PARKHILL ROAD SEWAGE PUMPING STATION CLASS ENVIRONMENTAL ASSESSMENT Public Information Centre Westmount Public School October 4, 2011, 6:30-8:30pm

Size: px
Start display at page:

Download "PARKHILL ROAD SEWAGE PUMPING STATION CLASS ENVIRONMENTAL ASSESSMENT Public Information Centre Westmount Public School October 4, 2011, 6:30-8:30pm"

Transcription

1 PARKHILL ROAD SEWAGE PUMPING STATION CLASS ENVIRONMENTAL ASSESSMENT Public Information Centre Westmount Public School October 4, 2011, 6:30-8:30pm BACKGROUND The City of Peterborough (The City) has recognized the need to provide new residential areas. With this growth comes the need to upgrade some existing infrastructure and / or provide new infrastructure to ensure that all future growth can be serviced. The City has worked with private developers to complete servicing studies for the Jackson Creek and Lily Lake Planning Areas. The next step in the development process is to complete an Environmental Assessment to determine the best sanitary servicing strategy to integrate the new development with the existing infrastructure. This current study is being completed as a Schedule B Municipal Class Environmental Assessment (Class EA) project. The City retained MTE Consultants Inc. (MTE) to undertake the Municipal Class EA. MTE is a privately owned engineering consulting firm with 25 years experience with a variety of projects throughout Ontario. Their main office is located in Kitchener with branches in Burlington, Guelph and Stratford. MTE reviewed the existing studies, drawings, available information, and conducted further investigations to develop feasible sanitary servicing alternatives. Public participation is a very important part of the planning process. When the public expresses their support or concerns regarding a project, it enables the municipality to make better choices for the project. Public Information Centres (PICs) allow the municipality the opportunity to present the proposed alternatives to the public and allows the public to ask questions and provide comments. The information provided at the PIC and contained within this hand-out is meant to provide facts and initiate the communication process. The public is encouraged to ask questions and / or provide comment throughout the duration of the project. MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT PROCESS All work done by a municipality must follow the Municipal Class EA Process (amended in 2007) in order to be approved under the EA Act. The EA process can include up to five phases depending on the schedule of the project. The process ensures the public is able to provide comments and that the evaluation of alternatives considers various aspects.

2 Schedule B undertakings must complete Phase 1 and 2 of the process which includes the development of a Problem Statement, Development of Alternatives, Evaluation of the Alternatives and the Determination of the Preferred Alternative. Once the preferred alternative has been established, the Project File Report is finalized and a Notice of Project Completion must be sent to the Ministry of the Environment (MOE) and all stakeholders. The document must then be available for a 30-day public review period. If there is an unresolved concern by a member of the public they may request a Part II Order which initiates the evaluation of the project by an MOE officer to ensure that all requirements of the EA process were addressed. The request must be in writing and must address the following issues as they relate to the identified concerns: Environmental impacts of the project and their significance; The adequacy of the planning process; The availability of other alternatives to the project; The adequacy of the public consultation program and the opportunities for public participation; The involvement of the person or party in the planning of the project; The nature of the specific concerns which remain unresolved; Details of any discussions held between the person or party and the proponent; The benefits of requiring the proponent to undertake an individual environmental assessment, and; Any other important matter considered relevant. The Ministry will review the request and consult with the proponent and the individual(s) that made the request prior to issuing a decision. The decision could be one of the following: 1. Deny with or without conditions. 2. Refer the matter to mediation. 3. Require the proponent to comply with Part II of the EA Act. If there are no Part II Order requests during the 30-day review period then the project is considered to be accepted and the proponent may proceed to implementation of the preferred alternative. PROPOSED ALTERNATIVES The Jackson Creek Planning Area Study has been completed and the preferred servicing alternative has been approved under the Planning Act. Therefore, each alternative includes the requirement of an upgrade to the Parkhill Road Sewage Pumping Station (SPS). The exact alignment of the sewers to the Parkhill Road SPS is beyond the scope of this project and will be determined by others. The following table describes the alternatives evaluated for this project. Alternative 1 Do Nothing No changes would be undertaken to address the problem statement. The Do Nothing alternative should always be included as an alternative to provide a benchmark for the other alternatives. -2- October 4, 2011 Parkhill Road Sew age Pumping Station Class Environmental Assessment Public Information Centre Information Package

3 Alternative 2 Upgrade Parkhill Road SPS Upgrade Parkhill Road SPS to service entire Jackson Creek and Lily Lake Planning Areas to a peak sewage flow of 406 L/s. Alternative 3 Upgrade both Parkhill Road SPS and Valleyview SPS Upgrade Parkhill Road SPS to a peak sewage flow of 229 L/s to service Jackson Creek Planning Area and Upgrade Valleyview SPS to a peak sewage flow of 218 L/s to service the Lily Lake Planning Area. Alternative 4 Upgrade Parkhill Road SPS and Fairbairn Street Sewer Upgrade Parkhill Road SPS to a peak sewage flow of 229 L/ to service Jackson Creek Planning Area and upgrade sewer infrastructure downstream of Fairbairn Street to service the Lily Lake Planning Area. EVALUATION OF ALTERNATIVES The alternatives were evaluated using environmental, legal/jurisdictional, economic, social, cultural and technical considerations. The following table provides a summary of the evaluation. Alternative Evaluation Rating Alternative 1 Do Nothing Does not address the problem statement. The Jackson Creek and Lily Lake Planning Areas would not be serviced and therefore, could not proceed. Alternative 2 Upgrade Parkhill Road SPS PRELIMINARY PREFERRED ALTERNATIVE Alternative 3 Upgrade both Parkhill Road SPS and Valleyview SPS The Parkhill Road SPS site has adequate space for the required upgrades. The SPS site is not in a residential area and would therefore, have little impact on the public. The upgrades to the Valleyview SPS may require additional land and would be disruptive (during construction as well as due to odour and noise during operation) to the residents adjacent to the site. There would be additional costs associated with the construction start-up requirements at two sites as opposed to just the Parkhill Road SPS site. Alternative 4 Upgrade Parkhill Road SPS and sewer infrastructure downstream of Fairbairn Street The upgrades to the sewers downstream of Fairbairn Street would be disruptive to the vegetation, terrestrial environment, traffic and residents adjacent to the 3.8 km of right-of-way. This would require substantial planning to mitigate the impacts. -3- October 4, 2011 Parkhill Road Sew age Pumping Station Class Environmental Assessment Public Information Centre Information Package

