1 SOUTH DENALI IMPLEMENTATION PROGRESS REPORT PROGRESS TO DATE: For over 40 years there has been a shared vision among public land managers in the South Denali region that the south side of Denali should receive greater use and development for visitors. However, the issues related to such development have historically generated extensive public controversy. A thorough public process associated with the South Denali Implementation Plan and EIS ( ) yielded a well vetted and supported visitor center location within Denali State Park on Curry Ridge. This was in direct contrast to earlier planning efforts where locations identified in the Peters Hills area generated a lot of public controversy. The EIS was followed by a Record of Decision supporting the EIS in The first development phase was acquisition of high resolution imagery and LIDAR, to have the best design aids in hand. A Master Interpretive Plan was completed in 2009 followed by design work for the access road including survey, geotechnical and environmental reports. Trails planning, scenic byway planning and corridor studies are ongoing. The state is working closely with the MatSu Borough on revising land use regulations for the Special Use District that encompasses all of Denali State Park. A traffic design was completed through a local engineering firm for the Parks Highway intersection; this study will be amended to include the new proposed access road north of the original location. The Center for Economic Development at the University of Alaska has just begun work on a feasibility study for the proposed visitor center. The state has entered into an agreement with UCI, a subsidiary of the Sea Lion Corporation, in which UCI will donate 130 acres of their 160 acre inholding in the park. The state has completed a Phase I environmental study on the proposed donation parcel. This donation will provide a better access to the South Denali project. Additional road design, geotechnical, and environmental studies will be conducted on this newly acquired property in spring and summer, Pending funding, the state will contract for the design of the South Denali facilities and their subsequent construction in EXPENDITURES: Progress and approximate expenditures include: $100K Master Interpretive Plan development and production $25K consultant coordination $400K geotechnical and wetlands delineation, Dowl HKM $100K engineering and consultant coordination

2 $50K electrical extension study, MEA $15K consultant coordination $60K South Denali special assistant $60K imagery and LIDAR collection, Aerometrics $25K mapping and technical assistance for 130 acre land donation, Sea Lion Corporation $75K Feasibility Study ongoing, UA Center for Economic Development $107K planning team, agency coordination, site planning, environmental, preliminary design, public meetings, and administration personal services and travel. $1,017K APPROXIMATE TOTAL EXPENDITURES TO DATE TIMELINE: Below is a timeline for the South Denali project. This timeline is dependent upon receiving Visitor Center design funding in 2011 and construction funding in 2012.

3 South Denali Visitor Center Design and Construction FY2012 Request: AP/AL: Appropriation Project Type: Construction Category: Natural Resources Location: Matanuska-Susitna Borough (Rural Mat- House District: Rural Mat-Su (HD 15) Su) Impact House District: Rural Mat-Su (HD 15) Contact: Jean Davis Estimated Project Dates: 07/01/ /30/2016 Contact Phone: (907) Brief Summary and Statement of Need: The funding will be used to complete the design of the South Denali Visitors Center. With the completion of the EIS and the Interpretive plan we are ready to move forward with design and construction. The total amount of state funding needed to complete the project is $25.0 million. This project will provide access to public lands, boost the local economy and is estimated to receive approximately 280,000 annual visits. Total remaining state project costs include: $3 million for design of the visitor center and the transportation system $13 million for the construction of the visitor center $3 million for construction of the transportation system $6 million to extend power to the site Funding: FY2012 FY2013 FY2014 FY2015 FY2016 FY2017 Total Gen Fund $22,000,000 $25,000,000 Total: $22,000,000 $0 $0 $0 $0 $25,000,000 State Match Required One-Time Project Phased - new Phased - underway On-Going 0% = Minimum State Match % Required Amendment Mental Health Bill Operating & Maintenance Costs: Amount Staff Project Development: 0 0 Ongoing Operating: 0 0 One-Time Startup: 0 Totals: 0 0 Additional Information / Prior Funding History: Previous Funding: CIP SLA 2008/CH 29 $8,900,000 (GO Bonds) for access road design and construction SLA 2007/CH 30/Sec18 (a) $100,000 SDPR for master interpretive plain Project Description/Justification: Detailed Project Justification: Purpose: Year round visitor center on Curry Ridge in Denali State Park approximately three miles east of the Parks Highway at mile post 135 Facilities will include 15,000 square foot visitor center, transportation center, campground, trails, interpretive displays, and parking FY2012 Governor Amended 2/16/11 3:32:08 PM Page 1

4 South Denali Visitor Center Design and Construction FY2012 Request: Meet Alaskans and visitors demand for additional interpretation, outdoor recreation, and access to public lands Provide opportunities for viewing Mt. McKinley, learning about Alaska, accessing the subalpine ridge and lake 1787 Meet growing demand for a Denali experience within one days drive of Anchorage Enhance opportunities for snow machining, skiing, hiking, camping, school groups, and education Boost local economy Provide the basic infrastructure that will support and encourage responsible private sector development of services and activities for visitors and Alaska residents Enhance four-season tourism opportunities in the region which will increase economic opportunities for businesses in local communities Economic Impact: Economic Impact Study completed in 2008 by the Institute of Social and Economic Research Estimated annual visitation of Alaskans, cruise passengers, independent and business travelers between 250,000 and 350,000 annually Visitor Center construction and related construction activities will provide employment for people, over a period of 2-3 years Ongoing employment created by the Visitor Center and related activities, including additional hotel rooms, would be jobs Over a 2-3 year period, Visitor Center construction related income will range from $6.8 million to $12.4 million Ongoing Visitor Center related employment income, including additional hotel facilities, etc., will range from $7.6 million to $18.6 million per year Tourism expenditures stimulated by the existence of the Visitor Center will range from $17.8 million to $44.8 million per year Funding: Total construction cost is $37 million. State of Alaska funding to date includes $9 million from state general fund for the road design and construction. Other (non-state) funding commitments include $1 million federal Scenic Byways Grant to be used primarily for the transportation system, a $1 million commitment from Princess Tours towards the cost of extending power to the site, and a $1 million UCI ( native village of Hooper Bay) donation of land as an access parcel to the project Additional state general fund needs total $25 million with this FY12 capital request funding $ 3 million for facility design, and FY13 capital requests of $13 million for facility construction, $ 3 million for the transportation system construction, and $ 6 million for the extension of power to the location. Timeline: 2011 finish road design and permitting, start visitor center design 2012 construct road, complete visitor center design and permitting 2013 visitor center construction 2014 finish construction and open visitor center Process: FY2012 Governor Amended 2/16/11 3:32:13 PM Page 2

