1 ceever LY) \HILLS/ Meeting Date: Match 5, 2019 Item Number: E 14 To: From: AGENDA REPORT Honorable Mayor & City Council Shana Epstein, Director of Public Works Josette Descalzo, Environmental Compliance and Sustainability Programs Manager Subject: AUTHORIZE STAFF TO SUBMIT A LETTER OF INTENT TO CULVER CITY FOR THE CULVER MEDIAN STORMWATER REGIONAL PROJECT Attachments: 1. Schematic Diagram For Culver Blvd Median 2. Letter of Intent to Culver City RECOMMENDATION It is recommended that City Council move to authorize staff to submit a Letter of Intent (LOl) to Culver City for the Culver Median Stormwater Regional Project. The LOl allows the cities of Beverly Hills and Culver City to begin formalizing a partnership by Memorandum of Agreement (MOA) for the Culver Median Stormwater Regional Project. Beverly Hills s project commitment is not to exceed $3.5M. The Public Works Commission and the City Council Liaison (Mayor Gold & Councilmember Wunderlich) reviewed the items at their meeting on January 29, 2019, and supported the project to move to the next steps. INTRODUCTION The City s urban and stormwater runoff contains toxins and pollutants that enter waterways and the ocean. The federal and state Clean Water Acts (CWA) regulates pollutant levels on the waters of the United States. To comply with regulations, cities are required to formulate implementation plans such as Watershed Management Programs (WMP5) and Enhanced Watershed Management Program (EWMP5). WMPs and EWMPs provide compliance pathways through the implementation of Low Impact Development (LID) green streets and regional projects that would capture and treat urban runoff. Page 1 of 6 02/25/2019

2 Meeting Date: March 5, 2019 The City of Beverly Hills is part of the Ballona Creek Watershed Management Group (BC-WMG) that developed BC-EWMP. The BC-EWMP prescribes that Beverly Hills will need to manage 87 acre-feet of runoff per rain event to meet its CWA obligations. Since 2015, the City has been looking for green streets and regional project opportunities to meet its regulatory obligations. To comply, the City included green streets as part of the Santa Monica Boulevard Project (1 acre-ft.), moving forward with the green streets design for Burton Way Median Phase 1 and Phase 2 (9 acre-ft.) and looking at the feasibility of the regional project at La Cienega Park (21 acre-ft.). These projects have the potential to capture 31 acre-feet of runoff per rain event, but the City will still need to capture 58 acre-feet of runoff per rain event to meet compliance. Last year, Culver City approached the City to gauge interest in cost-sharing to build the Culver Median Regional Project. The interest came after the City of Los Angeles, who was committed and the original project partner, reconsidered its partnership due to lack of funding. The Culver Median Regional Project was identified in the BC-EWMP as a signature regional project for the watershed. The project proposal included regulatory compliance credit, capital cost and estimated Operations & Maintenance (O&M) costs and project and operation management. Currently, staff is proposing a $3.5M costsharing contribution, which will result in 4.4 acre-ft. compliance credit throughout the project lifetime for Beverly Hills. Only Beverly Hills and Culver City would be collaborating in this project. BACKGROUND The Culver Median Project is a signature stormwater regional project in the Ballona Creek Watershed. The City of Culver City is the lead agency and the City of Los Angeles was the initial project partner as their jurisdictions drain to the project site. The City of Los Angeles removed itself from the partnership due to lack of funding after the $7.7M grant monies were awarded for the project. The City of Culver City approached Beverly Hills to inquire if it was interested to be project partners to complete the regional project and preserve the grant money. The City of Beverly Hills was only interested if the Regional Water Quality Control Board (Regional Board) would give Beverly Hills compliance credit towards its stormwater permit (MS4) obligations. The Regional Board provided compliance credit to Beverly Hills if it so wishes to partner with Culver City. Staff presented the Culver Median Project to the Public Works Commission on January 10, 2019, seeking support and a recommendation to take advantage of the compliance opportunity to cost-share for the Culver Median Project. The Commission voted 4-1 in support of the project partnership. Commissioner Felsenthal did not support the recommendation as he sees the City has higher priorities over this potential partnership. The Commission agreed with the project benefits, which include the precedent setting compliance credit mechanism that would provide regional flexibility towards stormwater compliance. The project was also presented to the Public Works Liaison on January 29, 2019, for consideration. The Liaison unanimously supported the recommendation to move forward with the compliance opportunity to cost-share for the project and to bring the issue to a future City Council meeting for consideration by the full City Council. Page 2 of 6 02/25/2019

3 Meeting Date: March 5, 2019 DISCUSSION In managing urban and stormwater runoff, regional projects are the most cost-effective solutions, Regional projects are centralized facilities typically treating 10 s to 100 s acreft. of runoff from large drainage areas rather than green streets, which is a street segment approach. The Culver Median Project is a signature regional project identified in the BC-EWMP. The project is designed to treat 796 acres of drainage areas and capture and treat 19.5 acre-ft. of runoff per rain event. During the design phase, it was determined that Culver City will need 13.1 acre-ft. of capacity to capture and treat its tributary drainage area and leaving 6.4 acre-ft. of excess capacity. The estimated project cost is $15.6M, which equates to $800KIacre-ft. capacity. The project design includes diversion structures, pre-treatment units, underground storage facility and treatment systems and re-use irrigation system for landscape (See Attachment 1). The Culver Median Project was initially a partnership between the cities of Los Angeles and Culver City before Measure W passed (County-wide parcel tax initiative for which revenues will be dedicated to fund multi-benefit stormwater projects). Culver City is the lead agency on the project on which they completed the feasibility study, started the design, submitted grant applications and received grant funding. The project was awarded a total of $7.7M from Prop 1 and Prop 84 grants pending the remaining costs for the project is funded by Culver City and the City of Los Angeles. Culver City approached Beverly Hills for interest in collaborating with this project after the City of Los Angeles de-committed due to lack of funding prior to Measure W. Beverly Hills staff expressed interest as long as Beverly Hills receives compliance credit from the Regional Water Quality Control Board (Regional Board), and the cost would be within range of other Beverly Hills projects. The Regional Board granted compliance credit to Beverly Hills if it so wishes to cost-share for the project. Besides compliance credit, this opportunity is precedent setting that promotes inter-agency collaboration to meet regional stormwater compliance requirements. This would be the first interagency collaboration of which the Regional Board has granted compliance credit to a city that does not drain to a regional project because it sees the water quality benefits to the entire Ballona Creek watershed. PROJECT ANALYSIS AND BENEFITS The overall project cost and funding is listed in Table 1. - Table 1: Project Cost and Funding Project Cost $1 56M Project Funding Source Prop 84 Grant $3.3M Prop 1 Grant $4.4M Culver City $4.4M Beverly Hills $3.5M Fifty percent (50%) of the project cost is grant funded from Prop 84 and Prop 1. Grant monies are guaranteed as long as local funding covers the remaining costs for the project. Page 3 of 6 02/25/2019