4 PRELIMINARY PREFERRED ALTERNATIVE Based on the preliminary evaluation, Alternative 2 is the Preliminary Preferred Alternative. This alternative requires the upgrade of the Parkhill Road Sewage Pumping Station to a capacity of 406 L/s. The existing site provides adequate space to perform the required upgrades. The extent and details of the required upgrades will be determined during detailed design phase. No upgrades to the Valleyview SPS or any sanitary infrastructure downstream of Fairbairn Street are required as part of the Preliminary Preferred Alternative. Note: The exact alignment of the sewers and/or forcemains required to convey sewage from the Jackson Creek and Lily Lake Planning Areas will be determined in their respective studies under the Planning Act. HOW CAN THE PUBLIC PARTICIPATE Your attendance at this meeting has initiated the communication process. You may provide comments today or at any time to either one of the team members listed below. Comments regarding today s PIC should be received before October 19, All comments will be considered when choosing the final preferred alternative. We appreciate your participation in this project and hope the meeting and this information package have answered your questions regarding this project. If you require more information please contact either of us directly. Sincerely, Mr. Robert Dunford Senior Project Manager City of Peterborough 500 George Street North Peterborough, ON K9H 3R9 Phone: Ext Fax: rjdunford@peterborough.ca Mr. Chris Spere Project Manager MTE Consultants Inc. 520 Bingemans Centre Drive Kitchener, ON N2B 3X9 Phone: Fax: cspere@mte85.com -4- October 4, 2011 Parkhill Road Sew age Pumping Station Class Environmental Assessment Public Information Centre Information Package

5 City of Peterborough Parkhill Road Sewage Pumping Station Class Environmental Assessment Public Information Centre Tuesday, October 4, :30 p.m. 8:30 p.m. Part of the Environmental Assessment (EA) Process requires the presentation of project information to the public. This process allows the public to provide comments and ask questions that will be considered during the preferred solution evaluation process. Please provide comments regarding the information that was presented today and any other issues pertaining to this Class EA study. Please return this completed comment sheet by either depositing it in the Comment Box tonight or via mail to one of project team members listed below by Friday, October 19, CONTINUED ON BACK

6 Thank-you for participating in this important project. If you have any further questions or comments about the project or the EA process please contact one of the project team members listed below. Mr. Robert Dunford Senior Project Manager City of Peterborough 500 George Street North Peterborough, ON K9H 3R9 Phone: Ext Fax: Mr. Chris Spere Project Manager MTE Consultants Inc. 520 Bingemans Centre Drive Kitchener, ON N2B 3X9 Phone: Fax: Optional. Name: Address: City: Postal Code: Phone Number: Note: All comments and information received from individuals, stakeholder groups and agencies regarding this project are being collected to assist the City of Peterborough in making a decision. Under the Municipal Act, personal information such as name, address, telephone number and property location that may be included in a submission becomes part of the public record. Questions regarding the collection of this information should be referred to a Project Team Member.

REPORT TO THE CHIEF ADMINISTRATIVE OFFICER FROM THE DEVELOPMENT AND ENGINEERING SERVICES DEPARTMENT

REPORT TO THE CHIEF ADMINISTRATIVE OFFICER FROM THE DEVELOPMENT AND ENGINEERING SERVICES DEPARTMENT October 19, 2016 REPORT TO THE CHIEF ADMINISTRATIVE OFFICER FROM THE DEVELOPMENT AND ENGINEERING SERVICES DEPARTMENT ON APPLICATIONS TO THE CLEAN WATER AND WASTEWATER FUND PURPOSE To seek Council's authorization

More information

Request for Qualifications Professional Engineering Services

Request for Qualifications Professional Engineering Services Page 1 of 7 Combined Sewage Storage Tunnel Preparation of Preliminary Design, Detailed Design, Tender Documents and Services during Construction Requirement: The City of Ottawa, hereinafter referred to

More information

Policy on Development Cost Sharing

Policy on Development Cost Sharing Policy on Development Cost Sharing 2016 Contents 1.0 Purpose... 3 2.0 General Principles and Criteria... 4 3.0 Definition of Terms... 6 4.0 Sanitary Sewers, Storm Sewers and Watermains... 9 5.0 Sanitary

More information

Administrative Report. Office of the Director of Infrastructure Services

Administrative Report. Office of the Director of Infrastructure Services Office of the Director of Infrastructure Services To: From: Warden Tom Bain and Members of County Council Tom Bateman, P.Eng Director of Infrastructure Services/County Engineer Date: Subject: Report #:

More information

Canada Ontario Resource Development Agreement (CORDA) Application Form

Canada Ontario Resource Development Agreement (CORDA) Application Form Canada Ontario Resource Development Agreement (CORDA) 2019-2020 Application Form Instructions 1. All application forms must be typed, complete and signed 2. Collect and attach all required supporting documents

More information

Master Environmental Servicing Plan & Secondary Plan

Master Environmental Servicing Plan & Secondary Plan East Side Lands Stage 2 Master Environmental Servicing Plan & Secondary Plan Public Consultation Centre: Presentation of the Draft Subwatershed Study and the Preliminary Assessment of Land Use Constraints/Opportunities

More information

CITY OF KINGSTON REPORT TO COUNCIL. Report No.:

CITY OF KINGSTON REPORT TO COUNCIL. Report No.: CITY OF KINGSTON REPORT TO COUNCIL Report No.: 13-020 TO: FROM: RESOURCE STAFF: Mayor and Council Jim Keech, President & CEO, Utilities Kingston Mark Van Buren, Director of Engineering DATE OF MEETING:

More information

Overview of the quality and completeness of wastewater ECA applications

Overview of the quality and completeness of wastewater ECA applications Overview of the quality and completeness of wastewater ECA applications Sanja Jankovic, Application Assessment Unit Client Services and Permissions Branch, MOECC November 29, 2017 Overview Background Approval

More information

THE REGIONAL MUNICIPALITY OF NIAGARA REQUEST FOR PRE-QUALIFICATION (RFPQ) OF

THE REGIONAL MUNICIPALITY OF NIAGARA REQUEST FOR PRE-QUALIFICATION (RFPQ) OF THE REGIONAL MUNICIPALITY OF NIAGARA REQUEST FOR PRE-QUALIFICATION (RFPQ) OF SUPPLY & DELIVERY OF WATER SOLUBLE POLYELECTROLYTE FOR MUNICIPAL SEWAGE SLUDGE DEWATERING DOCUMENT NUMBER 2017-RFPQ-04 ISSUE

