1 Engineering Sanitary Sewer Prepared by: Rich Davidson, Director Assisted by: Mary Phelps Verle Holland Steven Tam Andy Yeung Gina De la Torre Serenity Cummings

2 Engineering Department Sanitary Sewer Mission: To provide continuous operations and maintenance of the City of Richmond Municipal Sewer District conveyance system for domestic, commercial and industrial wastewater in the Richmond area of Contra Costa County Overview: Sewer Drain Improvements The Wastewater program of the Engineering Division is to Rehabilitate and provide preventative maintenance to the subsurface network of pipes and conduits. This division is also responsible for ensuring compliance with the City s Wastewater Discharge Permit (Order No , NPDES permit CA ) issued by the Regional Water Quality Control Board San Francisco Bay Region. The related appurtenances include more than 250 miles of underground pipes and remote sanitary sewage life stations and an FM telemetry system. This program is organized via a 20-year contract with Veolia Water North America under the direction of the City Engineer. Treatment Plant The majority of funds in the Sanitary Sewer System Capital Program are used to construct sewer improvement projects. Construction projects in the Proposed CIP fall into one of two categories: (a) enhance sewer capacity in substantially built-out areas and/or less developed areas; or (b) rehabilitate existing sewers, with higher priorities given to those with extensive, severe deterioration. A project that will enhance capacity and rehabilitate existing sewers is considered a rehabilitation project for the purpose of this budget. Emphasis is placed on larger lines within each category. Sources of Funding Wastewater Bond ($17,173,199) Digester Tank E-1

3 Program Highlights Sanitary Sewer Collections San Pablo Ave/Solano & Bissell Avenues FY FY2008 The long-term goal of this project is to prevent bottlenecking in the sanitary sewer system. This will be accomplished by increasing the pipe size to prevent the possibility of exceeding the systems hydraulic capacity, which could result in a Sanitary Sewer Overflow. (Program Cost $1,566,000) Sanitary Sewer Manhole Rehabilitation FY FY2011 This is an on-going project over a 10 year life cycle, which will be funded by the Wastewater Bond. The purpose of this project is to remedy the existing problems of deteriorated manholes which could result in Inflow and Infiltration in the collection system. (Program Cost $552,700) Harbour Way Hall Ave & Marina Way South Tidal Groundwater Infiltration Rehabilitation Project FY2006-FY2007 This area has been identified as a main source of tidal inflow and infiltration (I&I) as indicated in the Wet Weather Flow study. (Program Cost $1,500,000) First Street between Cutting Blvd and Macdonald Avenue FY FY2008 This area has been identified as a hot-spot for sanitary sewer problems (back-ups, bottleneck, etc.), as indicated from the Closed Circuit Televising [CCTV] (Program Cost $2,500,000) I-580 Castro Street FY2006 FY2007 This area has been identified as a hot-spot for sanitary sewer problems (back-ups, bottleneck, etc.) (Program Cost $1,000,000) Performance Measures A set of performance measures have been designed to set goals and meet target dates. The performance levels established are for Wastewater s Capital program. There is also contract language with milestones and deadlines for completion. Completion of Capital project within two (2) months of the approved schedule; Keep the budget costs for the Capital projects within the adopted budget; Better project delivery costs for construction costs; Contract language milestones; The sanitary sewer collection system s priority is always to comply with all local, state and federal Regulatory Agency requirements. This will be accomplished by Staff participating in off-site conferences, trainings, and workshops. E-2

4 Engineering Department Sanitary Sewer FY through FY CIP yr Strategic Goals 5yr Goal 1-yr Target Estimate 1-yr Target 2-yr Target Performance Outcome: 1 - % of CIP projects delivered within 2 months of approved baseline schedule 2 - % of CIP projects that are completed** within the approved baseline budget 85% 85% 75% 85% 85% 90% 90% 85% 90% 90% 3 - Project delivery costs (exclusive of city-wide overhead) as % of the total construction costs for completed costs: less than $500,000-30% 30% 35% 30% 30% between $500,000 and $3M- 25% 25% 28% 25% 25% greater than $3M- 15% 15% 20% 15% 15% Total (all construction costs) 4 - % of operations and maintenance divisions rating new or rehabilitated capital facilities as being functional and sustainable after first year of use 5 - % of customers rating new or rehabilitated CIP projects as meeting established goals (4 or better based on a scale of 1-5) 80% 80% 80% 80% 80% 85% 85% 85% 85% 85% Notes: * Projects are considered to be "delivered" when they are available for their intended use. ** Projects are considered to be "completed" when the final cost accounting has occurred and the project has been accepted. ***Not applicable. E-3

5 City of Richmond FY FY CIP 3b. Sanitary Sewer Prior Year Project Name FY FY FY FY FY FY Year Total 1 San Pablo Ave/ Solano & Bissell Mainline Replacement $763,900 $802,100 $1,566,000 2 Sanitary Sewer Manhole Rehabilitation $100,000 $105,000 $110,300 $115,800 $121,600 $552,700 3 Potrero Ave/ 20th & Marina Bay Mainline Replacement $126,075 $126, st Street b/t Chansler & Ohio Mainline Replacement $108,750 $108, Castro NW/ Western Dr. Off Ramp $488,580 $488,580 Subtotal Sanitary Sewer $1,478,555 $1,015,850 $110,300 $115,800 $121,600 $2,842,105 Total Funded $1,478,555 $1,015,850 $110,300 $115,800 $121,600 $2,842,105 Total Unfunded Sources WW Bond Fund $1,478,555 $1,015,850 $110,300 $115,800 $121,600 $2,842,105 Total Sanitary Sewer $1,478,555 $1,015,850 $110,300 $115,800 $121,600 $2,842,105

6 Richmond 2006/ /11 Capital Improvement Program Project Description Report Project Name: Project Manager: Department Responsible: Project Description: San Pablo Ave. between Solano & Bissell Avenues - sanitary sewer mainline replacement Rich Davidson Engineering - Wastewater Collections Remove 4,500 feet of 10-inch line and replace with 15-inch line at San Pablo Ave. between Solano and Bissell Avenues. Justification: 2006 Sanitary Sewer Master Plan. Total Estimated Cost: $1,566,000 Source Of Funding Fund No Fund Name Requested FY Projected FY 07/08 Projected FY 08/09 Projected FY 09/10 Projected FY 10/11 06/ WWB WW Fund $763,900 $802,100 1

