF Trust Fund and comprises representatives of Government and donors which provides periodic inputs on the strategic direction and oversight of Peduli, reviews progress of the program. It also has the key decision making role concerning the funding of the program, including approvals for any additional financing required and new EO partners. PNPM Support Facility (PSF): The PSF is guided by the Government of Indonesia and JMC in making strategic decisions about the program based on program reports, learning and consultation with implementing CSO partners, other stakeholders and the TSG. The PNPM PNPM Peduli PID May 2011 Page 6

7 Peduli Coordinator based at the PSF manages the Grant Agreements with EO and recipients of Innovations Grants, in accordance with World Bank Fiduciary Guidelines and Safeguards requirements as set out in the Program Operations Manual. It is accountable for funds disbursement and management, ensuring information flow to Government of Indonesia and JMC and ensuring that decision making bodies have a full and open account of the Program s progress and issues arising. PSF is responsible for ensuring that EO and TSG are acccountable for their their contractual and milestone obligations. It is the key decision maker regarding program strategies, processes and tools which are developed in consultation with EOs and will address any issues of misconduct or poor performance among EOs, Strategic Partners or TSG. Technical Support Group: The TSG will be guided by the Program Operations Manual and adhere to all governance provisions and program policies. While the TSG does not have responsibilty for financial management, it must be fully aware of Peduli financial procedures and requirements to the extent that it can report any identified issues to PSF for immediate action. The TSG will become the main point of contact between the EO and the PSF and will have the key decision making role regarding quality of implementation and reporting. The TSG will address any issues of misconduct or poor performance among team members, other than cases of fraud which are addressed by PSF. Executing Organizations and CSO partners: Executing Organizations and their CSO partners are guided by their Program Operational Manual (POM) and Project Management Manuals (PMM) respectively which align with the Peduli POM and World Bank requirements. EOs will decide their own program structures and implementation strategies and process, select their local partners using agreed criteria and address any issues of misconduct or poor performance among EO staff and/or CSO partners. Financial systems have been developed with EOs in line with World Bank requirements and they are responsible for addressing any fiduciary issues with their Partners. CSO partners are responsible for working in partnership with individuals and groups to develop and implement activities working with the most marginalized. PNPM Peduli PID May 2011 Page 7

8 This is shown pictorially below in Diagram 1. Diagram1. Pokja Pengendali (BAPPENAS ) Operational Oversight PSF Secretariat (World Bank) PNPM Peduli Coordinator Technical Support Group (TSG) GRANT MODEL A GRANT MODEL B Executing Organization (work thru 3 rd party org) Executing Organization (work thru 3 rd party org) Executing Organization (work thru subnational branches) Executing Organization work thru subnational branches) CSO CSO CSO CSO Subnational branch Subnational branch Subnational branch Subnational branch Beneficiaries Indicate Lines of Technical Assistance Indicate Grants/Sub-Grants Indicate Contract Grant Mechanism PNPM Peduli will be implemented through two grant mechanisms: Grant Model A. The World Bank will award Grants to Indonesian grant-making organizations (Executing Organisations, EO-A) that provide support to and work through a third party organization (ie. local CSOs). Grants will be used by EOs to: a) strengthen their own management and operational capacity and b) provide sub-grants to local CSOs. The sub-grants from EO-A to local CSOs will: a) support sub-grantees poverty reduction activities with marginalized groups; and b) strengthen their management and organizational capacity. Grant Model B. Through a separate process, the World Bank will also award Grants to Indonesian nation-wide organizations (Executing Organisations, EO-B) that provide support to and work through sub-national branches of their organization. Grants will be used by EO-B to: a) strengthen their own management and operational capacity and b) allocating funding to their sub-national branches. The funding from EOs to their sub- PNPM Peduli PID May 2011 Page 8

9 national branches will: a) support poverty reduction activities of sub-national branches with marginalized groups; and b) strengthen their management and organizational capacity. Grant Eligibility In order to be eligible to receive PNPM Peduli Grants, the Executing Organisation under Grant Model A and B must as a minimum be legally registered entity that has a legal basis for operation in Indonesia; must be working across more than one province; must be working with more than one of the target marginalized groups; and must be supporting a range of poverty reduction activities. In addition, the specific requirements include: Fiduciary Have existed as an organisation for the past two years and have documented external audit reports for the past two years; Have an Operation Manual outlining clear standard financial and operational procedures for program and financial management; Be willing and able to establish a separate account in the name of the Project or have an accounting system to adequately separate Project funds; and Be willing and able to be audited by an external independent auditor on an annual basis for the duration of the Grant Agreement. Grant Model A: Capacity and Experience Established and strong working partnerships with local CSOs working supporting poverty reduction activities to targeted marginalized groups; Able to identify potential CSO projects and activities consistent with the objectives of PNPM Peduli in reaching the most marginalized; Demonstrated experience strengthening the capacity of local CSO networks evidenced by reference letters from recipients for recent programs; Demonstrated experience in grant making to local CSOs and existing grantees carrying out relevant project activities; Capacity and willingness to upscale support for local CSOs over time through increased number and reach of sub-grants; Demonstrated staffing and resources that will be allocated (either existing or contracted for the project purposes) to ensure on-granting is well managed; Grant Model B: Capacity and Experience Have established sub-national branches of the organisation supporting poverty reduction activities to targeted marginalized groups; Established and strong working partnerships with local grassroots and community groups at the sub-national level working in poverty reduction in the priority themes evidenced by long term engagement, identification of potential partners and projects and demonstrated understanding of local poverty reduction activities; Propose projects that will be carried out by their sub-national branches that target the most marginalized groups, propose a logical implementation strategy for activities, propose a credible M&E systems and sound budget; Capacity and willingness to upscale support for sub-national branches over time through PNPM Peduli PID May 2011 Page 9

10 increased number and reach of sub-grants; Demonstrated staffing and resources that will be allocated (either existing or contracted for the project purposes) to ensure on-granting is well managed; Governance Requirements Have a credible and transparent organisation structure that ensures decision-making processes are consultative and the Board decisions and operations are transparent to members and beneficiaries. Grant Recipient Selection Process The PNPM Peduli team will prepare a number of documents to support the process of selection and appointment of Executing Organisations. These include: mapping and short listing documentation to invite shortlisted eligible organizations to submit full proposals, Selection Criteria for Executing Organisations, Terms of Reference (ToR) for Executing Organisations, Financial Proposal Template, Technical Proposal Template, Appraisal Criteria for Executing Organisations, CSO Selection Worksheet (which will include a financial and procurement assessment), and PNPM Peduli Operational Manual. The selection process for Executing Organisations will involve the following steps, shown pictorially below: PNPM Peduli PID May 2011 Page 10