5 South Denali Visitor Center Design and Construction FY2012 Request: A new visitor destination in this area has been discussed since the 1960s South Denali Implementation Plan and EIS 2006 Denali State Park Management Plan 2006 Winter trail system development 2007 Parks Highway Scenic Corridor Plan 2008 Interpretive Master Plan 2009 Road alignment, geotechnical survey, and preliminary road design completed 2010 Public support has switched from very contentious to almost unanimous support with a handful of folks from Talkeetna still voicing opposition Public Partners: The Final South Denali Implementation Plan and Environmental Impact Statement represents the culmination of more than 13 years of partnership planning between the State of Alaska, the Matanuska-Susitna Borough, and the National Park Service Operations costs will be self sustaining with a combination of gate receipts, Matsu Borough contribution, and the National Park Service operating budget Private Partners: In 2008, UCI, a wholly owned subsidiary of the native village of Hooper Bay purchased a 160 acre tract immediately adjacent to the project site for $1.2m Access across the UCI tract provides the most ideal access to the visitor center site. UCI has proposed donating 130 acres of the site to; o Facilitate the access road o Prohibit unwanted piecemeal development adjacent to the state park. o Preserve view shed for the park and visitor center UCI would retain 30 acres for development of private sector lodging experience within the park. The development would; o Adhere to restrictive covenants preserving the park environment. o Adhere to view shed restrictions making the lodge a discrete experience from the visitor center experience o Provide private sector improvements to complement the public park experience. The Lodge would add o $20-35m of private sector investment to the area and the tax base. o Long term jobs. o Long term investment return for the shareholders of Hooper Bay Why is this Project Needed Now?: This project has been talked about for 40 years. With completion of the EIS and Interpretive Plan it is time to move forward with design and construction. During the current economic times the cost of construction is very reasonable and it expected to increase in the future. The value of this project to the local economy, locals, visitors, and the tourism industry is very important and the project is needed now to meet those demands. FY2012 Governor Amended 2/16/11 3:32:13 PM Page 3

6 South Denali Visitor Center Design and Construction FY2012 Request: Specific Spending Detail: LINE ITEM DOLLAR AMOUNT DESCRIPTION (text) Personal Services $ 400,000 Staff preparation and oversight of design contract. Services $2,600,000 Contract for design. FY2012 Governor Amended 2/16/11 3:32:13 PM Page 4

HATCHER PASS RECREATIONAL AREA ACCESS, TRAILS. AND TRANSIT FACILITIES FAQs

HATCHER PASS RECREATIONAL AREA ACCESS, TRAILS. AND TRANSIT FACILITIES FAQs HATCHER PASS RECREATIONAL AREA ACCESS, TRAILS What is the purpose of this project? AND TRANSIT FACILITIES FAQs Hatcher Pass s potential for development into a high-quality Alpine and Nordic ski and recreation

More information

County of Sonoma Agenda Item Summary Report

County of Sonoma Agenda Item Summary Report County of Sonoma Agenda Item Summary Report Agenda Item Number: (This Section for use by Clerk of the Board Only.) Clerk of the Board 575 Administration Drive Santa Rosa, CA 95403 To: Board of Directors

More information

COMMUNITY LEADERSHIP & COMMUNICATION

COMMUNITY LEADERSHIP & COMMUNICATION COMMUNITY LEADERSHIP & COMMUNICATION We re not a community in the habit of pulling in the same direction. It s a bit of a selffulfilling prophesy we think we can t control the state, the borough, the Park

More information

MIDPENINSULA REGIONAL OPEN SPACE DISTRICT GENERAL COUNSEL

MIDPENINSULA REGIONAL OPEN SPACE DISTRICT GENERAL COUNSEL MIDPENINSULA REGIONAL OPEN SPACE DISTRICT GENERAL COUNSEL THE DISTRICT Open space lands offer a respite from everyday life, a source of clean air and water, and local agriculture as well as an opportunity

More information

Grand Forks Growth Fund, A Jobs Development Authority Staff Report

Grand Forks Growth Fund, A Jobs Development Authority Staff Report Grand Forks Growth Fund, A Jobs Development Authority Staff Report Growth Fund Committee October 17, 2016 JDA October 17, 2016 Agenda Item: Frost Fire Ski Area and Amphitheater Feasibility Study Submitted

More information

Committee Report. Community Development Committee. Business Item No Proposed Action. Summary of Committee Discussion/Questions

Committee Report. Community Development Committee. Business Item No Proposed Action. Summary of Committee Discussion/Questions Committee Report Business Item No. 2014-112 Community Development Committee For the Metropolitan Council meeting of May 28, 2014 Subject: Park Acquisition Opportunity Fund Grant Request for Hyland Bush

More information

The Bluffs concept is all about helping to change these perceptions.

