1 Community Orientation Meeting City of Long Beach Dana Branch Library 6:00 p.m. 8:00 p.m. INTRODUCTION On Tuesday, the City of Long Beach, hosted by Councilmember Rae Gabelich, held its fourth and final in a series of community orientation meetings. The meeting took place at Dana Branch Library and fourteen community members attended. Present from the I-710 Project Team were: Devon Cichoski (Metro), Rob McCann (LSA), Jack Waldron (URS), Jerry Wood (Gateway Cities COG), Becky Draper (MIG), Tony Torres (DSO) and Mary Brooks (The Robert Group). The purpose of the meeting was to provide a Project Overview and Update to the community regarding the I-710 Corridor Project EIR/EIS, and to introduce the community participation framework. Becky Draper began the meeting by welcoming those in attendance and introducing Councilmember Gabelich, who gave opening remarks, stressing the importance of community input and encouraging everyone to express their concerns to project staff and spread the word to others in their communities to participate in the process. She handed the floor back to Ms. Draper who proceeded to give a brief overview of the meeting format and agenda followed by introductions of the project team. She then turned the floor over to Devon Cichoski, Metro Community Participation Manager. Ms. Cichoski provided a project status report and overview of the process that has included the project team going out to the 15 cities within the 18-mile project area, forming local advisory committees and seeking community input in an effort to ensure an active community process. She pointed out that the objectives of this phase correspond to the three most important areas of concern arising from the Major Corridor Study that preceded this current project. They are:
2 1. Improved air quality and public heath 2. Improved mobility 3. Clean environmentally friendly technologies for moving goods out of the port She also noted the Major Corridor Study identified the locally preferred strategy through stakeholder and policymaker consensus, an alternative that includes 10 multi-purpose lanes and a corridor for truck lanes or alternative technologies. Ms. Cichoski concluded her remarks and introduced Jack Waldron of URS Corporation who gave an overview of the environmental and engineering work that would be conducted. He briefly reviewed these areas of assessment to be included in the initial studies: Air quality Health risk LA River impact Noise impacts Visual impact Mr. Waldron went on to review the six (6) alternatives that have been identified for evaluation during the upcoming scoping process: No build Transportation systems management / transportation demand management Goods movement enhancement Arterial highway and congestion relief program Mainline I-710 improvements addition of mixed flow lanes Locally preferred strategy addition of mixed flow lanes, improvements at interchanges and addition of a goods movement corridor He then reported that the work of the technical team has been underway for several months and has included aerial mapping, evaluation of the alignment and locally preferred strategy for improvements to the layout, goods movement study, development of the purpose and need statement and an alternative technology study that has identified 15 companies that are considering moving goods by the use of electrically driven technologies instead of diesel fuel. Page 2 of 6
3 Mr. Waldron completed his remarks by reviewing the project schedule: Pre-scoping March August 2008 Scoping September 2008 Evaluation of alternatives Preliminary engineering and environmental assessments Draft document Summer 2010 Final document Fall 2011 Ms. Draper then provided the audience with an overview of the framework for the community participation process, emphasizing the recurring opportunities for community input throughout the entire project She reviewed the schedule of meetings that began in May 2008 with local advisory committee (LAC) meetings and will conduct scoping meetings in September 2008 followed by the CAC and subject working group meetings in October At this time out the project team has met with each LAC at least once. Ms. Draper then explained the community participation framework that enables information to come up from the local communities to the governance levels through the tailored Local Advisory Committee (LAC) approach. Rob McCann was then introduced and distributed the CEQA and NEPA process fact sheets that were developed to provide background for the I-710 EIR/EIS corridor project. Mr. McCann explained the similarities and slight differences for each of these environmental processes. The document contained a step-by-step graphic illustration of the environmental process. Mr. McCann informed the audience that the environmental process examines the scope of the project alternatives and aims to mitigate any impacts to the surrounding community. Through this process the project team seeks to hear from the community about issues to be considered and screens for alternatives that do not meet the project s objectives. After completing a series of technical studies the draft environmental document is circulated for formal public review and from there a preferred alternative will be selected. Jerry Wood of the Gateway Cities COG was introduced to discuss the issues of concern to Long Beach that would be studied in this process: Container volumes from the ports Coordination of projects at Shoemaker Bridge Alternative technology applications at the ports and along I-710 Page 3 of 6