11 1.Mapping of eligible organisations using criteria and ranking. Verification of mapping with CSO experts. Short-listing of eligible organizations invited to submit pre-proposal forms. 2. Pre-Proposal Submission. Organisations meeting basic criteria submit form outlining core requirements related to their operations and structure. Organisations meeting all criteria invited for full proposals. 3. Initial Meeting on Full Proposal. Shortlisted potential EOs receive a project briefing and have opportunity to ask questions about proposal process or project. 4. Proposal Writing Clinic for shortlisted organisations to educate them on required information for proposal stsge in the correct Bank format..5. Technical Evaluation Committee. TEC established (inviting government WB experts and selected CSO experts) to assess proposals and select Executing Organisations. 6. Financial and Procurement Assessments & Procurement Plan for Executing Organisation involving anti-corruption and safeguards teams. Recommendations made to Legal Team. 7. Grant Agreement Drafted by Legal Team incorporating recommendations. Grant Agreement finalised with organisation. Activities begin. Sub-Grant Eligibility In order to be eligible to receive PNPM Peduli Sub-Grants or funding agreements, organisations under Grant Model A as a minimum the organisation must: Fiduciary Requirements Be a registered entity recognised either within their community or have a legal basis for operation; 6 Be able and willing to show accounts for the past year; Be able and willing to be audited annually by an external independent auditor for the duration of the Sub-Grant Agreement; 7 Be willing and able to use the Executing Organization s grant instruments (Financial and 6 Organisations that are not registered can obtain a letter from the local government or confirming their that they are recognised as an organisation carrying out activities as they claim.. 7 For smaller organisations who have not participated in an external formal audit, training will be provided in preparation for the first audit at the end of the 12 month period. PNPM Peduli PID May 2011 Page 11

12 Management Manual) and to meet their fiduciary and reporting requirements; Be willing and able to establish a separate account in the name of the Project; Capacity and Experience Have strong community partnerships demonstrated by long term engagement and strong understanding of the poverty issues in their working environment; Be currently engaged in poverty reduction activities working with marginalized groups; Have a clear strategy presented for how they target and work with the most marginalized groups; and Propose activities that demonstrate a logical implementation strategy, and sound budget. Governance and Accountability Requirements Have a clear organisational structure in place Have mechanisms to involve beneficiaries in decision-making and poverty reduction activities (this may include involvement in monitoring and reporting activities, planning, developing proposals, attendance at organisational meetings and how they make information readily available through newsletters, open meetings and so on). Under Grant Model B, Executing Organisations, as nationwide organisations, will have internal mechanisms to work with branches or affiliated organisations and select suitable partners. Executing Organisations will ensure eligible activities are selected with suitable branches that meet the following: Fiduciary Requirements That the branch implementing the activities is officially connected to the Executing Organisation; Be able and willing to show accounts for the past year; Be able and willing to be audited annually by an external independent auditor for the duration of the Funding Agreement; 8 Have financial and management systems in place from the Executing Organization s (i.e. using the EOs Financial and Management Manual/systems) and have demonstrated ability to meet their fiduciary and reporting requirements; Be willing and able to establish a separate account in the name of the Project; Capacity and Experience Have strong community partnerships demonstrated by long term engagement at the local level and strong understanding of the poverty issues in their working environment; Be currently engaged in poverty reduction activities working with marginalized groups; Have a clear strategy presented for how they target and work with the most marginalized groups; and Propose projects that demonstrate a logical implementation strategy, and sound budget. 8 For smaller organisations who have not participated in an external formal audit, training will be provided in preparation for the first audit at the end of the 12 month period. PNPM Peduli PID May 2011 Page 12

13 Governance and Accountability Requirements Have a clear organisational structure in place and mechanisms to involve beneficiaries in decision-making and poverty reduction activities (this may include involvement in monitoring and reporting activities, planning, developing proposals, attendance at organisational meetings and how they make information readily available through newsletters, open meetings and so on). Under both grant models, the selection process for all sub-grants will follow the existing systems of the Executing Organisations but ensure that local partners meet the basic criteria above and selected poverty reduction activities are in line with the objectives and priorities of PNPM Peduli in reaching the most marginalized. Process for selection of partners and activities must be well documented and transparent. Executing Organisations may carry out a mapping exercise of existing and new partners to identify potential poverty reduction activities, and they will be responsible for providing capacity support to local partners to support them in the development of proposals with well planned timelines, realistic budgets and quality monitoring and evaluation frameworks. Executing Organisations will be responsible for carry out capacity assessments of local CSOs/branches selected will work in partnership to develop Capacity Development Plans that will be carried out for the duration of the sub-grant/funding agreement. Executing Organisations can use existing templates within their organization to establish funding agreement but must ensure they include standard World Bank clauses for grant agreements as outlined in the project s Operational Manual. Executing Organisations will also be responsible for providing standard training on PNPM Peduli and relevant World Bank guidelines on financial management, procurement, safeguards and anti-corruption as outlined in the project s Operational Manual. PNPM Peduli Activities There are two broad types of activities supported by sub-grants/funding to local branches under PNPM Peduli. Support will be provided for activities that address specific and identified needs of a marginalized individual or community and directly provide for this need. This may include providing equipment for disabled persons or medicine for people suffering from infectious or terminal diseases, access to public and/or private services, and access to economic opportunities. Here the ultimate objective is to assist individuals to improve their situation and condition so that they can fulfill their own potential. Support will also be provided for activities that empower individuals to participate in order to effectively advocate or articulate their individual needs to those who can influence outcomes. This may include activities that focus on strategies for marginalized individuals to become involved in community planning and decision-making processes. Here the ultimate objective is to have the specific needs or aspirations of marginalized individuals heard and addressed, and to integrate into mainstream society so that they can fully participate. Ineligible Activities PNPM Peduli PID May 2011 Page 13