More information

Study the Mimico GO Train Station in the Vicinity of Park Lawn Road

Study the Mimico GO Train Station in the Vicinity of Park Lawn Road STAFF REPORT ACTION REQUIRED Study the Mimico GO Train Station in the Vicinity of Park Lawn Road Date: April 23, 2013 To: From: Ward: Reference Number: Planning and Growth Management Committee Chief Planner

More information

TOWN OF NEW TECUMSETH PROTOCOL FOR ESTABLISHING TELECOMMUNICATION FACILITIES

TOWN OF NEW TECUMSETH PROTOCOL FOR ESTABLISHING TELECOMMUNICATION FACILITIES TOWN OF NEW TECUMSETH PROTOCOL FOR ESTABLISHING TELECOMMUNICATION FACILITIES February 2009 Table of Contents Section Page Number 1.0 Introduction... 1 2.0 Objectives... 1 3.0 Jurisdiction... 1 4.0 Full

More information

4.b. 6/22/2017. Local Agency Formation Commission. George J. Spiliotis, Executive Officer

4.b. 6/22/2017. Local Agency Formation Commission. George J. Spiliotis, Executive Officer 4.b. 6/22/2017 TO: FROM: SUBJECT: Local Agency Formation Commission George J. Spiliotis, Executive Officer LAFCO 2014-09-5 SPHERE OF INFLUENCE AMENDMENT TO THE CITY OF BEAUMONT (ADDITION) AND AMENDMENT

More information

PETERBOROUGH POLICE SERVICES BOARD

PETERBOROUGH POLICE SERVICES BOARD PETERBOROUGH POLICE SERVICES BOARD LE-006 - Criminal Investigation and Major Case Management and Procedures Policy Statement: The Peterborough Police Services Board is required by Ontario Regulation 354/04

More information

ENVIRONMENTAL IMPACT ASSESSMENT. Background Information Document

ENVIRONMENTAL IMPACT ASSESSMENT. Background Information Document ENVIRONMENTAL IMPACT ASSESSMENT Background Information Document ENVIRONMENTAL IMPACT ASSESSMENT (SCOPING AND EIA) FOR THE PROPOSED VALLEYVIEW RESIDENTIAL DEVELOPMENT ON PORTION 22 OF THE FARM NAAUWPOORT

More information

REQUEST FOR QUALIFICATIONS -ENGINEERING DESIGN SERVICES -

REQUEST FOR QUALIFICATIONS -ENGINEERING DESIGN SERVICES - BUCKSKIN SANITARY DISTRICT Parker, Arizona PUBLIC NOTICE FOR PROFESSIONAL ENGINEERING SERVICES REQUEST FOR QUALIFICATIONS -ENGINEERING DESIGN SERVICES - PHASE 5&6 WASTEWATER CONVEYANCE SYSTEM Chairman

More information

LICENSING GUIDE FOR OPERATORS OF WASTEWATER FACILITIES. Licensing of Sewage Works Operators, O. Reg. 129/04

LICENSING GUIDE FOR OPERATORS OF WASTEWATER FACILITIES. Licensing of Sewage Works Operators, O. Reg. 129/04 LICENSING GUIDE FOR OPERATORS OF WASTEWATER FACILITIES Licensing of Sewage Works Operators, O. Reg. 129/04 Revised: April 2010 TABLE OF CONTENTS 1 INTRODUCTION...4 1.1 PURPOSE OF CERTIFICATION GUIDE...4

More information

INVENERGY LLC Meeting Summary Report Northline Solar Project

INVENERGY LLC Meeting Summary Report Northline Solar Project INVENERGY LLC Meeting Summary Report Northline Solar Project August 2015 Prepared by Dillon Consulting Limited i Table of Contents Acronyms, Abbreviations, Definitions 1.0 Introduction 1 2.0 Distribution

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS COLORADO 1868 REQUEST FOR PROPOSALS PROJECT: Lake Dredging Engineering/Design NOTICE: Wednesday, October 11, 2017 DEADLINE: October 30, 2017 at 4:00 pm PROJECT CONTACT: Alisha Reis, Interim Town Administrator,

More information

Municipality of North Grenville Rideau-Sanders Community Improvement Plan (CIP) Financial Incentive Program

Municipality of North Grenville Rideau-Sanders Community Improvement Plan (CIP) Financial Incentive Program Municipality of North Grenville Rideau-Sanders Community Improvement Plan (CIP) Financial Incentive Program Program Information Guide In accordance with the Ontario Planning Act, the Municipality of North

More information

York Mills Road Rezoning Application Refusal Report

York Mills Road Rezoning Application Refusal Report STAFF REPORT ACTION REQUIRED 850-858 York Mills Road Rezoning Application Refusal Report Date: July 30, 2010 To: From: Wards: Reference Number: Planning and Growth Management Committee Chief Planner and

More information

Guidelines. Ministry of Natural Resources and Forestry Land Stewardship and Habitat Restoration Program (LSHRP) Ontario.

Guidelines. Ministry of Natural Resources and Forestry Land Stewardship and Habitat Restoration Program (LSHRP) Ontario. Ministry of Natural Resources and Forestry Land Stewardship and Habitat Restoration Program (LSHRP) 2015-2016 Guidelines Ontario.ca/lshrp Page 1 of 12 Application Deadline: Applications must be received

More information

ABORIGINAL CONSULTATION PLAN FOR THE NANTICOKE SOLAR PROJECT

ABORIGINAL CONSULTATION PLAN FOR THE NANTICOKE SOLAR PROJECT ABORIGINAL CONSULTATION PLAN FOR THE NANTICOKE SOLAR PROJECT Submitted to: Ontario Power Generation Inc. 700 University Avenue Toronto, Ontario M5G 1X6 Prepared by: SENES Consultants, now ARCADIS Canada

More information

Provincial Niagara to GTA Corridor Study Community Meeting

Provincial Niagara to GTA Corridor Study Community Meeting Provincial Niagara to GTA Corridor Study Community Meeting John Taylor Councillor Ward 3 Blair Lancaster Councillor Ward 6 Gary Carr Halton Regional Chair Rick Goldring Mayor City of Burlington December

More information

3 MAJOR MACKENZIE DRIVE TRANSPORTATION IMPROVEMENTS HIGHWAY 50 TO WESTON ROAD, CITY OF VAUGHAN STATUS UPDATE, PROJECT 8066