4 Meeting Date: March 5, 2019 As the lead agency and grant recipient, Culver City will be taking 15.1 acre-ft. (4.9M gallons) of compliance credit and full $7.7M of the grant funding. The 15.1 acre-ft. includes the 13.1 acre-ft. of runoff from their drainage area and 2.0 acre-ft. excess that will be used to meet Culver City s obligation to manage 99 acre-ft. of stormwater runoff per rain event. Culver City will be spending $4.4M to cover the remaining costs if Beverly Hills agrees to cost-share in the project. Staff is recommending that the City of Beverly Hills cost-share for $3.5M towards the capital cost of the project. For that amount, the City will be receiving the remaining 4.4 acre-ft. (1.4M gallons) of volume capacity and compliance credit for the lifetime of the project. These types of projects typically have a 30-year life cycle. Most importantly, the compliance credit helps the City meets its stormwater obligations to manage 87 acre-ft. of runoff per rain event. In addition to meeting our stormwater obligations, the 4.4 acre-ft. of compliance credit is equivalent to constructing 2.6 linear miles of green streets towards the City s stormwater obligation. The estimated cost to construct such length will exceed $1OM. The estimate is based on typical green streets dimensions used in stormwater modeling. Besides cost savings comparison, the compliance credit opportunity relieves the City from onsite feasibility work, public outreach, construction disturbances and lifetime maintenance cost of the green streets. The annual O&M cost estimate is $100,000. The cost-sharing responsibility is proportional to compliance credits, which means that Culver City s share is estimated at $77,000 (77%) and Beverly Hills s share is estimated at $23,000 (23%). Beverly Hills s O&M funding will be taken from Measure W revenues. As previously reported to City Council, the City expects an annual revenue of $560K from the ballot initiative. Comparing the Culver Median Project to Beverly Hills stormwater projects, staff used the Burton Way Median Phase 1 and Phase 2 in the analyses because both projects have the same concept and design. As seen in Table 2, the capacity cost ($Iacre-ft.) for the Culver Median Regional Project is less than both Burton Way Median phases. Table 2: Capacity Cost Comparison ($Iacre-ft.) Project Capacity Capacity Cost Capital Cost (acre-fl) $Iacre-ft. Burton Way Median (Phase 1) $3.7M 4.0 $925K Burton Way Median (Phase 1 + $9.8M 9.0 $1.1M Phase 2) Culver Median Project $3.5 M 4.4 $795K ADDITIONAL BENEFITS Besides the cost and grant funding benefits, the Culver Median Project provides the following additional benefits to Beverly Hills: 1. Compliance Credit: The potential collaboration will be setting a compliance precedent in the Los Angeles Stormwater Regulatory Environment. If successful, the Regional Board will be able to grant future compliance credits throughout the Page 4 of 6 02/25/2019

5 Meeting Date: March 5, 2019 region, which allows for faster construction of signature regional projects and have a bigger water quality impact. The Culver Median project is one of the signature regional projects that will capture large amounts of runoff and have a positive impact in Ballona Creek. 2. Regulatory Considerations: The Regional Board issues notice of violations and monetary fines to agencies that violate permit conditions. Currently, the Regional Board issues violation settlements at a rate of $3,000 per day per violation. The Ballona Creek Watershed is subject to twenty-one (21) water quality standards and can be subjected to a maximum of $63,000 per day per violation if all 21 water quality standards are exceeded. In addition to fines, the Regional Board requires violators to take all actions to cease all discharges and may eventually result to a consent decree. However, the Regional Board provides special consideration to agencies who have invested and built water quality projects. With the potential partnership, the City of Beverly Hills can demonstrate its full faith effort by building and committing to projects that would capture 9.4 acre-ft. (3.1 M gallons) of stormwater runoff since These projects are: a. Bioswales at Santa Monica Boulevard = 1 acre-ft. b. Burton Way Median Phase 1 = 4.0 acre-ft. c. Culver Median Project = 4.4 acre-ft. Demonstrating such commitment will help the City receive regulatory considerations such as extensions to compliance deadlines. 3. Relief of project management and construction burdens: Green streets projects require years of public outreach to garner support, planning and loss of street parking; Culver City staff will carry out these functions. As mentioned, this compliance opportunity replaces 2.6 miles of green streets, which will cost over $1OM. NEXT STEPS If City Council approves the recommendation, staff will submit the Letter of Intent to the City of Culver City and begin developing a Memorandum of Understanding (MOU) for terms and cost-sharing payment schedule that will begin Fiscal Year 2019/20. FISCAL IMPACT The City of Beverly Hills is proposing to cost share no more than $3.5M for the Culver Median Stormwater Regional Project and project payment is anticipated to start in Fiscal Year 2019/20. All stormwater compliance projects are funded under CIP 0270, Ballona Creek MS4 Compliance. Over a 5-year period (FY22/23), the CIP budget is estimated to reach $46.7M. Currently (FYi 8/1 9), the CIP fund totals $6.7M of which $5.6M is available for this project. After dedicating $3.5M for this project, there will be $2.1M remaining this current year. The remaining amount plus the projected funds of $40M in the next three years would leave the CIP fund with $42.1M. The remaining amount in the CIP can be used to cover future stormwater compliance costs such as the construction costs for Page 5 of 6 02/25/2019

6 Meeting Date: Match 5, 2019 Burton Way Median and La Cienega Park stormwater projects. In addition to CIP funding, Measure W funds will be used to pay for the annual O&M costs for Culver Median project. Jeffrey S Muir / Approved By 1 / 1 Epst1c Page 6 of 6 02/25/2019

7 Attachment 1

8 -j cz1 Schematic Diagram for Culve BIvd Median Figure 1: Schematic Diagram for Culver Blvd Median

9 Attachment 2

10 LETTER Of INTENT The City of Culver City and the City of Beverly Hills have regulatory obligations to comply with Municipal Separate Storm Sewer System (MS4) Permit and Enhancement Watershed Management Program (EWMP) Plan. This letter of intent details the agreement between the City of Culver City and the City of Beverly Hills to jointly develop the Culver Boulevard Stormwater filtration/retention Regional Project (hereafter Project ) to comply with these obligations. This letter of intent describes the Project, the terms under which the Project will be designed, constructed, operated and maintained, and its cost-sharing terms. Project is designed to optimize BMP capacity to reduce sediments, bacteria and metals resulting in the improvement of water quality for the Ballona Creek Watershed. The Project is estimated to capture and treat up to acre-feet of stormwater in a 24-hour period from a 796 acre drainage area. This provides 100% of the 85th percentile, 24-hour water quality treatment volume from the City of Culver City s 297 acre drainage area and 67% of the entire 796 acre drainage area. Of the acre-feet, acre-feet represents the treatment volume required for 297 acres in the City of Culver City. The remaining 6.46 acre-feet is available for Structural BMP Capacity credit trading. The trading Structural BMP Capacity was accepted by Los Angeles Regional Water Quality Control Board (LARWQCB) on May 14, The Project contains the following features to strategically intercept runoff before it discharges to the Ballona Creek channel: Storm Drain Diversions. Two storm drain diversions will be constructed to divert and capture flows from the storm drains. Pre-Treatment Units. Two pre-treatment units will be installed for each storm drain diversion prior to discharge into the subsurface storage structure. Subsurface storage structure. A 10 high, 0.8-acre area, underground stormwater capture vault (8 acre-feet or 2.6 million gallons) will be installed beneath the existing median between Sepulveda Blvd and Harter Ave. The vaults are intended to store urban and stormwater run-off for future irrigation use and as a holding area for excess run-off for filtration. Post-Treatment Discharge Units. To implement the Project, the City of Culver City and Beverly Hills have agreed to the following: 1. Culver City will be responsible for the design, construction, and operation of the Project. 2. The City of Beverly Hills agrees to participate as a financial partner in this Project in the amount not to exceed $3.5 million.