7 Richmond 2006/ /11 Capital Improvement Program Project Description Report Project Name: Project Manager: Department Responsible: Project Description: Sanitary Sewer Manhole Rehabilitation Rich Davidson Engineering - Wastewater Collections Annual funding for rehabilitation of deteriorated sanitary sewer manholes. Justification: Reduce inflow and infiltration. Total Estimated Cost: $552,700 Source Of Funding Fund No Fund Name Requested FY Projected FY 07/08 Projected FY 08/09 Projected FY 09/10 Projected FY 10/11 06/ WWB WW Fund $100,000 $105,000 $110,300 $115,800 $121,600 1

8 Richmond 2006/ /11 Capital Improvement Program Project Description Report Project Name: Project Manager: Department Responsible: Project Description: Potrero Ave. between 20th St. & Marina Way So. - sanitary sewer mainline replacement Rich Davidson Engineering - Wastewater Collections Replace existing 790 feet of 6-inch line with 10-inch line at Potrero Ave. between 20th St. & Marina Way So. Justification: 2006 Sanitary Sewer Master Plan. Total Estimated Cost: $126,075 Source Of Funding Fund No Fund Name Requested FY Projected FY 07/08 Projected FY 08/09 Projected FY 09/10 Projected FY 10/11 06/ WWB WW Fund $126,075 1

9 Richmond 2006/ /11 Capital Improvement Program Project Description Report Project Name: Project Manager: Department Responsible: Project Description: 1st St. between Chanslor Ave. and 250 feet north of Ohio Ave. - sanitary sewer mainline replacement Rich Davidson Engineering - Wastewater Collections Replace existing 350 feet of 20-inch line with 24-inch line at 1st St. between Chanslor Ave. and 250 feet north of Ohio Ave. Justification: 2006 Sanitary Sewer Master Plan. Total Estimated Cost: $108,750 Source Of Funding Fund No Fund Name Requested FY Projected FY 07/08 Projected FY 08/09 Projected FY 09/10 Projected FY 10/11 06/ WWB WW Fund $108,750 1

10 Richmond 2006/ /11 Capital Improvement Program Project Description Report Project Name: 580 Freeway from west of Castro St. northwest to 1,700 feet east of the 580 Freeway/Western Dr. off ramp - sanitary sewer mainline replacement Project Manager: Department Responsible: Project Description: Rich Davidson Engineering - Wastewater Collections Replace existing 2,344 feet of 6-inch line and 12-inch line with 15-inch line at John T. Knox Freeway (580) west starting 1,300 feet west of Castro St. on the north side of 580 Freeway, then northwest and parallel to 580 Freeway to 1,700 feet east of the 580 Freeway/Western Dr. off ramp. Justification: 2006 Sanitary Sewer Master Plan. Total Estimated Cost: $488,580 Source Of Funding Fund No Fund Name Requested FY Projected FY 07/08 Projected FY 08/09 Projected FY 09/10 Projected FY 10/11 06/ WWB WW Fund $488,580 1

1. The purpose of this Program is to provide a framework for asset management of separate sanitary sewer systems to meet the following goals:

1. The purpose of this Program is to provide a framework for asset management of separate sanitary sewer systems to meet the following goals: ARTICLE 8. INFILTRATION / INFLOW CONTROL PROGRAM 800. Introduction The separate sanitary sewers within the District s service area are designed and intended to receive and convey only domestic and industrial

More information

THE ROSE GARDEN LIBRARY CLOSES AT 7:00PM

THE ROSE GARDEN LIBRARY CLOSES AT 7:00PM THE ROSE GARDEN LIBRARY CLOSES AT 7:00PM If you are parked in the library s garage, PLEASE MOVE YOUR CAR TO THE STREET, right away, so your car doesn t get locked in the garage until the library opens

More information

REQUEST FOR PROPOSAL

REQUEST FOR PROPOSAL Ithaca Area WWTF 525 Third Street Ithaca, New York 14850 Phone (607) 273-8381 Fax (607) 273-8433 REQUEST FOR PROPOSAL PROFESSIONAL ENGINEERING SERVICES FOR DESIGN AND INSTALLATION OF FLOW MONITORING STATIONS

More information

MASSACHUSETTS WATER RESOURCES AUTHORITY

MASSACHUSETTS WATER RESOURCES AUTHORITY MASSACHUSETTS WATER RESOURCES AUTHORITY REGIONAL INFILTRATION/INFLOW SEPTEMBER 2002 Table of Contents 1. Introduction 1.1. Background...1 1.2. Description of the Regional I/I Problem...1 1.3. MWRA Initial

More information

Figure 1: ALCOSAN ORGANIZATION CHART

Figure 1: ALCOSAN ORGANIZATION CHART Allegheny County Sanitary Authority (ALCOSAN) REQUEST FOR QUALIFICATIONS For Engineering and Architectural Design Services, As Needed Various Small to Mid-Size Capital Projects March 2018 1.0 INTRODUCTION

More information

City of Culver City. Staff Report

City of Culver City. Staff Report City of Culver City City Hall 9770 Culver Blvd. Culver City, CA 90232 (310) 253-5851 Staff Report File #: 18-0499, Version: 1 CC - Approval of Professional Services Agreement with Tetra Tech for the Design

More information

STATE WATER RESOURCES CONTROL BOARD

STATE WATER RESOURCES CONTROL BOARD STATE WATER RESOURCES CONTROL BOARD MONITORING AND REPORTING PROGRAM NO. 2006-0003 STATEWIDE GENERAL WASTE DISCHARGE REQUIREMENTS FOR SANITARY SEWER SYSTEMS This Monitoring and Reporting Program (MRP)

More information

DOTHAN CLEAN WATERS PROGRAM CITY COMMISSION UPDATE

DOTHAN CLEAN WATERS PROGRAM CITY COMMISSION UPDATE City of Dothan, Alabama DOTHAN CLEAN WATERS PROGRAM CITY COMMISSION UPDATE PRESENTED : February 19, 2013 Program Overview MOM Programs Capacity Assurance Program Information Management System Omussee WWTP

More information

PRIORITIZATION MODEL RESULTS SANITARY Prioritization Project Prioritization Rank Name Score 1 Facilities Renovation Offset Mitigation 58.