The Bluffs concept is all about helping to change these perceptions. We are planning for the future. Preparing sites to help attract advanced manufacturing companies to come to Northwest Florida. The Bluffs is a concept to help us be more competitive for new jobs. Our per

More information

Annual Plan

Annual Plan 2015-2020 Annual Plan 712 South Highway 6, Oakland, Iowa 51560 Our mission: Golden Hills Resource Conservation and Development is dedicated to conserving the community, cultural and environmental assets

More information

MAT-SU VALLEY SOUTH GATEWAY VISITOR CENTER. Preliminary Feasibility Study June Agnew::Beck Consulting, LLC Wolf Architecture RECON, LLC

MAT-SU VALLEY SOUTH GATEWAY VISITOR CENTER. Preliminary Feasibility Study June Agnew::Beck Consulting, LLC Wolf Architecture RECON, LLC MAT-SU VALLEY SOUTH GATEWAY VISITOR CENTER Preliminary Feasibility Study June 2010 Agnew::Beck Consulting, LLC Wolf Architecture RECON, LLC EXECUTIVE SUMMARY Introduction In 1986, the Matanuska-Susitna

More information

Community Development Committee Meeting date: December 15, 2014 For the Metropolitan Council meeting of January 14, 2015

Community Development Committee Meeting date: December 15, 2014 For the Metropolitan Council meeting of January 14, 2015 Business Item No. 2014-312 Community Development Committee Meeting date: December 15, 2014 For the Metropolitan Council meeting of January 14, 2015 Subject: Park Acquisition Opportunity Fund Grant Request

More information

Subject: Park Acquisition Opportunity Fund Grant Request for Big Marine Park Reserve (17980 Margo Avenue), Washington County

Subject: Park Acquisition Opportunity Fund Grant Request for Big Marine Park Reserve (17980 Margo Avenue), Washington County Committee Report Business Item No. 2014-312 Community Development Committee For the Metropolitan Council meeting of January 14, 2015 Subject: Park Acquisition Opportunity Fund Grant Request for Big Marine

More information

Meadow Lakes Comprehensive Plan

Meadow Lakes Comprehensive Plan Meadow Lakes Comprehensive Plan ADOPTED OCTOBER 2005 Prepared by: The Meadow Lakes Community Council Planning Team In partnership with: The Matanuska-Susitna Borough, Department of Planning and Land Use

More information

TABLE OF CONTENTS EXECUTIVE SUMMARY

TABLE OF CONTENTS EXECUTIVE SUMMARY TABLE OF CONTENTS EXECUTIVE SUMMARY v SECTION 1 BACKGROUND. 1 Coalfields Expressway.. 1 Route 460 Connector... 3 Corridor Q. 4 Project History.. 5 Current Activities.. 7 Project Implementation Schedule.

More information

LODGING TAX FACILITIES GRANT PROGRAM

LODGING TAX FACILITIES GRANT PROGRAM LODGING TAX FACILITIES GRANT PROGRAM I. DESCRIPTION The City of Airway Heights has established a tourism facilities program, funded by a portion of the revenue collected under the state Lodging Tax excise

More information

Asset-Based Economic Development and Building Sustainable Rural Communities

Asset-Based Economic Development and Building Sustainable Rural Communities Asset-Based Economic Development and Building Sustainable Rural Communities Part 2: Natural Resources and Amenities A briefing paper from the ICMA Center for Sustainable Communities Anna Read, ICMA Asset-Based

More information

Professional Planning Services to Complete Recreation Plan Update

Professional Planning Services to Complete Recreation Plan Update Professional Planning Services to Complete Recreation Plan Update Deadline to Submit: August 15, 2013 @ 4:00 PM City of Monroe Attn. Loretta LaPointe Recreation Department 120 East First Street Monroe,

More information

Metropolitan Parks and Open Space Commission

Metropolitan Parks and Open Space Commission Metropolitan Parks and Open Space Commission Meeting date: December 2, 2014 For the Community Development Committee meeting of December 15, 2014 For the Metropolitan Council meeting of January 14, 2015

More information

URBAN DEVELOPMENT CORPORATION INFORMATION MORANDUM DOCUMENT GREEN GROTTO CAVES- LAKE AREA RECREATIONAL ACTIVITIES

URBAN DEVELOPMENT CORPORATION INFORMATION MORANDUM DOCUMENT GREEN GROTTO CAVES- LAKE AREA RECREATIONAL ACTIVITIES URBAN DEVELOPMENT CORPORATION INFORMATION MORANDUM DOCUMENT GREEN GROTTO CAVES- LAKE AREA RECREATIONAL ACTIVITIES November 15, 2015 Urban Development Corporation 12 Ocean Boulevard Kingston 1 TABLE OF

More information

SPECIAL MEETING OF THE METROPOLITAN PARKS AND OPEN SPACE COMMISSION Tuesday, February 9, 2016

SPECIAL MEETING OF THE METROPOLITAN PARKS AND OPEN SPACE COMMISSION Tuesday, February 9, 2016 Minutes of the SPECIAL MEETING OF THE METROPOLITAN PARKS AND OPEN SPACE COMMISSION Tuesday, February 9, 2016 Committee Members Present: Rick Theisen, Bill Weber, Anthony Taylor, Todd Kemery, Sarah Hietpas,

More information

4. IMPLEMENTATION. 4.1 Implementation Matrix

4. IMPLEMENTATION. 4.1 Implementation Matrix 4. IMPLEMENTATION 4.1 Implementation Matrix IMPLEMENTATION MATRIX The Implementation Matrix includes the implementation items, proposed time line, potential participating parties and potential funding

More information

OPEN SPACE, RECREATION, BAY AND WATERSHED PROTECTION BONDS 2004 OPEN SPACE BOND AUTHORIZATION $70,000,000 (Chapter 595 Public Laws 2004) PENDING

OPEN SPACE, RECREATION, BAY AND WATERSHED PROTECTION BONDS 2004 OPEN SPACE BOND AUTHORIZATION $70,000,000 (Chapter 595 Public Laws 2004) PENDING STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS DEPARTMENT OF ENVIRONMENTAL MANAGEMENT Division of Planning & Development 235 Promenade Street PROVIDENCE, RI 02908 Filed with the Secretary of State: Effective

More information

2012 Heritage Action Plan Grant Program Schuylkill River Heritage Towns & Tours

2012 Heritage Action Plan Grant Program Schuylkill River Heritage Towns & Tours PROGRAM OVERVIEW 2012 Heritage Action Plan Grant Program Schuylkill River Heritage Towns & Tours Applications due May 15, 2012 by 4:00 p.m. The Heritage Action Plan (HAP) Grant Program is to assist communities

More information

REPORT TO THE 2002 HAWAII STATE LEGISLATURE

REPORT TO THE 2002 HAWAII STATE LEGISLATURE REPORT TO THE 2002 HAWAII STATE LEGISLATURE On the Status of Waianae Coast Transportation Studies and Projects (In response to House Resolution 160 House Draft 1-2000) Oahu Metropolitan Planning Organization