11 3. Beverly Hills $3.5M contribution equates approximately to 4.4 acre-feet based on a total project cost estimate of$15,557,593, which is approximately 23% of the total run-off volume treated, and Beverly Hills will therefore receive Structural BMP Capacity Credit equivalent approximately 4.4 acre-feet. If the total cost of the project at completion differs from $15,557,593 then Beverly Hills credit will be proportionally increased/decreased based on the following formula: ($15,557,593/actual project cost) x 4.4 acre-feet). The Structural BMP Capacity Credit trading was accepted by the LARWQCB. In an event there are Change Orders that affects the total cost of the project, the City of Culver City will be sending copies of the Change Order to the City of Beverly Hills. 4. The estimated cost of the Project is summarized in Table 1 and under the following categories: design, construction, monitoring and performance and public outreach. These costs are estimates pending final completion of the project. Project costs will be financed by Prop 84 grant funds, Prop 1 grant funds and a 50% local match of $7,778,796, which will be shared by Culver City and Beverly Hills as indicated in Table Payments from Beverly Hills to Culver City shall begin in fiscal Year 20 19/2020 and shall continue annually until the $3,500,000 has been paid to Culver City. Beverly Hills shall deposit payments into a segregated account established by Culver City. Culver City shall be entitled to withdraw from this established Culver Boulevard account to pay for or reimburse itself for project related expenses. 6. Once the Beverly Hills portion of the Project has been fully paid to Culver City and construction of project has been finalized, Beverly Hills will have met MOU capital cost obligations and be provided necessary documentation to receive credits. However, Beverly Hills will be obligated to share all maintenance, inspection and operational costs associated with the Pre-Treatment and Filtration/Retention System (collectively, Operations and Maintenance (O&M) ). O&M obligation will be included in a separate MOU between the cities. 7. Beverly Hills s O&M costs are currently estimated at $23,000 per year which is proportional to capacity that Beverly Hills is purchasing and are subject to change once project is finalized. 8. Culver City and Beverly Hills agree to share Maintenance Costs based on actual Maintenance Costs (which will be determined when project has been finalized), with Culver City paying 77% of the Maintenance Costs and Beverly Hills paying 23% of the Maintenance Costs in accordance with the procedures set forth below, Item #9. 9. Culver City will select a contractor to perform scheduled maintenance of the Pre-Treatment and filtration/retention System as recommended by manufacturer(s) pursuant to a five-year

12 maintenance agreement. The contractor shall be selected utilizing the City s procurement process. Prior to the expiration of the term of each maintenance agreement, City shall confer with Beverly Hills regarding the selection of a maintenance contractor for any subsequent maintenance agreement. 10. The agreement terms, payment schedule, and cost-sharing of the capital portion of the Project and O&M will be codified in separate Memorandum of Agreement approved by the respective, City Councils as necessary. Table 1. funding Summary Funding Summary Local Match Prop 1 Grant Funds Prop 24 Grant Funds $7,778,797 $4,478,796 $3,300O0O Total Project Funds $15,557,593 Table 2. Estimated cost of Project and sharing by Culver City and City of Beverly Hills Item Cost Local Match 50% of Project $7,772,797 BH share of total cost of Project $3,500,000 Culver City share of total cost of Project $4,278,797 Date: Date: Shana Epstein Director or Public Works City of Beverly Hills Charles D. Herbertson, P.E., L.S. Director of Public Works! City Engineer City of Culver City

City of Culver City. Staff Report

City of Culver City. Staff Report City of Culver City City Hall 9770 Culver Blvd. Culver City, CA 90232 (310) 253-5851 Staff Report File #: 18-0499, Version: 1 CC - Approval of Professional Services Agreement with Tetra Tech for the Design

More information

City of Los Angeles Department of Public Works Bureau of Sanitation (LASAN) On-call Consultant Services Contract

City of Los Angeles Department of Public Works Bureau of Sanitation (LASAN) On-call Consultant Services Contract City of Los Angeles Department of Public Works Bureau of Sanitation (LASAN) On-call Consultant Services Contract Task Order Solicitation (TOS) SN-93 for Concept Report Revisions for Three Downtown and

More information

1 Milwaukee Metropolitan Sewerage District Green Solutions Guidelines

1 Milwaukee Metropolitan Sewerage District Green Solutions Guidelines 1 Milwaukee Metropolitan Sewerage District Green Solutions Guidelines District s Project Overview To assist the municipalities served by the Milwaukee Metropolitan Sewerage District (District) with Total

More information

Water Quality Improvement Program. Funding Application Guide

Water Quality Improvement Program. Funding Application Guide Water Quality Improvement Program Funding Application Guide October 2018 Table of Contents I. Introduction... 2 II. Eligibility... 3 II.1 Eligible Projects... 3 II.2 Eligible Recipients... 4 III. Funding

More information

PLEASE READ CAREFULLY THERE ARE SEVERAL REVISIONS EXPANDING ELIGIBILITY

PLEASE READ CAREFULLY THERE ARE SEVERAL REVISIONS EXPANDING ELIGIBILITY John R. Kasich, Governor Mary Taylor, Lt. Governor Scott J. Nally, Director PLEASE READ CAREFULLY THERE ARE SEVERAL REVISIONS EXPANDING ELIGIBILITY REQUEST FOR PROPOSALS Surface Water Improvement Fund

More information

Standard Operating Procedure: Stormwater BMP Inspections

Standard Operating Procedure: Stormwater BMP Inspections Standard Operating Procedure: Stormwater BMP Inspections Issue Date: 12/20/2016* Version: 2 Review Frequency: Annual Reasons for Procedure The University of Virginia (UVA) has a permit to operate a Municipal

More information

Lexington s Stormwater Quality Projects Incentive Grant Program

Lexington s Stormwater Quality Projects Incentive Grant Program Lexington s Stormwater Quality Projects Incentive Grant Program PRESENTED BY: Gregory S. Lubeck, P.E., CFM, ENGINEERING SECTION MANAGER LEXINGTON-FAYETTE URBAN COUNTY GOVERNMENT Discussion Topics EPA Consent

More information

Board of Supervisors' Agenda Items

Board of Supervisors' Agenda Items A. Roll Call COUNTY OF SAN DIEGO BOARD OF SUPERVISORS REGULAR MEETING MEETING AGENDA WEDNESDAY, MARCH 16, 2016, 9:00 A.M. BOARD OF SUPERVISORS NORTH CHAMBER 1600 PACIFIC HIGHWAY, ROOM 310, SAN DIEGO, CALIFORNIA

More information

NPDES Small MS4 General Permit (ARR040000) Annual Reporting Form

NPDES Small MS4 General Permit (ARR040000) Annual Reporting Form NPDES Small MS4 General Permit (ARR040000) Annual Reporting Form Instructions for completing this form: ARR040000 requires that this form be used when submitting annual reports. You may request approval

More information

Florida Department of Environmental Protection

Florida Department of Environmental Protection Florida Department of Environmental Protection Marjory Stoneman Douglas Building 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 Rick Scott Governor Carlos Lopez-Cantera Lt. Governor Jonathan

More information

Vanderburgh County s Qualifications to Manage a Construction Site Run-off Control Program with the County Engineer as MS4 Operator.

Vanderburgh County s Qualifications to Manage a Construction Site Run-off Control Program with the County Engineer as MS4 Operator. Vanderburgh County Surveyor s Rule 13 Workbook Chapter 15.13.15 Vanderburgh County s Qualifications to Manage a Construction Site Run-off Control Program with the County Engineer as MS4 Operator. Introduction

More information

Guidance and Instructions for the Implementation of Land Disturbing Activities on Fort Jackson

Guidance and Instructions for the Implementation of Land Disturbing Activities on Fort Jackson Guidance and Instructions for the Implementation of Land Disturbing Activities on Fort Jackson 1. Purpose: This document is to provide a summary of regulations that Fort Jackson and associated consultants,

More information

Purpose 1 : Conflict of Interest 2 :

Purpose 1 : Conflict of Interest 2 : 146 Stoney Creek Drive, Suite 4 Mifflintown, PA 17059 (717) 436-8953 ext. 5 Purpose 1 : Juniata County Dirt, Gravel, and Low Volume Roads Quality Assurance Board Policies and Procedures Effective January

More information

ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT PERMITS AND SERVICES DIVISION STATE REVOLVING FUND PROGRAMS DIVISION

ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT PERMITS AND SERVICES DIVISION STATE REVOLVING FUND PROGRAMS DIVISION ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT PERMITS AND SERVICES DIVISION STATE REVOLVING FUND PROGRAMS DIVISION 335 11 1400 Coliseum Boulevard Montgomery, Alabama 36110 CITE AS ADEM Admin. Code r.