4 Near-dock rail yard projects I-710/SR-91 connector ramps Traffic projections assuming nighttime operations Air quality action plan Mr. Wood indicated that the locally preferred strategy will be basis for the process. He then returned the floor to Becky Draper who informed the audience that comments can be submitted via the website, telephone/fax or , and went over the upcoming scoping meeting dates and locations. Ms. Draper then opened the floor to discussion. Points discussed include the following: Consider freeway impacts on the Los Angeles River Look at implications of Mexican port construction Clarify project s potential to improve air quality Explain technology s role in enhancing improvements Demonstrate economic feasibility Specify allowable land uses under the I-710/405 flyover Clarify degree of impacts on neighborhoods west of the freeway Consider negative impacts of construction Confirm future of the docks at the Port of Long Beach Explore connection between traffic mitigation and resulting changes in duration of noise throughout the day Verify whether freeway widening in South Gate would necessitate property takings Investigate whether project goals of relieving congestion and improving air quality are contradictory or complementary Address concerns about emissions from the Alameda Corridor Prioritize mitigation measures near homes & schools early in the process Explore potential of alternative technologies to accommodate changes in elevation Consider partnerships with goods movers in the case of electrical reconstruction Clarify if meetings with school district representatives within the project area are planned Clarify how landscaping might be used in sound mitigation Page 4 of 6
5 Conclusion Following the discussion period Ms. Draper thanked the participation and repeated that further comments could be submitted via the project website, telephone/fax or , as well as reminding the participant of the upcoming scoping meeting dates and locations. Page 5 of 6
6 Long Beach Community Orientation Meeting Dana Branch Library Page 6 of 6
Corridor Advisory Committee Meeting #52. February 16, :00 PM - 8:00 PM Progress Park Downey Ave, Paramount, CA MEETING SUMMARY
Corridor Advisory Committee Meeting #52 February 16, 2017 6:00 PM - 8:00 PM Progress Park 15500 Downey Ave, Paramount, CA 90723 INTRODUCTION On Thursday, February 16, 2017, the Corridor Advisory Committee
More informationCorridor Advisory Committee Meeting #30. September 20, :00-8:00 p.m. Progress Park Downey Blvd., Paramount MEETING SUMMARY
Corridor Advisory Committee Meeting #30 September 20, 2012 6:00-8:00 p.m. Progress Park 15500 Downey Blvd., Paramount INTRODUCTION On September 20, 2012 the Corridor Advisory Committee met at Progress
More informationPublic-Private Partnership Program May 2015 Transit Coalition Update
Public-Private Partnership Program May 2015 Transit Coalition Update Los Angeles County Metropolitan Transportation Authority Mark Linsenmayer Director Presentation Agenda Overview of Metro Public Private
More information1.0 EXECUTIVE SUMMARY
1.0 EXECUTIVE SUMMARY FEASIBILITY REPORT In November 2008, Measure R was approved by a significant two-thirds majority, committing a projected $40 billion to traffic relief and transportation upgrades
More informationMOBILITY PARTNERSHIP AGENDA
1. CALL TO ORDER/ROLL CALL MOBILITY PARTNERSHIP Wednesday, October 11, 2017 9:00 a.m. to 10:30 a.m. Gilroy City Council Chambers 7351 Rosanna Street, Gilroy, CA AGENDA 2. PUBLIC PRESENTATIONS: This portion
More informationProject Budget and Schedule Status
Program Management Project Budget and Schedule Status Highway Program Planning & Programming Committee June 19, 2013 Highway Program Project Schedules EIR/EIS Construction Various project stages Engineering
More information2018 Regional Solicitation for Transportation Projects
2018 Regional Solicitation for Transportation Projects Regional Solicitation Workshop April 17 2018 Regional Solicitation Purpose To distribute federal Surface Transportation Block Grant Program (STBGP)
More informationCommonwealth Transportation Board Briefing
Hampton Roads Crossing Study (HRCS) (SEIS) Commonwealth Transportation Board Briefing September 20, 2016 Angel Deem VDOT, Environmental Division Director HRCS History 1991: Federal funding allocated for
More informationMETHODOLOGY - Scope of Work
The scope of work for the Truckee West River Site Redevelopment Feasibility Study will be undertaken through a series of sequential steps or tasks and will comprise four major tasks as follows. TASK 1:
More informationCITY OF SPOKANE VALLEY Request for Council Action
CITY OF SPOKANE VALLEY Request for Council Action Meeting Date: March 29, 2016 Department Director Approval: Check all that apply: consent old business new business public hearing information admin. report
More informationSynopsis of Revised Changes to DCA s Rules for Developments of Regional Impact
The Georgia Planning Act, passed by the General Assembly in 1989, charged the Georgia Department of Community Affairs with administering the State s comprehensive planning program. 1 That legislation assigned
More informationState Route 91 Corridor Improvement Project Update. State Route 91 Advisory Committee June 4, 2010
State Route 91 Corridor Improvement Project Update State Route 91 Advisory Committee June 4, 2010 Presentation Agenda Recent Project Milestones Project Development Schedule Environmental Permitting Design-Build
More informationTHE CORRADINO GROUP. RE: DRIC EPE/EIS Project; Job N TCG Project No Invoice No. 10 Progress Report.