14 Sub-grants will not support the following: revolving funds; micro-credit programs; charity nor provide welfare payments; activities banned by PSF donor policies or by Indonesian law; government programs, which PSF finances through Windows 1 &2; political activities; purchase of land; activities involving major construction works; and the purchase of large items that are not part of a broader project or activity approved for funded under PNPM Peduli. Target Groups Individuals and communities supported by project activities may include, but are not limited to: street children, orphans, exploited children who may be sexually abused, youth in conflict with the law or suffering drug abuse, female-headed households, victims of domestic violence and of community abuse, sex workers, victims of conflict, people living with HIV and AIDS, people living with disabilities related to leprosy, poor ethnic minorities, handicapped persons and other disabilities, garbage collectors, peddy-cab drivers (bajaj and becaks), domestic workers subject to exploitation, poor migrant workers, trafficked persons, transgendered persons, street beggars, landless farmers, rural fisher folk, poor plantation laborers and poor indigenous peoples. Accountability Mechanisms Downward accountability to these marginalized groups will be ensured through: mechanisms developed by selected CSOs and sub-national branches to involve beneficiaries in project planning, reporting, monitoring and evaluation; projects selected that are based on community needs and target activities to meet these identified needs; collection of stories and case studies to document and share good practice in downward accountability across the project network managed by the Technical Support Group (TSG) supported by the Executing Organisations and local CSOs/branches; a survey conducted of beneficiaries to provide feedback to the project cycle managed by the TSG and supported by local CSOs/branches; and a complaints handling mechanism developed and managed by the TSG making communication about the project accessible at all levels, including beneficiaries and the general public. Grant and Sub-Grant Sizes An initial USD 4 million has been allocated to the start-up pilot phase to support activities managed by EOs. Grants awarded to EOs will not to be of a value greater than the annual amount the EO has previously programmed under other donor funded projects. Sub-grant sizes will vary depending on size and capacity of local CSOs as well as activities being carried.it is expected that the sub-grants will vary between USD 20,000 up to USD 100,000. VII. Safeguard Policies (including public consultation) PNPM Peduli is a pilot project under the PNPM umbrella, with the main Government counterparts, Menko Kesra and Bappenas, providing strategic oversight to the program. The safeguards framework therefore builds upon the lessons learned from safeguards management in PNPM under the umbrella guideline of Implementation Guideline of Social and Environmental Safeguards (IGSES), which similarly funds small-scale projects at the local level. The updated IGSES with several improvement and updates will be used as reference for the implementation of PNPM Peduli. PNPM Peduli PID May 2011 Page 14

15 There are no significant long-term potential impacts expected to be triggered by this project. PNPM Peduli is implemented by Executing Organizations which are responsible for screening possible environmental and social impacts of their sub-grant activities during planning. If any impacts are identified they are provided with supervision and guidance for developing and implementing measures to mitigate the impacts. Specific guidelines for environmental management and Indigenous People safeguards issues will be referred to updated IGSES The safeguards screening, implementation and reporting will be outlined in the PNPM Peduli Operational Manual and reference to these guidelines will be included in the sub-grant manuals. The World Bank will provide initial safeguards training to EOs and will continue do so during project implementation. Following the provision of train-the-trainer training EOs may be in a position to provide safeguards training to their sub-grantees so that they have the capacity to manage any potential safeguards risks. Close supervision and monitoring from the Task Team and safeguards team is being provided during project implementation, specifically for safeguards compliance. In the initial start-up the World Bank will conduct a safeguards assessment of the EOs capacity to identify and mitigate safeguards risks. This will be followed by safeguards training on safeguard policies and how to manage potential environmental and social risks. The PNPM Peduli Operational Manual will include specific environmental and social guidelines for screening site-specific impact. The EOs progress implementation reports will contain a section on safeguard implementation for applicable cases. As most projects will be small-scale, there are no large-scale, significant, or irreversible impacts anticipated to occur from these activities. Most of the sub-grants in PNPM Peduli will be focused on capacity and skills training to marginalized beneficiaries, advocacy, legal aid and participatory governance. The few sub-projects that will involve minor construction will follow solid engineering designs and construction practices modeled on lessons learned from the PNPM safeguards approach. Any potential negative environmental impacts will therefore typically be negligible, site-specific, small in scale and can be managed locally by adopting screening criteria and adequate mitigation measures as outlined in the Operational Manual and specifically in the Environmental and Social Codes of Practices (ECOPs). Several of the sub-projects specifically target indigenous people with the aim of improving their economic and social conditions. All sub-grant projects, including those working with indigenous peoples, are expected to be prepared with free prior and informed consultation; with broad community support throughout the project cycle, in design, implementation, monitoring and evaluation. These processes are described in the sub-grant proposals and tracked through quarterly reports (templates developed by the program). The Indigenous Peoples Planning Framework will contain the principles and elements for identifying potential negative impacts, a framework for implementing free prior and informed consultation with the effected indigenous communities in each stage of the subproject cycle; institutional arrangements for screening project supported activities, evaluating their effects on indigenous communities; and monitoring and reporting arrangements. PNPM Peduli PID May 2011 Page 15

16 Safeguard Policies Triggered Yes No Environmental Assessment (OP/BP 4.01) Natural Habitats (OP/BP 4.04) Forests (OP/BP 4.36) Pest Management (OP 4.09) Physical Cultural Resources (OP/BP 4.11) Indigenous Peoples (OP/BP 4.10) Involuntary Resettlement (OP/BP 4.12) Safety of Dams (OP/BP 4.37) Projects on International Waterways (OP/BP 7.50) Projects in Disputed Areas (OP/BP 7.60) VIII. Contact point at World Bank and Borrower World Bank Contact: Kevin Tomlinson Title: Task Team Leader Tel: (62) Implementing Agencies Association for Community Empowerment Komplek Depkes, Jl. H. Umaidi No. 39 A, Rawa Bambu 2 Rt.010 Rw. 007, Pasar Minggu, South Jakarta Tel ; Contact person: Dra. Titik Hartini, M.Si (Executive Director) Kemitraan Jl. Wolter Monginsidi No. 3 Kebayoran Baru South Jakarta Tel Contact person: Wicaksono Sarosa (Executive Director) Lakpesdam/NU Jl. H. Ramli No. 20A Menteng Dalam, Tebet Jakarta Tel , , Contact person: YahyaMa'shum (Chairman of Board) I. For more information contact: The InfoShop The World Bank 1818 H Street, NW Washington, D.C Telephone: (202) Fax: (202) Web: PNPM Peduli PID May 2011 Page 16

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB7052

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB7052 Project Name Region Country Sector(s) Lending Instrument Project ID Borrower(s) Implementing Agency Environmental Category Date PID Prepared Estimated Date of Appraisal Completion Estimated Date of Board

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE. Adaptable Program Loan P F-Financial Intermediary Assessment 08-May Nov-2012

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE. Adaptable Program Loan P F-Financial Intermediary Assessment 08-May Nov-2012 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country PROJECT INFORMATION DOCUMENT (PID) (P128748) OTHER World