More information

General Permit Registration Form for the Discharge of Stormwater and Dewatering Wastewaters from Construction Activities

General Permit Registration Form for the Discharge of Stormwater and Dewatering Wastewaters from Construction Activities General Permit Registration Form for the Discharge of Stormwater and Dewatering Wastewaters from Construction Activities Please complete this form in accordance with the general permit (DEP-PERD- GP-015)

More information

Board of Supervisors' Agenda Items

Board of Supervisors' Agenda Items A. Roll Call COUNTY OF SAN DIEGO BOARD OF SUPERVISORS REGULAR MEETING MEETING AGENDA WEDNESDAY, APRIL 13, 2016, 9:00 A.M. BOARD OF SUPERVISORS NORTH CHAMBER 1600 PACIFIC HIGHWAY, ROOM 310, SAN DIEGO, CALIFORNIA

More information

LOCAL STORMWATER BMP IMPLEMENTATION PROGRAM PROJECT APPLICATION INSTRUCTIONS

LOCAL STORMWATER BMP IMPLEMENTATION PROGRAM PROJECT APPLICATION INSTRUCTIONS COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF CLEAN WATER LOCAL STORMWATER BMP IMPLEMENTATION PROGRAM PROJECT APPLICATION INSTRUCTIONS The Department of Environmental Protection

More information

Watershed Restoration and Protection

Watershed Restoration and Protection Watershed Restoration and Protection Program Guidelines March 2014 > ready > set > succeed Commonwealth of Pennsylvania Tom Corbett, Governor www.pa.gov newpa.com Table of Contents Section I Statement

More information

Stormwater Management Program

Stormwater Management Program UNIFIED GOVERNMENT OF WYANDOTTE COUNTY/KANSAS CITY, KANSAS Stormwater Management Program STORMWATER QUALITY EDUCATION GRANT PROGRAM APPLICATION PACKET A. INTRODUCTION The Unified Government of Wyandotte

More information

City of Fernley GRANTS MANAGEMENT POLICIES AND PROCEDURES

City of Fernley GRANTS MANAGEMENT POLICIES AND PROCEDURES 1 of 12 I. PURPOSE The purpose of this policy is to set forth an overall framework for guiding the City s use and management of grant resources. II ` GENERAL POLICY Grant revenues are an important part

More information

Need for Private Investment

Need for Private Investment Need for Private Investment Most municipal retrofit investments tend to be largescale and on publicly-owned land Often high capital costs Limited efficiencies due to geographic locations Limited opportunities

More information

SUBCHAPTER 59D - AGRICULTURE COST SHARE PROGRAM FOR NONPOINT SOURCE POLLUTION CONTROL SECTION AGRICULTURE COST SHARE PROGRAM

SUBCHAPTER 59D - AGRICULTURE COST SHARE PROGRAM FOR NONPOINT SOURCE POLLUTION CONTROL SECTION AGRICULTURE COST SHARE PROGRAM SUBCHAPTER 59D - AGRICULTURE COST SHARE PROGRAM FOR NONPOINT SOURCE POLLUTION CONTROL SECTION.0100 - AGRICULTURE COST SHARE PROGRAM 02 NCAC 59D.0101 PURPOSE This Subchapter describes the operating procedures

More information

Chesapeake Bay Grant Programs. Marcia Fox DNREC Watershed Assessment and Management Section

Chesapeake Bay Grant Programs. Marcia Fox DNREC Watershed Assessment and Management Section Chesapeake Bay Grant Programs Marcia Fox DNREC Watershed Assessment and Management Section 11/6/2015 Chesapeake Bay Grants Delaware is awarded three grants to focus on the restoration and protection of

More information

STATE OF NEW JERSEY. SENATE, No SENATE BUDGET AND APPROPRIATIONS COMMITTEE STATEMENT TO. with committee amendments DATED: NOVEMBER 9, 2015

STATE OF NEW JERSEY. SENATE, No SENATE BUDGET AND APPROPRIATIONS COMMITTEE STATEMENT TO. with committee amendments DATED: NOVEMBER 9, 2015 SENATE BUDGET AND APPROPRIATIONS COMMITTEE STATEMENT TO SENATE, No. 2769 with committee amendments STATE OF NEW JERSEY DATED: NOVEMBER 9, 2015 The Senate Budget and Appropriations Committee reports favorably

More information

FY 2018 Watershed-Based Funding Pilot Program Policy

FY 2018 Watershed-Based Funding Pilot Program Policy FY 2018 Watershed-Based Funding Pilot Program Policy From the Board of Water and Soil Resources, State of Minnesota Version: FY2018 Effective Date: 12/20/2017 Approval: Board Resolution #17-94 Policy Statement

More information

Construction Site TPDES Inspector Workshop. Erik Hobson EPSIII/Resource Protection and Compliance

Construction Site TPDES Inspector Workshop. Erik Hobson EPSIII/Resource Protection and Compliance Construction Site TPDES Inspector Workshop Erik Hobson EPSIII/Resource Protection and Compliance Page 1 Topics Changes to TXR150000 Inspections Edwards Aquifer Program Changes to the Permit Page 2 Revisions

More information

Submission, Review, and Approval Procedures

Submission, Review, and Approval Procedures CHAPTER 2 Submission, Review, and Approval Procedures 2.0 Introduction Chapter 2, Submission, Review, and Approval Procedures, outlines the steps required to obtain Philadelphia Water Department (PWD)

More information

Environmental Management Chapter

Environmental Management Chapter Environmental Management Chapter 335-11-1 ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT PERMITS AND SERVICES DIVISION STATE REVOLVING FUND PROGRAMS ADMINISTRATIVE CODE CHAPTER 335-11-1 CLEAN WATER STATE

More information

Sec moves to amend H.F. No as follows: 1.2 Delete everything after the enacting clause and insert:

Sec moves to amend H.F. No as follows: 1.2 Delete everything after the enacting clause and insert: 1.1... moves to amend H.F. No. 1731 as follows: 1.2 Delete everything after the enacting clause and insert: 1.3 "Section 1. CLEAN WATER FUND APPROPRIATIONS. 1.4 The sums shown in the columns marked "Appropriations"

More information

I. Introduction. II. Goals of the Program

I. Introduction. II. Goals of the Program 2017 Chesapeake Bay Trust- Anne Arundel County Watershed Restoration Grant Program Application Package www.chesapeakebaytrust.org / 410-974-2941 I. Introduction The Watershed Restoration Grant Program

More information

SAN JOSE CAPITAL OF SILICON VALLEY

SAN JOSE CAPITAL OF SILICON VALLEY CITY OF SAN JOSE CAPITAL OF SILICON VALLEY TO: HONORABLE MAYOR AND CITY COUNCIL COUNCIL AGENDA: 1-12-16 ITEM: 7.2 Memorandum FROM: Toni J. Taber, C City Clerk SUBJECT: SEE BELOW DATE: December 18, 2015