PRIORITIZATION MODEL RESULTS SANITARY Prioritization Project Prioritization Rank Name Score 1 Facilities Renovation Offset Mitigation 58. PRIORITIZATION MODEL RESULTS SANITARY itization Project itization Rank Name Score 1 Facilities Renovation 80.77 2 Offset Mitigation 58.60 3 Sanitary Sewer Lining Projects 53.97 4 Sanitary Sewer Collection

More information

Fort Monroe Authority. Capital Improvement Plan Fiscal Years 2017 Through 2022

Fort Monroe Authority. Capital Improvement Plan Fiscal Years 2017 Through 2022 Fort Monroe Authority Capital Improvement Plan Fiscal Years 2017 Through 2022 December 2016 Cover image credit: ational Park Service December 2016 Project Cost Summary Five Year CIP Project Appropriations

More information

CWSRF Intended Use Plan

CWSRF Intended Use Plan State of Alabama Alabama Department of Environmental Management Clean Water State Revolving Fund (CWSRF) Program SRF Section (334) 271-7796 Permits and Services Division (334) 271-7950 FAX Alabama Department

More information

CITY OF BUENA PARK SEWER SYSTEM MANAGEMENT PLAN

CITY OF BUENA PARK SEWER SYSTEM MANAGEMENT PLAN CITY OF BUENA PARK SEWER SYSTEM MANAGEMENT PLAN Updated Originally Submitted August 2, 2009 LIST OF ABBREVIATIONS/ACRONYMS... 4 EXECUTIVE SUMMARY... 5 CHAPTER 1 PROHIBITIONS AND PROVISIONS... 6 1.1 Prohibitions...

More information

3-Party Consent Decree Status Report: Quarter No

3-Party Consent Decree Status Report: Quarter No DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY Serving the Public Protecting the Environment 3-Party Consent Decree Status Report: Quarter No. 1-2018 Civil Action No. 1:00CV00183TFH Civil Action No. 02-2511

More information

SIGNIFICANT NONCOMPLIANCE OF WASTEWATER DISCHARGE LIMITS... 3 NONCOMPLIANCE NOTIFICATION (NCN)... 4 NOTICE OF VIOLATION (NOV)... 4

SIGNIFICANT NONCOMPLIANCE OF WASTEWATER DISCHARGE LIMITS... 3 NONCOMPLIANCE NOTIFICATION (NCN)... 4 NOTICE OF VIOLATION (NOV)... 4 TABLE OF CONTENTS SIGNIFICANT NONCOMPLIANCE OF WASTEWATER DISCHARGE LIMITS... 3 NONCOMPLIANCE NOTIFICATION (NCN)... 4 NOTICE OF VIOLATION (NOV)... 4 SCHEDULE OF COMPLIANCE... 5 ADMINISTRATIVE PENALTIES...

More information

AGENDA SPARTANBURG SANITARY SEWER DISTRICT COMMISSION REGULAR MEETING. MEETING PLACE: 200 Commerce Street. Tuesday, August 28, 2018, 2:15 p.m.

AGENDA SPARTANBURG SANITARY SEWER DISTRICT COMMISSION REGULAR MEETING. MEETING PLACE: 200 Commerce Street. Tuesday, August 28, 2018, 2:15 p.m. AGENDA SPARTANBURG SANITARY SEWER DISTRICT COMMISSION REGULAR MEETING MEETING PLACE: 200 Commerce Street, 2:15 p.m. This is a regular meeting of the Spartanburg Sanitary Sewer District Commission. Written

More information

City of Los Angeles Department of Public Works Bureau of Sanitation (LASAN) On-call Consultant Services Contract

City of Los Angeles Department of Public Works Bureau of Sanitation (LASAN) On-call Consultant Services Contract City of Los Angeles Department of Public Works Bureau of Sanitation (LASAN) On-call Consultant Services Contract Task Order Solicitation (TOS) SN-93 for Concept Report Revisions for Three Downtown and

More information

NYC S GREEN INFRASTRUCTURE PROGRAM AND USE OF GRANT FUNDING FOR DESIGN & CONSTRUCTION

NYC S GREEN INFRASTRUCTURE PROGRAM AND USE OF GRANT FUNDING FOR DESIGN & CONSTRUCTION NYC S GREEN INFRASTRUCTURE PROGRAM AND USE OF GRANT FUNDING FOR DESIGN & CONSTRUCTION June 19, 2013 Nitin Katiyar, P.E. (HDR Engineering) nitin.katiyar@hdrinc.com William Leo, P.E. (HDR Engineering) william.leo@hdrinc.com

More information

BEFORE THE STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION

BEFORE THE STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION BEFORE THE STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION Style Definition: Header STATE OF FLORIDA, DEPARTMENT ) IN THE OFFICE OF THE OF ENVIRONMENTAL PROTECTION ) SOUTHEAST DISTRICT ) v. ) OGC

More information

CCHS Health Care for the Homeless Co-Applicant Governing Board

CCHS Health Care for the Homeless Co-Applicant Governing Board CCHS Health Care for the Homeless Co-Applicant Governing Board WEDNESDAY, JANUARY 18, 2017 11:00AM- 12:30PM 597 CENTER AVENUE CONFERENCE ROOM 120 MARTINEZ, CA 94553 HCH Respite Care Center Presentation

More information

The requirements for the Organization element of the SSMP are:

The requirements for the Organization element of the SSMP are: 2.0 ORGANIZATION 2.1 Introduction This section of the identifies District staff responsible for implementing this, responding to SSO events, and meeting the SSO reporting requirements. This section also

More information

THE CITY OF SAN MATEO/ESTERO MUNICIPAL IMPROVEMENT DISTRICT WASTE WATER TREATMENT PLANT Request for Qualification 2015 Design Theme Competition San

THE CITY OF SAN MATEO/ESTERO MUNICIPAL IMPROVEMENT DISTRICT WASTE WATER TREATMENT PLANT Request for Qualification 2015 Design Theme Competition San THE CITY OF SAN MATEO/ESTERO MUNICIPAL IMPROVEMENT DISTRICT WASTE WATER TREATMENT PLANT Request for Qualification 2015 Design Theme Competition San Mateo, CA sustainable Sustainable Nature Innovation DESIGN

More information

THE ROSE GARDEN LIBRARY CLOSES AT 7:00PM

THE ROSE GARDEN LIBRARY CLOSES AT 7:00PM THE ROSE GARDEN LIBRARY CLOSES AT 7:00PM If you are parked in the library s garage, PLEASE MOVE YOUR CAR TO THE STREET, right away, so your car doesn t get locked in the garage until the library opens