THE CORRADINO GROUP November 7, 2005 Mr. Mohammed Alghurabi, Project Manager MDOT, Design Division 425 West Ottawa Lansing, MI 48933 RE: DRIC EPE/EIS Project; Job N. 802330 TCG Project No. 3600 - Invoice
More informationPecue Lane/I-10 Interchange Project Public Meeting Transcript
Pecue Lane/I-10 Interchange Project Public Meeting Transcript Thursday, November 4, 2010 Associated Builders & Contractors 19251 Highland Road 4:30pm 7:30pm 20 attendees Representatives from the Louisiana
More information$5.2 Billion Transportation Funding Deal Announced, includes $1.5 Billion for Local Streets and Roads
1400 K Street, Suite 400 Sacramento, California 95814 Phone: (916) 658-8200 Fax: (916) 658-8240 www.cacities.org $5.2 Billion Transportation Funding Deal Announced, includes $1.5 Billion for Local Streets
More informationPuget Sound Gateway Program
Puget Sound Gateway Program SR 167 Completion Project Tacoma Transportation Commission April 18, 2018 THOMAS SLIMAK, PE SR 167 ASSISTANT PROJECT MANAGER Agenda Puget Sound Gateway Program Overview Program
More informationAddendum. Final Environmental Impact Report for North Campus Project. California State University Los Angeles SCH# March 2018.
Addendum Final Environmental Impact Report for North Campus Project to SCH#2016111038 California State University Los Angeles March 2018 Lead Agency The Board of Trustees of the California State University
More informationDistrict 8 New Funding Project Selection
District 8 New Funding Project Selection Jon Huseby District Engineer ATP 8 Presentation October 4, 2017 District 8 mndot.gov FY 2018 2021 Approach to 2017 New Funding 10/4/2017 2 Distribution of 17 New
More informationMitigation Grant Programs Port of Long Beach
Mitigation Grant Programs Port of Long Beach Richard Cameron Director of Environmental Planning Port of Long Beach 925 Harbor Plaza Long Beach, CA 90802 (562) 590-4160 April 29, 2011 1 Table of Contents
More informationLocal Taxes and Highway Tolls: The New Normal
Local Taxes and Highway Tolls: The New Normal Los Angeles County Metropolitan Transportation Authority Public-Private Partnership Program August 16, 2012 Transportation and Infrastructure Summit Michael
More informationLong Range Transportation Plan
Summary of Policy Governor in 2000. The baseline can The purpose of the Long Range also be considered as the scenario in Transportation Plan (LRTP) is to which no new transportation projects provide decision
More informationInvitation letters were ed to 44 members of the PAG on June 23, Reminder invites were ed to PAG members on July 18, 2017.
POINCIANA PARKWAY EXTENSION / I-4 CONNECTOR PROJECT ADVISORY GROUP (PAG) MEETING SUMMARY Date/Time: Wednesday, July 19, 2017, 2:00 p.m. to 3:30 p.m. Location: Poinciana Library, 101 N. Dover Plum Road,
More information2013 Louisiana Transportation Conference
February 20, 2013 Baton Rouge River Center 2013 Louisiana Transportation Conference Partnerships for Progress in Transportation Mega Projects Session (I-12 to Bush) I-12 to Bush Agenda Inclusion into TIMED
More informationTHE CORRADINO GROUP. RE: DRIC EPE/EIS Project; Job N TCG Project No Invoice No. 25 Progress Report.
THE CORRADINO GROUP February 12, 2007 Mr. Mohammed Alghurabi, Project Manager MDOT, Design Division 425 West Ottawa Lansing, MI 48933 RE: DRIC EPE/EIS Project; Job N. 802330 TCG Project No. 3600 - Invoice
More information3. Award and execute contract modifications for up to $1,200,000.