More information

UNIFIED GOVERNMENT OF ATHENS-CLARKE COUNTY GEORGIA GREENSPACE ACQUISITION PROGRAM POLICY AND PROCEDURES

UNIFIED GOVERNMENT OF ATHENS-CLARKE COUNTY GEORGIA GREENSPACE ACQUISITION PROGRAM POLICY AND PROCEDURES UNIFIED GOVERNMENT OF ATHENS-CARKE COUNTY GEORGIA GREENSPACE ACQUISITION PROGRAM POICY AND PROCEDURES SPONSORING AGENCIES ATHENS-CARKE COUNTY PANNING DEPARTMENT ATHENS-CARKE COUNTY EISURE SERVICES DEPARTMENT

More information

Present Leonard Boord, Chair Justo L. Pozo, Vice Chair Cesar L. Alvarez Dean C. Colson Natasha Lowell Marc D. Sarnoff Kathleen L.

Present Leonard Boord, Chair Justo L. Pozo, Vice Chair Cesar L. Alvarez Dean C. Colson Natasha Lowell Marc D. Sarnoff Kathleen L. FLORIDA INTERNATIONAL UNIVERSITY BOARD OF TRUSTEES FINANCE AND FACILITIES COMMITTEE MINUTES JUNE 1, 2017 1. Call to Order and Chair s Remarks The Florida International University meeting was called to

More information

US 50/SOUTH SHORE COMMUNITY REVITALIZATION PROJECT

US 50/SOUTH SHORE COMMUNITY REVITALIZATION PROJECT US 50/SOUTH SHORE COMMUNITY REVITALIZATION PROJECT ABOUT THE PROJECT Frequently Asked Questions What is the US 50/South Shore Community Revitalization Project? A transportation project along U.S. Highway

More information

KNIGHTSEN TOWN COMMUNITY SERVICES DISTRICT

KNIGHTSEN TOWN COMMUNITY SERVICES DISTRICT IX. KNIGHTSEN TOWN COMMUNITY SERVICES DISTRICT LOCATION, ADMINISTRATION AND OPERATIONS The Knightsen Town Community Services District (KCSD) was created in 2005, and encompasses approximately 5,100 acres.

More information

Guidelines for the Hudson River Valley National Heritage Area 2018 Heritage Development Grant Program

Guidelines for the Hudson River Valley National Heritage Area 2018 Heritage Development Grant Program H U D S O N R I V E R V A L L E Y N A T I O N A L H E R I T A G E A R E A Barnabas McHenry, Co-Chair Kevin Burke, Acting Co-Chair Scott Keller, Acting Executive Director Guidelines for the Hudson River

More information

Lancaster County Smart Growth Transportation Program (Updated March 2017)

Lancaster County Smart Growth Transportation Program (Updated March 2017) Lancaster County Smart Growth Transportation Program (Updated March 2017) Program Description The Smart Growth Transportation (SGT) program was established offered by the Lancaster County Transportation

More information

SOUTHWEST LRT (METRO GREEN LINE EXTENSION)

SOUTHWEST LRT (METRO GREEN LINE EXTENSION) 10 Joint Development This chapter describes potential long-term direct and indirect and short-term (construction) direct and indirect effects that would result from the Southwest Light Rail Transit (LRT)

More information

Chisago County, Minnesota

Chisago County, Minnesota Chisago County, Minnesota 2 november 2015 Chisago County is home to a population of over 53,000 highly skilled workers, seventy-eight percent of whom travel outside of the county each day for employment.

More information

Request for Redevelopment Proposal 102 N. Broadway, City of De Pere

Request for Redevelopment Proposal 102 N. Broadway, City of De Pere Introduction and Summary The City of De Pere (City) is requesting redevelopment proposals for a development opportunity of a City owned parcel on the corner of Broadway and George Street in Downtown De

More information

Funding Application Portal Contents March 2018

Funding Application Portal Contents March 2018 Funding Application Portal Contents March 2018 FY2020 Funding Application Available 4/2/2018 through 7/31/2018 Introduction: The following document outlines the contents of the online Funding Application

More information

Minnesota Department of Natural Resources. Recreation & Conservation Grants. Traci Vibo. Grant Coordinator Division of Parks and Trails

Minnesota Department of Natural Resources. Recreation & Conservation Grants. Traci Vibo. Grant Coordinator Division of Parks and Trails Minnesota Department of Natural Resources Recreation & Conservation Grants Traci Vibo Grant Coordinator Division of Parks and Trails DNR Recreational Grants DNR Provides Funding Assistance to Local Communities

More information

STUDY AND ARCHITECTURAL DESIGN SERVICES

STUDY AND ARCHITECTURAL DESIGN SERVICES REQUEST FOR PROPOSALS For a FEASIBILITY STUDY AND ARCHITECTURAL DESIGN SERVICES For the Smugglers Notch Scenic Highway Corridor s Barnes Camp Visitor Center on VT Route 108 in Stowe, VT EA #: EH02030 Contract

More information

Funding Guidelines and Criteria March 2017

Funding Guidelines and Criteria March 2017 Funding Guidelines and Criteria March 2017 Introduction: The following document outlines the Commission s funding goals/considerations, application requirements, criteria, and eligibility lists. Only facilities

More information

Florida Job Growth Grant Fund Public Infrastructure Grant Proposal

Florida Job Growth Grant Fund Public Infrastructure Grant Proposal Florida Job Growth Grant Fund Public Infrastructure Grant Proposal Proposal Instructions: The Florida Job Growth Grant Fund Proposal (this document) must be completed by the governmental entity applying

More information

CITY OF DANA POINT AGENDA REPORT

CITY OF DANA POINT AGENDA REPORT 10/03/17 Page 1 Item #11 CITY OF DANA POINT AGENDA REPORT Reviewed By: DH X CM X CA DATE: OCTOBER 3, 2017 TO: FROM: CITY MANAGER/CITY COUNCIL MIKE ROSE, DIRECTOR OF GENERAL SERVICES JEFF ROSALER, PARKS