More information

PNPM SUPPORT FACILITY (PSF) PORTFOLIO

PNPM SUPPORT FACILITY (PSF) PORTFOLIO PNPM SUPPORT FACILITY (PSF) PORTFOLIO NATIONAL DEVELOPMENT PLANNING AGENCY JAKARTA, MARCH 2008 PNPM SUPPORT FACILITY (PSF) PORTFOLIO I. BACKGROUND The Government of Indonesia is committed to reduce poverty

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA2678. Project Name. Region. Country

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA2678. Project Name. Region. Country Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA2678 Project Name

More information

Project Information Document/ Identification/Concept Stage (PID)

Project Information Document/ Identification/Concept Stage (PID) Public Disclosure Authorized The World Bank Public Disclosure Authorized Public Disclosure Authorized Project Information Document/ Identification/Concept Stage (PID) Concept Stage Date Prepared/Updated:

More information

INDONESIA NATIONAL ROADS IMPROVEMENT PROJECT WESTERN INDONESIA PROJECT INFORMATION DOCUMENT CONCEPT STAGE Report No.:AB2075 Project Name

INDONESIA NATIONAL ROADS IMPROVEMENT PROJECT WESTERN INDONESIA PROJECT INFORMATION DOCUMENT CONCEPT STAGE Report No.:AB2075 Project Name INDONESIA NATIONAL ROADS IMPROVEMENT PROJECT WESTERN INDONESIA PROJECT INFORMATION DOCUMENT CONCEPT STAGE Report No.:AB2075 Project Name ID-National Roads Improvement Project Western Indonesia Region EAST

More information

Counterpart International Afghanistan Afghan Civic Engagement Program (ACEP)

Counterpart International Afghanistan Afghan Civic Engagement Program (ACEP) Counterpart International Afghanistan Afghan Civic Engagement Program (ACEP) Request for Applications (RFA) Key CSO Partner Policy & Advocacy Grants Counter trafficking in Persons (C-TiP) Note: The translated

More information

Counterpart International Afghanistan Afghan Civic Engagement Program (ACEP) Request for Applications (RFA) Government Monitoring Grant(GMG)

Counterpart International Afghanistan Afghan Civic Engagement Program (ACEP) Request for Applications (RFA) Government Monitoring Grant(GMG) Counterpart International Afghanistan Afghan Civic Engagement Program (ACEP) Request for Applications (RFA) Government Monitoring Grant(GMG) Issuance Date of RFA: Dec 08, 2016 Deadline for Submission of

More information

KECAMATAN DEVELOPMENT PROJECT *

KECAMATAN DEVELOPMENT PROJECT * Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Abstract KECAMATAN DEVELOPMENT PROJECT * The World Bank aided Kecamatan Development

More information

Wildlife Conservation Society 12/24/08 to 12/31/13 (72 months)

Wildlife Conservation Society   12/24/08 to 12/31/13 (72 months) PNPM Green Quarterly Progress Report: July 2012 to September 2012 Summary Information Status Active Activity Number Task Team Leader(s) Executing Agency(ies) TF090912, TF090977, TF011930, TF093076, TF096887,

More information

NEW PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: Report No.: LATIN AMERICA AND CARIBBEAN Country

NEW PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: Report No.: LATIN AMERICA AND CARIBBEAN Country Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name 1 NEW PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: Report

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 02/25/2010 INTEGRATED SAFEGUARDS DATASHEET

More information

Resettlement Planning Document

Resettlement Planning Document Resettlement Planning Document Resettlement Framework Document Stage: Final Project Number: 40247 May 2008 Republic of Indonesia: Rural Infrastructure Support for PNPM Mandiri Prepared by Directorate General

More information

PNPM Support Facility (PSF) Technical Committee - January 7, 2013 Meeting Meeting Minutes

PNPM Support Facility (PSF) Technical Committee - January 7, 2013 Meeting Meeting Minutes PNPM Support Facility (PSF) Technical Committee - January 7, 2013 Meeting Meeting Minutes ----------------------------- Chairman: Ibu Pamuji Lestari, Assistant Deputy for Community Empowerment Affairs,

More information

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA4973. Project Name

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA4973. Project Name Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA4973 Project

More information

PROJECT PROPOSAL PAPER FOR GPSA GRANT US$ 500,000 PUBLISH WHAT YOU PAY INDONESIA - (PWYP) INDONESIA FOR A

PROJECT PROPOSAL PAPER FOR GPSA GRANT US$ 500,000 PUBLISH WHAT YOU PAY INDONESIA - (PWYP) INDONESIA FOR A THIRD GLOBAL CALL FOR PROPOSALS PROJECT PROPOSAL PAPER FOR GPSA GRANT US$ 500,000 TO PUBLISH WHAT YOU PAY INDONESIA - (PWYP) INDONESIA FOR A Voice from Ring One: Citizen Monitoring and Engagement for Transparency

More information

Minutes of Meeting Subject

Minutes of Meeting Subject Minutes of Meeting Subject APPROVED: Generasi Impact Evaluation Proposal Host Joint Management Committee (JMC) Date August 04, 2015 Participants JMC, PSF Portfolio, PSF Cluster, PSF Generasi Agenda Confirmation

More information

PNPM Support Facility

PNPM Support Facility 2009 PROGRESS REPORT PNPM Support Facility Technical Secretariat National Development Planning Agency March 2009 2 2009 PROGRESS REPORT PSF SUPPORT FACILITY Foreword Indonesia has shown solid progress

More information

FRAMEWORK FINANCING AGREEMENT. (National Highway Development Sector Investment Program Project 1) between ISLAMIC REPUBLIC OF PAKISTAN.

FRAMEWORK FINANCING AGREEMENT. (National Highway Development Sector Investment Program Project 1) between ISLAMIC REPUBLIC OF PAKISTAN. FRAMEWORK FINANCING AGREEMENT (National Highway Development Sector Investment Program Project 1) between ISLAMIC REPUBLIC OF PAKISTAN and ASIAN DEVELOPMENT BANK DATED 29 October 2005 FRAMEWORK FINANCING

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 02/23/2011 INTEGRATED SAFEGUARDS DATASHEET

More information

DOCUMEWTS. Letter No. CD-246/PSF/VI/2013 June 12, Re: PSF TF Grant No. TF Pro-Poor Planning, Budgeting and Monitoring (P3BM) Project

DOCUMEWTS. Letter No. CD-246/PSF/VI/2013 June 12, Re: PSF TF Grant No. TF Pro-Poor Planning, Budgeting and Monitoring (P3BM) Project Public Disclosure Authorized THE WORLD BANK I BANK DUNIA Sharing Development Solutions for an Emerging Indonesia Stefan G. Koeberle Country Director, Indonesia - Ct DOCUMEWTS. Letter No. CD-246/PSF/VI/2013

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC3002. Date ISDS Prepared/Updated: 02/22/2009 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC3002. Date ISDS Prepared/Updated: 02/22/2009 I. BASIC INFORMATION. A. Basic Project Data Date ISDS Prepared/Updated: 02/22/2009 I. BASIC INFORMATION A. Basic Project Data INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC3002 Country: Indonesia Project ID: P101722 Project Name:

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: I. BASIC INFORMATION A. Basic Project Data INTEGRATED SAFEGUARDS

More information

POSITIVE ACTION FOR GIRLS AND WOMEN Call for Proposals Guidance Notes and Frequently Asked Questions (Updated June 2018) Eligibility...