One Gateway Plaza Los Angeles, CA 90012-2952 213 922.2C metro.net REGULAR BOARD MEETING SEPTEMBER 23,2010 SUBJECT: ACTION: 1-605 "HOT SPOTS" FEASIBILITY STUDY AND PROJECT STUDY REPORTS (PSRs) APPROVE RECOMMENDATIONS
More information2018 Regional Project Evaluation Criteria For PSRC s FHWA Funds
2018 Regional Project Evaluation Criteria For PSRC s FHWA Funds INTRODUCTION As described in the adopted 2018 Policy Framework for PSRC s Federal Funds, the policy focus for the 2018 project selection
More informationCITY OF SAN JOSE CHARCOT AVENUE EXTENSION PROJECT COMMUNITY STAKEHOLDER MEETING
CITY OF SAN JOSE CHARCOT AVENUE EXTENSION PROJECT COMMUNITY STAKEHOLDER MEETING Summary of Community Outreach Meeting Wednesday March 22, 2017 The City of San Jose hosted a community stakeholder outreach
More informationSTATE HIGHWAY (SH) 34 FEASIBILITY STUDY PUBLIC MEETING
STATE HIGHWAY (SH) 34 FEASIBILITY STUDY PUBLIC MEETING From FM 2578 in Terrell to SH 243 in Kaufman CSJ: 0173-04-056 June 28, 2018 WHAT IS A FEASIBILITY STUDY WHAT IS A FEASIBILITY STUDY? A feasibility
More informationLorie Tudor, P.E. Deputy Director and Chief Operating Officer. Alma Area Chamber of Commerce
Lorie Tudor, P.E. Deputy Director and Chief Operating Officer Alma Area Chamber of Commerce Tuesday, July 18, 2017 New Name New Identity 1929 Arkansas Highway and Department of Lands 1977 Arkansas State
More informationDistinctly Boerne! Boerne Master Plan ( ) JOINT MEETING OVERVIEW & PRIORITIZATION
Distinctly Boerne! Boerne Master Plan (2018-2028) JOINT MEETING OVERVIEW & PRIORITIZATION Halff Staff Matt Bucchin, AICP, LEED-GA Director of Planning Josh Donaldson, AICP Planner / Landscape Designer
More informationPROJECT DELIVERY MODELS ARKANSAS PLANNING RETREAT ON P3S. J. Douglas Koelemay, Director October 7, 2015
PROJECT DELIVERY MODELS ARKANSAS PLANNING RETREAT ON P3S J. Douglas Koelemay, Director October 7, 2015 VIRGINIA LEADERSHIP IN PUBLIC-PRIVATE PARTNERSHIPS Virginia and California first P3 legislation in
More informationREPORT. To the Honorable Mayor and City Council From the City Manager. May 9, 2016
REPORT To the Honorable Mayor and City Council From the City Manager May 9, 2016 SUBJECT Study Session for Consideration of the Draft Inner Harbor Specific Plan, Draft Inner Harbor Specific Plan Environmental
More informationToll Project Development Policy. Mark Boggs, P.E.
Mark Boggs, P.E. December 7, 2017 Statutory Framework Prior to Strategic Transportation Investments Act (STI) Nine Turnpike projects can be studied and developed Five Turnpike projects were identified
More informationI-69 Corridor Segment Committee 1 and 2 Kick-off Meeting April 15 Nacogdoches, Texas
I-69 Corridor Segment Committee 1 and 2 Kick-off Meeting April 15 Nacogdoches, Texas 10:00 a.m. Welcome/ Introductions Mark Tomlinson Division Dir., Texas Turnpike Authority Div, TxDOT 10:15 a.m. Presentations
More informationSubject: Request for Proposal Route 99 Interchanges at Hammett Road and Kiernan Avenue
DEPARTMENT OF PUBLIC WORKS Matt Machado Director 1010 10 th Street, Suite 3500, Modesto, CA 95354-0847 Phone: 209.525.6550 Date «FirstName» «LastName» «Company» «Address1» «City», «State» «PostalCode»
More informationSUBJECT: RESOLUTION NO. - ZERO EMISSIONS CONTAINER MOVER SYSTEM REQUEST FOR CONCEPTS & SOLUTIONS: COST SHARING AGREEMENT WITH PORT OF LONG BEACH
DATE: MAY 13,2010 FROM: GOODS MOVEMENT DIVISION SUBJECT: RESOLUTION NO. - ZERO EMISSIONS CONTAINER MOVER SYSTEM REQUEST FOR CONCEPTS & SOLUTIONS: COST SHARING SUMMARY: In the fall of 2008, American Maglev,
More informationCoolidge - Florence Regional Transportation Plan
Coolidge - Florence Regional Transportation Plan A Partnership Among the City of Coolidge, Town of Florence, and ADOT FINAL REPORT Kimley-Horn Kimley Kimley-Horn and and Associates, Associates, Inc. Inc.
More informationTable of Contents. Page 2
Sixth Avenue Transportation Demand Management Construction Mitigation Plan August 2014 Table of Contents Table of Contents... 2 1.0 Introduction... 3 Development of Recommendations... 6 2.0 Recommendations...
More information2018 STP & CMAQ Project Selection Process
2018 STP & CMAQ Project Selection Process Available Funding: (In Millions) CMAQ STP Preservation TOTAL 2021 2022 2021 2022 2021 2022 Regional $14.27 (project cap)$7.13 Countywide $2.41 (project cap)$1.2
More informationEastside Transit Corridor Phase 2 Draft EIS/EIR Public Hearings
Eastside Transit Corridor Phase 2 Draft EIS/EIR Public Hearings Agenda Registration/Open House (30 minutes) Draft EIS/EIR Presentation (30 minutes) Public Comment (90 minutes) 1 Purpose of Today s Meeting
More informationPUBLIC-PRIVATE PARTNERSHIP PROGRAM, HIGH DESERT CORRIDOR
29 One Gateway Plaza Los Angeles, CA 90012-2952 213.922.2000 l metro. net PLANNING AND PROGRAMMING COMMITTEE MARCH 20, 2013 SUBJECT: ACTION: PUBLIC-PRIVATE PARTNERSHIP PROGRAM, HIGH DESERT CORRIDOR RECEIVE
More informationOrder of Business. D. Approval of the Statement of Proceedings/Minutes for the meeting of January 24, 2018.