More information

DEFENSE LOGISTICS AGENCY WASTEWATER TREATMENT SYSTEMS. Report No. D March 26, Office of the Inspector General Department of Defense

DEFENSE LOGISTICS AGENCY WASTEWATER TREATMENT SYSTEMS. Report No. D March 26, Office of the Inspector General Department of Defense DEFENSE LOGISTICS AGENCY WASTEWATER TREATMENT SYSTEMS Report No. D-2001-087 March 26, 2001 Office of the Inspector General Department of Defense Form SF298 Citation Data Report Date ("DD MON YYYY") 26Mar2001

More information

REPORT TO THE CHIEF ADMINISTRATIVE OFFICER FROM THE DEVELOPMENT AND ENGINEERING SERVICES DEPARTMENT

REPORT TO THE CHIEF ADMINISTRATIVE OFFICER FROM THE DEVELOPMENT AND ENGINEERING SERVICES DEPARTMENT October 19, 2016 REPORT TO THE CHIEF ADMINISTRATIVE OFFICER FROM THE DEVELOPMENT AND ENGINEERING SERVICES DEPARTMENT ON APPLICATIONS TO THE CLEAN WATER AND WASTEWATER FUND PURPOSE To seek Council's authorization

More information

I. Background. Definitions

I. Background. Definitions Public Water Utility and Sanitary Sewer Utility Extensions to Existing Developed Property Policy City of Dublin, Ohio, USA As adopted by Dublin City Council on December 7, 2015 I. Background Dublin City

More information

Inkspot GREETINGS FROM THE PRESIDENT. March 2007

Inkspot GREETINGS FROM THE PRESIDENT. March 2007 Inkspot March 2007 GREETINGS FROM THE PRESIDENT After a relatively dry winter the rain has finally come! Hope everyone has its Sewer System Management Plan in place. On February 2, eleven leaders consisting

More information

INVITATION FOR EXPRESSION OF INTEREST

INVITATION FOR EXPRESSION OF INTEREST MINISTRY OF ENERGY AND PUBLIC UTILITIES REPUBLIC OF MAURITIUS WASTEWATER MANAGEMENT AUTHORITY INVITATION FOR EXPRESSION OF INTEREST FOR Consultancy Services for the Assessment of the Port Louis CONTRACT

More information

AGENDA. 1603rd MEETING OF THE BOARD OF TRUSTEES THE METROPOLITAN ST. LOUIS SEWER DISTRICT

AGENDA. 1603rd MEETING OF THE BOARD OF TRUSTEES THE METROPOLITAN ST. LOUIS SEWER DISTRICT AGENDA Pg 1 1603rd MEETING OF THE BOARD OF TRUSTEES THE METROPOLITAN ST. LOUIS SEWER DISTRICT March 8, 2018 4:45 P.M. PENSION MEETING IN MKT 110 5:00 P.M. ROLL CALL & PUBLIC BOARD MEETING MSD OFFICES 2350

More information

Major in FY2013/2014 (By and ing Source) Municipal Building Acquisition and Operations Balance $1,984, Contributions from Real Estate

Major in FY2013/2014 (By and ing Source) Municipal Building Acquisition and Operations Balance $1,984, Contributions from Real Estate Major in FY2013/2014 (By and ing Source) Environmental Services Solid Waste 4200 4200 06CON 4200 SWM01 Balance $13,753,504.00 Balance $4,631,754.00 Balance $2,738,918.00 ing Source Total: $21,124,176.00

More information

4/14/2017. Green Infrastructure Funding Opportunities

4/14/2017. Green Infrastructure Funding Opportunities Green Infrastructure Funding Opportunities CDRPC Grant Funding Workshop Hudson Valley Community College, Troy, NY April 12, 2017 EFC Overview Public benefit corporation that provides low-cost capital and

More information

j Water Utility Authority

j Water Utility Authority A Albuquerque Bernalillo County j Water Utility Authority PO Box 568 Albuquerque, NM 87103 505 768 2500 www.abcwua.org FEDERAL EXPRESS Chair Art De La Cruz Commissioner, District 2 Vice Chair Rey Garduho

More information

Clean Water Intended Use Plan

Clean Water Intended Use Plan 2007 Clean Water Intended Use Plan Inside Intended Use Plan Section 1: Introduction 1 Section 2: Funding Sources and Uses 1 Section 3: Goals 2 Section 4: Method and Criteria for Distributing Arizona's

More information

SEPTIC MAINTENANCE PROGRAM RULES (ARTICLE 10)

SEPTIC MAINTENANCE PROGRAM RULES (ARTICLE 10) SEPTIC MAINTENANCE PROGRAM RULES (ARTICLE 10) Catskill Watershed Corporation PO Box 569 Margaretville, NY 12455 (845) 586-1400 Approved by the Board of Directors October 28, 2003 Revised August 2, 2016

More information

REQUEST FOR PROPOSALS FOR. Jed Smith Pipeline Replacement Project

REQUEST FOR PROPOSALS FOR. Jed Smith Pipeline Replacement Project REQUEST FOR PROPOSALS FOR Jed Smith Pipeline Replacement Project PROPOSALS DUE by 3:00 p.m., Monday, October 31, 2016 LAS VIRGENES MUNICIPAL WATER DISTRICT 4232 LAS VIRGENES ROAD CALABASAS, CA 91302 818.251.2100

More information

K Sewer Inspection, Operation, and Reporting Services

K Sewer Inspection, Operation, and Reporting Services K600-17 Sewer Inspection, Operation, and Reporting Services Fred Szabo, Interim Director Department of Port Control PRE-QUALIFICATION MEETING AGENDA 1. Introduction 2. Project Description 3. Scope of Services

More information

FY 2016 Capital Improvement Program (CIP) BOWC Update. March 4, 2015

FY 2016 Capital Improvement Program (CIP) BOWC Update. March 4, 2015 FY 2016 Capital Improvement Program (CIP) BOWC Update March 4, 2015 FY 2016 CIP CIP Development Process 1 FY 2016 CIP Development Process Annually the CIP is reviewed and updated to recommend capital improvements

More information

The DRC Outside Agency Review/Approval Checklist is also available for your convenience.