POSITIVE ACTION FOR GIRLS AND WOMEN Call for Proposals Guidance Notes and Frequently Asked Questions (Updated June 2018) Eligibility... POSITIVE ACTION FOR GIRLS AND WOMEN Call for Proposals Guidance Notes and Frequently Asked Questions (Updated June 2018) Contents Introduction... 2 PAGW Topic Areas and Values... 2 Objectives Topic Areas...

More information

Implementation Status & Results Indonesia ID SPADA in Aceh and Nias (P097605)

Implementation Status & Results Indonesia ID SPADA in Aceh and Nias (P097605) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia ID SPADA in Aceh and Nias (P9765) Operation Name: ID SPADA in Aceh and Nias (P9765) Project

More information

Fiduciary Arrangements for Grant Recipients

Fiduciary Arrangements for Grant Recipients Table of Contents 1. Introduction 2. Overview 3. Roles and Responsibilities 4. Selection of Principal Recipients and Minimum Requirements 5. Assessment of Principal Recipients 6. The Grant Agreement: Intended

More information

INTEGRATED SAFEGUARDS DATA SHEET IDENTIFICATION / CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET IDENTIFICATION / CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET IDENTIFICATIN / CNCEPT STAGE 0 Report.: ISDSCI 1051

More information

1) Does the application platform offer the chance to edit your application, or is it a one time enter + submit?

1) Does the application platform offer the chance to edit your application, or is it a one time enter + submit? SECOND GLOBAL CALL FOR PROPOSALS NOVEMBER 18 TH, 2013 JANUARY 6 TH, 2014 FREQUENTLY ASKED QUESTIONS () The following list of questions and answers is updated weekly and contains the questions received

More information

UNOV / UNICRI Call for Proposals Guidelines for grant applicants

UNOV / UNICRI Call for Proposals Guidelines for grant applicants UNOV / UNICRI Call for Proposals Guidelines for grant applicants Name of the grants programme: Grant Initiative to Strengthen Cooperation with Civil Society Organizations in Conflict Mitigation Deadline

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5998 Project Name. Leveraging ICT for Governance, Growth and Employment Project Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5998 Project Name. Leveraging ICT for Governance, Growth and Employment Project Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5998 Project Name Leveraging

More information

Guidelines for Grant Applicants

Guidelines for Grant Applicants Guidelines for Grant Applicants The Commonwealth Foundation s mission is to support civic voices to share their stories, learn and act together and influence the institutions that shape people s lives.

More information

UNOV / UNICRI Call for Proposals Guidelines for grant applicants

UNOV / UNICRI Call for Proposals Guidelines for grant applicants with funding by the European Union UNOV / UNICRI Call for Proposals Guidelines for grant applicants Name of the grants programme: Grant Initiative to Strengthen Cooperation with Civil Society Organizations

More information

Re: Indonesia: JSDF Grant for Sustaining Women s Leadership Project Grant No.TF095058

Re: Indonesia: JSDF Grant for Sustaining Women s Leadership Project Grant No.TF095058 Public Disclosure Authorized CONFORMED COPY The World Bank 1818 H Street N.W. (202) 477-1234 INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Washington, D.C. 20433 Cable Address: INTBAFRAD INTERNATIONAL

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) TF Dec ,900,000.00

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) TF Dec ,900,000.00 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020652 Public Disclosure Authorized Public Disclosure Authorized Project ID P115564 Country World Project

More information

International Women s Club of Sofia Call for Proposals Small Grants. Deadline for receipt of applications: 31 January 2018

International Women s Club of Sofia Call for Proposals Small Grants. Deadline for receipt of applications: 31 January 2018 International Women s Club of Sofia Call for Proposals Small Grants Deadline for receipt of applications: 31 January 2018 Notice: This Call for Proposals forms the basis for applying for IWC grants. It

More information

Terms of Reference (ToR) Developing Advocacy Strategy for NCA Partners

Terms of Reference (ToR) Developing Advocacy Strategy for NCA Partners Terms of Reference (ToR) Developing Advocacy Strategy for NCA Partners 1. Introduction Norwegian Church Aid (NCA) with its long presence (since 1979) in Afghanistan. NCA is a partner based organization

More information

Terms of Reference. 1. Introduction

Terms of Reference. 1. Introduction 1. Introduction Terms of Reference Consultancy for and end of project evaluation of the HOPE - A Haus (house) for Protection and Empowerment Project Central Province, Papua New Guinea, 2014-2017 ChildFund

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: PIDC647 Project Name Support

More information

Cambodia, Lao PDR, Viet Nam: GMS Biodiversity Conservation Corridor Project

Cambodia, Lao PDR, Viet Nam: GMS Biodiversity Conservation Corridor Project Initial Poverty and Social Assessment Project Number: 40253 September 2009 Cambodia, Lao PDR, Viet Nam: GMS Biodiversity Conservation Corridor Project Appendix 5 1 INITIAL POVERTY AND SOCIAL ANALYSIS

More information

Financing Agreement. (National Program for Community Empowerment in Rural Areas Project) between REPUBLIC OF INDONESIA. and

Financing Agreement. (National Program for Community Empowerment in Rural Areas Project) between REPUBLIC OF INDONESIA. and Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 4385-ID Public Disclosure Authorized Financing Agreement (National Program for Community Empowerment in Rural Areas Project) Public Disclosure

More information

GRANT APPLICATION GUIDELINES. Global Call for Proposals

GRANT APPLICATION GUIDELINES. Global Call for Proposals GRANT APPLICATION GUIDELINES Global Call for Proposals Table of Contents A. Call for Proposals: Participating Countries 2 B. GPSA Objectives and Scope 3 C. CSOs Eligibility Requirements 3 D. Selection

More information

Project Information Document/ Identification/Concept Stage (PID)