COUNTY OF SAN DIEGO BOARD OF SUPERVISORS REGULAR MEETING MEETING AGENDA WEDNESDAY, FEBRUARY 14, 2018, 9:00 AM BOARD OF SUPERVISORS NORTH CHAMBER 1600 PACIFIC HIGHWAY, SAN DIEGO, CALIFORNIA Order of Business
More information2018 Regional Transportation Improvement Program
2018 Regional Transportation Improvement Program Fiscal Years 2018/19 through 2022/2023 Adopted November 15, 2017 Stanislaus Council of Governments 1111 I Street Suite 308 Modesto, CA 95354 www.stancog.org
More informationCity of San Diego Master Plans for the Montgomery-Gibbs Executive and Brown Field Airports Public Involvement Plan
City of San Diego Master Plans for the Montgomery-Gibbs Executive and Brown Field Airports Public Involvement Plan April 13, 2017 Prepared by: Katz & Associates on behalf of the City of San Diego Airports
More informationRoute 58 PPTA Project Finance Plan Annual Update Hillsville to Stuart Corridor. Submitted By:
Route 58 PPTA Project Finance Plan Annual Update Hillsville to Stuart Corridor Submitted By: Robert P. Williams District Construction Engineer Salem District Virginia Department of Transportation Submitted
More informationPlanning Area Location Meeting Date Attendance. Beach/CBD Miami Beach Regional Library January 29,
Needs Plan Public Involvement Meetings Summary February 23, 2009 Public Involvement Meetings Planning Area Location Meeting Date Attendance Beach/CBD Miami Beach Regional Library January 29, 2009 18 West
More informationEarly Scoping Report Appendix Attachment B-5:
Early Scoping Report Appendix Attachment B-5: Project Steering Committee Meeting, June 12, 2014 Summary and Presentation GA 400 Transit Initiative Project Stakeholder Committee Meeting North Fulton CID
More informationREPORT TO THE 2002 HAWAII STATE LEGISLATURE
REPORT TO THE 2002 HAWAII STATE LEGISLATURE On the Status of Waianae Coast Transportation Studies and Projects (In response to House Resolution 160 House Draft 1-2000) Oahu Metropolitan Planning Organization
More informationInterstate Tolling for Wisconsin: Why and How
Interstate Tolling for Wisconsin: Why and How by Robert W. Poole, Jr. Director of Transportation Policy Reason Foundation http://reason.org/transportation bob.poole@reason.org Interstate reconstruction/modernization
More informationStaff Report. Allocation of Congestion Management and Air Quality Improvement Program Funding
ITEM 7B Staff Report Subject: Contact: Allocation of Congestion Management and Air Quality Improvement Program Funding Eric Cowle, Transportation Program Manager (ecowle@cvag.org) Recommendation: Consider
More informationNORTHERN VIRGINIA TRANSPORTATION AUTHORITY
V NORTHERN VIRGINIA TRANSPORTATION AUTHORITY M E M O R A N D U M FOR: FROM: Members, Northern Virginia Transportation Authority Chairman Martin E. Nohe, Planning and Programming Committee DATE: September
More informationImplementation. Implementation through Programs and Services. Capital Improvements within Cambria County
The transportation system serves Cambria County communities because people make decisions and take action toward the stated goals of the long-range transportation plan. Locally, these people include officials
More informationPublic Meeting #5 Summary
Public Meeting #5 Summary Pulaski County, Arkansas February 4, 2016 TABLE OF CONTENTS 1.0 Introduction... 1 2.0 Public Meeting #5... 1 2.1 Public Meeting Advertising and Outreach... 2 2.2 Public Meeting
More informationCity of Lynwood MODIFIED REQUEST FOR PROPOSALS FOR
City of Lynwood MODIFIED REQUEST FOR PROPOSALS FOR AN URBAN PLANNING FIRM TO PREPARE A SPECIFIC PLAN AMENDMENT TO THE LYNWOOD TRANSIT AREA SPECIFIC PLAN AND REQUIRED CEQA SUPPORTING DOCUMENTS (SUPPLEMENTAL
More informationNAPA COUNTY BOARD OF SUPERVISORS Board Agenda Letter
Agenda Date: 8/20/2013 Agenda Placement: 9D Set Time: 9:30 AM Estimated Report Time: 30 Minutes NAPA COUNTY BOARD OF SUPERVISORS Board Agenda Letter TO: FROM: Board of Supervisors Lederer, Steven - Director
More informationMassachusetts Department of Transportation (MassDOT) Route 3 South Managed Lanes Project DRAFT FOR DISCUSSION PURPOSES ONLY
Massachusetts Department of Transportation (MassDOT) Project High Level P3 Project Suitability Assessment Report September 11, 2013 Contents Proposed Project Description Project Background and Status Commonwealth
More information2018 Project Selection Process
2018 Project Selection Process Workshop Agenda PSRC Funds Federal Requirements Overall Schedule Overview of Process Project Selection Details Project Evaluation Criteria Project Tracking and Delivery Requirements
More informationThe next steps outlined at the end of this section are the key requirements as we can best envision them at this stage.