3 MAJOR MACKENZIE DRIVE TRANSPORTATION IMPROVEMENTS HIGHWAY 50 TO WESTON ROAD, CITY OF VAUGHAN STATUS UPDATE, PROJECT 8066 3 MAJOR MACKENZIE DRIVE TRANSPORTATION IMPROVEMENTS HIGHWAY 50 TO WESTON ROAD, CITY OF VAUGHAN STATUS UPDATE, PROJECT 8066 The Transportation and Works Committee recommends the adoption of the recommendations

More information

Processor Application

Processor Application Processor Application Version 1.2 Step 1 Enrolment I confirm that the applicant has completed or updated a Growing Forward 2 (GF2) Enrolment. Step 2 Basic Eligibility Requirements I confirm, on behalf

More information

SRP-2.01-SP-11NNNN-026

SRP-2.01-SP-11NNNN-026 APPROVED FOR INTERNAL USE. Rev. 000 File# 2.01 E-Docs# 3243033 STAFF REVIEW PROCEDURE: Application for Licence to Prepare Site For a New Nuclear Power Plant SRP-2.01-SP-11NNNN-026 Rev. 000 Consideration

More information

PHOENIX LAKE IRWM PROJECT UPDATE Ross Town Council Meeting

PHOENIX LAKE IRWM PROJECT UPDATE Ross Town Council Meeting PHOENIX LAKE IRWM PROJECT UPDATE Ross Town Council Meeting Ross Valley Watershed Flood Risk Reduction Program RossValleyWatershed.org Contact us: 415 473 7226; lizlewis@marincounty.org February 16, 2017

More information

DEVELOPMENT SERVICES REPORT P

DEVELOPMENT SERVICES REPORT P DEVELOPMENT SERVICES REPORT P2012-80 To: Committee of the Whole Council Date: November 19, 2012 Subject: Origin: East Gwillimbury s University (EGU) Project - Expenses to Date Development Services, Economic

More information

Bill Waste Free Ontario Act AMO Waste Diversion Portal for Municipal Staff and Elected Officials

Bill Waste Free Ontario Act AMO Waste Diversion Portal for Municipal Staff and Elected Officials The Municipality of Dysart et al AGENDA Environment and Conservation Committee Thursday, March 2, 2017 at 10:00 A.M. Council Chambers, Haliburton, Ontario Page 1. ADOPTION OF AGENDA 2. DISCLOSURE OF PECUNIARY

More information

CANADIAN WEATHER RADAR NETWORK MODERNIZATION PROJECT FAIRNESS MONITOR FINAL REPORT. Submission Date: March 10, 2016

CANADIAN WEATHER RADAR NETWORK MODERNIZATION PROJECT FAIRNESS MONITOR FINAL REPORT. Submission Date: March 10, 2016 CANADIAN WEATHER RADAR NETWORK MODERNIZATION PROJECT FAIRNESS MONITOR FINAL REPORT Submission Date: March 10, 2016 Submitted To: Director, Fairness Monitoring Departmental Oversight Branch Public Services

More information

KANATA HIGHLANDS URBAN EXPANSION STUDY TERMS OF REFERENCE

KANATA HIGHLANDS URBAN EXPANSION STUDY TERMS OF REFERENCE KANATA HIGHLANDS URBAN EXPANSION STUDY TERMS OF REFERENCE REVISED MAY 2015 Prepared by: FOTENN Consultants Inc. 223 McLeod Street Ottawa, ON K2P 0Z8 T: 613-730-5709 F: 613-730-1136 www.fotenn.com Prepared

More information

Biosolids Forest Fertilization Program

Biosolids Forest Fertilization Program Request for Expressions of Interest (RFEI) Biosolids Forest Fertilization Program Issue Date: June 20, 2017 Closing: 3 complete hard copies plus 1 electronic copy (CD, DVD, or USB flash drive) in.pdf format

More information

March 9, Gary Smith, Utilities Director City of Van Buren P.O. Drawer 1269 Van Buren, AR Dear Mr. Smith:

March 9, Gary Smith, Utilities Director City of Van Buren P.O. Drawer 1269 Van Buren, AR Dear Mr. Smith: March 9, 2009 Gary Smith, Utilities Director City of Van Buren P.O. Drawer 1269 Van Buren, AR 72956 AFI: 17-00062 PDES Permit o.: AR0021482 Dear Mr. Smith: On March 3, 2009, I performed a recon inspection

More information

SIGNIFICANT NONCOMPLIANCE OF WASTEWATER DISCHARGE LIMITS... 3 NONCOMPLIANCE NOTIFICATION (NCN)... 4 NOTICE OF VIOLATION (NOV)... 4

SIGNIFICANT NONCOMPLIANCE OF WASTEWATER DISCHARGE LIMITS... 3 NONCOMPLIANCE NOTIFICATION (NCN)... 4 NOTICE OF VIOLATION (NOV)... 4 TABLE OF CONTENTS SIGNIFICANT NONCOMPLIANCE OF WASTEWATER DISCHARGE LIMITS... 3 NONCOMPLIANCE NOTIFICATION (NCN)... 4 NOTICE OF VIOLATION (NOV)... 4 SCHEDULE OF COMPLIANCE... 5 ADMINISTRATIVE PENALTIES...

More information

DRAFT GUIDELINE NO: X Drinking Water Operator/Water Quality Analyst Certification/Wastewater Operator Revised: 2017

DRAFT GUIDELINE NO: X Drinking Water Operator/Water Quality Analyst Certification/Wastewater Operator Revised: 2017 DRAFT GUIDELINE TITLE: OVERALL RESPONSIBLE OPERATOR AND OPERATOR-IN-CHARGE ROLES AND RESPONSIBILITIES PURPOSE This certification guide provides information to help ensure a common understanding and application

More information

COMMUNITY CARE FACILITY - CLASS B AND GROUP RESIDENCE GUIDELINES

COMMUNITY CARE FACILITY - CLASS B AND GROUP RESIDENCE GUIDELINES City of Vancouver Land Use and Development Policies and Guidelines Planning and Development Services, 453 W. 12th Ave Vancouver, BC V5Y 1V4 F 604.873.7344 fax 604.873.7060 planning@vancouver.ca COMMUNITY

More information

ReWa Capacity Approval Process Public Main Extension Project

ReWa Capacity Approval Process Public Main Extension Project ReWa Capacity Approval Process Public Main Extension Project April 13, 2016 For new development, service availability, and general development questions contact Angie Davis, Development Services Technician.

More information

Red River Valley Water Supply Project. Request for Statement of Qualifications and Preliminary Proposal for Value Engineering Services.