More information

American Farmland Trust Conference October 20-23, 2014 Lexington, KY

American Farmland Trust Conference October 20-23, 2014 Lexington, KY American Farmland Trust Conference October 20-23, 2014 Lexington, KY Sandra Romero Thurston County Commissioner Cynthia Wilson Thurston County Long Range Planning Manager Background Population 262,388

More information

Rural Grants Program (

Rural Grants Program ( Created 2013 Rural Grants Program (http://www.nccommerce.com/rd/rural-grants-programs) Statutory Authority G.S. 143B-472.126 to 472.128 Purpose Seeks to stimulate the creation of new, full-time jobs by

More information

CONTENT 1 INTRODUCTION 2 WHAT

CONTENT 1 INTRODUCTION 2 WHAT CONTENT 1 INTRODUCTION 2 WHAT 3 HOW Types of Special Uses Outfitting and Guiding Commercial and Noncommercial Use Special Use Authorizations Who Handles the Permit Process Your Role in the Process Process

More information

N E W B U I L D I N G S A T A U B U R N R E S E A R C H P A R K

N E W B U I L D I N G S A T A U B U R N R E S E A R C H P A R K N E W B U I L D I N G S A T The Auburn Research Park officially opened with the completion of its first building in September, 2008. Establishment of the park was the result of a partnership between the

More information

July 5, JOINT PUBLIC NOTICE Savannah District/State of Georgia

July 5, JOINT PUBLIC NOTICE Savannah District/State of Georgia DEPARTMENT OF THE ARMY SAVANNAH DISTRICT, CORPS OF ENGINEERS 100 W. OGLETHORPE AVENUE SAVANNAH, GEORGIA 31401-3604 July 5, 2018 Regulatory Branch SAS-2015-00235 JOINT PUBLIC NOTICE Savannah District/State

More information

ATTACHMENT AAAaAAAA. Washington DIRECTOR OF FINANCE $110,335 - $155,915. Plus Excellent Benefits OPEN UNTIL FILLED

ATTACHMENT AAAaAAAA. Washington DIRECTOR OF FINANCE $110,335 - $155,915. Plus Excellent Benefits OPEN UNTIL FILLED ATTACHMENT AAAaAAAA Washington DIRECTOR OF FINANCE $110,335 - $155,915 Plus Excellent Benefits OPEN UNTIL FILLED WHY APPLY? Snohomish County is located in northwest Washington State, twelve miles north

More information

DeKalb County Government Sycamore, Illinois. Economic Development Committee Minutes May 6, 2014

DeKalb County Government Sycamore, Illinois. Economic Development Committee Minutes May 6, 2014 Note: These minutes are not official until approved by the Economic Development Committee at a subsequent meeting. Please refer to the meeting minutes when these minutes are approved to obtain any changes

More information

DEPARTMENT OF THE ARMY SAVANNAH DISTRICT, CORPS OF ENGINEERS 1104 NORTH WESTOVER BOULEVARD, UNIT 9 ALBANY, GEORGIA SEPT 1ER

DEPARTMENT OF THE ARMY SAVANNAH DISTRICT, CORPS OF ENGINEERS 1104 NORTH WESTOVER BOULEVARD, UNIT 9 ALBANY, GEORGIA SEPT 1ER DEPARTMENT OF THE ARMY SAVANNAH DISTRICT, CORPS OF ENGINEERS 1104 NORTH WESTOVER BOULEVARD, UNIT 9 ALBANY, GEORGIA 31707 REPLY TO ATTENTION OF SEPT 1ER 1 1 2815 Regulatory Division SAS-2013-00942 JOINT

More information

USF Board of Trustees Finance & Audit Workgroup October 10, 2005

USF Board of Trustees Finance & Audit Workgroup October 10, 2005 Agenda item: USF Board of Trustees Finance & Audit Workgroup October 10, 2005 Issue: Memorandum of Understanding between University of South Florida Board of Trustees and University of South Florida Research

More information

RECREATION & CULTURE

RECREATION & CULTURE RECREATION & CULTURE OVERVIEW JOHN BALL PARK AND ZOOLOGICAL GARDEN The of Commissioners approved, in concept, the purchase of John Ball Park and Zoo from the City of Grand Rapids in September 1986; a

More information

South Dakota Transportation Alternatives

South Dakota Transportation Alternatives South Dakota Transportation Alternatives Program Summary and Application Guide Updated March 2018 Connecting South Dakota and the Nation 1 Transportation Alternatives (TA) Summary 1. Overview Transportation

More information

FROM: CITY MANAGER DEPARTMENT: COMMUNITY SERVICES

FROM: CITY MANAGER DEPARTMENT: COMMUNITY SERVICES TO: HONORABLE CITY COUNCIL FROM: CITY MANAGER DEPARTMENT: COMMUNITY SERVICES DATE: JULY 12, 2004 CMR: 347:04 SUBJECT: STATUS OF FUNDRAISING EFFORTS FOR THE ACQUISITION OF THE PENINSULA OPEN SPACE TRUST

More information

Milwaukee Railroad Shops Historic District ~ Sioux City, Iowa. Prepared by Larry Obermeyer, Executive Secretary

Milwaukee Railroad Shops Historic District ~ Sioux City, Iowa. Prepared by Larry Obermeyer, Executive Secretary Milwaukee Railroad Shops Historic District ~ Sioux City, Iowa Prepared by Larry Obermeyer, Executive Secretary Siouxland Historical i Railroad Association Presentation theme: How the investment of Transportation

More information

Transportation Alternatives Program Guidance

Transportation Alternatives Program Guidance Transportation Alternatives Program Guidance The Transportation Alternatives Program (TAP): The South Carolina Department of Transportation (SCDOT) partners with the Federal Highway Administration (FHWA)

More information

Public Notice U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT AND TEXAS COMMISSION ON ENVIRONMENTAL QUALITY