Project Information Document/ Identification/Concept Stage (PID) Public Disclosure Authorized The World Bank Public Disclosure Authorized Public Disclosure Authorized Project Information Document/ Identification/Concept Stage (PID) Concept Stage Date Prepared/Updated:

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Bangladesh Padma Multipurpose

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB7702 Project Name System Enhancement for Health Action in Transition (SEHAT) - Additional Financing Region SOUTH ASIA Country Afghanistan

More information

GUIDELINES FOR THE IMPLEMENTATION OF THE PUBLIC INVOLVEMENT POLICY

GUIDELINES FOR THE IMPLEMENTATION OF THE PUBLIC INVOLVEMENT POLICY GEF Council Meeting October 28 30, 2014 Washington, D.C. GEF/C.47/Inf.06 October 01, 2014 GUIDELINES FOR THE IMPLEMENTATION OF THE PUBLIC INVOLVEMENT POLICY TABLE OF CONTENTS Introduction... 1 Objectives

More information

UNFPA shall notify applying organizations whether they are considered for further action.

UNFPA shall notify applying organizations whether they are considered for further action. Invitation for Proposals UNFPA, United Nations Population Fund, an international development agency, invites qualified organizations to submit proposals for the implementation of projects and programmes

More information

Integrated Safeguards Data Sheet Identification / Concept Stage (ISDS)

Integrated Safeguards Data Sheet Identification / Concept Stage (ISDS) Public Disclosure Authorized The World Bank Public Disclosure Authorized Public Disclosure Authorized Integrated Safeguards Data Sheet Identification / Concept Stage (ISDS) Concept Stage Date ISDS Prepared/Updated:

More information

Empowering Youth Leaders to Counter Violent Extremism in Kenya and Nigeria. Call for Proposals 12,000 USD. 15 April 2018

Empowering Youth Leaders to Counter Violent Extremism in Kenya and Nigeria. Call for Proposals 12,000 USD. 15 April 2018 Empowering Youth Leaders to Counter Violent Extremism in Kenya and Nigeria Call for Proposals Opportunity name: Small Grants to Empower Youth Leaders to Counter Violent Extremism in Kenya and Nigeria Total

More information

Key Population Engagement in Global Fund

Key Population Engagement in Global Fund Key Population Engagement in Global Fund Country Dialogue CCMs and the 2017-2019 funding cycle 1 Key Population Engagement in Global Fund Country Dialogue CCMs and the 2017-2019 funding cycle This resource

More information

RETF: P (TF097410), P132585, and P (TF014769) BETF: P (TF092194)

RETF: P (TF097410), P132585, and P (TF014769) BETF: P (TF092194) PNPM Generasi Quarterly Progress Report: January to March 2014 Summary Information Status Active Activity Number RETF: P122032 (TF097410), P132585, and P147658 (TF014769) BETF: P111966 (TF092194) Task

More information

Financing Agreement. (National Program for Community Empowerment in Urban Areas Project) between REPUBLIC OF INDONESIA. and

Financing Agreement. (National Program for Community Empowerment in Urban Areas Project) between REPUBLIC OF INDONESIA. and Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 4384-ID Public Disclosure Authorized Financing Agreement (National Program for Community Empowerment in Urban Areas Project) Public Disclosure

More information

EU Grant Agreement DOC8UMEW. Public Disclosure Authorized GRANT NUMBER TF0A2379. Public Disclosure Authorized. (Access to Sustainable Energy Project)

EU Grant Agreement DOC8UMEW. Public Disclosure Authorized GRANT NUMBER TF0A2379. Public Disclosure Authorized. (Access to Sustainable Energy Project) Public Disclosure Authorized DOC8UMEW GRANT NUMBER TF0A2379 Public Disclosure Authorized Public Disclosure Authorized EU Grant Agreement (Access to Sustainable Energy Project) between INTERNATIONAL BANK

More information

BETF: P (TF and TF013728)

BETF: P (TF and TF013728) PNPM Urban in Aceh Quarterly Progress Report: January to March 2016 Summary Information Status Activity Number Task Team Leader(s) Executing Agency(ies) Active RETF: P131296 (TF012192) BETF: P131511 (TF012423

More information

Letter No. CD-399/PAMSIMAS/X/2013 October 30, 2013

Letter No. CD-399/PAMSIMAS/X/2013 October 30, 2013 Public Disclosure Authorized THE WORLD BANK I BANK DUNIA Sharing Development Solutions for an Emerging Indonesia OFFPCIAL LZ DOCUMENTS, Rodrigo A. Chaves Country Director, Indonesia Letter No. CD-399/PAMSIMAS/X/2013

More information

Vietnam Innovation Day 2011

Vietnam Innovation Day 2011 Vietnam Innovation Day 2011 Innovation for social equity and sustainable growth 1. General Introduction Competition Guidelines The Vietnam Innovation Day (VID) 2011, organized through the partnership of

More information

LEGEND. Challenge Fund Application Guidelines

LEGEND. Challenge Fund Application Guidelines LEGEND Challenge Fund Application Guidelines 24 th November, 2015 1 Contents 1. Introduction... 3 2. Overview of Challenge Fund... 3 2.1 Expected results... 3 2.2 Potential grantees... 4 2.3 Window structure...

More information

JAPAN SOCIAL DEVELOPMENT FUND (JSDF) Grant Funding Proposal (FY11 Round 33)

JAPAN SOCIAL DEVELOPMENT FUND (JSDF) Grant Funding Proposal (FY11 Round 33) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized A. BASIC DATA Beneficiary Country: Grant Name: Grant Recipient: JAPAN SOCIAL DEVELOPMENT

More information

Lessons Learned. Grant Management

Lessons Learned. Grant Management Lessons Learned Grant Management Introduction NSRP is a five year programme to support the initiatives of Nigerian actors and institutions to manage conflicts non-violently and reduce the impact of violent

More information

Contents. Australia Awards - PNG. Alumni Grants Scheme Guidelines / 00

Contents. Australia Awards - PNG. Alumni Grants Scheme Guidelines / 00 Contents Australia Awards - PNG Alumni Grants Scheme Guidelines / 00 Contents Contents Acronyms & Abbreviations... 1 Introduction... 1 Objectives... 2 Objective 1... 2 Objective 2... 2 Objective 3... 2

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Central African Backbone - APL2

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Central African Backbone - APL2 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Implementing Agency PROJECT INFORMATION

More information

Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS)

Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS) Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS) Concept Stage Date Prepared/Updated: 24-Mar-2017 Report : PIDISDSC20204 Public Disclosure Authorized Public Disclosure Authorized