Red River Valley Water Supply Project. Request for Statement of Qualifications and Preliminary Proposal for Value Engineering Services. Red River Valley Water Supply Project Request for Statement of Qualifications and Preliminary Proposal for Value Engineering Services June 7, 2018 The Garrison Diversion Conservancy District (Garrison

More information

QUALIFICATIONS BASED SELECTION FOR PROFESSIONAL SERVICES GUIDELINES FOR QUALIFICATION STATEMENTS INDEPENDENCE, OHIO JANUARY 2014 PREPARED BY:

QUALIFICATIONS BASED SELECTION FOR PROFESSIONAL SERVICES GUIDELINES FOR QUALIFICATION STATEMENTS INDEPENDENCE, OHIO JANUARY 2014 PREPARED BY: QUALIFICATIONS BASED SELECTION FOR PROFESSIONAL SERVICES GUIDELINES FOR QUALIFICATION STATEMENTS INDEPENDENCE, OHIO JANUARY 2014 PREPARED BY: DONALD J. RAMM, P.E. CITY ENGINEER QUALIFICATION STATEMENT

More information

UNIVERSITY OF HOUSTON Campus Facilities Planning Committee Request for Project Approval Form

UNIVERSITY OF HOUSTON Campus Facilities Planning Committee Request for Project Approval Form UNIVERSITY OF HOUSTON Campus Facilities Planning Committee Request for Project Approval Form 1. Project Number 2. Project Name Task Force Fencing 3. Committee Date April 9, 2010 4. Requesting Department

More information

Conrad Grebel University College. Kitchen and Dining Room Expansion and Renovation Architectural Feasibility Study

Conrad Grebel University College. Kitchen and Dining Room Expansion and Renovation Architectural Feasibility Study Conrad Grebel University College Request for Proposals For the Provision of Architectural Consulting Services Conrad Grebel University College invites eligible architects to submit a proposal for the provision

More information

RESOURCE ACCESS ROAD PROGRAM GUIDELINES. April 2015

RESOURCE ACCESS ROAD PROGRAM GUIDELINES. April 2015 RESOURCE ACCESS ROAD PROGRAM GUIDELINES April 2015 Contents: Overview:.. 1 Program Direction:...... 1 Definitions:.... 2 Policy Objectives & Goals: 2 Principles:. 2 Responsiveness to Needs of Resource

More information

Corporate Strategic Plan - Background

Corporate Strategic Plan - Background Strategic Plan Corporate Strategic Plan - Background In 2017, the Township of Selwyn embarked upon an update of its Corporate Strategic Plan, last prepared in 2012. The firm of Monteith Brown Planning

More information

Aboriginal Group Communication Plan Annual Report. Site C Clean Energy Project

Aboriginal Group Communication Plan Annual Report. Site C Clean Energy Project Aboriginal Group Communication Plan 2015-2016 Annual Report Site C Clean Energy Project Reporting period: June 5, 2015 to May 31, 2016 Date: This page intentionally left blank. Table of Contents 1 2 3

More information

Feasibility Analysis & Business Plan Summary In Support of Gas Bar and Convenience Store Borrowing Referendum

Feasibility Analysis & Business Plan Summary In Support of Gas Bar and Convenience Store Borrowing Referendum Feasibility Analysis & Business Plan Summary In Support of Gas Bar and Convenience Store Borrowing Referendum October 2016 We the Sovereign and respected Smalqmix of the Sjukwnaquin-x are committed to

More information

LIMITED ENVIRONMENTAL REVIEW

LIMITED ENVIRONMENTAL REVIEW LIMITED ENVIRONMENTAL REVIEW A. Project Identification Name: 2015 Ohio Department of Health/Ohio Environmental Protection Agency Household Sewage Treatment Systems Repair/ Replacement Program using Principal

More information

Town of Salem, New Hampshire. Development Handbook (last rev. April 2008)

Town of Salem, New Hampshire. Development Handbook (last rev. April 2008) Town of Salem, New Hampshire Development Handbook (last rev. April 2008) 4 5 DEVELOPMENT HANDBOOK Contents I. Introductions II. Development Directory A. Town of Salem 1. Lay Boards a. Board of Selectmen

More information

Downtown Shoulder Area Community Improvement Plan. Investing in our Community

Downtown Shoulder Area Community Improvement Plan. Investing in our Community Downtown Shoulder Area Community Improvement Plan Investing in our Community The Downtown Shoulder Area Renaissance Community Improvement Plan consists of the following: PART A - The preamble which does

More information

Section F: Committee of Adjustment: Minor Variance and Consent Applications

Section F: Committee of Adjustment: Minor Variance and Consent Applications Executive Summary Introduction The Development Review Process STAR Process Pre-application Consultation Submission of "Complete" Applications STAR Application Streams Section A: Official Plan and Zoning

More information

Plan of Development Review Process County of Henrico, Virginia

Plan of Development Review Process County of Henrico, Virginia Plan of Development Review Process County of Henrico, Virginia October 27, 2000 (Revised January 8, 2007, December 7, 2007) (Revised September 11, 2015, effective September 14, 2015) POF011 TABLE OF CONTENTS

More information

THE CORPORATION OF THE CITY OF ST. CATHARINES

THE CORPORATION OF THE CITY OF ST. CATHARINES THE CORPORATION OF THE CITY OF ST. CATHARINES PO Box 3012, 50 Church Street St. Catharines, ON L2R 7C2 Tel : 905.688.5600 Fax: 905.682.3631 www.stcatharines.ca TTY : 905.688.4TTY (4889) PLANNING SERVICES

More information

Guidance and Instructions for the Implementation of Land Disturbing Activities on Fort Jackson

Guidance and Instructions for the Implementation of Land Disturbing Activities on Fort Jackson Guidance and Instructions for the Implementation of Land Disturbing Activities on Fort Jackson 1. Purpose: This document is to provide a summary of regulations that Fort Jackson and associated consultants,

More information

WATER SUPPLY RESERVE FUND

WATER SUPPLY RESERVE FUND Introduction Senate Bill 06-179, adopted by the 2006 General Assembly, created the Water Supply Reserve Account, now called the Water Supply Reserve Fund (per SB13-181) (WSRF). The legislation, codified

More information

GLOBAL MARKET ACCELERATION FUND (GMAF) Program Guidelines

GLOBAL MARKET ACCELERATION FUND (GMAF) Program Guidelines GLOBAL MARKET ACCELERATION FUND (GMAF) Program Guidelines Context The Ministry of Research, Science and Innovation (MRIS) requested $27M per year (beginning in FY2017-18) for 4 (four) years from the Ministry