More information

FY 2017 Proposed Capital Improvement Program

FY 2017 Proposed Capital Improvement Program FY 2017 Proposed Capital Improvement Program Metropolitan St. Louis Sewer District FY 2017 Capital Improvement Program Proposed Engineering Services Rich Unverferth, P.E. Director of Engineering January

More information

TOWN OF GREENWICH Annual Department Operational Plan (FY )

TOWN OF GREENWICH Annual Department Operational Plan (FY ) TOWN OF GREENWICH Annual Department Operational Plan (FY 2012 2013) 1. Department: Inland Wetlands and Watercourses Agency 2. Divisions: N/A 3. Department Mission Statement: The Inland Wetlands and Watercourses

More information

REQUEST FOR PROPOSAL TO PROVIDE AS-NEEDED ENGINEERING SERVICES FOR THE IMPLEMENTATION OF

REQUEST FOR PROPOSAL TO PROVIDE AS-NEEDED ENGINEERING SERVICES FOR THE IMPLEMENTATION OF REQUEST FOR PROPOSAL TO PROVIDE AS-NEEDED ENGINEERING SERVICES FOR THE IMPLEMENTATION OF PURPLE LINE EXTENSION PROJECT BY LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY Project No. 16-34 CITY

More information

Policy Recommendations for the Safe, Clean Water Program

Policy Recommendations for the Safe, Clean Water Program TO: CC: FROM: Hon. Sheila Kuehl, Chair, Los Angeles County Board of Supervisors Hon. Janice Hahn, Chair Pro Tem, Los Angeles County Board of Supervisors Hon. Hilda L. Solis, Supervisor, First District,

More information

NYC S GREEN INFRASTRUCTURE PROGRAM AND USE OF GRANT FUNDING FOR DESIGN & CONSTRUCTION

NYC S GREEN INFRASTRUCTURE PROGRAM AND USE OF GRANT FUNDING FOR DESIGN & CONSTRUCTION NYC S GREEN INFRASTRUCTURE PROGRAM AND USE OF GRANT FUNDING FOR DESIGN & CONSTRUCTION June 19, 2013 Nitin Katiyar, P.E. (HDR Engineering) nitin.katiyar@hdrinc.com William Leo, P.E. (HDR Engineering) william.leo@hdrinc.com

More information

City of Malibu Request for Proposal

City of Malibu Request for Proposal Request for Proposal North Santa Monica Bay Coastal Watersheds Monitoring Services Date Issued: April 26, 2016 Date Due: May 17, 2016, 4:00 P.M. The Qualifications Proposal and Cost Proposal must be submitted

More information

Joint Application Form for Activities Affecting Water Resources in Minnesota

Joint Application Form for Activities Affecting Water Resources in Minnesota Joint Application Form for Activities Affecting Water Resources in Minnesota This joint application form is the accepted means for initiating review of proposals that may affect a water resource (wetland,

More information

1. MS4 Operator Name: ST. CLAIR TOWNSHIP & ROAD DISTRICT. 2. MS4 Operator Mailing Address: 107 SERVICE STREET SWANSEA IL Street City State Zip

1. MS4 Operator Name: ST. CLAIR TOWNSHIP & ROAD DISTRICT. 2. MS4 Operator Mailing Address: 107 SERVICE STREET SWANSEA IL Street City State Zip ILLINOIS ENVIRONMENTAL PROTECTION AGENCY NOTICE OF INTENT FOR NEW OR RENEWAL OF GENERAL PERMIT FOR DISCHARGES FROM SMALL MUNICIPAL SEPARATE STORM SEWER SYSTEMS (MS4s) Part 1. General Information Input

More information

BMPs eligible for funding under the Grants in Aid pilot project were based on the draft MRGP, and included the following:

BMPs eligible for funding under the Grants in Aid pilot project were based on the draft MRGP, and included the following: GRANTS IN AID PILOT PROJECT State Fiscal Year 2018- FINAL REPORT INTRODUCTION The Grants-in-Aid pilot project provided funding for municipalities to construct best management practices on municipal roads

More information

Green Infrastructure Challenge

Green Infrastructure Challenge Green Infrastructure Challenge $ BRIEFING DOCUMENT Practical green infrastructure solutions for: Public Private Governmental Institutions Award distribution: Design Construction... that s a lot of green

More information

VALLEY REGIONAL FIRE AUTHORITY

VALLEY REGIONAL FIRE AUTHORITY City of Algona City of Auburn City of Pacific VALLEY REGIONAL FIRE AUTHORITY REGIONAL FIRE PROTECTION SERVICE AUTHORITY PLAN August 29, 2006 1 REGIONAL FIRE PROTECTION SERVICE AUTHORITY NEEDS STATEMENT:

More information

MEETING DATE: December 8, 2016 ITEM TYPE: Action Consent Discussion. TITLE: Authorization of Cost Share Funding 2016 Fall Non-Homeowner Projects

MEETING DATE: December 8, 2016 ITEM TYPE: Action Consent Discussion. TITLE: Authorization of Cost Share Funding 2016 Fall Non-Homeowner Projects Minnehaha Creek Watershed District REQUEST FOR BOARD ACTION MEETING DATE: December 8, 2016 ITEM TYPE: Action Consent Discussion TITLE: Authorization of Cost Share Funding 2016 Fall Non-Homeowner Projects

More information

ORDINANCE NO. 640 NOW, THEREFORE, BE IT ORDAINED BY THE MAYOR AND CITY COUNCIL OF THE CITY OF FRUITLAND, IDAHO:

ORDINANCE NO. 640 NOW, THEREFORE, BE IT ORDAINED BY THE MAYOR AND CITY COUNCIL OF THE CITY OF FRUITLAND, IDAHO: ORDINANCE NO. 640 AN ORDINANCE OF THE CITY OF FRUITLAND, IDAHO, AMENDING TITLE 9, CHAPTER 3, SECTION 2, DRAINAGE STANDARDS; AMENDING TITLE 10, CHAPTER 7A, SECTION 19, STORM DRAINAGE; AMENDING TITLE 10,

More information

TRANSMITTAL 4/18/ S1

TRANSMITTAL 4/18/ S1 TO Deborah Flint. Executive Director Department of Airports TRANSMITTAL 0150-10638-0000 DAT t COUNC*. PU KO 4/18/16 15-1548-S1 "ROM The Mayor ' COUMCL OSTRJCT 11 I Approval to Award an Agreement to ABM

More information

Cumberland County Conservation District Strategic Plan Adopted June 23, 2009

Cumberland County Conservation District Strategic Plan Adopted June 23, 2009 Cumberland County Conservation District Strategic Plan Adopted June 23, 2009 Strategic Planning process and purpose This strategic plan is intended to provide a clear and realistic view of the Cumberland

More information

Hazardous Discharge Site Remediation Fund 2013Annual Report

Hazardous Discharge Site Remediation Fund 2013Annual Report Introduction Hazardous Discharge Site Remediation Fund 2013Annual Report The Hazardous Discharge Site Remediation Fund (HDSRF), administered by the New Jersey Economic Development Authority (EDA) and the

More information

ANNUAL STANDARDS AND SPECIFICATIONS

ANNUAL STANDARDS AND SPECIFICATIONS ANNUAL STANDARDS AND SPECIFICATIONS FOR EROSION AND SEDIMENT CONTROL AND STORMWATER MANAGEMENT Submitted: September 2011 Revised: October 2011 Subject: GEORGE MASON UNIVERSITY ANNUAL STANDARDS AND SPECIFICATIONS