Public Notice U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT AND TEXAS COMMISSION ON ENVIRONMENTAL QUALITY Public Notice U.S. Army Corps Permit Application No: SWG-2012-00381 Of Engineers Date Issued: April 27, 2016 Galveston District Comments Due: May 30, 2017 U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT

More information

City of Edina, Minnesota GrandView Phase I Redevelopment, 5146 Eden Avenue Request for Interest for Development Partner

City of Edina, Minnesota GrandView Phase I Redevelopment, 5146 Eden Avenue Request for Interest for Development Partner City of Edina, Minnesota GrandView Phase I Redevelopment, 5146 Eden Avenue Request for Interest for Development Partner The City of Edina has a rich history of innovative developments that have become

More information

State Project No. XXXXXX City Project No. c401807

State Project No. XXXXXX City Project No. c401807 June 29, 2017 Request for Qualifications Design and Environmental Services for the SLR Parkway Phase III Project also known as a portion of the MBSST (Rail Trail) Segment 8 (San Lorenzo River Railroad

More information

City of Terrace Economic Development Strategy

City of Terrace Economic Development Strategy Economic Development Strategy 2016-2018 1 Executive Summary Economic development for Terrace is a vital suite of strategies, projects and programs that will support the quality of life and resiliency of

More information

REQUEST FOR PROPOSALS (RFP)

REQUEST FOR PROPOSALS (RFP) REQUEST FOR PROPOSALS (RFP) TO: All Prospective Providers FROM: Kevin Keller, Planning and Development Director RE: Request for Proposals Town Green and Streetscape Improvements Consulting and Engineering

More information

SAFETEA-LU. Overview. Background

SAFETEA-LU. Overview. Background SAFETEA-LU This document provides information related to the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) that was previously posted on the Center for

More information

Application for Wenatchee Lodging Tax Funds

Application for Wenatchee Lodging Tax Funds Application for Wenatchee Lodging Tax Funds Amount of Lodging Tax Requested: $ Organization/Agency Name: Federal Tax ID Number: Event or Activity Name (if applicable): Contact Name and Title: Mailing Address:

More information

GROUNDWORK FIRST ANNUAL REPORT OF THE FOOTHILLS CONSERVATION ADVISORY COMMITTEE. May, 2002

GROUNDWORK FIRST ANNUAL REPORT OF THE FOOTHILLS CONSERVATION ADVISORY COMMITTEE. May, 2002 GROUNDWORK FIRST ANNUAL REPORT OF THE FOOTHILLS CONSERVATION ADVISORY COMMITTEE Submitted By: Foothills Conservation Advisory Committee Chas. F. McDevitt, Chairman May, 2002 MISSION STATEMENT The Foothills

More information

TRANSPORTATION FUNDING PROGRAMS

TRANSPORTATION FUNDING PROGRAMS APPENDIX A Note: Not yet edited by DCPD. TRANSPORTATION FUNDING PROGRAMS 6 Transportation Funding Programs The following provides a brief description of transportation related funding programs that are

More information

Economic Development ANNUAL REPORT. Innovate. Prosper. Grow.

Economic Development ANNUAL REPORT. Innovate. Prosper. Grow. 2015-2016 Economic Development ANNUAL REPORT Innovate. Prosper. Grow. Our mission is to attract, grow and retain businesses in Hanover County in a manner that contributes to our premier quality of life

More information

2012 Capital Improvement Budget Library Department

2012 Capital Improvement Budget Library Department 2012 Capital Improvement Budget Department Project Title Bonds State Federal Other Total Chugiak-Eagle River Materials - 25-168 193 Girdwood Materials - 25-168 193 Loussac Materials - 25-168 193 Mountain

More information

KITSAP COUNTY LODGING TAX ADVISORY COMMITTEE ALLOCATION PROCESS

KITSAP COUNTY LODGING TAX ADVISORY COMMITTEE ALLOCATION PROCESS KITSAP COUNTY LODGING TAX ADVISORY COMMITTEE ALLOCATION PROCESS APPLICATION Introduction The objective of the Kitsap County Lodging Tax Advisory Committee process is to support projects, which encourage

More information

CITY OF MARYVILLE, MISSOURI REQUEST FOR QUALIFICATIONS (RFQ) ARCHITECTURAL DESIGN SERVICES FOR WELCOME CENTER AT MOZINGO LAKE RECREATION PARK

CITY OF MARYVILLE, MISSOURI REQUEST FOR QUALIFICATIONS (RFQ) ARCHITECTURAL DESIGN SERVICES FOR WELCOME CENTER AT MOZINGO LAKE RECREATION PARK CITY OF MARYVILLE, MISSOURI REQUEST FOR QUALIFICATIONS (RFQ) ARCHITECTURAL DESIGN SERVICES FOR WELCOME CENTER AT MOZINGO LAKE RECREATION PARK www.mozingolake.com Mozingo Lake Recreation Park Request for

More information

STAR ATTRACTIONS DESIGNATION PROGRAM General Guidelines

STAR ATTRACTIONS DESIGNATION PROGRAM General Guidelines STAR ATTRACTIONS DESIGNATION PROGRAM General Guidelines Tourism Secretariat 6 th Floor 213 Notre Dame Avenue, Winnipeg, Manitoba, Canada R3B 1N3 What is the Star Attractions Program? The Star Attractions

More information

City Council Study Session Retail Market Analysis

City Council Study Session Retail Market Analysis November 29, 2011 City Council Study Session Retail Market Analysis November 29, 2011 Economic Development & Redevelopment City of Santa Cruz Background Robert Gibbs Founding New Urbanist Principal of

More information

REQUEST FOR QUALIFICATIONS/PROPOSALS SUBASE NEW LONDON JOINT LAND USE STUDY (JLUS) IMPLEMENTATION PROJECT

REQUEST FOR QUALIFICATIONS/PROPOSALS SUBASE NEW LONDON JOINT LAND USE STUDY (JLUS) IMPLEMENTATION PROJECT SOUTHEASTERN CONNECTICUT COUNCIL OF GOVERNMENTS 5 Connecticut Avenue, Norwich, Connecticut 06360 (860) 889-2324/Fax: (860) 889-1222/E-Mail: office@seccog.org REQUEST FOR QUALIFICATIONS/PROPOSALS SUBASE