More information

Planning for a Schedule Refresh Community Accountability Planning Submission. Multi-Sector Service Accountability Agreement Schedule Refresh Content

Planning for a Schedule Refresh Community Accountability Planning Submission. Multi-Sector Service Accountability Agreement Schedule Refresh Content 1. Structure 2. Context Why a Schedule Refresh? Planning for a Schedule Refresh Community Accountability Planning Submission Multi-Sector Service Accountability Agreement Schedule Refresh Content 3. Community

More information

City of Defiance Construction Management & Observation Services

City of Defiance Construction Management & Observation Services City of Defiance Construction Management & Observation Services REQUEST FOR QUALIFICATIONS January 5, PURPOSE The City of Defiance intends to contract for construction management & observation services

More information

407 East Environmental Assessment (EA) Development/Land-use Application Guidelines

407 East Environmental Assessment (EA) Development/Land-use Application Guidelines 407 East Environmental Assessment (EA) Development/Land-use Application Guidelines There is a need to establish procedural guidelines for the handling of corridor management issues that arise as a result

More information

INTERGOVERNMENTAL COORDINATION ELEMENT

INTERGOVERNMENTAL COORDINATION ELEMENT INTERGOVERNMENTAL COORDINATION ELEMENT I. PURPOSE The purpose of this Element is to identify and resolve incompatible goals, objectives, policies and development proposed by other governmental entities,

More information

The Regional Municipality of Halton. Chair and Members of the Planning and Public Works Committee

The Regional Municipality of Halton. Chair and Members of the Planning and Public Works Committee Approved - Planning and Public Works - May 06, 2009 Adopted - Regional Council - May 13, 2009 The Regional Municipality of Halton Report To: From: Chair and Members of the Planning and Public Works Committee

More information

PROPONENT'S GUIDE. Project Proposal Submission to a Designated Office

PROPONENT'S GUIDE. Project Proposal Submission to a Designated Office PROPONENT'S GUIDE Project Proposal Submission to a Designated Office Table of Contents 3 4 5 5 5 6 6 6 6 8 8 8 9 9 9 10 10 10 10 10 10 10 11 11 11 11 11 12 12 Preface What is a Designated Office Evaluation?

More information

Item No Transportation Standing Committee September 28, 2017

Item No Transportation Standing Committee September 28, 2017 P.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Item No. 12.1.2 Transportation Standing Committee September 28, 2017 TO: Chair and Members of Transportation Standing Committee SUBMITTED BY: Original

More information

First Nation, Inuit, Métis Urban & Rural 2014/20 Housing Program. Request for Proposals 2014 and 2015 Allocation

First Nation, Inuit, Métis Urban & Rural 2014/20 Housing Program. Request for Proposals 2014 and 2015 Allocation First Nation, Inuit, Métis Urban & Rural 2014/20 Housing Program Request for Proposals 2014 and 2015 Allocation Launch Date: September 17, 2014 Deadline: Submissions must be received by OAHS Head Office

More information

REQUEST FOR PROPOSALS PROFESSIONAL ARCHITECTURAL FIRM FOR DESIGN & CONSTRUCTION MANAGEMENT SERVICES

REQUEST FOR PROPOSALS PROFESSIONAL ARCHITECTURAL FIRM FOR DESIGN & CONSTRUCTION MANAGEMENT SERVICES REQUEST FOR PROPOSALS PROFESSIONAL ARCHITECTURAL FIRM FOR DESIGN & CONSTRUCTION MANAGEMENT SERVICES Prepared By: Ellis County Administration 718 Main Street P.O. Box 720 Hays, KS 67601 Contact: Phillip

More information

Pecue Lane/I-10 Interchange Project Public Meeting Transcript

Pecue Lane/I-10 Interchange Project Public Meeting Transcript Pecue Lane/I-10 Interchange Project Public Meeting Transcript Thursday, November 4, 2010 Associated Builders & Contractors 19251 Highland Road 4:30pm 7:30pm 20 attendees Representatives from the Louisiana

More information

Lexington s Stormwater Quality Projects Incentive Grant Program

Lexington s Stormwater Quality Projects Incentive Grant Program Lexington s Stormwater Quality Projects Incentive Grant Program PRESENTED BY: Gregory S. Lubeck, P.E., CFM, ENGINEERING SECTION MANAGER LEXINGTON-FAYETTE URBAN COUNTY GOVERNMENT Discussion Topics EPA Consent

More information

City of Portsmouth Portsmouth, New Hampshire Public Works Department RFP #68-14 REQUEST FOR PROPOSAL

City of Portsmouth Portsmouth, New Hampshire Public Works Department RFP #68-14 REQUEST FOR PROPOSAL City of Portsmouth Portsmouth, New Hampshire Public Works Department RFP #68-14 REQUEST FOR PROPOSAL DESIGN ENGINEERING SERVICES NEW CASTLE WATER LINE IMPROVEMENTS INVITATION Sealed Proposals, plainly

More information

- 1 - Bureau of Point and Non-Point Source Management

- 1 - Bureau of Point and Non-Point Source Management Bureau of Point and Non-Point Source Management Standard Operating Procedure (SOP) 1 for Clean Water Program Review of Sewage Facilities Planning Module Component 3s SOP No. BPNPSM-PLNG-006 Final, June

More information

THIS IS A SAMPLE APPLICATION ONLY ALL APPLICANTS MUST APPLY AND SUBMIT APPLICATIONS ONLINE

THIS IS A SAMPLE APPLICATION ONLY ALL APPLICANTS MUST APPLY AND SUBMIT APPLICATIONS ONLINE THIS IS A SAMPLE APPLICATION ONLY ALL APPLICANTS MUST APPLY AND SUBMIT APPLICATIONS ONLINE Visit the Clean Water and Wastewater website for the online application portal. A. Applicant Information Legal

More information

Meeting Minutes. Project: Subject: Date: Wednesday, December 16, 2015 Location: Attendees:

Meeting Minutes. Project: Subject: Date: Wednesday, December 16, 2015 Location: Attendees: Meeting Minutes Project: Subject: DART D2 Stakeholder Work Group for D2 Date: Wednesday, December 16, 2015 Location: Attendees: DART, 1401 Pacific Avenue, Dallas, TX Steve Salin, DART Ernie Martinez, DART