5 Implementation 5.1 Anticipated Caltrans Review Process... 2 5.1.1 Project Initiation Document and Project Report... 2 5.1.2 Environmental Review Process... 4 5.1.3 Right of Way Acquisition Process...
More informationI-15/Tropicana Interchange Feasibility Study in Clark County, NV. Comments are due October 16, 2015, 5 p.m.
Welcome Nevada Department of Transportation Public Meeting I-15/Tropicana Interchange Feasibility Study in Clark County, NV Ways to Comment Tonight Comment during public meeting Court reporter Comment
More informationUpdate on Transportation Funding and Potential Sources for Additional Revenue. June 19, 2017
Update on Transportation Funding and Potential Sources for Additional Revenue June 19, 2017 Existing Transportation Challenges in GWRC (PDC 16) Severe Reoccurring Congestion along I-95 Corridor I-95 &
More informationINDIAN RIVER COUNTY METROPOLITAN PLANNING ORGANIZATION
2016 PRIORITY PROJECTS REPORT INDIAN RIVER COUNTY METROPOLITAN PLANNING ORGANIZATION This document was produced in cooperation with the Florida Department of Transportation and the Federal Highway Administration
More informationWESTERN SLOPE CIP AND TIM FEE UPDATE
WESTERN SLOPE CIP AND TIM FEE UPDATE 12/6/16 BOARD OF SUPERVISORS STUDY SESSION B O A R D S T U D Y S E S S I O N # 8 2015 14-0245 Revised 22M 1 of 53 AGENDA 1. Background 2. Programmatic EIR 3. General
More informationEconomic Vitality and Quality of Life Unlocking Hampton Roads HRTAC Overview Kevin B. Page Executive Director
HAMPTON ROADS TRANSPORTATION ACCOUNTABILITY COMMISSION Economic Vitality and Quality of Life HRTAC Overview Kevin B. Page Executive Director 8/10/2018 CONGESTION/FUTURE CONNECTIVITY 2040 Population The
More informationRequest for Proposals For General Plan Update
Request for Proposals For General Plan Update Issued: Monday, December 18, 2017 Proposals Due: Tuesday, January 16, 2018, 5:00 pm PREPARED BY: 330 W. 20 th Avenue San Mateo, CA 94403 CONTACT: Planning
More informationCity of Seattle Partnering Agreement. December 2017
City of Seattle Partnering Agreement December 2017 Agenda System Expansion Plan West Seattle and Ballard Link Extensions Partnering Agreement System expansion Sound Transit s system expansion means every
More informationRESOLUTION ADOPTINGPRINCIPLES AND APPROVING A LIST OF CANDIDATE PROJECTS AND FUNDING REQUESTS FOR REGIONAL MEASURE 3
BD050917 RESOLUTION NO. 17-XX RESOLUTION ADOPTINGPRINCIPLES AND APPROVING A LIST OF CANDIDATE PROJECTS AND FUNDING REQUESTS FOR REGIONAL MEASURE 3 WHEREAS, The Transportation Authority annually approves
More informationCHAPTER 6 PUBLIC AND AGENCY OUTREACH
CHAPTER 6 PUBLIC AND AGENCY OUTREACH This chapter documents the Westside Purple Line Extension Project (the Project) Public Participation Plan for the Draft Supplemental Environmental Impact Statement
More information2018 POLICY FRAMEWORK FOR PSRC S FEDERAL FUNDS
2018 POLICY FRAMEWORK FOR PSRC S FEDERAL FUNDS TABLE OF CONTENTS Section 1: Background... 3 A. Policy Framework... 3 B. Development of the 2019-2022 Regional Transportation Improvement Program (TIP)..