More information

THE WORLD BANK IBRD * IDA WORLD BANK GROUP

THE WORLD BANK IBRD * IDA WORLD BANK GROUP Public Disclosure Authorized RODRIGO A. CHAVES Country Director, Indonesia THE WORLD BANK IBRD * IDA WORLD BANK GROUP Letter No. CD/I 04/ WB-REKOMPAK/V/2016 May 9, 2016 Public Disclosure Authorized Public

More information

STDF MEDIUM-TERM STRATEGY ( )

STDF MEDIUM-TERM STRATEGY ( ) STDF MEDIUM-TERM STRATEGY (2012-2016) 1. This Medium-Term Strategy sets outs the principles and strategic priorities that will guide the work of the Standards and Trade Development Facility (STDF) and

More information

Call for Proposals from NGOs INSTRUCTIONS

Call for Proposals from NGOs INSTRUCTIONS Call for Proposals from NGOs INSTRUCTIONS I. BACKGROUND UNDP partners with people at all levels of society to help build nations that can withstand crisis, and drive and sustain the kind of growth that

More information

REQUEST FOR APPLICATIONS (RFA-JAG ) Establish Fact Checking Services in Albania

REQUEST FOR APPLICATIONS (RFA-JAG ) Establish Fact Checking Services in Albania Justice for All Project REQUEST FOR APPLICATIONS (RFA-JAG-2017-005) Establish Fact Checking Services in Albania I. PROJECT DESCRIPTION USAID s Justice for All Project (hereinafter referred to as the Project

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy Public Disclosure Copy Date ISDS Prepared/Updated: 27-Mar-2014

More information

Anglo American Chairman s Fund Application Pack 2014

Anglo American Chairman s Fund Application Pack 2014 Anglo American Chairman s Fund Application Pack 2014 This Application pack contains the following: Funding principles Activities or sectors NOT considered for support Description of the Anglo American

More information

RETF: P (TF097410), P132585, and P (TF014769) BETF: P (TF092194)

RETF: P (TF097410), P132585, and P (TF014769) BETF: P (TF092194) PNPM GENERASI Quarterly Progress Report: July to September 214 Summary Information Status Activity Number Task Team Leader(s) Executing Agency(ies) Start date to Closing Date Geographic Coverage Approved

More information

The Foundation furthers its work to advance access to justice and opportunity through interrelated social change strategies, including:

The Foundation furthers its work to advance access to justice and opportunity through interrelated social change strategies, including: Grantmaking Guidelines Mission The Levi Strauss Foundation advances the human rights and well-- being of underserved people touched by our business by taking courageous risks, supporting innovative community

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 12/07/2010 INTEGRATED SAFEGUARDS DATASHEET

More information

Letter No: JA-204/JSDF/IV/2010 April 29, 2010

Letter No: JA-204/JSDF/IV/2010 April 29, 2010 Public Disclosure Authorized The World Bank 1818 H Street N.W. (202) 477-1234 INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Washington, D.C. 20433 Cable Address: INTBAFRAD CONFORMED COPY Letter

More information

FRAMEWORK OPERATIONAL GUIDELINES THE DEDICATED GRANT MECHANISM FOR INDIGENOUS PEOPLES AND LOCAL COMMUNITIES (DGM)

FRAMEWORK OPERATIONAL GUIDELINES THE DEDICATED GRANT MECHANISM FOR INDIGENOUS PEOPLES AND LOCAL COMMUNITIES (DGM) FRAMEWORK OPERATIONAL GUIDELINES THE DEDICATED GRANT MECHANISM FOR INDIGENOUS PEOPLES AND LOCAL COMMUNITIES (DGM) THE FOREST INVESTMENT PROGRAM September 12, 2013 Table of Contents Executive Summary...

More information

United Nations Democracy Fund Project Proposal Guidelines 11 th Round of Funding

United Nations Democracy Fund Project Proposal Guidelines 11 th Round of Funding United Nations Democracy Fund Project Proposal Guidelines 11 th Round of Funding 15 November 15 December 2016 Summary The present guidelines describe the application procedure for the Eleventh Round of

More information

Grantee Operating Manual

Grantee Operating Manual Grantee Operating Manual 1 Last updated on: February 10, 2017 Table of Contents I. Purpose of this manual II. Education Cannot Wait Overview III. Receiving funding a. From the Acceleration Facility b.

More information

Procedure: PR/IN/04 May 21,2012. Procedure: Accreditation of GEF Project Agencies

Procedure: PR/IN/04 May 21,2012. Procedure: Accreditation of GEF Project Agencies Procedure: PR/IN/04 May 21,2012 Procedure: Accreditation of GEF Project Agencies 1 Summary: This paper sets forth the key procedures for the accreditation of GEF Project Agencies. Background: The present

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized March 2009 2 PROGRESS REPORT PSF SUPPORT FACILITY Foreword Despite the deepening global

More information

INNOVATIONS IN FINANCE INDONESIA

INNOVATIONS IN FINANCE INDONESIA INNOVATIONS IN FINANCE INDONESIA Confronting challenges with new approaches The Global Partnership on Output-Based Aid (GPOBA) and its partners apply innovative results-based financing solutions that align

More information

Terms of Reference Approved 30 April 2015/ Revised 29 September 2016

Terms of Reference Approved 30 April 2015/ Revised 29 September 2016 COORDINATION DESK Terms of Reference Approved 30 April 2015/ Revised 29 September 2016 1. Introduction This document 1 describes the roles and working procedures for the Actors involved in the 10YFP Sustainable

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy Public Disclosure Copy Date ISDS Prepared/Updated: 16-Mar-2016

More information

Global Partnership on Output-based Aid Grant Agreement

Global Partnership on Output-based Aid Grant Agreement Public Disclosure Authorized CONFORMED COPY GPOBA GRANT NUMBER TF096551-BD Public Disclosure Authorized Global Partnership on Output-based Aid Grant Agreement (Rural Electrification and Renewable Energy

More information

GLOBAL PARTNERSHIP FOR SOCIAL ACCOUNTABILITY OPERATIONS MANUAL

GLOBAL PARTNERSHIP FOR SOCIAL ACCOUNTABILITY OPERATIONS MANUAL GLOBAL PARTNERSHIP FOR SOCIAL ACCOUNTABILITY OPERATIONS MANUAL JANUARY 29 TH, 2013 Abbreviations and Acronyms AFR Africa Region BETF Bank-executed trust fund CAS Country Assistance Strategy or Country

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 18-Nov-2015

More information

AUDIT OF THE UNDP AMKENI WAKENYA PROGRAMME KENYA. Report No Issue Date: 10 January 2014