The DRC Outside Agency Review/Approval Checklist is also available for your convenience. Updated: 4/25/06 DEVELOPMENT REVIEW COMMITTEE OUTSIDE AGENCY CONTACT INFORMATION This following list of permitting requirements and contact information was created to assist developers and design professionals

More information

A-3 RECLAMATION NOTICE OF AVAILABILITY

A-3 RECLAMATION NOTICE OF AVAILABILITY A-3 RECLAMATION NOTICE OF AVAILABILITY Los Vaqueros Reservoir Expansion Project February 2009 Draft EIS/EIR 4310-MN-P DEPARTMENT OF THE INTERIOR Bureau of Reclamation Los Vaqueros Reservoir Expansion,

More information

Five-Year Capital Improvement Plan

Five-Year Capital Improvement Plan Five-Year 2017-2022 Capital Improvement Plan Presentation to Board of Supervisors of Sonoma County and Board of Directors of the Sonoma County Water Agency Presented by County Administrator s Office and

More information

DAILY & WOODS A PROFESSIONAL LfMlTED LIABILITY COMPANY ATTORNEYS AT LAW

DAILY & WOODS A PROFESSIONAL LfMlTED LIABILITY COMPANY ATTORNEYS AT LAW JERRY L. CANFIELD, P.A. THOMASA. DAILY, P.A. WYM&.NR. WADE, JR., P.A. DOUGLAS M. CARSON, P.A. C. MICHAEL DATL Y, P.A. t COLBY T. ROE, P.A MICHAEL A. LAFRENIERE t Also Licensed in Oklahoma Also Licensed

More information

Request for Proposal. 23rd Street Streetscape Improvement Project. Richmond Community Redevelopment Agency. Request for Proposal for: July 2007

Request for Proposal. 23rd Street Streetscape Improvement Project. Richmond Community Redevelopment Agency. Request for Proposal for: July 2007 Request for Proposal Richmond Community Redevelopment Agency Request for Proposal for: 23rd Street Streetscape Improvement Project July 2007 Richmond Community Redevelopment Agency 1401 Marina Way South

More information

REGIONAL WATER & SEWER DISTRICT FEASIBILITY STUDY, PETITION, AND PLAN OF OPERATION REQUEST FOR PROPOSALS

REGIONAL WATER & SEWER DISTRICT FEASIBILITY STUDY, PETITION, AND PLAN OF OPERATION REQUEST FOR PROPOSALS REGIONAL WATER & SEWER DISTRICT FEASIBILITY STUDY, PETITION, AND PLAN OF OPERATION REQUEST FOR PROPOSALS This Request for Proposal (RFP) is for professional legal services required to prepare and furnish

More information

FY 2016 Clean Water Fund Competitive Grants Policy

FY 2016 Clean Water Fund Competitive Grants Policy FY 2016 Clean Water Fund Competitive Grants Policy Purpose The Clean Water Fund was established to implement part of Article XI, Section 15, of the Minnesota Constitution, and M.S. 114D with the purpose

More information

FY 2017 Proposed Capital Improvement Program

FY 2017 Proposed Capital Improvement Program FY 2017 Proposed Capital Improvement Program Metropolitan St. Louis Sewer District FY 2017 Capital Improvement Program Proposed Engineering Services Rich Unverferth, P.E. Director of Engineering January

More information

ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT PERMITS AND SERVICES DIVISION STATE REVOLVING FUND PROGRAMS DIVISION

ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT PERMITS AND SERVICES DIVISION STATE REVOLVING FUND PROGRAMS DIVISION ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT PERMITS AND SERVICES DIVISION STATE REVOLVING FUND PROGRAMS DIVISION 335 11 1400 Coliseum Boulevard Montgomery, Alabama 36110 CITE AS ADEM Admin. Code r.

More information

MADISON COUNTY MISSISSIPPI UNITED FOR PROGRESS

MADISON COUNTY MISSISSIPPI UNITED FOR PROGRESS MADISON COUNTY MISSISSIPPI UNITED FOR PROGRESS MADISON COUNTY MISSISSIPPI UNITED FOR PROGRESS Madison County Board of Supervisors City of Canton City of Flora City of Madison City of Ridgeland Madison

More information

1 Milwaukee Metropolitan Sewerage District Green Solutions Guidelines

1 Milwaukee Metropolitan Sewerage District Green Solutions Guidelines 1 Milwaukee Metropolitan Sewerage District Green Solutions Guidelines District s Project Overview To assist the municipalities served by the Milwaukee Metropolitan Sewerage District (District) with Total

More information

City of Punta Gorda Capital Improvement & Capital Outlay Programs FY 2017 to FY Capital Improvement Programs: Utilities Construction Fund 1

City of Punta Gorda Capital Improvement & Capital Outlay Programs FY 2017 to FY Capital Improvement Programs: Utilities Construction Fund 1 City of Punta Gorda Capital Improvement & Capital Outlay Programs FY 2017 to FY 2021 INDEX Page Capital Improvement Programs: Utilities Construction Fund 1 General Construction Fund 46 1% Sales Tax Fund

More information

County of San Joaquin Community Infrastructure Projects. Community Infrastructure Needs in Unincorporated Areas of San Joaquin County

County of San Joaquin Community Infrastructure Projects. Community Infrastructure Needs in Unincorporated Areas of San Joaquin County County of San Joaquin Community Infrastructure Projects Community Infrastructure Needs in Unincorporated Areas of San Joaquin County San Joaquin County, California January 2006 Community Infrastructure

More information

REQUEST FOR PROPOSAL (RFP) SOAP MINE ROAD GROUNDWATER CLEAN-UP DESIGN BUILD PROJECT. RFP RELEASE DATE January 17, 2014

REQUEST FOR PROPOSAL (RFP) SOAP MINE ROAD GROUNDWATER CLEAN-UP DESIGN BUILD PROJECT. RFP RELEASE DATE January 17, 2014 REQUEST FOR PROPOSAL (RFP) FOR SOAP MINE ROAD GROUNDWATER CLEAN-UP DESIGN BUILD PROJECT RFP RELEASE DATE January 17, 2014 PROPOSALS DUE February 12, 2014 @ 12 p.m. DIRECT QUESTIONS TO Kody Tompkins Chief

More information

Procedure For Processing An Application. For A Permit To Install Or Modify An Individual Sewer System

Procedure For Processing An Application. For A Permit To Install Or Modify An Individual Sewer System Procedure For Processing An Application For A Permit To Install Or Modify An Individual Sewer System With Surface Discharge And Design Flow Of 600GPD or < NOTE: Wastewater permit applications for design