More informationAdministrative Leadership Meeting
Administrative Leadership Meeting Randy Woodson Chancellor Tuesday, September 12, 2017 Upcoming ALMs November 14, 2017 Strategic Plan Report Card Titmus January 9, 2018 Strategic Plan Looking Forward Titmus
More informationAPPENDIX 5. Funding Plan
STUDY: FINAL REPORT APPENDIX 5 Funding Plan May 2015 V:\2073\active\2073009060\report\DRAFT Final Report\rpt_MalPCH_DRAFTFinalReport-20150515.docx Pacific Coast Highway Safety Study: Funding Plan City
More informationI-605 CORRIDOR HOT SPOT INTERCHANGES
I-605 CORRIDOR HOT SPOT INTERCHANGES Project Description Several traffic congestion Hot Spots have been identified in the I-605 Corridor through a Needs Assessment and an Initial Corridor Study. These
More informationAssociation of Metropolitan Planning Organizations Fixing America s Surface Transportation (FAST) Act
Association of Metropolitan Planning Organizations Fixing America s Surface Transportation (FAST) Act General Overview Total authorizations (Highway Trust Fund, HTF, Contract Authority plus General Funds
More informationPLANNING AND PROGRAMMING COMMITTEE NOVEMBER 5, 2014 CHAVEZ AND SOTO JOINT DEVELOPMENT
One Gateway Plaza Los Angeles. CA 90012-2952 213-922.2000 Tel metro. net 15 PLANNING AND PROGRAMMING COMMITTEE NOVEMBER 5, 2014 SUBJECT: ACTION: CHAVEZ AND SOTO JOINT DEVELOPMENT AUTHORIZE EXECUTION OF
More informationENVIRONMENTAL JUSTICE IN ACTION
THE NORTHWEST LOUISIANA COUNCIL OF GOVERNMENTS AND PROVIDENCE PRESENT: ENVIRONMENTAL JUSTICE IN ACTION I-49 INNER CITY CONNECTOR (ICC) 2013 Louisiana Transportation Conference WHAT IS ENVIRONMENTAL JUSTICE?
More informationModernization & Expansion Projects Statewide Totals
odernization & xpansion Projects Statewide Totals 37 total construction projects totaling $1.8 billion 6 preliminary engineering projects 253 miles will be completed $10 billion estimated economic impact
More informationI-290 Eisenhower Expressway Phase 1 Study
I-290 Eisenhower Expressway Phase 1 Study West of Mannheim (US 12/20/45) to East of Cicero (IL Route 50) Stakeholder Involvement Plan for Agency and Public Involvement November 2009 Version 2 Section Table
More informationI-69 Angelina and Nacogdoches Counties Committee Charge and Purpose
AGENDA I-69 Angelina and Nacogdoches Counties Committee Tuesday, January 22, 2013 2-5 pm TxDOT Lufkin District 1805 N. Timberland Drive Lufkin, TX 75901 MEETING OBJECTIVE: Review, discuss and understand
More informationAGENDA ITEM H-3 PAGE 57 STAFF REPORT. City Council Meeting Date: 5/8/2018 Staff Report Number: CC
AGENDA ITEM H-3 STAFF REPORT City Council Meeting Date: 5/8/2018 Staff Report Number: 18-104-CC Regular Business: Identify a preferred alternative for the Ravenswood Avenue Railroad Crossing study appropriate
More informationState Project No. XXXXXX City Project No. c401807
June 29, 2017 Request for Qualifications Design and Environmental Services for the SLR Parkway Phase III Project also known as a portion of the MBSST (Rail Trail) Segment 8 (San Lorenzo River Railroad
More informationPublic and Agency Involvement. 8.1 Scoping Meetings and Noticing. Chapter 8
8.1 Scoping Meetings and Noticing Chapter 8 As described in Chapter 1, Section 1.7, Scope and Content of this Environmental Impact Report, the scoping process for this EIR was formally initiated on June
More informationGEORGE MASSEY TUNNEL REPLACEMENT PROJECT
COMBINED MONTHLY AND QUARTERLY PROGRESS REPORT FOR QUARTER ENDING JUNE 30, 2014 GEORGE MASSEY TUNNEL MONTHLY STATUS REPORT JANUARY 2017 FINAL PROJECT STATUS DASHBOARD Scope Status* Reference concept includes
More informationIRVINE UNIFIED SCHOOL DISTRICT RESPONSE TO COMMENTS FOR THE PLANNING AREA 6 NORTH ELEMENTARY SCHOOL
IRVINE UNIFIED SCHOOL DISTRICT RESPONSE TO COMMENTS FOR THE PLANNING AREA 6 NORTH ELEMENTARY SCHOOL Prepared for: IRVINE UNIFIED SCHOOL DISTRICT Facilities Planning & Construction Services Departments
More informationFINAL ACTIONS Planning Commission Meeting of January 22, 2013
FINAL ACTIONS Planning Commission Meeting of January 22, 2013 AGENDA ITEM/ACTION FOLLOW-UP ACTION 1. Call to Order. Meeting was called to order at 6:00 p.m. by Mr. Morris, Chair. PC members present were
More informationGenoa Township Area Road and Bridge Projects
Genoa Township Area Road and Bridge Projects Delaware County Engineer s Office May 18, 2017 Delaware County Engineer s Office 2016 Construction Highlights Biggest construction year in Delaware County Engineer
More information2018 Transportation Alternatives (TA) Program Overview Palm Beach Transportation Planning Agency