More information

BROWNFIELDS TAX ASSISTANCE / REHABILITATION GRANT PROGRAM GUIDE

BROWNFIELDS TAX ASSISTANCE / REHABILITATION GRANT PROGRAM GUIDE 1) Program Description The intent of the Brownfields Tax Assistance Program is to provide a financial incentive in the form of a freeze of municipal (City and Region) property taxes for up to 5 years and

More information

NIRB File No.: 12MN036. February 23, Back River Distribution List

NIRB File No.: 12MN036. February 23, Back River Distribution List February 23, 2017 NIRB File No.: 12MN036 To: Re: Back River Distribution List Acceptance of the Final Environmental Impact Statement Addendum and Commencement of the Technical Review Period for the NIRB

More information

T O W N O F M I D L A N D MIDLAND BAY LANDING A MIDLAND WATERFRONT DEVELOPMENT OPPORTUNITY

T O W N O F M I D L A N D MIDLAND BAY LANDING A MIDLAND WATERFRONT DEVELOPMENT OPPORTUNITY T O W N O F M I D L A N D MIDLAND BAY A MIDLAND WATERFRONT DEVELOPMENT OPPORTUNITY REQUEST FOR EXPRESSIONS OF INTEREST FROM DEVELOPERS July, 2014 Town of Midland MIDLAND BAY A MIDLAND WATERFRONT DEVELOPMENT

More information

ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT PERMITS AND SERVICES DIVISION STATE REVOLVING FUND PROGRAMS DIVISION

ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT PERMITS AND SERVICES DIVISION STATE REVOLVING FUND PROGRAMS DIVISION ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT PERMITS AND SERVICES DIVISION STATE REVOLVING FUND PROGRAMS DIVISION 335 11 1400 Coliseum Boulevard Montgomery, Alabama 36110 CITE AS ADEM Admin. Code r.

More information

CITY CLERK. Consolidated Clause in Policy and Finance Committee Report 7, which was considered by City Council on July 19, 20, 21 and 26, 2005.

CITY CLERK. Consolidated Clause in Policy and Finance Committee Report 7, which was considered by City Council on July 19, 20, 21 and 26, 2005. CITY CLERK Consolidated Clause in Report 7, which was considered by City Council on July 19, 20, 21 and 26, 2005. 51 Authority for the City to Receive Donations of Cash for the Planning, Design and Development

More information

National Farmers Union, Local North Shore Road, RR#4 Gananoque, ON

National Farmers Union, Local North Shore Road, RR#4 Gananoque, ON National Farmers Union, Local 316 454 North Shore Road, RR#4 Gananoque, ON 1. Background Information REQUEST FOR PROPOSALS CONSULTANT TO PROVIDE BUSINESS PLAN FOR POULTRY ABATTOIR In September 2009 the

More information

NOTICE TO CONSULTANTS REQUEST FOR PROPOSAL FOR PROFESSIONAL SERVICES FOR GROUNDWATER MODELING AND INJECTION TESTING

NOTICE TO CONSULTANTS REQUEST FOR PROPOSAL FOR PROFESSIONAL SERVICES FOR GROUNDWATER MODELING AND INJECTION TESTING NOTICE TO CONSULTANTS REQUEST FOR PROPOSAL FOR PROFESSIONAL SERVICES FOR GROUNDWATER MODELING AND INJECTION TESTING March 30, 2018 Issued by: X Rob Livick, PE/PLS Public Works Director/City Engineer City

More information

FY 2016 Capital Improvement Program (CIP) BOWC Update. March 4, 2015

FY 2016 Capital Improvement Program (CIP) BOWC Update. March 4, 2015 FY 2016 Capital Improvement Program (CIP) BOWC Update March 4, 2015 FY 2016 CIP CIP Development Process 1 FY 2016 CIP Development Process Annually the CIP is reviewed and updated to recommend capital improvements

More information

City of Guelph. Site Plan User Guide. Version 1

City of Guelph. Site Plan User Guide. Version 1 City of Guelph Site Plan User Guide Version 1 Table of contents Chapter 1 What is the site plan process?...1 About this user guide...1 Standard site plan process...1 Minor site plan process...3 Site plan

More information

Regulation for the Environmental Clearance of Projects

Regulation for the Environmental Clearance of Projects Regulation for the Environmental Clearance of Projects February 2001 National Environment Commission Secretariat Thimphu Bhutan Table Of Contents CHAPTER I. ADMINISTRATION...1 AUTHORITY...1 PURPOSE...1

More information

Appendix F Public Meeting Summaries. F1: May 2013 Public Meeting Summary F2: September 2013 Public Meeting Summary

Appendix F Public Meeting Summaries. F1: May 2013 Public Meeting Summary F2: September 2013 Public Meeting Summary Loop 9 Southeast Corridor/Feasibility Study Appendix F Public Meeting Summaries F1: May 2013 Public Meeting Summary F2: September 2013 Public Meeting Summary Loop 9 Southeast Corridor/Feasibility Study

More information

CHAIR AND MEMBERS INVESTMENT AND ECONOMIC PROSPERITY COMMITTEE MEETING ON AUGUST 27, 2014 CITY MANAGER ART ZUIDEMA PERFORMING ARTS CENTRE STUDIES

CHAIR AND MEMBERS INVESTMENT AND ECONOMIC PROSPERITY COMMITTEE MEETING ON AUGUST 27, 2014 CITY MANAGER ART ZUIDEMA PERFORMING ARTS CENTRE STUDIES Item Page TO: CHAIR AND MEMBERS INVESTMENT AND ECONOMIC PROSPERITY COMMITTEE MEETING ON AUGUST 27, 2014 FROM: CITY MANAGER ART ZUIDEMA SUBJECT: PERFORMING ARTS CENTRE STUDIES RECOMMENDATIONS That, on the

More information

REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR THE MARCH LANE/EAST BAY MUD BICYCLE AND PEDESTRIAN PATH CONNECTIVITY IMPROVEMENTS.

REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR THE MARCH LANE/EAST BAY MUD BICYCLE AND PEDESTRIAN PATH CONNECTIVITY IMPROVEMENTS. REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR THE MARCH LANE/EAST BAY MUD BICYCLE AND PEDESTRIAN PATH CONNECTIVITY IMPROVEMENTS Federal Project No. CML-5008(179) City Project No. PW1722 Issued by: City

More information

STONEY INFORMATION LETTER (SIL) FORM

STONEY INFORMATION LETTER (SIL) FORM STONEY INFORMATION LETTER (SIL) FORM Project Proponent Use Project Proponent Name: Project Title: Project Location: (legal description) Date Submitted: Submitted By: Stoney Nation Use Date Received Received

More information

CITY OF LANCASTER, PENNSYLVANIA

CITY OF LANCASTER, PENNSYLVANIA CITY OF LANCASTER, PENNSYLVANIA REQUEST FOR PROPOSALS FOR PROFESSIONAL SERVICES May 11, 2012 The City of Lancaster, Pennsylvania, is seeking the professional services of an urban planning firm to assist

More information

Amended Guidelines for the Small Firm Assistance Program

Amended Guidelines for the Small Firm Assistance Program Amended Guidelines for the Small Firm Assistance Program Program The Small Firm Assistance Program (the Program) has been established by the Lower Manhattan Development Corporation (LMDC), in cooperation

More information

Comprehensive Plan 2009

Comprehensive Plan 2009 Comprehensive Plan 2009 2.14 PUBLIC SCHOOLS FACILITIES Goal: Coordinate and maintain a high quality education system. Collaborate and coordinate with the Okaloosa County School Board (School Board) to

More information

TO MEMBERS OF THE FINANCE AND CAPITAL STRATEGIES COMMITTEE: ACTION ITEM 1

TO MEMBERS OF THE FINANCE AND CAPITAL STRATEGIES COMMITTEE: ACTION ITEM 1 F12(X) Office of the President TO MEMBERS OF THE FINANCE AND CAPITAL : For Meeting of ACTION ITEM 1 AUTHORITY TO ENTER INTO A GROUND LEASE AND LEASE DISPOSITION AND DEVELOPMENT AGREEMENT FOLLOWING ACTION

More information

City of St. Catharines Graffiti Removal Financial Assistance Program

City of St. Catharines Graffiti Removal Financial Assistance Program City of St. Catharines Graffiti Removal Financial Assistance Program Implementation Flowchart 1. Applicant: a. Report incident to Police, and obtain an incident number: 905-688-4111 b. Report incident

More information

Request for Qualifications For

Request for Qualifications For D E L A W A R E V A L L E Y R E G I O N A L P L A N N I N G C O M M I S S I ON The ACP Building, 190 N. Independence Mall West Telephone: (215) 592-1800 Philadelphia, PA 19106-1520 FAX: (215) 592-9125

More information

Request for Redevelopment Proposal 102 N. Broadway, City of De Pere

Request for Redevelopment Proposal 102 N. Broadway, City of De Pere Introduction and Summary The City of De Pere (City) is requesting redevelopment proposals for a development opportunity of a City owned parcel on the corner of Broadway and George Street in Downtown De

More information

San Jacinto River Authority. Board of Directors Meeting June 28, 2018

San Jacinto River Authority. Board of Directors Meeting June 28, 2018 San Jacinto River Authority Board of Directors Meeting June 28, 2018 AGENDA SAN JACINTO RIVER AUTHORITY THURSDAY, JUNE 28, 2018-8:00 A.M. GENERAL AND ADMINISTRATION BUILDING 1577 DAM SITE ROAD, CONROE,

More information

REQUEST FOR INFORMATION. RFI No. CS-AM

REQUEST FOR INFORMATION. RFI No. CS-AM Where History and Innovation Thrive REQUEST FOR INFORMATION Partnering opportunity with the municipality in the provision of capital investment in marina infrastructure and delivery of marinas operations

More information

Werrington Grade Separation Pre-Application Approach to Community Consultation

Werrington Grade Separation Pre-Application Approach to Community Consultation Werrington Grade Separation Pre-Application Approach to Community Consultation Document reference Author 140365-ARP-CON-022 Network Rail Date August 2016 Revision number 4 CONTENTS Page 1 Executive Summary

More information

Request for Proposals For General Plan Update

Request for Proposals For General Plan Update Request for Proposals For General Plan Update Issued: Monday, December 18, 2017 Proposals Due: Tuesday, January 16, 2018, 5:00 pm PREPARED BY: 330 W. 20 th Avenue San Mateo, CA 94403 CONTACT: Planning

More information

City of Waterloo, Wisconsin. Request for Proposals. Municipal Engineering Services

City of Waterloo, Wisconsin. Request for Proposals. Municipal Engineering Services City of Waterloo, Wisconsin Request for Proposals Municipal Engineering Services Submission Date: December 1, 2011 @ 4:00 p.m. Issued by: Mo Hansen, Clerk/Treasurer City of Waterloo 136 N. Monroe Street

More information

Office of Climate Change Guyana September, TRANSITIONING TO NATIONAL ENERGY SECURITY: Bartica as a Model Green Town TERMS OF REFERENCE

Office of Climate Change Guyana September, TRANSITIONING TO NATIONAL ENERGY SECURITY: Bartica as a Model Green Town TERMS OF REFERENCE Office of Climate Change Guyana September, 2017 TRANSITIONING TO NATIONAL ENERGY SECURITY: Bartica as a Model Green Town TERMS OF REFERENCE ENERGY AUDIT OF PUBLIC INSTITUTIONS, FACILITIES AND STREET LIGHTING

More information

APPLICATION FOR CONNECTION TO A RURAL WATER SUPPLY SCHEME

APPLICATION FOR CONNECTION TO A RURAL WATER SUPPLY SCHEME APPLICATION FOR Important Note Being connected to one of the Rural Water Supply (RWS) schemes administered by Otorohanga District Council is different to being connected to a water supply in an urban community

More information

Service Accountability Agreements Update

Service Accountability Agreements Update Service Accountability Agreements Update Central East Local Health Integration Network Board Meeting Date: December 21, 2016 Presented By: System Finance and Performance Management Overview Context Service

More information

TOWN OF WRIGHTSVLLE BEACH REQUEST FOR QUALIFICATIONS (RFQ)

TOWN OF WRIGHTSVLLE BEACH REQUEST FOR QUALIFICATIONS (RFQ) TOWN OF WRIGHTSVLLE BEACH REQUEST FOR QUALIFICATIONS (RFQ) FOR CONSULTANT ENGINEERING SERVICES TO ASSESS THE CURRENT CONDITION OF THE TOWN S ONLY SEWER CONNECTION TO CAPE FEAR UTILITY AUTHORITY AND LOCATED

More information

Nevada Department of Transportation Traffic Operations Policy Memorandum Traffic Signal Warrant Approval Process

Nevada Department of Transportation Traffic Operations Policy Memorandum Traffic Signal Warrant Approval Process Nevada Department of Transportation Traffic Operations Policy Memorandum 2015-01 This document establishes procedures for the preparation of traffic signal warrant studies that meet NDOT requirements,

More information