More information

2017 MUNICIAL STATE BOND FUND INFLOW & INFILTRATION (I&I) GRANT PROGRAM

2017 MUNICIAL STATE BOND FUND INFLOW & INFILTRATION (I&I) GRANT PROGRAM 2017 MUNICIAL STATE BOND FUND INFLOW & INFILTRATION (I&I) GRANT PROGRAM Informational Meeting - July 2017 Agenda I. Welcome & Introductions II. III. Inflow & Infiltration Trends Grant Guidelines & Policies:

More information

2.2 DEPARTMENT OF PUBLIC WORKS (DPW) ORGANIZATIONAL CHART CITY COUNCIL CITY MANAGER. PUBLIC WORKS DEPARTMENT Director of PW

2.2 DEPARTMENT OF PUBLIC WORKS (DPW) ORGANIZATIONAL CHART CITY COUNCIL CITY MANAGER. PUBLIC WORKS DEPARTMENT Director of PW 2.1 ENVIRONMENTAL SERVICES DIVISION From 2001 through 2011, the Department of Public Works (DPW) Environmental Services Division (Division) was structured so that Sewer Engineering and Sewer Maintenance

More information

F I N A L D R A F T. Capital Improvement Plan. City of Black Diamond

F I N A L D R A F T. Capital Improvement Plan. City of Black Diamond City of Black Diamond 2013 2018 Capital Improvement Plan F I N A L D R A F T Old water tank in Black Diamond photo from King County Assessors and provided by Palmer Coking Coal Company. 4.3 MG Water Reservoir

More information

The Border Environment Cooperation Commission

The Border Environment Cooperation Commission Law and Business Review of the Americas Volume 2 1996 The Border Environment Cooperation Commission H. Roger Frauenfelder Follow this and additional works at: http://scholar.smu.edu/lbra Recommended Citation

More information

GENERAL ASSEMBLY OF NORTH CAROLINA 1989 SESSION CHAPTER 372 SENATE BILL 372

GENERAL ASSEMBLY OF NORTH CAROLINA 1989 SESSION CHAPTER 372 SENATE BILL 372 GENERAL ASSEMBLY OF NORTH CAROLINA 1989 SESSION CHAPTER 372 SENATE BILL 372 AN ACT TO REQUIRE CERTIFICATION OF PERSONS WHO INSTALL OR OPERATE SANITARY SEWAGE SYSTEMS UNDER THE JURISDICTION OF THE DEPARTMENT

More information

Request for Proposal Engineering Consultant for City of Ingleside

Request for Proposal Engineering Consultant for City of Ingleside Request for Proposal Engineering Consultant for Public Works and Building Services Departments Melissa Byrne Vossmer City Manager August 21, 2017 MAYOR AND CITY COUNCIL Luis Lamas, Mayor Oscar Adame, Mayor

More information

EXHIBIT 2 Page 1 of 9

EXHIBIT 2 Page 1 of 9 EXHIBIT 2 Page 1 of 9 Page 2 of 9 Page 3 of 9 EXHIBIT 2 Page 4 of 9 Page 5 of 9 PROJECT NARRATIVE The purpose for applying for these funds is to advance the City's revitalization efforts in Historic Miramar.

More information

APPROVED BUDGETS. district of columbia water and sewer authority. Section VII DEPARTMENTAL SUMMARIES

APPROVED BUDGETS. district of columbia water and sewer authority. Section VII DEPARTMENTAL SUMMARIES APPROVED BUDGETS district of columbia water and sewer authority Section VII DEPARTMENTAL SUMMARIES departmental Introduction summary overview financial plan rates&rev capital financing departments glossary

More information

ELECTRONIC PACKET FEBRUARY 12, 2018 OPERATIONS COMMITTEE MEETING. RELEASED: Monday, February 5, 2018

ELECTRONIC PACKET FEBRUARY 12, 2018 OPERATIONS COMMITTEE MEETING. RELEASED: Monday, February 5, 2018 ELECTRONIC PACKET FEBRUARY 12, 2018 OPERATIONS COMMITTEE MEETING RELEASED: Monday, February 5, 2018 Item 1 COMMISSION FILE NO: 18-020-2 DATE INTRODUCED: February 12, 2018 INTRODUCED BY: REFERRED BY

More information

PLEASE READ CAREFULLY THERE ARE SEVERAL REVISIONS EXPANDING ELIGIBILITY

PLEASE READ CAREFULLY THERE ARE SEVERAL REVISIONS EXPANDING ELIGIBILITY John R. Kasich, Governor Mary Taylor, Lt. Governor Scott J. Nally, Director PLEASE READ CAREFULLY THERE ARE SEVERAL REVISIONS EXPANDING ELIGIBILITY REQUEST FOR PROPOSALS Surface Water Improvement Fund

More information

SAFETY DIRECTIVE. This directive applies to all departments and employees of the Town of Marana.

SAFETY DIRECTIVE. This directive applies to all departments and employees of the Town of Marana. SAFETY DIRECTIVE Title: Spill Response Program Issuing Department: Town Manager s Safety Office Effective Date: March 01, 2015 Reviewed: Safety, Legal, Environmental Engineer, Human Resources, Finance

More information

Environmental Management Chapter

Environmental Management Chapter Environmental Management Chapter 335-11-1 ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT PERMITS AND SERVICES DIVISION STATE REVOLVING FUND PROGRAMS ADMINISTRATIVE CODE CHAPTER 335-11-1 CLEAN WATER STATE

More information

HENRICO COUNTY NOTICE OF SPECIAL MEETING BOARD OF SUPERVISORS

HENRICO COUNTY NOTICE OF SPECIAL MEETING BOARD OF SUPERVISORS HENRICO COUNTY NOTICE OF SPECIAL MEETING BOARD OF SUPERVISORS Please take notice that a special meeting of the Board of Supervisors will be held on Tuesday, December 8, 2015, at 4:15 p.m. in the County

More information

PUBLIC FACILITIES FINANCING

PUBLIC FACILITIES FINANCING 9. Public Facilities Financing Brisbane Baylands Specific Plan 257 9 PUBLIC FACILITIES FINANCING 9.1 PURPOSE The Baylands is planned to accommodate a variety of uses including retail at a range of types

More information

CWSRF Intended Use Plan

CWSRF Intended Use Plan State of Alabama Alabama Department of Environmental Management Clean Water State Revolving Fund (CWSRF) Program SRF Section (334) 271-7796 Permits and Services Division (334) 271-7950 FAX Alabama Department

More information

City of Portsmouth Portsmouth, New Hampshire Public Works Department RFP #68-14 REQUEST FOR PROPOSAL

City of Portsmouth Portsmouth, New Hampshire Public Works Department RFP #68-14 REQUEST FOR PROPOSAL City of Portsmouth Portsmouth, New Hampshire Public Works Department RFP #68-14 REQUEST FOR PROPOSAL DESIGN ENGINEERING SERVICES NEW CASTLE WATER LINE IMPROVEMENTS INVITATION Sealed Proposals, plainly

More information

Edric has done a great job as City Engineer for Richmond and we wish him well in his new position.