More information

GREEN NETWORK PLAN IMPLEMENTATION DRAFT RECOMMENDATION THEMES

GREEN NETWORK PLAN IMPLEMENTATION DRAFT RECOMMENDATION THEMES IMPLEMENTATION DRAFT RECOMMENDATION THEMES 1. Ensure predictability, transparency, and fairness for new green projects. Address issues related to maintenance, enhancement, and protection for existing green

More information

Santa Clara Valley Urban Runoff Pollution Prevention Program

Santa Clara Valley Urban Runoff Pollution Prevention Program Santa Clara Valley Urban Runoff Pollution Prevention Program MANAGEMENT COMMITTEE MEETING MINUTES November 17, 2016 Campbell Cupertino Los Altos Los Altos Hills Los Gatos Milpitas Monte Sereno Mountain

More information

THE REHABILITATION ACT OF 1973, AS AMENDED (by WIOA in 2014) Title VII - Independent Living Services and Centers for Independent Living

THE REHABILITATION ACT OF 1973, AS AMENDED (by WIOA in 2014) Title VII - Independent Living Services and Centers for Independent Living THE REHABILITATION ACT OF 1973, AS AMENDED (by WIOA in 2014) Title VII - Independent Living Services and Centers for Independent Living Chapter 1 - INDIVIDUALS WITH SIGNIFICANT DISABILITIES Subchapter

More information

MARTIN COUNTY BOARD OF COUNTY COMMISSIONERS

MARTIN COUNTY BOARD OF COUNTY COMMISSIONERS MARTIN COUNTY BOARD OF COUNTY COMMISSIONERS 2401 S.E. MONTEREY ROAD STUART, FL 34996 DOUG SMITH Commissioner, District 1 Telephone: 772-463-3263 Fax: 772-288-5955 Email: ddrum@martin.fl.us ED FIELDING

More information

COASTAL CONSERVANCY. Staff Recommendation June 16, 2005 MALIBU ACCESS: DAN BLOCKER BEACH. File No Project Manager: Marc Beyeler

COASTAL CONSERVANCY. Staff Recommendation June 16, 2005 MALIBU ACCESS: DAN BLOCKER BEACH. File No Project Manager: Marc Beyeler COASTAL CONSERVANCY Staff Recommendation June 16, 2005 MALIBU ACCESS: DAN BLOCKER BEACH File No. 03-163 Project Manager: Marc Beyeler RECOMMENDED ACTION: Authorization to augment the Conservancy s January

More information

ASSEMBLY, No STATE OF NEW JERSEY. 217th LEGISLATURE INTRODUCED FEBRUARY 15, SYNOPSIS Creates Joint Apprenticeship Incentive Grant Program.

ASSEMBLY, No STATE OF NEW JERSEY. 217th LEGISLATURE INTRODUCED FEBRUARY 15, SYNOPSIS Creates Joint Apprenticeship Incentive Grant Program. ASSEMBLY, No. STATE OF NEW JERSEY th LEGISLATURE INTRODUCED FEBRUARY, 0 Sponsored by: Assemblyman GARY S. SCHAER District (Bergen and Passaic) Assemblyman WAYNE P. DEANGELO District (Mercer and Middlesex)

More information

STORMWATER UTILITY. CREDIT MANUAL and GRANT PROGRAM DRAFT MAY credit_manual_v7.2.docx

STORMWATER UTILITY. CREDIT MANUAL and GRANT PROGRAM DRAFT MAY credit_manual_v7.2.docx STORMWATER UTILITY CREDIT MANUAL and GRANT PROGRAM DRAFT MAY 2018 credit_manual_v7.2.docx TABLE OF CONTENTS 1. A CITY GOING GREEN 1 1.1 The Green Domino Effect 1 2. LEARN THE ISSUES 2 2.1 Support for the

More information

New York City Department of Environmental Protection FY16 Regulatory Agenda

New York City Department of Environmental Protection FY16 Regulatory Agenda New York City Department of Environmental Protection FY16 Regulatory Agenda In compliance with section 1042 of the New York City Charter, the following is the regulatory agenda for rules that the Department

More information

WATER SUPPLY RESERVE FUND

WATER SUPPLY RESERVE FUND Introduction Senate Bill 06-179, adopted by the 2006 General Assembly, created the Water Supply Reserve Account, now called the Water Supply Reserve Fund (per SB13-181) (WSRF). The legislation, codified

More information

Stormwater Management Incentives Program Grant Manual

Stormwater Management Incentives Program Grant Manual Stormwater Management Incentives Program Grant Manual TABLE OF CONTENTS General Information Background Information... 3 Application Submission Information... Grant Requirements Eligibility Criteria...

More information

CAPITOL REGION COUNCIL OF GOVERNMENTS REQUEST FOR INFORMATION (RFI) FOR STORMWATER MANAGEMENT PLANNING SERVICES

CAPITOL REGION COUNCIL OF GOVERNMENTS REQUEST FOR INFORMATION (RFI) FOR STORMWATER MANAGEMENT PLANNING SERVICES CAPITOL REGION COUNCIL OF GOVERNMENTS REQUEST FOR INFORMATION (RFI) FOR STORMWATER MANAGEMENT PLANNING SERVICES Issue Date: Wednesday, August 3, 2016 Response Date/Time: Wednesday August 31, 2016 2:00

More information

REGIONAL WATER & SEWER DISTRICT FEASIBILITY STUDY, PETITION, AND PLAN OF OPERATION REQUEST FOR PROPOSALS

REGIONAL WATER & SEWER DISTRICT FEASIBILITY STUDY, PETITION, AND PLAN OF OPERATION REQUEST FOR PROPOSALS REGIONAL WATER & SEWER DISTRICT FEASIBILITY STUDY, PETITION, AND PLAN OF OPERATION REQUEST FOR PROPOSALS This Request for Proposal (RFP) is for professional legal services required to prepare and furnish

More information

CITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE Date: Richard H. Llewellyn, Jr., Interim City Administrative Officer

CITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE Date: Richard H. Llewellyn, Jr., Interim City Administrative Officer FORM GEN. 160 CITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE 0220-05384-0000 Date: August 2, To: The Mayor The Council Attn: Mandy Morales, Mayor s Office Michael Espinosa, City Clerk s Office From:

More information

NOTICE OF A PUBLIC HEARING

NOTICE OF A PUBLIC HEARING NOTICE OF A PUBLIC HEARING This is a notice of the City s intent to raise water service fees. If you wish to protest this increase in fees, you must provide a written protest in accordance with instructions

More information

Subject: Guidance on Submitting Consolidated Plans and Annual Action Plans for Fiscal Year (FY) Purpose:

Subject: Guidance on Submitting Consolidated Plans and Annual Action Plans for Fiscal Year (FY) Purpose: U.S. DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT WASHINGTON, DC 20410-7000 OFFICE OF COMMUNITY PLANNING AND DEVELOPMENT Special Attention of: NOTICE: CPD-18-01 All CPD Division Directors HUD Field Offices

More information

U.S. DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT Community Planning and Development

U.S. DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT Community Planning and Development U.S. DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT Community Planning and Development Special Attention of: NOTICE: CPD-16-01 All CPD Division Directors HUD Field Offices Issued: January 28, 2016 HUD Regional

More information

Instructions on Filling out the Western WA Phase II Municipal Stormwater Permit Annual Report Form for Cities and Counties

Instructions on Filling out the Western WA Phase II Municipal Stormwater Permit Annual Report Form for Cities and Counties Instructions on Filling out the Western WA Phase II Municipal Stormwater Permit Annual Report Form for Cities and Counties 1. Complete all TABS in the worksheet: (1) Permittee Information; (2) Certification;