AUDIT OF THE UNDP AMKENI WAKENYA PROGRAMME KENYA. Report No Issue Date: 10 January 2014 UNITED NATIONS DEVELOPMENT PROGRAMME AUDIT OF THE UNDP AMKENI WAKENYA PROGRAMME IN KENYA Report No. 1246 Issue Date: 10 January 2014 Table of Contents Executive Summary i I. Introduction 1 II. About the

More information

Terms of Reference. Consultancy to support the Institutional Strengthening of the Frontier Counties Development Council (FCDC)

Terms of Reference. Consultancy to support the Institutional Strengthening of the Frontier Counties Development Council (FCDC) Terms of Reference Consultancy to support the Institutional Strengthening of the Frontier Counties Development Council (FCDC) 1. Introduction August 2016 to August 2018 1. Supporting Kenya s devolution

More information

GRANT AGREEMENT (ADB Strategic Climate Fund) (Greater Mekong Subregion Biodiversity Conservation Corridors Project Additional Financing)

GRANT AGREEMENT (ADB Strategic Climate Fund) (Greater Mekong Subregion Biodiversity Conservation Corridors Project Additional Financing) GRANT NUMBER 0426-CAM (SCF) GRANT AGREEMENT (ADB Strategic Climate Fund) (Greater Mekong Subregion Biodiversity Conservation Corridors Project Additional Financing) (Cambodia Component) between KINGDOM

More information

Instructions for completing the CFC Application Form

Instructions for completing the CFC Application Form THE COMMON FUND FOR COMMODITIES 8 TH OPEN CALL FOR PROPOSALS Instructions for completing the CFC Application Form CFC does not charge any fees during the application procedure. However, on approval of

More information

Third Quarterly Progress Report

Third Quarterly Progress Report Ethiopia Protection of Basic Services Social Accountability Program Grant Agreement [TF099878] Third Quarterly Progress Report October 2012 (Version 29 October 2012) 1 Table of Content List of abbreviations...

More information

Microfinance for Rural Piped Water Services in Kenya

Microfinance for Rural Piped Water Services in Kenya Policy Note No.1 Microfinance for Rural Piped Water Services in Kenya Using an Output-based Aid Approach for Leveraging and Increasing Sustainability by Meera Mehta and Kameel Virjee The water sector in

More information

United Nations Democracy Fund Project Proposal Guidelines 12 th Round of Funding. 20 November 20 December Summary

United Nations Democracy Fund Project Proposal Guidelines 12 th Round of Funding. 20 November 20 December Summary United Nations Democracy Fund Project Proposal Guidelines 12 th Round of Funding 20 November 20 December 2017 Summary The present guidelines describe the application procedure for the Twelfth Round of

More information

Equality & Rights Action Plan

Equality & Rights Action Plan Equality & Action Plan 2013-17 This document outlines the actions we will take to work towards our Equality & Outcomes. Outcomes not processes An outcome is an end result, for example having staff who

More information

Cities Alliance: Standard Operating Procedures

Cities Alliance: Standard Operating Procedures Document Version Final Date Last updated Prepared by Approved by Cities Alliance Secretariat Cities Alliance Management Board and Assembly Table of Contents Abbreviations and Acronyms...4 Glossary of Terms...5

More information

Indonesia - FCPF Readiness Preparation Grant FCPFR - Forest Carbon Partnership Facility

Indonesia - FCPF Readiness Preparation Grant FCPFR - Forest Carbon Partnership Facility Assignment: TF099721 Indonesia - FCPF Readiness Preparation Grant FCPFR - Forest Carbon Partnership Facility Task Team Leader: 00000235980 Approving Manager: 00000066054 - Ann Jeannette Glauber - Iain

More information

Terms of Reference (TOR) for Independent End of Project Evaluation

Terms of Reference (TOR) for Independent End of Project Evaluation Terms of Reference (TOR) for Independent End of Project Evaluation Project Name Increasing the provision of clean energy in Uganda hereafter referred to as Clean Energy Project Project Number(s) ESARPO0218;

More information

Call for Proposals for small grants

Call for Proposals for small grants ACCESS TO JUSTICE AND RULE OF LAW PROJECT Call for Proposals for small grants CSOs/NGOs implementation of grants to establish community based entry point to referral pathways through the engagement and

More information

MENTOR UP REQUEST FOR PROPOSALS. Grant Opportunity. Application Deadline: November 13, 2015

MENTOR UP REQUEST FOR PROPOSALS. Grant Opportunity. Application Deadline: November 13, 2015 I. AARP Foundation Overview MENTOR UP REQUEST FOR PROPOSALS Grant Opportunity Application Deadline: November 13, 2015 AARP Foundation exists to solve the fundamental challenges that stand in the way of

More information

The hallmarks of the Global Community Engagement and Resilience Fund (GCERF) Core Funding Mechanism (CFM) are:

The hallmarks of the Global Community Engagement and Resilience Fund (GCERF) Core Funding Mechanism (CFM) are: (CFM) 1. Guiding Principles The hallmarks of the Global Community Engagement and Resilience Fund (GCERF) Core Funding Mechanism (CFM) are: (a) Impact: Demonstrably strengthen resilience against violent

More information

SGP. Small Grants Programme (GEF SGP) Global Environment Facility SOUTH AFRICA. implemented by United Nations Development Programme (UNDP)

SGP. Small Grants Programme (GEF SGP) Global Environment Facility SOUTH AFRICA. implemented by United Nations Development Programme (UNDP) Global Environment Facility Small Grants Programme (GEF SGP) implemented by United Nations Development Programme (UNDP) SGP environmental affairs Department: Environmental Affairs SOUTH AFRICA Community

More information

Primary education (46%); Secondary education (26%); Public administration- Education (16%); Tertiary education (12%) Project ID

Primary education (46%); Secondary education (26%); Public administration- Education (16%); Tertiary education (12%) Project ID Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB5401 General

More information

Cities Alliance: Standard Operating Procedures

Cities Alliance: Standard Operating Procedures Cities Alliance: Standard Operating Procedures Last updated 12 November 2013 Cities Alliance: Standard Operating Procedures 12 November 2013 Table of Contents Abbreviations and Acronyms...4 Glossary of

More information

Civil Society and local authorities thematic programme South Africa- CSO call for proposals

Civil Society and local authorities thematic programme South Africa- CSO call for proposals This is the presentation done at the information session on 27 January 2016 in Pretoria. Only the information provided the Call for proposals guidelines and the annexes documents constitute the sole authentic

More information