Edric has done a great job as City Engineer for Richmond and we wish him well in his new position. Mayor and Councilmembers: This is the weekly report for the week ending July 6 th, 2012. 1. Meeting Notes The next City Council meeting is scheduled for Tuesday, July 10 th, beginning with a Closed Session

More information

WATER QUALITY MANAGEMENT PERMIT

WATER QUALITY MANAGEMENT PERMIT 3800-PM-WSFR0015 1/2011 Permit WATER QUALITY MANAGEMENT PERMIT PERMIT NO. 0417201 AMENDMENT NO. APS ID. 956114 AUTH. ID. 1208815 A. PERMITTEE (Name and Address): CLIENT ID#: 311950 300 Frankfort Road Monaca,

More information

CITY OF MOUNT CARROLL CAPITAL IMPROVEMENTS PROGRAM UPDATE

CITY OF MOUNT CARROLL CAPITAL IMPROVEMENTS PROGRAM UPDATE CITY OF MOUNT CARROLL CAPITAL IMPROVEMENTS PROGRAM UPDATE 2017-2021 CITY OF MOUNT CARROLL CAPITAL IMPROVEMENTS PROGRAM UPDATE 2017-2021 December 2016 Prepared By: Council Members City Staff and Local Groups

More information

CITY OF SOUTH SAN FRANCISCO

CITY OF SOUTH SAN FRANCISCO CITY OF SOUTH SAN FRANCISCO DRAFT CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 201516 Adopted 6/24/15 Cover photos from top left: Buri Buri Park, Water Quality Control Plant, and Gellert Avenue. Photos by Engineering

More information

Supply & Demand of RNs in the LA-Orange-Ventura region

Supply & Demand of RNs in the LA-Orange-Ventura region Supply & Demand of RNs in the LA-Orange-Ventura region Joanne Spetz, PhD, FAAN Professor, Philip R. Lee Institute for Health Policy Studies Associate Director for Research, Healthforce Center University

More information

FY 2018 Watershed-Based Funding Pilot Program Policy

FY 2018 Watershed-Based Funding Pilot Program Policy FY 2018 Watershed-Based Funding Pilot Program Policy From the Board of Water and Soil Resources, State of Minnesota Version: FY2018 Effective Date: 12/20/2017 Approval: Board Resolution #17-94 Policy Statement

More information

General County. Project Title

General County. Project Title General County Project Title Page Project Title Page Roads Ops Facility 15 Rock Creek Aerator 34 Rural Legacy Program 14 Samaritan House 26 School Security Upgrades 30 Septic System Enhancements 12 Turf

More information

Florida Department of Environmental Protection

Florida Department of Environmental Protection Florida Department of Environmental Protection Marjory Stoneman Douglas Building 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 Rick Scott Governor Carlos Lopez-Cantera Lt. Governor Jonathan

More information

Bylaw No OFF-SITE LEVY BYLAW

Bylaw No OFF-SITE LEVY BYLAW PAGE 1 A BYLAW OF THE CITY OF LEDUC IN THE PROVINCE OF ALBERTA, TO PROVIDE FOR OFF-SITE LEVIES WHEREAS, pursuant to section 648(1) of the Municipal Government Act, R.S.A. 2000, c. M-26 a council may by

More information

Supply & Demand of RNs in the Sacramento & Northern regions

Supply & Demand of RNs in the Sacramento & Northern regions Supply & Demand of RNs in the Sacramento & Northern regions Joanne Spetz, PhD, FAAN Professor, Philip R. Lee Institute for Health Policy Studies Associate Director for Research, Healthforce Center University

More information

City Council Weekly Digest

City Council Weekly Digest City Council Weekly Digest TO: FROM: MENLO PARK CITY COUNCIL Alex D. McIntyre, City Manager Friday April 4, 2014 ITEMS INCLUDED: ATTACHMENTS: City Celebrates Arbor Day with Tree Planting Menlo Park Construction

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO. : _10.12 SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY DIVISION: Capital Programs and Construction Division BRIEF DESCRIPTION: Awarding San Francisco Municipal Transportation

More information

Regulatory Division General Information: January 2016

Regulatory Division General Information: January 2016 Permit Evaluation and NWP Verification Submittal Regulatory Division General Information: 415-503-6795 January 2016 US Army San Francisco District As of 13-JAN-2016 1 Submittals Permit Application/Evaluation

More information

S A W P A SANTA ANA WATERSHED PROJECT AUTHORITY Sterling Avenue, Riverside, California (951)

S A W P A SANTA ANA WATERSHED PROJECT AUTHORITY Sterling Avenue, Riverside, California (951) S A W P A SANTA ANA WATERSHED PROJECT AUTHORITY 11615 Sterling Avenue, Riverside, California 92503 (951) 354-4220 PROJECT AGREEMENT 21 COMMITTEE MEETING INLAND EMPIRE BRINE LINE PROJECT COMMITTEE (MEMBERS:

More information

Arizona s Drinking Water Revolving Fund

Arizona s Drinking Water Revolving Fund Water Infrastructure Finance Authority of Arizona Arizona s Drinking Water Revolving Fund Intended Use Plan Funding Cycle 2005 Governor Janet Napolitano WIFA Chairman Stephen A. Owens WIFA Executive Director

More information

NADBank News Vol. V, Edition 4 March 7, In this edition:

NADBank News Vol. V, Edition 4 March 7, In this edition: NADBank News Vol. V, Edition 4 March 7, 2001 In this edition: 1.- Request for Expressions of Interest Organismo Operador Municipal de Alcantarillado y Saneamiento de San Luis Río Colorado (OOMAPAS) Construction

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO. : 10.8 SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY DIVISION: Capital Programs & Construction BRIEF DESCRIPTION: Authorizing the Director of Transportation to execute

More information

Appendix B Review Matrix Text & Table Footnotes

Appendix B Review Matrix Text & Table Footnotes Review Submissions The PDP includes a series of review submissions designed to ensure that all projects are developed in accordance with ODOT policies. The PDP Products Review Matrix found in this Appendix

More information

State of Delaware Clean Water Advisory Council

State of Delaware Clean Water Advisory Council State of Delaware Clean Water Advisory Council 2007 Long-Term Wastewater Facilities Funding Plan FY 2008 FY 2013 State of Delaware Clean Water Advisory Council Membership Roger P. Roy, Chair Jeffrey M.