More information

Economic Development Strategic Plan Executive Summary Delta County, CO. Prepared By:

Economic Development Strategic Plan Executive Summary Delta County, CO. Prepared By: Economic Development Strategic Plan Executive Summary Delta County, CO Prepared By: 1 Introduction In 2015, Region 10, a 501(c)(3) Economic Development District that services six counties in western Colorado,

More information

4.b. 6/22/2017. Local Agency Formation Commission. George J. Spiliotis, Executive Officer

4.b. 6/22/2017. Local Agency Formation Commission. George J. Spiliotis, Executive Officer 4.b. 6/22/2017 TO: FROM: SUBJECT: Local Agency Formation Commission George J. Spiliotis, Executive Officer LAFCO 2014-09-5 SPHERE OF INFLUENCE AMENDMENT TO THE CITY OF BEAUMONT (ADDITION) AND AMENDMENT

More information

FOREST SERVICE MANUAL NATIONAL HEADQUARTERS (WO) WASHINGTON, DC

FOREST SERVICE MANUAL NATIONAL HEADQUARTERS (WO) WASHINGTON, DC Page 1 of 39 Information on how to comment is available online at http://www.fs.usda.gov/goto/planningrule/directives. FOREST SERVICE MANUAL NATIONAL HEADQUARTERS (WO) WASHINGTON, DC CHAPTER 1920 LAND

More information

Job announcement: Executive Director. $79,000 - $112,000; plus excellent benefit package

Job announcement: Executive Director. $79,000 - $112,000; plus excellent benefit package Job announcement: Executive Director Salary: First application review: $79,000 - $112,000; plus excellent benefit package January 31, 2018; open until filled 1 Do you Want to be a part of an idyllic mountain

More information

DEVELOPMENT AUTHORITY OF CLAYTON COUNTY REQUEST FOR PROPOSALS MASTER PLANNING CONSULTING SERVICES

DEVELOPMENT AUTHORITY OF CLAYTON COUNTY REQUEST FOR PROPOSALS MASTER PLANNING CONSULTING SERVICES DEVELOPMENT AUTHORITY OF CLAYTON COUNTY REQUEST FOR PROPOSALS MASTER PLANNING CONSULTING SERVICES Development Authority of Clayton County Attn: Ricky L. Clark, Jr., Treasurer 124 North Avenue Jonesboro,

More information

Appendix C: Public Participation

Appendix C: Public Participation Appendix C: Public Participation TABLE OF CONTENTS APPENDIX C PUBLIC PARTICIPATION... C-1 C.1 PROJECT WEBSITE... C-1 C.2 GENERAL SUMMARY OF THE SCOPING PERIOD... C-1 C.2.1 TRIBAL NOTIFICATION LETTERS...

More information

Request for Proposals

Request for Proposals Cherokee Nation Businesses Request for Proposals For Master Planning Services 1 Purpose Cherokee Nation Businesses, LLC (the Owner ) is seeking to engage an experienced master planner (the Master Planner

More information

Business Ready Community Grant and Loan Program Allocation Plan

Business Ready Community Grant and Loan Program Allocation Plan Business Ready Community Grant and Loan Program Allocation Plan FY17Q3 Total Annual Funds Available at Beginning of Quarter Base Quarterly Allocation Carry Forward from Previous Quarter Total Available

More information

December 1999 Report No

December 1999 Report No December 1999 Report No. 99-16 Continue Funding, But Substantiate That Program Activities Increase Florida Tourism at a glance The Florida Commission on Tourism met the standards for the outcome measures

More information

Business Events Bid Fund Program - Prospectus. Financial Year 2018/19

Business Events Bid Fund Program - Prospectus. Financial Year 2018/19 Business Events Bid Fund Program - Prospectus Financial Year 2018/19 TRADE AND INVESTMENT PRIORITY AREAS* The Australian Government s trade and investment facilitation strategies are focused around the

More information

Department of Natural Resources Recreation Grant Programs 2017 Workshop.

Department of Natural Resources Recreation Grant Programs 2017 Workshop. Department of Natural Resources Recreation Grant Programs 2017 Workshop Michigan Natural Resources Trust Fund (MNRTF) What s new in MNRTF: Great Lakes Shoreline Access Initiative now gets board priority

More information

Metropolitan Parks and Open Space Commission

Metropolitan Parks and Open Space Commission Business Item No. 2014-XXX Metropolitan Parks and Open Space Commission Meeting date: January 7, 2013 For the Community Development Committee meeting of January 21, 2013 For the Metropolitan Council meeting

More information

City of Lansing Application #2 River Trail West (Near Elm St) - Wall and Pavement Repair

City of Lansing Application #2 River Trail West (Near Elm St) - Wall and Pavement Repair City of Lansing Application #2 River Trail West (Near Elm St) - Wall and Pavement Repair 1 2 Ingham County Parks and Recreation Commission P.O. Box 178 121 E. Maple Street, Suite 102 Mason, MI 48854 Trails

More information

Capital Budget and Program Fiscal Year 2014

Capital Budget and Program Fiscal Year 2014 Capital and Program Fiscal Year 2014 Laura Neuman County Executive Karen Cook John R. Hammond Chief Administrative Officer Officer Anne Arundel County Council Jerry Walker Chairperson Peter Smith John

More information

Regional Parks. Policy Plan Amended June 12, 2013

Regional Parks. Policy Plan Amended June 12, 2013 Regional Parks 2030 Policy Plan Amended June 12, 2013 Metropolitan Council Members Susan Haigh.....Chair Roxanne Smith...District 1 Lona Schreiber...District 2 Jennifer Munt...District 3 Gary Van Eyll...District

More information

REQUEST FOR PROPOSALS (RFP)

REQUEST FOR PROPOSALS (RFP) REQUEST FOR PROPOSALS (RFP) TO: All Prospective Providers FROM: Kevin Keller, Planning and Development Director RE: Request for Proposals Streetscape Improvements Consulting and Engineering Services for