More information

Operating Criteria of the. Wyoming Water Development Program TABLE OF CONTENTS

Operating Criteria of the. Wyoming Water Development Program TABLE OF CONTENTS Operating Criteria of the Wyoming Water Development Program TABLE OF CONTENTS CHAPTER 1 Introduction A. Purpose of the Operating Criteria 1 B. Program Philosophy 2 C. Changes in Program Criteria 2 CHAPTER

More information

REQUEST FOR PROPOSALS (RFP) FOR A YORK COUNTY STORMWATER AUTHORITY FEASIBILITY STUDY

REQUEST FOR PROPOSALS (RFP) FOR A YORK COUNTY STORMWATER AUTHORITY FEASIBILITY STUDY REQUEST FOR PROPOSALS (RFP) FOR A YORK COUNTY STORMWATER AUTHORITY FEASIBILITY STUDY The York County Planning Commission, York, PA is accepting proposals for a one-time contract to perform certain professional

More information

Florence-Darlington Stormwater Consortium Minutes

Florence-Darlington Stormwater Consortium Minutes Florence-Darlington Stormwater Consortium Minutes January 19 th, 2012 2:00 p.m. City of Florence Surface Water Plant The meeting opened promptly at 2:00 p.m. with a welcome by Terasa Young, FDSC Program

More information

The City of Franklin has already expressed its intention to opt-in and administer the program locally.

The City of Franklin has already expressed its intention to opt-in and administer the program locally. SOUTHAMPTON COUNTY BOARD OF SUPERVISORS Regular Session i April 28, 2014 13. VIRGINIA STORMWATER MANAGEMENT PROGRAM CONSIDERATION IN OPTING-IN During its 2014 session, the General Assembly reversed course

More information

General Plan Land Use Amendment

General Plan Land Use Amendment PLANNING SERVICES DEPARTMENT 411 Main Street (530) 879-6800 P.O. Box 3420 Chico, CA 95927 Application No. APPLICATION FOR General Plan Land Use Amendment Applicant Information Applicant Daytime Phone Street

More information

1. Webinar Instructions 2. Overview of Chesapeake Bay Stewardship Fund 3. Review of 2016 Chesapeake Bay Stewardship Fund RFP 4.

1. Webinar Instructions 2. Overview of Chesapeake Bay Stewardship Fund 3. Review of 2016 Chesapeake Bay Stewardship Fund RFP 4. 1. Webinar Instructions 2. Overview of Chesapeake Bay Stewardship Fund 3. Review of 2016 Chesapeake Bay Stewardship Fund RFP 4. How to Submit a Proposal Using EasyGrants NFWF Chesapeake Bay Business Plan

More information

REQUEST FOR PROPOSALS Town of Brattleboro, VT

REQUEST FOR PROPOSALS Town of Brattleboro, VT REQUEST FOR PROPOSALS Town of Brattleboro, VT June 22, 2010 BACKGROUND: The Town of Brattleboro has conducted an extensive planning process for the reconstruction of the Putney Road (US Route 5) corridor

More information

Erosion Control and Water Management Policy

Erosion Control and Water Management Policy Erosion Control and Water Management Program Policy (commonly known as the State Cost Share Program) Table of Contents 1.0 Purpose... 1 2.0 Eligible Activities... 2 3.0 Technical and Administrative Components...

More information

Comments on Clean Water Program Draft Program Elements

Comments on Clean Water Program Draft Program Elements TO: CC: FROM: Hon. Sheila Kuehl, Chair, Los Angeles County Board of Supervisors Hon. Janice Hahn, Chair Pro Tem, Los Angeles County Board of Supervisors Hon. Hilda L. Solis, Supervisor, First District,

More information

OPEN SPACE, RECREATION, BAY AND WATERSHED PROTECTION BONDS 2004 OPEN SPACE BOND AUTHORIZATION $70,000,000 (Chapter 595 Public Laws 2004) PENDING

OPEN SPACE, RECREATION, BAY AND WATERSHED PROTECTION BONDS 2004 OPEN SPACE BOND AUTHORIZATION $70,000,000 (Chapter 595 Public Laws 2004) PENDING STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS DEPARTMENT OF ENVIRONMENTAL MANAGEMENT Division of Planning & Development 235 Promenade Street PROVIDENCE, RI 02908 Filed with the Secretary of State: Effective

More information

SUBCHAPTER 19L - NORTH CAROLINA COMMUNITY DEVELOPMENT BLOCK GRANT PROGRAM SECTION GENERAL PROVISIONS

SUBCHAPTER 19L - NORTH CAROLINA COMMUNITY DEVELOPMENT BLOCK GRANT PROGRAM SECTION GENERAL PROVISIONS SUBCHAPTER 19L - NORTH CAROLINA COMMUNITY DEVELOPMENT BLOCK GRANT PROGRAM SECTION.0100 - GENERAL PROVISIONS 04 NCAC 19L.0101 PROGRAM PURPOSE AND OBJECTIVE The purpose of the North Carolina Community Development

More information

Annual Plan of Work. July 1, 2016 June 30, 2017

Annual Plan of Work. July 1, 2016 June 30, 2017 July 1, 2016 June 30, 2017 The Commonwealth of Virginia supports the through financial and administrative assistance provided by the Department of Conservation and Recreation. In exchange for that support,

More information

CITY OF SIGNAL HILL SUBJECT: EXTENSION OF CONTRACT SERVICES AGREEMENT FOR CONTRACT CITY ENGINEERING SERVICES WITH RKA CONSULTING GROUP

CITY OF SIGNAL HILL SUBJECT: EXTENSION OF CONTRACT SERVICES AGREEMENT FOR CONTRACT CITY ENGINEERING SERVICES WITH RKA CONSULTING GROUP CITY OF SIGNAL HILL October 11, 2016 2175 Cherry Avenue Signal Hill, CA 90755-3799 AGENDA ITEM TO: FROM: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL STEVE MYRTER, P.E. DIRECTOR OF PUBLIC WORKS SUBJECT:

More information

SECTION 4. Construction Site Runoff Control Program

SECTION 4. Construction Site Runoff Control Program SECTION 4 Construction Site Runoff Control Program SECTION 4 Construction Site Runoff Control Program (Permit Part D.1.d.) I. Introduction The purpose of the (USAG HI) Construction Site Runoff Control

More information

DATE: January 16, 2018 REPORT NO. PW Chair and Members Committee of the Whole Operations and Administration

DATE: January 16, 2018 REPORT NO. PW Chair and Members Committee of the Whole Operations and Administration DATE: January 16, 2018 REPORT NO. PW2018-005 TO: FROM: Chair and Members Committee of the Whole Operations and Administration E. (Beth) Goodger, General Manager Public Works Commission 1.0 TYPE OF REPORT

More information

Watershed-based Funding: Pilot program

Watershed-based Funding: Pilot program Watershed-based Funding: Pilot program Background In 2017, the Board of Water and Soil Resources (BWSR), in partnership with the Local Government Water Round Table, began working with local governments

More information

The services shall be performed at appropriate sites as described in this contract.