The purpose of the s (TPA) Transportation Alternatives (TA) program is to help fund connected infrastructure for non-motorized users. Construction funding is typically provided three years out. Funding
More informationThroughout the Open House, the following informational stations will be available:
PECUE LANE/I-10 INTERCHANGE East Baton Rouge Parish CITY/PARISH PROJECT NO. 09-CS-US-0041 STATE PROJECT NO. 700-17-0221 FEDERAL AID PROJECT NO. IM-1709(507) Open House Public Meeting Thursday, February
More informationTransportation Planning & Investment in Urban North Carolina
Transportation Planning & Investment in Urban North Carolina Using the Voice of Mayors to Advance North Carolina Almost all future NC growth projected to occur in urban areas Projected share of 2010-2035
More informationPlanning Phase (Route Study and Pond Siting Analysis & Report) Determines Preferred Alignment Public Workshop and Board Approval Required Completion:
2 Planning Phase (Route Study and Pond Siting Analysis & Report) Determines Preferred Alignment Public Workshop and Board Approval Required Completion: 270 Days Design/Permitting Phase Engineering Plans
More informationTurnpike Mitigation Program Application
Ohio Department of Transportation - Ohio Turnpike Infrastructure Commission Turnpike Mitigation Program Application The application has been improved to enable project sponsors to save the application
More information2016 Measure B Program Areas
2016 Measure B Program Areas 2016 Measure B Programwide Topics 2 Program Areas 3 2016 Measure B Program Areas Program Category BART Phase II Bicycle/Pedestrian Caltrain Corridor Capacity Improvements Caltrain
More informationAppendix E Federal and State Funding Categories
Appendix E Federal and State Funding Categories This page left blank intentionally. Federal and State Funding Categories Appendix E E 3 Appendix E Federal and State Funding Categories Highway Programs
More informationTower 55 Rail Reliever Study
Tower 55 Rail Reliever Study Technical Advisory Group June 19, 2009 Meeting Agenda Welcome & Introductions Approval of the April 17, 2009 Meeting Minutes Review of Project s s Goals & Objectives Status
More informationContact person: Ernestine Mbroh (405)
OKLAHOMA DEPARTMENT OF TRANSPORTATION Project Management Division 200 N.E. 21 st Street Oklahoma City, OK 73105-3204 Division Phone: (405) 522-7601 Division FAX: (405) 522-7612 DATE: June 29, 2010 TO:
More informationApologies Michael, but lets work off of the attached update version. James Bass came back with a few additional minor tweaks to the language.
REFERENCE ITEM 3.16 RTC Handout March 8, 2018 From: To: Cc: Subject: Date: Attachments: Marc Williams Michael Morris Bill Hale; Kelly Selman; Mo Bur; Brian Barth RE: Recommended RTC Action for LBJ/IH 635
More informationREQUEST FOR PROPOSAL TO PROVIDE AS-NEEDED ENGINEERING SERVICES FOR THE IMPLEMENTATION OF
REQUEST FOR PROPOSAL TO PROVIDE AS-NEEDED ENGINEERING SERVICES FOR THE IMPLEMENTATION OF PURPLE LINE EXTENSION PROJECT BY LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY Project No. 16-34 CITY
More informationSTAFF REPORT. MEETING DATE: August 21, 2008 AGENDA ITEM: 9
STAFF REPORT SUBJECT: Draft Regional Transportation Plan MEETING DATE: August 21, 2008 AGENDA ITEM: 9 STAFF CONTACT: Aubrey Spilde, Michael Powers RECOMMENDATION: Hold public hearing to receive public
More informationSCOTT COUNTY COMMUNITY SERVICES DIVISION
SCOTT COUNTY COMMUNITY SERVICES DIVISION PHYSICAL DEVELOPMENT 600 COUNTRY TRAIL EAST JORDAN, MN 55352-9339 (952) 496-8346 Fax: (952) 496-8365 www.co.scott.mn.us MITCHELL J. RASMUSSEN, P.E. COUNTY ENGINEER
More informationTransportation Improvement Program for Lake, Porter, and LaPorte Counties, Indiana for
Transportation Improvement Program for Lake, Porter, and LaPorte Counties, Indiana for 2012-2015 Part II: TIP Development and Project Selection Processes MPO Planning Process The NIRPC Board of Commissioners
More informationHB2 Quick Guide To view the latest version of the HB2 Policy Guide:
HB2 Quick Guide To view the latest version of the HB2 Policy Guide: http://virginiahb2.com/resources.html What funds are available to projects through HB2? (See Policy Guide Section 1.0 1.1 and Policy
More informationPerformance and Production Review of the Florida Department of Transportation FY 2016/17
Performance and Production Review of the Florida Department of Transportation FY 2016/17 FLORIDA TRANSPORTATION COMMISSION DECEMBER 7, 2017 Introduction How we got here History behind the measures Conclusion
More information