More information

Federal Programs for Heritage and Cultural Tourism

Federal Programs for Heritage and Cultural Tourism Federal Programs for Heritage and Cultural Tourism The following is a general sampling of Federal programs that can help promote and support heritage tourism initiatives. In addition to these and the programs

More information

Frankfort Historic Landmarks Arts Center

Frankfort Historic Landmarks Arts Center Michigan Municipal League Frankfort Historic Landmarks Arts Center Better Communities. Better Michigan. PROJECT DETAILS: NAME: Elizabeth Lane Oliver Center for the Arts DATE: 2005-present CATEGORIES: Cultural

More information

Activity Recreation Cultural Center

Activity Recreation Cultural Center Activity Recreation Cultural Center (ARCC) The Campbell City Schools maximizes educational opportunities for all learners by responding to the needs of the community with leading-edge, high-quality, cost-effective

More information

REQUEST FOR CITY COUNCIL ACTION

REQUEST FOR CITY COUNCIL ACTION REQUEST FOR CITY COUNCIL ACTION MEETING DATE: MARCH 14, 2017 TITLE: SCOPING SESSION FOR A GENERAL PLAN AMENDMENT REQUEST REPRESENTING AN EXCHANGE OF NON RESIDENTIAL BUILDING SQUARE FOOTAGE FOR NEW RESIDENTIAL

More information

Boston Harbor Islands National and State Park

Boston Harbor Islands National and State Park Boston Harbor Islands National and State Park Peddocks Islands Management & Conceptual Development Plan REQUEST FOR EXPRESSIONS OF INTEREST Boston Harbor Now (BHN) works in partnership with public agencies,

More information

AMERICA BIKES SIDE-BY-SIDE COMPARISON OF BICYCLE AND PEDESTRIAN PROGRAMS SAFETEA LU VS. MAP 21

AMERICA BIKES SIDE-BY-SIDE COMPARISON OF BICYCLE AND PEDESTRIAN PROGRAMS SAFETEA LU VS. MAP 21 AMERICA BIKES SIDE-BY-SIDE COMPARISON OF BICYCLE AND PEDESTRIAN PROGRAMS SAFETEA LU VS. MAP 21 SAFETEA LU PROGRAMS 2012 MAP-21 PROGRAMS ANALYSIS 3 Distinct programs with their own funding, and mechanics

More information

Oregon John A. Kitzhaber, M.D., Governor

Oregon John A. Kitzhaber, M.D., Governor Oregon John A. Kitzhaber, M.D., Governor Department of Land Conservation and Development 635 Capitol Street NE, Suite 150 Salem, Oregon 97301-2540 Phone: (503) 373-0050 Fax: (503) 378-5518 www.oregon.gov/lcd

More information

Fiscal Year 2014 TRANSPORTATION ALTERNATIVES PROGRAM (TAP) INSTRUCTIONS AND GUIDELINES

Fiscal Year 2014 TRANSPORTATION ALTERNATIVES PROGRAM (TAP) INSTRUCTIONS AND GUIDELINES Fiscal Year 2014 TRANSPORTATION ALTERNATIVES PROGRAM (TAP) INSTRUCTIONS AND GUIDELINES TABLE OF CONTENTS Pages 1. Instructions for Submitting a Transportation Alternatives Program Application. 1 2. Transportation

More information

Executive Summary. Purpose

Executive Summary. Purpose ES Executive Summary The purpose of the Wake County Consolidated Open Space Plan is to protect and conserve county land and water for current residents and future generations. Open space is defined as

More information

Kendall Corridor Development Miami, Florida

Kendall Corridor Development Miami, Florida Kendall Corridor Development Miami, Florida Kendall Corridor Development Summary At the heart of Miami Dade County s residential expansion zone, this ambitious project is divided into two phases. The North

More information

Etna Riverfront Park and Trail: Design and Engineering RFP

Etna Riverfront Park and Trail: Design and Engineering RFP Etna Riverfront Park and Trail: Design and Engineering RFP Section I - Etna, PA Etna Borough is a resilient community of approximately 3,451 people and a.8 sq. mile footprint. The Borough has taken a pro-active

More information

Arkansas Transportation Alternatives Program (TAP-2015) & Recreational Trails Program (RTP-2015) Application Seminars

Arkansas Transportation Alternatives Program (TAP-2015) & Recreational Trails Program (RTP-2015) Application Seminars Arkansas Transportation Alternatives Program (TAP-2015) & Recreational Trails Program (RTP-2015) Application Seminars January 22, 2015 & February 19, 2015 Program History Guidelines Eligibility Application

More information

Transportation Alternatives (TA) Northeast Minnesota Workshop

Transportation Alternatives (TA) Northeast Minnesota Workshop Transportation Alternatives (TA) Northeast Minnesota Workshop October 4 th, 2016 1 What are TA Projects? Federally funded community based projects o Expand travel choices o Integrate modes o Improve cultural,

More information

KLAMATH COUNTY TOURISM TRADITIONAL GRANT PROGRAM APPLICATION

KLAMATH COUNTY TOURISM TRADITIONAL GRANT PROGRAM APPLICATION KLAMATH COUNTY TOURISM TRADITIONAL GRANT PROGRAM APPLICATION Date Issued: September 26, 2017 Issued By: Klamath County Finance 305 Main Street Klamath Falls, Oregon 97601 (541) 883-4202 Applications Due:

More information

REPORT. To the Honorable Mayor and City Council From the City Manager. May 9, 2016

REPORT. To the Honorable Mayor and City Council From the City Manager. May 9, 2016 REPORT To the Honorable Mayor and City Council From the City Manager May 9, 2016 SUBJECT Study Session for Consideration of the Draft Inner Harbor Specific Plan, Draft Inner Harbor Specific Plan Environmental

More information

The Matanuska-Susitna Borough

The Matanuska-Susitna Borough The Matanuska-Susitna Borough 27 communities encompassing 24,682 square miles (size of WV) Fastest growing population in Alaska, and one of the fastest growing in the nation Focus Areas Healthy Aging Healthy

More information