The services shall be performed at appropriate sites as described in this contract. Page 1 1. Service Overview The California Department of Health Care Services (hereafter referred to as DHCS or Department) administers the Mental Health Services Act, Projects for Assistance in Transition

More information

$5.2 Billion Transportation Funding Deal Announced, includes $1.5 Billion for Local Streets and Roads

$5.2 Billion Transportation Funding Deal Announced, includes $1.5 Billion for Local Streets and Roads 1400 K Street, Suite 400 Sacramento, California 95814 Phone: (916) 658-8200 Fax: (916) 658-8240 www.cacities.org $5.2 Billion Transportation Funding Deal Announced, includes $1.5 Billion for Local Streets

More information

CITY OF WEST HOLLYWOOD REQUEST FOR QUALIFICATIONS. Artwork Maintenance and Conservation Services

CITY OF WEST HOLLYWOOD REQUEST FOR QUALIFICATIONS. Artwork Maintenance and Conservation Services CITY OF WEST HOLLYWOOD REQUEST FOR QUALIFICATIONS Artwork Maintenance and Conservation Services 8300 Santa Monica Boulevard West Hollywood, CA 90069 [Submission Deadline: Wednesday, June 22, 2016 at 5

More information

Skipp kropp Steptoe & Johnson PLLC

Skipp kropp Steptoe & Johnson PLLC Skipp kropp Steptoe & Johnson PLLC S. Ct. decision May 31, 2016 U.S. Army Corps of Engineers v. Hawkes (578 U. S. (2016) Hawkes, owner of peat mining company in North Dakota, seeks to expand operations

More information

Matching Incentive Grant Program

Matching Incentive Grant Program Matching Incentive Grant Program Cabarrus County Active Living & Parks Department PO Box 707 Concord NC 28026 Where FUN comes naturally and las Cabarrus County Active Living & Parks Department MATCHING

More information

PATIENT RIGHTS TO ACCESS PERSONAL MEDICAL RECORDS California Health & Safety Code Section

PATIENT RIGHTS TO ACCESS PERSONAL MEDICAL RECORDS California Health & Safety Code Section PATIENT RIGHTS TO ACCESS PERSONAL MEDICAL RECORDS California Health & Safety Code Section 123100-123149. 123100. The Legislature finds and declares that every person having ultimate responsibility for

More information

Innovation Village, Cal Poly Pomona Economic Benefits Analysis City of Pomona

Innovation Village, Cal Poly Pomona Economic Benefits Analysis City of Pomona City of Pomona Executive Summary Prepared for: Cal Poly Pomona Foundation, Inc. 3801 W. Temple Avenue, Building #55 Pomona, CA 91768-4038 SRHA Job #1231 11661 San Vicente Blvd. Suite 306 Los Angeles, California

More information

DELTA CHI EDUCATIONAL FOUNDATION TABLE OF CONTENTS E-CHI. 1. Draft Proposed Educational Area Grant Program Opinion

DELTA CHI EDUCATIONAL FOUNDATION TABLE OF CONTENTS E-CHI. 1. Draft Proposed Educational Area Grant Program Opinion DELTA CHI EDUCATIONAL FOUNDATION TABLE OF CONTENTS E-CHI 1. Draft Proposed Educational Area Grant Program Opinion Exhibit A. Schedule 1. Exhibit 1. Uniform Grant Procedures for Educational Area Grant Program

More information

Revised January 6, The Park Master Planning Process

Revised January 6, The Park Master Planning Process Revised January 6, 2004 Resolution (2003) 735 A RESOLUTION TO REVISE THE PROCESS FOR APPROVAL OF MASTER PLANS FOR PARK AND RELATED PROJECTS PURPOSE: To develop a total program for a park which will best

More information

AGENDA REPORT. Meeting Date: December 21, 2010 Item Number: F 23

AGENDA REPORT. Meeting Date: December 21, 2010 Item Number: F 23 Meeting Date: December 21, 2010 Item Number: F 23 To: From: AGENDA REPORT Honorable Mayor & City Council Alan Schneider, Director of Project Administration Subject: APPROVAL OF THE AWARD OF A CONTRACT

More information

SEPTIC MAINTENANCE PROGRAM RULES (ARTICLE 10)

SEPTIC MAINTENANCE PROGRAM RULES (ARTICLE 10) SEPTIC MAINTENANCE PROGRAM RULES (ARTICLE 10) Catskill Watershed Corporation PO Box 569 Margaretville, NY 12455 (845) 586-1400 Approved by the Board of Directors October 28, 2003 Revised August 2, 2016

More information

MEMORANDUM OF UNDERSTANDING. between THE SAN FRANCISCO PUBLIC UTILITIES COMMISSION. and THE SAN FRANCISCO RECREATION AND PARK DEPARTMENT

MEMORANDUM OF UNDERSTANDING. between THE SAN FRANCISCO PUBLIC UTILITIES COMMISSION. and THE SAN FRANCISCO RECREATION AND PARK DEPARTMENT MEMORANDUM OF UNDERSTANDING between THE SAN FRANCISCO PUBLIC UTILITIES COMMISSION and THE SAN FRANCISCO RECREATION AND PARK DEPARTMENT THIS Memorandum of Understanding (MOU) is made this day of December,

More information

RANCHO PALOS VERDES CITY COUNCIL MEETING DATE: 12/05/2017 AGENDA HEADING: Consent Calendar

RANCHO PALOS VERDES CITY COUNCIL MEETING DATE: 12/05/2017 AGENDA HEADING: Consent Calendar RANCHO PALOS VERDES CITY COUNCIL MEETING DATE: 12/05/2017 AGENDA REPORT AGENDA HEADING: Consent Calendar AGENDA DESCRIPTION: Consideration and possible action to approve the proposed FY18-19 Community

More information

TRANSPORTATION FUNDING PROGRAMS

TRANSPORTATION FUNDING PROGRAMS APPENDIX A Note: Not yet edited by DCPD. TRANSPORTATION FUNDING PROGRAMS 6 Transportation Funding Programs The following provides a brief description of transportation related funding programs that are

More information

MEMORANDUM. Kari Holzgang, Program Analyst State Water Board Division of Financial Assistance

MEMORANDUM. Kari Holzgang, Program Analyst State Water Board Division of Financial Assistance MEMORANDUM DATE: June 9, 2017 Project No.: 592-10-16-05 SENT VIA: EMAIL TO: Harish Bagha, Grant Manager State Water Board Division of Financial Assistance Kari Holzgang, Program Analyst State Water Board

More information

Bureau of Rail Freight, Ports and Waterways Grant Program Policy

Bureau of Rail Freight, Ports and Waterways Grant Program Policy Bureau of Rail Freight, Ports and Waterways Grant Program Policy A. Background The Rail Freight Assistance Program (RFAP) and Rail Transportation Assistance Program (RTAP), also known as Rail TAP in the

More information

miom ENT CN NEXT 0 PE POSTED MOTION

miom ENT CN NEXT 0 PE POSTED MOTION ' ft. r : t ENT CN NEXT 0 PE POSTED MOTION Up to $2,000,000 has been made available by the U.S. Department of the Interior, Bureau of Reclamation in total funding under the Water SMART: Water Recycling

More information

Subject: Lifeline Cycle 4 Grant Funding

Subject: Lifeline Cycle 4 Grant Funding Agenda Item # 4.b. To: Board of Directors Date: May 11, 2015 From: Laramie Bowron, Manager of Planning Reviewed by: Subject: Lifeline Cycle 4 Grant Funding Summary: As part of County Connection s Lifeline

More information

CITY COUNCIL AGENDA REPORT. DEPARTMENT: Public Services MEETING DATE: November 21, PREPARED BY: Alex Tachiki, Management Analyst

CITY COUNCIL AGENDA REPORT. DEPARTMENT: Public Services MEETING DATE: November 21, PREPARED BY: Alex Tachiki, Management Analyst CITY COUNCIL AGENDA REPORT DEPARTMENT: Public Services MEETING DATE: November 21, 2017 PREPARED BY: Alex Tachiki, Management Analyst AGENDA LOCATION: CC-8 TITLE: Recordation of Memorandum of Unrecorded

More information