More information

O H I O P U B L I C W O R K S C O M M I S S I O N P R O J E C T G R A N T A G R E E M E N T

O H I O P U B L I C W O R K S C O M M I S S I O N P R O J E C T G R A N T A G R E E M E N T O H I O P U B L I C W O R K S C O M M I S S I O N P R O J E C T G R A N T A G R E E M E N T S T A T E C A P I T A L I M P R O V E M E N T P R O G R A M Pursuant to Ohio Revised Code 164.05 and Ohio Administrative

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Office of the Secretary Of Defense : February 2015 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 4: Advanced Component Development

More information

U.S. Army Corps of Engineers Navigation Program Update

U.S. Army Corps of Engineers Navigation Program Update U.S. Army Corps of Engineers Navigation Program Update For California Marine Affairs and Navigation Conference Jeffrey A. McKee Chief, Navigation Branch US Army Corps of Engineers March 10, 2015 US Army

More information

Traffic-Calming & Pedestrian Safety Project

Traffic-Calming & Pedestrian Safety Project Traffic-Calming & Pedestrian Safety Project RFP HR17-101 Pre-Proposal Conference May 2, 2017 Hillsboro Town Hall 1 WELCOME Thank you for attending today s Pre-Proposal Conference for the Town of, Hillsboro

More information

Element 07 Capital Facilities

Element 07 Capital Facilities Element 07 Capital Facilities Table of Contents 1. Introduction 2. Capital Facilities Goals & Policies 3. Public Facility Providers 4. Capital Facilities Funding Sources List of Tables: 1. City-Provided

More information

Construction Site TPDES Inspector Workshop. Erik Hobson EPSIII/Resource Protection and Compliance

Construction Site TPDES Inspector Workshop. Erik Hobson EPSIII/Resource Protection and Compliance Construction Site TPDES Inspector Workshop Erik Hobson EPSIII/Resource Protection and Compliance Page 1 Topics Changes to TXR150000 Inspections Edwards Aquifer Program Changes to the Permit Page 2 Revisions

More information

4.b. 6/22/2017. Local Agency Formation Commission. George J. Spiliotis, Executive Officer

4.b. 6/22/2017. Local Agency Formation Commission. George J. Spiliotis, Executive Officer 4.b. 6/22/2017 TO: FROM: SUBJECT: Local Agency Formation Commission George J. Spiliotis, Executive Officer LAFCO 2014-09-5 SPHERE OF INFLUENCE AMENDMENT TO THE CITY OF BEAUMONT (ADDITION) AND AMENDMENT

More information

5384 Appendices

5384 Appendices 5384 5385 Appendices 5386 Appendix A Programmatic Review Process Step 1: Is Proposed Action Evaluated in This EA? (Check Section 3 [Proposed Action] to Confirm) Step 2: Is New Action Within Scope of this

More information

City of Painesville, Ohio

City of Painesville, Ohio , Ohio U.S. Environmental Protection Agency Work Plan For Brownfields Grants (Hazardous Substances and Petroleum Substances) Project Contact: Cathy Bieterman, Director of Economic Development 7 Richmond

More information

The Resort Improvement District (RID) is seeking a full-time GRADE 1 WATER/WASTEWATER TREATMENT PLANT OPERATOR

The Resort Improvement District (RID) is seeking a full-time GRADE 1 WATER/WASTEWATER TREATMENT PLANT OPERATOR GRADE 1 WATER/WASTEWATER TREATMENT PLANT OPERATOR The RID is a special district located in a rural area which employs water, wastewater, electric and parks professionals who provide diverse services to

More information

Department of Defense INSTRUCTION

Department of Defense INSTRUCTION Department of Defense INSTRUCTION NUMBER 4715.6 April 24, 1996 USD(A&T) SUBJECT: Environmental Compliance References: (a) DoD Instruction 4120.14, "Environmental Pollution Prevention, Control and Abatement,"

More information

TAHOE CITY PUBLIC UTILITY DISTRICT Job Description

TAHOE CITY PUBLIC UTILITY DISTRICT Job Description TAHOE CITY PUBLIC UTILITY DISTRICT Job Description Job Title: Department: Utilities Supervised By: Utilities Superintendent FLSA Status: Non-Exempt Revised as of: January 2015 JOB SUMMARY To oversee and

More information

WATERWORKS ENGINEER, 7248 SENIOR WATERWORKS ENGINEER, 9405

WATERWORKS ENGINEER, 7248 SENIOR WATERWORKS ENGINEER, 9405 6-24-88 WATERWORKS ENGINEER, 7248 SENIOR WATERWORKS ENGINEER, 9405 Summary of Duties : Performs responsible professional engineering work in supervising the planning, construction, maintenance, and operation

More information

AGENDA CITY COUNCIL FRANCHISE/PUBLIC INFRASTRUCTURE SUBCOMMITTEE MONDAY, MAY 15, :00 PM COUNCIL CHAMBERS 525 HENRIETTA STREET MARTINEZ, CA 94553

AGENDA CITY COUNCIL FRANCHISE/PUBLIC INFRASTRUCTURE SUBCOMMITTEE MONDAY, MAY 15, :00 PM COUNCIL CHAMBERS 525 HENRIETTA STREET MARTINEZ, CA 94553 AGENDA CITY COUNCIL FRANCHISE/PUBLIC INFRASTRUCTURE SUBCOMMITTEE MONDAY, MAY 15, 2017 6:00 PM COUNCIL CHAMBERS 525 HENRIETTA STREET MARTINEZ, CA 94553 1. Call to order 2. Lease Agreements: A. Chamber of

More information